DAFTAR HARGA SATUAN POKOK KEG (HSPK) PEKERJAAN TANAH Nomor Uraian Kegiatan Koefisien Satuan 24.01 Pekerjaan Persiapan & Tanah 24.01.01 Pekerjaan Persiapan 24.01.01.01 Pembuatan Bouwplank /Titik Titik Upah: 23.02.03.01.02 Mandor 0.0045 O.H 23.02.03.01.01 Kepala Tukang Kayu 0.0100 O.H 23.02.03.01.04 Tukang Kayu 0.1000 O.H 23.02.03.01.05 Pekerja / Buruh Tak Terampil 0.1000 O.H Bahan/Material: 20.01.03.04.02 kayu meranti bekisting 0.0080 m3 20.01.03.04.04 Kayu Meranti (Usuk 4/6) 0.0120 m3 20.01.01.39.02.03 Paku biasa 2" - 5" 0.0500 Kg Nil m2 Upah : Mandor 0.0230 O.H Kepala Tukang Batu 0.0500 O.H Pembantu Tukang 0.3750 O.H Bahan : Bambu Ori diameter 10-12 cm p 300 m 6.0000 Batang Gedeg Guling 5.5000 m2 Kawat Ikat 0.3000 kg Pekerjaan Dewatering Upah : Pekerja Bahan : Oli Pompa Air 0.0000 Ltr Bensin pompa air 0.0000 Ltr Alat : Sewa pompa air 0.0000 Hari 24.01.01.04 Pembersihan Lapangan "Berat" dan Perataan m2 Upah: Pembuatan kistdam/coverdam (tinggi 2,5 m)

Rencana Anggaran Biaya

  • Upload
    sanjaya

  • View
    289

  • Download
    15

Embed Size (px)

DESCRIPTION

Rencana Anggaran BiayaRencana Anggaran BiayaRencana Anggaran BiayaRencana Anggaran BiayaRencana Anggaran BiayaRencana Anggaran BiayaRencana Anggaran BiayavvvRencana Anggaran BiayaRencana Anggaran Biaya

Citation preview

DAFTAR HARGA SATUAN POKOK KEGIATAN (HSPK)

PEKERJAAN TANAH Nomor Uraian Kegiatan Koefisien Satuan

Harga Satuan(Rp.)

24.01 Pekerjaan Persiapan & Tanah24.01.01 Pekerjaan Persiapan 24.01.01.01 Pembuatan Bouwplank /Titik Titik

Upah:23.02.03.01.02 Mandor 0.0045 O.H 119,500.0023.02.03.01.01 Kepala Tukang Kayu 0.0100 O.H 104,400.0023.02.03.01.04 Tukang Kayu 0.1000 O.H 99,400.0023.02.03.01.05 Pekerja / Buruh Tak Terampil 0.1000 O.H 99,400.00

Jumlah:Bahan/Material:

20.01.03.04.02 kayu meranti bekisting 0.0080 m3 3,622,500.0020.01.03.04.04 Kayu Meranti (Usuk 4/6) 0.0120 m3 4,000,000.0020.01.01.39.02.03 Paku biasa 2" - 5" 0.0500 Kg 24,200.00

Jumlah:Nilai HSPK :

Pembuatan kistdam/coverdam (tinggi 2,5 m) m2Upah :Mandor 0.0230 O.H 119,500.00Kepala Tukang Batu 0.0500 O.H 104,400.00Pembantu Tukang 0.3750 O.H 94,400.00

Jumlah:Bahan :Bambu Ori diameter 10-12 cm p 300 m 6.0000 Batang 31,900.00Gedeg Guling 5.5000 m2 44,000.00Kawat Ikat 0.3000 kg 16,500.00

Jumlah :Nilai HSPK :

Pekerjaan DewateringUpah :Pekerja

Bahan :Oli Pompa Air 0.0000 Ltr 23,750.00Bensin pompa air 0.0000 Ltr 7,400.00

Jumlah :Alat :Sewa pompa air 0.0000 Hari 33,250.00

24.01.01.04 Pembersihan Lapangan "Berat" dan Perataan m2

Upah:

SNI 03-2835-2002 pek.persiapan dan pek.tanah bangunan sederhana (6.8)

23.02.03.01.02 Mandor 0.0500 O.H 119,500.0023.02.03.01.05 pembantu tukang 0.1000 O.H 94,400.00

Jumlah:Nilai HSPK :

24.01.01.10 Pembuatan Direksi Kit m2Upah:

23.02.03.01.02 Mandor 0.0500 O.H 119,500.0023.02.03.01.01 Kepala tukang kayu 0.3000 O.H 104,400.0023.02.03.01.04 Tukang kayu 2.0000 O.H 99,400.0023.02.03.01.04 Tukang batu 1.0000 O.H 99,400.0023.02.03.01.05 Pekerja/Buruh Tak Terampil 2.0000 O.H 99,400.00

Jumlah:Bahan:

20.01.03.05.04 Dolken Kayu Gelam 8-10/400cm 1.2500 Batang 7,500.0020.01.03.04.04 Kayu Meranti Kaso 5/7 0.1800 m3 3,622,500.0020.01.01.39.02.02 Paku biasa 2" - 5" 0.8500 kg 24,200.0020.01.01.13.01 Besi Plat strip 1.1000 kg 19,800.0020.01.01.02.02 Semen portland (50kg) 0.7000 zak 58,900.0020.01.01.04.03 Pasir pasang 0.1500 m3 159,500.0020.01.01.04.04 Pasir Beton 0.1000 m3 159,900.0020.01.01.05.04.04 Batu Pecah mesin 2/3 0.1500 m3 184,300.0020.01.01.18.02 Bata merah (kelas 1) 30.0000 buah 650.0020.01.01.07.02.04 Gel. BJLS 30 uk. (80cmx180cm) 0.2500 lembar 52,800.0020.01.01.03.02.01 Kaca Polos tbl 3 mm 0.0800 m2 96,300.0020.01.01.34.03.01 Kunci Tanam 0.1500 buah 62,200.0020.01.01.48.06 Lapis triplek 0.4 cm 0.0600 lembar 64,100.00

Jumlah:Nilai HSPK :

Pembuatan jalan alternatif(jembatan sementara untuk lalu lintas kendaraan

Upah :Mandor 0.0500 O.H 119,500.00 Kepala tukang kayu 0.3000 O.H 104,400.00 Tukang kayu 2.0000 O.H 99,400.00 Tukang batu 1.0000 O.H 99,400.00 Pekerja/Buruh Tak Terampil 2.0000 O.H 99,400.00

Jumlah:Bahan :Dolken Kayu Gelam 8-10/400cm 1.2500 Batang 7,500.00Kayu Meranti Kaso 5/7 0.1800 m3Paku biasa 2" - 5" 0.8500 kg 24,200.00Besi Plat strip 1.1000 kgSemen portland (50kg) 0.7000 zak 58,900.00Pasir pasang 0.1500 m3 159,500.00Pasir Beton 0.1000 m3 159,900.00Batu Pecah mesin 2/3 0.1500 m3 184,300.00Bata merah (kelas 1) 30.0000 buah 650.00

Jumlah :Nilai HSPK :

Pengaturan Lalu Lintas

SNI 03-2835-2002 pek.persiapan dan pek.tanah bangunan sederhana (6.5)

Upah :Pekerja 0.1000 O.H 99,400.00

Jumlah :Nilai HSPK :

24.01.02.07 Penggalian Tanah untuk Konstruksi m3Upah:

23.02.03.01.02 Mandor 0.0250 O.H 119,500.0023.02.03.01.05 pembantu tukang 0.7500 O.H 94,400.00

Jumlah:Nilai HSPK :

24.01.02.13 Pengurugan Tanah Kembali untuk Konstruksi m3Upah:

23.02.03.01.02 Mandor 0.0190 O.H 119,500.0023.02.03.01.05 pembantu tukang 0.1020 O.H 94,400.00

Jumlah:Nilai HSPK :

24.01.02.15 Pengurugan Pasir (PADAT) m3 SNI 2835:2008 (6.11)Upah:

23.02.03.01.02 Mandor 0.0100 O.H 119,500.0023.02.03.01.05 pembantu tukang 0.3000 O.H 94,400.00

Jumlah:Bahan:

20.01.01.04.01 Pasir Urug 1.2000 m3 126,500.00Jumlah:

Nilai HSPK :24.01.02.16 Pengurugan Sirtu (PADAT) m3 SNI 2835:2008 (6.15)

Upah:23.02.03.01.02 Mandor 0.0250 O.H 119,500.0023.02.03.01.05 pembantu tukang 0.2500 O.H 94,400.00

Jumlah:Bahan:

20.01.01.04.06 Tasirtu/ Sirtu 1.2000 m3 137,500.00Jumlah:

Nilai HSPK :

PEKERJAAN PONDASI Nomor Uraian Kegiatan Koefisien Satuan

Harga Satuan(Rp.)

B PEKERJAAN PONDASI24.02.01 Pondasi24.02.01.01

Pengadaan tiang pancang diameter 40 cm(600 m)m3 SNI 2836:2008 (6.3)

Upah:23.02.04.01.01.F Mandor 0.0080 O.H 119,500.0023.02.04.01.02.F Kepala Tukang kayu 0.0800 O.H 104,400.0023.02.04.01.03.F Tukang Kayu 1.0000 O.H 99,400.0023.02.04.01.04.F pembantu tukang 1.0000 O.H 94,400.00

Jumlah:

SNI 2835:2008 (6.1)

SNI 03-2835-2002 pek.tanah bangunansederhana (6.8)

Bahan:20.01.01.43.04.01.F Kayu meranti(papan 3/30) 0.0330 m3 2,495,500.0020.01.01.43.04.03.F Kayu meranti (usuk) 0.0210 m3 4,000,000.0020.01.01.28.04.01.F paku Klem (No.4) 0.3000 Doz 0.00

Jumlah:Nilai HSPK :

24.02.01.19Pemancangan tiang pancang diameter 40 cm (600 m)

m3 SNI 2836:2008 (6.9)

Upah:23.02.03.01.02 Mandor 0.0390 O.H 119,500.0023.02.03.01.01 Kepala Tukang Batu 0.0390 O.H 104,400.0023.02.03.01.04 Tukang Batu 0.3900 O.H 99,400.0023.02.03.01.05 pembantu tukang 0.7800 O.H 94,400.00

Jumlah:Bahan:

20.01.01.05.03.02 Batu Kali Belah 15/20 cm 1.2000 m3 132,000.0020.01.01.04.01 Pasir Urug 0.4320 m3 126,500.00

Jumlah:Nilai HSPK :

24.02.01.26Pemotongan Tiang pancang

m1

Upah:23.02.03.01.02 Mandor 0.1250 O.H 119,500.00

Jumlah:Bahan:

22.01.01.04.06.03 Tiang Pancang 20/20 cm 1.0000 m 135,375.00Jumlah:

Sewa Peralatan:

23.02.03.04.10.04.02 0.2180 Jam 130625

23.02.03.04.10.06.01 0.2180 Jam175750

Jumlah:Nilai HSPK :

Menggali Tanah PondasiUpah :

Bahan :

Membuang Tanah keluar ProyekUpah :

Sewa Crane 30 ton - min. 8 jam (termasuk mob/demob, operator, BBM)

Sewa Hammer tiang pancang - min. 8 jam(termasuk mob/demob, operator, BBM)

Bahan :

Sewa Peralatan :

Urug Kembali Tanah PondasiUpah :

Bahan :

PEKERJAAN BETON Nomor Uraian Kegiatan Koefisien Satuan

Harga Satuan(Rp.)

C STRUKTUR UTAMABerat Jenis Pasir 1600 kg/m3Berat Jenis Kerikil 1900 kg/m3Berat Jenis Beton biasa 2200 kg/m3Berat Jenis Beton bertulang 2500 kg/m3

24.03.01 Beton24.03.01.02 Beton poer dengan K-300 m3 SNI 7394:2008 (6.2)

Tenaga:23.02.03.01.02 Mandor 0.0830 O.H 0.0023.02.03.01.01 Kepala Tukang Batu 0.0280 O.H 104,400.0023.02.03.01.04 Tukang batu 0.2750 O.H 99,400.0023.02.03.01.05 pembantu tukang 1.6500 O.H 94,400.00

Jumlah:Bahan:

20.01.01.02.01 Semen portland (40kg) 6.9000 Zak 52,300.0020.01.01.04.04 Pasir Beton 0.5175 m3 159,500.0020.01.01.05.04.03 Batu Pecah Mesin 1/2 cm 0.5326 m3 286,000.0023.02.02.02.03 Air (biaya air tawar) 215.0000 Liter 0.00

Jumlah:Nilai HSPK :

Beton dinding Abutmen K-250 m3 SNI 7394:2008 (6.2)

Tenaga:Mandor 0.2830 O.H 119,500.00Kepala Tukang Besi 0.3230 O.H 104,400.00Tukang Besi 1.4000 O.H 99,400.00Tukang Batu 0.2750 O.H 99,400.00Tukang Kayu 1.5600 O.H 99,400.00pembantu tukang 5.6500 O.H 94,400.00

Jumlah:Bahan:

E234
Harun: asumsi air pake air dengan vol < 500 m3

Semen portland (40kg) 8.4000 Zak 52,300.00Pasir Beton 0.5400 m3 159,500.00Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.00Besi Beton (polos/ulir) 210.0000 Kg 9,100.00Kawat Beton 3.0000 Kg 23,000.00Kayu meranti bekisting 0.2500 m3 3,622,500.00Paku Usuk 3.0000 Kg 16,500.00kayu kamper balok 3/5 0.1050 Batang 5,635,000.00Plywood tebal 9 mm 0.0000 lembar 98,000.00Minyak Bekisting 1.2000 ltr 6,600.00

Jumlah:Nilai HSPK :

24.03.01.23Beton Long Stopper k-200

m3 SNI DT 91-0008-2007 (6.28)

Tenaga:23.02.03.01.02 Mandor 0.2650 O.H 119,500.0023.06.02.01.01 Kepala Tukang Besi 0.2620 O.H 104,400.0023.02.03.01.04 Tukang Besi 1.0500 O.H 99,400.0023.02.03.01.04 Tukang Batu 0.2750 O.H 99,400.0023.02.03.01.04 Tukang Kayu 1.3000 O.H 99,400.0023.02.03.01.05 pembantu tukang 5.3000 O.H 94,400.00

Jumlah:Bahan:

20.01.01.02.01 Semen portland (40kg) 8.4000 Zak 52,300.0020.01.01.04.04 Pasir Beton 0.5400 m3 159,500.0020.01.01.05.04.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.0020.01.01.09.01.09 Besi Beton (polos/ulir) 188.2513 Kg 9,100.0020.01.01.50.01.02 2.2500 Kg 23,000.0020.01.03.04.06 Kayu meranti bekisting 0.2000 m3 3,622,500.0020.01.01.39.02.05 Paku Usuk 1.5000 Kg 16,500.00

20.01.02.01.04 Minyak Bekisting 0.4000 ltr 6,600.00Jumlah:

Nilai HSPK :

Beton Plat Injak k-150 m3 SNI DT 91-0008-2007 (6.28)

Tenaga:Mandor 0.2650 O.H 119,500.00Kepala Tukang Besi 0.2620 O.H 104,400.00Tukang Besi 1.0500 O.H 99,400.00Tukang Batu 0.2750 O.H 99,400.00Tukang Kayu 1.3000 O.H 99,400.00pembantu tukang 5.3000 O.H 94,400.00

Jumlah:Bahan:Semen portland (40kg) 8.4000 Zak 52,300.00Pasir Beton 0.5400 m3 159,500.00Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.00

Besi Beton (polos/ulir) 167.1933 Kg 9,100.00Kawat Beton 2.2500 Kg 23,000.00Kayu meranti bekisting 0.2000 m3 3,622,500.00Paku Usuk 1.5000 Kg 16,500.00

Minyak Bekisting 0.4000 ltr 6,600.00Jumlah:

Nilai HSPK :24.03.01.25

Beton Girder dengan K-150 m3 SNI DT 91-0008-2007 (6.31)

Tenaga:23.02.03.01.02 Mandor 0.3180 O.H 119,500.0023.06.02.01.01 Kepala Tukang Besi 0.3330 O.H 104,400.0023.02.03.01.04 Tukang Besi 1.4000 O.H 99,400.0023.02.03.01.04 Tukang Batu 0.2750 O.H 99,400.0023.02.03.01.04 Tukang Kayu 1.6500 O.H 99,400.0023.02.03.01.05 pembantu tukang 6.3500 O.H 94,400.00

Jumlah:Bahan:

20.01.01.02.01 Semen portland (40kg) 8.4000 Zak 52,300.0020.01.01.04.04 Pasir Beton 0.5400 m3 159,500.0020.01.01.05.04.03 Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.0020.01.01.09.01.09 Besi Beton (polos/ulir) 173.0226 Kg 9,100.0020.01.01.50.01.02 Kawat Beton 3.0000 Kg 23,000.0020.01.03.04.06 Kayu meranti bekisting 0.3200 m3 3,622,500.0020.01.03.03.05 Kayu Kamper balok 3/5 0.1400 m3 5,635,000.00

20.01.01.48.02 Plywood tebal 9 mm 2.8000 lembar 0.0020.01.01.39.02.05 Paku Usuk 3.2000 Kg 16,500.0020.01.02.01.04 Minyak Bekisting 1.6000 ltr 6,600.00

Jumlah:Nilai HSPK :

Balok diafragma dengan K-100 m3 SNI DT 91-0008-2007 (6.31)

Tenaga:Mandor 0.3180 O.H 119,500.00Kepala Tukang Besi 0.3330 O.H 104,400.00Tukang Besi 1.4000 O.H 99,400.00Tukang Batu 0.2750 O.H 99,400.00Tukang Kayu 1.6500 O.H 99,400.00Pekerja / Buruh Tak Terampil 6.3500 O.H 94,400.00

Jumlah:Bahan:Semen portland (40kg) 8.4000 Zak 52,300.00Pasir Beton 0.5400 m3 159,500.00Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.00Besi Beton (polos/ulir) 241.1994 Kg 9,100.00Kawat Beton 3.0000 Kg 23,000.00

Kayu meranti bekisting 0.3200 m3 3,622,500.00Kayu Kamper balok 3/5 0.1400 m3 5,635,000.00

Plywood tebal 9 mm 2.8000 lembar 0.00Paku Usuk 3.2000 Kg 16,500.00Minyak Bekisting 1.6000 ltr 6,600.00

Jumlah:Nilai HSPK :

Plat Jembatan dengan K-200 m3 SNI DT 91-0008-2007 (6.31)

Tenaga:Mandor 0.3180 O.H 119,500.00Kepala Tukang Besi 0.3330 O.H 104,400.00Tukang Besi 1.4000 O.H 99,400.00Tukang Batu 0.2750 O.H 99,400.00Tukang Kayu 1.6500 O.H 99,400.00Pekerja / Buruh Tak Terampil 6.3500 O.H 94,400.00

Jumlah:Bahan:Semen portland (40kg) 8.4000 Zak 52,300.00Pasir Beton 0.5400 m3 159,500.00Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.00Besi Beton (polos/ulir) 290.2794 Kg 9,100.00Kawat Beton 3.0000 Kg 23,000.00Kayu meranti bekisting 0.3200 m3 3,622,500.00Kayu Kamper balok 3/5 0.1400 m3 5,635,000.00

Plywood tebal 9 mm 2.8000 lembar 0.00Paku Usuk 3.2000 Kg 16,500.00Minyak Bekisting 1.6000 ltr 6,600.00

Jumlah:Nilai HSPK :

Plat Sandaran dengan K-100 m3 SNI DT 91-0008-2007 (6.31)

Tenaga:Mandor 0.3180 O.H 119,500.00Kepala Tukang Besi 0.3330 O.H 104,400.00Tukang Besi 1.4000 O.H 99,400.00Tukang Batu 0.2750 O.H 99,400.00Tukang Kayu 1.6500 O.H 99,400.00Pekerja / Buruh Tak Terampil 6.3500 O.H 94,400.00

Jumlah:Bahan:Semen portland (40kg) 8.4000 Zak 52,300.00Pasir Beton 0.5400 m3 159,500.00Batu Pecah Mesin 1/2 cm 0.8100 m3 286,000.00Besi Beton (polos/ulir) 167.1933 Kg 9,100.00Kawat Beton 3.0000 Kg 23,000.00

Kayu meranti bekisting 0.3200 m3 3,622,500.00Kayu Kamper balok 3/5 0.1400 m3 5,635,000.00

Plywood tebal 9 mm 2.8000 lembar 0.00Paku Usuk 3.2000 Kg 16,500.00Minyak Bekisting 1.6000 ltr 6,600.00

Jumlah:Nilai HSPK :

PEKERJAAN PERKERASAN JALAN E PEKERJAAN PERKERASAN JALAN24.08.01 Jalan24.05.01.01 Biaya menggilas dengan mesin gilas (walles 1 hari= 5 jam) m2

SNI 7395:2008 (6.36)Upah:

23.02.03.01.02 Supir 0.1429 O.H 94,400.0023.02.03.01.01 Pembantu Supir 0.1429 O.H 89,400.0023.02.03.01.05 pembantu tukang 0.1429 O.H 94,400.00

Jumlah:Sewa peralatan :

20.01.01.02.02 Sewa Walles ( min 5 jam) 0.2080 Zak 58,900.00

Jumlah:Nilai HSPK :

24.05.01.06 m2SNI 7395:2008 (6.11) & (6.35)

Upah:23.02.03.01.02 Mandor 0.0350 O.H 119,500.0023.02.03.01.01 Kepala Tukang Batu 0.0350 O.H 104,400.0023.02.03.01.04 Tukang Batu 0.3500 O.H 99,400.0023.02.03.01.05 pembantu tukang 0.7000 O.H 94,400.00

Jumlah:Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1960 Zak 58,900.0020.01.01.02.04 Semen Berwarna Yiyitan 1.3000 Kg 10,500.0020.01.01.04.03 Pasir Pasang 0.0450 m3 159,500.0020.01.01.31.01.02 Tegel Keramik 40x40 (motif/warna gelap) 1.0608 m2 49,800.00

Jumlah:Nilai HSPK :

24.05.01.07 Pemasangan Tegel Keramik 20x25 cm (Dinding) m2SNI 7395:2008 (6.54)

Upah:23.02.03.01.02 Mandor 0.0450 O.H 119,500.0023.02.03.01.01 Kepala Tukang Batu 0.0450 O.H 104,400.0023.02.03.01.04 Tukang Batu 0.4500 O.H 99,400.0023.02.03.01.05 pembantu tukang 0.9000 O.H 94,400.00

Jumlah:Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.1860 Zak 58,900.0020.01.01.02.04 Semen Berwarna Yiyitan 1.9400 Kg 10,500.0020.01.01.04.03 Pasir Pasang 0.0180 m3 159,500.0020.01.01.31.02.01 Tegel Keramik 20 x 25 Cm (dinding) 1.0500 m2 46,200.00

Jumlah:

Pemasangan Tegel Keramik 40x40 cm (Motif/Warna Gelap)

Nilai HSPK :24.05.01.10 m'

SNI 7395:2008 (6.39)Upah:

23.02.03.01.02 Mandor 0.0050 O.H 119,500.0023.02.03.01.01 Kepala Tukang Batu 0.0090 O.H 104,400.0023.02.03.01.04 Tukang Batu 0.0900 O.H 99,400.0023.02.03.01.05 pembantu tukang 0.0900 O.H 94,400.00

Jumlah:Bahan:

20.01.01.02.02 Semen PC (Portland Cement) 50 kg 0.0228 Zak 58,900.0020.01.01.02.04 Semen Berwarna Yiyitan 0.0250 Kg 10,500.0020.01.01.04.03 Pasir Pasang 0.0030 m3 159,500.0020.01.01.31.02.07 Tegel Plint Keramik warna/motif 5.3000 Buah 54,100.00

Jumlah:Nilai HSPK :

PEKERJAAN FINISHING F PEKERJAAN FINISHING24.06.0124.07.02.02 Pemasangan Titik Lampu Gedung Titik

Upah:23.02.03.01.01 Kepala Tukang Listrik 0.0500 O.H 104,400.0023.02.03.01.04 Tukang Listrik 0.5000 O.H 99,400.0023.02.03.01.05 Pekerja Terampil 0.3000 O.H 94,400.00

Jumlah:

Bahan20.03.06.27.16 Isolator 4.0000 Buah 55,000 20.03.06.01.01.08 Kabel NYA 500 Volt 2 x 2,5 mm2 10.0000 m1 18,500 20.05.02.01.02.01 Pipa Pralon 5/8 1.0000 Lonjor 6,270 20.05.01.08.07 T Doos Pvc 1.0000 Buah 2,132 20.03.06.27.50 Fiting Plafon 1.0000 Buah 152,800 20.01.01.20.06 Las Doof bh

Jumlah: Nilai HSPK :

24.07.02.03 Pemasangan Saklar Tunggal TitikUpah:

23.02.03.01.01 Kepala Tukang Listrik 0.0500 O.H 104,400.0023.02.03.01.04 Tukang Listrik 0.2000 O.H 99,400.0023.02.03.01.05 Pekerja Terampil 0.0010 O.H 94,400.00

Jumlah: Bahan

20.03.06.05.02.17 Saklar Tunggal Broco 1.0000 Buah 27,300 Jumlah:

Nilai HSPK :24.07.02.04 Pemasangan Saklar Ganda Titik

Upah:23.02.03.01.01 Kepala Tukang Listrik 0.0500 O.H 104,400.0023.02.03.01.04 Tukang Listrik 0.2000 O.H 99,400.0023.02.03.01.05 Pekerja Terampil 0.0010 O.H 94,400.00

Pemasangan Tegel Plin Dinding Keramik uk. 7,5x20 cm

Jumlah: Bahan

20.03.06.05.02.18 Saklar Ganda Broco 1.0000 Buah 25,000 Jumlah:

Nilai HSPK :Pemasangan Box MCB unitUpah:Kepala Tukang Listrik 0.0500 O.H 104,400.00Tukang Listrik 0.2000 O.H 99,400.00Pekerja Terampil 0.0010 O.H 94,400.00

Jumlah: Bahan Pas. MCB 10 A,1P 1.0000 Buah 40,300 Kabel NYA 500 Volt 2 x 2,5 mm2 5.0000 m1 18,500

Jumlah: Nilai HSPK :

Pemasangan Lampu SL18watt unitUpah:Kepala Tukang Listrik 0.0500 O.H 104,400.00Tukang Listrik 0.2000 O.H 99,400.00Pekerja Terampil 0.0010 O.H 94,400.00

Jumlah: Bahanlampu SL 18watt 1.0000 Buah 32,500

Jumlah: Nilai HSPK :

Pemasangan Lampu SL10watt unitUpah:Kepala Tukang Listrik 0.0500 O.H 104,400.00Tukang Listrik 0.2000 O.H 99,400.00Pekerja Terampil 0.0010 O.H 94,400.00

Jumlah: Bahanlampu SL 10watt 1.0000 Buah 26,300

Jumlah: Nilai HSPK :

DAFTAR HARGA SATUAN POKOK KEGIATAN (HSPK)

Jumlah Harga(Rp.)

537.751,044.009,940.009,940.00

21,461.75

28,980.0048,000.00

1,210.0078,190.0099,651.75

2,748.505,220.00

35,400.0043,368.50

191,400.00242,000.00

4,950.00438,350.00481,718.50

0.160.010.16

SNI 03-2835-2002 pek.persiapan dan pek.tanah bangunan sederhana (6.8)

5,975.009,440.00

15,415.0015,415.00

5,975.0031,320.00

198,800.0099,400.00

198,800.00534,295.00

9,375.00652,050.00

20,570.0021,780.0041,230.0023,925.0015,990.0027,645.0019,500.0013,200.00

7,704.009,330.003,846.00

866,145.001,400,440.00

5,975.0031,320.00

198,800.0099,400.00

198,800.00534,295.00

9,375.000.00

20,570.000.00

41,230.0023,925.0015,990.0027,645.0019,500.00

158,235.00692,530.00

SNI 03-2835-2002 pek.persiapan dan pek.tanah bangunan sederhana (6.5)

9,940.009,940.009,940.00

2,987.5070,800.0073,787.5073,787.50

2,270.509,628.80

11,899.3011,899.30

SNI 2835:2008 (6.11)

1,195.0028,320.0029,515.00

151,800.00151,800.00181,315.00

SNI 2835:2008 (6.15)

2,987.5023,600.0026,587.50

165,000.00165,000.00191,587.50

Jumlah Harga(Rp.)

SNI 2836:2008 (6.3)

956.008,352.00

99,400.0094,400.00

203,108.00

SNI 2835:2008 (6.1)

SNI 03-2835-2002 pek.tanah bangunansederhana (6.8)

82,351.5084,000.00

0.00166,351.50369,459.50

SNI 2836:2008 (6.9)

4,660.504,071.60

38,766.0073,632.00

121,130.10

158,400.0054,648.00

213,048.00334,178.10

14,937.5014,937.50

135,375.00135,375.00

28,476.25

38,313.50

66,789.75217,102.25

Jumlah Harga(Rp.)

0.002,923.20

27,335.00155,760.00186,018.20

360,870.0082,541.25

152,332.630.00

595,743.88781,762.08

dinding beton bertulang

33,818.5033,721.20

139,160.0027,335.00

155,064.00533,360.00922,458.70

439,320.0086,130.00

231,660.001,911,000.00

69,000.00905,625.00

49,500.00591,675.00

0.007,920.00

4,291,830.005,214,288.70

SNI DT 91-0008-2007 (6.28)

31,667.5027,352.80

104,370.0027,335.00

129,220.00500,320.00820,265.30

439,320.0086,130.00

231,660.001,713,086.83

51,750.00724,500.00

24,750.00

2,640.003,273,836.834,094,102.13

SNI DT 91-0008-2007 (6.28)

31,667.5027,352.80

104,370.0027,335.00

129,220.00500,320.00820,265.30

439,320.0086,130.00

231,660.00

1,521,459.0351,750.00

724,500.0024,750.00

2,640.003,082,209.033,902,474.33

SNI DT 91-0008-2007 (6.31)

38,001.0034,765.20

139,160.0027,335.00

164,010.00599,440.00

1,002,711.20

439,320.0086,130.00

231,660.001,574,505.66

69,000.001,159,200.00

788,900.00

0.0052,800.0010,560.00

4,412,075.665,414,786.86

SNI DT 91-0008-2007 (6.31)

38,001.0034,765.20

139,160.0027,335.00

164,010.00599,440.00

1,002,711.20

439,320.0086,130.00

231,660.002,194,914.54

69,000.00

1,159,200.00788,900.00

0.0052,800.0010,560.00

5,032,484.546,035,195.74

SNI DT 91-0008-2007 (6.31)

38,001.0034,765.20

139,160.0027,335.00

164,010.00599,440.00

1,002,711.20

439,320.0086,130.00

231,660.002,641,542.54

69,000.001,159,200.00

788,900.00

0.0052,800.0010,560.00

5,479,112.546,481,823.74

SNI DT 91-0008-2007 (6.31)

38,001.0034,765.20

139,160.0027,335.00

164,010.00599,440.00

1,002,711.20

439,320.0086,130.00

231,660.001,521,459.03

69,000.00

1,159,200.00788,900.00

0.0052,800.0010,560.00

4,359,029.03#REF!

SNI 7395:2008 (6.36)

13,489.7612,775.2613,489.7639,754.78

12,251.20

12,251.2052,005.98

SNI 7395:2008 (6.11) & (6.35)

4,182.503,654.00

34,790.0066,080.00

108,706.50

11,544.4013,650.00

7,177.5052,827.8485,199.74

193,906.24

SNI 7395:2008 (6.54)

5,377.504,698.00

44,730.0084,960.00

139,765.50

10,955.4020,370.00

2,871.0048,510.0082,706.40

222,471.90

SNI 7395:2008 (6.39)

597.50939.60

8,946.008,496.00

18,979.10

1,342.92262.50478.50

286,730.00288,813.92307,793.02

5,220.0049,700.0028,320.0083,240.00

220,000.00185,000.00

6,270.002,132.00

152,800.000.00

566,202.00649,442.00

5,220.0019,880.00

94.4025,194.40

27,300.0027,300.0052,494.40

5,220.0019,880.00

94.40

25,194.40

25,000.0025,000.0050,194.40

5,220.0019,880.00

94.4025,194.40

40,300.000.00

40,300.0065,494.40

5,220.0019,880.00

94.4025,194.40

32,500.0032,500.0057,694.40

5,220.0019,880.00

94.4025,194.40

26,300.0026,300.0051,494.40

karena nggak ada pekerjaan poer, namu setelah diteliti lagi ternyata dibuat sama

kayak dinding beton bertulang

L234
Harun: asumsi air pake air dengan vol < 500 m3

Pekerjaan Pondasi Beton Bertulang (150 kg besi +

Bekisting)

Pekerjaan Pondasi Beton Bertulang (150 kg besi +

Bekisting)

Pekerjaan Pondasi Beton Bertulang (150 kg besi +

Bekisting)

Kegiatan

Pekerjaan

Tahun

NO.NO. MATA

URAIAN PEKERJAAN SAT VOLUMEHARGA SAT. JUMLAH HARGA

PEMBYR (RP) (RP)

I. PEKERJAAN PERSIAPAN

1. 1.1 Pembuatan Bouwplank /Titik Ls 99,651.75 2. 1.2 Pembuatan kistdam/coverdam (tinggi 2,5 m) Ls 481,718.50 3. 1.3 Pekerjaan Dewatering Ls 1,498,366.00 4. 1.4 Pembersihan Lapangan "Berat" dan Perataan M2 567.97 15,415.00 8,755,257.55 5 1.5 Pembuatan Direksi Kit M2 15.00 1,400,440.00 21,006,600.00

Jumlah 29,761,857.55

II PEKERJAAN TANAH

1 2.2.1 Galian Kontruksi Tanah Biasa M3 576.88 73,787.50 42,566,680.57 2. 2.2.2 Galian Konstruksi Batu M3 205.93 241,760.95 49,785,832.43 2 2.2.3 Pengurugan tanah dengan pemadatan M3 376.11 188,915.00 71,053,576.31 3 2.2.4 Pengurugan sirtu M3 448.90 165,000.00 74,068,500.00

237,474,589.32

III. DRAINASE KONSTRUKSI

1. 3.1.1 Pemasangan talang pembuluh pipa PVC 3" type AW Bh 1.00 78,498.00 78,498.00 Jumlah Bab III 78,498.00

IV. PEKERJAAN PONDASI

Pengadaan Tiang Pancang Dia 40 cm (600 Cm) Ls 3800000

Pemancangan Tiang Pancang m' 255 217,102 55,361,010.00

Pengangkutan Tanah Keluar Proyek m3 782.81 39038 30,559,336.78

Jumlah Bab IV 85,920,346.78

V. PEKERJAAN KONSTRUKSI BETON

1 4.1.2 Beton K-175 pada Trotoar M3 7.48 843,814.00 6,311,728.72 4 4.4.1 Beton K-250 untuk Perletakan, Plat Lantai, Plat Injak M3 21.02 913,479.00 19,204,982.50 5 Beton Dinding Abutmen 250 kg/m3 Kg 62.65 913,479.00 57,232,199.79 6 Beton Long Stopper dengan 200 kg/m3 Kg 6.54 874,322.00 5,718,065.88

10 Pemasangan Plat Sandaran 100 kg/m3 Kg 745,975.00 23,058,087.25 11 Balok Girder dengan 250 kg/m3 Ls 30.91 913,479.00 28,235,635.89

Balok diafragma 5.78 13 4.5.2 pekerjaan bekisting balok M2 352,801.00 0.00

Jumlah Bab V 139,760,700.02

VI PASANGAN BATU DAN PLESTERAN

1. 5.1.1 Pasangan Batu 1 Pc : 4 Psr M3 666,797.00 2. 5.2.1 Plesteran 1 Pc : 3 Psr M2 59,417.00 4. 5.3 Acian Pc M2 369,072.00

Jumlah Bab V 0.00

PEKERJAAN JALAN

Lapis Resap Pengikat (prime coat ) m2 512.034 13,323.00 6,821,828.98

AC m2 51.2034 945,509.00 48,413,275.53

55,235,104.51

Jumlah Bab VI

VIII PEKERJAAN FINISHING

RENCANA ANGGARAN BIAYA PEMBANGUNAN JEMBATAN SUMMARECON

VII

Pengecatan marka jalan dengan termo(eb 2mm) m2 512.034 93,217.00 47,730,273.38

Pemasangan Instalasi Listrik 0.00

Pembersihan Lapangan Kerja 512.034 15,415.00 7,893,004.11

Jumlah 55,623,277.49

IX PEKERJAAN LAIN - LAIN

1 7.1.1 Pemasangan rambu lalulintas 90 cm Bh 4.00 606,678.00 2,426,712.00 10 7.7.1 pengecatan tiang PJU M2 145,331.00

Jumlah Bab VII 2,426,712.00

11.04

no Item pekerjaan Harga1 PEKERJAAN PERSIAPAN 29,761,857.55 2 PEKERJAAN TANAH 237,474,589.32 3 DRAINASE KONSTRUKSI 78,498.00 4 PEKERJAAN PONDASI 85,920,346.78 5 PEKERJAAN KONSTRUKSI BETON 139,760,700.02 6 PASANGAN BATU DAN PLESTERAN 0.00 7 PEKERJAAN JALAN 55,235,104.51 8 PEKERJAAN FINISHING 55,623,277.49 9 PEKERJAAN LAIN - LAIN 2,426,712.00

606,281,085.67

DAFTAR HARGA SATUAN UPAH KERJATAHUN ANGGARAN 2014

HARGA SATUANNO. U R A I A N K O D E KETERANGANPER HARI PER JAM

1 Pekerja L.01 99,400.00 14,200.00 2 Pembantu tukang 94,400.00 13,485.71

Kepala Tukang Batu 104,400.00 14,914.29 3 Tukang batu L.02 99,400.00 14,200.00 4 Mandor L.03 119,500.00 17,071.43 5 Kepala Tukang kayu L.04 104,400.00 14,914.29

Tukang kayu 99,400.00 14,200.00 6 Mekanik trampil L.071 150,000.00 21,428.57 7 Mekanik semi trampil L.072 120,000.00 17,142.86 8 Operator trampil L.081 150,000.00 21,428.57 9 Pembantu operator L.083 120,000.00 17,142.86

10 Sopir L.091 94,400.00 13,485.71 11 Pembantu sopir L.099 89,400.00 12,771.43 12 Masinis L.107 150,000.00 21,428.57 13 Tukang aspal L.109 99,400.00 14,200.00 14 Penjaga L.110 75,000.00 10,714.29

15 Tukang Listrik 99,400.00 14,200.00

Catatan : jam kerja efektif per-hari 7 jam

DAFTAR HARGA SATUAN BAHANTAHUN ANGGARAN 2014

[ CERME, DUDUK SAMPEYAN, BENJENG, BALONGPANGGANG, DRIYOREJO, MENGANTI, KEDAMEAN, WRINGINANOM ]

NO. U R A I A N K O D E SATUAN HARGA (Rp.) KETERANGAN

1 Pasir pasang M.01a m3 159,500.00 2 pasir beton M.01c m3 159,900.00 3 Batu kali belah 10/15 ; 15/20 cm M.02a m3 132,000.00 batu kali/batu gunung5 Batu pecah 3/5cm M.03 m3 184,300.00 pecah mesin6 Batu pecah 1/2cm M.04 m3 286,000.00 pecah mesin7 Batu pecah 5/7 cm - m3 250,000.00 pecah mesin8 Batu pecah 2/3 cm - m3 184,300.00 pecah mesin9 Batu pecah 2-4 cm - m3 350,000.00 pecah mesin

10 Batu pecah max.2 cm - m3 350,000.00 pecah mesin11 Batu pecah 1-1.5 cm - m3 370,000.00 pecah mesin12 Batu pecah 1/1 cm - m3 370,000.00 pecah mesin13 Batu pecah 0.5/1 cm - m3 163,900.00 pecah mesin14 Agregat kasar - m3 176,000.00 15 Agregat halus - m3 170,500.00 16 Pasir urug - m3 126,500.00 17 Tanah paras - m3 85,000.00 18 Tanah urug - m3 126,500.00 19 Sirtu - m3 137,500.00 20 Pedel M.08 m3 120,000.00 21 Agregat Klas A M.026 m3 195,800.00 22 Agregat Klas B M.027 m3 198,000.00 23 Agregat Klas C M.027 m3 170,000.00 24 Cement Treated Base (CTB) - m3 445,000.00 25 ATB K-026 ton 1,275,000.00 26 Laston K-040 ton 821,252.00 27 Lataston (HRS) K-035 ton 943,953.00 28 Latasir - ton 1,325,000.00 29 Dolken Kayu gelam 8-10/400cm - kg 7,500.00 30 Aspal/Bitumen M.10 kg 7,700.00 31 Minyak tanah M.11 ltr 8,800.00 32 Semen / PC M.12 zak 58,900.00 33 Kawat baja = kawat ikat ? M.14 kg 18,000.00

Paku biasa 2"-5" kg 24,200.00 34 Paku usuk (untuk bekesting) M.18 kg 16,500.00 35 Kayu meranti / begesting M.19 m3 3,622,500.00 36 Kayu bakar - m3 140,000.00 37 Cat besi - kg 49,500.00 38 Cat Tembok Eksterior - kg 17,500.00 39 Thermoplastic - kg 21,898.00 40 Glassbeed - kg 40,945.00

41 Besi beton polos M.39a kg 9,100.00 42 Besi tulangan ulir M.39b kg 13,000.00 43 Minyak solar - ltr 5,500.00 44 Premium - ltr 7,400.00 45 Minyak pelumas (oli ) - ltr 23,750.00 46 Cat meni besi - kg 36,900.00 47 Minyak cat (Thinner A) - ltr 30,000.00 48 Minyak cat (Thinner B) - ltr 15,000.00 49 Bata merah (Klas I) - bj 650.00 50 Paving stone/uskup (Tb.6cm) - m2 53,400.00 51 Paving stone/uskup (Tb.8cm) - m2 61,400.00 54 Beton Kanstin 10x20x40 - bh 23,000.00 55 Beton Kanstin 15x30x50 - bh 39,000.00 56 Pipa PVC dia. 2" - m' 27,500.00 56 Pipa PVC dia. 3" - m' 29,500.00 57 Cold Plastik - kg 46,028.00 58 Tiang Pancang Prestressed Dia. 40cm m' 512,000.00 59 Baja Struktural profil WF Kg 18,700.00 60 Elastomeric Bearing Pad 50.30.5 cm buah 335,000.00 61 m' 96,188.00 62 Bondek Galvanish tb. 0,75mm m2 97,500.00 63 Kawat bronjong - lbr 338,000.00 64 Air ltr -

kaca polos tebal 3mm 96,300.00 kunci tanam 62,200.00 lapis triplek 64,100.00 Kayu Meranti (papan 3/30 ) 2,495,500.00 Kayu meranti (usuk) 4,000,000.00 Paku Klem (No.4) - Bambu Ori diameter 10-12 cm p 300 m 31,900.00 Gedeg Guling 44,000.00 Kawat Ikat 16,500.00 besi plat strip 19,800.00 Gel. BJLS 30 uk. (80cmx180cm) 52,800.00

- - - -

Pipa Galvanish Ø2"

DAFTAR HARGA SEWA PERALATANTAHUN ANGGARAN 2014

BIAYANO. JENIS ALAT KODE ALAT SEWA/HARI SEWA/JAM KETERANGAN

(Rp.) (Rp.)

1 Asphalt Mixing Plant E01 26,334,000.00 3,762,000.00 2 Asphalt Finisher E02 6,949,250.00 992,750.00 3 Asphalt Sprayer E03 182,875.00 26,125.00 4 Bulldozer E04 2,695,000.00 385,000.00 5 Compressor E05 621,775.00 88,825.00 6 Concrete Mixer E06 432,250.00 61,750.00 7 Crane E07 532,000.00 76,000.00 8 Dump Truck 5 Ton E08 432,250.00 61,750.00 9 Dump Truck 10 Ton E09 432,250.00 61,750.00

10 Excavator E10 864,500.00 123,500.00 11 Flat Bed Truck E11 665,000.00 95,000.00 12 Generator Set E12 3,657,500.00 522,500.00 13 Motor Grader 125-140pk E13 1,828,750.00 261,250.00 14 Track Loader E14 1,575,000.00 225,000.00 15 Wheel Loader E15 3,803,800.00 543,400.00 16 Three Wheel Roller E16 1,015,000.00 145,000.00 17 Tandem Roller E17 1,755,600.00 250,800.00 18 Pneumatic Tandem Roller - 1,463,000.00 209,000.00 19 Tire Roller E18 2,975,000.00 425,000.00 20 Vibrator Roller E19 897,750.00 128,250.00 21 Concrete Vibrator E20 99,750.00 14,250.00 22 Stone Crusher E21 3,815,000.00 545,000.00 23 Water Pump E22 232,750.00 33,250.00 24 Water Tanker E23 470,250.00 67,178.57 25 Trailler 1,568,000.00 224,000.00 25 Pile Driver 1,932,000.00 276,000.00 25 Cutter Macgine 840,000.00 120,000.00 25 Welding Machine 99,750.00 14,250.00 25 Pedestrian Roller E24 504,000.00 72,000.00 25 Tamper E25 385,000.00 55,000.00 25 Jack Hammer E26 269,500.00 38,500.00 25 Mobil Pick Up - 302,050.00 43,150.00 25 Mesin cat marka - 133,000.00 19,000.00 25 Bor strous - 66,500.00 9,500.00

26 Sewa Theodolit - 329,175.00 47,025.00

PEKERJAAN :LOKASI :VOLUME :SUMBER DANA :

PERHITUNGAN VOLUME

NO. URAIAN PEKERJAAN

DIVISI 1 UMUMPengukuran

1.1 Pembuatan Bouwplank /Titik

1.2 Pembuatan kistdam/coverdam (tinggi 2,5 m)

1.4 Pembersihan Lapangan "Berat" dan Perataan

1.5 Pembuatan Direksi Kit

1.6 #NAME?

1.7 #NAME?

DIVISI 2 PEKERJAAN TANAH

DIVISI 3 PEKERJAAN TANAH3.1 Galian tanah biasa

Galian Tanah utk Pas. Batu Kali Penahan JalanGalian Tanah utk Abutment

Galian Tanah utk Pas. Batu Kali Plengsengan sungai

3.2 (2) Urugan sirtu padat

Urugan Sirtu utk Oprit sisi SelatanUrugan Sirtu utk Oprit sisi Utara

3.2 (3) Urugan PasirPek. Urugan Pasir Bawah Poer Abutment tb. 20cm

Pek. Urugan Pasir Bawah Pas. Batu Kali Penahan Jalan tb. 10cmPek. Urugan Pasir Bawah Pas. Batu Kali Plengsengan Sungai tb. 10cm

Pek. Urugan Pasir Bawah Paving tb. 5cm

Urugan tanah kembali dan pemadatanUrugan tanah kembali poer abutment

3.1.(9) Pembuangan Material Bekas Bongkaran dan Galian

Pembongkaran Pas. Batu Kali (Abutment Jemb. Eksisting)Pembongkaran Beton Bertulang (Balok & Plat Jemb. Eksisting)

DIVISI 4 PELEBARAN PERKERASAN DAN BAHU JALAN

DIVISI 5 PERKERASAN BERBUTIR DAN BETON SEMEN

DIVISI 6 PERKERASAN BERASPAL6.1.(1) Lapis resap pengikat

6.3(5a) Laston Lapis Aus (AC-WC) = 5cm

DIVISI 7 STRUKTUR7.1.5 Beton K350 (Ready Mix)

Pekerjaan Pille Head TreatmentPekerjaan Pilecap (Poer) Abutment

Pekerjaan Dinding AbutmentPekerjaan Longitudinal Stopper

Pekerjaan Lateral StopperPekerjaan WingwallPekerjaan Plat Injak

Pekerjaan Plat Lantai Kendaraan

7.1.7 Beton K225 (Ready Mix)Pek. Kolom Pembatas Ø 15cm

Pek. Tiang Sandaran 15/40

Galian tanah biasa dikurangi vol. urugan tanah kembali poer abutment

Pek. Sloof 15/20 (Bang. Atas)Pek. Strauss Pile Plengsengan Sungai

Pek. Poer PlengsenganPek. Kolom Plengsengan

Pek. Sloof 15/20 Plengsengan (Atas & Bawah)

7.1.9 Beton K175 (Ready Mix)Pek. Lantai Kerja Pile cap

7.3.(1) Besi beton BJTP U24

Pekerjaan PHT : Sengkang Spiral Pile Head Treatment (PHT2)Pekerjaan Sloof 15/20 (Bang. Atas) : Tulangan Utama (SL2)

Angkur Kolom (KL3)Pekerjaan Sloof Plengsengan : Tul. Utama Sloof 15/20 (SLP2)

Pekerjaan Tiang Sandaran : Sengkang (TS2)Pek. Sloof 15/20 (Bang. Atas) : Angkur (SL1)

Pek. Sloof 15/20 (Bang. Atas) : Sengkang (SL3)Pek. Strauss Pile Plengsengan : Sengkang (STS2)

Pek. Kolom Plengsengan : Sengkang (KL2)Pek. Sloof 15/20 (Plengsengan) : Angkur (SLP1)

Pek. Sloof 15/20 (Plengsengan) : Sengkang (SLP2)

7.3.(4) Besi beton BJTD U39

Pembesian D13Pek. Strauss Pile Plengsengan : Tul. Utama (STS1)

Pek. Poer Plengsengan (Semua)Pek. Kolom Plengsengan : Tul. Utama (KL1)

Pek. Dinding Abutment : Tul. Bagi Backwall (D7)Pek. Longitudinal Stopper : Tul. Bagi (LS2)

(LS3)Pek. Lateral Stopper : (LT2)

Pek. Plat Injak : Tul. Bagi (PI4)Pek. Plat Lantai Kendaraan : Melintang (PL1)

Melintang (PL2)Memanjang (PL3)Memanjang (PL4)

Pembesian Ø10

Pembesian Ø8Pek. Kolom Pembatas Ø15 : Sengkang (KP2)

Pek. Kolom Pembatas Ø15 : Tul. Utama (KP1)

Pekerjaan Tiang Sandaran : Tul. Utama (TS1)

Pembesian D16Pek. Pilecap Abutment : Tul. Melintang Atas (PC2)

Tul. Memanjang Atas (PC4)Tul. Samping Memanjang (PC5)

Tul. Samping Melintang (PC6)PC7

Pek. Dinding Abutment : (D3)(D4)(D6)

Pek. Longitudinal Stopper : Tul. Utama (LS1)Pek. Lateral Stopper : (LT1)

Pek. Wingwall : (WW1)Dalam (WW2)

Luar (WW3)Luar (WW4)

Dalam (WW5)

Pek. Plat Injak : Angkur (PI1)Tul. Atas (PI2)

Tul. Bawah (PI3)

Pembesian D19Pekerjaan PHT : Tul. Utama (PHT1)

Pek. Dinding Abutment : (D5)

Pembesian D22Pek. Pilecap Abutment : Tul. Melintang Bawah (PC1)

Tul. Memanjang Bawah (PC3)Pek. Dinding Abutment : (D1)

(D2)

7.4.(1).b Pengadaan dan Pemasangan Baja Profil BJ37

Gelagar Memanjang WF 600.200.11.17Gelagar Melintang WF 250.125.6.9

Siku L 80.80.6Stiffner Plate tb. 8mm

Pengecatan Baja dengan MeniWF 600.200.11.17

WF 250.125.6.9Siku L 80.80.8

7.4 Mour - Baut HTB M14

Panel Bondex tb. 0,75mm

Shear Connector (Stud Ø16 tinggi 15cm)

7.6.(12).b Pengadaan Tiang Pancang Prestressed Ø40 cm - Klas B

7.6.(18).b Pemancangan Tiang Pancang Prestressed Ø40 cm - Klas B

Pemecahan Kepala Tiang Pancang

Bor Tanah Ø30 cm

7.9.(1) Pasangan Batu Kali 1PC:4PSPenahan Jalan

Plengsengan Sungai

Plesteran 1PC:4PSPenahan Jalan

Plengsengan Sungai

Pekerjaan AcianAcian Tiang Sandaran

Acian Kolom Pembatas

7.11.(6) Pekerjaan Ekspansion Joint

7.12.(3) Pemasangan Bearing Pad 50.30.5 cm

7.13.(1) Pemasangan Railling Pipa Galvanish Ø3"

7.15.(1) Pembongkaran Pas. Batu Kali (Abutment Jemb. Eksisting)Pembongkaran Abutment

Pembongkaran Parapet Sisi UtaraPembongkaran Parapet Sisi Selatan

7.15.(2) Pembongkaran Beton Bertulang (Balok & Plat Jemb. Eksisting)Plat Lantai Jemb. Eksisting

Balok MemanjangBalok Melintang

7.16.(3).a Pelaluan Air Pipa PVC Type AW Ø 3"Pelaluan Air pada Lantai Jembatan

Pelaluan Air pada Penahan JalanPelaluan Air pada Plengsengan Sungai

Pekerjaan Pengecatan Dinding

Bongkar Pasang Paving StoneOprit sisi Utara

Oprit sisi Selatan

Bongkar Pasang Kanstin uk.15x30x50cm Oprit sisi Utara

Oprit sisi Selatan

Bongkar Pasang Paving Topi Uskup tb.8cm K.400Oprit sisi Utara

Oprit sisi Selatan

Pas. Paving stone tb.8cm K.400Oprit sisi Utara

Oprit sisi Selatan

5M X 12MAPBD TAHUN ANGGARAN 2015

PERHITUNGAN VOLUME

URAIAN PEKERJAAN SATUANPANJANG LEBAR

(m) (m)

UMUMPengukuran

Pembuatan Bouwplank /Titik

Pembuatan kistdam/coverdam (tinggi 2,5 m) M 12.000 8.000

Pembersihan Lapangan "Berat" dan Perataan M

Pembuatan Direksi Kit

#NAME?

#NAME?

PEKERJAAN TANAH

PEKERJAAN TANAHGalian tanah biasa

Galian Tanah utk Pas. Batu Kali Penahan JalanGalian Tanah utk Abutment

Galian Tanah utk Pas. Batu Kali Plengsengan sungai

Urugan sirtu padat

Urugan Sirtu utk Oprit sisi SelatanUrugan Sirtu utk Oprit sisi Utara

Urugan PasirPek. Urugan Pasir Bawah Poer Abutment tb. 20cm

Pek. Urugan Pasir Bawah Pas. Batu Kali Penahan Jalan tb. 10cmPek. Urugan Pasir Bawah Pas. Batu Kali Plengsengan Sungai tb. 10cm

Pek. Urugan Pasir Bawah Paving tb. 5cm

Urugan tanah kembali dan pemadatanUrugan tanah kembali poer abutment

Pembuangan Material Bekas Bongkaran dan Galian

Pembongkaran Pas. Batu Kali (Abutment Jemb. Eksisting)Pembongkaran Beton Bertulang (Balok & Plat Jemb. Eksisting)

PELEBARAN PERKERASAN DAN BAHU JALAN

PERKERASAN BERBUTIR DAN BETON SEMEN

PERKERASAN BERASPALLapis resap pengikat

Laston Lapis Aus (AC-WC) = 5cm

STRUKTURBeton K350 (Ready Mix)

Pekerjaan Pille Head TreatmentPekerjaan Pilecap (Poer) Abutment

Pekerjaan Dinding AbutmentPekerjaan Longitudinal Stopper

Pekerjaan Lateral StopperPekerjaan WingwallPekerjaan Plat Injak

Pekerjaan Plat Lantai Kendaraan

Beton K225 (Ready Mix)Pek. Kolom Pembatas Ø 15cm

Pek. Tiang Sandaran 15/40

Galian tanah biasa dikurangi vol. urugan tanah kembali poer abutment

Pek. Sloof 15/20 (Bang. Atas)Pek. Strauss Pile Plengsengan Sungai

Pek. Poer PlengsenganPek. Kolom Plengsengan

Pek. Sloof 15/20 Plengsengan (Atas & Bawah)

Beton K175 (Ready Mix)Pek. Lantai Kerja Pile cap

Besi beton BJTP U24

Pekerjaan PHT : Sengkang Spiral Pile Head Treatment (PHT2)Pekerjaan Sloof 15/20 (Bang. Atas) : Tulangan Utama (SL2)

Angkur Kolom (KL3)Pekerjaan Sloof Plengsengan : Tul. Utama Sloof 15/20 (SLP2)

Pekerjaan Tiang Sandaran : Sengkang (TS2)Pek. Sloof 15/20 (Bang. Atas) : Angkur (SL1)

Pek. Sloof 15/20 (Bang. Atas) : Sengkang (SL3)Pek. Strauss Pile Plengsengan : Sengkang (STS2)

Pek. Kolom Plengsengan : Sengkang (KL2)Pek. Sloof 15/20 (Plengsengan) : Angkur (SLP1)

Pek. Sloof 15/20 (Plengsengan) : Sengkang (SLP2)

Besi beton BJTD U39

Pembesian D13Pek. Strauss Pile Plengsengan : Tul. Utama (STS1)

Pek. Poer Plengsengan (Semua)Pek. Kolom Plengsengan : Tul. Utama (KL1)

Pek. Dinding Abutment : Tul. Bagi Backwall (D7)Pek. Longitudinal Stopper : Tul. Bagi (LS2)

(LS3)Pek. Lateral Stopper : (LT2)

Pek. Plat Injak : Tul. Bagi (PI4)Pek. Plat Lantai Kendaraan : Melintang (PL1)

Melintang (PL2)Memanjang (PL3)Memanjang (PL4)

Pembesian Ø10

Pembesian Ø8Pek. Kolom Pembatas Ø15 : Sengkang (KP2)

Pek. Kolom Pembatas Ø15 : Tul. Utama (KP1)

Pekerjaan Tiang Sandaran : Tul. Utama (TS1)

Pembesian D16Pek. Pilecap Abutment : Tul. Melintang Atas (PC2)

Tul. Memanjang Atas (PC4)Tul. Samping Memanjang (PC5)

Tul. Samping Melintang (PC6)PC7

Pek. Dinding Abutment : (D3)(D4)(D6)

Pek. Longitudinal Stopper : Tul. Utama (LS1)Pek. Lateral Stopper : (LT1)

Pek. Wingwall : (WW1)Dalam (WW2)

Luar (WW3)Luar (WW4)

Dalam (WW5)

Pek. Plat Injak : Angkur (PI1)Tul. Atas (PI2)

Tul. Bawah (PI3)

Pembesian D19Pekerjaan PHT : Tul. Utama (PHT1)

Pek. Dinding Abutment : (D5)

Pembesian D22Pek. Pilecap Abutment : Tul. Melintang Bawah (PC1)

Tul. Memanjang Bawah (PC3)Pek. Dinding Abutment : (D1)

(D2)

Pengadaan dan Pemasangan Baja Profil BJ37

Gelagar Memanjang WF 600.200.11.17Gelagar Melintang WF 250.125.6.9

Siku L 80.80.6Stiffner Plate tb. 8mm

Pengecatan Baja dengan MeniWF 600.200.11.17

WF 250.125.6.9Siku L 80.80.8

Mour - Baut HTB M14

Panel Bondex tb. 0,75mm

Shear Connector (Stud Ø16 tinggi 15cm)

Pengadaan Tiang Pancang Prestressed Ø40 cm - Klas B

Pemancangan Tiang Pancang Prestressed Ø40 cm - Klas B

Pemecahan Kepala Tiang Pancang

Bor Tanah Ø30 cm

Pasangan Batu Kali 1PC:4PSPenahan Jalan

Plengsengan Sungai

Plesteran 1PC:4PSPenahan Jalan

Plengsengan Sungai

Pekerjaan AcianAcian Tiang Sandaran

Acian Kolom Pembatas

Pekerjaan Ekspansion Joint

Pemasangan Bearing Pad 50.30.5 cm

Pemasangan Railling Pipa Galvanish Ø3"

Pembongkaran Pas. Batu Kali (Abutment Jemb. Eksisting)Pembongkaran Abutment

Pembongkaran Parapet Sisi UtaraPembongkaran Parapet Sisi Selatan

Pembongkaran Beton Bertulang (Balok & Plat Jemb. Eksisting)Plat Lantai Jemb. Eksisting

Balok MemanjangBalok Melintang

Pelaluan Air Pipa PVC Type AW Ø 3"Pelaluan Air pada Lantai Jembatan

Pelaluan Air pada Penahan JalanPelaluan Air pada Plengsengan Sungai

Pekerjaan Pengecatan Dinding

Bongkar Pasang Paving StoneOprit sisi Utara

Oprit sisi Selatan

Bongkar Pasang Kanstin uk.15x30x50cm Oprit sisi Utara

Oprit sisi Selatan

Bongkar Pasang Paving Topi Uskup tb.8cm K.400Oprit sisi Utara

Oprit sisi Selatan

Pas. Paving stone tb.8cm K.400Oprit sisi Utara

Oprit sisi Selatan

5M X 12MAPBD TAHUN ANGGARAN 2015

PERHITUNGAN VOLUME

TINGGI LUASANVOLUME

(m)

96.000

(m2)