  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Grenoble, France

    Architecture office: Chaix & Morel Associs, Paris

    Dimensions: 144m x 191m

    Specifications: 20 000 sitting capacity,

    13,000 square meters of offices,

    65,000 square meters of extracted ground

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Structural modeling achieved in a 3-month period

    Fast and easy DSTV files creation

    "Advance Steel was very useful thanks to

    the collision detection tool that enabled us

    to check nothing came between the

    various roof structure elements

    Mr Berger,

    ETI Project Manager

    Create joints between curved welded and

    tapered beams.

    Get workshop drawings and NC-DSTV files

    from these elements.

    Precise and fast 3D modeling of the utter

    structure.

    Easy creation of DSTV files.

    USERS BENEFITS

    GRENOBLE STADIUMGRENOBLE STADIUMGRENOBLE STADIUMGRENOBLE STADIUM

    ETI Design Office

    Grenoble, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Garmisch-Partenkirchen, Germany

    Contracting authority: Markt Garmisch

    Partenkirchen

    Dimensions: total height of 149 meters

    Specifications: 655 tons total weight

    35 meters height

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Increased productivity by the modeling of curved beams and creation of workshop drawings

    Libraries provided a wide range of profiles

    "Advance Steel has increased our

    productivity and therefore our efficiency.

    The software was excellent when

    designing the jump platform, especially

    regarding all the constructive challenges.

    Mr. Huber,

    Factory Manager of Bitschnau GmbH

    The structure is made of curved and folded

    beams

    Production of workshop drawings

    90% of fundamental beams are welded

    beams

    Increase in productivity

    Profile libraries

    Intelligent connections function

    USERS BENEFITS

    SKI JUMPSKI JUMPSKI JUMPSKI JUMP

    Bitschnau GmbH

    Nenzing, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Baku, Azerbaijan

    Contracting authority: Government of Azerbaijan

    Weight: 500 tons of steel

    Specifications: steel construction with 3D rolled

    pipes

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling saved a lot of time

    Advance Steel prepares double offsets

    "The fact that Advance Steel processes all

    information from the 3D model

    automatically leads to the easy creation of

    the documents and enables the conformity

    of all drawings and documents.

    Mr. Dohr,

    Construction Engineer

    The construction mainly consists of 3D

    rolled pipes

    Each single pipe has elliptical-shaped radii

    on two levels

    Entire information processing from the

    3D model

    Easy creation of documents

    Conformity of all drawings and

    documents

    USERS BENEFITS

    MMMMUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSE

    NCA Container und Anlagenbau GmbH

    St Paul, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Klagenfurt, Austria

    Contracting authority: Capital Klagenfurt

    Dimensions: total area of 32,000 m2, roof

    area of 32,000 m2,, 8,000 m2 playing field,

    height of 32.5 m

    Specifications: 32,000 seats capacity

    (12,000 seats after deconstruction in 2009)

    Approximately 4.000 tons of steel

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Reduction of errors by automatic drawing creation and collisions control

    3D-modeling saved a lot of time

    "With the automatic production of the

    drawings and collision control which is

    carried out regularly, we were able to

    significantly reduce errors. These features

    also saved us a lot of time.

    Mr. Schrammel,

    Department Manager for Steel

    Tight deadlines to get the stadium ready

    for UEFA Euro 2008

    Realisation of the structural requirements

    Realisation of the rebuild planning

    Differently arranged purlins

    3D modeling

    Simple and rapid creation of the model

    Reduced error rate

    USERS BENEFITS

    WRTHERSEE STADIUMWRTHERSEE STADIUMWRTHERSEE STADIUMWRTHERSEE STADIUM

    NCA Container- und Anlagenbau GmbH

    St. Paul, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Leichlingen, Germany

    Contracting authority: city of Leichlingen

    Dimensions: total length of 42.6 meters,

    width of 4.475 meters

    Specifications: a span of 42 meters

    between the support axes.

    A width of 3 meters between the railings

    of the bridge.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Efficient and precise 3d modeling

    Easy-to-learn and easy-to-handle solution

    Special sheet metal functions

    "Advance Steel allowed us to process the

    entire 3D model data, accelerate the

    creation of all documents and insured an

    all-around drawing consistency

    Mr. Heuer,

    Construction Engineer

    Bridge made of conical parts and cables

    Need to have the parts unreeled as a

    sheet metal construction

    3D CAD system

    Automatic functions to get conical parts

    All workshop drawings

    USERS BENEFITS

    BICYCLE AND PEDESTRIBICYCLE AND PEDESTRIBICYCLE AND PEDESTRIBICYCLE AND PEDESTRIAN BRIDGEAN BRIDGEAN BRIDGEAN BRIDGE

    Planungsbro Heuer

    Hattingen, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Meien, Germany

    Contracting authority: Road Construction

    Office Meien-Dresden

    Dimensions: 366 meters long with a main span

    of 192 meters

    Specifications: 1232 tons of steel

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Low error rate at workshop and at site

    Drawings that update after modifications

    "The use of Advance Steel was a complete

    success for our work since the creation of

    models, BOMs and DStV-NC-data can be

    set in a modular way.

    Mr. Streit,

    Construction Engineer

    Creation of welding preparation and

    folded plates

    Exact creation of the geometry of single

    components

    Bridge made of complex 3D girders

    Creation of the bridge model in modular

    form

    Clash detection tool

    Specific commands for automatic creation

    of 3D plates

    USERS BENEFITS

    NIEDERWARTHA BRIDGENIEDERWARTHA BRIDGENIEDERWARTHA BRIDGENIEDERWARTHA BRIDGE

    Plauen Stahl Technologie GmbH

    Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Linz, Austria

    Architecture Office: Treusch Architecture ZT

    GmbH

    Contracting authority: Immobilien Linz GmbH &

    Co.KG

    Dimensions: 5.000 m2 sheathing of the building,

    1.100 m2 grating

    Specifications: 200 tons of steel, 1.100 glass

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling

    Intelligent connections and NC-files

    Ease of use and short learning curve

    "Advance Steel processes the entire 3D

    model data, accelerates all document

    creation and ensures all-around drawing

    consistency.

    Mr. Moser,

    Project Manager

    Very specific geometry of the center

    The steel glass faade had to match the 3D

    geometry of the building

    The specific geometry required the

    creation of the faade to be done with a

    3D CAD system like Advance Steel

    Processing of the entire 3D model data

    USERS BENEFITS

    AAAARS ELECTRONICA CENTERS ELECTRONICA CENTERS ELECTRONICA CENTERS ELECTRONICA CENTERRRR

    Grmer Stahl GmbH

    Obersterreich, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comw