150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Grenoble, France
Architecture office: Chaix & Morel Associs, Paris
Dimensions: 144m x 191m
Specifications: 20 000 sitting capacity,
13,000 square meters of offices,
65,000 square meters of extracted ground
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Structural modeling achieved in a 3-month period
Fast and easy DSTV files creation
"Advance Steel was very useful thanks to
the collision detection tool that enabled us
to check nothing came between the
various roof structure elements
Mr Berger,
ETI Project Manager
Create joints between curved welded and
tapered beams.
Get workshop drawings and NC-DSTV files
from these elements.
Precise and fast 3D modeling of the utter
structure.
Easy creation of DSTV files.
USERS BENEFITS
GRENOBLE STADIUMGRENOBLE STADIUMGRENOBLE STADIUMGRENOBLE STADIUM
ETI Design Office
Grenoble, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Garmisch-Partenkirchen, Germany
Contracting authority: Markt Garmisch
Partenkirchen
Dimensions: total height of 149 meters
Specifications: 655 tons total weight
35 meters height
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Increased productivity by the modeling of curved beams and creation of workshop drawings
Libraries provided a wide range of profiles
"Advance Steel has increased our
productivity and therefore our efficiency.
The software was excellent when
designing the jump platform, especially
regarding all the constructive challenges.
Mr. Huber,
Factory Manager of Bitschnau GmbH
The structure is made of curved and folded
beams
Production of workshop drawings
90% of fundamental beams are welded
beams
Increase in productivity
Profile libraries
Intelligent connections function
USERS BENEFITS
SKI JUMPSKI JUMPSKI JUMPSKI JUMP
Bitschnau GmbH
Nenzing, Austria
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Baku, Azerbaijan
Contracting authority: Government of Azerbaijan
Weight: 500 tons of steel
Specifications: steel construction with 3D rolled
pipes
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling saved a lot of time
Advance Steel prepares double offsets
"The fact that Advance Steel processes all
information from the 3D model
automatically leads to the easy creation of
the documents and enables the conformity
of all drawings and documents.
Mr. Dohr,
Construction Engineer
The construction mainly consists of 3D
rolled pipes
Each single pipe has elliptical-shaped radii
on two levels
Entire information processing from the
3D model
Easy creation of documents
Conformity of all drawings and
documents
USERS BENEFITS
MMMMUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSE
NCA Container und Anlagenbau GmbH
St Paul, Austria
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Klagenfurt, Austria
Contracting authority: Capital Klagenfurt
Dimensions: total area of 32,000 m2, roof
area of 32,000 m2,, 8,000 m2 playing field,
height of 32.5 m
Specifications: 32,000 seats capacity
(12,000 seats after deconstruction in 2009)
Approximately 4.000 tons of steel
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Reduction of errors by automatic drawing creation and collisions control
3D-modeling saved a lot of time
"With the automatic production of the
drawings and collision control which is
carried out regularly, we were able to
significantly reduce errors. These features
also saved us a lot of time.
Mr. Schrammel,
Department Manager for Steel
Tight deadlines to get the stadium ready
for UEFA Euro 2008
Realisation of the structural requirements
Realisation of the rebuild planning
Differently arranged purlins
3D modeling
Simple and rapid creation of the model
Reduced error rate
USERS BENEFITS
WRTHERSEE STADIUMWRTHERSEE STADIUMWRTHERSEE STADIUMWRTHERSEE STADIUM
NCA Container- und Anlagenbau GmbH
St. Paul, Austria
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Leichlingen, Germany
Contracting authority: city of Leichlingen
Dimensions: total length of 42.6 meters,
width of 4.475 meters
Specifications: a span of 42 meters
between the support axes.
A width of 3 meters between the railings
of the bridge.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Efficient and precise 3d modeling
Easy-to-learn and easy-to-handle solution
Special sheet metal functions
"Advance Steel allowed us to process the
entire 3D model data, accelerate the
creation of all documents and insured an
all-around drawing consistency
Mr. Heuer,
Construction Engineer
Bridge made of conical parts and cables
Need to have the parts unreeled as a
sheet metal construction
3D CAD system
Automatic functions to get conical parts
All workshop drawings
USERS BENEFITS
BICYCLE AND PEDESTRIBICYCLE AND PEDESTRIBICYCLE AND PEDESTRIBICYCLE AND PEDESTRIAN BRIDGEAN BRIDGEAN BRIDGEAN BRIDGE
Planungsbro Heuer
Hattingen, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Meien, Germany
Contracting authority: Road Construction
Office Meien-Dresden
Dimensions: 366 meters long with a main span
of 192 meters
Specifications: 1232 tons of steel
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Low error rate at workshop and at site
Drawings that update after modifications
"The use of Advance Steel was a complete
success for our work since the creation of
models, BOMs and DStV-NC-data can be
set in a modular way.
Mr. Streit,
Construction Engineer
Creation of welding preparation and
folded plates
Exact creation of the geometry of single
components
Bridge made of complex 3D girders
Creation of the bridge model in modular
form
Clash detection tool
Specific commands for automatic creation
of 3D plates
USERS BENEFITS
NIEDERWARTHA BRIDGENIEDERWARTHA BRIDGENIEDERWARTHA BRIDGENIEDERWARTHA BRIDGE
Plauen Stahl Technologie GmbH
Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Linz, Austria
Architecture Office: Treusch Architecture ZT
GmbH
Contracting authority: Immobilien Linz GmbH &
Co.KG
Dimensions: 5.000 m2 sheathing of the building,
1.100 m2 grating
Specifications: 200 tons of steel, 1.100 glass
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling
Intelligent connections and NC-files
Ease of use and short learning curve
"Advance Steel processes the entire 3D
model data, accelerates all document
creation and ensures all-around drawing
consistency.
Mr. Moser,
Project Manager
Very specific geometry of the center
The steel glass faade had to match the 3D
geometry of the building
The specific geometry required the
creation of the faade to be done with a
3D CAD system like Advance Steel
Processing of the entire 3D model data
USERS BENEFITS
AAAARS ELECTRONICA CENTERS ELECTRONICA CENTERS ELECTRONICA CENTERS ELECTRONICA CENTERRRR
Grmer Stahl GmbH
Obersterreich, Austria
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Localisation : Massy, France
Matrise douvrage : GE
Dimensions : 10m x 5m
Spcifications : Surface, 50 m, Weight : 1500 kg
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Reduce project time
20% productivity gains
"Advance Steel enabled us to save a lot of
time during the design phase and frames
manufacturing. This is a very reactive
software solution in case of modifications
of the project.
Mr. Fenix,
Draftsman
Reduce time for workshop drawings and
manufacturing files
Compatibility and use of AutoCAD
USERS BENEFITS
TRESORER IITRESORER IITRESORER IITRESORER II
SAI Design Office
Massy, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Venezuela
Engineering Office: VIRO engineering
Dimensions: 6.6 km of piping
Specifications: 240 tons of steel
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Only one 3D model for detailed steel and shop drawings
High quality workshop drawings
Excellent bi-directional link between Advance Steel and PDMS
"Advance Steel is a great solution thanks
to its stairs & railings macros and also for
the automatic detailing of the complete
steel structure
Mr Kampen,
Manager Engineering of VIRO engineering
Equipment and primary steel to be created
in PDMS.
Primary steel imported in to Advance
Steel
Create all secondary and tertiary steel
(stairs and railings)
Clash check results between the
equipment and steel structure
Bi-directional SDNF file format exchange
Use Advance Steels automatic stairs and
railings macros
Automatic workshop drawings
USERS BENEFITS
REVAMP OF CAT CRACKEREVAMP OF CAT CRACKEREVAMP OF CAT CRACKEREVAMP OF CAT CRACKERRRR
VIRO engineering
Hengelo, The Netherlands
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Moscow, Russia
Architecture Office: Pshenichnikov & Partners
Dimensions: 92m wide x 125m long x 16m high
Specifications: 1200 tons of steel, 50 tons
tension members until DN 130, 2000m steel
cable until DN 75 and approximatively 20 tons of
screws until M48
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling
Ability to create the roof construction ready for fabrication
Do the 3D model within the German GUI and automatically get all the drawings containing
Russian annotations
"In Advance Steel the model is created
with real dimensions thus making it
possible to easily deal with complex
situations that can occur during the
assembly phase
Mr. Linge,
Manager of the Engineering Department
Needed a Multilanguage solution
Create steel elements to the compulsory
maximum unit weight.
Observation of geometric boundary
conditions for the assembly
The need to create compensatory
tolerances that could appear during the
assembly
Use Advance Steel, a 3D steel modeling
and detailing software
Drawings with 3D views and 3D details for
easy understanding at site
Workshop drawings automatically created
by Advance Steel
USERS BENEFITS
CANOPY FOR SHEREMETYCANOPY FOR SHEREMETYCANOPY FOR SHEREMETYCANOPY FOR SHEREMETYEVO INTERNATIONAL AIEVO INTERNATIONAL AIEVO INTERNATIONAL AIEVO INTERNATIONAL AIRPORTRPORTRPORTRPORT
Heinrich Lamparter Stahlbau & Co. KG GmbH
Kassel, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Prunerov II, Czech Republic
Architecture office: Viktovice Power Engineering
Contracting authority: CEZ
Dimensions: 250 x 80 x 80m
Specifications: 25.000 tons of steel structure
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Reduction of errors
Possibility to share full objects data across platform
Ease of design changes
"The project required to combine our own
measurement evaluation software with
Advance Steel. Without Advance Steel we
would not have been able to handle the
whole project.
Mr. Novotny,
Managing Director
Need to measure, check and create the
model from more than 30.000 elements
(beams, columns, bracing)
Size of the task
Successful import of parts
Measured by optical methods using
geodetic total station
In modeling, the total model was broken
into logical parts linked together as
AutoCAD external references xref
USERS BENEFITS
VERIFIED 3D MODEL OFVERIFIED 3D MODEL OFVERIFIED 3D MODEL OFVERIFIED 3D MODEL OF STEEL STRUCTURE OF STEEL STRUCTURE OF STEEL STRUCTURE OF STEEL STRUCTURE OF
PRUNEROV II POWER PLPRUNEROV II POWER PLPRUNEROV II POWER PLPRUNEROV II POWER PLANTANTANTANT
Noving Ltd
Vitkovice, Czech Republic
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Canada
Contracting authority: Shell Canada
Dimensions: 1,200 mm wide x 3,800 mm
high compensator connection, pieces of
channel with a rectangle cross section of
4,200 mm (width) x 5,100 mm (height)
Specifications: rectangular pieces of channels
with a diameter of 3,400 mm
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Efficient and precise 3d modeling
Easy-to-learn and easy-to-handle solution
Special sheet metal functions
"Advance Steel allowed us to process the
entire 3D model data, accelerate the
creation of all documents and ensured an
all-around drawing consistency
Mr. Heuer,
Construction Engineer
Need to have the parts unreeled as a
sheet metal construction
3D CAD system
Automatic functions to get conical parts
All workshop drawings
USERS BENEFITS
AIR INTAKEAIR INTAKEAIR INTAKEAIR INTAKE
Planungsbro Heuer
Hattingen, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Frankfurt, Germany
Specifications: Total weight of 10 tons
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Productivity increased by 75%
Fast modelling with joints
Collisions check
Fast drawing derivation
"Advance Steel increased our productivity by
75% thanks to the possibilities of fast
modifications and adjustments along with the
fast drawing derivation and the collisions
check that allowed us to finish the construction
in a short time.
Mr. Arikan,
Managing Director
Frame placed in a building that pokes out
of the roof.
Need to plan a waterproof sealing for the
roof covering
Frame above the roof to be encased
Need to create bay rails
Possibilities of fast modifications and
adjustments
Fast drawing derivation
Collisions check
USERS BENEFITS
FRAMEWORK FOR A FILTFRAMEWORK FOR A FILTFRAMEWORK FOR A FILTFRAMEWORK FOR A FILTER SYSTEMER SYSTEMER SYSTEMER SYSTEM AHP Arikan Ibrahim Konstruktionsbro
fr Stahlbau
Untermeitlingen, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Norwich, Norfolk, UK
Architecture Office: Tim Foster Architects
Main Contractor: R.G Carter Ltd
Structural Engineer: Price & Myers
Dimensions: Extension of the circular balcony by
3 metres
Specifications: Modernization program of the
Theatre Royal of Norwich, built in the 1390s
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Advance Steel is easy to use
The speed at which complicated models can be detailed
It is simple to add custom objects into the system
"Advance Steel was a key element in
enabling us to achieve the required
delivery, due to its ease of use and
modeling qualities that we require."
Mr. Nick Thompson,
Director
Complicated extension of the circular
balcony
Avoid double work by recreating the
existing environment
Detailed in small sections to allow better
handling
Start working directly on the AutoCAD
DWG file provided by the architect
USERS BENEFITS
THEATRE ROYAL THEATRE ROYAL THEATRE ROYAL THEATRE ROYAL MODERNIZATIONMODERNIZATIONMODERNIZATIONMODERNIZATION
TSI Structures Ltd
Norwich, Norfolk, UK
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Stubaier galcier, Austria
Contracting authority: Wintersport Tirol AG
Dimensions: 3200 m above sea level, anchors of
14 m in the glacier
Specifications: 39 tons of weather-proof steel,
80 m2 gratings
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3-D Modeling
Very exact unfolded sheet metal
Very fast and easy drawing creation
The fast and easy drawing creation
enabled us to save a lot of time.
Mr. Pfister,
Project Manager
The entire construction consists of curved
and rolled steel beams
Laying of sheet metal along
3-dimensional twisted polylines and
splines
Assembly of most of the pre-fabricated
units at the top of the mountain
Increase in productivity
Unfolded sheet metal function
Creating files from unfolded plates for the
CNC machines
USERS BENEFITS
TOP OF TYROL VIEWITOP OF TYROL VIEWITOP OF TYROL VIEWITOP OF TYROL VIEWING PLATFORMNG PLATFORMNG PLATFORMNG PLATFORM
Bitschnau GmbH
Nenzing, Austria
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Abu Dhabi, United Emirate
Contracting authority: Tourism Development and
Investment Company
Specifications: a cantilever carriage has a weight
of 68 tons and consists of 3000 single units
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D Modeling
Comprehensive possibilities during the creation of workshop drawings
Collision control
"Advance Steel enabled us to complete
the work by the deadline. I especially want
to put emphasis on the 3D function, the
comprehensive functionality when
creating workshop drawings, and the
automatic collision control that checks the
3D model continuously.
Mr. Jger,
Project Engineer
Use of 12 cantilever carriages at the same
time
One cantilever carriage has to hold a
bridge segment which has a weight of 200
tons
Link between 2D workshop drawings and
the 3D model
Automatic control of the model and
drawings
Compatibility between Advance Steel and
AutoCAD
USERS BENEFITS
CANTILEVER CARRIAGECANTILEVER CARRIAGECANTILEVER CARRIAGECANTILEVER CARRIAGE
Ed. Zblin AG
Stuttgart, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: offshore Congo, Africa
Dimensions: total height of 63m, dimension of
the deck 30m x 31m x 6m
Specifications: located 55 m below the water
surface and 8 m above the water surface; a total
weight of 2750 tons; 1650 tons of steel were
created with Advance steel
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Creation of lists
Fast drawing creation
Many possibilities for selection and sorting
"The fast and easy drawing creation
enabled us to save a lot of time.
Mrs. Ebert,
Construction Engineer
Self-transporting and self-installing
platform
Sub-construction as a steel tube
framework with 4 integrated cylindrical
footing elements
Automatic creation, control and updating
of the drawings
Increase in productivity
USERS BENEFITS
M.O.A.B. OFFSHORE PLM.O.A.B. OFFSHORE PLM.O.A.B. OFFSHORE PLM.O.A.B. OFFSHORE PLATFORM ATFORM ATFORM ATFORM
Overdick GmbH & Co. KG
Hamburg, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Ljubljana, Slovenia
Project: New building at the Faculty of
chemistry
Structure weight: 783 tons
Building dimensions: 59.30 m 26.20 m
16.00 m
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Study of this challenging structure was possible using 3D modeling
Clear drawings for accurate fabrication
"Advance Steel has increased our
productivity and even made it possible to
model the complex geometry of this
structure in the first place. We especially
appreciate its automatic detailing
capabilities and easy manual adjustments
to shop drawings.
Mr. Marko PAVLINJEK,
ELEA iC - Structural engineer
Elliptical roof shape
All columns are inclined
Obtaining precise drawings for fabrication
Curved beams 3D modeling
Automatic connections used between
straight and inclined beams
Automatic workshop drawings
USERS BENEFITS
UNIVERSITY OF LJUBLJUNIVERSITY OF LJUBLJUNIVERSITY OF LJUBLJUNIVERSITY OF LJUBLJANAANAANAANA
ELEA IC
Ljubljana, Slovenia
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: worldwide concert tour
Structure type: stage for the U2 360 Tour
Art design: Willie Williams (U2 production
manager) and Mark Fisher
STAGECO R&D project designer: Koen Peeters
Structure weight: 240 tons per touring system
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Advance Steel 3D drawings were much more illustrative than 2D drawings
Information for an accurate fabrication
"The use of Advance Steel and its easy-to-
use 3D modeling has significantly
contributed to the success of fabricating
and delivering the steel structure on time
and without errors at site."
Mr. Koen Peeters,
STAGECO R&D project designer
Study this complex structure "spaceship-
on-four-legs" in 3D
Get clear drawings for easy erection
Fabricate the steel structure without any
risk of errors
Use Advance Steel, a 3D steel modeling
and detailing software
Drawings with 3D views and 3D details for
easy understanding at site
Workshop drawings automatically created
by Advance Steel
USERS BENEFITS
U2 360 TOUR STAGEU2 360 TOUR STAGEU2 360 TOUR STAGEU2 360 TOUR STAGE
STAGECO
Tildonk, Belgium
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Dax, France
Customer: Mr. & Mrs. Da Silva
Dimensions: Height to climb: 3m
Specifications: Interior steel stairs (inside a
private new house) with the railing treads and top
handrail made from wood
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy design by working in 3D and render mode
Representation of the stairs in its final environment Better understanding of the parts to be fabricated by the workshop
"This is one of my first projects using Advance
Steel, which allowed me to design the stairs
that were not simple; the visualization in 3D
and in render mode was a great help, and the
3D and 2D details on drawings were useful for
fabrication and erection at site.
Mr. Bordas,
Detailer within the company
Designed for an exact fit to the existing
concrete structure
Stairs with double turn consisting of
several different slopes
Create clear and precise drawings for an
accurate fabrication without errors
Modeling of surrounding objects (walls,
slab opening) in 3D
Exact details of the different treads with
their rise and height.
Workshop drawings with side and 3D
views for an easier understanding
General arrangement drawings with 2D
and 3D details
USERS BENEFITS
INTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRS
ABC Serrurerie
St Geours de Maremne, France
150
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Main contractor: NEM, Netherlands
Location: Eemshaven, Netherlands
Dimensions: Boiler=36m x 13m x 40m
Stack = diameter of 7m x 35m height
Specifications: Part of a Power Plant which has a
production capacity of 1200 Mega watts.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Advance Steel is fully integrated in AutoCAD
All elements including mechanical parts are part of the unique model
Precise workshop drawings with correct dimensions and BOMs
"The use of Advance Steel is very easy and
you can, with few clicks, create all types of
elements such as folded plates, curved
plates or curved beams."
Mr. Ludo Plessers
CSM Project Engineer
Get all components within the model and
drawings in connection with the placement of
additional items such as welding neck flanges,
blind flanges, pipe couplings, etc.
Export model to a DWG file for use in AutoCAD
Provide drawings that can be opened in
AutoCAD to the customer
Create their own profiles and purchase
articles like flanges
It is easy to select an assembly part to
define frames for transporting the panels
to the site
Possible to explode the Advance Steel 3D
model to ACIS solids
Drawings created in DWG file format
USERS BENEFITS
MAGNUM BOILERMAGNUM BOILERMAGNUM BOILERMAGNUM BOILER
CSM
Hamont-Achel, Belgium
ADVANCE STEEL
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Warsaw
Architecture office: architecture for Warsaw city
center
Design architect: The Jerde Partnership
Skylight contractor: Waagner Biro
General contractor: Skanska
Dimensions: 116m X 100m (Atrium roof plan size)
Specifications: Shopping center having the
biggest glass dome in Europe
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Based on AutoCAD
Time savings
Efficiency gains
"Advance Steel increased our productivity
due to the automatic output of the NC-files
and the automatic creation of bills of
materials."
Mr. Schmidt,
Design Coordinator
The atrium roof is a double curvature
geometry meaning all glass panels are
different
Complex three-dimensionally columns
which look like trees
Detailed 3D modeling for get precise
panels workshop drawings
Modeling in 3D was necessary to design
this complex shape
USERS BENEFITS
GOLDEN TERRACESGOLDEN TERRACESGOLDEN TERRACESGOLDEN TERRACES
Waagner-Biro
Warsaw
150
ADVANCE STEEL
More projects on www.graitewww.graitewww.graitewww.graitec.comc.comc.comc.com
Location: Waure, Belgium
Architecture Office: ASSAR
Contracting Authority: GSK
Dimensions: 13m high x 5,4m wide
Specifications: Multi-level fire escape
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easier and quicker implementation
Significant time savings with automatic joints and workshop drawings
"Advance Steel is a very good solution for
industrial detailing. In addition, the software
has a short learning curve for professionals
who already use AutoCAD.
Mr Barillet,
Draftsman
The complexity of the project made it
impossible to implement it manually or using
AutoCAD
Move the already mounted fire escape to
the building site for quick mounting on site
Library already including stairs (steps,
balustrades)
More accurate views with 3D modeling
USERS BENEFITS
FIRE ESCAPEFIRE ESCAPEFIRE ESCAPEFIRE ESCAPE
SPRL Lardinois
Gosselies, Belgique
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Douains, France
Architecture Office: A.A.C.D
Contracting authority: Communaut
dagglomration des Portes de lEure
Dimensions: single sloped halls, 18m span and
lean-to buildings
Specifications: hall of 1000 m2, offices of 180 m
2,
53 tons in total
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
30% faster in design studies
Direct link with production tools
Easy understanding of workshop drawings
"The biggest advantage was the file
transfer to the manufacturing site.
Advance Steel offers a high manufacturing
quality which is due to significant error
minimization and easy mounting
at site.
Mr Vielle,
Manager of Launet Design Office
Show the architect a realistic 3D insight of
the project
Need to easily start workshop
manufacturing
Create a building with curved/arched
exterior faades
Quick structure 3D modeling
High manufacturing file quality
Send NC-DSTV files to the workshop
Automatic joints for curved bars
USERS BENEFITS
BUSINESS CENTERBUSINESS CENTERBUSINESS CENTERBUSINESS CENTER
LAUNET Design Office
Beauvais, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Wolhusen, Switzerland
Dimensions: Adventure center: total area of
2100 m2; length of 85 m x width of 30 m x height
of 14 m. Production center: total area of 5200 m2
Specifications: The buildings are located 661 m
above sea level. Inside, a production plant for the
production of tropical fruits and fishes and an
adventure center which consists of 105 tons of
steel, 107 tons of glass and 15 tons of aluminum
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy and efficient creation of the 3D model
Many automatic functions support the construction
Very good cost/performance ratio
Advance Steel enabled me to get fast and
useful results. Especially when planning the
details, I was able to save a lot of time by
using the standardized and comprehensive
possibilities of connections.
Mr. Sager,
Construction engineer
A very filigree 3-dimensional construction
that is located on slight, partly fixed
columns and which is created as three
glass waves
Because of the hillside situation, the
individual footing has different height
indications.
The three glass waves had to be
constructed to each other in a staggered
way to fit into the landscape.
Detailed planning of the joints by using the
comprehensive possibilities of connections
Special profiles and end plates are easy to
create and very helpful when creating
complex constructions
USERS BENEFITS
TROPICAL CENTERTROPICAL CENTERTROPICAL CENTERTROPICAL CENTER
Sager design CAD
Horn TG, Switzerland
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Poland
Engineering office: Biuro Inynierskie Micha
Nowicki
Dimensions: Survey project of transmission
tower Height 76m
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy way to create any connection between steel elements
Easy creation of spatial geometry of truss
"Advance Steel does not only give the opportunity
to create complete workshop documentation, it also
provides a lot of very useful information for the
design and construction process. Professional
technical support is a big advantage especially in
the phase of the software implementation and
regular work afterward.
Mr Nowicki,
Designer
Tight deadlines for the creation of the
survey project of a transmission tower
Prepare model of existing structure
Propose new geometry solutions and
prepare complete documentation
Additional verification of the
constructions mass set up during the
calculation of the resistance
Possibility of preparing proper
documentation all necessary technical
drawings as well as axiomatic views of
complex elements of the construction
readable for site engineers.
USERS BENEFITS
TRANSMISSION TOWERTRANSMISSION TOWERTRANSMISSION TOWERTRANSMISSION TOWER
KD Consulting & Biuro Inynierskie
Micha Nowicki
Poland
150
ADVANCE STEEL
More projects on wwwwww.graitec.comww.graitec.comww.graitec.comww.graitec.com
Location: Niort, France
Specifications: Building renovation of the Council
of a French department with the implementation of
stairs and railings
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy understanding with the 3D view
Correction of the majority of the conception, fabrication and assembly problems
Flexibility of the available modeling tools
"Advance Steel enabled me to create
documents with greater confidence; this is
why I will never go back to working in 2D!"
Mr Fays,
Projector in Steel
Use of solid, delicate/brittle and expensive
materials which do not allow for incorrect
material ordering
Implementation of stairs and railings with
glass panels
Minimization of errors due to the modeling
of the entire project
Get a BOM with correct quantities
USERS BENEFITS
PLATFORMS & STAIRCASPLATFORMS & STAIRCASPLATFORMS & STAIRCASPLATFORMS & STAIRCASESESESES
BGN (Bar Grolleau Nivault)
Niort, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Ham, Belgium
Contracting authority: Sleurs
Dimensions: Transport belt width 1m length 25m
Platforms around Conveyor belt + Stairs + Ladder
+ Railing = approximately 3500kg
Specifications: This installation consists of feeding
a reactor tank.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling to better visualize
Huge library of intelligent connections
Automatic NC files creation
"Advance Steel made it possible to easily
and quickly create the conveying system
thanks to the advanced 3D modeling
function.
Mr. Verstraten,
Design and Welding Engineer
Biggest challenge: put together different
parts that were drawn outside Advance
Steel (building around the installation
drawn in X-Steel, but a few points had to
come together).
Special parts like drive, gear, bearing,
transport belt parts, electrical switches
had to be connected to Advance Steel
objects
Creation of the conveying system done in
3D with Advance Steel
An entire 3D model, which accelerated all
document creation and insured all-around
drawing consistency.
USERS BENEFITS
CONVEYING SYSTEMCONVEYING SYSTEMCONVEYING SYSTEMCONVEYING SYSTEM
Breetec International NV
Steenweg, Belgium
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Netherlands
Architecture office: Designed by Frits van
Dongen of the Netherlands
Dimensions: 290 tons, 35m in diameter, 12m in
height
Specifications: Part of the Spazio Shopping
Centre in Zoetermeer and known as The UFO
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Modeling of the complex geometry
Curved beams
Specific user defined beams
"This project let us see the huge
possibilities offered by Advance Steel:
modeling of the complex geometry, curved
beams, specific user defined joints, etc.
One can see clearly the complexity of the
design entirely done in Advance."
Eddy Vrolix,
Draftsman
Complex geometry for this structure made
of several curved beams
Specific custom joints to connect elements
together
3D structure modeling with handling of
curved elements
Available tools to create custom joints
Automatic creation of fabrication drawings
USERS BENEFITS
THE UFO ZOETERMEER PTHE UFO ZOETERMEER PTHE UFO ZOETERMEER PTHE UFO ZOETERMEER PROJECTROJECTROJECTROJECT
CSM
Netherlands
150
ADVANCE STEEL
More projects on www.gwww.gwww.gwww.graitec.comraitec.comraitec.comraitec.com
Location: Brno, Czech Republic
Architecture office: Arch Design, s.r.o.
Contracting authority: BVV Brno, a.s.
Dimensions: 220,3m x 89,5m
Specifications: The new hall P in the Brno exhibition
centre
Description: The exhibition part of pavilion P is designed
as a two-aisle, one-storey hall with the possibility to parcel
into separate parts.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Error reduction controlling the model in 3D
BOMs derived from the model
Manufacturing directly from the 3D model
"With Advance Steel, the 3D modeling of steel
frameworks of "Pavilion P enabled the realization of the
model complexity and the detail control in the workshop
documentation. To expedite the tube structure fabrication,
the information from the 3D model was directly used for
the fabrication of particular elements. Using Advance Steel
improved the demanding deadlines both for the project
and for the steel structure delivery period."
Vladimr Dank, Michal Rudolf, OKF s.r.o,
Technical designers
Manufacturing The biggest problem with
this building was the intersections of tube
diagonals with the upper/lower strip of
truss beams/girder and welding
preparations.
Tube diagonals were manufactured
directly from the 3D model exploded to
ACIS solids
USERS BENEFITS
NEW EXHIBITION CENTRNEW EXHIBITION CENTRNEW EXHIBITION CENTRNEW EXHIBITION CENTRE HALLE HALLE HALLE HALL
OKF, s.r.o.
Brno, Czech Republic
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Brno, Czech Republic
Architecture office: Aciercon s.r.o, Brno
Contracting authority: PSG a.s., Zlin
Dimensions: W=30 m, l=30 m, h=30 m
Specifications: Steel Frame Structures for Heavy
Technological Equipment
Description: Total weight = 530 tons. It contains main carrier
construction for the kettles.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Simple verification using the 3D rendered view
Workshop drawing generated in line
"Advance steel is suitable for such a
complicated structure and was the perfect
solution for this waste incinerator."
Ing. Oldrich Balsinek,
Managing Director
Multi-floors steel structure
Very complicated spatial relationships
between steel structures and
technological equipment
Display the complete 3D structure of
only selected floors
Easy-to-use solution using collision
detection within the final checking.
USERS BENEFITS
RESTORATION OF WASTERESTORATION OF WASTERESTORATION OF WASTERESTORATION OF WASTE INCINERATOR INCINERATOR INCINERATOR INCINERATOR
Aciercon s.r.o.
Kosice, Slovakia
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Bermuda
Dimensions: 20 m high steel framework tower
Specifications: Weather radar built to withstand
hurricane velocity winds up to 300 km per hour;
total weight of 32 tons
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Collision control on screen
Virtual snapshots of the assembly for construction personnel
3D Modeling
"Graitecs Advance Steel does a great job
in automating and updating all part lists."
Rainer Bach and Georg Stichternath,
Managers
Assembly overseas
Bearing framework
Each single unit had to be under 6 m long
for transportation
Precise and automatic derivation of Bills of
materials for the construction
Sending NC files through a fiber optic cable
from the construction to the fabrication
USERS BENEFITS
WEATHER RADAR TOWERWEATHER RADAR TOWERWEATHER RADAR TOWERWEATHER RADAR TOWER
Conferdo GmbH
Esterwegen, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Chatenois (dept 67), France
Architecture office: Cabinet WACH
Dimensions: Straight parallel stairs with 2
intermediate platforms
Specifications: Railing and handrail attached to
the wall for the Hartmanns company
headquarters
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Time saver for the modeling of the entire staircase + railings
Changes are possible and easy
Respected deadlines for the manufacturing and delivery at site
"I was forced to change the entire 3D model
(because of a modification on the concrete)
while everything was finished, but this has
been very easy and fast thanks to Advance
Steels functionalities."
Olivier RASQUIER,
Draftsman, Ets J-C FASSLER
Creating railings and handrails attached to
a concrete wall
Architectural railings with filled panels
Tight deadlines due to the delay of
previous companies working on this
project
Manufacturing all plates using CNC
workshop machines
Representation of the concrete due to the
possibility to create a 3D solid
Use of the automatic railing macro
followed by specific adjustments to get
the desired architectural result
Time saver due to all drawings and BOMs
created automatically
NC-DSTV files automatically created for all
plates
USERS BENEFITS
OFFICE STAIRSOFFICE STAIRSOFFICE STAIRSOFFICE STAIRS
Ets J-C FASSLER
Ste Marie aux Mines, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Villers-les-Nancy, France
Engineering office: BECSI-EIC
Contracting authority: MADE Agencement
Dimensions: Height to climb: 3.8 m
Specifications: Turning stairs with double quarter
turns for a bank agency of Caisse dEpargne
Lorraine Champagne Ardennes in the city of
Villers-les Nancy
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easier job due to rendered 3D view
Tool to convert construction lines and polylines to polygonal plates
General arrangement drawing with labeled 3D view easy to understand
"Without Advance Steel, it would have
been more difficult to design such a stair
where most of the parts are different
because of the stairs complexity".
Olivier RASQUIER,
Draftsman, Ets J-C FASSLER
Steel stairs with double quarter turn with
steel support for wood steps
Respect dimensions by following drawings
provided by the engineering office
Represent steel without seeing it within
BOM and workshop drawings
Modeling in 3D with rendered mode
enabled to see clearly the particular
specificities of the stairs
Direct opening of the DWG in AutoCAD
Manage behavior of Advance Steel
elements to take them into consideration
for automatically created documents
USERS BENEFITS
INTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRS
Ets J-C FASSLER
Ste Marie aux Mines, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Esterwegen, Germany
Dimensions: 111.5 m high steel grille framework
connection
Specifications: basic size of the footing = 30m2
per corner bar; 4 individual footings; approx. 1300
bars; approx. 10500 bolted connections; king pin
angle = 18m; weight = 140000 kg; diameter of
the rotor = 77m
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy 3D Modeling
Quick Connection with Design
Precise workshop drawings with exact dimensions and Bills of Materials
"We have been using Advance Steel for many
years and we are very satisfied with the
software."
Rainer Bach and Georg Stichternath,
Managing Director at Conferdo GmbH & Co. KG
Bearing framework
Sloped columns
Drawings for fabrication
Intelligent connections
Automatic connections between straight
and sloped beams
Automatic creation of the workshop
drawings and the saw list
USERS BENEFITS
WIND POWER PLANTWIND POWER PLANTWIND POWER PLANTWIND POWER PLANT
Conferdo GmbH & Co. KG
Esterwegen, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Duisburg, Germany
Dimensions: 50 tons, height of 10 meters, front
span of 30 meters
Specifications: The canopy looks like a funnel. It is
Germany's most up-to-date casino, with 19
American roulette tables, 8 blackjack tables and 24
multi-roulette clients for classic gambling as well as
400 slot machines
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Simple to use
Good price/performance investment ratio
"We are very satisfied with the ease of use
of the Access database of Advance Steel.
We were also convinced by the excellent
customer support, the easy operation of
the software and last but not least by the
good price-performance ratio."
Mr. Peter Mertens,
Structural Engineer
Project Manager
Funnel-shaped canopy
Modeling of specific profiles
Symmetrical modification in flange shape
User friendly software which allows
handling of straight and curved elements
Easy to create custom profiles and to store
them in a library for a later reuse
Working in 3D makes the conception
easier
USERS BENEFITS
DUISBURG CASINO CANODUISBURG CASINO CANODUISBURG CASINO CANODUISBURG CASINO CANOPYPYPYPY
Innovations-Verbund-Systeme GmbH
Duisburg, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Kosice, Slovakia
Architecture office: Hutni Projekt FM
Contracting authority: U.S. Steel Kosice, s.r.o
Dimensions: Coke oven gas desulphurization: 44X22,5X36 m,
Regeneration of washing liquids: 7X21X29 m, Modified
sulphur production unit: 21X28X12 m
Specifications: Total tonnage of steel structures : 965 tons
Description: The subject of the project is designing different
steel platforms, constructions under technological devices,
pipeline bridges, and canopies for tanks, etc.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Collisions between steel parts and equipments
Visualization in 3D rendered mode
Efficient creation of stairs and railings
Using Advance Steel, we were able to
model together steel elements with
equipments and check the interference
between them.
Roman Lisnik,
Designer Engineer
Handle a huge structure and a run a clash
check verification between supporting
steel parts and equipments
The structure contains many platforms
with railings, stairs and cage ladders which
must be designed in a short time
Exchange the model with Plant Design
software
The Advance Steel clash checks works on
parts imported from different applications
Advance Steel provides efficient
automatic macros to create railings, stairs,
etc.
Many file format exchange options
allowing the exchange of the 3D model
USERS BENEFITS
COKE OVEN GAS DESULPCOKE OVEN GAS DESULPCOKE OVEN GAS DESULPCOKE OVEN GAS DESULPHURIZATIONHURIZATIONHURIZATIONHURIZATION
HUTNI PROJEKT Frydek-Mistek a.s.
Kosice, Slovakia
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Ivory Coast, West Africa
Specifications: Bin Capacity: 150 Tons (live load)
Steel work mass: 108.505 Tons
Bin plate work mass: 67.074 Tons
Chute plate work mass: 28.630 Tons
Total mass: 204.209 Tons
Description: The Roll-Off Material tip consists of
a bin which is fed raw material by a D777 dump
truck, from here an Apron feeder extracts the
material.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Speed and ease of modeling
. Standard connections
Standard member sizes
Creating bill of materials
"We found that the speed and ease of
modeling in Advance Steel was unmatched by
any other package in the current market place.
The transformation from AutoCAD to Advance
steel can be done within a short period of time
thus making the change quick and
inexpensive."
Clinton Dantu
Draftsman
Complete Roll-Off Material tips were
required with no workshop pre-assembly
time provided
The bin plate work forms part of the
structure to be able to withstand the
relevant forces
Modeling the complete Roll-Off Material
tip while using clash detection eliminated
any errors
By using Advance steels plate work
modeling functions, the bin was easily
made.
USERS BENEFITS
TONGON GOLD PROJECTTONGON GOLD PROJECTTONGON GOLD PROJECTTONGON GOLD PROJECT
Dantu Drafting
Ivory Coast, West Africa
150
ADVANCE STEEL & ADVANCE DESIGN
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Constana, Romania
Architecture office: S.C. PAVIAL S.R.L
Dimensions:
- Warehouse: 38 x 60m and height of 6m
- Tower: 5 levels (height of approximately
24m); a main area of 9 x 8.1m (houses the main
technological activity) and another area of 9 x
3.9m (which comprises vertical movement of
personnel and concrete).
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Significantly time saving assigned to calculation
Optimized synchronization of models using 3D visualization
Reducing costs and material consumption
"Import, export and synchronization functions of
Advance Steel software have made possible the
inclusion of the two models, tower and hall, in a
single model, in which, with the help of 3D
orientation made possible the examination of
slopes and continuity of joints for the entire
building."
Panait Alexandru,
General Manager
Controlling the influence of vibration
developed by the cumulative weight of
machinery and concrete
Changes due to technological basis
modification
Beneficiary requirements were strict
about the cost and material consumption
Temporary dynamic analysis using Advance
Design tools
The line position of similar joints was kept
due to a multiple-connections configuration
available in Advance Steel
Quick and easy analysis of variables, due to
available tools such as steel expert or
measurement tools
USERS BENEFITS
WAREHOUSE FOR CONCRETE AND WAREHOUSE FOR CONCRETE AND WAREHOUSE FOR CONCRETE AND WAREHOUSE FOR CONCRETE AND
TOWER FOR MACHINERYTOWER FOR MACHINERYTOWER FOR MACHINERYTOWER FOR MACHINERY S.C. PAVIAL S.R.L
Constana, Romania
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Milano, Italy
Dimension: 2 million square meters
Specifications: The fair consists of 10 exhibition halls
which are connected through a 1.3 km long axis. The
axis is roofed by a freeform lattice roof construction,
reminiscent of the Alps. The guests get an open-air
experience without being exposed to wind and rain.
This impression was reached using only 190 tree
columns supporting the VELA.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling of the structure
Time saving of 60 %
"First of all, Advance is an application based on
AutoCAD, the worldwide construction CAD
standard. Furthermore, Advance is a young,
extremely capable product that has proved itself
on the market. The unique evolving project
requirements on Advance were met by fast
software development on the part of Graitec and
we have come to realize the immense potential
the solution still has in terms of headroom for
future development.
Mr ING G.E Nestor,
General Manager, N-CAD Proiect
All 190 tree columns are unique
The drawing must be created according
to contractor requirements
Automatic drawing creation and modeling
of the tree columns in 3D
USERS BENEFITS
THE NEW MILANO FAIRTHE NEW MILANO FAIRTHE NEW MILANO FAIRTHE NEW MILANO FAIR
Emmerling GmbH
Amberg, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Romania
Specifications: The roof of this warehouse has an
arc steel structure, with a 72m span
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling greatly simplified the structure design
Reduction of errors
Time savings
"From my point of view, designing such a
structure in less than 3 weeks is a success
achieved entirely due to Advance Steel. It
would be almost impossible to handle such a
project without dedicated software like
Advance Steel."
Mr ING G.E Nestor,
General Manager, N-CAD Proiect
Arc structure built from straight beams
Sliding roof
Bolted connections on site
3D joint modeling
Automated drawing creation
USERS BENEFITS
WAREHOUSE FOR EXPLOSWAREHOUSE FOR EXPLOSWAREHOUSE FOR EXPLOSWAREHOUSE FOR EXPLOSIVE PRODUCTSIVE PRODUCTSIVE PRODUCTSIVE PRODUCTS
N-CAD Proiect
Slobozia, Romania
150
ARCHITECTURAL RAILING
BROGLI Constructions Mtalliques Bex, Suisse
Location: Villars-sur-Ollon (Switzerland)
Engineering office : Jean-Daniel Berset
Ingnieurs-Conseils SA
Owner: Fire station at Ollon
Dimensions: Railing with a total length of 32m
fixed on top of a concrete slab at a height of 5m
Specifications: Establishment of a railing all
around a terrace on the top of a fire station
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Site survey of the existing terrace slab, then input of the different level values in the 3D Advance Steel model
Numerous Advance Steel functionalities to model all steel elements and then to cut and drill them as required
Automatic numbering of the different parts and workshop drawings automatically dimensioned and labeled
"The easy modeling in 3D environment allowed me to realize this railing which is not standard and to limit at the minimum the risks of errors during fabrication, which I could not achieve with a 2D steel detailing software."
Daniel BROGLI, BROGLI CM Managing Director
AD
VA
NCE
STE
EL Design a railing on a concrete terrace having a slope and without any
perpendicular sides Architectural railing containing sloped
tubular filling and special posts Avoid any adjustment at site due to the
fact that the railing is galvanized and then thermo lacquered
Representation of the environment in concrete on which the railing will be fixed Much better understanding with the 3D modeling
Automatic numbering of identical or different elements
USERS BENEFITS
More projects on www.graitec.com
150
With its capabilities of working and
navigating through the model in 3D,
Advance Steel is the right 3D steel detailing
system to model complex connections
between plate girders and standard rolled
sections.
Advance Steel provides a complete library of
automatic macros for stairs & railings to
speed up the modeling of the different steel
walkways and handrails.
The steel structure consists of a light
tower with a height of 32m, and a circular
deck supported by 4 main columns
This steel tower must be connected to the
concrete tower, which contains the
elevator that provides access to the
different tower levels.
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Contracting authority: Barmherzige Brder Trier
Location: Hospital in Trier, Germany
Dimensions: 32m height tower with a 28m large
circular landing platform
Specifications: Helicopter base connected a special
elevator to the emergency room. Total weight:
approximately 310 tons for the steel construction
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Real 3D graphical presentation of the model
Automatic user friendly macros for stairs and railings
Connection of the derived documents to the model
"With its excellent functions Advance Steel
supported us in fulfilling all these
necessary and challenging demands for
this special helicopter base."
Mr. Matthias Thul,
Construction engineer
Stahlbau Ziemann GmbH
USERS BENEFITS
HELICOPTER BASE FOR HELICOPTER BASE FOR HELICOPTER BASE FOR HELICOPTER BASE FOR TRIER HOSPITALTRIER HOSPITALTRIER HOSPITALTRIER HOSPITAL
STAHLBAU ZIEMANN GmbH
Wittlich, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Contracting authority: Pirateninsel Rgen
Location: Ruegen Island, Germany
Dimensions: 12m long x 8.90m wide x 8.5m high
Specifications: New addition to the indoor
playground Pirateninsel Rgen. Total weight of
the steel structure: 61.1 tons
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy 3D modeling of the steel structure
Automatic creation of NC-DSTV files
"Without the use of Advance Steel with its
3D functions, the realization of this project
would not have been possible for us."
Mr. Moenter,
Construction Engineer at Husmann
Stahlbau GmbH
The steel frames consist of 35 tons of
steel.
The construction has a bent at 4 in the
longitudinal direction and in the cross
direction.
The house stands on the chimney, which is
substituted by two massive steel columns
Direct activation of the machines by using
the NC files created by Advance Steel
Automatic tools for the creation of the
necessary details of single drawings and
drawings of structural components
USERS BENEFITS
HOUSE STANDING ON ITHOUSE STANDING ON ITHOUSE STANDING ON ITHOUSE STANDING ON ITS ROOFS ROOFS ROOFS ROOF
HUSMANN STAHLBAU GmbH
Firrell, Germany
150
Model a steel house easily and in the most
efficient way
Need for more productivity: the company
had efficiency issues due to numerous
back and forth trips to the workshop and
repeated tasks
Requires DXF and DSTV files for automatic
fabrication at workshops
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Dax
Main Contractor: Mr. CAUDRON
Dimensions: 15m x 10m x 7m height
Specifications: Steel structure of a house since
termites are the biggest problem in this area with
wooden houses
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
User friendly 3D structural steel detailing
Increased productivity with the automated functions
Easy modifications with automatic update of all documents
"I appreciate the easy modeling Advance
Steel enables, the smartness of automated
dimensioning and the easy modification of
dimensions for the customization of our
drawings. The use of Advance Steel is easy
for someone who already knows a 3D
Steel detailing tool.
Mathieu Rouss,
Draftsman
Huge library of automatic connections
Creation of directly usable drawings
Automatic generation of DXF files for
metal plates: they can be produced
simultaneously
NC-DFX and NC-DSTV files created with
one click from the precise 3D model
USERS BENEFITS
HOUSE MADE OF STEELHOUSE MADE OF STEELHOUSE MADE OF STEELHOUSE MADE OF STEEL
METAL ADOUR
Anglet, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Leipzig, Germany
Customer: Staatsbetrieb Schsisches Immobilien-
und Baumanagement Niederlassung Leipzig
Architect: Erick van Egeraat (EEA)
Specifications: Total weight of the steel roof
construction: 50 tons; 3 different architectonical
buildings in one building (main building, bell
tower, auditorium); total surface: 9200 m
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Fast 3D modeling
Advance steel enables easy navigation in complex models
Automatic drawing derivation from the 3D model
"Without using Advance Steel with its excellent functions for such demanding objects, I would not have been able to realize this project.
Mr. Eduardo Cerda, Manager and
construction engineer of the
Architektur- und Konstruktionsbro
Dipl.-Ing. Eduardo Cerda
The building is divided into 3 parts, each
part having its own specific roof.
Get exact quantities and weights in BOMs.
Fast and exact 3D modeling
Automatic joints for the fast modeling of
assembly connections
Fast and correct update of BOMs
USERS BENEFITS
EXTENSION OF THE UNIEXTENSION OF THE UNIEXTENSION OF THE UNIEXTENSION OF THE UNIVERSITY OF LEIPZIGVERSITY OF LEIPZIGVERSITY OF LEIPZIGVERSITY OF LEIPZIG Architektur- und Konstruktionsbro
Dipl.-Ing Eduardo Cerda
Leipzig, Germany
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Munich, Germany
Customer: Stadtwerke Mnchen GmbH
Architect: RPM Architekten GmbH, OX2 Architekten
Dimensions: 73 m long, 31 m wide
total area: 1540 m2
Specifications: total weight of the steel roof
construction: 420 tons
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Fast 3D Modeling
Automatic derivation of workshop drawings
Fast and easy drawing creation
"Advance Steel is an excellent
program for complex steel
constructions. We appreciate the
time saving and the rise in
productivity."
Mr. Manfred Ammann,
Manager of the Construction and
Project office at Bitschnau GmbH
Star-shaped openings on the roof at the
top of the columns
Creation of the roof as a pentagonal
surface with rounded edges created from
three dimensional modeled steel plates
Creation of 18 similar columns. Each
column consists of similar vertical single
elements.
Design of advanced shapes, folded and
twisted plates in 3D
Creation of NC-DSTV and DFX files for the
monitoring of CNC machinery
User friendly functions and complete
international catalogs for more efficiency
and time saving
USERS BENEFITS
SUBWAY AND BUS STATISUBWAY AND BUS STATISUBWAY AND BUS STATISUBWAY AND BUS STATION ROOFON ROOFON ROOFON ROOF Bitschnau Stahl & Anlagenbau GmbH
Bitschnau project gmbh
Nenzing, Austria
150
Hip and valley purlins are difficult to
handle in 2D
Have all workshop drawings done as
quick as possible
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Architecture office: Kuo Xiong Ming architectural
firm
Contracting authority: Tong-Yu
Location: Hsin Chu, Taiwan
Dimensions: 3073 m
Specifications: 540-ton steel structure of a
factory building
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy understanding for users through clear representation
All possible collisions can be found at an early stage
Time saving
"Advance Steel is very easy to use; it
was quick to learn. We could find the
design issues in the model and discuss
the changes. Advance Steel allowed us
to reduce the construction cost losses."
Chris Liu,
Main structural shop drawing engineer
Display the complete structural model in
3D for easier understanding of all
complex connections of purlins.
Advance Steel provides efficient
automatic macros for hip and valley
purlins connections.
Save more time in the drawing process
with automatic drawing creation.
USERS BENEFITS
TONGTONGTONGTONG----YU FACTORYYU FACTORYYU FACTORYYU FACTORY
I JIA Construction Co Ltd
New Taipei City, Taiwan
150
ADVANCE STEEL
More projects on www.graitec.cwww.graitec.cwww.graitec.cwww.graitec.comomomom
Location: Cologne, Germany
Architecture office: Schulitz GmbH
Dimensions: 10.50 m high, 80 m wide and long
Specifications: Total weight of 400 tons
Description: new stadium with three different
areas (ice stadium, swimming pool and locker
rooms/restaurants area), and an ice rink going
around the building as a 1st floor
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D modeling
Automatic creation of documents
Easy to use software with a very good cost/performance ratio
"Without the use of Advance Steel
with its many excellent functions,
especially the 3D ability, the
realization of this project would not
have been possible for us."
Mr. Manfred Drge,
Construction engineer
Triangular shape of the building
Diamond-shaped arrangement of the
roof girders
Different spans of roof girders in the
single areas
Comprehensive modeling tools
Library of intelligent connections
Automatic creation of workshop
drawings with customized layout
USERS BENEFITS
ICE AND SWIMMING STAICE AND SWIMMING STAICE AND SWIMMING STAICE AND SWIMMING STADIUMDIUMDIUMDIUM
Stahlhallen und Baustoffe Janneck GmbH
Molbergen, Germany
150
Create a shading steel structure on an
existing insulated concrete structure
Fix the upper part on a parapet with
triangular end plates
Precisely install the wooden slats
according to the architects drawing
Provide the customer with a general
arrangement drawing for the final
agreement
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Architecture office: URBANA LINEA
Contracting authority: NACARAT
Location: Villeneuve dAscq, France
Dimensions: 12m high
Description: Installation of a shading steel
structure on the faade of an office building
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
3D viewing for easier designing
Easy browsing in the model for better comprehension of the design details
Clear and precise general arrangement drawings for the architect
"This project was not very complicated, but
Advance Steel allowed me to design the fixing
details of the structure with the rendered and 3D
navigation."
Mehdi BRENNE,
Draftsman, METALLERIE DU CAMBRESIS
Model the existing faade using separate
layers for miscellaneous materials
(concrete, insulating material, parapet top,
etc.)
Navigation tools in the 3D model that
enable easy design
Creation of the trapezoid shape of the
slats and use of copying functions to
distribute it as expected
Automatic creation of 2D and 3D views of
the general arrangement drawing
USERS BENEFITS
SUNSUNSUNSUN----SHADING STRUCTURESHADING STRUCTURESHADING STRUCTURESHADING STRUCTURE
METALLERIE DU CAMBRESSIS
Fontaine Notre Dame, France
The structure consists of tapered box
beams made of Y-shaped welded plates
The architects main constraint was that
no bolt should remain visible
The weight of the steel elements makes it
difficult to transport them and assemble
them
Need to display precise details in 3D for
easy understanding by the architect
Modeling of all weld preparation on beams
and plates edges for easy welding at site
Automatic collision detection
Realistic 3D model and clear 2D and 3D
assembly views
DSTV files are generated from the
Advance Steel model for the monitoring of
the CNC machinery
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Valenciennes, France
Dimensions: L: 180m; W: 145m; H: 23m
Specifications: The steel structure supports
prefabricated concrete bleachers. The stadium has
a capacity of 25000 spectators.
Description: A new stadium that is dedicated to
Valenciennes Football Club games.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Precise 3D modeling
No errors at site
Create DSTV files for the fabrication of complex elements
"We did not receive a single phone
call from the site foreman to report
any error!"
Mr Stphane Dottori,
Project Manager, ETI
USERS BENEFITS
VALENCIENNES STADIUMVALENCIENNES STADIUMVALENCIENNES STADIUMVALENCIENNES STADIUM
ETI
Echirolles, France
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Ontario, Canada
Dimensions: 23.77m x 22.25m x 25.29m
Specifications: Two braced-back legs are used to
resist the lateral loads from the sheave at the top
of the structure. Total weight: ~140 tons
Description: New extension of an existing
headframe building for a mining company.
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Easy 3D modeling
Large library of automatic connections
Low margin of error
"The fact that Advance Steel is based on
AutoCAD made the 3D modeling of the
project easy. This is necessary to avoid any
interference between the mechanical
equipment and the structural and
miscellaneous elements."
Marc DESAULNIERS,
Project Manager, ROULEAU-DESAULNIERS
The connections of the braced-back legs
with the two-way slope are very complex.
The new structure needs to be connected
on the existing columns and beams.
A great number of site work details (site
drills and site welded connections are
required).
Appropriate automatic connections were
used from the Advance Steel library
Easy modeling of the existing structure
along with the new structure to avoid any
interference
Use of special compound beams for easy
modeling of the back legs
USERS BENEFITS
HEADFRAMEHEADFRAMEHEADFRAMEHEADFRAME
ROULEAU-DESAULNIERS
St-Etienne-des-Gres, Canada
150
ADVANCE STEEL
More projects on www.graitewww.graitewww.graitewww.graitec.comc.comc.comc.com
Location: Indianapolis, USA
Dimensions: 202m long x 39.2m large x 56m
high
Specifications: 4 levels; total weight: 145 tons
Description: Additions to an existing industrial
plant
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Clear overview of the project with 3D model
Easy detection of collisions
Limited margin of error on site
"The Advance Steel 3D model
helped us to find and solve the
connection problems before
submittal and fabrication; it also
helped the erector to visualize
the concept of the entire
project."
Griogo DANESHVAR,
Owner of GD Drafting
Connection of vertical bracings to
horizontal members
Find correct spacing of guardrails posts not
to interfere with beam-to-beam
connection where guardrails are attached
3D modeling of the project for better
understanding of the project concept
Avoid interferences between vertical
bracing and other members, and collisions
of guardrail vertical post connections with
beams below in walking areas
USERS BENEFITS
INDIANAPOLIS PLANTINDIANAPOLIS PLANTINDIANAPOLIS PLANTINDIANAPOLIS PLANT
GD Drafting
Los Angeles, USA
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: East Coast, USA
Dimensions: 26.55m x 31m
Specifications: Total weight: ~340 tons. More
than 1350 shop drawings prepared
Description: Additional equipment supports
access platforms for a new engineered wood
factory
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Import AutoCAD 3D solids in Advance Steel
Automatic creation of shop and engineering drawings
Single-click switch between metric and imperial units
"The fact that Advance Steel is based on
AutoCAD made the 3D modeling of the
mechanical equipment and ducting easy.
This is necessary to avoid any interference
between the mechanical equipment and
the structural and miscellaneous
elements."
Marc DESAULNIERS,
Project Manager, ROULEAU-DESAULNIERS
3D modeling of the mechanical
equipment and duct
The mechanical equipment provider
uses metric units and the shop drawings
need to be prepared in imperial units.
Preparation of the engineering drawings
from the 3D model
Easy modeling with a combination of
AutoCAD 3D solids and Advance Steel
elements
Transfer of the 3D model between metric
and imperial units is made easy with
Advance Steel.
Shop drawings and engineering drawings
are automatically generated.
USERS BENEFITS
INDUSTRIAL PLANTINDUSTRIAL PLANTINDUSTRIAL PLANTINDUSTRIAL PLANT
ROULEAU-DESAULNIERS
St-Etienne-des-Gres, Canada
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Location: Indianapolis, USA
Dimensions: 35.66m x 41.14m
Specifications: Total weight: 76 tons
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
Time saving and increased productivity
Low margin of error
Short learning curve
"Advance Steel increases our production
by getting to the jobsite on schedule. The
learning curve was very easy and Advance
Steel has helped us a great deal."
Daniel Miller,
Detailing Manager, LIBERTY STEEL
Tight deadlines for the completion of
detailing.
Get DXF files for all plates and bars to be
burnt.
Fabricate the steel structure without any
risk of errors.
Use of Advance Steel templates for
connections
Details are created automatically for shop
fabrication
Creation of 3D views for a better
understanding at site
USERS BENEFITS
SEASONS 52 RESTAURANSEASONS 52 RESTAURANSEASONS 52 RESTAURANSEASONS 52 RESTAURANTTTT
LIBERTY STEEL
Fyffe, USA
150
ADVANCE STEEL
More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com
Architecture office: E.C.S.
Engineering Services ltd
Location: Victoria Hall Wembley
Specifications: Spiral roof from
8th floor level upto 19th floor
Level
PROJECT DESCRIPTION
THE CHALLENGE THE SOLUTION
More Compl