87
150 ADVANCE STEEL More projects on www.graitec.com www.graitec.com www.graitec.com www.graitec.com · Location: Grenoble, France · Architecture office: Chaix & Morel Associés, Paris · Dimensions: 144m x 191m · Specifications: 20 000 sitting capacity, 13,000 square meters of offices, 65,000 square meters of extracted ground PROJECT DESCRIPTION THE CHALLENGE THE SOLUTION Structural modeling achieved in a 3-month period ∙ Fast and easy DSTV files’ creation "Advance Steel was very useful thanks to the collision detection tool that enabled us to check nothing came between the various roof structure elements” Mr Berger, ETI Project Manager Create joints between curved welded and tapered beams. Get workshop drawings and NC-DSTV files from these elements. Precise and fast 3D modeling of the utter structure. Easy creation of DSTV files. USERSBENEFITS GRENOBLE STADIUM GRENOBLE STADIUM GRENOBLE STADIUM GRENOBLE STADIUM ETI Design Office Grenoble, France

References 1 to 87

  • Upload
    acinm

  • View
    252

  • Download
    0

Embed Size (px)

DESCRIPTION

graitec

Citation preview

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Grenoble, France

    Architecture office: Chaix & Morel Associs, Paris

    Dimensions: 144m x 191m

    Specifications: 20 000 sitting capacity,

    13,000 square meters of offices,

    65,000 square meters of extracted ground

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Structural modeling achieved in a 3-month period

    Fast and easy DSTV files creation

    "Advance Steel was very useful thanks to

    the collision detection tool that enabled us

    to check nothing came between the

    various roof structure elements

    Mr Berger,

    ETI Project Manager

    Create joints between curved welded and

    tapered beams.

    Get workshop drawings and NC-DSTV files

    from these elements.

    Precise and fast 3D modeling of the utter

    structure.

    Easy creation of DSTV files.

    USERS BENEFITS

    GRENOBLE STADIUMGRENOBLE STADIUMGRENOBLE STADIUMGRENOBLE STADIUM

    ETI Design Office

    Grenoble, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Garmisch-Partenkirchen, Germany

    Contracting authority: Markt Garmisch

    Partenkirchen

    Dimensions: total height of 149 meters

    Specifications: 655 tons total weight

    35 meters height

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Increased productivity by the modeling of curved beams and creation of workshop drawings

    Libraries provided a wide range of profiles

    "Advance Steel has increased our

    productivity and therefore our efficiency.

    The software was excellent when

    designing the jump platform, especially

    regarding all the constructive challenges.

    Mr. Huber,

    Factory Manager of Bitschnau GmbH

    The structure is made of curved and folded

    beams

    Production of workshop drawings

    90% of fundamental beams are welded

    beams

    Increase in productivity

    Profile libraries

    Intelligent connections function

    USERS BENEFITS

    SKI JUMPSKI JUMPSKI JUMPSKI JUMP

    Bitschnau GmbH

    Nenzing, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Baku, Azerbaijan

    Contracting authority: Government of Azerbaijan

    Weight: 500 tons of steel

    Specifications: steel construction with 3D rolled

    pipes

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling saved a lot of time

    Advance Steel prepares double offsets

    "The fact that Advance Steel processes all

    information from the 3D model

    automatically leads to the easy creation of

    the documents and enables the conformity

    of all drawings and documents.

    Mr. Dohr,

    Construction Engineer

    The construction mainly consists of 3D

    rolled pipes

    Each single pipe has elliptical-shaped radii

    on two levels

    Entire information processing from the

    3D model

    Easy creation of documents

    Conformity of all drawings and

    documents

    USERS BENEFITS

    MMMMUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSEUGAM EVI MUSIC HOUSE

    NCA Container und Anlagenbau GmbH

    St Paul, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Klagenfurt, Austria

    Contracting authority: Capital Klagenfurt

    Dimensions: total area of 32,000 m2, roof

    area of 32,000 m2,, 8,000 m2 playing field,

    height of 32.5 m

    Specifications: 32,000 seats capacity

    (12,000 seats after deconstruction in 2009)

    Approximately 4.000 tons of steel

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Reduction of errors by automatic drawing creation and collisions control

    3D-modeling saved a lot of time

    "With the automatic production of the

    drawings and collision control which is

    carried out regularly, we were able to

    significantly reduce errors. These features

    also saved us a lot of time.

    Mr. Schrammel,

    Department Manager for Steel

    Tight deadlines to get the stadium ready

    for UEFA Euro 2008

    Realisation of the structural requirements

    Realisation of the rebuild planning

    Differently arranged purlins

    3D modeling

    Simple and rapid creation of the model

    Reduced error rate

    USERS BENEFITS

    WRTHERSEE STADIUMWRTHERSEE STADIUMWRTHERSEE STADIUMWRTHERSEE STADIUM

    NCA Container- und Anlagenbau GmbH

    St. Paul, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Leichlingen, Germany

    Contracting authority: city of Leichlingen

    Dimensions: total length of 42.6 meters,

    width of 4.475 meters

    Specifications: a span of 42 meters

    between the support axes.

    A width of 3 meters between the railings

    of the bridge.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Efficient and precise 3d modeling

    Easy-to-learn and easy-to-handle solution

    Special sheet metal functions

    "Advance Steel allowed us to process the

    entire 3D model data, accelerate the

    creation of all documents and insured an

    all-around drawing consistency

    Mr. Heuer,

    Construction Engineer

    Bridge made of conical parts and cables

    Need to have the parts unreeled as a

    sheet metal construction

    3D CAD system

    Automatic functions to get conical parts

    All workshop drawings

    USERS BENEFITS

    BICYCLE AND PEDESTRIBICYCLE AND PEDESTRIBICYCLE AND PEDESTRIBICYCLE AND PEDESTRIAN BRIDGEAN BRIDGEAN BRIDGEAN BRIDGE

    Planungsbro Heuer

    Hattingen, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Meien, Germany

    Contracting authority: Road Construction

    Office Meien-Dresden

    Dimensions: 366 meters long with a main span

    of 192 meters

    Specifications: 1232 tons of steel

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Low error rate at workshop and at site

    Drawings that update after modifications

    "The use of Advance Steel was a complete

    success for our work since the creation of

    models, BOMs and DStV-NC-data can be

    set in a modular way.

    Mr. Streit,

    Construction Engineer

    Creation of welding preparation and

    folded plates

    Exact creation of the geometry of single

    components

    Bridge made of complex 3D girders

    Creation of the bridge model in modular

    form

    Clash detection tool

    Specific commands for automatic creation

    of 3D plates

    USERS BENEFITS

    NIEDERWARTHA BRIDGENIEDERWARTHA BRIDGENIEDERWARTHA BRIDGENIEDERWARTHA BRIDGE

    Plauen Stahl Technologie GmbH

    Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Linz, Austria

    Architecture Office: Treusch Architecture ZT

    GmbH

    Contracting authority: Immobilien Linz GmbH &

    Co.KG

    Dimensions: 5.000 m2 sheathing of the building,

    1.100 m2 grating

    Specifications: 200 tons of steel, 1.100 glass

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling

    Intelligent connections and NC-files

    Ease of use and short learning curve

    "Advance Steel processes the entire 3D

    model data, accelerates all document

    creation and ensures all-around drawing

    consistency.

    Mr. Moser,

    Project Manager

    Very specific geometry of the center

    The steel glass faade had to match the 3D

    geometry of the building

    The specific geometry required the

    creation of the faade to be done with a

    3D CAD system like Advance Steel

    Processing of the entire 3D model data

    USERS BENEFITS

    AAAARS ELECTRONICA CENTERS ELECTRONICA CENTERS ELECTRONICA CENTERS ELECTRONICA CENTERRRR

    Grmer Stahl GmbH

    Obersterreich, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Localisation : Massy, France

    Matrise douvrage : GE

    Dimensions : 10m x 5m

    Spcifications : Surface, 50 m, Weight : 1500 kg

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Reduce project time

    20% productivity gains

    "Advance Steel enabled us to save a lot of

    time during the design phase and frames

    manufacturing. This is a very reactive

    software solution in case of modifications

    of the project.

    Mr. Fenix,

    Draftsman

    Reduce time for workshop drawings and

    manufacturing files

    Compatibility and use of AutoCAD

    USERS BENEFITS

    TRESORER IITRESORER IITRESORER IITRESORER II

    SAI Design Office

    Massy, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Venezuela

    Engineering Office: VIRO engineering

    Dimensions: 6.6 km of piping

    Specifications: 240 tons of steel

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Only one 3D model for detailed steel and shop drawings

    High quality workshop drawings

    Excellent bi-directional link between Advance Steel and PDMS

    "Advance Steel is a great solution thanks

    to its stairs & railings macros and also for

    the automatic detailing of the complete

    steel structure

    Mr Kampen,

    Manager Engineering of VIRO engineering

    Equipment and primary steel to be created

    in PDMS.

    Primary steel imported in to Advance

    Steel

    Create all secondary and tertiary steel

    (stairs and railings)

    Clash check results between the

    equipment and steel structure

    Bi-directional SDNF file format exchange

    Use Advance Steels automatic stairs and

    railings macros

    Automatic workshop drawings

    USERS BENEFITS

    REVAMP OF CAT CRACKEREVAMP OF CAT CRACKEREVAMP OF CAT CRACKEREVAMP OF CAT CRACKERRRR

    VIRO engineering

    Hengelo, The Netherlands

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Moscow, Russia

    Architecture Office: Pshenichnikov & Partners

    Dimensions: 92m wide x 125m long x 16m high

    Specifications: 1200 tons of steel, 50 tons

    tension members until DN 130, 2000m steel

    cable until DN 75 and approximatively 20 tons of

    screws until M48

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling

    Ability to create the roof construction ready for fabrication

    Do the 3D model within the German GUI and automatically get all the drawings containing

    Russian annotations

    "In Advance Steel the model is created

    with real dimensions thus making it

    possible to easily deal with complex

    situations that can occur during the

    assembly phase

    Mr. Linge,

    Manager of the Engineering Department

    Needed a Multilanguage solution

    Create steel elements to the compulsory

    maximum unit weight.

    Observation of geometric boundary

    conditions for the assembly

    The need to create compensatory

    tolerances that could appear during the

    assembly

    Use Advance Steel, a 3D steel modeling

    and detailing software

    Drawings with 3D views and 3D details for

    easy understanding at site

    Workshop drawings automatically created

    by Advance Steel

    USERS BENEFITS

    CANOPY FOR SHEREMETYCANOPY FOR SHEREMETYCANOPY FOR SHEREMETYCANOPY FOR SHEREMETYEVO INTERNATIONAL AIEVO INTERNATIONAL AIEVO INTERNATIONAL AIEVO INTERNATIONAL AIRPORTRPORTRPORTRPORT

    Heinrich Lamparter Stahlbau & Co. KG GmbH

    Kassel, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Prunerov II, Czech Republic

    Architecture office: Viktovice Power Engineering

    Contracting authority: CEZ

    Dimensions: 250 x 80 x 80m

    Specifications: 25.000 tons of steel structure

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Reduction of errors

    Possibility to share full objects data across platform

    Ease of design changes

    "The project required to combine our own

    measurement evaluation software with

    Advance Steel. Without Advance Steel we

    would not have been able to handle the

    whole project.

    Mr. Novotny,

    Managing Director

    Need to measure, check and create the

    model from more than 30.000 elements

    (beams, columns, bracing)

    Size of the task

    Successful import of parts

    Measured by optical methods using

    geodetic total station

    In modeling, the total model was broken

    into logical parts linked together as

    AutoCAD external references xref

    USERS BENEFITS

    VERIFIED 3D MODEL OFVERIFIED 3D MODEL OFVERIFIED 3D MODEL OFVERIFIED 3D MODEL OF STEEL STRUCTURE OF STEEL STRUCTURE OF STEEL STRUCTURE OF STEEL STRUCTURE OF

    PRUNEROV II POWER PLPRUNEROV II POWER PLPRUNEROV II POWER PLPRUNEROV II POWER PLANTANTANTANT

    Noving Ltd

    Vitkovice, Czech Republic

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Canada

    Contracting authority: Shell Canada

    Dimensions: 1,200 mm wide x 3,800 mm

    high compensator connection, pieces of

    channel with a rectangle cross section of

    4,200 mm (width) x 5,100 mm (height)

    Specifications: rectangular pieces of channels

    with a diameter of 3,400 mm

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Efficient and precise 3d modeling

    Easy-to-learn and easy-to-handle solution

    Special sheet metal functions

    "Advance Steel allowed us to process the

    entire 3D model data, accelerate the

    creation of all documents and ensured an

    all-around drawing consistency

    Mr. Heuer,

    Construction Engineer

    Need to have the parts unreeled as a

    sheet metal construction

    3D CAD system

    Automatic functions to get conical parts

    All workshop drawings

    USERS BENEFITS

    AIR INTAKEAIR INTAKEAIR INTAKEAIR INTAKE

    Planungsbro Heuer

    Hattingen, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Frankfurt, Germany

    Specifications: Total weight of 10 tons

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Productivity increased by 75%

    Fast modelling with joints

    Collisions check

    Fast drawing derivation

    "Advance Steel increased our productivity by

    75% thanks to the possibilities of fast

    modifications and adjustments along with the

    fast drawing derivation and the collisions

    check that allowed us to finish the construction

    in a short time.

    Mr. Arikan,

    Managing Director

    Frame placed in a building that pokes out

    of the roof.

    Need to plan a waterproof sealing for the

    roof covering

    Frame above the roof to be encased

    Need to create bay rails

    Possibilities of fast modifications and

    adjustments

    Fast drawing derivation

    Collisions check

    USERS BENEFITS

    FRAMEWORK FOR A FILTFRAMEWORK FOR A FILTFRAMEWORK FOR A FILTFRAMEWORK FOR A FILTER SYSTEMER SYSTEMER SYSTEMER SYSTEM AHP Arikan Ibrahim Konstruktionsbro

    fr Stahlbau

    Untermeitlingen, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Norwich, Norfolk, UK

    Architecture Office: Tim Foster Architects

    Main Contractor: R.G Carter Ltd

    Structural Engineer: Price & Myers

    Dimensions: Extension of the circular balcony by

    3 metres

    Specifications: Modernization program of the

    Theatre Royal of Norwich, built in the 1390s

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Advance Steel is easy to use

    The speed at which complicated models can be detailed

    It is simple to add custom objects into the system

    "Advance Steel was a key element in

    enabling us to achieve the required

    delivery, due to its ease of use and

    modeling qualities that we require."

    Mr. Nick Thompson,

    Director

    Complicated extension of the circular

    balcony

    Avoid double work by recreating the

    existing environment

    Detailed in small sections to allow better

    handling

    Start working directly on the AutoCAD

    DWG file provided by the architect

    USERS BENEFITS

    THEATRE ROYAL THEATRE ROYAL THEATRE ROYAL THEATRE ROYAL MODERNIZATIONMODERNIZATIONMODERNIZATIONMODERNIZATION

    TSI Structures Ltd

    Norwich, Norfolk, UK

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Stubaier galcier, Austria

    Contracting authority: Wintersport Tirol AG

    Dimensions: 3200 m above sea level, anchors of

    14 m in the glacier

    Specifications: 39 tons of weather-proof steel,

    80 m2 gratings

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3-D Modeling

    Very exact unfolded sheet metal

    Very fast and easy drawing creation

    The fast and easy drawing creation

    enabled us to save a lot of time.

    Mr. Pfister,

    Project Manager

    The entire construction consists of curved

    and rolled steel beams

    Laying of sheet metal along

    3-dimensional twisted polylines and

    splines

    Assembly of most of the pre-fabricated

    units at the top of the mountain

    Increase in productivity

    Unfolded sheet metal function

    Creating files from unfolded plates for the

    CNC machines

    USERS BENEFITS

    TOP OF TYROL VIEWITOP OF TYROL VIEWITOP OF TYROL VIEWITOP OF TYROL VIEWING PLATFORMNG PLATFORMNG PLATFORMNG PLATFORM

    Bitschnau GmbH

    Nenzing, Austria

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Abu Dhabi, United Emirate

    Contracting authority: Tourism Development and

    Investment Company

    Specifications: a cantilever carriage has a weight

    of 68 tons and consists of 3000 single units

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D Modeling

    Comprehensive possibilities during the creation of workshop drawings

    Collision control

    "Advance Steel enabled us to complete

    the work by the deadline. I especially want

    to put emphasis on the 3D function, the

    comprehensive functionality when

    creating workshop drawings, and the

    automatic collision control that checks the

    3D model continuously.

    Mr. Jger,

    Project Engineer

    Use of 12 cantilever carriages at the same

    time

    One cantilever carriage has to hold a

    bridge segment which has a weight of 200

    tons

    Link between 2D workshop drawings and

    the 3D model

    Automatic control of the model and

    drawings

    Compatibility between Advance Steel and

    AutoCAD

    USERS BENEFITS

    CANTILEVER CARRIAGECANTILEVER CARRIAGECANTILEVER CARRIAGECANTILEVER CARRIAGE

    Ed. Zblin AG

    Stuttgart, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: offshore Congo, Africa

    Dimensions: total height of 63m, dimension of

    the deck 30m x 31m x 6m

    Specifications: located 55 m below the water

    surface and 8 m above the water surface; a total

    weight of 2750 tons; 1650 tons of steel were

    created with Advance steel

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Creation of lists

    Fast drawing creation

    Many possibilities for selection and sorting

    "The fast and easy drawing creation

    enabled us to save a lot of time.

    Mrs. Ebert,

    Construction Engineer

    Self-transporting and self-installing

    platform

    Sub-construction as a steel tube

    framework with 4 integrated cylindrical

    footing elements

    Automatic creation, control and updating

    of the drawings

    Increase in productivity

    USERS BENEFITS

    M.O.A.B. OFFSHORE PLM.O.A.B. OFFSHORE PLM.O.A.B. OFFSHORE PLM.O.A.B. OFFSHORE PLATFORM ATFORM ATFORM ATFORM

    Overdick GmbH & Co. KG

    Hamburg, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Ljubljana, Slovenia

    Project: New building at the Faculty of

    chemistry

    Structure weight: 783 tons

    Building dimensions: 59.30 m 26.20 m

    16.00 m

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Study of this challenging structure was possible using 3D modeling

    Clear drawings for accurate fabrication

    "Advance Steel has increased our

    productivity and even made it possible to

    model the complex geometry of this

    structure in the first place. We especially

    appreciate its automatic detailing

    capabilities and easy manual adjustments

    to shop drawings.

    Mr. Marko PAVLINJEK,

    ELEA iC - Structural engineer

    Elliptical roof shape

    All columns are inclined

    Obtaining precise drawings for fabrication

    Curved beams 3D modeling

    Automatic connections used between

    straight and inclined beams

    Automatic workshop drawings

    USERS BENEFITS

    UNIVERSITY OF LJUBLJUNIVERSITY OF LJUBLJUNIVERSITY OF LJUBLJUNIVERSITY OF LJUBLJANAANAANAANA

    ELEA IC

    Ljubljana, Slovenia

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: worldwide concert tour

    Structure type: stage for the U2 360 Tour

    Art design: Willie Williams (U2 production

    manager) and Mark Fisher

    STAGECO R&D project designer: Koen Peeters

    Structure weight: 240 tons per touring system

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Advance Steel 3D drawings were much more illustrative than 2D drawings

    Information for an accurate fabrication

    "The use of Advance Steel and its easy-to-

    use 3D modeling has significantly

    contributed to the success of fabricating

    and delivering the steel structure on time

    and without errors at site."

    Mr. Koen Peeters,

    STAGECO R&D project designer

    Study this complex structure "spaceship-

    on-four-legs" in 3D

    Get clear drawings for easy erection

    Fabricate the steel structure without any

    risk of errors

    Use Advance Steel, a 3D steel modeling

    and detailing software

    Drawings with 3D views and 3D details for

    easy understanding at site

    Workshop drawings automatically created

    by Advance Steel

    USERS BENEFITS

    U2 360 TOUR STAGEU2 360 TOUR STAGEU2 360 TOUR STAGEU2 360 TOUR STAGE

    STAGECO

    Tildonk, Belgium

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Dax, France

    Customer: Mr. & Mrs. Da Silva

    Dimensions: Height to climb: 3m

    Specifications: Interior steel stairs (inside a

    private new house) with the railing treads and top

    handrail made from wood

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy design by working in 3D and render mode

    Representation of the stairs in its final environment Better understanding of the parts to be fabricated by the workshop

    "This is one of my first projects using Advance

    Steel, which allowed me to design the stairs

    that were not simple; the visualization in 3D

    and in render mode was a great help, and the

    3D and 2D details on drawings were useful for

    fabrication and erection at site.

    Mr. Bordas,

    Detailer within the company

    Designed for an exact fit to the existing

    concrete structure

    Stairs with double turn consisting of

    several different slopes

    Create clear and precise drawings for an

    accurate fabrication without errors

    Modeling of surrounding objects (walls,

    slab opening) in 3D

    Exact details of the different treads with

    their rise and height.

    Workshop drawings with side and 3D

    views for an easier understanding

    General arrangement drawings with 2D

    and 3D details

    USERS BENEFITS

    INTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRS

    ABC Serrurerie

    St Geours de Maremne, France

  • 150

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Main contractor: NEM, Netherlands

    Location: Eemshaven, Netherlands

    Dimensions: Boiler=36m x 13m x 40m

    Stack = diameter of 7m x 35m height

    Specifications: Part of a Power Plant which has a

    production capacity of 1200 Mega watts.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Advance Steel is fully integrated in AutoCAD

    All elements including mechanical parts are part of the unique model

    Precise workshop drawings with correct dimensions and BOMs

    "The use of Advance Steel is very easy and

    you can, with few clicks, create all types of

    elements such as folded plates, curved

    plates or curved beams."

    Mr. Ludo Plessers

    CSM Project Engineer

    Get all components within the model and

    drawings in connection with the placement of

    additional items such as welding neck flanges,

    blind flanges, pipe couplings, etc.

    Export model to a DWG file for use in AutoCAD

    Provide drawings that can be opened in

    AutoCAD to the customer

    Create their own profiles and purchase

    articles like flanges

    It is easy to select an assembly part to

    define frames for transporting the panels

    to the site

    Possible to explode the Advance Steel 3D

    model to ACIS solids

    Drawings created in DWG file format

    USERS BENEFITS

    MAGNUM BOILERMAGNUM BOILERMAGNUM BOILERMAGNUM BOILER

    CSM

    Hamont-Achel, Belgium

    ADVANCE STEEL

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Warsaw

    Architecture office: architecture for Warsaw city

    center

    Design architect: The Jerde Partnership

    Skylight contractor: Waagner Biro

    General contractor: Skanska

    Dimensions: 116m X 100m (Atrium roof plan size)

    Specifications: Shopping center having the

    biggest glass dome in Europe

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Based on AutoCAD

    Time savings

    Efficiency gains

    "Advance Steel increased our productivity

    due to the automatic output of the NC-files

    and the automatic creation of bills of

    materials."

    Mr. Schmidt,

    Design Coordinator

    The atrium roof is a double curvature

    geometry meaning all glass panels are

    different

    Complex three-dimensionally columns

    which look like trees

    Detailed 3D modeling for get precise

    panels workshop drawings

    Modeling in 3D was necessary to design

    this complex shape

    USERS BENEFITS

    GOLDEN TERRACESGOLDEN TERRACESGOLDEN TERRACESGOLDEN TERRACES

    Waagner-Biro

    Warsaw

  • 150

    ADVANCE STEEL

    More projects on www.graitewww.graitewww.graitewww.graitec.comc.comc.comc.com

    Location: Waure, Belgium

    Architecture Office: ASSAR

    Contracting Authority: GSK

    Dimensions: 13m high x 5,4m wide

    Specifications: Multi-level fire escape

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easier and quicker implementation

    Significant time savings with automatic joints and workshop drawings

    "Advance Steel is a very good solution for

    industrial detailing. In addition, the software

    has a short learning curve for professionals

    who already use AutoCAD.

    Mr Barillet,

    Draftsman

    The complexity of the project made it

    impossible to implement it manually or using

    AutoCAD

    Move the already mounted fire escape to

    the building site for quick mounting on site

    Library already including stairs (steps,

    balustrades)

    More accurate views with 3D modeling

    USERS BENEFITS

    FIRE ESCAPEFIRE ESCAPEFIRE ESCAPEFIRE ESCAPE

    SPRL Lardinois

    Gosselies, Belgique

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Douains, France

    Architecture Office: A.A.C.D

    Contracting authority: Communaut

    dagglomration des Portes de lEure

    Dimensions: single sloped halls, 18m span and

    lean-to buildings

    Specifications: hall of 1000 m2, offices of 180 m

    2,

    53 tons in total

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    30% faster in design studies

    Direct link with production tools

    Easy understanding of workshop drawings

    "The biggest advantage was the file

    transfer to the manufacturing site.

    Advance Steel offers a high manufacturing

    quality which is due to significant error

    minimization and easy mounting

    at site.

    Mr Vielle,

    Manager of Launet Design Office

    Show the architect a realistic 3D insight of

    the project

    Need to easily start workshop

    manufacturing

    Create a building with curved/arched

    exterior faades

    Quick structure 3D modeling

    High manufacturing file quality

    Send NC-DSTV files to the workshop

    Automatic joints for curved bars

    USERS BENEFITS

    BUSINESS CENTERBUSINESS CENTERBUSINESS CENTERBUSINESS CENTER

    LAUNET Design Office

    Beauvais, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Wolhusen, Switzerland

    Dimensions: Adventure center: total area of

    2100 m2; length of 85 m x width of 30 m x height

    of 14 m. Production center: total area of 5200 m2

    Specifications: The buildings are located 661 m

    above sea level. Inside, a production plant for the

    production of tropical fruits and fishes and an

    adventure center which consists of 105 tons of

    steel, 107 tons of glass and 15 tons of aluminum

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy and efficient creation of the 3D model

    Many automatic functions support the construction

    Very good cost/performance ratio

    Advance Steel enabled me to get fast and

    useful results. Especially when planning the

    details, I was able to save a lot of time by

    using the standardized and comprehensive

    possibilities of connections.

    Mr. Sager,

    Construction engineer

    A very filigree 3-dimensional construction

    that is located on slight, partly fixed

    columns and which is created as three

    glass waves

    Because of the hillside situation, the

    individual footing has different height

    indications.

    The three glass waves had to be

    constructed to each other in a staggered

    way to fit into the landscape.

    Detailed planning of the joints by using the

    comprehensive possibilities of connections

    Special profiles and end plates are easy to

    create and very helpful when creating

    complex constructions

    USERS BENEFITS

    TROPICAL CENTERTROPICAL CENTERTROPICAL CENTERTROPICAL CENTER

    Sager design CAD

    Horn TG, Switzerland

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Poland

    Engineering office: Biuro Inynierskie Micha

    Nowicki

    Dimensions: Survey project of transmission

    tower Height 76m

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy way to create any connection between steel elements

    Easy creation of spatial geometry of truss

    "Advance Steel does not only give the opportunity

    to create complete workshop documentation, it also

    provides a lot of very useful information for the

    design and construction process. Professional

    technical support is a big advantage especially in

    the phase of the software implementation and

    regular work afterward.

    Mr Nowicki,

    Designer

    Tight deadlines for the creation of the

    survey project of a transmission tower

    Prepare model of existing structure

    Propose new geometry solutions and

    prepare complete documentation

    Additional verification of the

    constructions mass set up during the

    calculation of the resistance

    Possibility of preparing proper

    documentation all necessary technical

    drawings as well as axiomatic views of

    complex elements of the construction

    readable for site engineers.

    USERS BENEFITS

    TRANSMISSION TOWERTRANSMISSION TOWERTRANSMISSION TOWERTRANSMISSION TOWER

    KD Consulting & Biuro Inynierskie

    Micha Nowicki

    Poland

  • 150

    ADVANCE STEEL

    More projects on wwwwww.graitec.comww.graitec.comww.graitec.comww.graitec.com

    Location: Niort, France

    Specifications: Building renovation of the Council

    of a French department with the implementation of

    stairs and railings

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy understanding with the 3D view

    Correction of the majority of the conception, fabrication and assembly problems

    Flexibility of the available modeling tools

    "Advance Steel enabled me to create

    documents with greater confidence; this is

    why I will never go back to working in 2D!"

    Mr Fays,

    Projector in Steel

    Use of solid, delicate/brittle and expensive

    materials which do not allow for incorrect

    material ordering

    Implementation of stairs and railings with

    glass panels

    Minimization of errors due to the modeling

    of the entire project

    Get a BOM with correct quantities

    USERS BENEFITS

    PLATFORMS & STAIRCASPLATFORMS & STAIRCASPLATFORMS & STAIRCASPLATFORMS & STAIRCASESESESES

    BGN (Bar Grolleau Nivault)

    Niort, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Ham, Belgium

    Contracting authority: Sleurs

    Dimensions: Transport belt width 1m length 25m

    Platforms around Conveyor belt + Stairs + Ladder

    + Railing = approximately 3500kg

    Specifications: This installation consists of feeding

    a reactor tank.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling to better visualize

    Huge library of intelligent connections

    Automatic NC files creation

    "Advance Steel made it possible to easily

    and quickly create the conveying system

    thanks to the advanced 3D modeling

    function.

    Mr. Verstraten,

    Design and Welding Engineer

    Biggest challenge: put together different

    parts that were drawn outside Advance

    Steel (building around the installation

    drawn in X-Steel, but a few points had to

    come together).

    Special parts like drive, gear, bearing,

    transport belt parts, electrical switches

    had to be connected to Advance Steel

    objects

    Creation of the conveying system done in

    3D with Advance Steel

    An entire 3D model, which accelerated all

    document creation and insured all-around

    drawing consistency.

    USERS BENEFITS

    CONVEYING SYSTEMCONVEYING SYSTEMCONVEYING SYSTEMCONVEYING SYSTEM

    Breetec International NV

    Steenweg, Belgium

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Netherlands

    Architecture office: Designed by Frits van

    Dongen of the Netherlands

    Dimensions: 290 tons, 35m in diameter, 12m in

    height

    Specifications: Part of the Spazio Shopping

    Centre in Zoetermeer and known as The UFO

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Modeling of the complex geometry

    Curved beams

    Specific user defined beams

    "This project let us see the huge

    possibilities offered by Advance Steel:

    modeling of the complex geometry, curved

    beams, specific user defined joints, etc.

    One can see clearly the complexity of the

    design entirely done in Advance."

    Eddy Vrolix,

    Draftsman

    Complex geometry for this structure made

    of several curved beams

    Specific custom joints to connect elements

    together

    3D structure modeling with handling of

    curved elements

    Available tools to create custom joints

    Automatic creation of fabrication drawings

    USERS BENEFITS

    THE UFO ZOETERMEER PTHE UFO ZOETERMEER PTHE UFO ZOETERMEER PTHE UFO ZOETERMEER PROJECTROJECTROJECTROJECT

    CSM

    Netherlands

  • 150

    ADVANCE STEEL

    More projects on www.gwww.gwww.gwww.graitec.comraitec.comraitec.comraitec.com

    Location: Brno, Czech Republic

    Architecture office: Arch Design, s.r.o.

    Contracting authority: BVV Brno, a.s.

    Dimensions: 220,3m x 89,5m

    Specifications: The new hall P in the Brno exhibition

    centre

    Description: The exhibition part of pavilion P is designed

    as a two-aisle, one-storey hall with the possibility to parcel

    into separate parts.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Error reduction controlling the model in 3D

    BOMs derived from the model

    Manufacturing directly from the 3D model

    "With Advance Steel, the 3D modeling of steel

    frameworks of "Pavilion P enabled the realization of the

    model complexity and the detail control in the workshop

    documentation. To expedite the tube structure fabrication,

    the information from the 3D model was directly used for

    the fabrication of particular elements. Using Advance Steel

    improved the demanding deadlines both for the project

    and for the steel structure delivery period."

    Vladimr Dank, Michal Rudolf, OKF s.r.o,

    Technical designers

    Manufacturing The biggest problem with

    this building was the intersections of tube

    diagonals with the upper/lower strip of

    truss beams/girder and welding

    preparations.

    Tube diagonals were manufactured

    directly from the 3D model exploded to

    ACIS solids

    USERS BENEFITS

    NEW EXHIBITION CENTRNEW EXHIBITION CENTRNEW EXHIBITION CENTRNEW EXHIBITION CENTRE HALLE HALLE HALLE HALL

    OKF, s.r.o.

    Brno, Czech Republic

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Brno, Czech Republic

    Architecture office: Aciercon s.r.o, Brno

    Contracting authority: PSG a.s., Zlin

    Dimensions: W=30 m, l=30 m, h=30 m

    Specifications: Steel Frame Structures for Heavy

    Technological Equipment

    Description: Total weight = 530 tons. It contains main carrier

    construction for the kettles.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Simple verification using the 3D rendered view

    Workshop drawing generated in line

    "Advance steel is suitable for such a

    complicated structure and was the perfect

    solution for this waste incinerator."

    Ing. Oldrich Balsinek,

    Managing Director

    Multi-floors steel structure

    Very complicated spatial relationships

    between steel structures and

    technological equipment

    Display the complete 3D structure of

    only selected floors

    Easy-to-use solution using collision

    detection within the final checking.

    USERS BENEFITS

    RESTORATION OF WASTERESTORATION OF WASTERESTORATION OF WASTERESTORATION OF WASTE INCINERATOR INCINERATOR INCINERATOR INCINERATOR

    Aciercon s.r.o.

    Kosice, Slovakia

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Bermuda

    Dimensions: 20 m high steel framework tower

    Specifications: Weather radar built to withstand

    hurricane velocity winds up to 300 km per hour;

    total weight of 32 tons

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Collision control on screen

    Virtual snapshots of the assembly for construction personnel

    3D Modeling

    "Graitecs Advance Steel does a great job

    in automating and updating all part lists."

    Rainer Bach and Georg Stichternath,

    Managers

    Assembly overseas

    Bearing framework

    Each single unit had to be under 6 m long

    for transportation

    Precise and automatic derivation of Bills of

    materials for the construction

    Sending NC files through a fiber optic cable

    from the construction to the fabrication

    USERS BENEFITS

    WEATHER RADAR TOWERWEATHER RADAR TOWERWEATHER RADAR TOWERWEATHER RADAR TOWER

    Conferdo GmbH

    Esterwegen, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Chatenois (dept 67), France

    Architecture office: Cabinet WACH

    Dimensions: Straight parallel stairs with 2

    intermediate platforms

    Specifications: Railing and handrail attached to

    the wall for the Hartmanns company

    headquarters

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Time saver for the modeling of the entire staircase + railings

    Changes are possible and easy

    Respected deadlines for the manufacturing and delivery at site

    "I was forced to change the entire 3D model

    (because of a modification on the concrete)

    while everything was finished, but this has

    been very easy and fast thanks to Advance

    Steels functionalities."

    Olivier RASQUIER,

    Draftsman, Ets J-C FASSLER

    Creating railings and handrails attached to

    a concrete wall

    Architectural railings with filled panels

    Tight deadlines due to the delay of

    previous companies working on this

    project

    Manufacturing all plates using CNC

    workshop machines

    Representation of the concrete due to the

    possibility to create a 3D solid

    Use of the automatic railing macro

    followed by specific adjustments to get

    the desired architectural result

    Time saver due to all drawings and BOMs

    created automatically

    NC-DSTV files automatically created for all

    plates

    USERS BENEFITS

    OFFICE STAIRSOFFICE STAIRSOFFICE STAIRSOFFICE STAIRS

    Ets J-C FASSLER

    Ste Marie aux Mines, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Villers-les-Nancy, France

    Engineering office: BECSI-EIC

    Contracting authority: MADE Agencement

    Dimensions: Height to climb: 3.8 m

    Specifications: Turning stairs with double quarter

    turns for a bank agency of Caisse dEpargne

    Lorraine Champagne Ardennes in the city of

    Villers-les Nancy

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easier job due to rendered 3D view

    Tool to convert construction lines and polylines to polygonal plates

    General arrangement drawing with labeled 3D view easy to understand

    "Without Advance Steel, it would have

    been more difficult to design such a stair

    where most of the parts are different

    because of the stairs complexity".

    Olivier RASQUIER,

    Draftsman, Ets J-C FASSLER

    Steel stairs with double quarter turn with

    steel support for wood steps

    Respect dimensions by following drawings

    provided by the engineering office

    Represent steel without seeing it within

    BOM and workshop drawings

    Modeling in 3D with rendered mode

    enabled to see clearly the particular

    specificities of the stairs

    Direct opening of the DWG in AutoCAD

    Manage behavior of Advance Steel

    elements to take them into consideration

    for automatically created documents

    USERS BENEFITS

    INTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRSINTERIOR STAIRS

    Ets J-C FASSLER

    Ste Marie aux Mines, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Esterwegen, Germany

    Dimensions: 111.5 m high steel grille framework

    connection

    Specifications: basic size of the footing = 30m2

    per corner bar; 4 individual footings; approx. 1300

    bars; approx. 10500 bolted connections; king pin

    angle = 18m; weight = 140000 kg; diameter of

    the rotor = 77m

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy 3D Modeling

    Quick Connection with Design

    Precise workshop drawings with exact dimensions and Bills of Materials

    "We have been using Advance Steel for many

    years and we are very satisfied with the

    software."

    Rainer Bach and Georg Stichternath,

    Managing Director at Conferdo GmbH & Co. KG

    Bearing framework

    Sloped columns

    Drawings for fabrication

    Intelligent connections

    Automatic connections between straight

    and sloped beams

    Automatic creation of the workshop

    drawings and the saw list

    USERS BENEFITS

    WIND POWER PLANTWIND POWER PLANTWIND POWER PLANTWIND POWER PLANT

    Conferdo GmbH & Co. KG

    Esterwegen, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Duisburg, Germany

    Dimensions: 50 tons, height of 10 meters, front

    span of 30 meters

    Specifications: The canopy looks like a funnel. It is

    Germany's most up-to-date casino, with 19

    American roulette tables, 8 blackjack tables and 24

    multi-roulette clients for classic gambling as well as

    400 slot machines

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Simple to use

    Good price/performance investment ratio

    "We are very satisfied with the ease of use

    of the Access database of Advance Steel.

    We were also convinced by the excellent

    customer support, the easy operation of

    the software and last but not least by the

    good price-performance ratio."

    Mr. Peter Mertens,

    Structural Engineer

    Project Manager

    Funnel-shaped canopy

    Modeling of specific profiles

    Symmetrical modification in flange shape

    User friendly software which allows

    handling of straight and curved elements

    Easy to create custom profiles and to store

    them in a library for a later reuse

    Working in 3D makes the conception

    easier

    USERS BENEFITS

    DUISBURG CASINO CANODUISBURG CASINO CANODUISBURG CASINO CANODUISBURG CASINO CANOPYPYPYPY

    Innovations-Verbund-Systeme GmbH

    Duisburg, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Kosice, Slovakia

    Architecture office: Hutni Projekt FM

    Contracting authority: U.S. Steel Kosice, s.r.o

    Dimensions: Coke oven gas desulphurization: 44X22,5X36 m,

    Regeneration of washing liquids: 7X21X29 m, Modified

    sulphur production unit: 21X28X12 m

    Specifications: Total tonnage of steel structures : 965 tons

    Description: The subject of the project is designing different

    steel platforms, constructions under technological devices,

    pipeline bridges, and canopies for tanks, etc.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Collisions between steel parts and equipments

    Visualization in 3D rendered mode

    Efficient creation of stairs and railings

    Using Advance Steel, we were able to

    model together steel elements with

    equipments and check the interference

    between them.

    Roman Lisnik,

    Designer Engineer

    Handle a huge structure and a run a clash

    check verification between supporting

    steel parts and equipments

    The structure contains many platforms

    with railings, stairs and cage ladders which

    must be designed in a short time

    Exchange the model with Plant Design

    software

    The Advance Steel clash checks works on

    parts imported from different applications

    Advance Steel provides efficient

    automatic macros to create railings, stairs,

    etc.

    Many file format exchange options

    allowing the exchange of the 3D model

    USERS BENEFITS

    COKE OVEN GAS DESULPCOKE OVEN GAS DESULPCOKE OVEN GAS DESULPCOKE OVEN GAS DESULPHURIZATIONHURIZATIONHURIZATIONHURIZATION

    HUTNI PROJEKT Frydek-Mistek a.s.

    Kosice, Slovakia

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Ivory Coast, West Africa

    Specifications: Bin Capacity: 150 Tons (live load)

    Steel work mass: 108.505 Tons

    Bin plate work mass: 67.074 Tons

    Chute plate work mass: 28.630 Tons

    Total mass: 204.209 Tons

    Description: The Roll-Off Material tip consists of

    a bin which is fed raw material by a D777 dump

    truck, from here an Apron feeder extracts the

    material.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Speed and ease of modeling

    . Standard connections

    Standard member sizes

    Creating bill of materials

    "We found that the speed and ease of

    modeling in Advance Steel was unmatched by

    any other package in the current market place.

    The transformation from AutoCAD to Advance

    steel can be done within a short period of time

    thus making the change quick and

    inexpensive."

    Clinton Dantu

    Draftsman

    Complete Roll-Off Material tips were

    required with no workshop pre-assembly

    time provided

    The bin plate work forms part of the

    structure to be able to withstand the

    relevant forces

    Modeling the complete Roll-Off Material

    tip while using clash detection eliminated

    any errors

    By using Advance steels plate work

    modeling functions, the bin was easily

    made.

    USERS BENEFITS

    TONGON GOLD PROJECTTONGON GOLD PROJECTTONGON GOLD PROJECTTONGON GOLD PROJECT

    Dantu Drafting

    Ivory Coast, West Africa

  • 150

    ADVANCE STEEL & ADVANCE DESIGN

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Constana, Romania

    Architecture office: S.C. PAVIAL S.R.L

    Dimensions:

    - Warehouse: 38 x 60m and height of 6m

    - Tower: 5 levels (height of approximately

    24m); a main area of 9 x 8.1m (houses the main

    technological activity) and another area of 9 x

    3.9m (which comprises vertical movement of

    personnel and concrete).

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Significantly time saving assigned to calculation

    Optimized synchronization of models using 3D visualization

    Reducing costs and material consumption

    "Import, export and synchronization functions of

    Advance Steel software have made possible the

    inclusion of the two models, tower and hall, in a

    single model, in which, with the help of 3D

    orientation made possible the examination of

    slopes and continuity of joints for the entire

    building."

    Panait Alexandru,

    General Manager

    Controlling the influence of vibration

    developed by the cumulative weight of

    machinery and concrete

    Changes due to technological basis

    modification

    Beneficiary requirements were strict

    about the cost and material consumption

    Temporary dynamic analysis using Advance

    Design tools

    The line position of similar joints was kept

    due to a multiple-connections configuration

    available in Advance Steel

    Quick and easy analysis of variables, due to

    available tools such as steel expert or

    measurement tools

    USERS BENEFITS

    WAREHOUSE FOR CONCRETE AND WAREHOUSE FOR CONCRETE AND WAREHOUSE FOR CONCRETE AND WAREHOUSE FOR CONCRETE AND

    TOWER FOR MACHINERYTOWER FOR MACHINERYTOWER FOR MACHINERYTOWER FOR MACHINERY S.C. PAVIAL S.R.L

    Constana, Romania

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Milano, Italy

    Dimension: 2 million square meters

    Specifications: The fair consists of 10 exhibition halls

    which are connected through a 1.3 km long axis. The

    axis is roofed by a freeform lattice roof construction,

    reminiscent of the Alps. The guests get an open-air

    experience without being exposed to wind and rain.

    This impression was reached using only 190 tree

    columns supporting the VELA.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling of the structure

    Time saving of 60 %

    "First of all, Advance is an application based on

    AutoCAD, the worldwide construction CAD

    standard. Furthermore, Advance is a young,

    extremely capable product that has proved itself

    on the market. The unique evolving project

    requirements on Advance were met by fast

    software development on the part of Graitec and

    we have come to realize the immense potential

    the solution still has in terms of headroom for

    future development.

    Mr ING G.E Nestor,

    General Manager, N-CAD Proiect

    All 190 tree columns are unique

    The drawing must be created according

    to contractor requirements

    Automatic drawing creation and modeling

    of the tree columns in 3D

    USERS BENEFITS

    THE NEW MILANO FAIRTHE NEW MILANO FAIRTHE NEW MILANO FAIRTHE NEW MILANO FAIR

    Emmerling GmbH

    Amberg, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Romania

    Specifications: The roof of this warehouse has an

    arc steel structure, with a 72m span

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling greatly simplified the structure design

    Reduction of errors

    Time savings

    "From my point of view, designing such a

    structure in less than 3 weeks is a success

    achieved entirely due to Advance Steel. It

    would be almost impossible to handle such a

    project without dedicated software like

    Advance Steel."

    Mr ING G.E Nestor,

    General Manager, N-CAD Proiect

    Arc structure built from straight beams

    Sliding roof

    Bolted connections on site

    3D joint modeling

    Automated drawing creation

    USERS BENEFITS

    WAREHOUSE FOR EXPLOSWAREHOUSE FOR EXPLOSWAREHOUSE FOR EXPLOSWAREHOUSE FOR EXPLOSIVE PRODUCTSIVE PRODUCTSIVE PRODUCTSIVE PRODUCTS

    N-CAD Proiect

    Slobozia, Romania

  • 150

    ARCHITECTURAL RAILING

    BROGLI Constructions Mtalliques Bex, Suisse

    Location: Villars-sur-Ollon (Switzerland)

    Engineering office : Jean-Daniel Berset

    Ingnieurs-Conseils SA

    Owner: Fire station at Ollon

    Dimensions: Railing with a total length of 32m

    fixed on top of a concrete slab at a height of 5m

    Specifications: Establishment of a railing all

    around a terrace on the top of a fire station

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Site survey of the existing terrace slab, then input of the different level values in the 3D Advance Steel model

    Numerous Advance Steel functionalities to model all steel elements and then to cut and drill them as required

    Automatic numbering of the different parts and workshop drawings automatically dimensioned and labeled

    "The easy modeling in 3D environment allowed me to realize this railing which is not standard and to limit at the minimum the risks of errors during fabrication, which I could not achieve with a 2D steel detailing software."

    Daniel BROGLI, BROGLI CM Managing Director

    AD

    VA

    NCE

    STE

    EL Design a railing on a concrete terrace having a slope and without any

    perpendicular sides Architectural railing containing sloped

    tubular filling and special posts Avoid any adjustment at site due to the

    fact that the railing is galvanized and then thermo lacquered

    Representation of the environment in concrete on which the railing will be fixed Much better understanding with the 3D modeling

    Automatic numbering of identical or different elements

    USERS BENEFITS

    More projects on www.graitec.com

  • 150

    With its capabilities of working and

    navigating through the model in 3D,

    Advance Steel is the right 3D steel detailing

    system to model complex connections

    between plate girders and standard rolled

    sections.

    Advance Steel provides a complete library of

    automatic macros for stairs & railings to

    speed up the modeling of the different steel

    walkways and handrails.

    The steel structure consists of a light

    tower with a height of 32m, and a circular

    deck supported by 4 main columns

    This steel tower must be connected to the

    concrete tower, which contains the

    elevator that provides access to the

    different tower levels.

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Contracting authority: Barmherzige Brder Trier

    Location: Hospital in Trier, Germany

    Dimensions: 32m height tower with a 28m large

    circular landing platform

    Specifications: Helicopter base connected a special

    elevator to the emergency room. Total weight:

    approximately 310 tons for the steel construction

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Real 3D graphical presentation of the model

    Automatic user friendly macros for stairs and railings

    Connection of the derived documents to the model

    "With its excellent functions Advance Steel

    supported us in fulfilling all these

    necessary and challenging demands for

    this special helicopter base."

    Mr. Matthias Thul,

    Construction engineer

    Stahlbau Ziemann GmbH

    USERS BENEFITS

    HELICOPTER BASE FOR HELICOPTER BASE FOR HELICOPTER BASE FOR HELICOPTER BASE FOR TRIER HOSPITALTRIER HOSPITALTRIER HOSPITALTRIER HOSPITAL

    STAHLBAU ZIEMANN GmbH

    Wittlich, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Contracting authority: Pirateninsel Rgen

    Location: Ruegen Island, Germany

    Dimensions: 12m long x 8.90m wide x 8.5m high

    Specifications: New addition to the indoor

    playground Pirateninsel Rgen. Total weight of

    the steel structure: 61.1 tons

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy 3D modeling of the steel structure

    Automatic creation of NC-DSTV files

    "Without the use of Advance Steel with its

    3D functions, the realization of this project

    would not have been possible for us."

    Mr. Moenter,

    Construction Engineer at Husmann

    Stahlbau GmbH

    The steel frames consist of 35 tons of

    steel.

    The construction has a bent at 4 in the

    longitudinal direction and in the cross

    direction.

    The house stands on the chimney, which is

    substituted by two massive steel columns

    Direct activation of the machines by using

    the NC files created by Advance Steel

    Automatic tools for the creation of the

    necessary details of single drawings and

    drawings of structural components

    USERS BENEFITS

    HOUSE STANDING ON ITHOUSE STANDING ON ITHOUSE STANDING ON ITHOUSE STANDING ON ITS ROOFS ROOFS ROOFS ROOF

    HUSMANN STAHLBAU GmbH

    Firrell, Germany

  • 150

    Model a steel house easily and in the most

    efficient way

    Need for more productivity: the company

    had efficiency issues due to numerous

    back and forth trips to the workshop and

    repeated tasks

    Requires DXF and DSTV files for automatic

    fabrication at workshops

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Dax

    Main Contractor: Mr. CAUDRON

    Dimensions: 15m x 10m x 7m height

    Specifications: Steel structure of a house since

    termites are the biggest problem in this area with

    wooden houses

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    User friendly 3D structural steel detailing

    Increased productivity with the automated functions

    Easy modifications with automatic update of all documents

    "I appreciate the easy modeling Advance

    Steel enables, the smartness of automated

    dimensioning and the easy modification of

    dimensions for the customization of our

    drawings. The use of Advance Steel is easy

    for someone who already knows a 3D

    Steel detailing tool.

    Mathieu Rouss,

    Draftsman

    Huge library of automatic connections

    Creation of directly usable drawings

    Automatic generation of DXF files for

    metal plates: they can be produced

    simultaneously

    NC-DFX and NC-DSTV files created with

    one click from the precise 3D model

    USERS BENEFITS

    HOUSE MADE OF STEELHOUSE MADE OF STEELHOUSE MADE OF STEELHOUSE MADE OF STEEL

    METAL ADOUR

    Anglet, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Leipzig, Germany

    Customer: Staatsbetrieb Schsisches Immobilien-

    und Baumanagement Niederlassung Leipzig

    Architect: Erick van Egeraat (EEA)

    Specifications: Total weight of the steel roof

    construction: 50 tons; 3 different architectonical

    buildings in one building (main building, bell

    tower, auditorium); total surface: 9200 m

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Fast 3D modeling

    Advance steel enables easy navigation in complex models

    Automatic drawing derivation from the 3D model

    "Without using Advance Steel with its excellent functions for such demanding objects, I would not have been able to realize this project.

    Mr. Eduardo Cerda, Manager and

    construction engineer of the

    Architektur- und Konstruktionsbro

    Dipl.-Ing. Eduardo Cerda

    The building is divided into 3 parts, each

    part having its own specific roof.

    Get exact quantities and weights in BOMs.

    Fast and exact 3D modeling

    Automatic joints for the fast modeling of

    assembly connections

    Fast and correct update of BOMs

    USERS BENEFITS

    EXTENSION OF THE UNIEXTENSION OF THE UNIEXTENSION OF THE UNIEXTENSION OF THE UNIVERSITY OF LEIPZIGVERSITY OF LEIPZIGVERSITY OF LEIPZIGVERSITY OF LEIPZIG Architektur- und Konstruktionsbro

    Dipl.-Ing Eduardo Cerda

    Leipzig, Germany

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Munich, Germany

    Customer: Stadtwerke Mnchen GmbH

    Architect: RPM Architekten GmbH, OX2 Architekten

    Dimensions: 73 m long, 31 m wide

    total area: 1540 m2

    Specifications: total weight of the steel roof

    construction: 420 tons

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Fast 3D Modeling

    Automatic derivation of workshop drawings

    Fast and easy drawing creation

    "Advance Steel is an excellent

    program for complex steel

    constructions. We appreciate the

    time saving and the rise in

    productivity."

    Mr. Manfred Ammann,

    Manager of the Construction and

    Project office at Bitschnau GmbH

    Star-shaped openings on the roof at the

    top of the columns

    Creation of the roof as a pentagonal

    surface with rounded edges created from

    three dimensional modeled steel plates

    Creation of 18 similar columns. Each

    column consists of similar vertical single

    elements.

    Design of advanced shapes, folded and

    twisted plates in 3D

    Creation of NC-DSTV and DFX files for the

    monitoring of CNC machinery

    User friendly functions and complete

    international catalogs for more efficiency

    and time saving

    USERS BENEFITS

    SUBWAY AND BUS STATISUBWAY AND BUS STATISUBWAY AND BUS STATISUBWAY AND BUS STATION ROOFON ROOFON ROOFON ROOF Bitschnau Stahl & Anlagenbau GmbH

    Bitschnau project gmbh

    Nenzing, Austria

  • 150

    Hip and valley purlins are difficult to

    handle in 2D

    Have all workshop drawings done as

    quick as possible

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Architecture office: Kuo Xiong Ming architectural

    firm

    Contracting authority: Tong-Yu

    Location: Hsin Chu, Taiwan

    Dimensions: 3073 m

    Specifications: 540-ton steel structure of a

    factory building

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy understanding for users through clear representation

    All possible collisions can be found at an early stage

    Time saving

    "Advance Steel is very easy to use; it

    was quick to learn. We could find the

    design issues in the model and discuss

    the changes. Advance Steel allowed us

    to reduce the construction cost losses."

    Chris Liu,

    Main structural shop drawing engineer

    Display the complete structural model in

    3D for easier understanding of all

    complex connections of purlins.

    Advance Steel provides efficient

    automatic macros for hip and valley

    purlins connections.

    Save more time in the drawing process

    with automatic drawing creation.

    USERS BENEFITS

    TONGTONGTONGTONG----YU FACTORYYU FACTORYYU FACTORYYU FACTORY

    I JIA Construction Co Ltd

    New Taipei City, Taiwan

  • 150

    ADVANCE STEEL

    More projects on www.graitec.cwww.graitec.cwww.graitec.cwww.graitec.comomomom

    Location: Cologne, Germany

    Architecture office: Schulitz GmbH

    Dimensions: 10.50 m high, 80 m wide and long

    Specifications: Total weight of 400 tons

    Description: new stadium with three different

    areas (ice stadium, swimming pool and locker

    rooms/restaurants area), and an ice rink going

    around the building as a 1st floor

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D modeling

    Automatic creation of documents

    Easy to use software with a very good cost/performance ratio

    "Without the use of Advance Steel

    with its many excellent functions,

    especially the 3D ability, the

    realization of this project would not

    have been possible for us."

    Mr. Manfred Drge,

    Construction engineer

    Triangular shape of the building

    Diamond-shaped arrangement of the

    roof girders

    Different spans of roof girders in the

    single areas

    Comprehensive modeling tools

    Library of intelligent connections

    Automatic creation of workshop

    drawings with customized layout

    USERS BENEFITS

    ICE AND SWIMMING STAICE AND SWIMMING STAICE AND SWIMMING STAICE AND SWIMMING STADIUMDIUMDIUMDIUM

    Stahlhallen und Baustoffe Janneck GmbH

    Molbergen, Germany

  • 150

    Create a shading steel structure on an

    existing insulated concrete structure

    Fix the upper part on a parapet with

    triangular end plates

    Precisely install the wooden slats

    according to the architects drawing

    Provide the customer with a general

    arrangement drawing for the final

    agreement

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Architecture office: URBANA LINEA

    Contracting authority: NACARAT

    Location: Villeneuve dAscq, France

    Dimensions: 12m high

    Description: Installation of a shading steel

    structure on the faade of an office building

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    3D viewing for easier designing

    Easy browsing in the model for better comprehension of the design details

    Clear and precise general arrangement drawings for the architect

    "This project was not very complicated, but

    Advance Steel allowed me to design the fixing

    details of the structure with the rendered and 3D

    navigation."

    Mehdi BRENNE,

    Draftsman, METALLERIE DU CAMBRESIS

    Model the existing faade using separate

    layers for miscellaneous materials

    (concrete, insulating material, parapet top,

    etc.)

    Navigation tools in the 3D model that

    enable easy design

    Creation of the trapezoid shape of the

    slats and use of copying functions to

    distribute it as expected

    Automatic creation of 2D and 3D views of

    the general arrangement drawing

    USERS BENEFITS

    SUNSUNSUNSUN----SHADING STRUCTURESHADING STRUCTURESHADING STRUCTURESHADING STRUCTURE

    METALLERIE DU CAMBRESSIS

    Fontaine Notre Dame, France

  • The structure consists of tapered box

    beams made of Y-shaped welded plates

    The architects main constraint was that

    no bolt should remain visible

    The weight of the steel elements makes it

    difficult to transport them and assemble

    them

    Need to display precise details in 3D for

    easy understanding by the architect

    Modeling of all weld preparation on beams

    and plates edges for easy welding at site

    Automatic collision detection

    Realistic 3D model and clear 2D and 3D

    assembly views

    DSTV files are generated from the

    Advance Steel model for the monitoring of

    the CNC machinery

    150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Valenciennes, France

    Dimensions: L: 180m; W: 145m; H: 23m

    Specifications: The steel structure supports

    prefabricated concrete bleachers. The stadium has

    a capacity of 25000 spectators.

    Description: A new stadium that is dedicated to

    Valenciennes Football Club games.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Precise 3D modeling

    No errors at site

    Create DSTV files for the fabrication of complex elements

    "We did not receive a single phone

    call from the site foreman to report

    any error!"

    Mr Stphane Dottori,

    Project Manager, ETI

    USERS BENEFITS

    VALENCIENNES STADIUMVALENCIENNES STADIUMVALENCIENNES STADIUMVALENCIENNES STADIUM

    ETI

    Echirolles, France

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Ontario, Canada

    Dimensions: 23.77m x 22.25m x 25.29m

    Specifications: Two braced-back legs are used to

    resist the lateral loads from the sheave at the top

    of the structure. Total weight: ~140 tons

    Description: New extension of an existing

    headframe building for a mining company.

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Easy 3D modeling

    Large library of automatic connections

    Low margin of error

    "The fact that Advance Steel is based on

    AutoCAD made the 3D modeling of the

    project easy. This is necessary to avoid any

    interference between the mechanical

    equipment and the structural and

    miscellaneous elements."

    Marc DESAULNIERS,

    Project Manager, ROULEAU-DESAULNIERS

    The connections of the braced-back legs

    with the two-way slope are very complex.

    The new structure needs to be connected

    on the existing columns and beams.

    A great number of site work details (site

    drills and site welded connections are

    required).

    Appropriate automatic connections were

    used from the Advance Steel library

    Easy modeling of the existing structure

    along with the new structure to avoid any

    interference

    Use of special compound beams for easy

    modeling of the back legs

    USERS BENEFITS

    HEADFRAMEHEADFRAMEHEADFRAMEHEADFRAME

    ROULEAU-DESAULNIERS

    St-Etienne-des-Gres, Canada

  • 150

    ADVANCE STEEL

    More projects on www.graitewww.graitewww.graitewww.graitec.comc.comc.comc.com

    Location: Indianapolis, USA

    Dimensions: 202m long x 39.2m large x 56m

    high

    Specifications: 4 levels; total weight: 145 tons

    Description: Additions to an existing industrial

    plant

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Clear overview of the project with 3D model

    Easy detection of collisions

    Limited margin of error on site

    "The Advance Steel 3D model

    helped us to find and solve the

    connection problems before

    submittal and fabrication; it also

    helped the erector to visualize

    the concept of the entire

    project."

    Griogo DANESHVAR,

    Owner of GD Drafting

    Connection of vertical bracings to

    horizontal members

    Find correct spacing of guardrails posts not

    to interfere with beam-to-beam

    connection where guardrails are attached

    3D modeling of the project for better

    understanding of the project concept

    Avoid interferences between vertical

    bracing and other members, and collisions

    of guardrail vertical post connections with

    beams below in walking areas

    USERS BENEFITS

    INDIANAPOLIS PLANTINDIANAPOLIS PLANTINDIANAPOLIS PLANTINDIANAPOLIS PLANT

    GD Drafting

    Los Angeles, USA

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: East Coast, USA

    Dimensions: 26.55m x 31m

    Specifications: Total weight: ~340 tons. More

    than 1350 shop drawings prepared

    Description: Additional equipment supports

    access platforms for a new engineered wood

    factory

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Import AutoCAD 3D solids in Advance Steel

    Automatic creation of shop and engineering drawings

    Single-click switch between metric and imperial units

    "The fact that Advance Steel is based on

    AutoCAD made the 3D modeling of the

    mechanical equipment and ducting easy.

    This is necessary to avoid any interference

    between the mechanical equipment and

    the structural and miscellaneous

    elements."

    Marc DESAULNIERS,

    Project Manager, ROULEAU-DESAULNIERS

    3D modeling of the mechanical

    equipment and duct

    The mechanical equipment provider

    uses metric units and the shop drawings

    need to be prepared in imperial units.

    Preparation of the engineering drawings

    from the 3D model

    Easy modeling with a combination of

    AutoCAD 3D solids and Advance Steel

    elements

    Transfer of the 3D model between metric

    and imperial units is made easy with

    Advance Steel.

    Shop drawings and engineering drawings

    are automatically generated.

    USERS BENEFITS

    INDUSTRIAL PLANTINDUSTRIAL PLANTINDUSTRIAL PLANTINDUSTRIAL PLANT

    ROULEAU-DESAULNIERS

    St-Etienne-des-Gres, Canada

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Location: Indianapolis, USA

    Dimensions: 35.66m x 41.14m

    Specifications: Total weight: 76 tons

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    Time saving and increased productivity

    Low margin of error

    Short learning curve

    "Advance Steel increases our production

    by getting to the jobsite on schedule. The

    learning curve was very easy and Advance

    Steel has helped us a great deal."

    Daniel Miller,

    Detailing Manager, LIBERTY STEEL

    Tight deadlines for the completion of

    detailing.

    Get DXF files for all plates and bars to be

    burnt.

    Fabricate the steel structure without any

    risk of errors.

    Use of Advance Steel templates for

    connections

    Details are created automatically for shop

    fabrication

    Creation of 3D views for a better

    understanding at site

    USERS BENEFITS

    SEASONS 52 RESTAURANSEASONS 52 RESTAURANSEASONS 52 RESTAURANSEASONS 52 RESTAURANTTTT

    LIBERTY STEEL

    Fyffe, USA

  • 150

    ADVANCE STEEL

    More projects on www.graitec.comwww.graitec.comwww.graitec.comwww.graitec.com

    Architecture office: E.C.S.

    Engineering Services ltd

    Location: Victoria Hall Wembley

    Specifications: Spiral roof from

    8th floor level upto 19th floor

    Level

    PROJECT DESCRIPTION

    THE CHALLENGE THE SOLUTION

    More Compl