    T E N S O S T R U C T U R E S

    E N G I N E E R I N G

    S U S P E N S I O N S T R U C T U R E S

    CABLE STAYED STRUCTURES

  • 8/20/2019 Redaelli for Engineering

    2/142

  • 8/20/2019 Redaelli for Engineering

    3/142

  • 8/20/2019 Redaelli for Engineering

    4/142

    E S P E R I E N Z E

    E X P E R I E N C E

  • 8/20/2019 Redaelli for Engineering

    5/142

    Picture: © Palladium

  • 8/20/2019 Redaelli for Engineering

    6/142

    5

    Stadio Juventus, Torino, ItaliaJuventus Stadium, Turin, Italy

    2010-2011

    Copertura strallata. 28 funiFLC 104, 4 funi FLC 75.Le funi hanno unalunghezza totale di circa3300 m per una massa di200 tonnellate.

    Stayed roof. 28 ropesFLC 104, 4 ropes FLC 75.Total ropes length is about3300 m for a total mass of200 tons.

  • 8/20/2019 Redaelli for Engineering

    7/142

    6

    Stadio BC Place, Vancouver, Canada

    BC Place Stadium, Vancouver, Canada

    2010-2011

    Copertura sospesaretrattile, 40.500 m2 coperti. Anello di funi composto dapiù di 6.000 m di funeFLC 125.

    Suspension retractableroof, 40.500 m2 covered.Ring cables made of morethan 6.000 meters oflocked coil cables FLC 125.

       F   R   E   Y   S   S   I   N   E   T

      -   P   i  c   t  u  r  e  s  :   B .

       C

      o  u  s   i  n

  • 8/20/2019 Redaelli for Engineering

    8/142

  • 8/20/2019 Redaelli for Engineering

    9/142

    8

    Palazzetto per mountain bike, Manchester, Gran BretagnaNational Indoor BMX Centre, Manchester, Great Britain

    2010-2011

    Copertura strallata con100 m di luce, 9.000 m2

    coperti. Stralli a terra inFLC 60 e funi disospensione in FLC 32.

    Stayed roof with 100 mspan, 9.000 m2 covered.Suspension and back staysin FLC 32 and FLC 60.

  • 8/20/2019 Redaelli for Engineering

    10/142

    9

    Ponte Jamarat, Mina, Arabia SauditaJamarat bridge, Mina, Saudi Arabia

    2010

    Sistema di sospensionedella membrana, 35000 m2

    totali coperti, composto dapiù di n. 400 funi con funiFLC e OSS con diametri da16 a 85 mm.

    Cable system formembrane covering,35000 m2 covered, made ofmore than nr. 400 cablesboth FLC and OSS, withdiameters between 16 and85 mm.

       T   A   M   I   M   I   &   S   O   N   S  -   E  n  g .

       M .

       M  a   f   f  e   i  s

  • 8/20/2019 Redaelli for Engineering

    11/142

    10

    Ponte ad arco Dambovita, Bucarest, RomaniaDambovita arch bridge, Bucharest, Romania

    2010

    Ponte stradale ad arco,117 m luce libera conpendini in fune FLC 70.

     Arch road bridge, 117 mspan. Hangers made with

    FLC 70.

  • 8/20/2019 Redaelli for Engineering

    12/142

    11

    Passerella sospesa Forsoddin, Leira, NorvegiaSuspension footbridge Forsoddin, Leira, Norway

    2010

    Passerella sospesa con132 m di luce libera.Funi portanti FLC 60.

    Suspension footbridge with132 m span.

    Main cables FLC 60.

  • 8/20/2019 Redaelli for Engineering

    13/142

    12     A     T     M   -     I     N     T     O     P

    Passerella pedonale adarco, 143 m di luce libera,n. 100 pendini in funiFLC 36.

     Arch footbridge, 143 m

    span, nr. 100 hangersFLC 36.

    Passerella pedonale Bernatka sul fiume Vistola, Cracovia, PoloniaFootbridge Bernatka over Vistula river, Krakow, Poland

    2010

  • 8/20/2019 Redaelli for Engineering

    14/142

    13

    Passerella ciclopedonalestrallata di 86 + 86 m diluce libera. Stralli in funechiusa FLC 75, 60, 44.

    Pedestrian stayedfootbridge. 86 + 86 m span.Full locked coil strandsFLC 75, 60, 44.

    Passerella strallata, Pescara, ItaliaStayed footbridge, Pescara, Italy

    2009

       P   i  c   t  u  r  e  s  :   S   t  a   h   l   b  a  u

       P   i  c   h   l  e  r

  • 8/20/2019 Redaelli for Engineering

    15/142

  • 8/20/2019 Redaelli for Engineering

    16/142

    15

    Passerella sospesa, Podgorica, MontenegroSuspension footbridge, Podgorica, Montenegro

    2009

    Passerella sospesa con71,5 m di luce libera. Funiportanti e pendini FLC 40 eOSS 12.

    Suspension footbridge with

    71,5 m span. Main cablesand hangers FLC 40 andOSS 12.

       P   i  c   t  u  r  e  s  :   I  n   t  e  r  -   M  o  s   t   A   D

       B  e   l  g  r  a   d  e

  • 8/20/2019 Redaelli for Engineering

    17/142

    16

    Zagreb Arena, Zagabria, CroaziaZagreb Arena, Zagreb, Croatia

    2008-2009

    Copertura sospesa con136 m massimi di lucelibera, 15.200 m2 coperti.Funi principali e funi disospensione in fune chiusaFLC 60, 64, 40, 35, 24 e

    morsetti di collegamento.

    Suspended roof with136 m maximum span,15,200 m2 covered. Maincables and suspensioncables in full locked cablesFLC 60, 64, 40, 35, 24 andheavy clamps.

       P   i  c   t  u  r  e  s  :   ©    S

       t  u   d   i  o   H   R   G

       d .  o .  o

     .

  • 8/20/2019 Redaelli for Engineering

    18/142

    17

    Passerella pedonale sospesa Collegebrug, Kortrijk, BelgioCollegebrug suspension footbridge, Kortrijk, Belgium

    Passerella pedonalesospesa con particolaregeometria ad S di 210 m dilunghezza con campatacentrale di luce libera 86 m.Funi principali e pendini in

    fune chiusa FLC 93,FLC 60 e fune spiroidaleOSS 18, OSS 32.

    Suspended footbridgefollowing an “S” shape.The bridge’s length is 210 mwith a central span of 86 m.Main cables and hangersFull locked cables FLC 93,FLC 60 and open spiralstrand OSS 18, OSS 32.

    2008-2009

       P   i  c   t  u  r  e  s  :   ©    A

       l  e  s  a   D  a  m

  • 8/20/2019 Redaelli for Engineering

    19/142

    18

    Parco divertimenti coperto Khan Shatyr, Astana, KazakistanKhan Shatyr Entertainment Center, Astana, Kazakhstan

    2008-2009

       P   i  c   t  u  r  e  s  :   ©    C

      o  n   t  r  a  s   t  o

  • 8/20/2019 Redaelli for Engineering

    20/142

    19

    Parco divertimenti coperto Khan Shatyr, Astana, KazakistanKhan Shatyr Entertainment Center, Astana, Kazakhstan

    2008-2009

    La più alta struttura tessiledel mondo. Rete di funi abase ellittica alta 150 m,15,000 m2 coperti. 180 t mdi funi OSS.

    The tallest tensile structurein the world. Elliptical basecable-net structure, 150metres high, 15,000 m2

    covered. 180 tons m ofOSS cables.

  • 8/20/2019 Redaelli for Engineering

    21/142

    20

    Passerella strallata, Casalecchio di Reno (Bologna), ItaliaStayed footbridge, Casalecchio di Reno (Bologna), Italy

    Passerella strallata conpennone inclinato, 74 m diluce libera. Stralli in funechiusa FLC 54 e FLC 32.

    Stayed footbridge with

    sloping mast, 74 m span.Stay cables FLC 54 andFLC 32.

    2008

  • 8/20/2019 Redaelli for Engineering

    22/142

    21

    Passerella pedonale sul fiume Adda, Albosaggia (Sondrio), ItaliaFootbridge over the Adda river, Albosaggia (Sondrio), Italy

    Passerella pedonalesospesa, 63 m di lucelibera. Funi portanti estabilizzanti.

    Suspension footbridge,

    63 m span. Supporting andstabilizing cables.

    2008

       T  e  n  s  o  s  p  a  z   i  o ,

       I   t  a   l  y

  • 8/20/2019 Redaelli for Engineering

    23/142

    22

    Passerella Parque de Alzamora, Saragozza, SpagnaPedestrian bridge Parque de Alzamora, Zaragoza, Spain

    2008

    Passerella strallata perl’Expo 2008 di Saragozzacon 94 + 191 m di lucelibera. Stralli in fune chiusaFLC 35, 40, 45 e 128.

    Pedestrian stayedfootbridge for the ZaragozaExpo 2008 with 94 + 191 mspan. Full locked coilstrands FLC 35, 40, 45 and128.

       F   C   C ,

       S  p  a   i  n

  • 8/20/2019 Redaelli for Engineering

    24/142

    23

    Expo 2008 - Struttura tessile, Saragozza, SpagnaExpo 2008 - Textile structure, Zaragoza, Spain

    2008

    Funi di sostegno coperturaa membrana, 400 m di lucelibera, 5000 m2 coperti.

    Suspension cables fortextile structure, 400 m

    span, 5000 m

    2

    covered.

       I   A   S   O ,

       S  p  a   i  n

  • 8/20/2019 Redaelli for Engineering

    25/142

    24

    Ponte ad arco, Zambana Vecchia (Trento), Italia Arch bridge, Zambana Vecchia (Trento), Italy

    2008

    Ponte stradale ad arco,60 m di luce libera. Pendiniin barre di diametro 72 mm.

     Arch road bridge, 60 mspan. Hangers made with

    bars 72 mm diameter.

       O   b  e  r  o  s   l  e  r  -   C  o  r   d   i  o   l   i ,

       I   t  a   l  y

  • 8/20/2019 Redaelli for Engineering

    26/142

    25

    Ponte stradale strallato,130+130 m di luce libera.Stralli in fune chiusa FLC116 e 128.

    Cable stayed road bridge,

    130+130 m span. FLC 116and 128 stay cables.

    Ponte strallato Adige, Lavis (Trento), Italia Adige stayed bridge, Lavis (Trento), Italy

    2007-2008

       O   b  e  r  o  s   l  e  r  -   C  o  r   d   i  o   l   i ,

       I   t  a   l  y

  • 8/20/2019 Redaelli for Engineering

    27/142

    26

    Ponte ferroviario metropolitano, Gerusalemme, IsraeleLight rail train bridge, Jerusalem, Israel

    2007-2008

       P   i  c   t  u  r  e  s  :   ©    P

      a   l   l  a   d   i  u  m

  • 8/20/2019 Redaelli for Engineering

    28/142

    27

    Ponte ferroviario metropolitano, Gerusalemme, IsraeleLight rail train bridge, Jerusalem, Israel

    2007-2008

    Ponte ferroviario strallato di225 m di luce libera conpennone inclinato di altezza120 m. 70 stralli FLC 30,40, 50 e 90.

    Stayed Bridge, 225 m spanand 120 m tall mast. N. 70stay cables FLC 30, 40, 50and 90.

  • 8/20/2019 Redaelli for Engineering

    29/142

    28

    Ponte stradale sospeso Älvsborg, Gothenburg, Svezia Älvsborg road suspension bridge, Gothenburg, Sweden

    2007-2008

    Ponte sospeso avente418 m di luce libera.Sostituzione dei 112pendini doppi disospensione in fune chiusaFLC 45 extra-flessibile.

    Suspension road bridge.418 m free span.Replacement of the 112twin hangers with FLC 45extra-flexible.

  • 8/20/2019 Redaelli for Engineering

    30/142

    29

    Scavalcamento pedonale autostrada A13, Bologna, ItaliaPedestrian walkway A13 motorway, Bologna, Italy

    2007-2008

    Passerella pedonalestrallata con strutturaportante a portale estabilizzazione di impalcato.90 m di luce libera.

    Stayed-stabilizedfootbridge with portal mastsystem, 90 m free span.

       S   t  u   d   i  o   T  e  c  n   i  c  o   M  a   j  o  w   i  e  c   k   i

  • 8/20/2019 Redaelli for Engineering

    31/142

  • 8/20/2019 Redaelli for Engineering

    32/142

    31

       L   t   d

       "   E   l   i   t  a  -   B  u  r   j   i   " ,

       G  e  o  r  g   i  a

    Pontile, Ureki, GeorgiaPier, Ureki, Georgia

    2007

    Pontile in tensostruttura,70+70 m di luce libera.Sistema di funi chiuse espiroidali di vario diametro.

    Tensostructural pier,

    70+70 m span. Full lockedcoil and open spiral cablesystem.

  • 8/20/2019 Redaelli for Engineering

    33/142

    32

    Passerella pedonale sopra lo Zuid, Willelmsvaart, BelgioFootbridge over Zuid, Willelmsvaart, Belgium

    2007

    Passerella pedonalestrallata, 76 m di luce liberae pilone inclinato di 42 md'altezza.

    Cable stayed footbridge,

    76 m span and 42 m tallcurved A-mast.

  • 8/20/2019 Redaelli for Engineering

    34/142

    33

    Ponte strallato Fabian Way, Swansea, Gran BretagnaFabian Way stayed bridge, Swansea, Great Britain

    2007

    Ponte stradale strallato,70 m luce libera. Stralli FLC56 con capicorda regolabilidel tipo TBF.

    Stayed road bridge, 70 m

    span. Stay cables systemwith FLC 56 and adjustablesocket type TBF.

       P   i  c   t  u  r  e  s  :   ©    J

      a  m  e  s   S  a  m  u  e   l  -   F

       l   i  n   t   &   N  e   i   l   l   P  a  r   t  n  e  r  s   h   i  p   D  e  s   i  g  n  e  r

  • 8/20/2019 Redaelli for Engineering

    35/142

    34

    Copertura fiera di Madrid, SpagnaMadrid fair pavilion roof, Spain

    2007

    Sistema radiale di funi dicatena per copertura avolta, 111 m di luce libera.

    Tensostructure chainsystem for the pavilion

    vault roof with 111 m span.

  • 8/20/2019 Redaelli for Engineering

    36/142

    35

    Passerella pedonale, Segrate (Milano), ItaliaFootbridge, Segrate (Milan), Italy

    2007

    Passerella pedonalesospesa, 10+39+10 m diluce libera.

    Suspension footbridge10+39+10 m span.

  • 8/20/2019 Redaelli for Engineering

    37/142

    36

    Ponte ad arco stradale, Egna Ora (Trento), Italia Arch road bridge, Egna Ora (Trento), Italy

    2007

    Ponte ad arco, pendini infune FLC 44 con guaina inpolietilene HDPE, 60 m diluce libera.

     Arch road bridge, 60 m

    span. Hangers FLC 44protected with HDPEsheath.

  • 8/20/2019 Redaelli for Engineering

    38/142

    37

    Ponte stradale ad arco, Lucca, Italia Arch road bridge, Lucca, Italy

    2006-2007

    Ponte stradale ad arco con46 pendini in fune FLC 72 e132 m di luce libera.

     Arch road bridge with 46hangers FLC 72 and 132 m

    free span.

  • 8/20/2019 Redaelli for Engineering

    39/142

    38

    Passerella pedonale Università di Limerick, EIREUniversity of Limerick pedestrian bridge, EIRE

    Passerella sospesa,6 x 44 m di luce libera.Funi spiroidali OSS 40.

    Suspension footbridge,6 x 44 m span.

    OSS 40 cable system.

    2006-2007

       P   i  c   t  u  r  e  s  :   ©   R  o  s   K  a  v  a  n  a  g   h  -   W

       i   l   k   i  n  s  o  n   E  y  r  e   A  r  c   h   i   t  e  c   t  s

  • 8/20/2019 Redaelli for Engineering

    40/142

    39

    Membrana pontile Ichnusa, Cagliari, ItaliaMembrane pier Ichnusa, Cagliari, Italy

    2006

    Strallatura per la membranadi copertura di 1829 m2.Sistema di funi zincate einox.

    Membrane stayed roof of

    1829 m

    2

    . Galvanized andstainless steel cablesystem.

  • 8/20/2019 Redaelli for Engineering

    41/142

    40

    Passerella strallata, Pireo, GreciaStayed footbridge, Piraeus, Greece

    2006

    Passerella pedonalestrallata, 43 m span.Stralli in OSS 17 e FLC55 e 86.

    Cable stayed footbridge,

    43 m span. Stay cablesOSS 17 and FLC 55, 86.

       S   t  u   d   i  o   T  e  c  n   i  c  o   M  a   j  o  w   i  e  c   k   i

  • 8/20/2019 Redaelli for Engineering

    42/142

    41

    Stazione ferroviaria di Caracas, VenezuelaRailway station roof in Caracas, Venezuela

    2006

    Doppia copertura strallatacontrapposta sostenuta da35 x 120 m e 85 x 20 m diluce libera per un totale di4200 + 1700 m2 coperti.Strallatura in fune chiusa.

    Double cable stayed roof.35 x 120 m and 85 x 20 mspan for 4200 + 1700 m2

    covered. FLC stay system.

  • 8/20/2019 Redaelli for Engineering

    43/142

    42

    2006

    Passerella sospesa M-40, Madrid, SpagnaSuspension footbridge M-40, Madrid, Spain

    Passerella sospesa conluce libera di 89 m. Funiportanti FLC 106, pendini estralli OSS 26 e 20.

    Suspension footbridge with

    89 m free span. Catenarycable hangers and staycables FLC 106, OSS 26and OSS 20.

       C  a  r   l  o  s   F  e  r  n  a  n   d  e  z   C  a  s  a   d  o  -   M

       K   4

  • 8/20/2019 Redaelli for Engineering

    44/142

    43

    Passerella sospesa R-3, Madrid, SpagnaSuspension footbridge R-3, Madrid, Spain

    Passerella sospesa con40+110+40 m di lucelibera. Funi portanti FLC118, pendini e stralli OSS26 e 20.

    Suspension footbridge with40+110+40 m free span.Catenary cable hangersand stay cables FLC 118,OSS 26 and OSS 20.

    2006

       C  a  r   l  o  s   F  e  r  n  a  n   d  e  z   C  a  s  a   d  o  -   M

       K   4

  • 8/20/2019 Redaelli for Engineering

    45/142

    44

    Ponte a doppio arco.30 pendini FLC 52, 90 m diluce libera.

    Double arch bridge.30 hanger cables FLC 52,

    90 m span.

    Ponte stradale ad arco, Pieve di Soligo (Treviso), Italia Arch road bridge, Pieve di Soligo (Treviso), Italy

    2005-2006

  • 8/20/2019 Redaelli for Engineering

    46/142

    45

    Passerella ciclopedonalesospesa, 170 m di lucelibera. Funi portanti,stabilizzanti e pendini.

    Suspension footbridge,

    170 m span. Main cables,stabilizing cables andhangers.

    Passerella pedonale, Karjaly, BulgariaFootbridge, Karjaly, Bulgaria

    2005-2006

       P   i  c   t  u  r  e  s  :   R   E   A

       B  u   l  g  a  r   i  a

  • 8/20/2019 Redaelli for Engineering

    47/142

    46

    Passerella strallata, Sestriere (Torino), ItaliaPedestrian bridge, Sestriere (Turin), Italy

    2005-2006

    Passerella strallata per iGiochi Olimpici Invernali diTorino 2006.

    Pedestrian stayedfootbridge for Winter

    Olympic Games of Turin2006.

  • 8/20/2019 Redaelli for Engineering

    48/142

    47

     Arco Olimpico. Olimpiadi Torino 2006, ItaliaOlympic Footbridge. Winter Olympic Games Turin 2006, Italy

    2005-2006

    Passerella strallata aventeluce libera di 160 msostenuta da un grandearco inclinato alto 65 msimbolo delle OlimpiadiInvernali di Torino 2006.

    Pedestrian stayedfootbridge, symbol of theOlympic Games of Turin2006; 160 m free spandeck stayed on an inclined65 m tall arch.

       H   D   A   P  a  r   i  s  -   A   T   I   S  e  r  m  e  c  a   F  a   l  c

      o  n  e

  • 8/20/2019 Redaelli for Engineering

    49/142

    48

    Ponti stradali, Reggio Emilia, ItaliaRoad bridges, Reggio Emilia, Italy

    2005-2006

    Sistema di 3 ponti stradali:ponte ad arco di 220 m diluce libera; 2 ponti strallatisostenuti da un arcocentrale alto 70 m aventi90+90 m di luce libera.

    System of 3 road bridges:arch bridge with 220 mspan; 2 bridges stayed on70 m tall transverse archwith 90+90 m span.

       P   i  c   t  u  r  e  s  :   ©    P

      a   l   l  a   d   i  u  m

  • 8/20/2019 Redaelli for Engineering

    50/142

    49

    Ponti stradali, Reggio Emilia, ItaliaRoad bridges, Reggio Emilia, Italy

    2005-2006

  • 8/20/2019 Redaelli for Engineering

    51/142

    50

    Ponte ad arco RN 141, Angouleme, Francia Arch bridge RN 141, Angouleme, France

    2005

    Ponte stradale ad arco,45 m di luce libera.Pendini diagonali OSS 68con guaina HDPE.

     Arch road bridge, 45 m

    span. Diagonal hangersOSS 68 + HDPE sheathed.

  • 8/20/2019 Redaelli for Engineering

    52/142

    51

    Passerella strallata, Bormio (Sondrio), ItaliaPedestrian bridge, Bormio (Sondrio), Italy

    2005

    Fornitura di 31 stralli inFLC 50, 42 e OSS 28, 22.Luce libera 62,5 m.

    31 stay cables FLC 50, 42and OSS 28, 22.

    62,5 m span.

  • 8/20/2019 Redaelli for Engineering

    53/142

    52

    Stadio di Malabo, Guinea EquatorialeMalabo Stadium, Equatorial Guinea

    2005

    Copertura strallata.Sistema di cavi in acciaioinossidabile OSS 14, 19, 24e 32.

    Suspension roof

    tensostructure. Cable staysystem OSS 14, 19, 24 and32 stainless steel.

       ©    I

      n  g   é  r  o  p   A   f  r   i  c  a

  • 8/20/2019 Redaelli for Engineering

    54/142

    53

    Ponte strallato, Fuengirola, SpagnaStayed bridge, Fuengirola, Spain

    2005

    Ponte stradale strallato.70 m di luce libera.

    Cable stayed road bridge.70 m free span.

       P   i  c   t  u  r  e  s  :   F   C   C

  • 8/20/2019 Redaelli for Engineering

    55/142

    54

    Passerella sospesa, Parco Naturale Alpi Marittime a Valdieri (Cuneo), ItaliaPedestrian suspension bridge, Natural Park Alpi Marittime in Valdieri (Cuneo), Italy

    2005

    Passerella sospesastabilizzata, 35 m di lucelibera.

    Footbridge with supportingand stabilizing cables,

    35 m span.

  • 8/20/2019 Redaelli for Engineering

    56/142

    55

    Passerella ad arco sul fiume Topino, Foligno (Perugia), ItaliaPedestrian arch bridge over Topino river, Foligno (Perugia), Italy

    2005

    Passerella con arcoinclinato in pianta, 26 m diluce libera.

    Footbridge with inclinedarch, 26 m span.

  • 8/20/2019 Redaelli for Engineering

    57/142

    56

    Briglia sul Sarca, Trento, ItaliaRiver Sarca weir filter, Trento, Italy

    2005

    Sistema di cavi di f iltraggio.120 m di luce libera.

    Weir cable system, 120 mspan.

  • 8/20/2019 Redaelli for Engineering

    58/142

    57

    Passerella sospesa, Venzone (Udine), ItaliaPedestrian suspension bridge, Venzone (Udine), Italy

    2004-2005

    Passerella sospesa. Funeportante, pendini e funi diparapetto. Luce libera 48 m.

    Suspension footbridge.Main cables, hangers and

    parapet cables. 48 m span.

  • 8/20/2019 Redaelli for Engineering

    59/142

    58

    Passerella strallata, Beinasco (Torino), ItaliaFootbridge, Beinasco (Turin), Italy

    2004

    Passerella ciclopedonale,luce libera 50 m con piloneinclinato di 45 m d'altezza.

    Stayed footbridge with50 m free span deck and

    45 m tall mast.

  • 8/20/2019 Redaelli for Engineering

    60/142

    59

    Passerella pedonale, Ortisei (Bolzano), ItaliaPedestrian bridge, Ortisei (Bolzano), Italy

    2004

    Passerella sospesa, funiportanti e stabilizzanti,65 m di luce libera.

    Suspension footbridge,supporting and stabilizing

    cables, 65 m span.

  • 8/20/2019 Redaelli for Engineering

    61/142

    60

    Passerella pedonale Zouthaven, Amsterdam, Paesi BassiZouthaven footbridge, Amsterdam, The Netherlands

    2004

    Passerella con sistematensostrutturale, 58 m lucelibera.

    Tensostructural footbridge,58 m span.

       P   i  c   t  u  r  e  s  :   H   S   M

  • 8/20/2019 Redaelli for Engineering

    62/142

    61

    Grande ruota con 45 mdi diametro raggiata esospesa tramite un sistemapresollecitato di funi.

    Giant wheel with 45 m

    diameter suspended with asystem of spoke and staycables.

    Scultura in Matosiños, PortogalloSculpture in Matosiños, Portugal

    2004

       I   C   Q ,

       P  o  r   t  u  g  a   l

  • 8/20/2019 Redaelli for Engineering

    63/142

    62

    Copertura palasport, Trivero (Biella), ItaliaSports hall roof, Trivero (Biella), Italy

    2004

    Sistema multi-modulare ditensostrutture piane con36 m di luce libera. Funiportanti e stabilizzanti inFLC 46 e 31.

    Modular planetensostructures, 36 mspan. Main and stabilizingFLC 46 and 31.

       T  e  n  s  o  s  p  a  z   i  o ,

       I   t  a   l  y

  • 8/20/2019 Redaelli for Engineering

    64/142

    63

    Passerella strallata ciclopedonale, Farra d'Alpago (BL), ItaliaStayed footbridge, Farra d'Alpago (BL), Italy

    2004

    Passerella strallata di23+63+23 m di luce libera.Stralli in OSS 44 e 32.

    Cable stayed pedestrianbridge, 23+63+23 m span.

    Stay cables made withOSS 44 and 32.

  • 8/20/2019 Redaelli for Engineering

    65/142

    64

    Stadio Olimpico di Atene, Grecia Athens Olympic Stadium, Greece

    Copertura strallatasostenuta da due doppiarchi con luce libera di300 m, stralli dicollegamento principali estralli di sospensione

    secondari in fune chiusa.32 stralli principali didiametro 104 mm e 90 mm.216 stralli di sospensione didiametro 40 mm.

    Cable stayed roofsupported by two doublearches with 300 m freespan, main connection staycables and secondarysuspension stay cablesmade by full locked coilrope. 32 main stay cables104 mm and 90 mmdiameter. 216 suspension

    stay cables 40 mmdiameter.

    2003-2004

       P   i  c   t  u  r  e  s  :   ©    P

      a   l   l  a   d   i  u  m

  • 8/20/2019 Redaelli for Engineering

    66/142

    65

    Stadio Olimpico di Atene, Grecia Athens Olympic Stadium, Greece

    2003-2004

  • 8/20/2019 Redaelli for Engineering

    67/142

    66

    Ragnatela di funi. Cerimonia di apertura e chiusura dei Giochi Olimpici di Atene 2004“Spidernet” for opening and closing ceremony of Olympic Games 2004 in Athens

    2003-2004

    Sistema di funi strallato esospeso, dipartente dalcentro campo a raggieracon diametro di 200 m.

    Stay an suspension spoke

    cable system, opening fromthe center of field with200 m diemeter.

  • 8/20/2019 Redaelli for Engineering

    68/142

    67

    Ponti strallati sull’Hoofdvaart ad Haarlemmermeer, OlandaStayed bridges over the Hoofdvaart in Haarlemmermeer, Holland

     Toolenburg

    Sistema di due pontistradali e pedonali.2x26 m di luce libera.

    Two road and walkwaycable stayed bridges.2x26 m span.

    2003-2004

       P   i  c   t  u  r  e  s  :   ©    P

      a   l   l  a   d   i  u  m

  • 8/20/2019 Redaelli for Engineering

    69/142

    68

    Ponti strallati sull’Hoofdvaart ad Haarlemmermeer, OlandaStayed bridges over the Hoofdvaart in Haarlemmermeer, Holland

    2003-2004

    Nieuw Vennep

    Ponte stradale strallato.56+87 m di luce libera.

    Cable stayed road bridge.

    56+87 m span.

       P   i  c   t  u  r  e  s  :   ©    P

      a   l   l  a   d   i  u  m

  • 8/20/2019 Redaelli for Engineering

    70/142

    69

    Ponti strallati sull’Hoofdvaart ad Haarlemmermeer, OlandaStayed bridges over the Hoofdvaart in Haarlemmermeer, Holland

    2003-2004

    Bennebroekerweg

    Ponti stradali strallati sudue livelli. 75+75 m e 20 mdi luce libera.

    Cable stayed road bridges.75+75 and 20 m span.

       P   i  c   t  u  r  e  s  :   ©    P

      a   l   l  a   d   i  u  m

  • 8/20/2019 Redaelli for Engineering

    71/142

    70

    Ponte stradale, Villanova d’Albenga (Savona), ItaliaRoad bridge, Villanova d’Albenga (Savona), Italy

    2003

    Ponte stradale strallato con35 m di luce libera e piloneinclinato.

    Cable stayed road bridge,with 35 m span and

    inclined mast.

  • 8/20/2019 Redaelli for Engineering

    72/142

    71

    Copertura piscina comunale, Travagliato (Brescia), ItaliaSwimming pool roof, Travagliato (Brescia), Italy

    2003

    Tensostruttura pianamodulare, 36 m di lucelibera. Funi portanti estabilizzanti FLC 43 e 31.

    Modular plane

    tensostructures, 36 mspan, main cables andstabilizing FLC 43 and 31.

       T  e  n  s  o  s  p  a  z   i  o ,

       I   t  a   l  y

  • 8/20/2019 Redaelli for Engineering

    73/142

    72

    Stadio di Braga, PortogalloBraga Stadium, Portugal

    2002-2003

    Copertura sospesa. Funi disospensione, supportispeciali, sistemaammortizzante.202 m di luce libera, 550 tdi funi chiuse.

    Suspension Roof.Suspension cables, roofsupports, damping system.202 m span, 550 tons FullLocked Coil Strand.

  • 8/20/2019 Redaelli for Engineering

    74/142

    73

    Stadio di Braga, PortogalloBraga Stadium, Portugal

    2002-2003

  • 8/20/2019 Redaelli for Engineering

    75/142

    74

    Pensilina fiera di Genova, ItaliaGenoa fair pavilion roof, Italy

    2002

    Copertura sospesa delpadiglione fieristico. Funi disospensione FLC 30.

    Suspension roofsteel/membrane system.

    Suspension cables FLC 30.

  • 8/20/2019 Redaelli for Engineering

    76/142

    75

    Copertura strallata,2 x 120 m di luce libera.

    Stand roof tensostructurescables, 2 x 120 m span.

    Stadio Hannappi, Vienna, AustriaHannappi Stadium, Wien, Austria

    2002

  • 8/20/2019 Redaelli for Engineering

    77/142

    76

    Copertura fiera di Bergamo, ItaliaBergamo pavilion roof, Italy

    2002

    Funi di catena percopertura modulare, 96 mdi luce libera.

    Roof cables system withchain cables, 96 m span.

       P   i  c   t  u  r  e  s  :   E  s  s  e   t   i   t  r  e ,

       I   t  a   l  y

  • 8/20/2019 Redaelli for Engineering

    78/142

    77

    Copertura piscina, Oggiono (LC), ItaliaSwimming pool roof, Oggiono (LC), Italy

    2001-2002

    Copertura strallata di 26 mdi luce libera.

    Cable stayed roof, 26 mspan.

  • 8/20/2019 Redaelli for Engineering

    79/142

    78

    Passerella pedonale, Gressan (Aosta), ItaliaPedestrian bridge, Gressan (Aosta), Italy

    2001-2002

    Passarella pedonalestrallata con 62 + 62 m diluce libera.

    Cable stayed footbridgewith 62 + 62 m span.

  • 8/20/2019 Redaelli for Engineering

    80/142

    79

    2001

    Sistema di coperturatensegrity. 5875 m2 disuperficie coperta. Sistemadi funi spiroidali.

    Tensegrity membrane roof

    of 5875 m

    2

    . OSS cablesystem.

     Velodromo Centro Mondiale del Ciclismo, Aigle, SvizzeraWorld Cycling Centre velodrome, Aigle, Switzerland

       T  e   k   h  n  e   S   A  -   P   i  e  r  r  e   &   P  a  s  c  a   l   G

      r  a  n   d  -   P  a  s  s  e  r  a   &   P  e   d  r  e   t   t   i  -   P   i  c   t  u  r  e  s  :   L  e  o   F  a   b  r   i  z   i  o ,

       S  w   i   t  z  e  r   l  a  n   d

  • 8/20/2019 Redaelli for Engineering

    81/142

    80

     Velodromo di Lommel, BelgioLommel Velodrome, Belgium

    2001

    Stralli di sospensione percopertura di 7000 m2, con83 x 100 m di luce libera.

    Stay cables for stadiumroof of 7000 m2, with

    83 x 100 m span.

  • 8/20/2019 Redaelli for Engineering

    82/142

    81

    Ponte strallato, Spiazzo (Trento), ItaliaPedestrian bridge, Spiazzo (Trento), Italy

    2000-2001

    Passerella pedonalestrallata con 60 m di lucelibera.

    Cable stayed footbridgewith 60 m span, stay

    cables.

  • 8/20/2019 Redaelli for Engineering

    83/142

    82

    British Airways London Eye, Londra, InghilterraBritish Airways London Eye, England

    1999

    Diametro: 135 metri.5.000 metri di stralli.Progetto e fornitura delsistema a funi.

    Diameter: 135 m.

    5.000 metres of stay cables.Wheel cable system, staycable system, dampingsystem, monitoring system.

       ©   N   i  c   k   W  o  o   d   2   0   0   0

  • 8/20/2019 Redaelli for Engineering

    84/142

    83

    British Airways London Eye, Londra, InghilterraBritish Airways London Eye, England

    1999

  • 8/20/2019 Redaelli for Engineering

    85/142

    84

    Ponte sospeso Forth Road, Edimburgo, ScoziaForth Road Bridge, suspension bridge, Edinburgh, Scotland

    1998-1999

    Sostituzione dei pendini disospensione.406+1006+406 m di lucelibera.

    Replacement of hangers.

    406+1006+406 m span.

  • 8/20/2019 Redaelli for Engineering

    86/142

    85

     Torre di Pisa, ItaliaLeaning Tower of Pisa, Italy

    1998

    Stralli e sistema dicerchiatura per la messa insicurezza temporanea.

    Temporary safety stay andhooping cable system.

  • 8/20/2019 Redaelli for Engineering

    87/142

  • 8/20/2019 Redaelli for Engineering

    88/142

    87

    Ponte strallato Capelle a/d Ijssel, Paesi BassiCapelle a/d Ijssel Rivium Bridge, The Netherlands

    1998

    Strallatura con guainaHDPE, luce libera36,5 + 69,5 m.

    HDPE sheeted stay cables,36,5 + 69,5 m span.

  • 8/20/2019 Redaelli for Engineering

    89/142

    88

    Passerella strallata,18+67+18 m di luce libera.

    Cable stayed footbridge18+67+18 m span.

    Passerella pedonale, Cortina all’Adige (Bolzano), ItaliaFootbridge, Cortina all’Adige (Bolzano), Italy

    1997

  • 8/20/2019 Redaelli for Engineering

    90/142

    89

    Ponte stradale strallato,luce libera 40 m.

    Cable stayed road bridge,40 m span.

    Ponte strallato, Palazzolo sull’Oglio (Brescia), ItaliaStayed road bridge, Palazzolo sull’Oglio (Brescia), Italy

    1996-1997

  • 8/20/2019 Redaelli for Engineering

    91/142

    90

    Ponte sospeso “Storebælt”, DanimarcaStorebælt East Bridge suspension bridge, Denmark 

    La struttura più grande inDanimarca.535 + 1624 + 535 metri diluce libera.1.000 tonnellate di funichiuse protette con guaina

    in polietilene impiegate peri pendini di sospensione.

    The biggest structure inDenmark.535 + 1624 + 535 m span.1,000 tons of full lockedcoil steel ropes protectedwith HDPE sheath for thehangers.

    1996-1997

  • 8/20/2019 Redaelli for Engineering

    92/142

    91

    Ponte sospeso “Storebælt”, DanimarcaStorebælt East Bridge suspension bridge, Denmark 

    1996-1997

  • 8/20/2019 Redaelli for Engineering

    93/142

  • 8/20/2019 Redaelli for Engineering

    94/142

    93

    Ponte stradale, Trofarello (Torino), ItaliaRoad bridge, Trofarello (Turin), Italy

    1994

    Ponte stradale strallato con63 m di luce libera, sistemastrallato e stabilizzato.

    Cable stayed road bridgewith 63 m span, stay and

    stabilizing cables system.

  • 8/20/2019 Redaelli for Engineering

    95/142

  • 8/20/2019 Redaelli for Engineering

    96/142

    95

    Tensostruttura di coperturadi 2250 m2.Funi portanti, stabilizzanti edella membrana.

    Roof space tensostructure

    of 2250 m

    2

    .Supporting, stabilizing,ridge, edge and valleycable system.

    Stadio comunale Santamonica, Misano Adriatico (Rimini), ItaliaSantamonica stadium, Misano Adriatico (Rimini), Italy

    1992

  • 8/20/2019 Redaelli for Engineering

    97/142

    96

    Grande Bigo, Genova, ItaliaGrande Bigo, Genoa, Italy

    Struttura spazialestrallata.

    Space stayed structure.

    1991-1992

  • 8/20/2019 Redaelli for Engineering

    98/142

    97

    1990

    Stadio Olimpico di Roma, ItaliaOlympic Stadium in Rome, Italy

    40.000 m2 di coperturasorretti da una grandetensostruttura.

    40.000 sq meterssustained by a large

    tensostructure.

  • 8/20/2019 Redaelli for Engineering

    99/142

    98

    Copertura palazzetto dello sport, Reggio Calabria, ItaliaSports hall roof, Reggio Calabria, Italy

    1988

    Tensostruttura spaziale.106 x 75 m di luce libera,6750 m2 coperti.

    Space tensostructure.106 x 75 m span, 6750 m2

    covered. Cable net.

  • 8/20/2019 Redaelli for Engineering

    100/142

    99

    Stadio Brianteo di Monza, ItaliaBrianteo stadium, Monza, Italy

    1988

    Tensostruttura di copertura.4300 m2 di superficiecoperta.

    Space tensostructure of4300 m2 for the covering of

    the stand.

  • 8/20/2019 Redaelli for Engineering

    101/142

    100

    Strallature torri ed antenneStayed breathing and antenna towers

    Strallature per torri diimpianti per lo stoccaggio ela raffinazione di idrocarburie per antenne e ripetitoriradio-televisivi.

    Stay cables for breathingtowers for hydrocarbonsrefinery plants andantennas for radio-television

    broadcasting.

  • 8/20/2019 Redaelli for Engineering

    102/142

    101

    Manutenzioni torri ed antenne strallateMaintenance of stayed towers and antennas

    Hydrocarbons refinery andstorage plants.Stay cables, inspection andmaintenance, nondestructive inspections(NDI) magnetic particle,

    magnetoinductive,ultrasonic and dyepenetrant examination,endoscopic inspectionsand topographic survey.Control of cable forces witholeodynamic andvibrational systems.Check on the state ofconservation. Application ofprotective coatingssystems such as TensocoatEpoxy, Tensocoat Wax andTensocoat Pro, sealing withbutyl rubber and aluminiumtapes.

    Impianti di raffinazione estoccaggio idrocarburi.Strallature, ispezione emanutenzione, controlli nondistruttivi (NDI)magnetoscopici,

    magnetoinduttivi,ultrasonori e con liquidipenetranti, ispezioniendoscopiche e controllitopografici. Verifica tiri sulle funimediante sistemioleodinamici e metodivibrazionali. Verifica stato diconservazione generaledelle strallature. Applicazione di sistemiprotettivi superficialiTensocoat Epoxy,Tensocoat Wax e

    Tensocoat Pro, sigillaturecon gomma butilica enastro d’alluminio.

  • 8/20/2019 Redaelli for Engineering

    103/142

    102

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    I - Monza MI Stadio Brianteo Monza Calcio Space tensostructure. System of cables 4300 m2 1988Stand Roof

    I - Reggio Calabria Sport Hall Roof M.L.M. Space tensostructure. System of cables 106 x 75 m span 6750 m2 1988

    I - Roma Olympic Stadium Olimpico ‘90 Space Tensostructure, Cable System 200 m span 40000 m2 1990

    I - Milano Pedestrian Bridge Pessina Cable Stayed Bridge, Stay Cables System 40.2 + 17.7 m 1991

    I - Centuripe EN Factory Building Centuripe Multispan Plane Tensostructures 1 x 24 3100 m2 1991Roof Municipality 2 x 24 m span

    I - Centuripe EN Factory Building Roof Centuripe Municipality Multispan Plane Tensostructures 3 x 24 m span 1750 m2 1991

    I - Genova Grande Bigo, Canobbio Space stayed structure. System of cables   1991Genova, Italy   1992

    I - Nicolosi CT Factory Building Nicolosi Multispan Plane Tensostructure 2 x 24 1500 m2 1992Roof Municipality 3 x 24 m span

    I - Vigevano PV Sport Hall CEFER Plane Tensostructures 32 m span 1500 m2 1992

    I - Rondissone TO Motoway Terminal Bio Italia Cable Stayed Covering, Stay Cables System 22 m span 3580 m2 1992

    I - Alta Nurra SS  Anemometric Towers Galtarossa Cable Stayed Towers, Stay Cables System 2 x 96 m Height 1992

    I - Ponte Pipeline Bridge Bosco Suspension Bridge, Special Maintenance 96 m span 1992

    S.Giovanni PGI - San Vincenzo LI Ropeway Solvay Ropeway, Special Maintenence 5000 m Lenght 1992

    1993

    I - Carrara MC International Internazionale Multispan Plane Tensostructures 3 x 45 m span 9300 m2 1992Exibition Marmi e Macchine Inspection and Maintenance

    I - Sannazzaro PV AGIP Torch Tower SAMIA Cable Stayed Tower, Stay Cables System 134 m Height 1992

    I - Misano Santamonica Canobb io Supporting and stabiliz ing cables 188 m span 2250 m2 1992 Adriatico RN Stadium

    I - Modena Hippodrome CFM Cable Stayed Covering, Stay Cables System 50 m span 1700 m2 1993Grandstand

    I - Genova Square Covering CMC Cable Stayed Covering, Stay Cables System 36 m span 700 m2 1993

    I - Torino Football Stadium SAPAM Space Tensostructure, Retensioning, 200 m span 30000 m2 1993Inspection and Manintenance 1994

    I - Roma Hooping of the dome Pouchain Hooping Of The Dome 1993

    of the S. Maria Degli Angeli Cathedral

    I - Roma Torch Tower Raffinerie Di Roma Cable Stayed Tower, Inspection and Maintenance 1993

    I - Alta Nurra SS  Anemometric Tower Galtarossa Cable Stayed Towers, Inspection and Maintenance 2 x 96 m Height 1993

    P - Lisbona 25 April Suspension Hidrosorefame Suspension Bridge, 1993Bridge Replacement of Hangers

    I - Varedo MI Factory SACLA Cable Stayed Covering, Stay Cables System 26.2 x 7.4 m 200 m2 1994

    I - Pesaro Sport Hall CFM Tensioning Ropes for Space, Truss System 120 m span 10000 m2 1994

    I - Torino MGDR Factory MGDR Cable Stayed Road Bridge, Stay Cables System 63 m span 1994

    I - Trofarello TO MGDR MGDR Cable Stayed Building, 32 m span   1994Office Building Stay Cables System

    GB - Bristol Pedestrian Bridge Cimolai Cable Stayed Bridge, Stay Cables System 75 m span 1994

    I - Roseto degli Sport Hall Roof Roseto Plane Tensostructures 50 m span 2500 m2

    1994 Abruzzi TE Municipality Inspection and Maintenance

    I - Arcore MI Swimming Pool Arcore Municipality Plane Tensostructures Special Maintenance 40 m span 1200 m2 1994Roof 1995

    I - Scandicci FI Pedestrian Bridge Scandicci Cable Stayed Bridge Inspection 75 m span 1995Municipality

    I - Torino Delle Alpi Stadium SOGEALPI Space Tensostructure Inspection 200 m span 30000 m2 1995Monitoring and Maintenance

    I - Roma Olympic Stadium IMAC Space Tensostructure Inspection and Monitoring 200 m 40000 m2 1995

    UAE - Abu Dhabi Torch Tower NAO Cable Stayed Towers, Stay Cables System 1995

    DK - Storebælt Storebælt COINFRA Suspension Bridge Hangers 535 + 1624 + 535 m span 1995East Bridge 1997

    I - Isili NU Swimming Italengineering Plane Tensostructures, Cables 40 m span 1995Pool Roofing 1996

    I - Brembate BG Sport Hall Roofing Italengineering Plane Tensostructures, Cables 40 m span 19951996

    I - Albenga SV Road Arch Bridge CFM Arch Suspension Bridge Hangers 100 m span   1995

    I - Penice Telecom-TV Tower Libertà Piacenza Cable Stayed Tower Inspection 1996Mountain PC and Maintence

    I - Avigliano PZ Congress Hall Roof Italengineering Plane Tensostructures, Cables 35 m span 1996

  • 8/20/2019 Redaelli for Engineering

    104/142

    103

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    I - Ferentino FR Stayed Building N2 Stayed Buiding, Stay Cables System 1996

    I - Torino Delle Alpi Stadium SOGEALPI Space Tensostructure Inspection, Monitoring 200 m span 30000 m2 1996and Maintenance

    I - Palazzolo BS Cable Stayed Viberto Cable Stayed Bridge, Stay Cables System 40 m span   1996

    Road Bridge   1997

    I - Palermo Sport Hall Roof CGP Plane Tensostructure 60 m span 4800 m2 19971998

    I - Brugherio MI San Bartolomeo Tecnobrianza Hooping of the Dome Chaining of the Archs 1997Church 1998

    I - Cortina Pedestrian Bridge Cimolai Cable Stayed Bridge, Stay Cables System 18 + 67 + 18 m span   1997all’Adige BZ

    I - Torino Delle Alpi Stadium COMAPI Space Tensostructure Inspection, Monitoring 200 m span 30000 m2 1997and Maintenance

    I - Centuripe EN Factory Build ing La Prometec Multispan Plane Tensostructures, Cables System 1 x 24, 2x24, 4x24 m span 1997

    DK - Storebælt Storebælt East COINFRA Erection Supervision and Assistance 535 + 1624 + 535 m span   1996Bridge   1997

    DK - Storebælt Storebælt East COINFRA Hangers Separators and Handropes 535 + 1624 + 535 m span 1997Bridge Accessories

    I - Genova Grande Bigo Porto Antico Space Stayed Structure Inspection 1997Structure Genova and Maintenance

    I - Torino MGDR Factory MGDR Cable Stayed Road Bridge and Building 1997and Building Inspection and Maintenance

    I - Roma Olympic Stadium IMAC Space Tensostructure Retensioning 200 m 40000 m2 1997

    I - Marina Exibition IFF Carrara Expo Multispan Plane Tensostructures 2 x 45 m span 6100 m2 1997di Carrara MC Pavilion Rook 1998

    I - Prato FI Sport Hall Covering Fubelli Plane Tensostructures 55 m span 4200 m2 19971998

    I - Schio VI Valex Stayed VALEX Cable Stayed Roof, Stay Cable System 135 m span 3500 m2 1997Covering 1998

    I - Casale Galbani Ceriali Costruzioni Cable Stayed Roof, Stay Cable System 14 + 13 +14 m 1540 m2 1997Cremasco CR Stayed Roof span 1998

    I - Lissone MI Pedestrian Bridge MECOOP Cable Stayed Curved Bridge, Stay Cable System 24 m span   1998

    I - Palazzolo Pedestrian Bridge Off. Ma. Suspension Bridge, Main Cables 75 m span 1998dello Stella UD and Hangers Replacement

    I - Anzio Roma Reinforced Concrete Colgate Palmolive External Reinforcement Cables 20 + 20 + 20 m span 1998 Arch Frame

    I - Torino Delle Alpi Stadium COMAPI Space Tensostructure Inspection, 200 m span 30000 m2 1998Monitoring and Maintenance

    NL - Stadskanaal Stadskanaal Bridge HSM Cable Stayed Bridge, Stay Cables 62.5 + 62.5 m span 1998

    NL - Capelle Capelle a/d HSM Cable Stayed Bridge, Stay Cables 36.5 + 69.5 m span   1998a/d IJssel IJssel Rivium Bridge

    I - Garbagnate Bayer Stayed Roof Officine Landini Cable Stayed Roof, Stay Cable System 30 m span 1998Milanese MI

    I - Pisa Pisa Tower Soilmec Safety Stay Cables and Hoop Cable System   1998Safety Stay Cables

    I - Montebelluna TV Road Bridge Cogeba External Reinforcement Cables 14 m span 1998GB - Edinburgh Forth Road MT Steel Suspension Bridge, New Hangers 406 + 1006 + 406 m span   1998

    Suspension Bridge   1999

    I - Faedo V.T. SO Pedestrian Bridge Ital Engineering Suspension Bridge, Cables 80 m span 1999

    I - Torino Delle Alpi Stadium COMAPI Space Tensostructure Inspection, 200 m span 30000 m2 1999Monitoring and Maintenance

    E - Elche Vinalopo River Fomento Suspension Bridge, Main Cables, Hangers 165 m half span bridge 1999SuspensionRoad Bridge

    GB - London British Airways Hollandia Wheel Cable System, Stay Cable System, 135 m wheel diameter   1999London Eye Damping System, Monitoring System

    I - Modena Hippodrome SMEFCC Cable Stayed Roof, Stay Cables Inspection 35 m span 1700 m2 1999Stand Roof and Maintenance

    I - Reggio Calabria Stadium Stand Roof Ferrocemento Cable Stayed Roof, Stay Cable System 135 m span 3000 m2 1999Condotte

    I - Malpensa Airport Malpensa 2000 Officine Tosoni Cable stayed roof, Stay Cable System 2 x 7 m span 5300 m2 1999Cargo City Cargo City

    Stayed Roof

    I - Roma Olympic Stadium IMAC Space Tensostructure Inspection 200 m span 40000 m2 1999

    I - Cesano Pedestrian Bridges Olmet Cable Stayed Bridges, Stay Cables 20 m span 1999Maderno MI

  • 8/20/2019 Redaelli for Engineering

    105/142

    104

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    I - Brescia Swimming Pool Tensospazio Italia Plane Tensostructures, Cables 30 m span 1999Roof

    E - Castejon River Ebro Bridge DRACE Cable Stayed Bridge, 150 m span 1999Stay Cables Replacement

    I - Roma Torch Tower Raffinerie di Roma Cable Stayed Tower, 1999Inspection and Maintenance

    I - Anzio Roma Reinforced Concrete Colgate Palmolive External Reinforcement Cables 20 + 20 + 20 m span 1999 Arch Frame

    I - Desenzano BS Gymansium Roof Desenzano Space Tensostructure, 2000Municipality Special Inspection and Maintenance

    I - Larderello SI Pipeline Bridge Società Chimica Suspension Bridge, Inspection 100 m span 2000Larderello

    I - Sannazzaro NO Torch Tower SAMIA Cable Stayed Tower, 132 m Heigth 2000Inspection and Maintenance

    I - Casale Torch Tower ENI Cable Stayed Tower, 70 m Heigth 2000Cremasco CR Inspection and Maintenance

    I - Milano Deutsche Bank Leoni Cable Stayed Roof, Stay Cables 27 + 17 m span 2000Building

    I - Centuripe EN Factory Building La Prometec Multispan Plane Tensostructures, 2 x 24 m span 2000Cables System

    I - Torino Delle Alpi Stadium Torino Municipality Space Tensostructure, 200 m span 30000 m2 2000Retensioning and Special Maintenance

    I - Cilavegna PV Gymnasium Cilavegna Roof, Plane Tensostructures, Retensioning 30 m span 1200 m2 2000Municipality

    I - Genova Grande Bigo Porto Antico Space Stayed Structure, 2000Structure Genova Inspection and Maintenance

    I - Modena Palapanini Fontana External Reinforcing Cables for Steel Trusses 68 x 75 m span 5000 m2 2000Sport Hall

    I - Venezia Piazza Bucintoro Major Costruzioni Stay Cables for Space Structure 37 m Heigth 20002001

    I - Castelsilano KR Lese River Bridge COGES Hanger Cables for Arch Suspended Bridge 70 m span 20002001

    I - Castano Party Area Covering Pizzi Plane Tensostructures 28 m span 490 m2 2000

    Primo MI 2001

    I - Spiazzo TN Pedestrian Bridge Pre Metal Cable Stayed Footbridge, Stay Cables 60 m span   20002001

    I - Rimini New Rimini Impregilo Arch Chains Tensostructures n. 12 pavilions 69000 m2 2000Exibition Pavilions 60 x 96 m 2001

    B - Lommel Lommel Stadium CSM Stay Cables for Stadium Roof 83 x 100 m span 7000 m2 2001

    CH - Aigle Velodrome Seele Tensegrity Cables System for Stadium Roof   2001

    I - Venezia Glass Roofing Maeg Cables for Stayed 2001and Suspension Tensostructure

    I - Anzio Roma Reinforced Concrete Colgate Palmolive External Reinforcement Prestressing Cables 20 + 20 + 20 m span 2001 Arch Frame

    I - Torino Delle Alpi Stadium Torino Municipality Space Tensostructure Inspection, Monitoring 200 m span 30000 m2 2001and Maintenance

    NL - Carnisselanden Pedestrian Bridge HBG Cable Stayed Footbridge, Stay Cables 38 m span 2001

    I - Monza MI Stadio Brianteo Monza Calcio Space Tensostructure, Inspection 4300 m2 2001Stand Roof and Maintenance

    I - Reggio Calabria Stadium Stand Reggio Calabria Cable Stayed Roof, Inspection, Retensioning 135 m span 3000 m2 2001Roof Municipality and Maintenance

    I - Oggiono LC Swimming Pool Alberghi Briantei Cable Stayed Roof, Stay Cables 26 m span   2001Roof   2002

    I - Gressan AO Pedestrian Bridge Chenevier Cable Stayed Footbridge, Stay Cables 62 + 62 m span   20012002

    I - Venaria TO Glass Facade ED.AR.T. Cable for Glass Facade 2002

     A - Wien Hanappi Stadium Zeman Roof Tensostructure Cables n. 2 x 120 m span   2002Stand Roof

    I - Como Pedestrian Bridge Cerri Cable Stayed Footbridge, Stay Cables 30 m span 2002

    I - Gorgonzola MI Road Bridge Alfa Sogemi Cable Stayed Bridge, Stay Cables 23 + 6 m span 2002

    F - Saint Martin Pedestrian Bridge HCB Cable Stayed Footbridge, Stay Cables 2002

    F - Blagnac Pedestrian Bridge HCB Cable Stayed Footbridge, Stay Cables 2002

    I - Torino Delle Alpi Stadium Torino Municipality Space Tensostructure Inspection, 200 m span 30000 m2 2002Monitoring and Maintenance

    I - Loano SV Church Roof Parrocchia S. Pio X Roof Plane Tensostructures, Retensioning 30 m span 1300 m2 2002

  • 8/20/2019 Redaelli for Engineering

    106/142

    105

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    GB - London British Airways Hollandia Wheel Cable System, Inspection 135 m wheel diameter 2002London Eye

    I - Roma Olympic Stadium IMAC Space Tensostructure, Cable System Inspection 200 m span 40000 m2 2002

    I - Bergamo Bergamo Fair Fiera Arch Chain Tensostructures, Cable System n. 2 pavilions 12600 m2 2002

    48 x 131 m

    I - Genova Marinafiera 1 Fair Falcone Cable Stayed Roof, Stay Cables 2002

    E - Madrid Rio Manzanares FCC Cable Stayed Footbridge, Stay Cables 60 + 90 m 2002M-30 Footbridge 70 + 80 m

    I - Bondeno FE Pipeline Bridge Coopcostruttori Cable Stayed Bridge, Stay Cables 2002

    I - Castellaneta Imax Cinema Metalmeccanica Cable Stayed Roof, Stay Cables 30 x 35 m 1000 m2 2002Marina TA di Fonzo

    I - Cortemaggiore PC Torch Tower Eni-Agip Cable Stayed Tower, Maintenance 60 m Height 2002

    I - Sabbioncello FE Torch Tower Eni-Agip Cable Stayed Tower, Maintenance 48 m Height 2002

    I - Rimini Rimini Exibition Rimini Fiera Arch Chains Tensostructures, Inspection, n. 12 pavilions 69000 m2 2002Pavilions Retensioning 60 x 96 m

    I - Milano Forlanini Stayed Profacta Cable Stayed Footbridge, Stay Cables, 55 m span 2002Footbridge Inspection and Maintenance

    I - Biancade TV Glass Facade Reflex Cables for Glass Facade 2002

    I - Domodossola VB Torch Tower Sices Cable Stayed Tower, Stay Cables 45 m Height 2002

    I - Bocenago TN Pedestrian Bridge Pichler Cable Stayed Footbridge, Stay Cables 30 m span 2002

    I - Corsico MI Pedestrian Bridge Comune di Corsico Cable Stayed Bridge, Stay Cables 45 + 45 m span 2003

    GB - London British Airways Hollandia Wheel Cable System, Inspection 135 m wheel diameter 2003London Eye

    I - Colleferro RM Chimneys Pianimpianti Cable Stayed Chimneys, Stay Cables n. 2 x 50 m Height 2003

    P - Braga Braga Stadium Assoc-Soares Design, Supply and Installation 202 m span x 15000 m2 2002da Costa of the Roof Cables System 130 m   2003

    I - Villanova Road Bridge Monsud Cable Stayed Bridge, Stay Cables 35 m span 1530 m2 2003d'Albenga SV

    I - Travagliato BS Swimming Pool Tensospazio Italia Plane Tensostructures, Cables 34 x 45 m span   2003

    RoofNL - Haarlemmermeer Nieuw Vennep Victor Buyck Cable Stayed Bridge, Stay Cables 56 + 87 m span   2003

    Road Bridge   2004

    NL - Haarlemmermeer Toolenburg Walkway  Victor Buyck Two Cable Stayed Bridges, Stay Cables 2 x 26 m span   2003and Road Bridges   2004

    NL - Haarlemmermeer Bennebroekerweg Victor Buyck Two Cable Stayed Bridges, Stay Cables 75 + 75 m span   2003Road Bridges and 20 m span   2004

    GR - Athens Olympic Stadium Cimolai Cable Stayed Roof, Two double Arches 2 x 300 m span   2003Stand Roof Main Connection and 2004

    Secondary Suspension Stay Cables

    GR - Athens Spidernet for Elemka sa Rope Net, Cable System 400 m span   2003Olympic Stadium   2004

    I - Torino Catenaries Lighting CTE - SIFEL Main Cables, Secondary Cables 124 + 138 + 183 m span 2004System and Hangers System

    I - Farra d'Alpago BL Pedestrian Bridge Holzbau Cables Stayed Pedestrian Bridge, 23 + 63 + 23 m span   2004Stay Cables

    I - Ortisei BZ Pedestrian Bridge Pichler Supported and Stabilized Footbridge, 65 m span   2004Cable System

    P - Matosinhos Sculpture ICQ Cable Stayed Structure, Stay 50 m diameter   2004Porto San Salvador and Spoke Cable System

    I - Beinasco TO Pedestrian Bridge Mo.spe.ca. Cable Stayed Footbridge, Stay Cables 80 m span   2004

    NL - Amsterdam Zouthaven Bam-SS Supported and Stabilized Footbridge, 58 m span   2004Footbridge Cable System

    I - Bussolengo VR Suspended Offices LMV Suspended Building, Stay Cables 10 x 50 m 500 m2 2004

    I - Cornaredo MI Swimming Pool Tensospazio Italia Plane Tensostructures, Cables 35 m span 2004Roof

    I - Rimini Rimini Exibition Euroholz Arch Chains Tensostructures n. 1 pavilions 12700 m2 2004Pavilions 60 m span x 212 m

    I - Bologna Swimming Pool ISPA Plane Tensostructures, Roof Cables 50 m span x 70 m 3500 m2 2004Roof

    I - Castano Primo MI Summer Pavilion Edil Ser io Plane Tensostructures, Cables 32 m span 2004

    GB - London British Airways Hollandia Wheel Cable System, Inspection 135 m wheel diameter 2004London Eye

    I - Malizia SI Road Bridge Tecnosteel Arch Bridge, Hanger Cables 50 m span 2004

  • 8/20/2019 Redaelli for Engineering

    107/142

    106

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    I - Minerbio BO Torch Tower Stogit Cable Stayed Tower, Maintenance 110 m Height 2004

    I - Cupello CH Torch Tower Stogit Cable Stayed Tower, Maintenance 90 m Height 2004

    I - Piossasco TO Pedestrian Bridge La Fondazione Suspension Reinforcement Catenary Cable System 22.5 m span 2004

    I - Arezzo Suspension F.lli Aguzzi - Coint Suspension Catenary Cable System, 132 m span 2004Pipe Water Maintenance

    I - Roma Olympic Stadium IMAC Space Tensostructure, Cable System Inspection 200 m span 40000 m2 2004

    I - Trivero BI Sport Hall Roof Tensospazio Plane Tensostructures, Cables 36 m span   2004

    I - Milano Facade Italcables Glass Curtain Wall Cables 2004

    I - Carrara Carrara Exibition I.M.M.C. Plane Roof Tensostructures, Inspections 9200 m2 2004Pavilions

    I - Valbrembo BS Pedestrian Bridge Pandini Suspension Footbridge, Main Cables 36 m span 2004

    NL - Dongen Torch Tower Mennens Cable Stayed Tower, Guy Cables 200 m height 2004

    I - Bari Membrane Italcover Plane Tensostructures, Cables 90 m span 2004Exposition Pavilion

    I - Treviso Pedestrian Bridge Ortolan Costruzioni Cable Stayed Footbridge, Stay Cables 2004

    I - Venzone UD Pedestrian Bridge L'Elettrotecnica scarl Suspension Footbridge, Main, Stabilizing 42 m span   2004and Hanger Cables   2005

    I - Trento Pedestrian Bridge Carpenterie Suspension Footbridge, Main and Hanger Cables 48 m span 2004Rotaliane 2 2005

    I - Segrate MI Swimming Pool La Gen Plane Tensostructures, Cables Maintenance 42 m span 2004Roof 2005

    I - Calvisano BS Cammi1 Ceriali Costruzioni Cable Stayed Roof, Stay Cable System 6.5 + 26 + 6.5 m 2004Stayed Roof 2005

    GB - London British Airways Hollandia Wheel Cable System, Inspection 135 m wheel diameter 2005London Eye

    I - San Polo Inspection Elevator SBS Aerial Platform, Suspension 130 m operative elevation 2005di Piave TV and Stabilizing Cables

    F - Paris Repere Signal H.C.B. - Eiffel Temporary Mast for Olympic Exibition 80 m height 2005Olympique

    I - Valdieri CN Footbridge Parco Naturale Suspension Footbridge, 35 m span  2005

     Alpi Marittime Main and Stabilizing Cables

    E - Fuengirola Pedestrian Bridge Mekano 4 Cable Stayed Footbridge, Stay Cables 70 m span   2005

    GB - London St. Pancras Station Macalloy - Entech Catenary Cables for Lighting System 4400 m length 2005Ligthing System

    I - Montepulciano SI Sport Hall Carpem Stayed Roof - Stay Cables 180 m2 2005

    I - Sarche TN River Weir Filter Co.Gen. Weir Cable System - Guy Cables 120 m span   2005

    I - Bormio SO Pedestrian Bridge G.A.L. Cable Stayed Footbridge, Stay Cables 62.5 m span   2005

    F - Clermont Ferrand  Aesthetic Facade H.C.B. - Seram HDPE Sheath Protected Cables 2005for Glass Curtain Road

    F - Angouleme Arch Road Bridge H.C.B. Arch Bridge, 44 m span   2005Joseph Par is HDPE Sheath Protected Hanger Cables

    GNQ - Malabo Malabo Stadium H.C.B. - Bouygues Tensostructure Cable System n. 2 pavilions 2005

    InternationalP - Lagos Exibition Pavilions ICQ Arch Chains Tensostructures, Cable Chains 45 m span 2005

    P - Braga Braga Stadium Soares da Costa Inspection and Maintenance 202 m span x 130 m 15000 m2 2005

    I - Busto Arsizio MI Pedestrian Bridge COESTRA Cable Stayed Footbridge, Stay Cables 21 m span 2005

    I - Busto Arsizio MI Pedestrian Bridge COESTRA Cable Stayed Footbridge, Stay Cables 23 m span 2005

    I - Busto Arsizio MI Pedestrian Bridge COESTRA Cable Stayed Footbridge, Stay Cables 30 m span 2005

    I - Foligno PG Pedestrian Bridge D'Allacqua Arch Footbridge, Hanger Cables 26 m span   2005Over Topino River Costruzioni Generali

    I - Fortezza BZ Pedestrian Bridge Holzbau Suspension Reinforcement, Chatenary Cable System 38 m span 2005

    I - Rimini Rimini Exibition Rimini Fiera Arch Chains Tensostructures, Cable Chains n. 2 pavilions 12000 m2 2005Pavilions 2006

    I - Torino Olympic Footbridge ATI Arch Cable Stayed Footbridge, 160 m span   2005Sermeca - Falcone Stay Cables and Installation Assistance   2006

    I - Reggio Emilia Road Bridge Costruzioni Arch Bridge, Hanger Cables 220 m span   2005Cimolai Armando   2006

    I - Reggio Emilia N° 2 Road Bridges Costruzioni Arch Stayed Bridges, Stay Cables N° 2, 90 + 90 m span   2005Cimolai Armando   2006

    I - Pieve di Soligo TV  Arch Road Bridge Ortolan Costruzioni Double Arch Bridge, Hanger Cables 90 m span 20052006

  • 8/20/2019 Redaelli for Engineering

    108/142

    107

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    I - Sestriere TO Pedestrian Bridge Costrade Cable Stayed Footbridge, Stay Cables 15 m span   20052006

    BG - Karjaly Pedestrian Bridge Savarona Suspension Footbridge, Main, 170 m span   2005Stabilizing and Hanger Cables   2006

    I - Bari Membrane Italcover Boundary and Anchor Cables 90 m span 5000 m2

    2005Exposition Pavilion 2006

    E - Madrid Pedestrian Bridge Mekano 4 Cable Stayed Footbridge, Stay Cables 89 m span   2006M-40

    E - Madrid Pedestrian Bridge Mekano 4 Cable Stayed Footbridge, Stay Cables 110 + 40 + 40 m span   2006R-3

    P - Braga Braga Stadium Soares da Costa Inspection and Maintenance 202 m span x 130 m 15000 m2 2006

    YV - Caracas Railway Costruzioni Stayed Roof, Stay Cables 35 x 120 m 2006Station Roof Cimolai Armando 85 x 20 m

    I - Roma Pedestrian Bridge, Cometal Footbridge Hanger 1000 m 2006Rome Exposition

    I - Montepulciano SI Gymnasium Carpem Cable Stayed Roof, Stay Cable System 15 m span 2006

    I - Udine Pedestrian Bridge Cos.me. Cable Stayed Footbridge, Stay Cables 78 m span 2006

    I - Cagliari Membrane Canobbio Membrane Stayed Roof, Stay Cables 69 x 41 m 1800 m2

    2006Pier Ichnusa

    GR - Piraeus Footbridge Probeton Cable Stayed Footbridge, Stay Cables 43 m span   2006Ergotechniki

    GB - Vale Transmitting RigOut Transmitting Station Antenna, Stay Cables 2006of Glamorgan Antenna

    I - Sannazzaro PV ENI Torch Tower ENI Cable Stayed Tower, Maintenance 134 m Height 2006

    I - Genova Square Covering PDR Cable Stayed Covering, Maintenance 36 m span 700 m2 2006

    I - Torino MGDR Factory Geodis Immobiliare Cable Stayed Road Bridge, Stay Cables, 63 m span 2006Inspection and Maintenance

    I - Beinasco TO Footbridge Edilsteel Cable Stayed Footbridge, Stay Cables 62 + 42 m span 2006

    IRL - Limerick University HCB Supported Footbridge, Cable System 6 x 44 m span   2006Footbridge   2007

    CDN - Victoria, B.C. Floating Road Bridge Wesco Industries Floating Bridge, 300 m span 2006HDPE Sheath Protected Mooring Cables 2007

    I - Lucca Road Bridge Ortolan Costruzioni Arch Bridge, Hanger Cables 132 m span   20062007

    E - Toledo University Foobridge ICQ Suspended Bridge, Main Cables and Hangers 99 m span 2007over the Tajo River

    I - Segrate MI Pedestrian Bridge Sonnante Cable Stayed Footbridge, Stay Cables 10 + 37 + 10 m span   2007

    E - Cordoba Road Bridge over the FCC, Contruccion Arch Bridge, Hanger 130 m span   2007Guadalquivir River

    E - Madrid Madrid Fair Waagner Biro Arch Chain Tensostructures, Cable System 111 m span   2007

    GE - Ureki Pedestrian Bridge Elita Burji Suspension Footbridge, Cables system 70 + 70 m span   2007

    GB - Swansea Fabian Way Bridge City and County Stay Cables, Installation and Tensioning Assistance 70 m span   2007of Swansea

    I - Roma Flare Stays Cestaro Rossi Inspection and Maintenance 2007

    I - Egna Ora TN Road Arch Bridge Giugliano Costruzioni HDPE Sheath Hangers 42 m span   2007

    GB - Crimond Radio Mast Scotland RigOut Stay Cables 184 + 274 m Height 2007

    I - Cesena Stayed Roof Mobilificio Lucchi Stay Cables Substitution 80 m2 2007

    I - Piacenza Editoriale Libertà C.I.B. Carp. Ind. Roof Cable System 600 m2 2007Stay Roof Bresciana

    B - Zuid-Willelmsvaart Cable Stayed Iemants Stay Cables and Installation Assistance 76 m span   2007Footbridge

    IL - Jerusalem Road Bridge Koor Metals Stayed Bridge, Stay Cables 225 m span   20072008

    S - Gothenburg Älvsborg  Vagverket region Vast Suspension Bridge, New Hangers 418 m span   2007Road Bridge   2008

    I - Bologna Bologna Fair Roof Mero Italiana Roof Cables System, Installation 10000 m2 2007and Tensioning Assistance 2008

    I - Bologna Pedestrian Bridge Sipal Cable Stayed Footbridge, Stay Cables 90 m span   20072008

    I - Trento Suspended Building Premetal Suspended Building, Stay Cables n. 6 x 29 x 8,3 m 20072008

    I - Trento Stayed Road Bridge Cordioli & C. spa Stay Cables, Installation and Tensioning Assistance 140 + 140 m span   20072008

  • 8/20/2019 Redaelli for Engineering

    109/142

    108

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    I - Imola BO Stayed Footbridge GED Stay Cables, Installation 50 m span 2008and Tensioning Assistance

    E - Zaragoza De La Alzamora FCC Stay Cables 94+141 m span   2008Footbridge - Rio Ebro

    E - Zaragoza Textile structure IASO Suspension Cables 400 m span 5000 m2

    2008

    I - Modena Hippodrome Società Modenese Inspection and Maintenance 1700 m2 2008Grandstand Roof

    I - Bologna Tensostucture Metalstrutture Horizontal Bracings 10000 m2 2008Building Covering

    I - Albosaggia SO Suspension Tensospazio Supporting and Stabilizing Cables 63 m span   2008Footbridge

     AUS - Perth Waratah II-III-IV Sandvik Boom Suspension Cable 19 + 37 m 2008Operating Machine

    E - Lugo Suspension Footbridge Mekano 4 Main and Hangers Cables 100 m span 2008over Rio Miñio

    I - Sannazzaro Fare Stays Demont Tensioning Supervision and Assistance 4000 m2 2008de Burgondi

    I - Biella Sport Hall Edilcentro Roof Stay Cables System 5000 m2 2008

     AUS - Perth Brockman Sandvik Boom Suspension Cable 31 + 22 m 2008Operating Machine

    I - Zambana TN Road Arch Bridge Cordioli & C. Tendon Hangers 60 m span   2008

    IRL - Dublin Arch Bridge M50 Thompson Structure Suspension Hangers System 67 m span 2008

    I - Ronchis UD Motorway Terminal Ortolan Roof Stay Cables System 69 + 44 m span 830+550 m2 2008Roof

    I - Casalecchio BO Stayed Footbridge Ortolan Stay Cables 75 m span   2008

     AUS - Perth Cape Lambert Sandvik Boom Suspension Cable 30 + 31 m 2008Operating Machine

     AUS - Perth NCIG Sandvik Boom Suspension Cable 36 + 30 + 20 m 2008Operating Machine

    I - Plan di Meduna PN Suspension Impresa Suspension and Stabilizing Cables, 107 m span 2008Footbridge Prevedello Isidoro Installation and Tensioning Assistance

    I - Penice PC Telecom-TV Antena Libertà Piacenza Cable Stayed Antena Inspection and Maintenance 2008

    I - Goito MN Stayed Footbridge GED Stay Cables and Installation Assistance 45 m span 2008

    B - Collegebrug Stayed and Anmeco Stay cab les, Tensioning 160 m span   2008Kortrijk Suspension Bridge and Installation Assistance   2009

    KZ - Astana Khan Shatyr Montageservice Roof Space Structure, Cable System 120 x 150 x 120 m 15000 m2 2008Entertainment Centre   2009

    HR - Zagreb Sport Arena BBR Connex Suspension Roof Cables 80.000 m2 2008and Installation Assistance   2009

    I - La Spezia Stayed Drawbridge S.I.M.A.N. Stay Cables and Installation Assistance 21 m span 2009

    I - Pescara Stayed Footbridge Pichler Stay Cables, Site Assistance 86 + 86 m span   2009

    I - Lucca Road Bridge Edilsteel Cable Stayed Bridge, Stay Cables 72 m span 2009

    NZ - Auckland Clarkslane HEB Construction Stayed footbridge. 30+30 m span 2009Footbridge HDPE Sheath Protected Stay Cables

    MNE - Podgorica Suspension Inter-Most AD Main cables, Hangers and Clamps 44 m span   2009Footbridge

    UAE - Abu Dhabi Yas Marina Circuit Tayio Tensostructure, Suspension System 2500 m2 + 20098900 m2

    I - Treviso New Treviso District Setten Tendon Cable System 2009Head Office

     AUS - Perth Shiploader Sandvik Mining Boom Suspension Cables 2009 Austria

    I - Firenze Footbridge Habitat Legno Stay Cables 50 m span 2009Over Sieve River

    I - Ravello NA Auditorium Paco Costruzioni Bracings System 2009Oscar Niemeyer

    PL - Warsaw Jagiellonska Arch Intop - Atm Hangers Cables 32 + 32 m span 2009Footbridge

    I - Aosta Stayed Footbridge OMC Stay Cables, Installation 16 + 40 + 16 m 2009and Tensioning Assistance

    I - Piacenza Temporary Cimolai Floating Bridge, Mooring Cables 45.5 + 50 + 45.5 m span 2010Road BridgeOver Po River

    I - Cin isel lo Stayed Footbridge Carpenfer-Roma Stay Cables, Instal lat ion 70 + 59 + 59 m span 2010Balsamo MI and Tensioning Assistance

  • 8/20/2019 Redaelli for Engineering

    110/142

    109

    SITE PROJECT CLIENT PROJECT DATA m2  YEAR

    D - Zwingenberg Neckarbruke Stayed Mce-Smb Stay cables, Installation 210 m span 2010am Neckar Road Bridge and Tensioning Assistance

    PL - Krakow Pedestrian Arch Bridge Intop - Atm Hangers Cables 143 m span   2010

    I - Sassuolo MO Pedestrian Cisaf Stay Cables, Installation 40 x 4 m span 2010

    Stayed Bridge and Tensioning AssistanceOver Secchia River

    RO - Bucarest Road Arch Bridge Astaldi - FCC Hangers Cables 118 m span   2010Dambovita River

    MOC - Tete Stayed Road Bridge ICQ Hangers Cables Substitution, Installation 90 + 180x3 + 90 m span 2010and Tensioning Assistance

    KSA - Mina Tents Over Ali Tamimi & Sons Membrane Stayed Roof, Stay Cables   2010Pedestrian Bridge

    I - Contron PN Suspension Cos.Me. Suspension, Stabilizing and Hangers Cables. 75 m span 2010Footbridge Installations and Tensioning Assistance

    N - Leira Forsoddin Suspension HMR VOSS Main Cables 132 m span   2010Footbridge

    CDN - Vancouver BC Place Freyssinet Ring Cables 40500 m2 2010Vancouver Stadium Internat ional   2011

    E - Lugo Arch Road Bridge FCC Hangers Cables 95 m span 2010Over Miño River 2011

    I - Torino Juventus Stadium Fip Industriale Suspended Stayed Roof, Stay and 35000 m2 2010Suspension Cables, Installation and Tensioning   2011

    PL - Warsaw National Stadium Cimolai Suspended Roof, Suspension Net Cables 70000 m2 20102011

    GB - Manchester Olympic BMX Macalloy Stayed Roof, Stay and Anchor Cables 8000 m2 2010Stadium   2011

    GB - Hemel Pedestrian Sh Structures Stay Cables, Installation 40 m span 2011Hempstead Stayed Bridge and Tensioning Assistance

    S - Gothenburg Älvsborg C. Spencer Handrail Cables, Installation 148 + 418 + 145 m span 2011Road Bridge and Tensioning Assistance

    GB - Drovers Stayed M20 Macalloy Stay Cables, Installation 101 m span 2011Foot/Cycle Bridge and Tensioning AssistanceJunction 9and Drovers

    RoundaboutGR - Athens Stayed Footbridge Aktor Stay Cables & Stay Monitoring System 27 m span 2011

    Kifisias Avenue

    JO - Amman Abdali Boulevard Ali Tamimi & Sons Cables System for Membrane Tent 2011Tents

    PL - Sopot Canopied Stage Tayio Europe Membrane Arch Roof, Stay Cables 5000 m2 2011Opera Lesna

    PL - Pabianice Arch Bridges WD7 Intop - Atm Hangers Cables 85 x 2 m span 2011and WD8

    GE - Anaklia Footbridge Over Caucasus Road Stay Cables, Installation and Tensioning 144 m span in progressInguri River Project

    NL - Eindhoven Stayed Circular Bridge Victor Buyck Stayed Cable 72 m diameter in progress

    BR - Salvador Arena Fonte Nova Martifer Suspended Roof, Suspension Net Cables, 55500 m2 in progress Assistance to Lay Down

     A - Bruck an Road Arch Bridge NCA Hanger Cables, Installation 72 m span in progressDer Mur and Tensioning Assistance

    I - Seriate BG Suspension Bridge Carpenter ie Ghidott i Suspension, Stabilizing and Hangers Cables. 63 m span in progressInstallations and Tensioning Assistance

    E - Elche Road Arch Bridge Ronda Sur De Hanger Cables, Installation and Tensioning 120 m span in progressIn Elche Elche Ute

    I - Roma Ostiense Arch Bridge Cimolai Hanger Cables, Installation Assistance 121 m span in progressOver Railway and Tensioning

    I - Prato Road Arch Bridge Giovannini Hanger Cables, Installation Assistance 88 m in progressOver Ombrone River Costruzioni and Tensioning

    I - Torino Turin Tower - Banca Cometal Bracing Cables System for the Mega-Colums 167 m Height in progressIntesa San Paolo Installaton and Tensioning

    NL - Nijmegen Stayed Bridge Max-Bögl N.60 Cable Hangers. Installaton and Tensioning 290 m span in progress

    PL - Wloclawek 3 Arch Bridges Intop - Atm Hangers Cables 55 m, 55 m and 80 m span in progressWD175, WD180and WD186,

     A1 MotorwayJunction Brzezieand Junction Kowal

    PL - Mokra 2 Arch Bridges BBR Polska Hangers Cables 66 x 2 m span in progressWD19 and WD32

     A4 Freeway

  • 8/20/2019 Redaelli for Engineering

    111/142

    Picture: © PalladiumPicture: © Palladium

  • 8/20/2019 Redaelli for Engineering

    112/142

    111

    Redaelli opera nel campo

    dei derivati dell’acciaio fin

    dalla seconda metà

    dell’800 e oggi è sinonimo

    di qualità, progresso,

    esperienza tecnica ed

    assistenza al cliente in tutto

    il mondo in ogni settore di

    utilizzo delle funi di acciaio.

    L’elevato livello qualitativo

    delle funi di acciaioprodotte dalla Redaelli e

    utilizzate dalla Engineering

    Division è garantito dal

    rispetto delle più severe

    normative internazionali ed

    è abitualmente certificato

    dai principali enti di

    controllo indipendenti quali

    Lloyd's Register of

    Shipping, Det Norske

     Veritas, American Bureau of

    Shipping, Registro Italiano

    Navale ed altri. Il processo

    produttivo Redaelli è

    certificato ISO 9001:2008 e

    ISO 14001:2000.

    Redaelli has been active in

    the field of steel derivates

    since the second half of the

    19th century and today the

    Redaelli name is

    synonomous worldwide

    with quality, progress,

    technical expertise, and

    customer service in all

    fields of steel wire rope.

    The very high quality of theproducts manufactured by

    Redaelli and used by their

    Engineering Division is

    guaranteed by meeting the

    most severe International

    standards and is usually

    certified by the principal

    independent controlling

    bodies, including Lloyd's

    Register of Shipping, Det

    Norske Veritas, American

    Bureau of Shipping,

    Registro Italiano Navale

    and many others.

    The certification to the

    ISO 9001:2008 and to the

    ISO 14001:2000

    International Standard is

    the expression of the highquality level of our

    manufacturing process & 

    top level quality system of

    Redaelli.

  • 8/20/2019 Redaelli for Engineering

    113/142

  • 8/20/2019 Redaelli for Engineering

    114/142

  • 8/20/2019 Redaelli for Engineering

    115/142

    Funi spiroidaliOpen spiral strands

    Le funi spiroidali Redaellisono costituite da fili diacciaio ad alta resistenzazincati a caldo.

    La fune è formata da stratidi fili tondi avvolti ad elicaattorno al nucleo centrale.

    Le caratteristiche principalidi resistenza e dellaprotezione anticorrosionedei fili sono conformi allaEN 12385-10.

    Le caratteristiche di

    resistenza, snervamento,duttilità, allungamento arottura, piega, torsione,aderenza del protettivo eavvolgimento vengonosingolarmente verificate daRedaelli su ogni singolo filo.

    La zincatura e duttilità deifili sono in accordo con leEN 10264 classe A o altristandard richiesti.

    Le funi spiroidali Redaelligarantiscono o superano lecaratteristiche minime diresistenza a fatica previste

    dal EN 1993-1-9 eEN 1993-1-11.

    Redaelli EngineeringDivision ha già eseguitomolteplici prove diresistenza a fatica susimulacri di fune completidi capicorda uguali a quellirealmente utilizzati.

    The open spiral strands aremade with hot dipgalvanised high strengthsteel wires.

    The strand is made up ofseveral layers of roundwires helically woundaround the core.

    The typical main propertiesof the wires conform to theEN 12385-10.

    Tensile strength, yieldstress, ductility, elongation

    at breaking, bending,torsion, adherence andwrapping properties areindividually tested byReadelli on each wire.

    The zinc coating and thewire ductility comply withthe EN 10264 class A andother required standards.

    The OSS Redaelli cablesmeet or exceed theminimum specifications forfatigue strength defined byEN 1993-1-9 andEN 1993-1-11.

    Redaelli EngineeringDivision has already mademany tests for fatigueresistance on cablemock-ups complete withsockets the same as thosein real use.

    OSS

    114

  • 8/20/2019 Redaelli for Engineering

    116/142

    Funi spiroidaliOpen spiral strands

    OSS 8 8 60 36 39 6.5 0.3

    OSS 12 12 135 82 88 14.6 0.7

    OSS 16 16 240 145 157 25.9 1.3

    OSS 20 20 380 230 245 40.4 2.0

    OSS 24 24 545 330 353 58.2 2.9

    OSS 28 28 745 452 480 79.3 4.0

    OSS 32 32 970 588 628 104 5.2

    OSS 36 36 1230 745 794 131 6.5

    OSS 40 40 1520 921 981 162 8.1

    OSS 44 44 1840 1115 1186 196 9.8

    OSS 48 48 2190 1327 1412 233 11.6

    OSS 52 52 2570 1558 1657 273 13.7

    OSS 56 56 2980 1806 1922 317 15.8

    OSS 60 60 3425 2076 2206 364 18.2

    OSS 64 64 3815 2312 2477 404 20.4

    OSS 68 68 4290 2600 2796 456 23.0

    OSS 72 72 4795 2906 3135 511 25.8

    OSS 76 76 5325 3227 3493 569 28.8

    OSS 80 80 5885 3567 3870 631 31.9

    OSS 84 84 6475 3924 4267 695 35.2

    OSS 88 88 7090 4297 4683 763 38.6

    Funi portanti e stabilizzantiper tensostrutture. Stralliper ponti ciclo-pedonali.Stralli per torri.

    Carrying and stabilizingstrands for tensostructures.Stays for pedestrianbridges. Guy ropes.

    d Diametro nominaleNominal diameter

    Fu,k MBL(Forza di rottura minima)(Minimum breaking load)

    FR,d Forza resistente di progettoDesign load

     A Sezione metallicaMetallic cross section

    EA Rigidezza elasticaElastic stiffness

    Note:(1) Fu,k MBL / γR

    with γR = 1 (EC3 1-11)

    (2) FR,d (MBL / 1.5) / γRwith γR = 1.1

    Productcode

    d

    (mm)

    Fu,k(1)

    (kN)

    FR,d(2)

    (kN)

     A 

    (mm2 )

    EA 

    (MN)

    Mass

    (kg/m)

    OSS

    115

  • 8/20/2019 Redaelli for Engineering

    117/142

    Funi chiuse

    Full locked coil strands

    Le funi chiuse Redaellisono costituite da fili diacciaio ad alta resistenzazincati a caldo.

    La fune è formata da unnucleo interno di fili tondi eda uno o più strati esternidi fili sagomati a Z.

    La forma a Z dei fili è taleda avere un bloccaggioreciproco dei fili perottenere una sezionecompatta.

    Le caratteristiche principali

    di resistenza e dellaprotezione anticorrosionedei fili sono conformi allaEN 12385-10.

    Le caratteristiche diresistenza, snervamento,duttilità, allungamento arottura, piega, torsione,aderenza del protettivo eavvolgimento vengonosingolarmente verificate daRedaelli su ogni singolo filo.

    La zincatura e duttilità deifili sono in accordo con leEN 10264 classe A o altri

    standard richiesti.La forma speciale dei fili aZ dà superfici di contattopiane e basse pressionisuperficiali tra i fili.

    Geometrie speciali per i filia Z possono essereproposte su richiesteparticolari.

    La forma a Z dei filipreviene l’ingresso di agentiesterni all’interno dei cavi.

    Le funi chiuse Redaelligarantiscono o superano le

    caratteristiche minime diresistenza a fatica previstedal EN 1993-1-9 eEN 1993-1-11. RedaelliEngineering Division ha giàeseguito molteplici prove diresistenza a fatica susimulacri di fune completidi capicorda uguali a quellirealmente utilizzati.

    The full locked coil strandsare made with hot dipgalvanised high strengthsteel wires.

    The strand is built with aninner core made of roundwires and by one or moreexternal layers of Z shapedwires.

    The Z shape of the wires isso as to have a self-lockingof the wires to obtain acompact section.

    The principal characteristicsof resistance and corrosionprotection of the wiresconform with EN 12385-10.

    Tensile strength, yieldstress, ductility, elongationat breaking, bending,torsion, adherence andwrapping properties areindividually tested byReadelli on each wire.

    The zinc coating and thewire ductility comply withthe EN 10264 class A andother required standards.

    The special shape of the Zshaped wires allows flatcontact surfaces and lowcontact stresses betweenthe wires.

    Special geometries for theZ shaped wires may bedesigned on request.

    The Z shape of the wiresprevents the entry ofexternal agents inside thecables.

    The FLC Redaelli cablesmeet or exceed the

    minimum specifications forfatigue strength defined byEN 1993-1-9 andEN 1993-1-11. RedaelliEngineering Division hasalready made many testsfor fatigue resistance oncable mock-ups completewith sockets the same asthose in real use.

    FLC

    116

  • 8/20/2019 Redaelli for Engineering

    118/142

    Funi chiuse

    Full locked coil strands

    Funi portanti e stabilizzantiper tensostrutture.Stralli per ponti. Pendini perponti sospesi. Stralli e funidi sospensione per edifici.

    Carrying and prestressingstrands for tensostructures.Stays for bridges. Hangersfor suspension bridges.Stays and suspensioncables for buildings.

    d Diametro nominaleNominal diameter

    Fu,k MBL(Forza di rottura minima)(Minimum breaking load)

    FR,d Forza resistente di progettoDesign load

     A Sezione metallicaMetallic cross section

    EA Rigidezza elasticaElastic stiffness

    Note:

    (1) Fu,k MBL / γRwith γR = 1 (EC3 1-11)

    (2) FR,d (MBL / 1.5) / γRwith γR = 1.1

    Productcode

    d

    (mm)

    Fu,k(1)

    (kN)

    FR,d(2)

    (kN)

     A 

    (mm2 )

    EA 

    (MN)

    Mass

    (kg/m)

    FLC 16 16 250 152 170 28.1 1.4

    FLC 20 20 395 239 266 43.9 2.2

    FLC 24 24 570 345 383 63.2 3.2

    FLC 28 28 775 470 521 86.0 4.3

    FLC 32 32 1015 615 681 112 5.7

    FLC 36 36 1285 779 862 142 7.2

    FLC 40 40 1605 973 1077 178 9.0

    FLC 44 44 1945 1179 1303 215 10.8

    FLC 48 48 2315 1403 1551 256 12.9

    FLC 52 52 2750 1667 1841 304 15.3

    FLC 56 56 3190 1933 2136 352 17.8

    FLC 60 60 3660 2218 2452 405 20.4

    FLC 64 64 4165 2524 2789 460 23.2

    FLC 68 68 4700 2848 3149 513 26.2

    FLC 72 72 5210 3158 3530 575 29.4

    FLC 76 76 5790 3509 3933 641 32.7

    FLC 80 80 6405 3882 4358 710 36.3

    FLC 84 84 7045 4270 4805 783 40.0

    FLC 88 88 7720 4679 5274 860 43.9

    FLC 92 92 8430 5109 5764 940 48.0

    FLC 96 96 9165 5555 6276 1023 52.2

    FLC 100 100 10050 6091 6890 1123 57.3

    FLC 104 104 10860 6582 7452 1215 62.0

    FLC 108 108 11700 7091 8037 1310 66.9

    FLC 112 112 12720 7709 8744 1425 72.8

    FLC 116 116 13635 8264 9379 1529 78.0

    FLC 120 120 14585 8839 10037 1636 83.5

    FLC 124 124 15565 9433 10718 1747 89.2

    FLC 128 128 16765 10161 11551 1883 96.1

    FLC 132 132 17820 10800 12285 1966 102.2

    FLC 136 136 18910 11461 13040 2086 108.5

    FLC 140 140 20260 12279 13976 2236 116.3

    FLC 144 144 21425 12985 14786 2366 123.0

    FLC

    117

  • 8/20/2019 Redaelli for Engineering

    119/142

    Descrizione tecnica

    delle funi

    Protezione anticorrosione

    La protezioneanticorrosione è data dallasovrapposizione deiseguenti sistemi:

    • zincatura a caldo o legadi zinco-alluminioZn95/Al5 (galfan) dei fili;

    • tamponante internoTensofill;

    • forma a Z dei fili esterninelle funi chiuse, chepreviene l’ingresso diagenti esterni;

    • sistemi addizionalispeciali possono essereusati:

    - protezione esterna conTensocoat Wax, inibitoredella corrosione perambienti molto aggressiviadditivato conmicroscaglie di alluminioTensocoat Aluminium(colore grigio alluminiometallico) o con biossidodi titanio TensocoatTitanium (colore bianco);

    - protezione esterna con

    Tensocoat Epoxy, resinaepossidica bi-componente,addizionata conmicroscaglie di alluminio,ad alta flessibilità,primer/finitura, surfacetolerant;

    - guaina di HDPE,polietilene ad alta densità,estruso a caldo sul cavo;questo sistema forniscecompleta impermeabilità,dalla prefabbricazione instabilimento, durantel’installazione ed in servizio.

    Inibitore della corrosioneTensofill

    Le funi sono riempite neglistrati interni con Tensofill,costituito da inibitore dellacorrosione per ambientimolto aggressiviaddizionato con resinespeciali e polvere di zinco.

    Il riempimento previenel’ingresso e diffusione diumidità e dà una protezioneaggiuntiva ai fili zincati.

    Prestiratura e marcatura

    Le funi per impieghistrutturali sono prestirate instabilimento per eliminarela deformazione anelasticainiziale e per stabilizzare ilmodulo di elasticità.

    I cavi sono poi misurati emarcati sotto la forzaspecificata, per il taglio amisura e per ilposizionamento di eventualimorsetti intermedi.

    La prestiratura è eseguitacon 5 o più cicli dal 10% al50÷60% della forza minimadi rottura con un massimodi 5000 kN; dopo l’ultimociclo la forza vienemantenuta al valoremassimo per un intervallodi tempo più lungo e poi

    regol