RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

  • Author
    others

  • View
    1

  • Download
    0

Embed Size (px)

Text of RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2...

  • RECORD NOTES OF THE MEETING ON SCHEDULING AND

    KHANRectangle

  • Annexure-1(1/2)

  • Annexure-1(2/2)

  • SPPD

    Description Status Yes /

    No

    Remarks SPD1 SPD2 SPPD

    1

    Register with SRLDC as User ( Entity )

    Yes / No Appendix - IV ( Fees & Charges

    of RLDC , CERC Regulations ,

    2015

    2as per CERC , RE Framework Sch. & forcasting : Annexure - I

    Yes / No Annexure - I ( Technical Data )

    3

    SLD : Visible ( PDF )

    Yes / No Complete Project w.r .t

    Metering , Protection , Scheme

    , etc.

    4Notarized copy of PPAs w. r .t connectivity with SPPD

    Yes / No

    5

    Forecast and Schedule Data to be submitted by Wind/Solar

    plants/ Lead generator, Principal generator , ( Annexure - II )

    Yes / No Annexure - II ( forecast Data )

    6 Real Time Avilabiltiy ( Annexure -III ) Yes / No Annexure - III

    7generation data ( Annexure - IV )

    Yes / No Annexure - IV

    8ABT compliant meters at inter - connection points ( ABT

    compliant meters shall have provision of automatic meter

    reading technology for data transfer to SRLDC )

    Yes / No

    8.1

    SEM Sample Data : NPC (Text file ) , for L&T : DAT , Secure :

    MRI ….

    Yes / No

    8.2 Make of meter / Meter Sl. No. / CT & VT Ratio Yes / No

    8.3 Time drift statement Yes / No

    9 Notarized copy of PPA RATES on Affidavit TO SRPC for DSM

    Preparation

    Yes / No Affidavit

    10 shall be responsible for sending the SCADA data to the RLDC

    and to the Renewable Energy management Center , as and

    when required.

    Yes / No

    11Undertaking by Licensee / Generating Company

    Yes / No

    11.1Shall be responsible for ensuring metering ( ABT compliant

    meter ) , data collection and weekly transmission of data ( in

    SRLDC data format ) to SRLDC as per IEGC and extant CERC

    Regulations

    Yes / No

    11.2

    Shall under take commercial settlement of all deviation

    settlement charges to the Regional Pool Account on Weekly

    basis , as per applicable CERC Regulations

    Yes / No

    11.3

    Shall be responsible for commercial settlement on scheduled

    generation with it beneficiaries as per the monthly Regional

    Energy Account (REA ) issued by SRPC .

    Yes / No

    SPD /SPPD : CHECK LIST FOR SCHEDULING

    S.No. SPD Verification Check List

    ANNEXURE 2

  • SPPD

    Description Status Yes /

    No

    Remarks SPD1 SPD2 SPPD

    SPD /SPPD : CHECK LIST FOR SCHEDULING

    S.No. SPD Verification Check List

    ANNEXURE 2

    11.4shall abide by the IEGC and CEA Regulations.

    Yes / No

    11.5shall follow the new element / generator procedure of SRLDC

    while connecting to the grid .

    Yes / No

    11.6shall undertake to indemnify , defend and save SRLDC

    harmless from any and all damages , losses including

    commercial lossess due to forecasting error , claims and

    actions including commercial losses due to forecasting error ,

    claims and actions including those relating to injury to or

    death of any person or damage to property , demands , suits

    , recoveries , costs and expenses , court costs , attorney fees ,

    and all other obligations by or to third parties , arising out of

    or resulting from thetransactions undertaken by the

    generators .

    Yes / No

    11.7Shall inform SRLDC regarding the new additions / deletion of

    Power system elements within the solar park , as and when

    there is a change .

    No

    11.8Shall be responsible for getting approval of SRPC of the

    metering scheme and accounting methodology of solar park

    and for each SPD.

    No

    11.9Shall provide the information sought by SRLDC & SRPC

    regarding the solar park activities from time by coordinating

    with the SPDs.

    No

    12

    Shall submit to SRLDC the grant of connectivity agreement

    with CTU / STU and the agreements entered with SPDs.

    Yes / No

    13Exemption of transmission charges and losses for the use of

    ISTS network ( as per Central Electricity Regulatory

    Commission (Sharing of Inter State Transmission Charges and

    Losses) (Fifth Amendment) Regulations, 2017. dated :

    14.12.2017 )

    Yes / No

    14

    LTA Operationalization