1
RAPID RESPONSE At 3:30am the call came in A 20ft container was blocking two central tracks At 7:00am the SRS Palfinger crane arrive on site Removal took 30 minutes At about 3:30am on Saturday 1st March 2008, the SRS Systems Ltd duty manager at Bolsover received a call from the Network Rail Rapid Response Team. The West Coast Main Line had been blocked in the Tring area by three 20 foot containers which freak gusts of wind had blown from their wagons. One container had landed on its end in the 10 foot. Not only was it was blocking the two central tracks, but it was also supporting overhead line. At 7am, just 3½ hours later, the SRS articulated road rail vehicle carrying a Palfinger PR750 crane arrived on site. A specialist crew had been mobilised and the crane had covered about 75 miles by road and a little by rail. It took about half an hour to lift each container and dump it in the cess. Such rapid response using the motorway network and travelling the final few miles on track is typical. It can only be achieved with commercial road going trucks which have been converted to road rail. SRS Rail System Ltd. operates a pool of 32 SRS road rail vehicles from its purpose built depot at Bolsover in the centre of England. They are available for hire throughout the land and rapid response is our speciality. A COMMERCIAL TRUCK ON THE ROAD A VERSATILE TRAIN ON THE TRACK SRS RAIL SYSTEM LTD | UNIT 3 | RIVERSIDE WAY | GATEWAY BUSINESS PARK BOLSOVER | CHESTERFIELD | S44 6GA For more information about how we can help you; CALL: 01246 241 312 EMAIL: [email protected] VISIT: WWW.SRSRAILUK.COM

RAPID RESPONSE - srsrailuk.co.uk · Ltd duty manager at Bolsover received a call from the Network Rail Rapid Response Team. The West Coast Main Line had been blocked in the Tring

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RAPID RESPONSE - srsrailuk.co.uk · Ltd duty manager at Bolsover received a call from the Network Rail Rapid Response Team. The West Coast Main Line had been blocked in the Tring

RAPID RESPONSE

At 3:30am the call came in

A 20ft container was blocking two central tracks

At 7:00am the SRS Palfinger crane arrive on site

Removal took 30 minutes

At about 3:30am on Saturday 1st March 2008, the SRS Systems Ltd duty manager at Bolsover received a call from the Network Rail Rapid Response Team.

The West Coast Main Line had been blocked in the Tring area by three 20 foot containers which freak gusts of wind had blown from their wagons. One container had landed on its end in the 10 foot. Not only was it was blocking the two central tracks, but it was also supporting overhead line.

At 7am, just 3½ hours later, the SRS articulated road rail vehicle carrying a Palfinger PR750 crane arrived on site.

A specialist crew had been mobilised and the crane had covered about 75 miles by road and a little by rail. It took about half an hour to lift each container and dump it in the cess.

Such rapid response using the motorway network and travelling the final few miles on track is typical. It can only be achieved with commercial road going trucks which have been converted to road rail.

SRS Rail System Ltd. operates a pool of 32 SRS road rail vehicles from its purpose built depot at Bolsover in the centre of England. They are available for hire throughout the land and rapid response is our speciality.

A C O M M E R C I A L T R U C K O N T H E R O A D A V E R S AT I L E T R A I N O N T H E T R A C K

SRS RAIL SYSTEM LTD | UNIT 3 | RIVERSIDE WAY | GATEWAY BUSINESS PARKBOLSOVER | CHESTERFIELD | S44 6GA

For more information about how we can help you;CALL: 01246 241 312 EMAIL: [email protected]: WWW.SRSRAILUK.COM