A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN No. URAIAN SATUAN VOLUME HARGA SATUAN HARGA (Rp) (Rp) A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m - Dolken Kayu Ø 8-10 / 400 cm Btg 1.2500 28,000.00 35,000.00 - Semen Portland Kg 2.5000 1,406.00 3,515.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Kayu balok terentang M3 0.0720 2,640,000.00 190,080.00 - Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00 - Residu Kg 0.4000 8,100.00 3,240.00 - Pekerja Oh 0.4000 42,000.00 16,800.00 - Tukang Kayu Oh 0.2000 65,000.00 13,000.00 - Kepala Tukang Oh 0.0200 75,000.00 1,500.00 - Mandor Oh 0.0200 80,000.00 1,600.00 Jumlah 269,315.90 Dibulatkan 269,316.00 A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m - Dolken Kayu Ø 8-10 / 400 cm Btg 1.2500 28,000.00 35,000.00 - Semen Portland Kg 2.5000 1,406.00 3,515.00 - Seng Gelombang BJLS-30 Lbr 1.2000 62,900.00 75,480.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Kayu balok terentang M3 0.0720 2,640,000.00 190,080.00 - Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00 - Meni Besi Kg 0.4500 30,400.00 13,680.00 - Pekerja Oh 0.4000 42,000.00 16,800.00 - Tukang Kayu Oh 0.2000 65,000.00 13,000.00 - Kepala Tukang Oh 0.0200 75,000.00 1,500.00 - Mandor Oh 0.0200 80,000.00 1,600.00 Jumlah 355,235.90 Dibulatkan 355,236.00 A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m - Dolken Kayu Ø 8-10 / 400 cm Btg 1.0000 28,000.00 28,000.00 - Semen Portland Kg 2.0000 1,406.00 2,812.00 - Kawat Duri Kg 2.5000 63,500.00 158,750.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00 - Pekerja Oh 0.3000 42,000.00 12,600.00 - Tukang Kayu Oh 0.2000 65,000.00 13,000.00 - Kepala Tukang Oh 0.0200 75,000.00 1,500.00 - Mandor Oh 0.0200 80,000.00 1,600.00 Jumlah 222,842.90 Dibulatkan 222,843.00 A-04 1 M2 Pengukuran Dan Pasang Bouwplank - Kayu kaso 5/7 M3 0.0120 1,870,500.00 22,446.00 - Paku Biasa 2" - 5" Kg 0.0200 23,400.00 468.00 - Kayu papan albasia M3 0.0070 2,071,700.00 14,501.90 - Pekerja Oh 0.1000 42,000.00 4,200.00 - Tukang Kayu Oh 0.1000 65,000.00 6,500.00 - Kepala Tukang Oh 0.0100 75,000.00 750.00 - Mandor Oh 0.0050 80,000.00 400.00 Jumlah 49,265.90 Dibulatkan 49,266.00

RAB Dan Analisa BOGOR 2011

Embed Size (px)

Citation preview

AA. ANALISA HARGA SATUAN PEKERJAAN PERSIAPANNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)A-011 M' Pagar Sementara Dari Kayu Tinggi 2 m-Dolken Kayu 8-10 / 400 cmBtg1.250028,000.0035,000.00-Semen PortlandKg2.50001,406.003,515.00-Pasir betonM30.0050255,400.001,277.00-Koral Beton 2/3M30.0090211,100.001,899.90-Kayu balok terentangM30.07202,640,000.00190,080.00-Paku Biasa 2" - 5"Kg0.060023,400.001,404.00-ResiduKg0.40008,100.003,240.00-PekerjaOh0.400042,000.0016,800.00-Tukang KayuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.020080,000.001,600.00Jumlah269,315.90Dibulatkan269,316.00A-021 M' Pagar Sementara Seng Gelombang Tinggi 2 m-Dolken Kayu 8-10 / 400 cmBtg1.250028,000.0035,000.00-Semen PortlandKg2.50001,406.003,515.00-Seng Gelombang BJLS-30Lbr1.200062,900.0075,480.00-Pasir betonM30.0050255,400.001,277.00-Koral Beton 2/3M30.0090211,100.001,899.90-Kayu balok terentangM30.07202,640,000.00190,080.00-Paku Biasa 2" - 5"Kg0.060023,400.001,404.00-Meni BesiKg0.450030,400.0013,680.00-PekerjaOh0.400042,000.0016,800.00-Tukang KayuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.020080,000.001,600.00Jumlah355,235.90Dibulatkan355,236.00A-031 M' Pagar SementaraKawat Duri Tinggi 1,80 m-Dolken Kayu 8-10 / 400 cmBtg1.000028,000.0028,000.00-Semen PortlandKg2.00001,406.002,812.00-Kawat DuriKg2.500063,500.00158,750.00-Pasir betonM30.0050255,400.001,277.00-Koral Beton 2/3M30.0090211,100.001,899.90-Paku Biasa 2" - 5"Kg0.060023,400.001,404.00-PekerjaOh0.300042,000.0012,600.00-Tukang KayuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.020080,000.001,600.00Jumlah222,842.90Dibulatkan222,843.00A-041 M2 Pengukuran Dan Pasang Bouwplank-Kayu kaso 5/7M30.01201,870,500.0022,446.00-Paku Biasa 2" - 5"Kg0.020023,400.00468.00-Kayu papan albasiaM30.00702,071,700.0014,501.90-PekerjaOh0.100042,000.004,200.00-Tukang KayuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.005080,000.00400.00Jumlah49,265.90Dibulatkan49,266.00A-051 M2 Pembuatan Kantor Sementara dgn Lantai Diplester-Dolken Kayu 8-10 / 400 cmBtg1.250028,000.0035,000.00-Kayu Balok terentangM30.18002,640,000.00475,200.00-Paku BiasaKg0.850023,400.0019,890.00-Besi StripKg1.100026,800.0029,480.00-Semen PortlandKg35.00001,406.0049,210.00-Pasir PasangM30.1500233,400.0035,010.00-Pasir betonM30.1000255,400.0025,540.00-Koral Beton2/3M30.1500211,100.0031,665.00-Bata MerahBh30.0000775.0023,250.00-Seng Platm'0.250015,815.003,953.75-Kawat harmonikaM22.000035,900.0071,800.00-Kaca Polos 3mmM20.080087,400.006,992.00-Kunci TanamBh0.150094,500.0014,175.00-Plywood 120 x 240 x 0,4 cmLbr0.0600140,000.008,400.00-PekerjaOh2.000042,000.0084,000.00-Tukang KayuOh2.000065,000.00130,000.00-Tukang BatuOh1.000065,000.0065,000.00-Kepala TukangOh0.300075,000.0022,500.00-MandorOh0.050080,000.004,000.00Jumlah1,135,065.75Dibulatkan1,135,066.00A-061 M2 Pembuatan Gudang Semen dan Alat-alat-Dolken Kayu 8-10 / 400 cmBtg1.700028,000.0047,600.00-Kayu balok terentangM30.21002,640,000.00554,400.00-Paku BiasaKg0.300023,400.007,020.00-Semen PortlandKg10.50001,406.0014,763.00-Pasir BetonM30.0300255,400.007,662.00-Koral Beton 2/3M30.0500211,100.0010,555.00-Seng Gelombang BJLS 30Lbr1.500062,900.0094,350.00-PekerjaOh1.000042,000.0042,000.00-Tukang KayuOh2.000065,000.00130,000.00-Kepala TukangOh0.200075,000.0015,000.00-MandorOh0.050080,000.004,000.00Jumlah927,350.00Dibulatkan927,350.00A-071 M2 Pembuatan Bedeng Buruh-Dolken Kayu 8-10 / 400 cmBtg1.250028,000.0035,000.00-Kayu balok terentangM30.18602,640,000.00491,040.00-Paku BiasaKg0.300023,400.007,020.00-Semen PortlandKg18.00001,406.0025,308.00-Pasir BetonM30.0300255,400.007,662.00-Koral Beton 2/3M30.0500211,100.0010,555.00-Seng Gelombang BJLS 30Lbr1.500062,900.0094,350.00-PekerjaOh1.000042,000.0042,000.00-Tukang KayuOh2.000065,000.00130,000.00-Kepala TukangOh0.200075,000.0015,000.00-MandorOh0.050080,000.004,000.00Jumlah861,935.00Dibulatkan861,935.00A-081 M2 Membersihkan Lapangan dan Perataan-PekerjaOh0.100042,000.004,200.00-MandorOh0.050080,000.004,000.00Jumlah8,200.00Dibulatkan8,200.00A-091M2 Pembuatan Jalan Sementara-Batu Belah 15/20M30.1500205,500.0030,825.00-Batu Pecah 5/7M30.0900196,000.0017,640.00-Pasir PasangM30.0100233,400.002,334.00-PekerjaOh1.000042,000.0042,000.00-MandorOh0.050080,000.004,000.00Jumlah96,799.00Dibulatkan96,799.00A-101 M3 Bongkaran Beton Bertulang-PekerjaOh6.667042,000.00280,014.00-MandorOh0.333080,000.0026,640.00Jumlah306,654.00Dibulatkan306,654.00A-111 M3 Bongkaran Dinding Tembok Bata Merah-PekerjaOh6.667042,000.00280,014.00-MandorOh0.033080,000.002,640.00Jumlah282,654.00Dibulatkan282,654.00A-121 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm-Panel Beton PracetakLbr0.9860199,200.00196,411.20-Kolom Beton PracetakBtg0.5250264,000.00138,600.00-Pasir BetonM30.0740255,400.0018,899.60-Koral 2/3M30.1460211,100.0030,820.60-Semen abu - abuKg45.00001,406.0063,270.00-PekerjaOh0.375042,000.0015,750.00-Tukang BatuOh0.125065,000.008,125.00-Kepala TukangOh0.012075,000.00900.00-MandorOh0.019080,000.001,520.00Jumlah474,296.40Dibulatkan474,296.00A-131 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'-Kawat ram ayamLbr0.434014,900.006,466.60-Besi siku L 50.50.5Kg6.786018,300.00124,183.80-Besi pelat (1,2 x 3) mmKg0.042418,300.00775.92-Bautbh4.0000600.002,400.00-Semen PortlandKg2.50001,406.003,515.00-Pasir betonM30.0050255,400.001,277.00-Koral Beton 2/3M30.0090211,100.001,899.90-PekerjaOh0.375042,000.0015,750.00-Tukang BatuOh0.125065,000.008,125.00-Kepala TukangOh0.012075,000.00900.00-MandorOh0.019080,000.001,520.00Jumlah166,813.22Dibulatkan166,813.00A-141 M2 Pagar BRC lengkap dengan tiang-BRC lengkap dengan tiangLbr0.4340171,300.0074,344.20-Semen PortlandKg2.00001,406.002,812.00-Kawat DuriKg2.500063,500.00158,750.00-Pasir betonM30.0050255,400.001,277.00-Koral Beton 2/3M30.0090211,100.001,899.90-PekerjaOh0.375042,000.0015,750.00-Tukang BatuOh0.125065,000.008,125.00-Kepala TukangOh0.012075,000.00900.00-MandorOh0.019080,000.001,520.00Jumlah265,378.10Dibulatkan265,378.00A-151 M2 Steiger Werk / perancah dari Bambu-Bambu 6 - 10 (600) cmbtng1.000025,000.0025,000.00-Tali ijukkg0.250023,400.005,850.00-Pekerjaorg0.250042,000.0010,500.00-Tukang kayuorg0.017065,000.001,105.00-Kepala tukangorg0.002075,000.00150.00-Mandororg0.013080,000.001,040.00Jumlah43,645.00Dibulatkan43,645.00A-161 M' Cerucuk Bambu-Bambu 7 -10 (400) cmbtng1.250025,000.0031,250.00-Pekerjaorg0.500042,000.0021,000.00-Mandororg0.025080,000.002,000.00Jumlah54,250.00Dibulatkan54,250.00

BB. ANALISA HARGA SATUAN PEKERJAAN TANAHNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)B-011 M3 Galian Tanah Biasa sedalam 1 m-PekerjaOh0.400042,000.0016,800.00-MandorOh0.040080,000.003,200.00Jumlah20,000.00Dibulatkan20,000.00B-021 M3 Galian Tanah Biasa Sedalam 2 m-PekerjaOh0.526042,000.0022,092.00-MandorOh0.052080,000.004,160.00Jumlah26,252.00Dibulatkan26,252.00B-031 M3 Galian Tanah Biasa Sedalam 3 m-PekerjaOh0.735042,000.0030,870.00-MandorOh0.073080,000.005,840.00Jumlah36,710.00Dibulatkan36,710.00B-041 M3 Galian Tanah Keras Sedalam 1 m-PekerjaOh0.625042,000.0026,250.00-MandorOh0.062080,000.004,960.00Jumlah31,210.00Dibulatkan31,210.00B-051 M3 Galian Tanah Lumpur Sedalam 1 m-PekerjaOh0.823042,000.0034,566.00-MandorOh0.083080,000.006,640.00Jumlah41,206.00Dibulatkan41,206.00B-061 M2 Pekerjaan Stripping Setinggi 10 cm-PekerjaOh0.050042,000.002,100.00-MandorOh0.005080,000.00400.00Jumlah2,500.00Dibulatkan2,500.00B-071 M3 Pembuangan Tanah sejauh 150 m-PekerjaOh0.516042,000.0021,672.00-MandorOh0.050080,000.004,000.00Jumlah25,672.00Dibulatkan25,672.00B-081 M3 Urugan Kembali-PekerjaOh0.192042,000.008,064.00-MandorOh0.019080,000.001,520.00Jumlah9,584.00Dibulatkan9,584.00B-091 M3 Pemadatan Tanah-PekerjaOh0.500042,000.0021,000.00-MandorOh0.050080,000.004,000.00Jumlah25,000.00Dibulatkan25,000.00B-101 M3 Urugaan Pasir-Pasir UrugM31.2000175,300.00210,360.00-PekerjaOh0.300042,000.0012,600.00-MandorOh0.010080,000.00800.00Jumlah223,760.00Dibulatkan223,760.00B-111 M2 Pemasangan Lapisan Ijuk Tebal 10 cm-Ijukm21.200022,000.0026,400.00-PekerjaOh0.150042,000.006,300.00-MandorOh0.015080,000.001,200.00Jumlah33,900.00Dibulatkan33,900.00B-121 M3 Urugan Sirtu-SirtuM31.2000203,500.00244,200.00-PekerjaOh0.250042,000.0010,500.00-MandorOh0.025080,000.002,000.00Jumlah256,700.00Dibulatkan256,700.00B-131 M3 Urugan Tanah Pilihan-Tanah urug pilihanM31.200089,200.00107,040.00-PekerjaOh0.250042,000.0010,500.00-MandorOh0.025080,000.002,000.00Jumlah119,540.00Dibulatkan119,540.00B-141 M2 Pembuatan jalan sementara, tebal 25 cm-Batu belahM30.2750205,500.0056,512.50-KerikilM30.0300172,600.005,178.00-Pasir UrugM30.0500175,300.008,765.00-PekerjaOh1.000042,000.0042,000.00-MandorOh0.100080,000.008,000.00Jumlah120,455.50Dibulatkan120,456.00

CC. ANALISA HARGA SATUAN PEKERJAAN PONDASINo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)C-011 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps-Batu BelahM31.1000205,500.00226,050.00-Semen PortlandKg202.00001,406.00284,012.00-Pasir PasangM30.4850233,400.00113,199.00-PekerjaOh1.500042,000.0063,000.00-Tukang BatuOh0.600065,000.0039,000.00-Kepala TukangOh0.060075,000.004,500.00-MandorOh0.075080,000.006,000.00Jumlah735,761.00Dibulatkan735,761.00C-021 M3 Pasang Pondasi Batu kali adk 1pc : 4ps-Batu BelahM31.1000205,500.00226,050.00-Semen PortlandKg163.00001,406.00229,178.00-Pasir PasangM30.5200233,400.00121,368.00-PekerjaOh1.500042,000.0063,000.00-Tukang BatuOh0.600065,000.0039,000.00-Kepala TukangOh0.060075,000.004,500.00-MandorOh0.075080,000.006,000.00Jumlah689,096.00Dibulatkan689,096.00C-031 M3 Pasang Pondasi Batu kali adk 1pc : 5ps-Batu BelahM31.1000205,500.00226,050.00-Semen PortlandKg136.00001,406.00191,216.00-Pasir PasangM30.5440233,400.00126,969.60-PekerjaOh1.500042,000.0063,000.00-Tukang BatuOh0.600065,000.0039,000.00-Kepala TukangOh0.060075,000.004,500.00-MandorOh0.075080,000.006,000.00Jumlah656,735.60Dibulatkan656,736.00C-041 M3 Pasang Pondasi Batu Kosong (aanstamping)-Batu BelahM31.2000205,500.00246,600.00-Pasir UrugM30.3000175,300.0052,590.00-PekerjaOh0.780042,000.0032,760.00-Tukang BatuOh0.390065,000.0025,350.00-Kepala TukangOh0.039075,000.002,925.00-MandorOh0.039080,000.003,120.00Jumlah363,345.00Dibulatkan363,345.00C-051 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan-Besi BetonKg75.000016,500.001,237,500.00-Semen PortlandKg202.00001,406.00284,012.00-Pasir Betonm30.3200255,400.0081,728.00-Koral Beton 2/3m30.4900211,100.00103,439.00-Kawat BetonKg0.800027,700.0022,160.00-Batu Belahm30.4500205,500.0092,475.00-PekerjaOh3.000042,000.00126,000.00-Tukang BatuOh0.850065,000.0055,250.00-Kepala TukangOh0.085075,000.006,375.00-MandorOh0.150080,000.0012,000.00Jumlah2,020,939.00Dibulatkan2,020,939.00C-061 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)-Batu BelahM30.4500205,500.0092,475.00-Semen PortlandKg280.00001,406.00393,680.00-Pasir BetonM30.4500255,400.00114,930.00-Koral BetonM30.6700211,100.00141,437.00-PekerjaOh2.380042,000.0099,960.00-Tukang BatuOh0.300065,000.0019,500.00-Kepala TukangOh0.030075,000.002,250.00-MandorOh0.080080,000.006,400.00Jumlah870,632.00Dibulatkan870,632.00C-071 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah-Batu BelahM30.4500205,500.0092,475.00-Semen PortlandKg202.00001,406.00284,012.00-Pasir BetonM30.3200255,400.0081,728.00-Koral BetonM30.4900211,100.00103,439.00-PekerjaOh3.000042,000.00126,000.00-Tukang BatuOh0.850065,000.0055,250.00-Kepala TukangOh0.085075,000.006,375.00-MandorOh0.150080,000.0012,000.00Jumlah761,279.00Dibulatkan761,279.00C-081 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang-Pasir UrugM30.0190175,300.003,330.70-Pasir BetonM30.0940255,400.0024,007.60-Koral BetonM30.1500211,100.0031,665.00-Semen PortlandKg60.50001,406.0085,063.00-Besi BetonKg45.000016,500.00742,500.00-Kawat BetonKg0.900027,700.0024,930.00-Kayu balok terentangM30.03202,640,000.0084,480.00-PakuKg0.120023,400.002,808.00-Minyak BekistingLtr0.090055,000.004,950.00-Plamir TembokKg0.240025,000.006,000.00-PekerjaOh1.000042,000.0042,000.00-Tukang BatuOh0.670065,000.0043,550.00-Kepala TukangOh0.067075,000.005,025.00-MandorOh0.050080,000.004,000.00Jumlah1,104,309.30Dibulatkan1,104,309.00C-091 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang-Pasir UrugM30.0160175,300.002,804.80-Pasir BetonM30.0800255,400.0020,432.00-Koral BetonM30.1250211,100.0026,387.50-Semen PortlandKg49.00001,406.0068,894.00-Besi BetonKg34.500016,500.00569,250.00-Kawat BetonKg0.700027,700.0019,390.00-Kayu balok terentangM30.02702,640,000.0071,280.00-PakuKg0.120023,400.002,808.00-Minyak BekistingLtr0.090055,000.004,950.00-Plamir TembokKg0.200025,000.005,000.00-PekerjaOh0.800042,000.0033,600.00-Tukang BatuOh0.500065,000.0032,500.00-Kepala TukangOh0.050075,000.003,750.00-MandorOh0.040080,000.003,200.00Jumlah864,246.30Dibulatkan864,246.00C-101 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang-Pasir UrugM30.0149175,300.002,614.600.16-Pasir BetonM30.0738255,400.0018,845.970.1256-Koral BetonM30.1178211,100.0024,857.030.785-Semen PortlandKg47.49251,406.0066,774.46-Besi BetonKg45.000016,500.00742,500.00-Kawat BetonKg0.900027,700.0024,930.00-Kayu balok terentangM30.03202,640,000.0084,480.00-PakuKg0.120023,400.002,808.00-Minyak BekistingLtr0.090055,000.004,950.00-Plamir TembokKg0.240025,000.006,000.00-PekerjaOh1.000042,000.0042,000.00-Tukang BatuOh0.670065,000.0043,550.00-Kepala TukangOh0.067075,000.005,025.00-MandorOh0.050080,000.004,000.00Jumlah1,073,335.05Dibulatkan1,073,335.00C-111 M' Memancang Tiang Pancang Beton Tulang-Crawler crane lengkapjam0.11701,078,774.00126,216.56-PekerjaOh0.040042,000.001,680.00-MandorOh0.002080,000.00160.00Jumlah128,056.56Dibulatkan128,057.00C-121 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang-Pekerjajam3.320042,000.00139,440.00-Kepala Tukangjam0.070075,000.005,250.00-Mandorjam0.200080,000.0016,000.00-Alat bantulot0.3500160,690.0056,241.50Jumlah216,931.50Dibulatkan216,932.00C-131 M' Menyambung Tiang Pancang Beton Bertulang-Besi pelatkg18.370014,100.00259,017.00-Besi betonkg6.0616,500.0099,990.00-Kawat laskg2.2023,600.0051,920.00-Tukang lasorg1.0065,000.0065,000.00-Pembantu tukang lasorg2.000042,000.0084,000.00-Mandororg0.200080,000.0016,000.00-Mesin lasjam2.000026,325.0052,650.00Jumlah628,577.00Dibulatkan628,577.00

DD. ANALISA HARGA SATUAN PEKERJAAN BETONNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)D-011 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr-Semen PortlandKg218.00001,406.00306,508.00-Pasir BetonM30.5200255,400.00132,808.00-Batu Pecah Mesin 2/3M30.8700211,100.00183,657.00-PekerjaOh1.650042,000.0069,300.00-Tukang BatuOh0.250065,000.0016,250.00-Kepala TukangOh0.025075,000.001,875.00-MandorOh0.080080,000.006,400.00Jumlah716,798.00Dibulatkan716,798.00D-021 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr-Semen PortlandKg197.00001,406.00276,982.00-Pasir BetonM30.4700255,400.00120,038.00-Batu Pecah Mesin 2/3M30.9400211,100.00198,434.00-PekerjaOh1.650042,000.0069,300.00-Tukang BatuOh0.250065,000.0016,250.00-Kepala TukangOh0.025075,000.001,875.00-MandorOh0.080080,000.006,400.00Jumlah689,279.00Dibulatkan689,279.00D-031 M3 Membuat Beton Tumbuk 1pc:2ps:3kr-Semen PortlandKg336.00001,406.00472,416.00-Pasir BetonM30.5400255,400.00137,916.00-Batu Pecah Mesin 2/3M30.8100211,100.00170,991.00-PekerjaOh2.000042,000.0084,000.00-Tukang BatuOh0.350065,000.0022,750.00-Kepala TukangOh0.035075,000.002,625.00-MandorOh1.000080,000.0080,000.00Jumlah970,698.00Dibulatkan970,698.00D-041 M3 Membuat Tiang Pancang Beton Prestressed-Semen PortlandKg440.00001,406.00618,640.00-Pasir BetonM30.5000255,400.00127,700.00-Batu Pecah Mesin 2/3M30.8000211,100.00168,880.00-RapidrantGln2.460015,700.0038,622.00-PekerjaOh1.650042,000.0069,300.00-Tukang BatuOh0.250065,000.0016,250.00-Kepala TukangOh0.025075,000.001,875.00-MandorOh0.080080,000.006,400.00Jumlah1,047,667.00Dibulatkan1,047,667.00D-051 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr-Semen PortlandKg291.00001,406.00409,146.00-Pasir BetonM30.4700255,400.00120,038.00-Batu Pecah Mesin 2/3M30.9300211,100.00196,323.00-PekerjaOh2.000042,000.0084,000.00-Tukang BatuOh0.350065,000.0022,750.00-Kepala TukangOh0.035075,000.002,625.00-MandorOh1.000080,000.0080,000.00Jumlah914,882.00Dibulatkan914,882.00D-061 M Memasang PVC Waterstop Lebar 200 mm-Waterstop Lebar 200 mmM1.050057,900.0060,795.00-PekerjaOh0.050042,000.002,100.00-Tukang BatuOh0.035065,000.002,275.00-Kepala TukangOh0.003575,000.00262.50-MandorOh0.002080,000.00160.00Jumlah65,592.50Dibulatkan65,593.00D-071 Kg Pembesian Dengan Besi Polos/ulir-Besi Beton ( Polos / Ulir )Kg1.050016,500.0017,325.00-Kawat BetonKg0.015027,700.00415.50-PekerjaOh0.007042,000.00294.00-Tukang BesiOh0.007065,000.00455.00-Kepala TukangOh0.000775,000.0052.50-MandorOh0.000380,000.0024.00Jumlah18,566.00Dibulatkan18,566.00D-081 M2 Pasang Bekesting Untuk Pondasi-Kayu papan terentangM30.04002,850,000.00114,000.00-Paku Biasa 2" - 5"Kg0.300023,400.007,020.00-Minyak BekistingLtr55,000.000.0-PekerjaOh0.300042,000.0012,600.00-Tukang KayuOh0.260065,000.0016,900.00-Kepala TukangOh0.026075,000.001,950.00-MandorOh0.005080,000.00400.00Jumlah152,870.00Dibulatkan152,870.00D-091 M2 Pasang Bekisting Untuk Sloof-Kayu papan terentangM30.04502,850,000.00128,250.00-Paku Biasa 2" - 5"Kg0.300023,400.007,020.00-Minyak BekistingLtr55,000.000.0-PekerjaOh0.300042,000.0012,600.00-Tukang KayuOh0.260065,000.0016,900.00-Kepala TukangOh0.026075,000.001,950.00-MandorOh0.005080,000.00400.00Jumlah167,120.00Dibulatkan167,120.00D-101 M2 Pasang Bekesting Untuk Kolom-Kayu papan terentangM30.04002,850,000.00114,000.00-Paku Biasa 2" - 5"Kg0.400023,400.009,360.00-Minyak BekistingLtr55,000.000.0-Kayu balok terentangM30.01502,640,000.0039,600.00-MultiPlek 9 mm 120 x 240Lbr0.3500151,100.0052,885.00-Dolken -8-10/4mBtg2.000028,000.0056,000.00-PekerjaOh0.300042,000.0012,600.00-Tukang KayuOh0.330065,000.0021,450.00-Kepala TukangOh0.033075,000.002,475.00-MandorOh0.006080,000.00480.00Jumlah308,850.00Dibulatkan308,850.00D-111 M2 Pasang Bekesting Untuk Balok-Kayu papan terentangM30.04002,850,000.00114,000.00-Paku Biasa 2" - 5"Kg0.400023,400.009,360.00-Minyak BekistingLtr55,000.000.0-Kayu balok terentangM30.01802,640,000.0047,520.00-MultiPlek 9 mm 120 x 240Lbr0.3500151,100.0052,885.00-Dolken -8-10/4mBtg2.000028,000.0056,000.00-PekerjaOh0.300042,000.0012,600.00-Tukang KayuOh0.330065,000.0021,450.00-Kepala TukangOh0.033075,000.002,475.00-MandorOh0.006080,000.00480.00Jumlah316,770.00Dibulatkan316,770.00D-121 M2 Pasang Bekesting Untuk Lantai-Kayu papan terentangM30.04002,850,000.00114,000.00-Paku Biasa 2" - 5"Kg0.400023,400.009,360.00-Minyak BekistingLtr0.200055,000.0011,000.00-Kayu balok terentangM30.01502,640,000.0039,600.00-MultiPlek 9 mm 120 x 240Lbr0.3500151,100.0052,885.00-Dolken -8-10/4mBtg6.000028,000.00168,000.00-PekerjaOh0.300042,000.0012,600.00-Tukang KayuOh0.330065,000.0021,450.00-Kepala TukangOh0.033075,000.002,475.00-MandorOh0.006080,000.00480.00Jumlah431,850.00Dibulatkan431,850.00D-131 M2 Pasang Bekesting Untuk Tangga-Kayu papan terentangM30.03002,850,000.0085,500.00-Paku Biasa 2" - 5"Kg0.400023,400.009,360.00-Minyak BekistingLtr0.150055,000.008,250.00-Kayu balok terentangM30.01502,640,000.0039,600.00-MultiPlek 9 mm 120 x 240Lbr0.3500151,100.0052,885.00-Dolken -8-10/4mBtg2.000028,000.0056,000.00-PekerjaOh0.320042,000.0013,440.00-Tukang KayuOh0.330065,000.0021,450.00-Kepala TukangOh0.033075,000.002,475.00-MandorOh0.006080,000.00480.00Jumlah289,440.00Dibulatkan289,440.00D-141 M3 Membuat Beton Cor Mutu K-225-Semen PortlandKg388.00001,406.00545,528.00-Pasir Betonm30.6500255,400.00166,010.00-Koral Beton 2/3M30.6500211,100.00137,215.00-Airltr215.00003.00645.00-PekerjaOh6.000042,000.00252,000.00-Tukang BatuOh1.000065,000.0065,000.00-Kepala TukangOh0.100075,000.007,500.00-MandorOh0.300080,000.0024,000.00Jumlah1,197,898.00Dibulatkan1,197,898.00D-151 M3 Membuat Beton Cor Mutu K-275-Semen PortlandKg400.00001,406.00562,400.00-Pasir BetonM30.4000255,400.00102,160.00-Koral Beton 2/3M30.8200211,100.00173,102.00-Airltr215.00003.00645.00-PekerjaOh6.000042,000.00252,000.00-Tukang BatuOh1.000065,000.0065,000.00-Kepala TukangOh0.100075,000.007,500.00-MandorOh0.300080,000.0024,000.00Jumlah1,186,807.00Dibulatkan1,186,807.00D-161 M3 Pondasi Beton Tulang (150 kg besi + bekisting)-Kayu papan terentangM30.20002,850,000.00570,000.00-Paku Biasa 2" - 5"Kg1.500023,400.0035,100.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg150.000016,500.002,475,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh3.900042,000.00163,800.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.040065,000.0067,600.00-Tukang BesiOh1.050065,000.0068,250.00-Kepala TukangOh0.245075,000.0018,375.00-MandorOh0.165080,000.0013,200.00Jumlah4,248,004.00Dibulatkan4,248,004.00D-171 M3 Sloof Beton Tulang (200 kg besi + bekisting)-Kayu papan terentangM30.27002,850,000.00769,500.00-Paku Biasa 2" - 5"Kg2.000023,400.0046,800.00-Minyak BekistingLtr0.600055,000.0033,000.00-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh4.850042,000.00203,700.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.331075,000.0024,825.00-MandorOh0.170080,000.0013,600.00Jumlah5,441,279.00Dibulatkan5,441,279.00D-17r11 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)-Kayu papan terentangM30.27002,850,000.00769,500.00-Paku Biasa 2" - 5"Kg2.000023,400.0046,800.00-Minyak BekistingLtr0.600055,000.0033,000.00-Besi BetonKg150.000016,500.002,475,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh4.850042,000.00203,700.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.331075,000.0024,825.00-MandorOh0.170080,000.0013,600.00Jumlah4,616,279.00Dibulatkan4,616,279.00D-17r21 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15-Kayu papan terentangM30.27002,850,000.00769,500.00-Paku Biasa 2" - 5"Kg2.000023,400.0046,800.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg180.000016,500.002,970,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh4.850042,000.00203,700.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.331075,000.0024,825.00-MandorOh0.170080,000.0013,600.00Jumlah5,078,279.00Dibulatkan5,078,279.001 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15-Kayu papan terentangM30.27002,850,000.00769,500.00-Paku Biasa 2" - 5"Kg2.000023,400.0046,800.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg150.000016,500.002,475,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh4.850042,000.00203,700.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.331075,000.0024,825.00-MandorOh0.170080,000.0013,600.00Jumlah4,583,279.00Dibulatkan4,583,279.001 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15-Kayu papan terentangM30.27002,850,000.00769,500.00-Paku Biasa 2" - 5"Kg2.000023,400.0046,800.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh4.850042,000.00203,700.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.331075,000.0024,825.00-MandorOh0.170080,000.0013,600.00Jumlah5,408,279.00Dibulatkan5,408,279.001 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat-Kayu papan terentangM30.27002,850,000.00769,500.00-Paku Biasa 2" - 5"Kg2.000023,400.0046,800.00-Minyak BekistingLtr0.600055,000.0033,000.00-Besi BetonKg240.000016,500.003,960,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-PekerjaOh4.850042,000.00203,700.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.331075,000.0024,825.00-MandorOh0.170080,000.0013,600.00Jumlah6,101,279.00Dibulatkan6,101,279.00D-181 M3 Kolom Beton Tulang (120 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg120.000016,500.001,980,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-Plywood Tebal 9 mmLbr3.5000235,000.00822,500.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah6,646,664.00Dibulatkan6,646,664.00D-18r1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg140.000016,500.002,310,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah6,573,014.00Dibulatkan6,573,014.00(73,650.00)1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg180.000016,500.002,970,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,233,014.00Dibulatkan7,233,014.001 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg175.000016,500.002,887,500.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM32,640,000.000.0-MultiPlek 9 mm 120 x 240Lbr151,100.000.0-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah6,225,664.00Dibulatkan6,225,664.001 M3 Kolom Beton Tulang Praktis 12/12 (210 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg210.000016,500.003,465,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM32,640,000.000.0-MultiPlek 9 mm 120 x 240Lbr151,100.000.0-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah6,803,164.00Dibulatkan6,803,164.001 M3 Kolom Beton Tulang Praktis 12/12 (260 kg besi + bekisting) 4dia.10 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg260.000016,500.004,290,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM32,640,000.000.0-MultiPlek 9 mm 120 x 240Lbr151,100.000.0-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,628,164.00Dibulatkan7,628,164.001 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg210.000016,500.003,465,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,728,014.00Dibulatkan7,728,014.001 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12, 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg230.000016,500.003,795,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah8,058,014.00Dibulatkan8,058,014.001 M3 Kolom Beton Tulang 20/40 (250 kg besi + bekisting) Struktur bertingkat-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg250.000016,500.004,125,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah8,498,014.00Dibulatkan8,498,014.001 M3 Kolom Beton Tulang 30/30 (175 kg besi + bekisting) Struktur bertingkat 8dia.16, 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg175.000016,500.002,887,500.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,150,514.00Dibulatkan7,150,514.001 M3 Kolom Beton Tulang 30/30 (210 kg besi + bekisting) Struktur bertingkat 10dia.16, 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg210.000016,500.003,465,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,728,014.00Dibulatkan7,728,014.001 M3 Kolom Beton Tulang 30/40 (200 kg besi + bekisting) Struktur bertingkat-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,673,014.00Dibulatkan7,673,014.00D-191 M3 Kolom Beton Tulang (140 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg140.000016,500.002,310,000.00-Kawat BetonKg2.100027,700.0058,170.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah6,691,324.00Dibulatkan6,691,324.00D-201 M3 Kolom Beton Tulang (150 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.000.4000-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.004.0000-Minyak BekistingLtr2.000055,000.00110,000.002.0000-Besi BetonKg150.000016,500.002,475,000.00150.0000-Kawat BetonKg2.400027,700.0066,480.004.5000-Semen PortlandKg323.00001,406.00454,138.00323.0000-Pasir BetonM30.5200255,400.00132,808.000.5200-Koral Beton 2/3M30.7800211,100.00164,658.000.7800-Kayu Balok TerentangM30.15002,640,000.00396,000.000.1500-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.003.5000-Dolken -8-10/4mBtg20.000028,000.00560,000.0020.0000-PekerjaOh7.300042,000.00306,600.007.3000-Tukang BatuOh0.350065,000.0022,750.000.3500-Tukang KayuOh3.300065,000.00214,500.003.3000-Tukang BesiOh2.100065,000.00136,500.002.1000-Kepala TukangOh0.570075,000.0042,750.000.5700-MandorOh0.250080,000.0020,000.000.2500Jumlah6,864,634.00Dibulatkan6,864,634.00D-211 M3 Kolom Beton Tulang (180 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg180.000016,500.002,970,000.00-Kawat BetonKg2.700027,700.0074,790.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,367,944.00Dibulatkan7,367,944.00D-221 M3 Kolom Beton Tulang (200 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,706,254.00Dibulatkan7,706,254.00D-231 M3 Kolom Beton Tulang (250 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg250.000016,500.004,125,000.00-Kawat BetonKg3.750027,700.00103,875.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah8,552,029.00Dibulatkan8,552,029.00D-241 M3 Kolom Beton Tulang (300 kg besi + bekisting)-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr2.000055,000.00110,000.00-Besi BetonKg300.000016,500.004,950,000.00-Kawat BetonKg4.500027,700.00124,650.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.15002,640,000.00396,000.00-MultiPlek 9 mm 120 x 240Lbr3.5000151,100.00528,850.00-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah9,397,804.00Dibulatkan9,397,804.00D-251 M3 Balok Beton Tulang (120 kg besi + bekisting)-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr1.600055,000.0088,000.00-Besi BetonKg120.000016,500.001,980,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah5,693,859.00Dibulatkan5,693,859.00D-261 M3 Balok Beton Tulang 15/20 (150 kg besi + bekisting)-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr1.600055,000.0088,000.00-Besi BetonKg150.000016,500.002,475,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,201,324.00Dibulatkan6,201,324.00D-261 M3 Balok Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg180.000016,500.002,970,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,608,324.00Dibulatkan6,608,324.001 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg180.000016,500.002,970,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,608,324.00Dibulatkan6,608,324.001 M3 Balok Beton Tulang 15/30 (190 kg besi + bekisting) Struktur bertingkat 4dia. 16, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg190.000016,500.003,135,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,773,324.00Dibulatkan6,773,324.00D-271 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,959,099.00Dibulatkan6,959,099.001 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,959,099.00Dibulatkan6,959,099.001 M3 Balok Beton Tulang 20/30 (175 kg besi + bekisting) Struktur bertingkat 5dia. 16, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0Besi BetonKg175.000016,500.002,887,500.00-Kawat BetonKg3.000055,000.00165,000.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah6,628,499.00Dibulatkan6,628,499.001 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg140.000016,500.002,310,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah5,969,099.00Dibulatkan5,969,099.001 M3 Balok Beton Tulang 30/60 (110 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg110.000016,500.001,815,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah5,474,099.00Dibulatkan5,474,099.001 M3 Balok Beton Lintel 11/11 (300 kg besi + bekisting) 4dia.10 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg300.000016,500.004,950,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM32,640,000.000.0-MultiPlek 9 mm 120 x 240Lbr151,100.000.0-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah8,288,164.00Dibulatkan8,288,164.001 M3 Balok Beton Lintel 11/15 (234 kg besi + bekisting) 4dia.10 8-15-Kayu papan terentangM30.40002,850,000.001,140,000.00-Paku Biasa 2" - 5"Kg4.000023,400.0093,600.00-Minyak BekistingLtr55,000.000.0-Besi BetonKg234.000016,500.003,861,000.00-Kawat BetonKg1.800027,700.0049,860.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM32,640,000.000.0-MultiPlek 9 mm 120 x 240Lbr151,100.000.0-Dolken -8-10/4mBtg20.000028,000.00560,000.00-PekerjaOh7.300042,000.00306,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh3.300065,000.00214,500.00-Tukang BesiOh2.100065,000.00136,500.00-Kepala TukangOh0.570075,000.0042,750.00-MandorOh0.250080,000.0020,000.00Jumlah7,199,164.00Dibulatkan7,199,164.00D-281 M3 Balok Beton Tulang (230 kg besi + bekisting)-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr1.600055,000.0088,000.00-Besi BetonKg230.000016,500.003,795,000.00-Kawat BetonKg3.450027,700.0095,565.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.14002,640,000.00369,600.00-MultiPlek 9 mm 120 x 240Lbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg16.000028,000.00448,000.00-PekerjaOh5.960042,000.00250,320.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.800065,000.00182,000.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.455075,000.0034,125.00-MandorOh0.208080,000.0016,640.00Jumlah7,554,564.00Dibulatkan7,554,564.00D-291 M3 Tangga Beton Tulang (200 kg besi + bekisting)-Kayu papan terentangM30.25002,850,000.00712,500.00-Paku Biasa 2" - 5"Kg3.000023,400.0070,200.00-Minyak BekistingLtr1.200055,000.0066,000.00-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.10502,640,000.00277,200.00-Plywood Tebal 9 mmLbr2.5000151,100.00377,750.00-Dolken -8-10/4mBtg14.000028,000.00392,000.00-PekerjaOh5.600042,000.00235,200.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.300065,000.00149,500.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.405075,000.0030,375.00-MandorOh0.202080,000.0016,160.00Jumlah6,575,339.00Dibulatkan6,575,339.00D-301 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)-Beton tulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM210.0000431,850.004,318,500.00-Besi Beton PolosKg90.000018,566.001,670,940.00Jumlah6,904,322.00Dibulatkan6,904,322.001 M3 Lisplang Beton Tulang T= 8 cm (77,5 kg besi + bekisting)-Beton tulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM210.0000431,850.004,318,500.00-Besi Beton PolosKg77.500018,566.001,438,865.00Jumlah6,672,247.00Dibulatkan6,672,247.00D-311 M3 Pelat Lantai Beton Tulang T= 12 cm (110 kg besi + bekisting) dia.8-12,5-Beton bertulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM28.3300431,850.003,597,310.50-Besi Beton PolosKg110.000018,566.002,042,260.00Jumlah6,554,452.50Dibulatkan6,554,453.001 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting) dia.10-20-Beton bertulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM28.3300431,850.003,597,310.50-Besi Beton PolosKg130.000018,566.002,413,580.00Jumlah6,925,772.50Dibulatkan6,925,773.00D-321 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting)-Beton bertulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM28.3300431,850.003,597,310.50-Besi Beton PolosKg130.000018,566.002,413,580.00Jumlah6,925,772.50Dibulatkan6,925,773.00D-331 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)-Beton bertulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM26.6700431,850.002,880,439.50-Besi Beton PolosKg90.000018,566.001,670,940.00Jumlah5,466,261.50Dibulatkan5,466,262.00D-341 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)-Beton bertulang ad. 1Pc : 2Ps : 3KrM31.0000914,882.00914,882.00-Pasang Bekisting untuk lantaiM26.6700431,850.002,880,439.50-Besi Beton PolosKg115.000018,566.002,135,090.00Jumlah5,930,411.50Dibulatkan5,930,412.00D-351 M' Kolom Praktis Beton Tulang (11x11) cm-Kayu papan terentangM30.00202,850,000.005,700.00-Paku Biasa 2" - 5"Kg0.010023,400.00234.00-Besi Beton PolosKg3.000016,500.0049,500.00-Kawat BetonKg0.045027,700.001,246.50-Semen PortlandKg4.00001,406.005,624.00-Pasir BetonM30.0060255,400.001,532.40-Koral BetonM30.0090211,100.001,899.90-PekerjaOh0.060042,000.002,520.00-Tukang BatuOh0.020065,000.001,300.00-Tukang KayuOh0.020065,000.001,300.00-Tukang BesiOh0.020065,000.001,300.00-Kepala TukangOh0.006075,000.00450.00-MandorOh0.003080,000.00240.00Jumlah72,846.80Dibulatkan72,847.00D-361 M' Ring Balok Beton Tulang (10x15) cm-Kayu papan terentangM30.00302,850,000.008,550.00-Paku Biasa 2" - 5"Kg0.020023,400.00468.00-Besi Beton PolosKg3.600016,500.0059,400.00-Kawat BetonKg0.050027,700.001,385.00-Semen PortlandKg5.50001,406.007,733.00-Pasir BetonM30.0090255,400.002,298.60-Koral BetonM30.0150211,100.003,166.50-PekerjaOh0.100042,000.004,200.00-Tukang BatuOh0.033065,000.002,145.00-Tukang KayuOh0.033065,000.002,145.00-Tukang BesiOh0.033065,000.002,145.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.005080,000.00400.00Jumlah94,786.10Dibulatkan94,786.00D-371 M2 Pasang Bekesting Untuk Dinding-Kayu papan terentangM30.03002,850,000.0085,500.00-Paku Biasa 2" - 5"Kg0.40001,406.00562.40-Minyak BekistingLtr0.200055,000.0011,000.00-Kayu balok terentangM30.02002,640,000.0052,800.00-Plywood Tebal 9 mmLbr0.3500151,100.0052,885.00-Dolken -8-10/4mBtg3.000028,000.0084,000.00-Formite/spacerBuah4.00002,500.0010,000.00-PekerjaOh0.320042,000.0013,440.00-Tukang KayuOh0.033065,000.002,145.00-Kepala TukangOh0.033075,000.002,475.00-MandorOh0.006080,000.00480.00Jumlah315,287.40Dibulatkan315,287.00D-381 M3 Pelat Beton Tulang (150 kg besi + bekisting)-Kayu papan terentangM30.32002,850,000.00912,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr1.600055,000.0088,000.00-Besi BetonKg150.000016,500.002,475,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.12002,640,000.00316,800.00-Plywood Tebal 9 mmLbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg32.000028,000.00896,000.00-PekerjaOh5.300042,000.00222,600.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.300065,000.0084,500.00-Tukang BesiOh1.050065,000.0068,250.00-Kepala TukangOh0.265075,000.0019,875.00-MandorOh0.265080,000.0021,200.00Jumlah6,438,864.00Dibulatkan6,438,864.00D-391 M3 Dinding Beton Tulang (150 kg besi + bekisting)-Kayu papan terentangM30.24002,850,000.00684,000.00-Paku Biasa 2" - 5"Kg3.200023,400.0074,880.00-Minyak BekistingLtr1.600055,000.0088,000.00-Besi BetonKg150.000016,500.002,475,000.00-Kawat BetonKg2.250027,700.0062,325.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.16002,640,000.00422,400.00-Plywood Tebal 9 mmLbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg24.000028,000.00672,000.00-PekerjaOh5.600042,000.00235,200.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh2.640065,000.00171,600.00-Tukang BesiOh1.050065,000.0068,250.00-Kepala TukangOh0.400075,000.0030,000.00-MandorOh0.193080,000.0015,440.00Jumlah6,196,529.00Dibulatkan6,196,529.00D-401 M3 Dinding Beton Tulang (200 kg besi + bekisting)-Kayu papan terentangM30.25002,850,000.00712,500.00-Paku Biasa 2" - 5"Kg3.000023,400.0070,200.00-Minyak BekistingLtr1.200055,000.0066,000.00-Besi BetonKg200.000016,500.003,300,000.00-Kawat BetonKg3.000027,700.0083,100.00-Semen PortlandKg323.00001,406.00454,138.00-Pasir BetonM30.5200255,400.00132,808.00-Koral Beton 2/3M30.7800211,100.00164,658.00-Kayu Balok TerentangM30.10502,640,000.00277,200.00-Plywood Tebal 9 mmLbr2.8000151,100.00423,080.00-Dolken -8-10/4mBtg14.000028,000.00392,000.00-PekerjaOh5.650042,000.00237,300.00-Tukang BatuOh0.350065,000.0022,750.00-Tukang KayuOh1.560065,000.00101,400.00-Tukang BesiOh1.400065,000.0091,000.00-Kepala TukangOh0.323075,000.0024,225.00-MandorOh0.283080,000.0022,640.00Jumlah6,574,999.00Dibulatkan6,574,999.00D-411 M3 Membuat Beton Cor Mutu K-300-Semen PortlandKg413.00001,406.00580,678.00-Pasir BetonM30.4256255,400.00108,704.63-Koral Beton 2/3M30.6807211,100.00143,688.73-PekerjaOh1.650042,000.0069,300.00-Tukang BatuOh0.275065,000.0017,875.00-Kepala TukangOh0.028075,000.002,100.00-MandorOh0.083080,000.006,640.00Jumlah928,986.36Dibulatkan928,986.00D-421 M3 Membuat Beton Cor Mutu K-200-Semen PortlandKg352.00001,406.00494,912.00-Pasir BetonM30.4569255,400.00116,685.88-Koral Beton 2/3M30.6873211,100.00145,096.07-PekerjaOh1.650042,000.0069,300.00-Tukang BatuOh0.275065,000.0017,875.00-Kepala TukangOh0.028075,000.002,100.00-MandorOh0.083080,000.006,640.00Jumlah852,608.94Dibulatkan852,609.00D-431 M3 Membuat Beton Cor Mutu K-250-Semen PortlandKg384.00001,406.00539,904.00-Pasir BetonM30.4325255,400.00110,460.50-Koral Beton 2/3M30.6927211,100.00146,221.93-PekerjaOh1.650042,000.0069,300.00-Tukang BatuOh0.275065,000.0017,875.00-Kepala TukangOh0.028075,000.002,100.00-MandorOh0.083080,000.006,640.00Jumlah892,501.43Dibulatkan892,501.00

EE. ANALISA HARGA SATUAN PEKERJAAN DINDINGNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)E-011 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps-Bata MerahBh140.0000775.00108,500.00-Semen PortlandKg32.95001,406.0046,327.70-Pasir PasangM30.0910233,400.0021,239.40-PekerjaOh0.650042,000.0027,300.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.030080,000.002,400.00Jumlah220,267.10Dibulatkan220,267.00E-021 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps-Bata MerahBh140.0000775.00108,500.00-Semen PortlandKg26.55001,406.0037,329.30-Pasir PasangM30.0930233,400.0021,706.20-PekerjaOh0.650042,000.0027,300.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.030080,000.002,400.00Jumlah211,735.50Dibulatkan211,736.00E-031 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps-Bata MerahBh140.0000775.00108,500.00-Semen PortlandKg22.20001,406.0031,213.20-Pasir PasangM30.1020233,400.0023,806.80-PekerjaOh0.650042,000.0027,300.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.030080,000.002,400.00Jumlah207,720.00Dibulatkan207,720.00E-041 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps-Bata MerahBh70.0000775.0054,250.00-Semen PortlandKg14.37001,406.0020,204.22-Pasir PasangM30.0400233,400.009,336.00-PekerjaOh0.320042,000.0013,440.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah105,680.22Dibulatkan105,680.00E-051 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps-Bata MerahBh70.0000775.0054,250.00-Semen PortlandKg11.50001,406.0016,169.00-Pasir PasangM30.0430233,400.0010,036.20-PekerjaOh0.320042,000.0013,440.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah102,345.20Dibulatkan102,345.00E-061 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps-Bata MerahBh70.0000775.0054,250.00-Semen PortlandKg9.68001,406.0013,610.08-Pasir PasangM30.0450233,400.0010,503.00-PekerjaOh0.320042,000.0013,440.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah100,253.08Dibulatkan100,253.00E-071 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 3ps-Roster / TerawangBh36.000014,800.00532,800.00-Semen PortlandKg12.80001,406.0017,996.80-Pasir PasangM30.0350233,400.008,169.00-PekerjaOh0.300042,000.0012,600.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah580,015.80Dibulatkan580,016.00E-081 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 4ps-Roster / TerawangBh36.000014,800.00532,800.00-Semen PortlandKg11.00001,406.0015,466.00-Pasir PasangM30.0350233,400.008,169.00-PekerjaOh0.300042,000.0012,600.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah577,485.00Dibulatkan577,485.00E-091 M2 Pasang Dinding Roster/terawng (12 x 11 x 24) cm-Roster / TerawangBh36.000014,800.00532,800.00-Semen PortlandKg12.80001,406.0017,996.80-Pasir PasangM30.0350233,400.008,169.00-PekerjaOh0.300042,000.0012,600.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah580,015.80Dibulatkan580,016.00E-101 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps-Batakobh13.00002,400.0031,200.00-PCkg12.00001,406.0016,872.00-Pasir PasangM30.0380233,400.008,869.20-PekerjaOh0.300042,000.0012,600.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah46,791.20Dibulatkan46,791.00E-111 M2 Pasang Dinding hollowblock (HB-20)-HB-20Bh12.50005,000.0062,500.00-PC (50 kg)Kg13.50001,406.0018,981.00-Pasir Pasangm30.0480233,400.0011,203.20-Besi angkur f 8 mmKg1.950016,500.0032,175.00-PekerjaOh0.350042,000.0014,700.00-Tukang BatuOh0.150065,000.009,750.00-Kepala TukangOh0.015075,000.001,125.00-MandorOh0.017080,000.001,360.00Jumlah151,794.20Dibulatkan151,794.00E-121 M2 Pasang Dinding hollowblock (HB-15)-HB-15Bh12.50004,000.0050,000.00-PC (50 kg)Kg10.45001,406.0014,692.70-Pasir Pasangm30.0380233,400.008,869.20-Besi angkur f 8 mmKg1.950016,500.0032,175.00-PekerjaOh0.320042,000.0013,440.00-Tukang BatuOh0.120065,000.007,800.00-Kepala TukangOh0.012075,000.00900.00-MandorOh0.015080,000.001,200.00Jumlah129,076.90Dibulatkan129,077.00E-131 M2 Pasang Dinding hollowblock (HB-10)-HB-10Bh12.50003,000.0037,500.00-PC (50 kg)Kg7.50001,406.0010,545.00-Pasir Pasangm30.0270233,400.006,301.80-Besi angkur f 8 mmKg1.950016,500.0032,175.00-PekerjaOh0.320042,000.0013,440.00-Tukang BatuOh0.120065,000.007,800.00-Kepala TukangOh0.012075,000.00900.00-MandorOh0.015080,000.001,200.00Jumlah109,861.80Dibulatkan109,862.00E-141 M2 Pasang Dinding Conblock (CB-20)-CB-20Bh12.50005,000.0062,500.00-PC (50 kg)Kg14.05001,406.0019,754.30-Pasir betonM30.0040255,400.001,021.60-Pasir PasangM30.0420233,400.009,802.80-Besi angkur f 8 mmKg3.870016,500.0063,855.00-Paku Biasa 2" - 5"kg0.006023,400.00140.40-Kayu terentangM30.00102,850,000.002,850.00-Kawat betonkg0.030027,700.00831.00-Koral betonM30.0050211,100.001,055.50-PekerjaOh0.370042,000.0015,540.00-Tukang BatuOh0.157065,000.0010,205.00-Tukang BesiOh0.007075,000.00525.00-Kepala TukangOh0.016475,000.001,230.00-MandorOh0.018580,000.001,480.00Jumlah190,790.60Dibulatkan190,791.00E-151 M2 Pasang Dinding Conblock (CB-15)-CB-15Bh12.50004,000.0050,000.00-PC (50 kg)Kg10.46001,406.0014,706.76-Pasir betonM30.0030255,400.00766.20-Pasir PasangM30.0320233,400.007,468.80-Besi angkur f 8 mmKg0.870016,500.0014,355.00-Paku Biasa 2" - 5"kg0.004023,400.0093.60-Kayu terentangM30.00102,850,000.002,850.00-Kawat betonkg0.020027,700.00554.00-Koral betonM30.0040211,100.00844.40-PekerjaOh0.340042,000.0014,280.00-Tukang BatuOh0.130065,000.008,450.00-Tukang BesiOh0.007075,000.00525.00-Kepala TukangOh0.013775,000.001,027.50-MandorOh0.017080,000.001,360.00Jumlah117,281.26Dibulatkan117,281.00E-161 M2 Pasang Dinding Conblock (CB-10)-CB-10Bh12.50003,000.0037,500.00-PC (50 kg)Kg10.46001,406.0014,706.76-Pasir betonM30.0030255,400.00766.20-Pasir PasangM30.0320233,400.007,468.80-Besi angkur f 8 mmKg0.870016,500.0014,355.00-Paku Biasa 2" - 5"kg0.004023,400.0093.60-Kayu terentangM30.00102,850,000.002,850.00-Kawat betonkg0.020027,700.00554.00-Koral betonM30.0040211,100.00844.40-PekerjaOh0.340042,000.0014,280.00-Tukang BatuOh0.130065,000.008,450.00-Tukang BesiOh0.007075,000.00525.00-Kepala TukangOh0.013775,000.001,027.50-MandorOh0.017080,000.001,360.00Jumlah104,781.26Dibulatkan104,781.00E-171 M2 Dinding Keramik Corak 10 x 20 cm Setara Mulia-Keramik Corak 10 x 20 cmm21.000056,000.0056,000.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah108,782.30Dibulatkan108,782.00E-181 M2 Dinding Keramik polos 10 x 20 cm Setara Mulia-Keramik 10 x 20 cmm21.000054,500.0054,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah107,282.30Dibulatkan107,282.00E-191 M2 Dinding Keramik corak 20 x 20 cm setara Mulia-Keramik 20 x 20 cmm21.000062,500.0062,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah115,282.30Dibulatkan115,282.00E-201 M2 Dinding Keramik polos 20 x 20 cm Setara Mulia-Keramik 20 x 20 cmm21.000054,500.0054,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah107,282.30Dibulatkan107,282.00E-211 M2 Dinding Keramik polos 20 x 25 cm Setara Mulia-Keramik 20 x 25 cmm21.000054,500.0054,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah107,282.30Dibulatkan107,282.00E-221 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia-Keramik corak 20 x 25 cmm21.000062,500.0062,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah115,282.30Dibulatkan115,282.00E-231 M2 Dinding Keramik Polos 30 x 30 cm Setara Mulia-Keramik polos 30 x 30 cmm21.000053,000.0053,000.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah105,782.30Dibulatkan105,782.00E-241 M2 Dinding Keramik Corak 30 x 30 cm Setara Mulia-Keramik corak 30 x 30 cmm21.000058,000.0058,000.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah110,782.30Dibulatkan110,782.00E-251 M2 Dinding Keramik Polos 40 x 40 cm Setara Mulia-Keramik polos 40 x 40 cmm21.000056,800.0056,800.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah109,582.30Dibulatkan109,582.00E-261 M2 Dinding Keramik Corak 40 x 40 cm Setara Mulia-Keramik corak 40 x 40 cmm21.000065,500.0065,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah118,282.30Dibulatkan118,282.00E-271 M2 Dinding Keramik Corak 10 x 20 cm Setara Roman-Keramik Corak 10 x 20 cmm21.000072,200.0072,200.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah124,982.30Dibulatkan124,982.00E-281 M2 Dinding Keramik polos 10 x 20 cm Setara Roman-Keramik 10 x 20 cmm21.000064,400.0064,400.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah117,182.30Dibulatkan117,182.00E-291 M2 Dinding Keramik corak 20 x 20 cm setara Roman-Keramik 20 x 20 cmm21.000075,200.0075,200.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah127,982.30Dibulatkan127,982.00E-301 M2 Dinding Keramik polos 20 x 20 cm Setara Roman-Keramik 20 x 20 cmm21.000064,400.0064,400.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah117,182.30Dibulatkan117,182.00E-311 M2 Dinding Keramik polos 20 x 25 cm Setara Roman-Keramik 20 x 25 cmm21.000072,900.0072,900.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah125,682.30Dibulatkan125,682.00E-321 M2 Dinding Keramik Corak 20 x 25 cm Setara Roman-Keramik corak 20 x 25 cmm21.000075,200.0075,200.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah127,982.30Dibulatkan127,982.00E-331 M2 Dinding Keramik Polos 30 x 30 cm Setara Roman-Keramik polos 30 x 30 cmm21.000068,900.0068,900.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah121,682.30Dibulatkan121,682.00E-341 M2 Dinding Keramik Corak 30 x 30 cm Setara Roman-Keramik corak 30 x 30 cmm21.000076,600.0076,600.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah129,382.30Dibulatkan129,382.00E-351 M2 Dinding Keramik Polos 40 x 40 cm Setara Roman-Keramik polos 40 x 40 cmm21.000072,500.0072,500.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah125,282.30Dibulatkan125,282.00E-361 M2 Dinding Keramik Corak 40 x 40 cm Setara Roman-Keramik corak 40 x 40 cmm21.000077,000.0077,000.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah129,782.30Dibulatkan129,782.00E-371 M2 Dinding Marmer-MarmerM21.0200550,000.00561,000.00-Paku pancing 60 x 230Bh2.0000900.001,800.00-Semen abu-abuKg12.44001,406.0017,490.64-Pasir pasangM30.0250233,400.005,835.00-Semen warnaKg1.500015,700.0023,550.00-PekerjaOh0.720042,000.0030,240.00-Tukang batuOh0.650065,000.0042,250.00-Kepala tukangOh0.065075,000.004,875.00-MandorOh0.035080,000.002,800.00Jumlah689,840.64Dibulatkan689,841.00E-381 M2 Dinding Batu Tempel Hitam-Batu tempel hitamM21.050096,600.00101,430.00-Semen abu-abuKg11.75001,406.0016,520.50-Pasir pasangM30.0350233,400.008,169.00-PekerjaOh0.620042,000.0026,040.00-Tukang batuOh0.350065,000.0022,750.00-Kepala tukangOh0.035075,000.002,625.00-MandorOh0.030080,000.002,400.00Jumlah179,934.50Dibulatkan179,935.00E-391 M2 Dinding Porselen (11 x 11) cm-PorselenM21.000063,300.0063,300.00-Semen abu-abuKg8.00001,406.0011,248.00-Pasir pasangM30.0180233,400.004,201.20-Semen warnaKg0.013015,700.00204.10-PekerjaOh0.187542,000.007,875.00-Tukang batuOh0.375065,000.0024,375.00-Kepala tukangOh0.045075,000.003,375.00-MandorOh0.018880,000.001,504.00Jumlah116,082.30Dibulatkan116,082.00E-401 M2 Wall paper-Wall paperM21.050055,700.0058,485.00-LemKg0.250035,700.008,925.00-PekerjaOh0.350042,000.0014,700.00-Tukang batuOh0.175065,000.0011,375.00-Kepala tukangOh0.017075,000.001,275.00-MandorOh0.002080,000.00160.00Jumlah94,920.00Dibulatkan94,920.00E-411 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan-Kayu Balok Kamper MedanM30.02805,692,600.00159,392.80-Paku Biasa 2" - 5"Kg0.150023,800.003,570.00-Lem KayuLtr0.560023,900.0013,384.00-Teakwood 120 x 240 x 0,4 cmLbr0.8600131,700.00113,262.00-PekerjaOh0.150042,000.006,300.00-Tukang KayuOh0.450065,000.0029,250.00-Kepala TukangOh0.045075,000.003,375.00-MandorOh0.008080,000.00640.00Jumlah329,173.80Dibulatkan329,174.00E-421 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan-Kayu Balok Kamper MedanM30.02805,692,600.00159,392.80-Paku Biasa 2" - 5"Kg0.150023,800.003,570.00-Lem KayuLtr0.560023,900.0013,384.00-Plywood 120 x 240 x 9 mmLbr0.8600235,000.00202,100.00-PekerjaOh0.200042,000.008,400.00-Tukang KayuOh0.600065,000.0039,000.00-Kepala TukangOh0.060075,000.004,500.00-MandorOh0.010080,000.00800.00Jumlah431,146.80Dibulatkan431,147.00E-431 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan-Kayu Balok Kamper MedanM30.02805,692,600.00159,392.80-Paku Biasa 2" - 5"Kg0.150023,800.003,570.00-Lem KayuLtr0.560023,900.0013,384.00-Triplek (120x240x0,4) cmLbr0.860064,400.0055,384.00-PekerjaOh0.200042,000.008,400.00-Tukang KayuOh0.600065,000.0039,000.00-Kepala TukangOh0.060075,000.004,500.00-MandorOh0.010080,000.00800.00Jumlah284,430.80Dibulatkan284,431.00E-441 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow-Hollow 4/4 ZincromateBtg0.415029,200.0012,118.00-Hollow 2/4 ZincromateBtg0.150022,600.003,390.00-GRC ( 120 x 240 x 4 ) mmLbr0.364067,500.0024,570.00-Paku GRCkg0.110035,000.003,850.00-Ramset / dina boltBh4.00007,200.0028,800.00-Cotton plasterBh0.072023,900.001,720.80-CompounZak0.125075,000.009,375.00-PekerjaOh0.100042,000.004,200.00-Tukang kayuOh0.050065,000.003,250.00-Kepala tukangOh0.005075,000.00375.00-MandorOh0.005080,000.00400.00Jumlah92,048.80Dibulatkan92,049.00E-441 M2 Dinding Pemisah Gypsum t = 4 mm + rangka besi hollow-Hollow 4/4 ZincromateBtg0.415029,200.0012,118.00-Hollow 2/4 ZincromateBtg0.150022,600.003,390.00-GypsumLbr0.364079,800.0029,047.20-Paku GRCkg0.110035,000.003,850.00-Ramset / dina boltBh4.00007,200.0028,800.00-Cotton plasterBh0.072023,900.001,720.80-CompounZak0.125075,000.009,375.00-PekerjaOh0.100042,000.004,200.00-Tukang kayuOh0.050065,000.003,250.00-Kepala tukangOh0.005075,000.00375.00-MandorOh0.005080,000.00400.00Jumlah96,526.00Dibulatkan96,526.00E-451 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow-Hollow 4/4 ZincromateBtg0.415029,200.0012,118.00-Hollow 2/4 ZincromateBtg0.150022,600.003,390.00-Plywood 120 x 240, 9 mmLbr0.3640235,000.0085,540.00-Pakukg0.110023,800.002,618.00-Ramset / dina boltBh4.00007,200.0028,800.00-PekerjaOh0.100042,000.004,200.00-Tukang kayuOh0.050065,000.003,250.00-Kepala tukangOh0.005075,000.00375.00-MandorOh0.005080,000.00400.00Jumlah140,691.00Dibulatkan140,691.00E-461 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow-Hollow 4/4 ZincromateBtg0.415029,200.0012,118.00-Hollow 2/4 ZincromateBtg0.150022,600.003,390.00-Teakwood ( 120 x 240 x 4 ) mmLbr0.3640131,700.0047,938.80-Pakukg0.110023,800.002,618.00-Ramset / dina boltBh4.00007,200.0028,800.00-PekerjaOh0.100042,000.004,200.00-Tukang kayuOh0.050065,000.003,250.00-Kepala tukangOh0.005075,000.00375.00-MandorOh0.005080,000.00400.00Jumlah103,089.80Dibulatkan103,090.00E-471 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps-Glass block 20 x 20Bh36.000022,000.00792,000.00-Semen PortlandKg11.00001,406.0015,466.00-Pasir PasangM30.0350233,400.008,169.00-PekerjaOh0.300042,000.0012,600.00-Tukang BatuOh0.100065,000.006,500.00-Kepala TukangOh0.010075,000.00750.00-MandorOh0.015080,000.001,200.00Jumlah836,685.00Dibulatkan836,685.00E-481 M2 Pasang Dinding anyaman bambu, rangka kayu-Bilik bambuM21.500022,700.0034,050.00-Kayu kaso 5/7M30.01403,356,800.0046,995.20-PakuKg0.011223,800.00266.56-List kayu 2/4m30.00305,280,000.0015,840.00-PekerjaOh0.100042,000.004,200.00-Tukang BatuOh0.050065,000.003,250.00-Kepala TukangOh0.005075,000.00375.00-MandorOh0.002080,000.00160.00Jumlah105,136.76Dibulatkan105,137.00

FF. ANALISA HARGA SATUAN PEKERJAAN PLESTERANNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)F-011 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm-Semen PortlandKg8.52001,406.0011,979.12-Pasir PasangM30.0170233,400.003,967.80-PekerjaOh0.200042,000.008,400.00-Tukang BatuOh0.150065,000.009,750.00-Kepala TukangOh0.015075,000.001,125.00-MandorOh0.010080,000.00800.00Jumlah36,021.92Dibulatkan36,022.00F-021 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm-Semen PortlandKg6.48001,406.009,110.88-Pasir PasangM30.0190233,400.004,434.60-PekerjaOh0.200042,000.008,400.00-Tukang BatuOh0.150065,000.009,750.00-Kepala TukangOh0.015075,000.001,125.00-MandorOh0.010080,000.00800.00Jumlah33,620.48Dibulatkan33,620.00F-031 M2 Plesteran adk. 1pc : 4ps Tebal 15 mmF-031 M2 Plesteran adk. 1pc :5ps Tebal 15 mm-Semen PortlandKg5.20001,406.007,311.20-Semen PortlandKg4.3214066073.92-Pasir PasangM30.0200233,400.004,668.00-Pasir PasangM30.0222334005134.8-PekerjaOh0.200042,000.008,400.00-PekerjaOh0.2420008400-Tukang BatuOh0.150065,000.009,750.00-Tukang BatuOh0.15650009750-Kepala TukangOh0.015075,000.001,125.00-Kepala TukangOh0.015750001125-MandorOh0.010080,000.00800.00-MandorOh0.0180000800Jumlah32,054.20Jumlah31283.72Dibulatkan32,054.00Dibulatkan31,284.00F-041 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm-Semen PortlandKg10.80001,406.0015,184.80-Pasir PasangM30.0260233,400.006,068.40-PekerjaOh0.250042,000.0010,500.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah47,253.20Dibulatkan47,253.00F-051 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm-Semen PortlandKg8.68001,406.0012,204.08-Pasir PasangM30.0280233,400.006,535.20-PekerjaOh0.250042,000.0010,500.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah44,739.28Dibulatkan44,739.00F-061 M2 Plesteran adk. 1pc:5ps tebal 20 mm-Semen PortlandKg7.29001,406.0010,249.74-Pasir PasangM30.0260233,400.006,068.40-PekerjaOh0.250042,000.0010,500.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah42,318.14Dibulatkan42,318.001 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian-Semen PortlandKg4.32001,406.006,073.92-Pasir PasangM30.0220233,400.005,134.80-PekerjaOh0.200042,000.008,400.00-Tukang BatuOh0.150065,000.009,750.00-Kepala TukangOh0.015075,000.001,125.00-MandorOh0.010080,000.00800.00Jumlah31,283.72Dibulatkan31,284.00F-071 M2 Berapen adk. 1pc : 5ps Tebal 15 mm-Semen PortlandKg5.67001,406.007,972.02-Pasir PasangM30.0230233,400.005,368.20-PekerjaOh0.150042,000.006,300.00-Tukang BatuOh0.070065,000.004,550.00-Kepala TukangOh0.007075,000.00525.00-MandorOh0.008080,000.00640.00Jumlah25,355.22Dibulatkan25,355.00F-081 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm-Semen PortlandKg9.30001,406.0013,075.80-Pasir PasangM30.0180233,400.004,201.20-PekerjaOh0.260042,000.0010,920.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.013080,000.001,040.00Jumlah43,737.00Dibulatkan43,737.00F-091 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm-Semen PortlandKg7.07001,406.009,940.42-Pasir PasangM30.0210233,400.004,901.40-PekerjaOh0.260042,000.0010,920.00-Tukang BatuOh0.200065,000.0013,000.00-Kepala TukangOh0.020075,000.001,500.00-MandorOh0.013080,000.001,040.00Jumlah41,301.82Dibulatkan41,302.00F-101 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm-Semen PortlandKg0.50001,406.00703.00-Pasir PasangM30.0130233,400.003,034.20-PekerjaOh0.080042,000.003,360.00-Tukang BatuOh0.400065,000.0026,000.00-Kepala TukangOh0.040075,000.003,000.00-MandorOh0.004080,000.00320.00Jumlah36,417.20Dibulatkan36,417.00F-111 M2 Acian Plesteran-Semen PortlandKg4.00001,406.005,624.00-PekerjaOh0.143042,000.006,006.00-Tukang batuOh0.107065,000.006,955.00-Kepala TukangOh0.010575,000.00787.50-MandorOh0.010580,000.00840.00Jumlah20,212.50Dibulatkan20,213.00F-121 M2 Plesteran Siar adk. 1pc : 2ps batu belah-Semen PortlandKg6.34001,406.008,914.04-Pasir PasangM30.0120233,400.002,800.80-PekerjaOh0.300042,000.0012,600.00-Tukang BatuOh0.150065,000.009,750.00-Kepala TukangOh0.015075,000.001,125.00-MandorOh0.015080,000.001,200.00Jumlah36,389.84Dibulatkan36,390.00F-131 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah-Semen PortlandKg4.32001,406.006,073.92-Semen PortlandM30.0160233,400.003,734.40-PekerjaOh0.150042,000.006,300.00-Tukang BatuOh0.070065,000.004,550.00-Kepala TukangOh0.007075,000.00525.00-MandorOh0.008080,000.00640.00Jumlah21,823.32Dibulatkan21,823.00

GG. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAPNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)G-011 M2 Pasang Atap Genteng Palentong-Genteng palentongBh25.00001,900.0047,500.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.075065,000.004,875.00-Kepala tukangOh0.008075,000.00600.00-MandorOh0.008080,000.00640.00Jumlah59,915.00Dibulatkan59,915.00G-021 M2 Pasang Genteng Bubung Palentong-Genteng bubung palentongBh5.00006,000.0030,000.00-Semen PortlandKg8.00001,406.0011,248.00-Pasir pasangM30.0320233,400.007,468.80-PekerjaOh0.400042,000.0016,800.00-Tukang kayuOh0.200065,000.0013,000.00-Kepala tukangOh0.020075,000.001,500.00-MandorOh0.002080,000.00160.00Jumlah80,176.80Dibulatkan80,177.00G-031 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm-Roof light fibreglassLbr0.6000100,000.0060,000.00-Paku biasa " - 1"Kg0.050023,800.001,190.00-PekerjaOh0.140042,000.005,880.00-Tukang kayuOh0.067065,000.004,355.00-Kepala tukangOh0.007075,000.00525.00-MandorOh0.007080,000.00560.00Jumlah72,510.00Dibulatkan72,510.00G-041 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.350080,000.0028,000.00-Paku sengKg0.120023,800.002,856.00-PekerjaOh0.140042,000.005,880.00-Tukang kayuOh0.070065,000.004,550.00-Kepala tukangOh0.007075,000.00525.00-MandorOh0.007080,000.00560.00Jumlah42,371.00Dibulatkan42,371.00G-051 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.420073,300.0030,786.00-Paku sengKg0.120023,800.002,856.00-PekerjaOh0.140042,000.005,880.00-Tukang kayuOh0.070065,000.004,550.00-Kepala tukangOh0.007075,000.00525.00-MandorOh0.007080,000.00560.00Jumlah45,157.00Dibulatkan45,157.00G-061 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.440065,900.0028,996.00-Paku sengKg0.120023,800.002,856.00-PekerjaOh0.140042,000.005,880.00-Tukang kayuOh0.067065,000.004,355.00-Kepala tukangOh0.007075,000.00525.00-MandorOh0.007080,000.00560.00Jumlah43,172.00Dibulatkan43,172.00G-071 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.510058,500.0029,835.00-Paku sengKg0.120023,800.002,856.00-PekerjaOh0.140042,000.005,880.00-Tukang kayuOh0.067065,000.004,355.00-Kepala tukangOh0.007075,000.00525.00-MandorOh0.007080,000.00560.00Jumlah44,011.00Dibulatkan44,011.00G-081 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.800042,300.0033,840.00-Paku sengKg0.120023,800.002,856.00-PekerjaOh0.140042,000.005,880.00-Tukang kayuOh0.067065,000.004,355.00-Kepala tukangOh0.007075,000.00525.00-MandorOh0.007080,000.00560.00Jumlah48,016.00Dibulatkan48,016.00G-091 M Pasang Nok Stel Gelombang 1,05 m-Nok stel gelombangLbr2.100038,100.0080,010.00-Paku sekrup 3,5"Bh6.0000800.004,800.00-PekerjaOh0.084042,000.003,528.00-Tukang kayuOh0.125065,000.008,125.00-Kepala tukangOh0.013075,000.00975.00-MandorOh0.004080,000.00320.00Jumlah97,758.00Dibulatkan97,758.00G-101 M2 Pasang Atap Genteng Beton-Genteng betonbh11.00008,500.0093,500.001260-Paku biasa 2" - 5"Kg0.030023,400.00702.00-PekerjaOh0.200042,000.008,400.00-Tukang kayuOh0.100065,000.006,500.00-Kepala tukangOh0.010075,000.00750.00-MandorOh0.010080,000.00800.00Jumlah110,652.00Dibulatkan110,652.00G-111 M2 Pasang Atap Genteng Murando Natural-Genteng murando naturalbh18.00002,700.0048,600.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.075065,000.004,875.00-Kepala tukangOh0.008075,000.00600.00-MandorOh0.008080,000.00640.00Jumlah61,015.00Dibulatkan61,015.00G-121 M2 Pasang Atap Genteng Murando Glazur-Genteng murando glazurbh18.00004,000.0072,000.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.075065,000.004,875.00-Kepala tukangOh0.008075,000.00600.00-MandorOh0.008080,000.00640.00Jumlah84,415.00Dibulatkan84,415.00G-131 M2 Pasang Atap Genteng Metal-Genteng metalm21.0200203,100.00207,162.00-Paku biasa 2" - 5"Kg0.200023,400.004,680.00-PekerjaOh0.200042,000.008,400.00-Tukang kayuOh0.100065,000.006,500.00-Kepala tukangOh0.010075,000.00750.00-MandorOh0.001080,000.0080.00Jumlah227,572.00Dibulatkan227,572.00G-141 M Pasang Nok Genteng Beton-Nok genteng betonBh3.500010,500.0036,750.00-Paku biasa 2" - 5"Kg0.050023,400.001,170.00-Semen abu-abuKg10.80001,406.0015,184.80-Pasir pasangM30.0320233,400.007,468.80-Semen warnaKg1.000015,700.0015,700.00-PekerjaOh0.400042,000.0016,800.00-Tukang kayuOh0.200065,000.0013,000.00-Kepala tukangOh0.020075,000.001,500.00-MandorOh0.020080,000.001,600.00Jumlah109,173.60Dibulatkan109,174.00G-151 M Pasang Nok Genteng Metal-Nok genteng metalLbr1.1000138,500.00152,350.00-Paku biasa " - 1"Kg0.050023,800.001,190.00-PekerjaOh0.250042,000.0010,500.00-Tukang kayuOh0.150065,000.009,750.00-Kepala tukangOh0.015075,000.001,125.00-MandorOh0.013080,000.001,040.00Jumlah175,955.00Dibulatkan175,955.00G-161 M2 Pasang Atap Seng Gelombang-Seng gelombang 180x80, 5mmLbr0.700083,100.0058,170.00-Paku biasa " - 1"Kg0.020023,800.00476.00-PekerjaOh0.120042,000.005,040.00-Tukang kayuOh0.060065,000.003,900.00-Kepala tukangOh0.006075,000.00450.00-MandorOh0.006080,000.00480.00Jumlah68,516.00Dibulatkan68,516.00G-171 M2 Pasang Atap Nok Seng-Seng plat 3" x 6" BJLS 30Lbr0.300037,500.0011,250.00-Paku biasa " - 1"Kg0.040023,800.00952.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.070065,000.004,550.00-Kepala tukangOh0.008075,000.00600.00-MandorOh0.006080,000.00480.00Jumlah24,132.00Dibulatkan24,132.00G-181 M2 Pasang Alluminium Foil / Sisalation-Sisalation / alluminium foilM21.050019,600.0020,580.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.050065,000.003,250.00-Kepala tukangOh0.005075,000.00375.00-MandorOh0.008080,000.00640.00Jumlah31,145.00Dibulatkan31,145.00G-191 M2 Pasang Atap Alluminium Natural-Atap Alumunium Natural USR 26Lbr1.0500140,600.00147,630.00-Paku hak panjang 15 cmKg0.020020,000.00400.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.750065,000.0048,750.00-Kepala tukangOh0.008075,000.00600.00-MandorOh0.006080,000.00480.00Jumlah204,160.00Dibulatkan204,160.00G-201 M2 Pasang Atap Alluminium warna-Atap Alumunium Warna USR 26Lbr1.0500164,700.00172,935.00-Paku hak panjang 15 cmKg0.020020,000.00400.00-PekerjaOh0.150042,000.006,300.00-Tukang kayuOh0.750065,000.0048,750.00-Kepala tukangOh0.008075,000.00600.00-MandorOh0.006080,000.00480.00Jumlah229,465.00Dibulatkan229,465.00G-211 M2 Pasang Nok Alluminium-Nok standarM21.200075,000.0090,000.00-Paku hak panjang 15 cmKg0.040020,000.00800.00-PekerjaOh0.100042,000.004,200.00-Tukang kayuOh1.000065,000.0065,000.00-Kepala tukangOh0.010075,000.00750.00-MandorOh0.010080,000.00800.00Jumlah161,550.00Dibulatkan161,550.00G-221 M' Pasang Lisplank GRC ukuran 30 cm-GRCM20.330067,500.0022,275.00-Paku GRCkg0.050035,000.001,750.00-PekerjaOh0.100042,000.004,200.00-Tukang kayuOh0.200065,000.0013,000.00-Kepala tukangOh0.020075,000.001,500.00-MandorOh0.005080,000.00400.00Jumlah43,125.00Dibulatkan43,125.00G-211 M' Pasang Nok Pinggir-Nok Genteng PinggirM'4.00004,000.0016,000.00-Paku biasa 2" - 5"Kg0.052620,000.001,052.00-PekerjaOh0.084042,000.003,528.00-Tukang kayuOh0.125065,000.008,125.00-Kepala tukangOh0.013075,000.00975.00-MandorOh0.004080,000.00320.00Jumlah30,000.00Dibulatkan30,000.00

HH. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGITNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)H-011 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm-Pelat asbes tebal 4 mmm21.100022,500.0024,750.00-Paku sengKg0.010023,800.00238.00-PekerjaOh0.030042,000.001,260.00-Tukang kayuOh0.