R12 Projects Overview

Embed Size (px)

Citation preview

  • 8/3/2019 R12 Projects Overview

    1/63

    Release 12 Oracle Projects Overview

    David Lipinski

    Solution Architect

  • 8/3/2019 R12 Projects Overview

    2/63

    Purpose:

    This document provides an overview of features and enhancements included inRelease 12. It is intended solely to help you assess the business benefits of

    upgrading to Release 12.

    Disclaimer:

    This document in any form, software or printed matter, contains proprietary

    information that is the exclusive property of Oracle. Your access to and use of

    this confidential material is subject to the terms and conditions of your Oracle

    Software License and Service Agreement, which has been executed and with

    which you agree to comply. This document and information contained herein

    may not be disclosed, copied, reproduced or distributed to anyone outside

    Oracle without prior written consent of Oracle. This document is not part ofyour license agreement nor can it be incorporated into any contractual

    agreement with Oracle or its subsidiaries or affiliates. This document is for

    informational purposes only and is intended solely to assist you in planning for

    the implementation and upgrade of the product features described. It is not a

    commitment to deliver any material, code, or functionality, and should not be

    relied upon in making purchasing decisions. The development, release, andtiming of any features or functionality described in this document remains at

    the sole discretion of Oracle. Due to the nature of the product architecture, it

    may not be possible to safely include all features described in this document

    without risking significant destabilization of the code.

  • 8/3/2019 R12 Projects Overview

    3/63

    Project Costing& Project Billing

    Initial release - Jan 1992

    Manage ProjectFinancials

    ResourceManagement

    May 2001

    Manage ProjectResources

    Manage Projects,Enable Collaboration

    ProjectManagement

    & CollaborationMay 2003

    Manage theRight Projects

    ProjectPortfolio Analysis

    May 2005

    Provide EnterpriseInsight

    ProjectIntelligence

    Oct 2002

    Project Accounting to Project Management

  • 8/3/2019 R12 Projects Overview

    4/63

    Objectives

    Scenarios

    Portfolios

    Project Approval

    Updates

    Forecasts

    Changes

    Billings Capitalization

    Progress Documents

    Issues

    Actuals

    Workplans Resources

    Budget

    Exceptions KPIs

    Reports Accounting

    Closeout

    GlobalProject

    Repository

    GlobalProject

    Repository

    Enterprise Project Management with Fp.MManage Full Lifecycle, For All Project Stakeholders

    Project Selection & Initiation

    Project Reporting & Closeout Project Planning

    Project Control Project Execution

  • 8/3/2019 R12 Projects Overview

    5/63

    Project Intelligence

    ResourceManagement

    Accounting &OperationsCollaboration

    ProjectManagement

    ProjectInitiatives

    Personalized

    Role-Based Views

    Global

    Project

    Repository

    Global

    Project

    Repository

    Integration toE-Business Suite

    Oracle Projects Suite

    Portfolio ManagementSalesDelivery

    Research

    ProductDevelopment

    Information

    Technology

    Construction

    Marketing

    Financials

    HR

    Time & Labor

    Sales

    Supply Chain

    Documents

    MS Project& Excel

    Integration toDesktop Tools

  • 8/3/2019 R12 Projects Overview

    6/63

    Integrated Work, Resource, and Financials

    Streamline Planning, Execution & Control

    ResourceSchedule

    Rolluppeople

    resourcesto create

    team roles

    Budget

    Generatebudget

    based onworkplan

    resources*Generate

    budgetbased on

    team roles

    ActualsWorkplanProgress

    Actualscan beused to

    determineprogress

    Updateforecastbased onrevisedbudget

    Update

    forecastbased onprogress(ETC, %

    Complete)

    Updateforecastbased onactuals

    Workplan FinancialForecast

    Generate

    forecastbased onworkplan

    or scheduledteam roles

    Performance

    Analyze metrics,Comparing Actuals

    vs. Budget vs.

    Forecast

  • 8/3/2019 R12 Projects Overview

    7/63

    Standardize Project Creation ProcessFrom Very Simple to Complex Projects

    Key Capabilities:

    Leverage project templates or past projects

    Assign resources (both labor & non-labor)at the task level

    Unlimited WBS

    Integration with Microsoft Project for Schedulingand Progress Tracking/Updates

    Track Project Deliverables Use workflow to streamline approvals and phase

    gate processes

    Email Notifications

    Audit History

    Alerts of Exceptions out of Threshold Configurable Process based on Type of Project,

    Change, Task, etc.

    Status Reports

    Create

    Workplan

    Approve

    Publish andVersion

    Workplans

    WBS

    Template

    DeliverablesWork

    EstimatesResources

  • 8/3/2019 R12 Projects Overview

    8/63

    Project Creation in HTML

    Get Projects into Oracle Earlier Gain Insight Faster!

    NEW World

    Project Managers create projects themselves

    PMs plan work, budget, resources

    Standardize business processes with templates

    Workflow enable project approval processResources

    Time ScopePla

    nPla

    nExecute

    Execute

    ControlControl

    Forms/Old World

    Project Accounting/Finance has to create projects based on

    requests from Project Managers email, paper form requests,

    Excel spreadsheets, etc.

  • 8/3/2019 R12 Projects Overview

    9/63

    Project Creation in HTML

    Allow Project Managers to Request & Plan Project

  • 8/3/2019 R12 Projects Overview

    10/63

    Work Breakdown Structure Maintenance

    Financial Task Details in HTML

  • 8/3/2019 R12 Projects Overview

    11/63

    Workplan Tasks

    Addl Task Details enabled with Project Management

  • 8/3/2019 R12 Projects Overview

    12/63

    Project Budgeting & ForecastingImprove Forecast Accuracy and Efficiency

    Generate budgets based on resource plan, workplanschedule & commitments

    Automatically create forecasts, pull in Actuals-To-Date

    Compare variances to prior forecasts

    Create ETC based on:- Earned value- Percent complete

    - Future budget amounts

    - Future resource schedule

    - Open Commitments

    -Open Change Orders

    Adjust in summary or detail, Task or Resources

    Edit in Excel

    Create and compare what if scenarios

    Route for Approval via WorkflowAdjust

    via Excel

    or Web

    ActualCosts

    InitialBudget

    Resources

    Changes

    Workplan

    Forecast

    Forecast (EAC) = Actuals + Estimate to Complete (ETC)

  • 8/3/2019 R12 Projects Overview

    13/63

    Forecast Entry

    Flexible Planning Levels & Entry Methods

  • 8/3/2019 R12 Projects Overview

    14/63

    Forecast Edit in Excel

    Bi-Directional, for Easy Updates

  • 8/3/2019 R12 Projects Overview

    15/63

    Project Performance ReportingAccurately Assess Project Health and Drilldown to Root Causes

    Define, view and investigate exceptions toperformance; drill down to details

    Exceptions flagged based on Business-DefinedThresholds

    Review project performance via multiple reports- By Tasks of WBS

    - By Resource Hierarchy

    - By Period and Trend, Graphs

    - By Currency

    - Earned Value

    Rollup Program Information from Subprojects Schedule: Dates, Effort/Cost, Resources

    Financials: Actual, Budget, Forecast, Billings &Collections

    Project

    Program

    Project

    TasksTasksTasksTasks

    Resource Resource Resource ReportatAny

    Level

    Transactions

  • 8/3/2019 R12 Projects Overview

    16/63

    Performance Reporting

    PSI Next Generation! Self-Service Project Mgr Access

  • 8/3/2019 R12 Projects Overview

    17/63

    Performance Reporting

    By WBS, Drilldown to Expenditures & Commitments

  • 8/3/2019 R12 Projects Overview

    18/63

    Performance Reporting

    Flexible Resource Breakdown Structure Hierarchies

  • 8/3/2019 R12 Projects Overview

    19/63

    Performance Reporting

    Periodic Data

  • 8/3/2019 R12 Projects Overview

    20/63

    Invoice Review

    Drilldown, Approve Invoices Online!

  • 8/3/2019 R12 Projects Overview

    21/63

    Project Portfolio AnalysisAlign Organizational Goals and Resources

    Plan

    Portfolio

    Plan

    Portfolio

    ExecutePortfolio

    MonitorPortfolio

    Portfolio Management

    Define Standard Objectives

    Determine Project Costs

    and Requirements

    Score and Rank All Projects

    Balance Portfolio

    Approve & Launch Portfolio

  • 8/3/2019 R12 Projects Overview

    22/63

    R12 Goals

    The Global Business Release

    3

    Think Globally to make the right decisions

    I can make more informed decisions with a global view ofcustomer / supplier / partner / operations

    Work Globally to be more competitiveMy business will be more competitive with better support

    for work that crosses applications, divisions, and regions

    Manage Globally to lower cost and increaseperformance

    R12 makes it easier and less expensive for me toimplement, manage, and scale global applications

  • 8/3/2019 R12 Projects Overview

    23/63

    WORK GLOBALLY

    To Be More Competitive

    WORK GLOBALLY

    To Be More Competitive

    THINK GLOBALLY

    To Make the Right Decisions

    THINK GLOBALLY

    To Make the Right Decisions

    MANAGE GLOBALLY

    To Lower Cost & IncreasePerformance

    MANAGE GLOBALLY

    To Lower Cost & IncreasePerformance

    How Release 12 Projects ContributesThe Global Business Release

    Subledger Accounting

    Multi-Org Access Control

    (MOAC)

    Standardized Data Model

    for MRCProgram Management

    Portfolio Management XML Publisher

    Fusion MiddlewarePerformance Management

    Supplier Cost

    Management

    Subcontractor Payment

    Management Uptake

    Revenue in a Foreign

    Currency

    Oracle Projects Specific

    BPEL

  • 8/3/2019 R12 Projects Overview

    24/63

    Release 12 Financial Initiatives(Projects Uptake)

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    25/63

    Release 12 Projects Initiatives

    Supplier Cost Management

    Improved Project Costing with Cash Basis Accounting

    Removal of Supplier Cost Adjustment Restrictions

    Mass Adjust Concurrent Processing

    Aids for Oracle Payables and Project Costing Reconciliation

    Flexible Derivation of Expenditure Item Date

    Subcontractor Payment Management Uptake

    Revenue in a Foreign Currency

  • 8/3/2019 R12 Projects Overview

    26/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    27/63

    What is Subledger Accounting?

    SLA is an intermediate step between subledger products andthe Oracle General Ledger

    Journal entries are created in Subledger Accounting and

    then transferred to Oracle General Ledger

    Each subledger transaction that requires accounting isrepresented by a complete and balanced subledger journal

    entry stored in a common data model

    Subledger Accounting

  • 8/3/2019 R12 Projects Overview

    28/63

    Release 11i

    Accounting model and

    transaction model are tightlyintegrated

    Release 12.0

    Accounting model is separated

    from the transaction model

    Subledger

    Products

    Projects

    Payables

    Receivables

    General

    Ledger

    Subledger

    Products

    Projects

    Payables

    Receivables

    Subledger

    Accounting

    AR Rules &

    journal entries

    PA Rules &journal entries

    AP Rules &

    journal entries

    General

    Ledger

    Subledger Accounting Upgrade / Setup

  • 8/3/2019 R12 Projects Overview

    29/63

    Infrastructure to centralize accounting setup

    Subledger Accounting is the engine used to store the rulesfor accounting transactions from various applications across

    the Oracle E-Business Suite

    Infrastructure to standardize accounting policies

    Business users can extend predefined accounting rules orcreate their own rules allowing organizations to reactimmediately to change.

    Extensible list of sources to derive accounts Projects will be seeding over 300 sources to help customers

    derive accounts and account descriptions

    Subledger Accounting Upgrade / Setup

  • 8/3/2019 R12 Projects Overview

    30/63

    Subledger Accounting Upgrade / Setup

    Upgrade process seeds SLA with rules to

    automatically accept the accounts that Projects

    sends (derived from AutoAccounting)

    Existing Customers:

    If the accounting provided in Release 11iis satisfactory, then

    it is recommended that customers leave their

    AutoAccounting and SLA setups untouched.

    May utilize SLA setups if AutoAccounting did not fully meet

    their needs.

  • 8/3/2019 R12 Projects Overview

    31/63

  • 8/3/2019 R12 Projects Overview

    32/63

    Release 11i Release 12

    Generate Revenue for a Single/ Range ofProjects

    Review Revenue

    Release Revenue

    Interface Revenue to GL

    Journal Import (Oracle GL)

    Journal Import (Oracle GL)

    Create Accounting

    Generate Revenue Accounting Events

    Generate Revenue for a Single/ Range ofProjects

    Review Revenue

    Release Revenue

    Subledger Accounting

    Flow Comparison for Revenue

  • 8/3/2019 R12 Projects Overview

    33/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    34/63

    Multi-Org Access Control

    Data Entry - Enter data for multiple operating units

    from a single responsibility

    Inquiry and Adjustments - Inquire and adjust data

    from multiple operating units from a singleresponsibility

    Processing and Reporting - Run concurrent programs

    and reports for multiple operating units from a singleresponsibility

  • 8/3/2019 R12 Projects Overview

    35/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    36/63

    Legal Entity Uptake

    Provides a clear and consistent legal entity model.

    Strengthen the role of Legal Entity in Oracle

    Applications Separate Legal Structure and Operations Structure

    Projects Uptake -

    Legal entity context derived fromoperating unit no change from 11i

  • 8/3/2019 R12 Projects Overview

    37/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    38/63

    Multiple Reporting Currency Migration

    Oracle Projects has eliminated

    Set of Books Currency Selection during the Inquiry

    MRC Columns in folders

    Switching currency for the Project Functional Amount Concurrent Programs for interfacing the MRC amounts to the Reporting Set

    of Books/Ledger

    You can view the Multiple Reporting Currency (MRC) amounts in

    Projects by choosing the Alternate Ledger Currency from View

    Accounting

    Release 12 onwards, MRC amounts for new transactions in Projects

    will be displayed from Sub-Ledger Accounting Module

    Consistent approach in Alternate Ledger Currency amount calculation

    MRC calculation centrally managed

    Key Benefits

  • 8/3/2019 R12 Projects Overview

    39/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    40/63

    Budgetary Control API (commonly known as GL FundsCheck API) is enhanced to provide better integrationwith other sub-ledger applications :

    Projects Impact: Uptake SLA for Encumbrance Accounting

    Uptake new budgetary control API

    Streamlined funds check data flow to minimize dependencies

    Funds Management Uptake

  • 8/3/2019 R12 Projects Overview

    41/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    42/63

    TCA a.k.a Oracle Trading Community Architectureis a model that includes:

    A global registry of organizations, people, addresses, andthe relationships among them

    Public APIs for custom development

    Support for Integration with 3rd party content providers

    Projects Impact: Migrate forRA_Views to HZ_Tables

    TCA Uptake

  • 8/3/2019 R12 Projects Overview

    43/63

    Release 12 Financial Initiatives

    Subledger Accounting Uptake

    Multi-Org Access Control (MOAC)

    Legal Entity / Ledger Architecture

    Standard Data Model for Multiple Reporting Currencies

    MRC Migration

    Budget Controls and Public Sector Accounting Funds

    Management

    TCA Uptake

    eTax Uptake

    T U k

  • 8/3/2019 R12 Projects Overview

    44/63

    eTax a.k.a E-Business Tax is a tax engine includes: Central Repository which contains rules & definitions required to

    calculate tax

    Record Repository which is the actual transaction tax data required for

    auditing and reporting purposes Services such as tax content, tax determination & tax administration

    Projects Impact:

    Setup via eTax (at the project, expenditure type, & event level) Customer Invoicing

    Pass eTax tax code to AR on invoices/credit memos so that eTaxcan generate the appropriate tax lines.

    InterCompany Invoicing Tax line generation through eTax supported on Intercompany

    Invoicing.

    Integration with Payables and Receivables

    eTax Uptake

  • 8/3/2019 R12 Projects Overview

    45/63

    E-Business Tax Integration

  • 8/3/2019 R12 Projects Overview

    46/63

    Release 12 Projects Initiatives

    Supplier Cost Management

    Improved Project Costing with Cash Basis Accounting

    Removal of Supplier Cost Adjustment Restrictions

    Mass Adjust Concurrent Processing

    Aids for Oracle Payables and Project Costing Reconciliation Flexible Derivation of Expenditure Item Date

    Subcontractor Payment Management Uptake Revenue in a Foreign Currency

    S li C t M t

  • 8/3/2019 R12 Projects Overview

    47/63

    Supplier Cost Management

    Since its inception, Oracle Payables modeled invoices withheaders and distributions. Disadvantages Line item info on the physical document is not available in the

    system. Calculation of item charges is cumbersome because the item itself is

    split across multiple distributions.

    Approval and payment processing requires accounting and taxcreation.

    In Release 12, Payables is introducing a new entity calledInvoice Lines. Advantages Line item info can be captured and accurately reflected in the

    system. Transaction processing is separate from accounting (SLA) and tax

    (eTax) processing.

    Variances will now be separate lines and distributions.

    O l P bl I i Li E tit

  • 8/3/2019 R12 Projects Overview

    48/63

    Oracle Payables Invoice Lines Entity

    InvoiceSupplier: Advanced NetworksInvoice Num: 11111Date: 13-JUN-2001

    Line # Item Qty Unit Price1 Computer 1 $10002 Printer 1 $5003 Tax (10%) $150_______________________________Total $1650

    Allocate

    Yes

    No

    Invoice

    Headers

    Invoice Lines

    Invoice

    Distributions

    O l P bl I i W kb h

  • 8/3/2019 R12 Projects Overview

    49/63

    Oracle Payables Invoice Workbench

    Supplier Cost Management

  • 8/3/2019 R12 Projects Overview

    50/63

    Supplier Cost Management

    Projects Uptake Improved Project Costing with Cash Basis

    Accounting

    Removal of Supplier Cost Adjustment Restrictions Supplier Cost Adjustment Accounting Performed by

    Oracle Projects

    New Mass Adjust Concurrent Process New Aids for Reconciling Supplier Cost with Other

    Products

    Removal of Pre-approved Batch Entryfor Expense Report Entry in Projects

    New Supplier Cost Audit Report

  • 8/3/2019 R12 Projects Overview

    51/63

    New Supplier Cost Audit Report

    Expenditure Inquiry Find Window

  • 8/3/2019 R12 Projects Overview

    52/63

    Expenditure Inquiry Find Window

    Expenditure Inquiry

  • 8/3/2019 R12 Projects Overview

    53/63

    Expenditure Inquiry

    New columns available:

    Document Type PO Number

    Doc Distribution Type PO Line Number

    Invoice Number PO Distribution NumberInvoice Line Number PO Price Type

    Payment Number PO Receipt Number

    Invoice Distribution Line Number

    Invoice Workbench

  • 8/3/2019 R12 Projects Overview

    54/63

    Invoice Workbench

  • 8/3/2019 R12 Projects Overview

    55/63

    Release 12 Projects Initiatives

    Supplier Cost Management

    Improved Project Costing with Cash Basis Accounting

    Removal of Supplier Cost Adjustment Restrictions

    Mass Adjust Concurrent Processing

    Aids for Oracle Payables and Project Costing Reconciliation Flexible Derivation of Expenditure Date from Purchasing

    Subcontractor Payment Management Uptake

    Revenue in a Foreign Currency

    Subcontractor Payment Management

  • 8/3/2019 R12 Projects Overview

    56/63

    Subcontractor Payment Management

    An integrated solution for services procurement used to

    model complex work contracts where advanced payment

    terms need to be considered during execution

    Commodities / Industries of Interest

    Professional Services

    Engineering and Construction Aerospace and Defense

    Public Sector

    Subcontractor Payment Mgmt

  • 8/3/2019 R12 Projects Overview

    57/63

    y gBusiness Flow

    Apply Retainage

    Release Retainage

    Pay Advances

    Liquidate Advances

    Author Contract

    Invoice

    Request to

    Subcontract

    Work

    Source

    Supplier

    Supplier Reports Progress

    Certify Progress/ Stage of

    Completion

    Submit SOVAward Contract

    Subcontractor Payment Management

  • 8/3/2019 R12 Projects Overview

    58/63

    Commitment Reporting

    - Financing pay items, Retainage not shown as

    commitments

    - Unmatched prepayments are displayed as

    commitments

    Budgetary controls Retainage distributionsare not funds checked against the project

    budget.

    Projects Impact

  • 8/3/2019 R12 Projects Overview

    59/63

    Release 12 Projects Initiatives

    Supplier Cost Management

    Improved Project Costing with Cash Basis Accounting

    Removal of Supplier Cost Adjustment Restrictions

    Mass Adjust Concurrent Processing

    Aids for Oracle Payables and Project Costing Reconciliation Flexible Derivation of Expenditure Date from Purchasing

    Subcontractor Payment Management Uptake

    Revenue in a Foreign Currency

    Revenue in a Foreign Currency

  • 8/3/2019 R12 Projects Overview

    60/63

    Support Revenue Revaluation in GL

    Calculate revenue including unbilledreceivables and unearned revenue inrevenue transaction currency

    Interface project revenue to SubledgerAccounting for posting to General Ledgerin project functional currency andinrevenue transaction currency

    e e ue a o e g Cu e cy

    Revenue in Foreign Currency

  • 8/3/2019 R12 Projects Overview

    61/63

    Setup Project Billing Currency

    Option to Select

    Revenue Transaction

    Currency

    Enable Multi

    Currency BillingBox Checked

    Invoice by Bill

    Transaction Currency

    Box Unchecked

    Revenue in Foreign Currency

  • 8/3/2019 R12 Projects Overview

    62/63

    Event Currency =

    Invoice Transaction

    Currency = 150,000 CADin this example

    Revenue Event Creation

    For More Information

  • 8/3/2019 R12 Projects Overview

    63/63

    Metalink Information:http://metalink.oracle.com/

    Oracle Product Documentation:http://www.oracle.com/technology/documentation/applications.html

    All Projects Books republished!

    Oracle Projects Fundamentals (B25617-02)Oracle Projects Implementation Guide (B25623-02)

    Oracle Project Costing User Guide (B25618-02)

    Oracle Project Billing User Guide (B25619-02)

    Oracle Project Resource Management User Guide (B25620-02)Oracle Project Management User Guide (B25621-02)

    Oracle Project Portfolio Analysis User Guide (B25622-02)

    Oracle Project Contracts Implementation Guide (B25715-01)

    Oracle Project Contracts User's Guide (B25716-01)

    Oracle Projects APIs, Client Extensions, and Open Interfaces Reference(B25624-02)

    Projects Collateral & Whitepapers:

    http://www.oracle.com/applications/projects/intro.html