65
w January – March 2011 No. 05 USDP-R-PMU-10038

QPR 5th Quarterly 2011 6 May 2011 Final - USDP · AMDAL : Analisis Dampak Lingkungan (Environmental Impact Assessment) AMPL : Air Minum dan Penyehatan Lingkungan ... TOR : Terms of

  • Upload
    habao

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

w   

January – March 2011 No. 05

USDP-R-PMU-10038

ii

 

 

 

 

 

 

 

 

January – March 2011

USDP-R-PMU-10038

No. 05

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

CONTENTS 

CONTENTS ....................................................................................................................................... I 

LIST OF ANNEXES ............................................................................................................................. I 

LIST OF TABLES ................................................................................................................................ I 

LIST OF FIGURES ............................................................................................................................. II 

GLOSSARY, ACRONYMS, ABBREVIATIONS ...................................................................................... III 

0  RINGKASAN LAPORAN KEMAJUAN USDP KE‐5 (JANUARI‐MARET 2011) ..................................... 1 

0.1  KEGIATAN DAN PENCAPAIAN PERIODE JANUARI‐MARET .......................................................................... 1 0.1.1  Kemajuan Umum PPSP ............................................................................................................... 1 0.1.2  Acara‐acara utama USDP dan hasil‐hasilnya pada triwulan yang lalu. ....................................... 1 

0.2  RENCANA KEGIATAN UNTUK TIGA BULAN BERIKUT: APRIL‐JUNI 2011 ...................................................... 2 0.2.1  Program PPSP ............................................................................................................................. 2 0.2.2  Dukungan USDP bagi kelembagaan dan penerapan PPSP .......................................................... 2 

0.3  MASALAH DAN REKOMENDASI .................................................................................................................. 6 

1  INTRODUCTION ........................................................................................................................ 11 

1.1  BACKGROUND .............................................................................................................................. 11 1.2  PURPOSE OF THE QUARTERLY REPORTS ............................................................................................. 12 

2  ACTIVITIES AND ACHIEVEMENTS OF THIS PAST QUARTER ......................................................... 13 

2.1  GENERAL PROGRESS OF PPSP .......................................................................................................... 13 2.2  USDP’S MAIN EVENTS AND RESULTS DURING THE PAST QUARTER ........................................................... 13 2.3  PROGRESS USDP VERSUS SPECIFIED OUTPUTS AND TASKS ..................................................................... 14 

3  PLANNED ACTIVITIES FOR NEXT THREE MONTHS: APRIL‐JUNE 2011 .......................................... 23 

3.1  PPSP PROGRAM ........................................................................................................................... 23 3.2  USDP SUPPORT FOR PPSP INSTITUTIONALIZATION AND IMPLEMENTATION .............................................. 23 3.3  QUARTERLY BAR CHARTS OF ACTIVITIES FOR PPSP AND USDP ............................................................... 33 

4  ISSUES AND RECOMMENDATIONS ............................................................................................ 45 

5  MANAGEMENT ........................................................................................................................ 48 

5.1  GENERAL ..................................................................................................................................... 48 5.2  STAFFING ..................................................................................................................................... 48 5.3  MEETINGS ................................................................................................................................... 49 

6  COLOPHON .............................................................................................................................. 52 

 

LIST OF ANNEXES 

Annex 1  Status Report on Earlier Issues and Recommendations ................................................. 1 Annex 2  List of Completed USDP Reports and Documents .......................................................... 1  

LIST OF TABLES 

Tabel 0.1  Masalah dan Rekomendasi .......................................................................................... 7 Table 2.1   Specific activities of USDP in the reporting period (January–March 2011) .................... 14 Table 3.1  PPSP Program Activities and USDP Support Activities scheduled for next quarter         

(April‐June 2010) ......................................................................................................... 26 Table 4.1  Issues and Recommendations ..................................................................................... 45 Table 5.1  Engagement periods of international consultants in Q1‐2011 ...................................... 48 Table 5.2  Meetings/Workshops in January – March 2011 in which USDP has participated .......... 49  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

ii 

LIST OF FIGURES 

Figure 3.1  Bar chart of activities for PPSP .................................................................................. 34 Figure 3.2  Bar chart of Activities of USDP Cell at PMU ............................................................... 35 Figure 3.3  Bar chart of Activities of USDP Cell at PIU‐AE ............................................................ 38 Figure 3.4  Bar chart of Activities of USDP Cell at PIU‐IF ............................................................. 40 Figure 3.5  Bar chart of Activities of USDP Cell at PIU‐T .............................................................. 42  

 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

iii 

GLOSSARY, ACRONYMS, ABBREVIATIONS 

ADB  :  Asian Development Bank AKKOPSI  :  Aliansi Kabupaten/Kota Peduli Sanitasi AMDAL  :  Analisis Dampak Lingkungan (Environmental Impact Assessment) AMPL  :  Air Minum dan Penyehatan Lingkungan  APBN  :  Anggaran Pendapatan Belanja Negara (Revenue and Expenditure Budget) APBD  :  Anggaran Pendapatan Belanja Daerah (Regional Revenue and Expenditure Budget) AusAID  :  Australian Government’s Overseas Aid Program Bappenas  :  Badan Perencanaan Pembangunan Nasional (Ministry of National Planning) CF  :  City Facilitator CSS  :  City Sanitation Summit DAK  :  Dana Alokasi Khusus DEWATS  :  Decentralized Wastewater Treatment System DG  :  Director General DMPSS  :  Draft Memorandum Program Sanitation Sector DPM  :  Draft Program Memorandum EHRA  :  Environmental Health Risk Assessment FAQ  :  Frequently Asked Questions GoI  :  Government of Indonesia INDII  :  Indonesia Infrastructure Initiative  INKINDO  :  Ikatan Nasional Konsultan Indonesia (The National Association of Indonesian Consultants) INPRES  :  Instruksi Presiden (Presidential Instruction) ISSDP  :  Indonesia Sanitation Sector Development Program IUWASH  :  Indonesia Urban Water, Sanitation and Hygiene KASN  :  Konferensi Air Minum dan Sanitasi Nasional (National Water and Sanitation Conference) KMW  :  Konsultan Manajemen Wilayah (Regional Management Consultant) KMP  :  Konsultant Manajemen Provinsi (Provincial Management Consultant) LARAP  :  Land Acquisition and Resettlement Action Plan Loknas  :  Lokakarya Nasional (National Workshop) MDGs  :  Millennium Development Goals MOHA  :  Ministry of Home Affair Monev  :  Monitoring and Evaluationf PAN  :  Pokja AMPL Nasional (National Pokja AMPL) Pamsimas  :  Penyediaan  Air Minum  dan  Sanitasi  Berbasis Masyarakat  (Water  Supply  and  Sanitation 

Community‐Based) PF  :  Provincial Facilitator PHBS  :  Perilaku Hidup Bersih dan Sehat (Campaign for Clean and Hygienic Behaviour) PIN  :  Pusat Informasi Nasional (National Information Centre) PIU  :  Project Implementation Unit PIU‐AE  :  PIU Advocacy and Empowerment PIU‐IF  :  PIU Institutional and Finance PIU‐T  :  PIU‐Technical PM  :  Program Memorandum PMJK  :  Pemberdayaan Masyarakat dengan Pelibatan Jender dan Kemiskinan PMM  :  Project Management Manual PMU  :  Project Management Unit Pokja  :  Kelompok Kerja PPLP  :  Pengembangan Penyehatan Lingkungan Permukiman PPP  :  Public Private Partnership PPSP  :  Program  Percepatan  Pembangunan  Sanitasi  (Sanitation  Development  Acceleration 

Program) PU  :  Pekerjaan Umum (Public Works) QA  :  Quality Assessment Rakernas  :  Rapat Kerja Nasional RPJMN  :  Rencana Program Jangka Menengah Nasional (National Medium Term Development Plan) Sanimas  :  Sanitasi Berbasis Masyarakat Satker  :  Satuan Kerja SC  :  Steering Committee SPM  :  Standard Pelayanan Minimum  (Minimum Standard Services) SSA  :  Sanitation Supply Assessment SSK  :  Strategi Sanitasi Kota (City Sanitation Strategy, or CSS) STBM  :  Sanitasi Total Berbasis Masyarakat (Community‐Based Sanitation) 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

iv 

TNA  :  Training Needs Assessment TOR  :  Terms of Reference TOT  :  Training of Trainers TTPS  :  Tim Teknis Pembangunan Sanitasi UC‐PMU  :  USDP Cell at PMU UC‐AE  :  USDP Cell at PIU‐AE UC‐IF  :  USDP Cell at PIU‐IF UC‐T  :  USDP Cell at PIU‐T USDP  :  Urban Sanitation Development Program WASAP  :  Water and Sanitation Sector Monitoring WATSAN  :  Water and Sanitation WB  :  White Book YIS  :  Yayasan Insan Sembada  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

0 RINGKASAN LAPORAN KEMAJUAN USDP KE‐5 (JANUARI‐MARET 2011) 

0.1 KEGIATAN DAN PENCAPAIAN PERIODE JANUARI‐MARET 

USDP  memberikan  layanan  pendukung  bagi  PPSP,  dan  beroperasi  dalam  konteks  dan  dalam  hubungannya dengan PPSP. Bab ini akan dibuka dengan suatu bagian tentang kegiatan‐kegiatan dan pencapaian PPSP selama periode  yang  dilaporkan  dari  sudut  pandang  USDP.  PPSP  diasumsikan  akan menyusun  laporan  kemajuannya sendiri bagi Kementerian‐Kementerian yang terlibat.  

0.1.1 Kemajuan Umum PPSP 

Kegiatan‐kegiatan dan pencapaian‐pencapaian utama dari PPSP selama  tri wulan yang  terkahir dapat disarikan sebagai berikut:  

1. Proses  awal  rekrutmen  dan  pemilihan  Kota‐kota  yang  dilibatkan  dalam  program  PPSP  pada  tahun  2012, termasuk  penyelenggaraan  Pertemuan‐pertemuan  Konsultasi  Regional/Konreg  (Regional  Consultation Meeting) untuk mendiskusikan persoalan‐persoalan masalah pemilihan kota 2012.  

2. Pembentukan sebuah Panel,  terdiri atas anggota‐anggota PMU dan staf‐staf PIU, untuk meninjau kembali dan  menilai  isi  dan  kualitas  BPS  dan  SSK.  Dijadualkan  Panel  telah  menyelesaikan  peniliaian  dokumen‐dokumen untuk 25 kota pada bulan Juni. 

3. Persiapan rekrutmen dan penentuan PF/CF baru.  

4. Partisipasi  pada  pelatihan  USDP  mengenai  pengembangan  Modul‐modul  Pelatihan  dan  pengembangan ketrampilan‐ketrampilan dan pengalaman melalui lokakarya TOT. 

5. Bekerja sama dengan USDP dan INKINDO Cabang DKI Jakarta, menyelenggarakan sebuah seminar bagi para calon  Konsultan  KMW  sebagai  bentuk  persiapan  dari  keterjadualan  tender  untuk  Konsultan‐Konsultan KMW. 

6. In collaboration with USDP and  INKINDO Branch DKI Jakarta, organisation of a seminar for potential KMW Consultants in preparation of the scheduled tender for KMW Consultants. 

7. Persiapan lebih lajut mengenai RFP dan TOR untuk tender‐tender KMW dan KMP.  

8. Persiapan awal City Sanitasion Sumit X (Puncak Sanitasi Kota X) di Banda Aceh, diselenggarakan dari 29‐31 Mei 2011 di Balaikota Banda Aceh. 

9. Penyelenggaraan  beberapa  pertemuan  Dewan  Pengarah  untuk  mendiskusikan  dan  memutuskan  isu‐isu strategis, seperti: persiapan KASN, persiapan CSS‐X, dan finalisasi rancangan INPRES mengenai Sanitasi, CLTS (STBM) dan Ketersediaan Air (dijadualkan diserahkan ke Kantor Presiden pada akhir bulan Mei).  

0.1.2 Acara‐acara utama USDP dan hasil‐hasilnya pada triwulan yang lalu. 

Layanan‐layanan pendukung utama USDP untuk pengembangan dan pelaksanaan PPSP pada tri wulan yang lalu dapat disarikan sebagai berikut (untuk mengetahui daftar rinci keluaran‐keluaran dan tugas‐tugas dapat di baca pada bagian 2.3): 

1. Layanan pendukung untuk rekrutmen dan mobilisasi terhadap kota‐kota baru yang dilibatkan pada program PPSP  2012, mencakup  peninjauan  kembali  penentuan  kriteria,  peninjauan  kembali  pedoman mengenai persiapan kelembagaan; disain dan pengembangan materi‐materi advokasi dan komunikasi terkait.  

2. Mendukung berbagai diskusi mengenai rekrutmen, penentuan dan pelatihan PF/CF; memberikan kontribusi berupa solusi terhadap kendala GOI yang kembali terjadi dalam menyediakan anggaran dengan jumlah dan pada waktu yang tepat.  

3. Meninjau kembali dan memutakhirkan TOR untuk KMW dan KMP sesuai anggaran‐anggaran GOI terendah yang  tersedia  untuk  layanan‐layanan  ini  dan  bukan  pada  anggaran‐anggaran  yang  sedianya direkomendasikan sebagaimana tertera pada rancangan TOR (oleh karena perencanaan anggaran yang tidak tepat pada tahun 2010); mendisain, menyiapkan dan mendanai sebuah seminar orientasi untuk calon‐calon Konsultan KMW bekerja sama dengan INKINDO DKI Jakarta dan PMU/PIU. 

4. Menyiapkan Materi‐materi Pelatihan dan Pelatihan untuk Pelatih  (Training of  Trainers/ToT) untuk empat jabatan  kunci  PPSP,  khususnya  untuk  PF/CF  baru;  jejaring  dengan  lembaga‐lembaga  pelatihan  Indonesia yang mampu memainkan peran sebagai pengorganisir di waktu yang akan dating dan pelaksana berbagai peristiwa pelatihan PPSP; tahap‐tahap awal menuju disain Besar untuk program pelatihan menyeluruh PPSP.  

5. Pengembangan MONEV lebih lanjut, termasuk uji piranti QA untuk BKS dan SSK. 

6. Acara  dan  pendampingan  untuk memperoleh  persetujuan  dari  Kantor  Presiden mengenai  status  INPRES untuk PPSP, yang semula dijadualkan untuk tri wulan ke tiga tahun 2010. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

7. Dukungan dan pendampingan  terhadap persiapan dan penyelenggaraan berbagai peristiwa nasional seperti loka  karya  nasional mengenai  rektrutmen  dan  penentuan  kota‐kota  yang  terlibat  di  dalam  PPSP  2012, Konvensi Sanitasi Nasional dan Penyediaan Air, proyeksi Puncak Sanitasi Kota pada tahun 2011, dst. 

8. Pembinaan  dan  pendampingan  terhadap  persiapan  Panel  PPSP  untuk  meninjau  kembali  dan  menilai keluaran PPSP seperti BPS dan SSK.  

9. Pengembangan  lebih  lanjut  terhadap  percontohan  mengenai  perbaikan  kapasitas  kelembagaan  dan kapasitas  kinerja  Pokja‐pokja  tingkat  Provinsi  untuk  dapat  berkontribusi  terhadap  pelaksanaan  PPSP  dari tingkat Provinsi. 

10. Lokakarya  internal USDP untuk memutakhirkan  visi  terhadap  isu‐isu  strategis dan  isu‐isu penting  lainnya dengan dukungan PPSP pada tahun 2011.  

11. Berpartisipasi di berbagai konsultasi publik mengenai BPS dan SSK, biasanya di  Ibu Kota‐Ibu Kota Provinsi, memberikan umpan balik kepada Pokja dan KMW.  

 

0.2 RENCANA KEGIATAN UNTUK TIGA BULAN BERIKUT: APRIL‐JUNI 2011 

USDP memberikan layanan pendukung bagi PPSP. USDP bekerja dalam konteks dan dalam hubungannya dengan PPSP. Dengan demikian bab  ini akan dimulai dengan bagian yang membahas rencana kegiatan PPSP untuk tiga bulan berikut sesuai dengan persepsi USDP berdasarkan pada berbagai pembicaraan dengan PMU dan PIU. PPSP diasumsikan akan menyusun  laporan‐laprannya sendiri mengenai rencana kegiatan dan  juga rencana kerja bagi Kementerian yang turut serta.  

0.2.1 Program PPSP 

Kegiatan‐kegiatan  yang  direncanakan  oleh  PMU  dan  PIU  bagi  PPSP  untuk  periode  Januari‐Maret  2011  dapat diringkas sebagai berikut (daftar jadwal kegiatan yang lebih rinci tercantum pada Tabel 3.1): 

Terkait pelembagaan PPSP: 1. Menyempurnakan konsolidasi rencana‐rencana kerja PMU dan PIU untuk PPSP 2011. 2. Internalisasi dan formalisasi Panduan Manajemen Program. 3. Lokakarya nasional mengenai penentuan kota untuk periode 2012. 4. Persiapan dan distribusi Surat Edaran mengenai partisipasi PPSP kepada Pemerintah Lokal. 5. Pelatihan mengenai komunikasi pada aspek manajemen untuk Pokja‐pokja tingkat Provinsi. 6. Persiapan Konvensi Sanitasi Nasional selanjutnya (Oktober 2011). 7. Pemutakhiran kebijakan‐kebijakan investasi pada sanitasi dengan dukungan Roadmap PPSP. 

 Terkait pelaksanaan tahap‐tahap PPSP: 1. Rekrutmen dan penentuan PF/CF, dan pelatihan untuk PF/CF baru. 2. Persiapan dan pelaksanaan City Sanitation Summit X (CSS X) di Banda Aceh bekerja sama dengan AKKOPSI. 3. Finalisasi prosedur‐prosedur dan pendokumentasian INPRES untuk diserahkan kepada Presiden. 4. Penentuan dan pengadaan KMW dan KMP, inisiasi kontrak‐kontrak di tingkat nasional dan provinsi. 5. Distribusi dari persiapan Anggaran Pendapatan dan Belanja Daerah. 6. Seminar Propinsi mengenai jejaring Kabupaten/Kota. 7. Pelaksanaan dan penerapan EHRA sederhana.  0.2.2 Dukungan USDP bagi kelembagaan dan penerapan PPSP 

Pada  tri wulan mendatang,  kegiatan‐kegiatan  dukungan  utama  berikut  ini  diramalkan  untuk  setiap  Sel USDP (daftar jadual kegiatan‐kegiatan yang lebih rinci dapat dibaca pada Tabel 3.1):  

 Sel USDP di PMU (Bappenas): 1. Mendukung  pemerintah,  melalui  Pokja  AMPL,  di  dalam  sosialisasi  INPRES  mengenai  percepatan 

pembangunan sanitasi pemukiman penduduk dan hukum yang mengaturnya (INPRES). 

2. Mendukung  dan mendampingi  PMU,  termasuk  kelompok  kerja  nasional  untuk  Air  dan  Sanitasi  (POKJA AMPL), di dalam kerangka regionalisasi Pokja. 

3. Mendukung dan mendampingi Pokja AMPL Nasional untuk menyiapkan Konferensi Nasional Pembangunan Sanitasi. 

4. Terus mendukung PMU dalam melaksanakan kegiatan‐kegiatan di dalam konteks manajemen pengetahuan. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

5. Mendukung PMU di dalam mengawal pelaksanaan Pengawasan dan Evaluasi berbasis  Laman  (web‐based Monev).  

6. Mendukung PIU‐AE di dalam melaksanakan sosialisasi kebijakan hukum dan peraturan PPSP. 

7. Terus mendukung PIU‐AE di dalam persiapan program. 

8. Terus  mendukung  PIU‐AE  di  dalam  memfasilitasi  Kementeriannya  mendampingi  AKKOPSI  dalam menyelenggarakan CSS X pada tahun 2011 yang akan diselenggarakan di Banda Aceh. 

9. Mendukung  PIU‐IF  di  dalam memfasilitasi  Kementeriannya menyiapkan  peraturan  dan  ketetapan  lainnya untuk menghimpun komitmen‐komitmen dalam membangun kesadaran akan kewajiban dari semua jenjang pemerintahan, masyarakat  dan  pihak‐pihak  swasta  untuk mengalokasikan  anggaran  investasi mereka  di sektor sanitasi.  

10. Terus  mendukung  UC‐IF  di  dalam  memfasilitasi  hal‐hal  terkait  program  peningkatan  kapasitas  untuk memperbaiki kualitas dan profesionalitas layanan‐layanan dari semua unit lembaga‐lembaga PPSP dan pada Pokja‐pokja tingkat Provinsi yang terpilih. 

 Secara khusus terkait dengan Tim 6:  

11. Lebih meningkatkan  pemanfaatan  sistim  pengawasan  dan  evaluasi  berbasis web  untuk mengembangkan CSS: mempromosikan tahap pengembangan SSK.  

12. Menilai rancangan WB yang diserahkan oleh Pokja.  

13. Mempromosikan hasil‐hasil Pengawasan dan evaluasi (Monev). 

14. Konsultasi regional mengenai rancangan‐rancangan WB.  

15. Kunjungan lokasi ke kota‐kota yang terpilih dan mengembangkan pembelajaran pada tri wulan ke dua.  

16. Mendampingi pelaksanaan klinik‐klinik hub dan pelatihan.  

 Sel USDP pada PIU‐AE (Kementerian Kesehatan), termasuk Tim 1:  

1. Berbagi dan mentransfer pengetahuan ke Tim PIU‐AE mengenai pelaksanaan peran dan tugas mereka.  

2. Pendampingan  teknis  dan  penilaian  kualitas  terhadap  materi/piranti,  kampanye,  dan  pengembangan promosi untuk PMU dan tim pelaksana PPSP yang lain.  

3. Pelaksanaan  pengarusutamaan  aspek‐aspek  PMJK,  Promosi  Higenitas  dan  kemitraan  Pemerintah  dan Swasta.  

4. Mengembangkan dan memproduksi kembali materi‐materi dan piranti‐piranti komunikasi.  

5. Mendampingi tim PIU‐AE di dalam menilai WB, CSS dan PM (kualitas isi dan rasa memiliki). 

6. Mengembangkan kapasitas anggota‐anggota PIU‐AE untuk mengawasi, mengevaluasi dan mengembangkan semua  komunikasi  dan  advokasi  serta  pemberdayaan  nilai‐nilai  mendasar  dan  misi  PPSP  (pelatihan partisipatif mini).  

7. Memfasilitasi perbaikan disain kelembagaan PIU‐AE. 

8. Pelatihan‐pelatihan  dan  lokakarya  ketrampilan  komunikasi  untuk  kampiun‐kampiun  PPSP,  agen  advokasi dan komunikator‐komunikator.  

9. Menginternalisasikan prinsip‐prinsip, ketrampilan/pengetahuan advokasi dan pemberdayaan, menerapkan studi/penilaian dan merancang SSK.  

10. Mendampingi PIU‐AE di dalam menggunakan sistim pengawasan dan evaluasi dari PPSP.  

11. Berkontribusi di dalam acara‐acara dan pelatihan‐pelatihan PIU, PMU dan AKKOPSI serta mengawasi kulaitas materi/piranti komunikasi.  

12. Berkontribusi di dalam persiapan dan disain konseptual,  silabus peningkatan kapasitas untuk komunikasi, dan mendukung pelaksanaan pelatihan untuk pelatih (ToT) dari WB dan CSS untuk tim PMU dan PIU.  

13. Memberikan  input‐input  dan  dukungan  terhadap  UC  PIU‐AE  dan  PIU  dan  PMU  yang  lain  di  dalam menyelenggarakan  dan  melaksanakan  lokakarya  di  tingkat  nasional  dan/atau  regional  untuk menyebarluaskan/mensosialisasikan peraturan PPSP dan persiapan kelembagaan PPSP di  tingkat nasional, provinsi dan kabupaten/kota. 

14. Mendukung UC  PMU  untuk mendukung  PMU  di  dalam menyelenggarakan  dan melaksanakan  lokakarya‐lokakarya, pelatihan‐pelatihan dan acara‐acara bersifat pengetahuan bertaraf nasional.  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

15. Mendukung  UC  PMU  untuk  memastikan  bahwa  semua  pedoman/piranti  yang  dihasilkan;  disain  dan panduan konseptual disebarluaskan dan dibagikan secara tepat kepada pihak‐pihak terkait yang sesuai.   

16. Menyediakan dukungan kepada fasilitator 2011 (CF/PF dan tim pendampingan teknis) di berbagai pelatihan dan coaching. 

 Sel USDP pada PIU‐IF (Kementerian Dalam Negeri) 

1. Menyiapkan Disain Besar (Grand Design) Peningkatan Kapasitas PPSP. 

2. Memperbaiki modul‐modul pelatihan dengan basis hasil‐hasil ToT. 

3. Memfasilitasi pertemuan Pelatih sebagai tindak lanjut ToT WB dan CSS. 

4. Menyiapkan disain, silabus, dan melakukan koordinasi fasilitasi pelaksanaan program pelatihan untuk KMW dan KMP. 

5. Menyiapkan  disain,  silabus  dan melakukan  koordinasi  program  pelatihan  untuk  Pokja  provinsi mengenai pengembangan  fasilitasi  WB,  CSS  dan  Memorandum  Sektor  Program  Sanitasi  (Memorandum  Program Sanitation Sector/MPSS). 

6. Menyiapkan disain dan memfasilitasi pelaksanaan dari pengembangan tim (team building) USDP, PMU dan PIU. 

7. Mengevaluasi program pelatihan PPSP 2011. 

8. Menyediakan input untuk rancangan INPRES PPSP. 

9. Melaksanakan pemetaan  kelembagaan, pelatihan  tematis, penguatan  kelembagaan dan pengawasan dan evaluasi pada enam provinsi percontohan:  Sumatera  Selatan,  Jawa  Tengah,  Jawa  Timur, Bali, Kalimantan barat, dan Kalimantan Selatan.  

10. Menyiapkan panduan penguatan kelembagaan terhadap Pokja provinsi. 

11. Memberikan  dukungan  dalam  pemutakhiran  Panduan  mengenai  persiapan  kelembagaan  dan  indikasi kegiatan‐kegiatan program PPSP pada tingkat lokal.  

12. Menyediakan dukungan untuk sosialisasi  surat edaran Menteri Dalam Negeri ke provinsi dan kota madya yang terpilih untuk PPSP 2012 terkait persiapan Pokja dan alokasi anggaran.  

13. Menyiapkan panduan mengenai regulator dan operator sektor sanitasi.  

14. Mendukung pemutakhiran identifikasi Sumber Panduan dan Mekanisme Pendanaan sektor sanitasi.  

15. Mendukung memfasilitasi program pelatihan identifikasi Sumber dan Mekanisme Pendanaan sektor sanitasi.  

16. Tambahan: Menyiapkan disain, silabus, dan melakukan koordinasi fasilitasi program pelatihan untuk PF dan CF untuk memfasilitasi pengembangan WB, CSS dan Memorandum Sektor Program Sanitasi (Memorandum Program Sanitation Sector/MPSS). 

17. Memenuhi  dukungan  pelaksanaan  umum  di  dalam menguatkan  organisasi  AKKOPSI  dan  pusat  pelatihan sektor swasta.  

18. Mendukung rektrutmen fasilitator. 

19. Menyediakan dukungan terhadap penilaian kualitas WB dan CSS. 

20. Mendukung di dalam pengembangan Panduan Memorandum Program untuk aspek‐aspek kelembagaan dan financial (catatan untuk Panduan). 

21. Memberikan dukungan panduan mengenai penguatan kelembagaan Pokja kabupaten dan kota pada masa memorandum program.  

22. Menyiapkan panduan mengenai Kemitraan Pemerintah dan Swasta  (Public Private Partnership/PPP) untuk aspek kelembagaan dan finansial.  

23. Memberikan input mengenai pengembangan dan kinerja Pelatihan Web PPSP. 

24. Memastikan  semua  pedoman  dan  panduan  disebarluaskan  dan  dibagikan  secara  tepat  kepada  para pemangku kepentingan yang relevan. 

 

   

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

Secara khusus untuk Tim 2: 

25. Menyelenggarakan pelatihan tematik di enam provinsi percontohan: Sumatera Selatan, Jawa Tengah, Jawa Timur, Bali, Kalimantan barat, dan Kalimantan Selatan.  

26. Melanjutkan menyiapkan panduan mengenai penguatan kelembagaan dari Pokja provinsi.  

27. Memberikan  dukungan  di  dalam  pemutakhiran  panduan  persiapan  kelembagaan  dan  indikasi  kegiatan‐kegiatan program PPSP di tingkat lokal.  

28. Memberikan dukungan panduan mengenai penguatan kelembagaan Pokja kabupaten dan kota pada masa memorandum program. 

29. Memberikan input untuk rancangan INPRES PPSP. 

30. Mengembangkan  input‐input  strategis  bagi  Kebijakan  Menteri  Dalam  Negeri  di  dalam  menekankan kewajiban dukungan anggaran daerah untuk pelaksanaan PPSP pada tingkat lokal.  

31. Memberikan dukungan untuk sosialisasi surat edaran Menteri Dalam Negeri kepada provinsi dan kotamadya terpilih untuk PPSP 2012 terkait persiapan Pokja dan alokasi anggaran.  

 Sel USDP pada PIU‐T (Kementrian Pekerjaan Umum):   

1. Mendampingi di dalam penyiapan TOR KMW mengenai rekrutmen KMW pada tahun 2012. 

2. Mendampingi di dalam mengidentifikasi dan menentukan kebutuhan‐kebutuhan fasilitator untuk PPSP 2012 (tahap 3). 

3. Meninjau kembali pedoman‐pedoman dan panduan‐panduan terkait pada tahap CSS. 

4. Menyediakan klinik coaching rutin untuk KMW, secara tidak langsung CF/PF (pada tingkat regional).  

5. Memberikan dukungan pada implementasi Penilaian Kualitas WB dan CSS melalui forum panel. 

6. Memberikan  dukungan  dalam  penerapan  Pendekatan  Penetapan  Prioritas  pada  Peristiwa‐Peristiwa Pengetahuan di dalam pengembangan WB. 

7. Mendukung  dan memberikan  input‐input mengenai  Lokakarya  Regional  CSS  dan WB  (berbasis  regional dan/atau pada kota‐kota yang terpilih).  

8. Mendukung penerapan “sistim Hub” – Pertanyaan dan Jawaban.    

9. Finalisasi dan perbaikan  lanjutan  jangkauan kegiatan dan rencana kerja untuk melengkapi dukungan USDP terhadap KMP dan PF/CF. 

10. Melanjutkan menyusun  dan memfinalisasi  dokumen‐dokumen  pendukung  untuk  tahap  pelaksnaan  yang terkait dengan pengadaan, manajemen kontrak,  supervisi konstruksi, penilaian dan pengendalian kualitas dan pengawasan dan evaluasi.  

11. Menyiapkan TOR dan Panduan untuk klinik‐klinik coaching, dikelola untuk mendukung dan meningkatkan kinerja KMP dan PF/CF. 

12. Mendampingi PIU‐T dengan identifikasi 3 proyek percontohan yang sesuai dan penyeleksian (kemungkinan alternatif) pilihan‐pilihan teknologi.  

13. Dukungan terus‐menerus untuk melaksanakan pengawasan atas PPSP (pengembangan PM, CSS, WB). 

14. Mendampingi UC‐AE dengan secara efektif menyebarluaskan Pedoman dan Manual kepada para pemangku kepentingan yang relevan. 

15. Membantu  UC‐AE  di  dalam mendukung  PIU‐AE  di  dalam menyelenggarakan  lokakarya/roadshow  untuk membangun komitmen kota‐kota atas partisipasi mereka di dalam PPSP 2012. 

16. Melakukan  koordinasi  finalisasi  survei  DEWATS  dan  penyebarluasan  kesimpulan‐kesimpulan  dan rekomendasi‐rekomendasi secara efektif.  

 Secara khusus Tim 3:  

17. Membantu persiapan TOR KMW untuk rekrutmen KMW pada tahun 2012. 

18. Membantu di dalam mengidentifikasi dan menentukan  kebutuhan‐kebutuhan para  fasilitator untuk PPSP 2012. 

19. Meninjau kembali pedoman‐pedoman dan panduan‐panduan terkait.  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

20. Menyediakan  klinik  coaching  rutin  terhadap  KMW,  secara  tidak  langsung  kepada  CF/PF  (pada  tingkat regional).  

21. Memberikan dukungan untuk pelaksanaan Penilaian Kualitas WB dan CSS melalui forum panel.  

22. Memberikan  dukungan  di  dalam  pelaksanaan  Knowledge  Event  Priority  Setting  Approach  mengenai pengembangan WB.  

23. Mendukung  dan  memberikan  input‐input  untuk  Lokakarya  Regional  WB  dan  CSS  (pada  basis  regional dan/atau di kota‐kota yang terpilih).  

24. Dukungan untuk menerapkan “sistim Hub”‐ Pertanyaan dan Jawaban berbasis Web.  

25. Menyusun pembelajaran dan memberikan umpan balik seperlunya untuk memperbaiki program.  

26. Dukungan terus‐menerus untuk memberikan input‐input untuk piranti/sistim pengawasan kinerja PF/CF.  

27. Dukungan di dalam pengawasan kemajuan pengembangan CSS dan WB.  

28. Dukungan terus‐menerus untuk memberikan input‐input untuk pemutakhiran FAQ di situs WB dan CSS. 

 Secara khusus untuk Tim 45: 

29. Finalisasi dan perbaikan  lanjutan  jangkauan kegiatan dan rencana kerja untuk melengkapi dukungan USDP terhadap KMP dan PF/CF.  

30. Melanjutkan  menyusun  dan  melakukan  finalisasi  terhadap  dokumen‐dokumen  pendukung  untuk  tahap pelaksanaan  terkait  pengadaan,  manajemen  kontrak,  supervisi  konstruksi,  pengendalian  dan  penilaian kualitas dan pengawasan dan evaluasi.  

31. Menyiapkan  TOR  dan  Panduan untuk  coaching  klinik  yang  dikelola  untuk mendukung  dan meningkatkan kinerja KMP dan PF/CF.  

32. Menyiapkan TOR dan Panduan  lokakarya‐lokakarya untuk mengevaluasi performa dan keluaran KMP dan PF/CF  dengan  tujuan  menghasilkan  pembelajaran  dan  –  jika  demikian  dibutuhkan  –  untuk meningkatkan/memodifikasi  prosedur‐prosedur  dan  pedoman‐pedoman  dan  panduan‐panduan pelaksanaan.  

33. Membantu  UC  PIU‐T  dengan  melakukan  identifikasi  3  proyek  percontohan  yang  layak  dan  pemilihan (kemungkinan alternative) pilihan‐pilihan teknologi.   

34. Membantu dengan penyelenggaraan dan pemberian semacam coaching klinik‐klinik.  

35. Membantu UC  PIU‐AE  dengan  secara  efektif menyebarluaskan  semua  Pedoman‐Pedoman  dan  Panduan‐Panduan kepada para pemangku kepentingan yang relevan.  

36. Secara efektif berbagi pengetahuan dan pengalaman dengan pelaksanaan PPSP Tahap 4 melalui situs‐situs, media‐media masa, lokakarya‐lokakarya, dan seminar‐seminar, dan sebagainya yang berdedikasi. 

37. Melakukan koordinasi finalisasi survei DEWATS dan secara efektif menyebarluaskan kesimpulan‐kesimpulan dan rekomendasi‐rekomendasi.  

38. Membantu Tim Pengawasan dan Evaluasi dengan melakukan pengawasan  terhadap pelakasanaan PPSP 4 dan 5.  

0.3 MASALAH DAN REKOMENDASI 

Masalah utama yang muncul pada triwulan terakhir disajikan pada Tabel 0.1. Masalah‐masalah dan rekomendasi yang dilaporkan pada Laporan Kemajuan Triwulanan  (Quarterly Progress Report/QPR) yang  lalu, dan  juga yang masih relevan yang masih belum ditutup dari QPR yang lalu, kini disajikan pada Lampiran 1 laporan ini, lengkap dengan  status  mereka  saat  ini  sejauh  yang  kami  ketahui.  Beberapa  dari  masalah‐masalah  tersebut  masih sangatlah penting disaat sekarang bagi keberhasilan PPSP. 

   

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

Tabel  0. 1  Masalah dan Rekomendasi 

No  Masalah/Kendala   Rekomendasi untuk Aksi Perbaikan   Aktor Kunci 

POKJA AMPL Nasional (dulu TTPS) dan anggota Kementrian  

1  Interaksi‐interaksi antara Dewan Pengarah dan PPSP, dan kinerja‐kinerja koordinasi oleh PMU dan kerja sama melekat antara PMU dan PIU‐PIU terhambat oleh lemahnya status dan kapasitas PMU.  

Penerapan suatu sistim yang memadai untuk berkomunikasi, berkonsultasi dan memberikan laporan antar lembaga‐lembaga PPSP terkait kinerja‐kinerja dan penyelesaian berbagai persoalan untuk mengefektifkan masalah‐masalah dan aksi‐aksi strategis.  

Pokja AMPL Nasional PMU dan Direktur Programnya 

2  Inti sari program dan proyek PPSP yang layak masih disimpan di Buku Biru.   

Konsultasi‐konsultasi mendalam dengan PMU dan Bappenas untuk merumuskan intisari program dan proyek tersebut.  

Pokja AMPL Nasional  

3  Pelaksanaan aksi‐aksi untuk mengefektifkan pemberlakuan INPRES sebagai sebuah kebijakan baru belum dirumuskan.  

Mengabarkan konsultasi antar aktor‐aktor yang relevan pada waktu yang singkat.  

Pokja AMPL Nasional  

4  Minimnya keterlibatan aktif anggota kementerian‐kementerian di dalam struktur organisasi PPSP.     

Struktur‐struktur kelembagaan PPSP disusun dengan keterwakilan anggota‐anggota semua kementerian yang relevan di setiap Dewan Pengarah untuk POKJA AMPL, PMU dan PIU; pendekatan yang sebaiknya juga diterapkan pada Sekretariat PMU.   

Pokja AMPL Nasional  

5  Anggaran‐anggaran yang dikomitmenkan pada PPSP masih jauh di bawah anggaran yang dahulu disepakati dan dipresentasikan pada Roadmap PPSP.  

Inisiatif‐inisiatif pro‐aktif dibutuhkan baik untuk jauh meningkatkan komitmen jumlah pendanaan atau sebaliknya mengecilkan PPSP. 

Pokja AMPL Nasional  

6  Oleh karena ketidakcukupan anggaran pada anggota kementerian‐kementerian, pembelanjaan‐pembelajaan aktual untuk PPSP jauh di bawah perencanaan, besar anggaran pada anggaran yang berkendala saat ini lebih kecil daripada anggaran yang dicantumkan dalam Peta Jalan.  

Pembicaraan antar anggota Pokja AMPL dan PPSP mengenai bagaimana anggaran untuk tahun 2012 dan tahun‐tahun selanjutnya dapat diperbaiki sedemikian rupa sehingga dapat mencegah munculnya kendala pendanaan pada tahun 2011 dan 2012. 

Pokja AMPL Nasional. Anggota Kementrian‐Kementrian 

7  Pilihan‐pilihan dan keputusan‐keputusan yang berbasis kecukupan informasi mengenai semua pendekatan dan prosedur relevan untuk pelaksanaan PPSP, termasuk pedoman‐pedoman dan produk‐produknya, perlu dikomunikasikan secara jelas kepada semua pihak.  

Pokja AMPL Nasional seharusnya mengirimkan surat (‐surat) informasi kepada semua pemangku kepentingan PPSP baik di pusat maupun kota untuk mensosialisasikan perubahan‐perubahan pada kurun waktu yang teratur. 

Pokja AMPL Nasional  

8  TOR Direktur Program yang ada tidak berisikan mandat yang jelas untuk Direktur Program dan stafnya. 

Bersama dengan PMU, mengambil inisiatif‐inisiatif untuk merumuskan TOR dan mandat‐mandat yang memadai.  

Pokja AMPL Nasional PMU, UC‐PMU 

9  Tidak ada mimbar yang memadai untuk membicarakan isu‐isu utama dan kegiatan‐kegiatan TA, dan meninjau kembali (potensi) perbedaan‐perbedaan dalam hal harapan; persepsi; pendapat dan pendekatan‐pendekatan layanan USDP antara USDP dan Klien/Penerima Manfaat dari sisi GOI.  

Membentuk semacam Mimbar Tim Teknis yang dicangkokkan di dalam Kerangka Administratif antara GOI dan EKN re. USDP.      

Pokja AMPL Nasional EKN 

Unit Manajemen Program (Program Management Unit/PMU) 

1  Keterlibatan penuh anggota‐anggota PMU dan PIU di dalam advokasi dan fasilitasi langsung terhadap pemerintah‐pemerintah daerah, khususnya terkait konsultasi‐konsultasi Pemerintah.  

Meningkatkan kapasitas anggota‐anggota secara memadai untuk memberikan fasilitas‐fasilitas konsultasi Pemerintah sebagaimana disebut di muka, dengan cara yang sesuai. 

Pimpinan PMU dan PIU‐PIU    

2  Tidak terdapat rumusan yang jelas terkait peran dan fungsi penasihat senior 

Memulai merumuskan TOR dengan peran‐peran dan fungsi‐fungsi yang sesuai.  

PMU 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

No  Masalah/Kendala   Rekomendasi untuk Aksi Perbaikan   Aktor Kunci 

terhadap Direktur Program yang baru saja direkrut oleh Pokja AMPL Nasional. 

3  Kesepakatan antara institusi‐institusi di dalam menyusun suatu mekanisme pelaporan dan komunikasi tidak sepenuhnya terlaksanakan.  

Pertimbangkan untuk menerapkan ketentuan‐ketentuan di dalam Pedoman Manajemen Program (Program Management Manual/PMM) PPSP segera. 

PMU 

4  Pembelajaran dari pelaksanaan PPSP akan memberi masukan‐masukan yang sangat baik sebagai basis untuk perbaikan pelaksanaan PPSP di periode yang akan datang.  

Melaksanakan sebuah lokakarya pembelajaran, yaitu mengenai pelaksanaan PPSP masa ini.    

PMU 

5  Mengalokasikan staf yang berkualitas untuk pekerjaan koordinasi, pemrograman, pengawasan dan evaluasi, etc di dalam situasi minimnya jumlah staf di Sekretariat PMU dan PIU.  

Mengerjakan persoalan alokasi staf sebelum PPSP dihadapkan pada kendala‐kendala operasional serius.  

PMU 

6  Anggota‐anggota PIU‐AE tidak menjabat di struktur dewan. 

Surat resmi untuk anggota‐anggota PIU‐AE harus diberikan.  

PMU, PIU‐AE 

7  Kesiapan dan kapasitas PMU/PIU di dalam memproses rekrutmen dan pelatihan fasilitator‐fasilitator PPSP sangat terbatas.  

PMU/PIU harus mempertimbangkan untuk merekrut suatu Agen Rekrutmen; selanjutnya untuk jangka panjang melembagakan pelatihan, sebuah Penyedia Pelatihan harus disiapkan untuk melaksanakan program‐program pelatihan bersamaan dengan, dan dengan panduan dari tim CBT USDP.  

PMU 

Unit Pelaksana Program (Program Implementation Units/PIUs) 

1  Telah terbentuk sebuah kesepakatan antara lembaga‐lembaga PPSP dalam menyusun suatu mekanisme pelaporan dan komunikasi, namun kesepakatan tersebut belum sepenuhnya dilaksanakan oleh PIU (tidak ada laporan yang telah diserahkan ke PMU).  

Pertemuan‐pertemuan Tim Manajemen pada dan antar lembaga‐lembaga PPSP di tingkat pusat seharusnya dilakukan paling tidak sekali dalam sebulan.    

PMU and PIU 

2  Meskipun SK PIU‐T telah ditandatangani oleh DG, manajemen PIU‐T belum didefinisikan dan ditunjuk, tugas staf PIU‐T untuk mendukung pelaksanaan PPSP belum terealisasikan, khususnya staf untuk menjalankan Sekretariat PIU‐T.  

Sangat direkomendasikan bahwa PPSP menjalankan aksi‐aksi yang dibutuhkan segera.   

PPLP, PIU‐T 

3  PIU‐T telah memutuskan bahwa jangkauan pekerjaan KMW tidak terbatas pada memfasilitasi Pokja‐Pokja di dalam mengembangkan WB dan CSS, melainkan juga merancang Memorandum Program.    

Fasilitasi untuk pengembangan Memorandum Program seharusnya didefinisikan dengan jelas, untuk menghindari terjadinya kelebihan beban pada KMW sehingga hanya terfokus pada fasilitasi mereka. Fasilitasi untuk merancang Memorandum Program seharusnya ditugaskan kepada KMP‐KMP yang berdedikasi, dan bukan dimasukan menjadi bagian pekerjaan KMW.   

PIU‐T 

4  Untuk menjamin kualitas dan keberlanjutan peningkatan kapasitas di bawah PPSP, perlu dikembangkan tim pelatih professional dari PMU dan PIU‐PIU. Belajar dari TOT yang telah dilaksanakan, diketahui sebagian besar peserta tidak siap menjadi seorang pelatih oleh karena keterbatasan pemahaman mereka mengenai persoalan‐persoalan substansial dari PPSP atau terbatasnya pengalaman mengajar mereka. Bekerja sama dengan konsultan‐konsultan USDP 

Direkomendasikan agar setiap direktorat dari lembaga‐lembaga yang terlibat pada PMU dan PIU PPSP menunjuk staf yang telah mengikuti TOT dan dipandang mempunyai kualifikasi sebagai anggota tim pelatih. Alokasi anggaran dibutuhkan untuk mendukung perbaikan kualitas pelatih‐pelatih yang berpotensi. Selanjutnya, dukungan terhadap tim pelatih dalam bentuk apresiasi yang dinyatakan dengan keputusan Direktorat Jendral juga dirasa penting untuk menjadikan pelatihan PPSP 

PIU 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

No  Masalah/Kendala   Rekomendasi untuk Aksi Perbaikan   Aktor Kunci 

yang terlibat di dalam program‐program pelatihan selama sekali hingga tiga kali pelatihan akan meningkatkan pengetahuan dan ketrampilan mereka.  

lebih prestisius dan berkelanjutan.   

5  PIU‐T tidak mempunyai mekanisme internal yang jelas terkait berbagai kontrak, untuk mengawasi dan mengevaluasi performa KMW dan KMP dan juga masing‐masing fasilitator kota dan propinsi.  

Tim Monev (monitoring dan evaluasi), UC‐IF dan UC‐T dapat menyusun piranti untuk mendukung PMU/PIU dalam mengawasi dan mengevaluasi performa KMW, KMP dan CF/PF.   

PMU, PIU‐T + Tim Monev,  UC PIU‐IF, UC PIU‐T 

6  PIU‐T tidak mempunyai mekanisme internal untuk mengawasi dan mengevaluasi kelengkapan dan, terutama, kualitas WB, CSS dan CPM.  

Tim Monev, UC PIU‐IF dan UC PIU‐T menyusun piranti untuk mendukung PMU/PIU mengawasi dan mengevaluasi kelengkapan dan kualitas BP, SSK, dan DPM.  

PMU dan PIU‐T + Tim Monev,  UC PIU‐IF, UC PIU‐T 

7  Proses tender KMW dan KMP ditunda kembali, seperti halnya terjadi pada kasus di tahun 2010. Selanjutnya, serupa dengan di tahun 2010, alokasi‐alokasi anggaran jauh di bawah yang telah diperkirakan.  

PPSP harus mengembangkan alternatif‐alternatif untuk mendampingi dan mendorong PPLP/PIU‐T mengatasi kendala‐kendala dan untuk menghindari penundaan‐penundaan serupa di tahun‐tahun berikutnya. 

PIU‐T, PMU 

8  Mobilisasi PF/CF untuk PPSP Tahap 3 (WB dan CFS) dan CP Tahap 4 (DPM) tertunda lagi.    

PIU‐T, didukung oleh PMU, harus menemukan sebuah solusi struktural untuk merekrut dan melatih calon‐calon fasilitator lebih awal di dalam siklus tahunan PPSP, sehingga dapat menghindari terjadinya penundaan kembali.  

PIU‐T, PMU 

9  Kota‐kota yang telah menyelesaikan atau kota‐kota yang akan dalam proses menyelesaikan Rancangan Memorandum Program (Draft Program Memorandum/DPM) harus “mencari” pendanaan dari PU Pusat, dari Provinsi‐provinsi dan dari sumber‐sumber pendanaan lain yang memungkinkan berdasarkan prosedur‐prosedur yang ada di masing‐masing Kementrian. PPSP belum membuat PPSP gabungan – prosedur‐prosedur dan regulasi‐regulasi pendanaan khusus yang akan kondusif untuk percepatan pembangunan sanitasi dan bukan sekedar “hal biasa”.  

Mempercepat proses‐proses, prosedur‐prosedur dan regulasi‐regulasi yang benar‐benar mampu menjawab dan mendukung berbagai tantangan percepatan yang diinginkan di bawah PPSP.   

PIU‐T, PMU 

10  Terbatasnya kesadaran Pokja‐pokja mengenai PPSP dan peran‐peran mereka.    

Roadshow PIU‐AE perlu lebih fokus pada agenda PPSP, dan menemui SKPD yang mempunyai irisan isu terkait, di dalam Pokja ( tidak hanya pejabat kesehatan kabupaten/kota).  

PIU‐AE 

11  Tim Panel QA dari BP dan SSK ditetapkan dengan surat resmi. Hal ini diikuti dengan 4 kali pertemuan untuk 13 partisipan untuk meninjau kembali prioritas kabupaten/kota. Meski demikian, tidak satupun anggota PIU‐AE hadir pada 3 pertemuan terakhir.  

Surat resmi dari PMU dibutuhkan untuk penetapan tim (penggantian 2 anggota: Bu Ayu dan Pak Wahanudin).     

PIU‐AE 

USDP 

1  Masalah‐masalah strategis mengharuskan adanya TA dengan dukungan PPSP dan perlu dirumuskan dengan lebih rinci.   

Berdasar pada konsultasi‐konsultasi periodik yang diselenggarakan oleh PMU‐PIU dan USDP untuk menentukan layanan‐layanan yang bisa dan tidak bisa diberikan oleh USDP di bawah ketentuan program pendampingan teknis. 

Tim Manajemen USDP  UC PMU 

2  Pertemuan rutin manajemen antara  Kembali menyelenggarakan pertemuan‐ Tim Manajemen 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

10 

No  Masalah/Kendala   Rekomendasi untuk Aksi Perbaikan   Aktor Kunci 

manajemen PMU dan manajemen USDP belum pernah diselenggarakan selama beberapa bulan terakhir. Hal ini menghambat konsultasi‐konsultasi dan perencanaan yang tepat dalam hal layanan dukungan. 

pertemuan manajemen rutin dan pengawasan terkait dengan kegiatan‐kegiatan tindak lanjut yang telah disepakati.   

USDP  PMU 

3  Peran‐peran Tim SSK dan Tim SDI masih kurang dipahami oleh sejumlah aktor; terkait dengan dukungan mereka terhadap para pemangku kepentingan PPSP dengan peningkatan kapasitas dan pelatihan, sementara PMU/PIU tidak memiliki jadual yang pasti untuk melaksanakan pelatihan dan lokakarya yang dibutuhkan untuk para pemangku kepentingan PPSP (KMW, CF/PF, Pokja, KMP, dst).  

Manajemen USDP seharusnya tetap menyelenggarakan konsultasi‐konsultasi dengan aktor‐aktor tersebut pada interval waktu yang rutin untuk lebih memperjelas bentuk dan jangkauan layanan USDP dan memperoleh pemahaman yang lebih baik mengenai peran, tugas dan tanggung jawab mereka.    

Manajemen USDP Koordinator‐koordinator Sel USDP  

4  PIU‐T belum mempunyai mekanisme yang jelas di dalam mengawasi dan mengevaluasi performa KMW dan Fasilitator.  

Tim Monev dan UC PIU‐IF menyediakan piranti untuk mendukung PMU/PIU sebagai basis pengawasan dan evalusi terhadap performa KMW dan CF/PF.  

Tim Monev dan UC PIU‐IF 

5  Peran dan layanan USDP dianggap melebihi harapan anggota PIU AE dan pejabat tinggi Kementerian Kesehatan.   

Diperlukan pertemuan rutin Tim Manajemen (antara USDP dan Pokja AMPL, termasuk Kementerian Kesehatan) untuk melakukan koordinasi terkait perencanaan, penganggaran, dan penjadualan. 

Tim Manajemen USDP 

 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

11 

1 INTRODUCTION 

1.1 Background 

Indonesia’s commitment to the MDGs, as well as a World Bank report on the adverse economic impacts of poor sanitation  in  Indonesia, brought the sector under  increased attention of the authorities, although these drivers did not result in increased funding allocations until the current Medium Term National Development Plan. They did, however, contribute to the creation of the Sanitation Technical Team (Tim Teknis Pembangunan Sanitasi, or TTPS), a grouping of 8 Ministries with responsibilities regarding sanitation, with Bappenas as  leading Agency. In 2009 TTPS launched a challenging program to scale up and accelerate sanitation planning and investments during the period 2010‐2014: Percepatan Pembangunan Sanitasi Permukiman (Accelerated Sanitation Development for Human Settlements), or PPSP. This program targets 330 cities experiencing sanitation problems and focuses on particular goals to be achieved by 2014. 

PPSP provides a framework for all stakeholders  in sanitation development (government departments as well as foreign donors and private sector) to align their programs and projects in the tree sub‐sectors with the goals of this national sanitation program. To accelerate urban sanitation improvements and increase the effectiveness of investments  in  the sector, GOI has decided  to encourage all cities  to apply a  five‐stage process  leading  to  the implementation of an  integrated sanitation strategy (Strategi Sanitasi Kota, or SSK).  In effect, the availability of an SSK has become a criterion  for allocating shares  in  the GOI’s specific allocation grants  to  local government (Dana Alokasi Khusus, or DAK).  

The role of the USDP will be to facilitate and further strengthen GOI institutions at the national, provincial and, indirectly, at the local level involved in implementing the PPSP. USDP will also support the TTPS with the further development  of  a  national  sanitation  strategy  including  convincing  national  budget  holders  and  international donors to invest in sanitation development based on the integrated plans prepared by the city authorities. As per Administrative Arrangement, USDP will provide technical assistance to the urban component of PPSP.  

The USDP Program  is a co‐operation between  the State Ministry of National Planning  (Bappenas), as  the  lead agency of TTPS, and the Government of the Netherlands represented by the Royal Netherlands Embassy. USDP provides technical assistance to PPSP and its PMU and three PIUs as established by the core ministries of TTPS, i.e. Bappenas and the Ministries of Public Works, Home Affairs and Health. The Program started on February 1, 2010 and will be completed by December 31, 2014. 

The context of the USDP is determined by the Government’s Medium Term National Development Plan which is, in  effect,  reflected  in  the  Roadmap  for  the  “Accelerated  of  Sanitation  Development  Program  for  Human Settlements” (“PPSP”). The PPSP is meant to provide the framework for all interventions in the sanitation sector. The PPSP program will be carried out in the period 2010‐2014. 

To date  the average allocation of  sanitation  funds  in  the  local budget  (APBD) has never been higher  than 1% while less than 0.18% in the provincial budget and 0.036% in the national budget (APBN) respectively, including the  funds  that  are  allocated  through  DAK  (specific  transfer  from  national/central  government).  Notable developments have been  the  formulation of a policy  for  community based drinking water and  sanitation,  the introduction of urban strategic sanitation planning, and piloting approaches such as sanimas and community led total  sanitation. As  a  result,  the Ministry of Public Works became  active  in  the  sanitation  sector  through  the Community‐Based  Water  Supply  and  Sanitation  Program  (Pamsimas)  and  the  Community‐Based  Sanitation Program (Sanimas). The Ministry of Health carried out Community‐Based Total Sanitation (STBM) and conducted Campaigns for Clean and Hygienic Behaviour (PHBS). 

In 2007, the National Sanitation Conference‐I agreed on the government’s commitment to develop sanitation in line with the MDGs. The International Year of Sanitation  in 2008 was used to  increase the awareness and gage the  commitment  of  local  government  authorities.  Subsequently,  the  issues  and  targets  for  future  sanitation development were  identified  and  the  introduction  of  an  integrated  approach  of  city  sanitation  planning  and development was launched at the Urban Sanitation Convention in April 2009.   

The  Government  set  out  a  number  of  policies  and  strategies  to  overcome  various  structural  constraints  in sanitation development. These strategies are  stated  in  the RPJMN 2010‐2014  (5‐Years National Medium Term Development Plan). 

The Government’s 2014 milestones for sanitation development include:   

• No open defecation in both urban and rural areas by providing access to off‐site sewerage systems to 10% and to on‐site sewerage facilities to 90% of the population;  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

12 

• Reduction of waste generation at  source, expansion of environmentally  sounds  solid waste manage‐ment  through  sanitary  or  controlled  landfills  and  other  safer  technologies.  These measures would affect 80% of the urban households; 

• Reduction  of  water  pounding  in  100  flood‐prone  cities/regencies  with  coverage  of  over  22,500 hectares. 

 PPSP aims at lifting sanitation conditions in urban and rural areas, in particular for some 330 cities that are faced most  seriously  with  problems  in  one  or  several  of  the  sanitation  sub‐sectors.  PPSP’s  integrated  sanitation planning and implementation approach is consisting of five more or less subsequent stages and one overall stage, i.e.  1.  Awareness  rising  by  Campaigns,  Education  and  Advocacy  activities,  2.  Institutional  and  Regulatory Development, 3. Preparation of  Strategi  Sanitasi Kota  (SSK), 4. Preparation of Program Memorandum, and 5. Program Implementation. The overall stage 6 relates to Monitoring, Evaluation and Guidance. 

The  overall  aim  of  the USDP  is  to  facilitate  and  support  the  implementation  of  PPSP. More  specifically,  the objectives are to: 

1. Develop capacity  in the PMU and PIUs responsible  for  implementing the PPSP  in effectively managing the development of the sector together with the stakeholders at the provincial and local levels; 

2. Consolidate  the SSK approach  for use by government  facilitators and cities  throughout  the country, while ensuring that the SSKs address the needs of the poor and underserved citizens; 

3. Support the implementation of fundable project proposals following the outcomes of the SSKs.  

The USDP consultants will provide technical assistance to the PMU and the PIUs to strengthen their capacity  in supporting  the provinces and  cities with  the planning and  implementation of  sanitation  improvements. More specifically, the technical assistance will ensure or support the following main activities: 

a) The  production  and  dissemination  of  technical,  financial,  administrative  and  operational  guidelines  for sanitation  planning,  program  memorandum  development  and  the  implementation  of  sanitation improvement projects; 

b) Capacity development and training of TTPS, PMU, PIUs and their facilitators and consultants at central and local government levels, such as for example the “Regional Management Consultants” which will guide and monitor the provincial facilitators and the city facilitators guiding the city working groups in SSK preparation; 

c) The establishment of a national monitoring system to track progress in PPSP implementation; d) The organization of a range of national and regional meetings/workshops to exchange lessons learned and 

disseminate information; e) The design of a sanitation investment strategy and framework; f) The provision of technical advice and support to a specific number of cities/regencies; g) Provide inputs for draft Presidential on PPSP as National Program (continuation).   1.2 Purpose of the Quarterly Reports 

Quarterly Reports represent one of the reporting mechanisms of USDP. Quarterly Reports describe the progress and achievements of the past three months, and the scheduled services and activities for the next three months, within the context of the Annual Work Plan, each year prepared in December for the next calendar year. 

This 5th Quarterly Report describes the progress of USDP over the period January‐March 2011, the 1st quarter of 2011, and the scheduled activities for the period April‐June 2011. 

  

 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

13 

2 ACTIVITIES AND ACHIEVEMENTS OF THIS PAST QUARTER 

USDP is providing support services to PPSP. It operates in the context of and in conjunction with PPSP. This chapter will therefore start with a section on the activities and achievements of PPSP during the reporting period from the perspective of USDP. PPSP is assumed to produce its own progress reports for the participating Ministries.  

 2.1 General progress of PPSP 

Main activities and achievements of PPSP during the past quarter can be summarized as follows: 

1. Start‐up of process of  recruitment and  selection of Cities  to enrol  in  the PPSP program of 2012,  including organisation of Regional Consultation Meetings (Konreg) to discuss the 2012 cities selection issues. 

2. Establishment of a Panel, consisting of members of PMU and PIUs staff,  to review and assess  the contents and quality of BPSs and SSKs. The Panel is scheduled to complete the assessment of documents for 25 cities by June. 

3. Preparation of recruitment and selection of new PFs/CFs. 

4. Participation  in USDP’s  training  events on development of  Training Modules  and development of  training skills and experience through TOT workshop. 

5. In collaboration with USDP and  INKINDO Branch DKI  Jakarta, organisation of a  seminar  for potential KMW Consultants in preparation of the scheduled tender for KMW Consultants 

6. Further preparation of RFPs and TORs for the tenders for KMWs and KMPs. 

7. Initial preparation of City Sanitation Summit X  in Banda Aceh to be held  from 29‐31 May 2011 at Balaikota Banda Aceh. 

8. Organization  several  Steering  Committees  meeting  to  discuss  and  decide  strategic  issues,  such  as:  the preparation of KASN, the preparation of CSS‐X, and the finalisation of draft INPRES covering Sanitation, CLTS (STBM) and Water Supply (scheduled to be send to the Office of the President by the end of May). 

 2.2 USDP’s main events and results during the past Quarter 

The main support services of USDP towards PPSP’s development and  implementation  in the past quarter can be summarized as follows (for a more detailed listing against outputs and tasks see section 2.3): 

1. Support service towards the recruitment and mobilisation of new cities to enrol  in the PPSP 2012 program, including  review  of  selection  criteria,  review  of  the  guidelines  on  institutional  preparation;  design  and development of related advocacy and communication materials. 

2. Support numerous discussions on the recruitment, selection and training of PFs/CFs; contribution to solutions for the recurring GOI’s constraints in making the required budgets available in the rights volumes and at the right time. 

3. Review  and  update  the  TORs  for  KMWs  and  KMPs  following  the  lower  GOI  budgets  available  for  these services  compared  to what was  originally  recommended  in  the  draft  TORs  (due  to  unfavourable  budget planning in 2010); design, preparation and funding of an orientation seminar for potential KMW Consultants in collaboration with INKINDO DKI Jakarta and PMU/PIUS. 

4. Preparation of Training Materials and Training of Trainers event for four key PPSP job titles, in particular for the  new  PFs/CFs;  networking  with  Indonesian  training  Institutes  which  could  take  the  role  of  future organisers and  implementers of  various PPSP  training events;  initial  steps  towards  the Grand design  for a PPSP wide training program. 

5. Further development of MONEV, including testing of QA tools for BKSs and SSKs. 

6. Support and assistance in getting the approval of the Office of the President for INPRES status for PPSP, which was originally scheduled for 3rd quarter of 2010. 

7. Support and assistance  to  the preparation and organisation of various national events such as the national workshop on the recruitment and selection of cities to enrol in PPSP 2012, the National Sanitation and Water Supply Convention, the projected City Sanitation Summits in 2011, etc. 

8. Guidance and assistance towards the preparation of the PPSP Panel for the review and assessment of PPSP output such as BPSs and SSKs. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

14 

9. Further development of the pilot on improvement of institutional and operation capacity of Provincial Pokjas to contribute to the implementation of PPSP from the Provincial level 

10. Internal USDP workshop to update the vision on strategic and other main issues in support of PPSP in 2011. 

11. Participation  in  several  public  consultations  for  BPSs  and  SSKs,  usually  in  Provincial  Capitals,  providing feedback to Pokjas and KMWs.   

 2.3 Progress USDP versus specified outputs and tasks 

The progress presented here  in more detail  concerns  the activities  implemented by USDP  in  the 1st quarter of 2011,  i.e. January–March 2011. Main activities of PPSP and USDP during this reporting period were presented  in the previous sections 2.1. and 2.2.  

USDP’s activities  in said period are presented  in Table 2.1 below  in relation  to  the outputs and tasks defined  in USDP’s TOR. 

Table 2.1 Specific activities of USDP in the reporting period (January–March 2011) 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

1  Output 1 Large numbers of districts/cities are able to develop poor‐inclusive district/city (‐wide) Sanitation Strategies (CSS) 

1.T1  Support Government (i.e. TTPS and PMU/PIUs) in annual process of city selection (incl. support to planning and implementation of workshops, roadshows and production of publicity materials). 

UC‐AE5 Team‐AE Team‐IP    

Developed timeline for ideal city selection process in accordance with planning and budgeting within government schedules. 

Provided support to implementation of monitoring and ensuring institutional and financial readiness of local governments to engage in PPSP in the years 2011 and 2012. 

Prepared support for PIU AE: draft program for national event; prepared communication materials for Lokakarya Nasional event that is scheduled for next quarter, on April 28‐29, 2011. 

1.T2  Review and streamline the CSS process to enable efficient scaling up of the CSS at city level while maintaining quality and local ownership (incl. involvement of Public Works). 

UC‐T Team‐SSK Team‐IP (Team SDI) 

In the period of mid‐December to the end of December 2010, SSK QA tools were tested to assess the quality of SSK Kota Semarang. In March 2011, assessing of the 6 selected WBs and SSKs  (developed in 2010) was continued to get information the quality (i.e.; Lhoksumawe, Prabumulih, Serang, Kebumen, Banjar and Balikpapan): 4 documents are of poor quality, and 2 documents are of moderate to good quality.   

The lessons learned workshop on implementation of PPSP (particularly on the stage of SSKs development) was proposed to be arranged at the beginning of February 2011 so as to get inputs and lessons learned from all of PPSP stakeholders to stimulate improvement of spirit of PPSP implementation for the next period. But, PMU indicated that the budget (APBN) can only be released after June 2011. So, the event is considered to be arranged after June 2011. The draft of Term of References for this activity has been developed. 

Developed internalization model of SSK into routine program and budget plan at local level through synchronizing model of SSK and the Regulation of Minister of Home Affairs 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

15 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

No.54/2010. This model has been discussed with the Director Bina Perkotaan, MOHA.    

Supported PIU AE’s contribution for a number of suggestions from members of PIU: public consultations of the WB and CSS and panel team of review (QA/Quality Assurance) of the WB and CSS). 

1.T3  Train PFs/CFs via Training‐of‐Trainers and provide subsequent coaching and facilitation re. planning processes and products. Identify national/regional learning institutions to serve as long‐term resources centre(s) for the training and supply of facilitators. 

UC‐IF CBT 

In cooperation with PMU/PIUs and INKINDO Jakarta, PPSP dissemination and socialization was executed in the PPSP workshop and exhibition, held on February 1‐2, 2011 at Pendopo, Public Works Ministry, Jl. Pattimura 20. The participants of workshop were coming from individual consultants and representatives of consultant companies. More than 170 participants were attending the PPSP workshop and exhibition, in preparation for the KMW tenders. 

PMU/PIUs planned to recruit and train the CFs/PFs before KMWs are on‐board. The training is scheduled for mid to the end of May 2011. Terms of reference on CFs/PFs training were already developed. USDP will support to organize and fund the training. 

Following earlier preparation of ToR for EHRA studies, USDP tried to follow‐up on apparently stalled arrangements between PMU and INDII; to date no feedback or results. 

Visit to Yayasan Insan Sembada (YIS) in Solo and WIN development consultant in Jakarta, as part of survey to identify a training institute, which could act as qualified training organiser / implementer for PPSP.  

1.T4  Provide ongoing guidance and support to CFs and PFs to ensure that CSS are of a high quality, are poor‐inclusive and lead to action plans for pro‐poor investments in priority areas. 

UC‐T Team‐SSK Team‐IP CBT 

Actively supported the PMU/PIUs in orienting QA tools of WB and SSK to the PMU/PIUs staff who sit on the Panel Team; since its establishment in February 2011, the Panel Team it the basis of assessing the quality of WB and SSK, which consists not only the technical aspect, but also non‐technical aspect (as institutional, financial, communication, community development‐poor inclusive‐gender sensitive, private sector participation, behaviour, personal hygiene, etc.). 

Supported to PMU/PIUs in developing Help‐desk/ “The Hub” mechanism, through a web‐based system.  The set‐up of Help‐desk mechanism is needs to be oriented to KMWs/CFs/PFs to ensure this mechanism working properly and to make clear the roles of all parties involved (Pokjas, CFs, PFs, KMWs, PMU/PIUs).  The KMW’s tasks in relation to this matter have also been inserted in the draft KMW’s TOR (revised version).  

Supported PMU/PIUs to provide inputs and feedback to the substance of WBs and CSSs through Panel Team in assessing the quality of WBs and CSSs. The Panel Team will assess the quality of at least 25 documents of WBs and CSSs by May 2011. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

16 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

Provided support and inputs in PF and CF recruitment and training design. 

2  Output 2 Municipalities have access to skilled human resources for sanitation advocacy, planning and the formulation and implementation of technical proposals. 

2.T1  Ensure the technical capacity of the PMU/PIUs and of a high quality technical assistance to PFs/CFs and Pokjas including assistance from specialist consultants. 

UC‐IF UC‐PMU Team‐IP Team‐SSK Team‐SDI 

Based on Monev mechanism, UC PMU shared input data and information to measure improvement to the quality of outcomes.  

Supported PIU‐T in finalizing the TOR of KMWs for tendering process in recruiting KMWs for facilitation of SSK development in the year 2011. The first draft TOR was submitted to PMU and PIU‐T in November 1, 2010. The revised version was submitted to PIU‐T at the end of March 2011. 

Supported PMU/PIUs in preparing the PPSP work plan to be discussed at PMU/PIUs coordination meeting to review PPSP work plan 2011 and its milestones (held on March 30, 2011). 

Supported PIU‐IF in implementing Training of Trainers to PMU/PIUs staff, in internalizing PPSP Training Modules (Module 1 – Module 4). The ToT was executed on March 21‐24, 2011 at Puri Denpasar Hotel.  

Conducted internal discussions with respect on the aspects of WB and CSS at each PIUs cell so as to internalize the understanding of WBs and CSSs substance and QA tools in PMU/PIU’s Panel Team. 

Supported PMU/PIUs in developing draft TOR for CFs/PFs recruitment and training. The recruitment of CFs/PFs will be executed between late April and early May 2011. The training is scheduled for mid May to the end of May 2011. 

Submitted Draft Training Need Assessment (TNA) report last quarter; so far no comment from Pokja AMPL Nasional and PIU‐IF yet. Therefore, the status has remained draft in this quarter.   

Organised a meeting to improve he training modules at Pasir Mukti on 7‐8 March 2011, as a follow up to the development of a Model for the Training Program PPSP 2011, which was discussed in the joint meeting of PMU, PIUs and USDP held at CICO on 16 December 2010.  The output of the meeting was a final draft of 4 substantial Training Modules (with various sub‐modules each) for the PPSP Program, entitled:  1. Module 1: Road Map dan Tata Kelola 

Program PPSP  2. Module 2: Penyusunan Buku Putih Sanitasi  3. Module 3: Penyusunan Strategi Sanitasi 

Kota  4. Module 4: Penyusunan Memorandum 

Program Sektor Sanitasi   Prepared design and facilitated Training of 

Trainers (ToT) of PPSP programs for PMU and 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

17 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

PIUs held on March 21‐24, 2011 at Hotel Puri Denpasar, Jakarta.  The developed modules were used in the TOT.  

• Training evaluation was held. From proposed participants of 54 people, 38 followed the program till end and 25 of them are potential trainers. They can’t be considered as trainers yet since they still need to master substantial PPSP matters.     

• Started preparation of grand design of capacity building PPSP. The initial draft needs to be continued next quarter.  

• Prepared training design for provincial Pokjas on facilitation of PPSP (development of WB, CSS and PM for sanitation). 

Prepared TOR for Team Building between USDP, PMU and PIUs. Exploring possibilities to work with another institution for its implementation.  

2.T1.1  Create enabling environment through Technical Assistance services (1.1.1‐1.1.6). 

All Cells Team‐IP Team‐SSK Team‐SDI 

Guided Pokja AMPL Nasional to distribute 1 set of Manuals (Manual A‐D) and related Source Book to PPSP stakeholders to enable all levels in supporting cities to develop CSSs. 

Posted all Manuals (A‐D) and related references at the PPSP website (also in relation to forthcoming CF/PF training).  

Developed Training Modules (Modules 1‐4) which focus on introduction of PPSP (Module 1), WB development (Module 2), CSS development (Module 3), PM development (Module 4). 

2.T1.1.1  Community engagement, social equity (poor‐inclusive) and gender‐related issues in the planning process. 

UC‐AE Team‐A Team‐SSK 

 

2.T1.1.2  Design of improved wastewater management, drainage, and solid waste management infrastructure and systems, including drafting of technical proposals (Stage 4). 

UC‐T Team‐SDI 

 

2.T1.1.3  Implementation including procurement and the management of physical works (Stage 5). 

UC‐T Team‐SDI 

 

2.T1.1.4  Sanitation advocacy and hygiene promotion, especially the promotion of hand washing with soap. 

UC‐AE Team‐A 

Contributed in conceptual notes and by drafting terms of reference for the National information and Advocacy Center of Pokja AMPL National. 

2.T1.1.5  Monitoring SSK implementation (Stages 3 and 6). 

UC‐PMU Team‐SSK 

Support the dissemination of the implementation of the Web‐based Monev. 

2.T1.1.6  Institutional, financial and governance issues related to urban sanitation. 

UC‐IF CBT 

Developed capacity of PIU‐IF members to monitor, evaluate, and develop strategic inputs in developing Pokja and ensuring financial support at provincial and local level by regular mini coaching. 

Provided input for draft INPRES PPSP.   Developed strategic inputs to the Regulation of 

Minister of Home Affairs in emphasizing compulsory local budget support for PPSP 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

18 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

implementation at local level.   Prepared guidelines on institutional 

strengthening of Provincial Pokja.  Provided support to implementation of 

monitoring and ensuring institutional and financial readiness of local government to engage in PPSP in the year 2011 and 2012. 

Provided inputs to PIU IF regarding the arrangements organizational structure of Pokja at Local Level; and for the roll‐out of PSP at local level is to be incorporated into the revised guidelines on institutional preparation; in addition indication of activities for PPSP implementation at local level. 

Facilitated inputs to PIU‐IF in developing the MONEV instrument regarding availability and functions of Pokja, and Pokja’s operational fund in PPSP cities for stages 1,2,3 and 4,5,6. 

Delivered a mini coaching for Team Institutional Monitoring of PIU‐IF as preparation activity for implementation of institutional MONEV in PPSP cities 2010. 

Supported in improvement of draft Program Management Manual of PPSP development. 

Facilitated the improvement of institutional design of PIU IF. The new PIU’s decree has accommodated the input.  

Facilitated the improvement of institutional design of PIU T. The new PIU’s decree has accommodated the input. 

2.T1.2  Provide feedback and guidance on draft ‘White Books’ and CSSs. 

UC‐T Team‐SSK 

Supported actively the PMU/PIUs in orienting QA tools for WB and CSS to the PMU/PIUs staff who sit on Panel Team since the establishment of Panel Team in the end of February, as basis on assessing the quality of WB and CSS (see also 1.T4).   

Provided QA tools for Advocacy and Empowerment aspects. 

2.T1.3  Provide direct TA in the development of project proposals or support to (local) Government appointed consultants developing master plans. 

UC‐T Team‐SDI 

  

2.T1.4  Via PMU and PIUs facilitate the inclusion of any large‐scale technical proposals in Bappenas’ ‘Blue Book’. 

UC‐PMU Team SDI 

Supported coordination in formulating “the digest” for any investment to be put in the Blue Book (BB).  

 

2.T1.5  Play an important role in advocacy and awareness‐raising at all levels of government. 

UC‐AE UC‐PMU Team‐AE 

Promoted the enabling environment for a proper commitment among related ministries within the Steering Committee. 

Contributed in conceptual notes and drafting term of reference of National Information and Advocacy Center of Pokja AMPL Nasional. 

Supported AKKOPSI’s advocacy event, such as conceptual preparation of City Sanitation Summit (CSS) side event and contributed materials on communications and implementation of the CSS X in Banda Aceh, such as: 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

19 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

- Flow of sessions, - Conceptual event, - Public campaign through Radio and TV, - Press conference. 

Field visit to project site 2.T1.6  Ensure that CSSs and action plans 

and proposals pay full attention to: ‘hard’ and ‘soft’ issues affecting progress in urban sanitation, Institutional development, cost recovery, operation and maintenance, community engagement, gender‐related issues, social equity through poor‐inclusive planning, pro‐poor investments and hygiene promotion. 

UC‐T All Cells All Teams  

Finalized QA tools on SSKs as basis for assessing quality of SSKs (developed by Pokjas), which include not only technical aspects, but also non‐technical aspects.  

2.T2  Assist PMU and PIUs in providing ongoing support and guidance to all cities in PPSP: see 2.T2.1‐2.T2.4. 

UC‐PMU  Take coordination to put priority on sanitation development in the setting‐up of APBN and APBD. 

2.T2.1  A dedicated PPSP website.  UC‐PMU Team‐AE 

The instrument is now improved and ready to be managed and used by related stakeholders. 

Contributed a number of communication inputs, materials, news and guidelines for regular updates of PPSP website. 

2.T2.2  Guidance notes, manuals, and other advisory material. 

UC‐PMU All Cells 

Prepared agenda for transfer of knowledge.  PMU has distributed Manuals and related 

Reference Book to PPSP stakeholders.  Manuals and Guidance Notes are available on 

the PPSP website.  Supported development of Program 

Management Manual/Guideline PPSP  Training Modules.  Finalized guideline on community managed 

simplified sewerage services.  2.T2.3  Networking events and national 

or regional workshops. UC‐PMU UC‐AE All Cells      

Supported input to the National agenda for CSS, KASN and EASAN and inviting Ministers and the Top Leader of GOI to present their speech in launching the implementation of the INPRES for PPSP. 

Prepared design and coordinate PMU, PIUs and INKINDO in facilitation of workshop and exhibition of PPSP for potential KMW Consultants. The event was held on February 1 and 2, 2011 and the participating Consultants had to pay for their attendance.    

Assisted and participated in implementation of Jejaring AMPL’s regular members meeting. 

Supported and contributed in piloting of PPSP with private sectors and the mass media. 

Contributed a conceptual draft and communication materials for integrated advocacy events and coordination forums. 

Contributed to Workshop Gender Mainstreaming (with Waspola). 

Assessed potential pilot project for PPP and community participation on solid waste treatment (forum RW Bandung). 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

20 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

2.T2.4  Ensure close cooperation and good coordination with other projects and programs in the urban sanitation sector. 

UC‐PMU All Cells 

Contributed to draft TOR aimed at improving mutual cooperation between PPSP stakeholders. 

Contributed to and involved in National Communications Strategy development of Pokja AMPL National. 

3  Output 3 Quality technical proposals (Program Memorandums), based on poor‐inclusive City Sanitation Strategies, developed and being implemented in at least 30 small‐ to medium‐sized cities, with municipalities playing the lead coordinating role. 

3.T1  Provide technical assistance and quality assurance to both locally funded and centrally co‐funded proposals arising from SSKs, and to their implementation. For works that can be funded by local government from their own resources or through the special allocation budget (DAK), technical preparation and implementation is a local government responsibility. In the case of larger works, these will normally be centrally co‐funded and designed and implemented by MPW. 

UC‐T Team‐SDI CBT 

Contributing to ongoing development of Manual for Public Private Partnership (PPP), in institution and financial aspects. 

 

3.T2  Ensure that program memoranda are pro‐poor, address the expressed needs of under‐served customers and work towards the national target of eliminating open defecation. 

UC‐T Team‐SDI Team‐A 

On‐going contribution in conceptual input of PMJK mainstreaming, promotion materials development for Program Memorandum and Implementation stages of PPSP. 

Contributed on drafting training modules for DMPSS. 

On‐going support to develop video scenario for MP’s advocacy and promotion materials.  

3.T3  Facilitate small‐scale municipal pilot projects to resolve key challenges identified in CSSs. 

UC‐T Team‐SDI 

 

4  Output 4 Technical and administrative guidelines and procedures for the preparation, financing and implementation of urban sanitation investments in small‐ to medium‐sized cities, developed or updated as necessary, are formally adopted and disseminated widely. 

4.T1  Ensure that municipalities/provincial Go‐vernments have all necessary standard documents for implementation of PPSP Stages: see 4.T1.1 ‐ 4.T1.3. 

UC‐T UC‐PMU All Teams CBT  

The guidelines of SPM (Minimum Standard Services) for sanitation is already stipulated by central government and to be followed‐up by Local Government to be applied in the implementation phase at local level. 

Ensured that municipalities and provincial governments have access through Web‐based provisions, to all necessary standard documents for city sanitation planning, especially in support the development of WBs and CSSs.  

See 2.T1.1 4.T1.1  Standard documents for City 

Sanitation Planning. UC‐T Team‐SSK  

Supported PMU in distributing all (ISSDP) manuals and guidance notes for SSK development; in addition posting on the PPSP website. 

Distributed and updated complimentary materials on Frequently Asked Questions (FAQ) and PPSP source/reference books to PPSP facilitators and PPSP stakeholders, especially on developing WB and CSS. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

21 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

4.T1.2  Standard documents for preparation of technical proposals (program memoran‐dum). 

UC‐T Team‐SDI  

 

4.T1.3  Standard documents for procurement and implementation. 

UC‐T Team‐SDI  

 

4.T2  Provide support in sector financing; see 4.T2.1 ‐ 4.T2.4. 

UC‐PMU UC‐IF CBT  

Prepared initial budget policy and investment policy for sanitation development.  

4.T2.1  Advocate for, and support government in the establishment of operational links between CSS formulation and access to finance for sanitation improvements 

UC‐PMU UC‐IF CBT 

Preparing and promoting the draft regulation of sanitation budget policy. 

4.T2.2  Clarify and communicate to local governments the available financing options and mechanisms. 

UC‐IF UC‐AE CBT 

 

4.T2.3  Advocate for, and support the development of an urban sanitation investment framework at national level. 

UC‐PMU UC‐IF 

Prepared and supported the draft of the implementation of INPRES regarding the obligation of all levels of government to share investment capital. 

4.T2.4  Document and disseminate nationally lessons learned from PPSP implementation and use lessons learned in advocacy to inform strategy and decision making at national level. 

UC‐PMU UC‐AE CBT  

Preparing and compiling the paper on lessons‐learned, to be presented at a special workshop. 

Supported in documenting up of success stories as communication materials for various communication channels including PPSP website and newsletter. 

5  Output 5 Systems are operational at national, provincial and city level for monitoring the progress of PPSP Implementation and outcome of new (urban sanitation) investments with particular reference to quality and equity 

5.T1  Assist with the design of a monitoring framework for PPSP and ensure that lessons learned from the monitoring information are used to inform national strategy and decision making. 

UC‐PMU Team‐ME 

Supported, together with Technical Team of Pokja AMPL, the setting of the National Information Centre (PIN). 

Established for about 80% the monitoring and evaluation system of PPSP. The system has been presented to Echelon 2, PMU and Directorate of Housing and Settlement of Bappenas, PIU‐T and Directorate of Settlement Sanitation, PIU‐IF. The system is also presented to other programmes such as WASAP‐E and INDII.  

Supported the upgrading of the sanitation part of the system from the programme level to the national level, in cooperation with WASAP‐E and under the direction of Bappenas. 

5.T2  Monitor the quality of PPSP activities to ensure quality of city planning process, as well as quality of the technical proposals (program memorandums), and the fostering of municipal ownership. 

UC‐T UC‐IF All Teams 

Established progress‐monitoring system (stage 1,2,3) and developed web based Monev system�(ongoing support). 

Established a regular feedback mechanism for the progress monitoring system (ongoing support). 

Implemented a progress monitoring system (ongoing support). 

Implemented a regular feedback mechanism for the progress monitoring system (ongoing support). 

• Developed capacity of members of PIU‐IF to 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

22 

No. of 

Output Key Task 

USDP Outputs and Key Tasks1 (Terms of Reference USDP) 

USDP2 Cell Team 

Program Institutionalization and Implementation3 

Activities and Results USDP 

monitor, evaluate, and develop strategic inputs in developing Pokja and ensuring financial support at provincial and local levels by regular mini coaching. 

Prepared draft TOR for workshop on quality assessment of WB and CSS to be financed by PIU IF.    

5.T3  Monitor the implementation of the CSS by the cities/regencies for the full range of activities prioritized by the CSS (e.g. including communication campaigns, pilot activities to improve O&M). 

UC‐T Team‐SSK Team‐SDI Team‐ME  

 

5.T4  Monitor the implementation of physical works and the outcome of new investments. (Small‐scale work will generally be managed by the municipality, with larger investments implemented by central government (via MPW). 

UC‐T UC‐IF Team‐SDI Team‐ME  

 

5.T5  Establish a system for monitoring of the technical quality of physical works being implemented (under DAK), as well as the effectiveness and equity of benefits related to these works. 

Team‐ME UC‐T  

 

 1    Outputs, Key Tasks (T) and Deliverables (D) as per USDP TOR relate to USDP support services towards PPSP 2   Principal Cells and Teams for particular tasks and Deliverables are indicated; in practice other Cells and Teams will also be 

involved 3   Deliverables relating to Program Implementation are presented in italics 4  Text between squared brackets indicate internal differences in specifications in TOR     5  Abbreviations: UC= USDP Cell; A=Advocacy (at PIU‐AE); E=Empowerment (at PIU‐AE); UC‐AE= USDP Cell at PIU‐AE;  

IF=Institutional and Finance (at PIU‐IF); T=Technical (at PIU‐T); KM= Knowledge Management; CBT=Capacity Building and Training; ADV=Advocacy; ME=Monitoring and Evaluation (MONEV); IP= Institutional Preparation; SDI= Studies, Designs, Implementation; QA=Quality Assurance; FIN= Finance   

�  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

23 

3 PLANNED ACTIVITIES FOR NEXT THREE MONTHS: APRIL‐JUNE 2011 

USDP is providing support services to PPSP. It operates in the context and in conjunction with PPSP. This chapter will therefore start with a section on the planned activities of PPSP during the next three months as perceived by USDP based on discussions with PMU and PIUs. PPSP is assumed to produce its own reports on planned activities as well as work plans for the participating Ministries.  

 3.1 PPSP program 

The activities planned by PMU and PIUs for PPSP for the period April‐June 2011 can be summarized as follows (for a more detailed listing of scheduled activities see Table 3.1): 

Regarding PPSP institutionalization: 

1. Completion of consolidation of work plans of PMU and PIUs for PPSP 2011 2. Internalisation  and formalisation of Program Management Manual 3. National workshop on city selection for batch 2012 4. Preparation and distribution of Circular Letter on PPSP participation to Local Government 5. Training on communication on management aspect for Provincial Pokjas 6. Preparation of next National Sanitation Convention (October 2011) 7. Update on investment policies in sanitation in support of Roadmap PPSP 

Regarding implementation of PPSP Stages: 

1. PFs/CFs recruitment and selection, and training of new PFs/CFs 2. Preparation and implementation of City Sanitation Summit X in Banda Aceh in collaboration with AKKOPSI 3. Finalisation of INPRES procedures and documentation for submission to the President  4. Selection and procurement of KMW and KMP, start‐up of contracts at national and provincial level  5. Distribution of the preparation of Regional Budget (APBD) 6. Provincial seminar on Regency/City networking. 7. Implement and apply simplified EHRA 

 3.2 USDP support for PPSP institutionalization and implementation 

In  the next  quarter  the  following main  support  activities  are  foreseen  for  each  of  the USDP  Cells  (for  a more detailed listing of scheduled activities see Table 3.1):  USDP Cell at PMU (Bappenas): 

1. To support the government, through the Pokja AMPL, in socialization of the INPRES regarding the accelerated of the development of human settlement sanitation and its stipulation by law (INPRES). 

2. Support and assist PMU, as well as the national working group for Water and Sanitation  (POKJA AMPL), on the framework of regionalization of the Pokja. 

3. Support and assist National Pokja AMPL to prepare the National Conference of Sanitation Development. 4. Continue to support PMU in carrying out activities in the context of knowledge management. 5. To support PMU in the guarding the implementation of Web‐based Monev. 6. To support PIU‐AE in carrying out the socialization of the legal and stipulated policy of PPSP. 7. Continue to support PIU‐AE in the preparation of the PPSP roll out program for 2012 cities in preparing SSK. 8. Continue to support PIU‐AE in facilitating its Ministry to assist AKKOPSI in conducting the first City Sanitation 

Summit in year 2011 that will be held in Banda Aceh. 9. To support PIU‐IF  in facilitating  its Ministry to prepare regulation as well as decree  in getting commitments 

for the setting up of the obligations of all level governments, as well as the community and private parties to allocate their investment budgets for the sanitation sector. 

10. Continue  to  support UC‐IF  in  facilitation  related  to  capacity  building  program  to  improve  the  quality  and professional services of all unit of PPSP institutions, and at selected Provincial Pokjas. 

In particular with regard to Team 6: 11. Further enhance the utilization of web based Monev system to develop CSS: promotion of SSK development 

phase. 12. Assess WB draft submitted by Pokja. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

24 

13. Promote Monev results to PMU and PIU leads through regular meeting initiation and sanitation web. 14. Regional consultation for WB drafts. 15. Site visit to selected cities and develop lessons learned at second quarter. 16. Assist as implementation of hub and coaching clinics. 

 

USDP Cell at PIU‐AE (Ministry of Health), including Team 1: 

1. Share and transfer knowledge to PIU‐AE team on implementation their roles and tasks. 2. Technical assistance and quality assessment of material/tools,  campaign, and promotions development  for 

PMU and other implementation team of PPSP. 3. Implementation of mainstreaming PMJK, Hygiene Promotions and Public Private Partnership aspects. 4. Develop and re‐produce materials and tools communications. 5. Assist PIU‐AE team in assessing WB, CSS and PM (content quality and ownership). 6. Develop  capacity  the members  of  PIU‐AE  to monitor,  evaluate,  and  develop  all  of  communications  and 

advocacy and empowerment of PPSP’s principals and mission (mini participative coaching). 7. Facilitate the improvement of institutional design of PIU‐AE. 8. Communications skill trainings and workshop for PPSP champions, agent advocacy and communicators. 9. Internalize  communication  principles,  advocacy  and  empowerment  skill/knowledge  implement 

studies/assessment and drafting SSK. 10. Assist PIU‐AE in using monitoring and evaluations system of PPSP. 11. Contribute  to  PIUs,  PMU  and  AKKOPSI  events  and  trainings  and  monitoring  quality  of  materials/tools 

communications. 12. Contribute  in  conceptual  preparation  and  design,  syllabus  of  capacity  building  for  communication,  and 

support implementation of training of trainers (TOT) of WBs and CSS for PMU and PIU team.    13. Provide inputs and support to UC PIU‐AE and other PIUs and PMU in organizing and implementing workshop 

at  national  and/or  regional  level  in  dissemination/socialization  PPSP  regulation  and  preparation  of  PPSP institutional at national, provincial and city/regency level. 

14. Support  UC  PMU  to  support  PMU  in  organizing  and  implementing  national  workshops,  trainings  and knowledge events. 

15. Support to UC PMU to make sure all produced manuals/tools; design and conceptual guidelines are properly disseminated and shared with relevant stakeholders. 

16. Provide  support  to  facilitator  2011  (CF/PF  and  technical  assistance  team)  in  a  number  of  trainings  and coaching.  

USDP Cell at PIU‐IF (Ministry of Home Affairs): 

1. Preparing Grand Design Capacity Building PPSP. 2. Improved the training modules based on ToT results.  3. Facilitate Trainers preparation meeting as a follow up of ToT of WB and CSS. 4. Prepare design, syllabus, and coordinate facilitation of training program implementation for KMW and KMP. 5. Prepare  design,  syllabus,  and  coordinate  facilitation  of  training  program  for  province  Pokja  on  facilitation 

development of WB, CSS and Memorandum Program Sanitation Sector (MPSS). 6. Prepare design and facilitate implementation of team building USDP, PMU and PIUs. 7. Evaluate training program PPSP 2011. 8. Provide input for draft INPRES PPSP. 9. Carry out  institutional mapping,  thematic training,  institution strengthening and Monev at 6 pilot province: 

South Sumatera, Central Java, East Java, Bali, west Kalimantan, and South Kalimantan. 10. Prepare guideline on institutional strengthening of province Pokja. 11. Provide support  in updating Guideline on  institutional preparation and  indication program activities of PPSP 

at local level. 12. Provide  support  on  socialization  of  circular  letter Minister  of Home Affairs  to  province  and municipalities 

selected for PPSP 2012 concerning Pokja preparation and budget allocation. 13. Prepare guideline on regulator and operator of sanitation sector. 14. Support update Guideline Source identification and Funding Mechanism sanitation sector. 15. Support to facilitate training program of Source identification and Funding Mechanism sanitation sector. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

25 

16. Addition: Prepare design, syllabus, and coordinate facilitation of training program for PF and CF on facilitation development of WB, CSS and Memorandum Program Sanitation Sector (MPSS). 

17. Provision  general  implementation  support  in  strengthening  organization  of  AKKOPSI  and  private  sector training centre. 

18. Support to facilitator recruitment. 19. Provide support to quality assessment of WB and CSS. 20. Support  in  development  of  Guideline  of  Program  Memorandum  for  institutional  and  financial  aspects 

(Guidance note). 21. Provide  support  the  guideline  on  institutional  strengthening  of  district  and  city  Pokja  in  program 

memorandum phase. 22. Prepare guideline on PPP (Public Private Partnership) for institutional and financial aspect. 23. Provide input on development and operation of web Training PPSP. 24. Make  sure  all  produced  manuals  and  guidelines  are  properly  disseminated  and  shared  with  relevant 

stakeholders. In particular for Team 2: 25. Carry  out  thematic  training  at  6  pilot  provinces:  South  Sumatera,  Central  Java,  East  Java,  Bali,  west 

Kalimantan, and South Kalimantan. 26. Continue to prepare guideline on institutional strengthening of province Pokja. 27. Provide  support  in updating  the guideline on  institutional preparation and  indication program activities of 

PPSP at local level. 28. Provide  support  the  guideline  on  institutional  strengthening  of  district  and  city  Pokja  in  program 

memorandum phase. 29. Provide input for draft INPRES PPSP. 30. Develop  strategic  inputs  to  the  Regulation  of Minister  of  Home  Affairs  in  emphasizing  compulsory  local 

budget support for PPSP implementation in local level. 31. Provide  support  on  socialization  of  circular  letter Minister  of Home Affairs  to  province  and municipalities 

selected for PPSP 2012 concerning Pokja preparation and budget allocation.  

USDP Cell at PIU‐T (Ministry of Public Works):   

1. Assist the preparation of TOR KMWs for KMW’s recruitment in 2012.  2. Assist in identifying and determining the needs of facilitators for PPSP 2012 (stage 3). 3. Review the related manuals and guidelines on CSS stage. 4. Provide regular coaching clinic to KMWs, indirectly CFs/PFs (at regional level). 5. Provide support to implement Quality Assessment of WB and CSS through panel forum. 6. Provide support in implementing Knowledge Event‐Priority Setting Approach on WB development. 7. Support and provide inputs on WB and CSS Regional Workshop (on regional basis and/or in selected cities). 8. Support to implement the Web‐based “Hub‐system”‐Question and Answer.  9. Finalizing and further refining the scope of activities and work plan for the provision of USDP support to the 

KMPs and PFs/CFs. 10. Continue  compiling  and  finalizing  supporting  documents  for  the  implementation  stage  related  to 

procurement,  contract  management,  construction  supervision,  quality  assessment  and  control  and monitoring and evaluation. 

11. Prepare TORs and Guidelines for coaching clinics to be organized to support and  improve the efforts of the KMPs and PFs/CFs 

12. Assist  PIU‐T with  the  identification  of  3  suitable  pilot  projects  and  the  selection  of  (possible  alternative) technology options. 

13. Continuous support to implement monitoring of PPSP (WB, CSS, PM development). 14. Assist  UC‐AE  with  the  effective  dissemination  of  all  completed  Manuals  and  Guidelines  to  relevant 

stakeholders. 15. Assist UC‐AE in support PIU‐AE in organizing workshop/road show to build the commitment of cities in their 

participation on PPSP 2012. 16. Coordinate  the  finalization  of  the  DEWATS  survey  and  effective  dissemination  of  the  conclusions  and 

recommendations. 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

26 

In particular for Team 3: 17. Assist the preparation of TOR KMWs for KMW’s recruitment in 2012.  18. Assist in identifying and determining the needs of facilitators for PPSP 2012. 19. Review the related manuals and guidelines. 20. Provide regular coaching clinic to KMWs, indirectly CFs/PFs (at regional level). 21. Provide support to implement Quality Assessment of WB and CSS through panel forum. 22. Provide support in implementing Knowledge Event‐Priority Setting Approach on WB development. 23. Support and provide inputs on WB and CSS Regional Workshop (on regional basis and/or in selected cities). 24. Support to implement the Web‐based “Hub‐system”‐Question and Answer.  25. Compile lessons learned and provide necessary feedback in improving the program. 26. Ongoing support to provide inputs to PFs/CFs performance monitoring tools/system. 27. Support in monitoring the WB and CSS development progress. 28. Ongoing support to provide inputs to update the FAQ re WB and CSS in the website. In particular for Team 45: 29. Finalizing and further refining the scope of activities and work plan for the provision of USDP support to the 

KMPs and PFs/CFs. 30. Continue  compiling  and  finalizing  supporting  documents  for  the  implementation  stage  related  to 

procurement,  contract  management,  construction  supervision,  quality  assessment  and  control  and monitoring and evaluation. 

31. Prepare TORs and Guidelines for coaching clinics to be organized to support and  improve the efforts of the KMPs and PFs/CFs. 

32. Prepare  TORs  and  Guidelines  for  workshops  to  evaluate  the  performance  and  output  of  the  KMPs  and PFs/CFs with  the  purpose  to  draw  lessons  learned  and‐if  so  required‐to  improve/modify  procedures  and implementation manuals and guidelines. 

33. Assist UC PIU‐T with the  identification of 3 suitable pilot projects and the selection of (possible alternative) technology options. 

34. Assist with the organization and delivery of such coaching clinics. 35. Assist  UC‐AE  with  the  effective  dissemination  of  all  completed  Manuals  and  Guidelines  to  relevant 

stakeholders. 36. Effective  sharing  of  knowledge  and  experience  with  PPSP  Phase  4  implementation  through  dedicated 

websites, mass media, workshops, seminars etc. 37. Coordinate  the  finalization  of  the  DEWATS  survey  and  effective  dissemination  of  the  conclusions  and 

recommendations. 38. Assist Team Monev with monitoring of the implementation of PPSP 4 and 5. 

 The planned PPSP activities and the USDP support activities during the next quarter (April‐June 2011) are further elaborated in Table 3.1 below. 

Table 3.1  PPSP Program Activities and USDP Support Activities scheduled for next quarter (April‐June 2010) 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No 

  PMU    USDP Cell at PMU (UC‐PMU)   

1  Support National Pokja AMPL as well as Steering Committee Team on finalization of the Draft of INPRES that now intends to address jointly the acceleration of the national programs for sanitation and water supply. 

The small team of Pokja AMPL 

Support and assist the input of legal language from related legal bureau of Ministries. 

Convincing to the Steering Committee member about the ready draft of INPRES to be transferred to the related Minister for having stipulation from the President. 

Having initiative to prepare a draft of the implementation of regulation of the INPRES. 

4.T1 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

27 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No 2  Networking with cities preparing 

SSK in 2012. PMU and PIUs  Support PMU and PIUs in terms of 

preparing and transferring the selection process to provincial level of government. 

Building a new network of provincial expertise in doing the city selection for participation in PPSP, starting from 2012. 

1.T1 

3  Networking with AKKOPSI.  The leaders and members of AKKOPSI 

Continuing to support AKKOPSI for the development of their institutional capacity of national secretariat through technical assistance. 

Continuing to support PIU AE and AKKOPSI for the preparation of the City Sanitation Summits for the year of 2011. 

Continuing to assist PIU‐AE and AKKOPSI in development of the concepts for a city sanitation rating system at national level. 

2.T2.3 2.T2.4 

4  Hands‐on capacity building and training for PMU and PIUs at national level. 

PMU and PIUs’ staffs 

Providing support to the development of capacity building and forming the mechanism of coordination and consolidation. 

2.T1 

5  Hands‐on capacity building and training for Provincial and City/Regency Pokjas. 

Selected Provinces and City/ Regency 

Continuing to support the development of training modules and resource persons. 

2.T1 

6  Support the implementation phase of Monev and further development of the web based system. 

All Pokjas at Provinces and City/regency 

Support and assist the other program in integrating the PPSP Monev to the WATSAN Monev that is coordinated by WASAP‐E. 

5.T5 

7  Support Pokja AMPL and PMU to develop proper data regarding obligations for the funding and investment planning at all levels of government. 

National Pokja AMPL  

Continue to support and assist the development of funding mechanism to support the effectuation of the ongoing policy and strategy through budget and investment policy.  

4.T2.3 

8  Further monitor use of web‐based Monev system and remove bugs found. 

  Continue to assist PMU in monitoring results of web‐based Monev and to support in developing the activities of National Information centre (PIN). 

 

9  Assess document quality of SSK 2011 cities, focusing on cities reporting to complete SSK documents in the web‐based Monev. 

  Manage quick assessment of SSK so as to enable continuation to PM Stage. Assist PMU to manage response to city Pokja. 

 

10  Executing recruitment of PPSP Facilitators (CFs/PFs) 2011. 

PPSP Facilitators 

Provide suport to prepare TOR of PFs/CFs, evaluation tools for CFs/PFs selection. 

1.T3 

11  Orientation and training to Provincial Pokjas. 

Provincial Pokjas 

Support in preparing draft TOR/proposal, training materials and facilitating/organizing the training.   

2.T2.1 

12  Training to the PPSP Facilitators  CFs, PFs  Support in developing TOR of training and support in facilitating/organizing the training. 

1.T3 

13  Kick‐off PPSP 2011 by orientation  Pokjas  Support in preparing draft  2.T.1.1 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

28 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No and training to Provincial and Municipal Pokjas. 

TOR/proposal and facilitating the delivery of training.   

14  Realise a national water and sanitation Monev system. 

  Support to the further development of national water and sanitation Monev system particularly on the sanitation part. Role of USDP will be to ensure that the PPSP module on sanitation is properly applied into the new system. 

 

15  Programme initiation at 56 cities.    Provide training to new cities, PF and CF in using the available Monev modules for SSK development as well as identified implementation.  

 

  PIU‐AE    USDP Cell at PIU‐AE (UC‐AE)   

1  National workshop on city selection for PPSP implementation 2012. 

Provincial Pokjas 

Support in preparing TOR, workshop materials, facilitating the workshop. 

1.T1.1 

2  City/District selection for PPSP 2012 & 2013 processes under responsibility of Provincial Governments (27‐27 April, 2011)  

Provincial Pokja/Government 

Conceptual event, materials and technical supports. 

 

3  Action plan for quarterly activities of PIU AE in developing materials and conceptual note for piloting pro poor campaign and gender mainstreaming with private and media involvement (June 2011)  

Serang and Bandung and was targeted for other Pokja’s  

Conceptual event, materials and technical support. 

 

4  City Sanitation Summit X  Banda Aceh (29‐31 May, 2011) 

63 Cities /Districts 14 Provinces and Central governments/ invitations 

Conceptual event, materials and technical support. 

 

5  PF/CF Training (18‐28 May 2011)  PF/CF candidates 

Support in communications, PMJK, Hygiene and PPP aspects. 

 

6  Joined facilitation on QA of “Buku Putih Sanitasi & SSK” 

QA Panel Team 

Technical assistance.   

7  Adjusted EHRA Implementation Trial 

PIU AE, Pokja Provinsi 

Capacity Building and Technical assistance. 

 

8  On‐Going preparation Konferensi Air & Sanitasi nasional (KASN) 

PMU/Pokja AMPL 

Member of Organizing Committee.    

9  Community participation and PPP Pilot Project on community based integrated solid waste processing.  

PIU AE, private sectors and Communities 

Facilitation   

 

10  Campaign and Strategic Communication training for PPSP’s Cities/Districts 

Pokja members of communication team 

Conceptual, materials and sources contributions (including sub‐sub modules of sanitation and hygiene communication strategy). 

 

  PIU‐IF    USDP Cell at PIU‐IF  (UC‐IF)   

1  Provide support to PIU AE on city selection. 

  Provide support on socialization of circular letter Minister of Home Affairs to provinces and municipalities selected for PPSP 2012 concerning Pokja preparation and budget allocation. 

1T1  

2  Verification of Governor decree for    Develop capacity members of PIU‐ 2 T1.1.6 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

29 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No provincial working groups and mayor decree for cities working groups and financial readiness of provinces and cities for PPSP.  

IF to monitor, evaluate, and develop strategic inputs in developing Pokja and ensuring financial support at provincial and local levels by regular mini coaching  (continuation from previous quarter). 

Provide support to implementation of monitoring and ensuring institutional and financial readiness of local government to engage in PPSP in the year 2011 and 2012 (continuation from previous quarter). 

  1 T1 

3  Strengthening the provincial and cities working group to be able to implement PPSP Program through guidance/visits to provincial and cities working groups.  

  Carry out institutional mapping, identify thematic training, institutional strengthening and Monev in 6 pilot provinces: South Sumatera, Central Java, East Java, Bali, West Kalimantan and South Kalimantan (continuation from previous quarter). 

Develop strategic inputs to the Regulation of Minister of Home Affairs in emphasizing compulsory local budget support for PPSP implementation at local level (continuation from previous quarter). 

Prepare guidelines on institutional strengthening of provincial Pokjas (continuation from previous quarter) 

Note: USDP will only visit the provincial level. 

2T1.1.6  

4  Prepare and agreed on tools for verification of institutional and financial readiness for province and cities working groups for implementation of PPSP Program 2011 and 2012  

  Provide support to implementation of monitoring and ensuring institutional and financial readiness of local government to engage in PPSP in the year 2011 and 2012 (continuation from previous quarter). 

Support in improvement of draft Program Management Manual of PPSP development (continuation from previous quarter). 

Develop capacity members of PIU‐IF to monitor, evaluate, and develop strategic inputs in developing Pokja and ensuring financial support to provincial and local level by regular mini coaching  (continuation from previous quarter). 

2 T1.1.6  5T2  

5  Quality assessment of WB and CSS in institutional and financials aspects. 

  Provide support to quality assessment of WB and CSS. 

5 T 1  

6  Finalization of draft INPRES PPSP Program. 

  Provide input if needed   1T1 

7  Provide guideline related to    Prepare guideline on regulator and  2T2.2 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

30 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No institutional development and financial aspects. 

operator of sanitation sector.  Support in development of 

Guideline of Program Memorandum for institutional and financial aspects (Guidance note). 

Provide support for the guideline on institutional strengthening of district and city Pokjas in program memorandum phase. 

Prepare guideline on PPP (public private partnership) for institutional and financial aspects. 

8  Training for Provincial Pokjas on facilitation PPSP, for KMW and KMP. 

  Preparing Grand Design Capacity Building PPSP. 

Improve the training modules based on TOT results. 

Facilitate Trainers preparation meeting as a follow up of TOT. 

Prepare design, syllabus, and coordinate facilitation of training program for province Pokja on facilitation development of WB, CSS and Memorandum Program Sanitation Sector (MPSS). 

Prepare design, syllabus, and coordinate facilitation of training program implementation for KMW and KMP.  

Prepare design and facilitate implementation of team building USDP, PMU and PIUs. 

Evaluate training program PPSP 2011. 

Provide input on development and operation of web Training PPSP. 

2 T1  

9  Support to PIU‐T on recruitment and training of PF and CF. 

  As member of team recruitment PF and CF. 

Prepare design, syllabus, and coordinate facilitation of training program for PF and CF on facilitation development of WB, CSS and Memorandum Program Sanitation Sector (MPSS). 

1 T3  

10   Provide guideline Source identification and Funding Mechanism sanitation sector 

  Support update Guideline Source identification and Funding Mechanism sanitation sector. 

 Support to facilitate training program of Source identification and Funding Mechanism sanitation sector. 

2 T2.2  2.T1  

  PIU‐T    USDP Cell at PIU‐T  (UC‐T)   

1  Organize the secretariat PIU‐T to prepare the smooth implementation of PPSP in the year 2010 – 2014 (as follow up to the SK of PIU‐T by DG of Cipta Karya) to effectuate the PIU‐T’s roles and tasks. 

PIU‐T  Continued discussions with Directorate of Environmental Sanitation regarding operational PPSP issues, and 

manning of the PIU‐Technical; assist PPLP and PIU‐T in further 

internalizing the commitments and requirements from MPW for the 

2.T1.1 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

31 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No successful implementation of PPSP. 

2  Organize/Facilitate the panel to assess the quality of SSKs. 

Municipal Pokjas 

Provide support to internalize the QA tools to PIU‐T’s Panel Team to assess the quality of SSKs for the technical aspect. 

1.T4 

3  Executing tender process of KMWs recruitment (for SSKs development 2011) started in January 2011.  

KMWs PPSP 2011 

Provide support to ensure TOR of KMW (consultants for SSKs and MPs facilitation) has been properly developed and updated for processing tender in the year of 2011 (the tender process is ongoing and will be finished in the end of May 2011). 

1.T3 

4  Executing tender process of KMPs recruitment (for PM development) at the provincial level by the Provincial PU Satker. 

KMPs PPSP 2011 

Provide support to PIU‐T in developing KMP’s TOR and update (consultants for PM development). 

 

5  Prepare the budget proposal for PPSP implementation in 2012. 

PIU‐T  Provide support in developing KMW’s and KMP’s TOR for PPSP implementation 2012. 

1.T3 

6  Support PMU in  organizing/facilitating the recruitment of PFs/CFs. 

PFs/CFs of PPSP 2011 

Develop performance evaluation tools for evaluating existing facilitators and develop evaluation tools for recruitment the new facilitators. 

1.T3 

7  Support PMU in organizing/facilitating the training to CFs/PFs. 

PFs/CFs PPSP 2011 

Support in developing TOR of training and support in facilitating the training. 

 

1.T3 

8  Mobilize the KMWs.  Experts/Specialists of KMWs PPSP 2011 

Support in preparing orientation and training to Experts/Specialists of KMWs.  

1.T3 

9  Organise/Facilitate training to KMWs. 

Experts/Specialists of KMWs PPSP 2011 

Provide support in preparing TOR, training materials, organizing the training for KMWs Experts/specialists. 

1.T3 

10  Support KMWs/PFs and CFs in facilitating Provincial Pokjas and City Pokjas. 

KMWs, CFs, PFs 

Coaching clinics to KMWs Provide guidance and support to 

KMWs, CFs, PFs through HUB System/Help‐desk. 

1.T4 

11  Review the WBs and CSS Manual.  PIU‐T  Provide support in desk review and observation on the utilization of the Manual B and Manual C at city level. 

1.T1.2 

12  Province wise consolidation of the scope of work related to identified additional studies and designs for cities that are eligible to continue with PM phase. 

PIU‐T  Assist the city Pokjas concerned with finalizing Draft Program Memorandum in 9 cities (former ISSDP + Banda Aceh and Pekanbaru). 

Assist with assessing completion status of SSKs in 41 cities (2010 PPSP Batch) in order to determine scope of work for completion of SSK and preparation of DPM by KMPs covering 10 provinces/32 cities and the KMWs covering 4 provinces/9 cities. 

3.T.1 

13  Delegation of KMP procurement, contract management and 

Prov. Satkers  Consolidate mechanism and seek consensus with PIU‐PU to provide 

2.T.1 3.T.1 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

32 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No monitoring & evaluation of the PM Phase to Provincial Satkers. 

assistance to the offices of the Provincial Satkers in KMP procurement, contract management, quality assessment for which training programs will be developed. 

14  Tendering and recruiting KMPs (including PM City and Provincial Facilitators) for 2011 PPSP program. 

KMP  Assist with tendering process, including public consultations, tender evaluation and contracting as requested. 

Assist with preparing detailed task descriptions of those CFs and PFs (recruited to facilitate preparation of BP and SSK) with additional responsibilities to support 9 cities with finalizing the SSK and preparing the Draft Program Memorandum. 

3.T.1 

15  Ensure that KMPs follow standard procedures in preparing a Draft PM. 

PIU‐T KMP Pokjas 

Submission, processing of comments from PIU‐T and finalization of Manual and Guidelines for the preparation of a Draft Program Memorandum. 

Finalize related training material for training of City and Provincial Facilitators and consultants mobilized under KMP contract on proper use of the Manual and Guidelines and quality of the DPMs. 

Assist with the delivery of the training. 

Finalize the development of effective and measurable indicators to assess quality of DPM. 

Seek consensus with PIU‐PU on the procedures to monitor preparation, completeness and effectiveness of Draft PM, obtain feed back to ensure refinement of procedures, manuals and guidelines and general quality of the document produced. 

Prepare a work plan and TOR for coaching clinics aimed to provide support to the City/Regency Pokjas, Provincial Satkers, KMPs and Facilitators and PIU‐T in getting feed back on the implementation procedures and effectiveness of Manuals and Guidelines with the aim to obtain feed back and lessons learned as input for improving the Manuals and Guidelines. 

2.T.1 4.T.1 (4.T.1.1, 4.T.1.2 and 4.T.1.3) 5.T.1 

16  Ensure that KMPs follow standard formats for master planning, feasibility studies and detailed engineering designs. 

PIU‐T KMP Pokjas 

Initiate and finalize preparation of a Manual and related Guidelines to support the planning and implementation of the required 

2.T.1 4.T.1  (4.T.1.1, 4.T.1.2 and 4.T.1.3) 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

33 

No.  PPSP Program Activities       Scheduled for next three months  Target Group 

USDP Support Activities  through USDP Cells and/or Teams Scheduled for next three months incl.  General Support Services 

USDP  Activities 

Corresponding  to  

TOR section No additional studies and detailed engineering designs. 

Finalizing Manual and Guidelines (including translations) for the preparation of Master Plans, Feasibility Studies (for 3 sub‐sectors), AMDAL and LARAP and Detailed Engineering Designs. 

5.T.1 

17  Organize/Facilitate a panel to assess the quality of DPM and the identified Master Plans, Feasibility Studies, AMDAL+LARAP and Detailed Engineering Designs. 

Pokjas KMP 

Provide continued support to assess the quality of DPM and Studies and Designs through a Pannel Forum on Quality Assessement  and Quality Assurance of documents prepared under PPSP. 

5.T.2  

18  Develop standard procedures and standard documents for procuring works, goods and services under PPSP Phase 5. 

PIU‐T  Continue preparation of standard procedures and documents for procuring works, goods and services under PPSP Phase 5. 

4.T.1  (4.T.1.1, 4.T.1.2 and 4.T.1.3)  

19  Contract management, construction supervision, quality assessment and control of works and goods contracts, including commissioning procedures under supply and installation of goods contracts. 

PIU‐T  Start developing standard procedures, manuals and guidelines related to contract management, construction supervision, quality assessment and control of works and goods contracts, including commissioning procedures under supply and installation of goods contracts. 

4.T.1  (4.T.1.1, 4.T.1.2 and 4.T.1.3) 5.T.2 

20  Contract management, quality assessment and control of service contracts. 

PIU‐T  Start with developing standard procedures, manuals and guidelines related to contract management and quality assessment and control of service contracts. 

4.T.1  (4.T.1.1, 4.T.1.2 and 4.T.1.3) 5.T.2 

21  Measure the quality of SSK documents from 41 cities.  

  Support panel team of PPSP in measuring the submitted documents.  

Support panel team of PPSP in internalising the process of QA within the PPSP system. 

 

 

3.3 Quarterly bar charts of activities for PPSP and USDP 

The bar chart of activities for the period April‐June 2011 for PPSP, as prepared by USDP for the PMU and PIUs from available information, is presented in Figure 3.1. The bar charts of activities for the four USDP Cells for the period April‐June 2011 are presented in Figure 3.2 u/i Figure 3.5.    

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

34 

 

Figure 3.1  Bar chart of activities for PPSP 

  

2010

Decem

ber

Janu

ary

Februa

ry

March

April

May

June

July

August

Septem

ber

Octob

er 

Novem

ber

Decem

ber

A PMUA.1 Consolidation of the PMU & PIUs work plan related to the implementation of 2011 PPSPA.2 Preparation of syllabus and orientation materialA.3 Advocacy at decision maker levelA.4 Advocacy mass media for PPSP promotionA.5 Conduct the 2011 program management workshopA.6 Training on PMM for Provincial Pokjas (including Monev web‐based)A.7 Issue the Appointment Letter of 2012 PPSP to Regency/City in each Province

A.8Conduct the Orientation of PMU and PIUs re the preparation of White Book and SSK (including Monev web‐based) workshop

A.9 Conduct the Orientation of PMU and PIUs re the preparation of White Book and SSK workshopA.10 Agreement on QA tools of  White Book A.11 Launch the 2010 PPSP's ReportA.12 Training PMU and PIUs re PPSP Monev system 

A.13 Assessment on Monev result of the PPSP's Implementation 1st QuarterA.14 Training on adult learning methods and facilitation technics A.15 Training on communication management aspect for Provincial Pokja

A.16 Assesment on Monev result of the PPSP's Implementation 2nd QuarterA.17 Practice of  White Book QA mechanismA.18 Conduct the mid year evaluation of PPSP implementation workshopA.19 Agreement on QA tools of SSK

A.20 Assesment on Monev result of the PPSP's Implementation 3rd QuarterA.21 Training media relation for TTPS (PAN)A.22 Practice of SSK QA mechanismA.23 Conduct the end of year evaluation of PPSP implementation workshopA.24 Distribute the assesment result for White Book and SSK QA, with Action Plan for Regency/City to ProvinceA.25 Report writingA.26 Launch the 2011 PPSP's Report

A.27 Assesment on Monev result of the PPSP's Implementation 4rd QuarterA.28 Conduct the end of year evaluation of PPSP implementation workshop

B PIU‐AEB.1 Conduct small team meeting on city selection criteria B.2 Conduct meeting on provincial selection for the 2011 PPSP participantsB.3 Conduct Provincial seminar on Regency/City networkingB.4 Assesment of the additional criteria from each ProvinceB.5 Conduct small team meeting to identify material requirementB.6 Preparation and production of materialB.7 Dissemination communication and advocacy materialB.8 Preparation and absorption verification toolB.9 Assistance (roadshow) at Provincial level

B.10Conduct training for Provincial Pokja on White Book and SSK assesment related to communication, community empowerment and private sector

B.11Conduct PMU and PIUs orientation workshop on QA for communication aspects, community empowerment, gender and poor inclusive, as well as private sector for White Book and SSK

B.12 Conduct meeting on provincial selection for the 2012 PPSP participantsB.13 Conduct Provincial seminar on Regency/City networking

C PIU‐IFC.1 Verification at the Governor or Regent/Mayor Decree regarding Pokja formationC.2 Assistance (visit) Provincial Pokja in order to Strengthening the Institutional and Budgeting PlanC.3 Preparation and agreement verification toolC.4 Finalisation Draft Presidential Decree PPSP ProgramC.5 Consolidation of the institutional and budget plan statusC.6 Conduct training for Provincial Pokja on White Book and SSK  assesment related technical aspect C.7 Conduct PMU and PIUs orientation workshop on QA Institutional and Financial aspect within White Book and SSKC.8 Distribution of the preparation of Regional Budget (APBD) Permendagri C.9 Distribution the Ministry of Home Affair Circular Letter regarding regional PPSP Implementation C.10 Distribution the Institutional Preparation and Indicative ActivitiesC.11 Conduct Provincial seminar on PPSP implementation

D PIU‐TD.1 Issue KMW and KMP assigment letter by TTPSD.2 Preparation of the tools and performance assesment mechanism D.3 Conduct KMW and KMP orientation workshop (TA coaching for KMW and other aspects)D.4 Conduct KMW and KMP orientation workshop for the implementation of EHRAD.5 Training Provincial Pokja on the White Book and SSK assesment related to technical aspectD.6 Conduct PMU and PIUs orientation workshop on QA Technical aspect within White Book and SSKD.7 Training Provincial Pokja on the EHRA study implementationD.8 Assesment on KMW performance

E Provincial PokjaE.1 Conduct Pokja internal meeting to set up the additional criteria for networkingE.2 Conduct regency/city networking interest workshop at Provincial levelE.3 Submission of Provincial Proposals

F City PokjaF.1 Develop EHRA and White BookF.2 Develop SSKF.3 Public consultation SSK

PPSP Workplan 2011

PPSP Stages/Activity DetailsNo.

2011

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

35 

Figure 3.2  Bar chart of Activities of USDP Cell at PMU    

Bar Chart of Activities for the USDP Cell at PMU 

1 2 3 4

OUTPUTS

PMU

AE IF T 1 2 3 45 6

January

February

March

April

May

June

July

August

Septem

ber

October

Novem

ber

Decem

ber

1.1. Support the government to provide the national policy and strategy of the urban sanitation development and its sustainable of the implementation,

Support and assist the government through POKJA AMPL in guarding the implementation of RPJMN and MDG's S L S

Support the government in final drafting of new national policy and strategy  addressed to the PPSP and its stipulation by law (INPRES) S L S

Support and assist PMU and PIU Cell‐AE to develop strategy communication for the socialization of the legal and stipulated policy of PPSP L S S S

Support the government, through the POKJA AMPL,  in socialization of the INPRES of PPSP and its stipulation by law (INPRES) L S S

Support PIU Cell‐AE in carrying out the socialization of the legal and stipulated policy of PPSP L S SSupport the POKJA AMPL,  in preparing the guidelines for the implementation of the INPRES of  PPSP L S S S

Facilitate and assist National POKJA AMPL to prepare the National Conference of Sanitation Development S L S

Facilitate and assist PMU in preparing the decree of the obligations of the investment budget L S

Support PIU Cell‐IF in facilitating its Ministry in dissemination of the decree regarding the setting up of the obligations of the investment budget L S S S

Facilitate PMU and assist PIU of AE providing networking with AKKOPSI for the preparation and conducting of City Sanitation Summits L S S

Support the development of Sanitation Technical Team institution at AMPL institution. 

Support advocacy and communication strategy development at the central level PPSP C L S S

Support the implementation of the national sanitation policy and strategy L S S S

Support the preparation of policy initiatives and sanitation strategy L S S S

Support the preparation of the sanitation standardisation development plans C S L S

1.2. Support and assist the government through POKJA AMPL and PMU the continuous collaboration among the POKJA’s divisions in more intensive ways of coordination and communication, with high quality performance,Support and assist PMU and PIUs to establish new strong organization and its network, functional operation and its professional human resource involvement, L S S

Support and assist PMU, as well as the national working group for Water and Sanitation (POKJA AMPL), the framework of regionalization of the POKJA, L S S

Support PMU to convince the well establishment of institutional set up of the local POKJA of AMPL in the framework of regionalization of the POKJA, L S S

Support and assist PMU in the need of HRD and the applying the multidiscipline experts to perform the quality of services L SSupport and assist PMU as well as PKJA AMPL in the development and implementation of communication strategy, L S

Support and assist PMU in carry out issues in the context of knowledge management, L S

Support PMU and PIU of AE providing networking with AKKOPSI for the development of their institutional capacity building,  L S S

Support PMU and PIU of AE in the development and implementation of the concept of city sanitation rating at national level, L S S

Support in the implementation of MTM to coordinate and consolidate PPSP institutional  L S

Support institutional development of sanitation technical team on institutional of AMPL C S L S

Support capacity building of PMU and related agencies in the implementation of PMM PPSP C S L S

Support the implementation of MTM in the implementation of coordination and consolidation of institutional PPSP C S L S

1.3 Support the development and implementation of a complete MONEV system and assist the operation for the full period of the project

Specific support to Team‐6 in implementation of MONEV system and further effective utilization of the web based system L S L

Assist PMU in the applying system of Web‐based MONEV. L S L

Assist PMU and PIU‐IF in developing web‐based Training Center administration/management S L S S

Support the establishment of national standards for the development and implementation of monitoring and evaluation system AMS L S S S

2.1 Support government (POKJA AMPL/PMU and PIUs) in annual process of city selection  

Advocate the involvement of POKJA AMPL in city selection S L S

Support the preparation and implementation of city selection workshop S L S

Support PMU in providing input to municipal selection conducted by provinces L S S S

Provide consideration to determine cities to be selected on PPSP 2012  L S S

Facilitate PMU in supporting sosialization of "Surat Edaran" L S SDevelop PFs/CFs performance monitoring system L S S S

Provide input to facilitator recruitmen plan; including input for facilitator training sylabus S L S

Facilitate PMU in supporting the selection of facilitator for PPSP 2012 L S S

Facilitate PMU in supporting facilitator training by providing the latest PPSP material  S L S

Support PMU in coordinating the follow up activity to increase the capacity of the existing facilitator L S S

Support PMU in providing input to institutional readiness monitoring L S S

Provide consideration for PMU on the follow up the result from institutional readiness monitoring L S S S L

Assist in identifying information on activities related to city selection and status readiness to be taken into PPSP Website L S S L

Support the implementation of regional roadshow for institutional preparation of PPSP 2011 S L S

Assist to communicating cities selection and status readiness through PPSP website (www.sanitasi.or.id) S L S S

Assist in maintaining and updating website related to city selection process S S S S L

Support for the implementation activities of the national agenda   L C S S

KEY TASKS AND ACTIVITIES

1. Major task to assist in all issues relevant to the development of active and sustainable entities at the  four participating Ministries handling PPSP institutional aspect.

USDP SUPPORT:   USDP CELL  at PMU Roles: Lead (L)/Supporting(S)USDP‐CELLS TEAMS

2011

2. Large number of cities are mobilised to develop poor‐inclusive City‐wide Sanitation Strategy

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

36 

1 2 3 4

OUTPUTS

PMU

AE IF T 1 2 3 45 6

January

February

March

April

May

June

July

August

Septem

ber

October

Novem

ber

Decem

ber

2.2 Review and streamline the CSS process to enable scalling up the CSS while maintaining quality and local ownershipReview Practical Guideline needed S S L

Technical support to get TTPS approval on final draft of all manual needed, if any L S S

Maintain and complete the monitoring system on CSS development conducted by municipal L S S

Support the coordination of White Book and CSS evaluation S S L

Advocate TTPS to be involved in White Book and CSS public consultation S S L

Support the implementation of SSK Preparation Learning Forum (lesson learned) L S S

Deliver every latest manual/guideline/practical guideline into website L S S L

Assist in maintaining and updating website related to SSK preparation L S S L

UC‐AEReview and completed the White Book and CSS guideline/manual regarding communication, PMJK and private sector involvement aspects S L

Develop practical guideline, as needed S L

Support the White Book and CSS monitoring regarding communication, pmjk, and private participation aspects S L

Provide inputs to update the FAQ on website based on  PPSP lesson learned 2010 S L

UC‐IFReview White Book and CSS guideline and manual regarding strategic planning, institutional, and financial aspects S L

Review and complete the facilitating manual for facilitator S L

Support the White Book and CSS monitoring regarding institutional and financial aspects S L

Provide inputs to update the FAQ on website based on  PPSP lesson learned 2010 S L

UC‐TReview White Book and CSS guideline and manual regarding technical aspect S L

Support the White Book and CSS monitoring regarding technical aspect S L

Provide inputs to update the FAQ on website based on  PPSP lesson learned 2010 S L

2.3 Train PFs/CFs via TOT and provide coaching and facilitation regarding planning process and product Identify national/regional learning institution to serve as resources center(s) for the training and facilitationSupport the coordination of TOT S L

Assist in providing training material regarding PPSP in general (including the latest progress in PPSP) S L

Ensure all related material, manual, practical guideline available for PF/CF training S L

Assist in developing web‐based Training Center administration/management L S

Support to identify intitution/local entity to be the EHRA implementor and data management S L

Support the consolidation with related training center (at MPW and MOHA) L S

2.4 Provide guidance and support to CFs and PFs to ensure that CSS are of a high quality, poor inclusive and lead to action plans for pro‐poor investmentsAssist PMU in monitoring the performance of PF and CF regularly monitored as well as provide coaching when necessary S L

Develop web‐based "hub‐system" in order to support CFs and PFs S L

Support the hub‐system implementation S L

Collect, documentation, and distribute lesson learned from PPSP cities  L S

3.1 Ensure the technical capacity of PMU/ PIUs and a high quality technical assistance to PFs/CFs and Pokjas (indirectly) including assistance from specialist consultantSupport PMU in coodinating TNA to PMU/PIUs member S L

Advocate the importance of PPSP training to all PMU/PIUs member S L

Develop specialist consultants database S L

3.2 Assist PMU and PIU with ongoing support and guidance to all cities in the PPSP via : website, making available guidance note, manuals, and other advisory material, networking events and national or regional workshops ensuring close cooperation and good coordination with other projects and programs in urban sanitation sectorAssist PMU and TTPS to coordinate with other urban sanitation programs L S

Maintain and update USDP website (public and internal user) L S

Maintain and update PPSP website due to www.sanitasi.or.id L S

Support in desaigning and assist implementation of the workshop or knowledge sharing event (learning forum) L S S

Support the establishment of "communication forum" for coordinating with other urban sanitation sector projects and programs L S S

Compile lessons learned and training material for workshops  / knowledge sharing events L S

USDP SUPPORT:   USDP CELL  at PMU Roles: Lead (L)/Supporting(S)USDP‐CELLS TEAMS

2011

3. Municipalities have access to skilled human resources for sanitation advocacy, planning, and the formulation and implementation of technical proposal

KEY TASKS AND ACTIVITIES

 Bar chart of Activities of USDP Cell at PMU (Cont’d)    

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

37 

1 2 3 4

OUTPUTS

PMU

AE IF T 1 2 3 45 6

Janu

ary

Februa

ry

March

April

May

June

July

Augu

st

Septem

ber

Octob

er

Novem

ber

Decem

ber

4.1 Provide technical assistance and quality assurance to both locally funded and centrally co‐funded proposals arising from SSKs, and to their implementation

Support to coordinate the development of guideline/manual/practical guideline needed L S S

Deliver guidelines/manuals/practical manual related to program memoranda into PPSP website L S S

Support the facilitation of sorting SSK programs into funding resources S L

Support PMU in consolidating/channeling the program memoranda to central funding  S S L

4.2 Ensure that program memoranda are pro‐poor, address the expressed needs of under served customers and work towards the national target of eliminating open defecationSupport the coordination of review SSKs that will be taken into program memoranda S S L

4.3 Facilitate small‐scale municipal pilot project to resolve key challenges identified in SSKSupport the facilitation of small‐scale municipal pilot project S S L

Support to consolidate the selection of pilot project S S L

5.1 Ensure that municipalities and provincial governments have all necessary standard documents, for city sanitation planning, preparation of technical proposal / program memoranda, procurement and implementationSupport the coordination of implementation stages S S L

Deliver all standard document for program memoranda and implementation into PPSP website S S L

5.2 Advocate for, and support government, in the establishment of operational links between SSK formulation and access to finance for sanitation improvement; clarify and communicate to local governments the available financing options and mechanism, advocate for, and support the development of an urban sanitation investment framework at national level, document and disseminate nationally lessons learned in advocacy to inform strategy and decision making at national levelDevelop  the program memoranda and implementation preparation progres report periodically S S L

Advocate related ministries about the importance to make SSKs as major requirement in urban sanitation development program L S

Advocate private sector and donors about the importance to make SSKs as major requirement in urban sanitation development  L S

Provide input on sylabus and implementation of program meoranda and implementation training for TTPS S S L

Assist PMU to develop "A Case Study Book" L S S

6.1 Design of a monitoring framework for PPSP and ensure that lesson learned are used to inform national strategy and decision makingDevelop PPSP monitoring and evaluation system  L S L

Select lesson learned of PPSP progress during 2010 ‐ 2012 in updating the PPSP website L S

Select lesson learned of PPSP progress to be published through Percik or other publication L S

Support knowledge management L

6.2 Monitor the quality of PPSP activities to ensure quality of city planning process, as well as the program memoranda and fostering of municipal ownershipDevelop monitoring systems to ensure that a holistic approach to sanitation improvement is maintained at the implementation stage L S S L

6.3 Monitor the implementation of the CSS by the cities/regencies  for full range of activities prioritized by the CSS

Develop monitoring system on absorption of SSK program in the city planning process S S L

6.4 Monitor the implementation of physical works and the outcome of new investments (small scale work will generally be managed by the municipality, with larger investments implemented by central government via MPW)

Develop LFA to tracking the outcome of physical works S S L

Deliver approved LFA into PPSP website S S L

Develop evaluation and monitoring system based on the LFA S S L

6.5 Establish a system for monitoring of the technical quality of physical works being implemented (under DAK), as well as the effectiveness and equity of benefits related to these worksDevelop monitoring system for implementation under DAK L S S L

Develop system for outcome monitoring of investments under DAK in terms of effectiveness and equity of benefit L S S L

* L=Lead role S=Supporting Role

5.Technical and administrative guidelines and procedures for the preparation, financing  and implementation of urban sanitation investments developed or updated as necessary, are formally adopted and disseminated widely

6. Systems are operational at national, provincial and city level for monitoring the progress and outcome of new (urban sanitation) investments with particular reference to quality and equity

4. Quality technical proposals, based on poor‐inclusive SSKs are developed and being implemented with municipalities playing the lead coordinating role

KEY TASKS AND ACTIVITIES

USDP SUPPORT:   USDP CELL  at PMU Roles: Lead (L)/Supporting(S)USDP‐CELLS TEAMS

2011

Bar chart of Activities of USDP Cell at PMU (Cont’d)  

�  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

38 

Bar chart of Activities of USDP Cell at PIU‐AE

1 2 3 4

OUTPUTS

PMU

AE IF T 1 2 3 45 6

Janu

ary

Februa

ry

March

April

May

June

July

Augu

st

Septem

ber

Octob

er

Novem

ber

Decem

ber

1.1 Support government (TTPS/PMU and PIUs) in annual process of city selection

Support PIU Advocacy and Empowerment to coordinate the districs/cities selection process  C L S S L S S

Coordinate support to provide advocacy and communication materials and tools needed in city selection process C L S S L S S

Support PIU Advocacy and Empowerment in developing general criteria of criteria for PPSP 2012 district/city targeted C L S S S S S

Support PIU Advocacy and Empowerment in monitoring the municipal selection conducted by provinces S L S S L S S

Support PIU Advocacy and Empowerment in facilitating the additiional province or municipal, if any S S S S L S S S S

Support the advocacy and campaign materials and tools for socialization of "Surat Edaran" C L C S S C S S S

Provide input to facilitator recruitmen plan; including input for facilitator training sylabus S C L S

Provide input to PFs/CFs performance monitoring system S S S S L

Facilitate PIU AE in facilitator training by providing advocacy, communication, PMJK and private sector promotion materials S L S S S S S

Provide advocacy and communication material to institutional readiness monitoring events L C S S L

1.2 Review and streamline the CSS process to enable scalling up the CSS while maintaining quality and local ownership

Review Practical Guideline needed L S S S S S

Technical support to get TTPS approval on final draft of all manual needed, if any L S S S

Maintain and complete the monitoring system on CSS development conducted by municipal L S S S S L

Support the coordination of White Book and CSS evaluation C S S L S S S S L

Advocate TTPS to be involved in White Book and CSS public consultation L C S S C S

Support the implementation of SSK Preparation Learning Forum (lesson learned) L C S S C S

Deliver every latest manual/guideline/practical guideline into website L C S S S

Assist in maintaining and updating website related to SSK preparation L S S S C S

1.3Train PFs/CFs via TOT and provide coaching and facilitation regarding planning process and product Identify national/regional learning institution to serve as resources center(s) for the training and facilitationSupport training preparations, and content of communications, PMJK and private sector participation aspects S L S S

Provide materials and tools of training as needed C L C C S S S S S

1.4 Provide guidance and support to CFs and PFs to ensure that CSS are of a high quality, poor inclusive and lead to action plans for pro‐poor investments

Support the White Book and CSS monitoring regarding communication, pmjk, and private participation aspects S L S S C

Support "hub‐system" implementation regarding communication, PMJK, and private sector participation aspects C L S S C

2.1Ensure the technical capacity of PMU/ PIUs and a high quality technical assistance to PFs/CFs and Pokjas (indirectly) including assistance from specialist consultantKnowledge transfer to PIU AE regarding communication, PMJK, and private sector participation aspects L C S S S

Develop promotion and advocacy event for program memoranda S L S C C S

2.2Assist PMU and PIU with ongoing support and guidance to all cities in the PPSP via : website, making available guidance note, manuals, and other advisory material, networking events and national or regional workshops ensuring close cooperation and good coordination with other projects and programs in urban sanitation sector

Contributing to advocacy, communication and social campaign materials in PPSP website as tool for PPSP stakeholders C L C C S S S S S

Develop practical guidance and act as trainer/resource person in pmjk campaign training, both theoritical and practical training  S L C S

Support in providing and developing display, sanitation campaign material and distribution materials in sharing event C L S S S S S S S

Support PMU's knowledge management to conduct knowledge event regarding PMJK and hygiene promotion and sanitation at national level L C S S

Support PMU's knowledge management to conduct knowledge event regarding public private partnership issues L S S S

Support implementation of City Summit and Rembuk Sanitation National event L C S S S S S S S

Maintain the relationship with other program/projects through meetings and advocacy/communications event participation/support L C S S

Strengthen sanitation stakeholders in partnership, alliances and networking, including the media circle in national and local level L C S S

1. Large number of cities are mobilised to develop poor‐inclusive City‐wide Sanitation Strategy

KEY TASKS AND ACTIVITIES

2011Roles: Lead(L)/Supporting(S)USDP‐CELL TEAMS

USDP SUPPORT:   USDP CELL  at  PIU ‐ AE

2. Municipalities have access to skilled human resources for sanitation advocacy, planning, and the formulation and implementation of technical proposal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3.3  Bar chart of Activities of USDP Cell at PIU‐AE 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

39 

1 2 3 4

OUTPUTS

PMU

AE IF T 1 2 3 45 6

Janu

ary

February

March

April

May

June

July

August

Septem

ber

Octob

er

Novem

ber

Decem

ber

3.1 Provide technical assistance and quality assurance to both locally funded and centrally co‐funded proposals arising from SSKs, and to their implementation

Support the facilitation of sorting SSK programs into funding resources C C L S L S

Provide program memoranda training material, regarding social and private funded program S C L S

Support the implementation of program memoranda for PFs and CFs S S S L S L S

Support the facilitation of program memoranda preparation under UC‐T coordination S S S L L

Support the consolidation of program memoranda that funded by society and private S S S L L

Support the facilitation on revising the program memoranda funded by society and private S S S L L

3.2Ensure that program memoranda are pro‐poor, address the expressed needs of under served customers and work towards the national target of eliminating open defecationSupport the review of SSK focusing on the program in the area of under served customer L C C

3.3 Facilitate small‐scale municipal pilot project to resolve key challenges identified in SSK

Provide advocacy, communication, and campaign material for project preparation S C L S L S

Facilitate the social marketing and mobilization, also community preparation for the implementation of the pilot project S L S C C

Provide "pilot project " for model of solution and best practices of 3 sub sector (waste water, solid waste and drainage)     S L C S L

4.1Ensure that municipalities and provincial governments have all necessary standard documents, for city sanitation planning, preparation of technical proposal / program memoranda, procurement and implementationProvide program memoranda and implementation advocacy and communication material to be distributed to province and municipal S C S C L

4.2

Advocate for, and support government in, the establishment of operational links between SSK formulation and access to finance for sanitation improvement; clarify and communicate to local governments the available financing options and mechanism, advocate for, and support the development of an urban sanitation investment framework at national level, document and disseminate nationally lessons learned in advocacy to inform strategy and decision making at national levelProvide program memoranda and implementation advocacy and communication material to be distributed to related ministries S C S L L

Provide program memoranda and implementation advocacy and communication material to be distributed to related private sector or donor S C L L

Support advocacy of program memoranda and implementation to various parties S C L L

Provide advocacy material needed in program memoranda and implementation training for TTPS C S S L L

Provide input on sylabus and implementation of program meoranda and implementation training for TTPS C S S L L

5.1 Design of a monitoring framework for PPSP and ensure that lesson learned are used to inform national strategy and decision making

Support in internal regular PPSP progress update and consolidation among PIU team and high ranking official government of Health Ministry S L S C C

Develop popular version of lesson learned into a periodically publication L C S S S S S S C

Deliver lesson learned that experinced during undertake the PPSP facilitation S L S S S S S S C

Provide input to the monitoring and evaluation system that being developed S S S S S S S S L

5.2 Monitor the quality of PPSP activities to ensure quality of city planning process, as well as the program memoranda and fostering of municipal ownership

Provide input to the monitoring and evaluation system  S S S S S S S S L

5.3 Monitor the implementation of the CSS by the cities/regencies  for full range of activities prioritized by the CSS

Provide input to the system of SSK absorption in the city planning process S S S L S S L S S

5.4Monitor the implementation of physical works and the outcome of new investments (small scale work will generally be managed by the municipality, with larger investments implemented by central government via MPW)Provide input to the LFA S S S S S S S S L

Provide input to the evaluation and monitoring system S S S S S S S S L

5.5Establish a system for monitoring of the technical quality of physical works being implemented (under DAK), as well as the effectiveness and equity of benefits related to these worksProvide input to the monitoring for implementation under DAK S S S S S C L

Provide input to the system for outcome monitoring of investment under DAK S S S S S C L

5. Systems are operational at national, provincial and city level for monitoring the progress and outcome of new (urban sanitation) investments with particular reference to quality and equity

4.Technical and administrative guidelines and procedures for the preparation, financing  and implementation of urban sanitation investments developed or updated as necessary, are formally adopted and disseminated widely

KEY TASKS AND ACTIVITIES

2011

3. Quality technical proposals, based on poor‐inclusive SSKs are developed and being implemented with municipalities playing the lead coordinating role

Roles: Lead(L)/Supporting(S)USDP‐CELL TEAMS

USDP SUPPORT:   USDP CELL  at  PIU ‐ AE

Bar chart of Activities of USDP Cell at PIU‐AE (Cont’d) 

   

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

40 

Bar Chart of Activities for the USDP Cell at PIU ‐ IF 

1 2 3 4

OUTPUTS PMU

AE IF T 1 2 3 45 6

Janu

ary

Febr

uary

Marc

h

April

May

June

July

Augu

st

Sept

embe

r

Octo

ber

Nove

mbe

r

Dece

mbe

r

Facilitate PIU Institutional in supporting city selection workshop C L S S L C SFacilitate PIU Institutional in supporting the municipal selection monitoring C L S S L C SSupport PIU Institutional in conducting institutional and financial readiness monitoring for PPSP 2011 municipals C S L S S C CSupport PIU Institutional in preparing draft Surat Edaran regarding budget allocation and requirement for PPSP 2012 S S C LSupport the socialization of the "Surat Edaran" S S L S S C S S C

Review White Book and CSS guideline and manual regarding strategic planning, institutional, and financial aspects S S C S L S SReview and complete the facilitating manual for facilitator S S L S S C S S SSupport the White Book and CSS monitoring regarding institutional and financial aspects C S L C SProvide inputs to update the FAQ on website based on PPSP lesson learned 2010 S S L S S C S S S

Develop PF/CF training plan S S L S S C C C SDevelop province training plan S S L S S C C C SSupport the development of training center (selected) training plan S S C S S L S S SProvide institutional and financial training materials for PFs/CFs training S S C S S L S S SCoordinate the collection of all training materials S S L S S S S S SSupport the implementation of TOT on White Book and CSS for province S S L S S C S S SSupport the implementation of KMW training S S S L S S L S S

Support the White Book and CSS monitoring regarding institutional and financial aspects S S C S S L S S SSupport "hub-system" implementation regarding institutional and financial aspects S S S S S L C S S

Support PIU Institutional in preparing facilitator recruitment plan (PPSP 2012) S S S L S S C S SSupport the implementation of facilitator recruitment (PPSP 2012) S S S L S S C S SDevelop facilitator training plan for PPSP 2011 and 2012 S S L S S S S S SDevelop cylabus for facilitator training S S L S S S S S SSupport the implementation of facilitator training S S L C S S C S SSupport the refreshment training for facilitator S S L C S S C S SPrepare the institutional and financial material for facilitator training S LProvide input to PFs/CFs performance monitoring system S C C LSupport the implementation of institutional readiness monitoring for PPSP 2012 municipal C L CArrange and conduct TNA for PMU and PIUs member S S L S S S S S SSupport TNA result to UC-T LSupport for institutional and financial aspect in developing the draft of program memoranda S LDesaign and develop PPSP 2011 training program, including develop web-based PPSP training program (TNA on-line) S S L S S S S S SPrepare training module for PPSP 2011 (selected training program) S S L S S S S S SConduct TOT for PMU and PIU regarding facilitation on White Book and CSS preparation S S L S S S C S

Support in updating Guideline of institutional preparation and PPSP indicative activities for province and municipals S C L SSupport the preparation of the strengthening the Pokja provinces guideline in terms of PPSP facilitation to municipals S C L SSupport the implementation of Pokja training for province S S L S S C S S SSupport in updating the Guideline of financial sources and mechanism for sanitation development C S C S S L S S SPrepare the guidance note of financial aspect to program memoranda preparation S S C LSupport the implementation of workshop regarding financial sources and mechanism S S L S S C S S SProvide input (guidance note material) to sanitation funding workshop S S C S S L S S S

2.1 Ensure the technical capacity of PMU/ PIUs and a high quality technical assistance to PFs/CFs and Pokjas (indirectly) including assistance from specialist consultant

2.2 Assist PMU and PIU with ongoing support and guidance to all cities in the PPSP via : website, making available guidance note, manuals, and other advisory material, networking events and national or regional workshops ensuring close cooperation and good coordination with other projects and programs in urban sanitation sector

2. Municipalities have access to skilled human resources for sanitation advocacy, planning, and the formulation and implementation of technical proposal

1. Large number of cities are mobilised to develop poor-inclusive City-wide Sanitation Strategy

1.1 Support government (TTPS/PMU and PIUs) in annual process of city selection

1.2 Review and streamline the CSS process to enable scalling up the CSS while maintaining quality and local ownership

1.3 Train PFs/CFs via TOT and provide coaching and facilitation regarding planning process and product Identify national/regional learning institution to serve as resources center(s) for the training and facilitation

1.4 Provide guidance and support to CFs and PFs to ensure that CSS are of a high quality, poor inclusive and lead to action plans for pro-poor investments

2011USDP-CELLS TEAMS

KEY TASKS AND ACTIVITIES

USDP SUPPORT: USDP CELL at PIU - IF Roles: lead (L)/supporting(S)

                                        Figure 3.4  Bar chart of Activities of USDP Cell at PIU‐IF    

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

41 

Bar chart of Activities of USDP Cell at PIU‐IF  (Cont’d) 

1 2 3 4

OUTPUTS PMU

AE IF T 1 2 3 45 6

Janu

ary

Febr

uary

Marc

h

April

May

June

July

Augu

st

Sept

embe

r

Octo

ber

Nove

mbe

r

Dece

mbe

r

Support to syncronize SSK program into available funding resources S S S S S C L C SSupport UC-T in conducting consolidation of various funding resources to achieve initial funding agreement S S C L S C S S SUndertake TNA for PFs/CFs training on program memoranda C S LProvide institutional and financial aspects training material for PFs/CFs program memoranda training C L CConsolidate program memoranda training material needed S C LSupport the implementation of program memoranda training for PFs/CFs L S CSupport the facilitation of program memoranda preparation under UC-T coordination S L S CSupport the consolidation of program memoranda that funded by central or province S S L S S C S C SSupport the facilitation on revising the program memoranda funded by central or province S S L S S C S C S

Support in develop logframe for program lead to fulfill target of eliminate open defecation LSupport in develop detail institutional arrangement of the program for under served customer S S C S L S S SSupport in develop detail funding arrangement of the program for under served customer S S L S C S S S

Facilitate institutional preparation for the implementation of pilot project S C LFacilitate the development and preparation of funding mechanism for the pilot project S C L

Provide assistance in preparing the Manual / Guideline for Draft and Final Program Memorandum S C L

Organize coordination event between central and provincial Pokja AMPL to consolidate commitment among all S L CSupport in updating the Guideline of financial sources and mechanism for sanitation development S C LPrepare the guidance note of financial aspect to program memoranda preparation S S L CSupport the implementation of workshop regarding financial sources and mechanism S S L S S C S S S

Deliver lesson learned that experinced during undertake the PPSP facilitation S S L S S S S S SProvide input to the monitoring and evaluation system that being developed S S L

Provide input to the monitoring and evaluation system desaign S S LProvide input to ensure the results from monev system (especially in terms of institutional and financial) are prepared and used for policy development

Facilitate province to monitor the absorption of SSK program in annual city development plan C L SProvide input to the system of SSK absorption in the city planning process C L

Provide input to the LFA S S S S S S S S LProvide input to the evaluation and monitoring system S S C S S C S S L

Provide input to the monitoring for implementation under DAK S L CProvide input to the system for outcome monitoring of investment under DAK S C L

* L=Lead role S=Supporting Role

4.1 Ensure that municipalities and provincial governments have all necessary standard documents, for city sanitation planning, preparation of technical proposal / program memoranda, procurement and implementation

4.2 Advocate for, and support government in, the establishment of operational links between SSK formulation and access to finance for sanitation improvement; clarify and communicate to local governments the available financing options and mechanism, advocate for, and support the development of an urban sanitation investment framework at national level, document and disseminate nationally lessons learned in advocacy to inform strategy and decision making at national level

5. Systems are operational at national, provincial and city level for monitoring the progress and outcome of new (urban sanitation) investments with particular reference to quality and equity

5.1 Design of a monitoring framework for PPSP and ensure that lesson learned are used to inform national strategy and decision making

5.2 Monitor the quality of PPSP activities to ensure quality of city planning process, as well as the program memoranda and fostering of municipal ownership

5.3 Monitor the implementation of the CSS by the cities/regencies for full range of activities prioritized by the CSS

5.4 Monitor the implementation of physical works and the outcome of new investments (small scale work will generally be managed by the municipality, with larger investments implemented by central government via MPW)

5.5 Establish a system for monitoring of the technical quality of physical works being implemented (under DAK), as well as the effectiveness and equity of benefits related to these works

4.Technical and administrative guidelines and procedures for the preparation, financing and implementation of urban sanitation investments developed or updated as necessary, are formally adopted and disseminated widely

3.2 Ensure that program memoranda are pro-poor, address the expressed needs of under served customers and work towards the national target of eliminating open defecation

2011USDP-CELLS TEAMS

KEY TASKS AND ACTIVITIES

3.3 Facilitate small-scale municipal pilot project to resolve key challenges identified in SSK

3. Quality technical proposals, based on poor-inclusive SSKs are developed and being implemented with municipalities playing the lead coordinating role.

USDP SUPPORT: USDP CELL at PIU - IF Roles: lead (L)/supporting(S)

3.1 Provide technical assistance and quality assurance to both locally funded and centrally co-funded proposals arising from SSKs, and to their implementation

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

42 

 Figure 3.5  Bar chart of Activities of USDP Cell at PIU‐T 

Bar Chart of Activities for the USDP Cell at PIU ‐ T 

OUTPUTS KEY TASKS AND ACTIVITIES

PMU

AE IF T 1 2 3 45 6

Janu

ary

Februa

ry

March

April

May

June

July

Augu

st

Septem

ber

Octob

er

Nov

embe

r

Decem

ber

1.1 Support government (PMU and PIUs) in annual process of city selectionFacilitate support during city selection workshops S S L S

Assist with preparation of ToR KMWs (for KMWs recruitment in 2012) S L

Support to identify and determine the needs of facilitators for PPSP 2012 S S L

Provide inputs to the facilitator recruitment plan, including input for facilitators training sylabus S S L

Provide input to PFs/CFs performance monitoring system S S S L

1.2 Review and streamline the CSS process to enable scalling up the CSS while maintaining quality and local ownership

Review White Book and CSS guideline and manual regarding technical aspect S LSupport the White Book and CSS monitoring regarding technical aspect S S LDevelop White Book and CSS Training Modules S S L S

Develop Practical Guideline (as complementary of White Book and CSS  Training Modules) S S S L S

Provide inputs to update the FAQ re White Book and CSS based on PPSP lessons learned 2010 S S L

1.3Train PFs/CFs via TOT and provide coaching and facilitation regarding planning process and product  Identify national/regional learning institution to serve as resources center(s) for the training and facilitationPrepare criterias, job discription and performance evaluation tools S S L S

Support the preparation of training material for CF/PF Training and KMWs Training (based on TNA results) S S S L

Assist with preparation of ToR Provincial and City Facilitators S S L

Support the training of the Provincial and City Facilitators S S L S

Support the training of the KMWs S S L S

1.4 Provide guidance and support to CFs and PFs to ensure that CSS are of a high quality, poor inclusive and lead to action plans for pro‐poor investments

Support the White Book and CSS monitoring regarding technical aspects S S S S S L

Support "hub‐system" implementation regarding technical aspects S S L S

Provide regular coaching to PFs/CFs and KMWs (regional basis) S L

Support "hub‐system" implementation regarding technical aspects S S L S

2.1Ensure the technical capacity of PMU/ PIUs and a high quality technical assistance to PFs/CFs and Pokjas (indirectly) including assistance from specialist consultantSupport to implement ToT to PMU/PIUs re facilitation on White Book and CSS S L

Provide support to PIU‐T with implementation of quality assessment (white Book and SSK) through panel forum S L S

Assist with delivering training programmes for the use of PM Manuals / Guidelines based on TNA program S S L S

Provide technical expertise to assist Pokjas to use various manuals and guidelines  S L

Design quality assessment tools for technical designs, tender documents, contracts etc. S L S

Provide support to PIU‐T with implementation of quality assessment S L S

2.2Assist PMU and PIU with ongoing support and guidance to all cities in the PPSP via : website, making available guidance note, manuals, and other advisory material, networking events and national or regional workshops ensuring close cooperation and good coordination with other projects and programs in urban sanitation sector

Provide inpiuts to update related Manuals, Guideline and FAQ on White Book and CSS to be uploaded on the website. S L

Support knowledge event on priority setting approach S S S L

Support knowledge event on system choice and technology options on sanitation S S S L

Support and provide input on White Book and CSS regional workshop (on regional basis and on selected cities) S S S L

Support the implementation of panel forum in Quality Assessment of White Book and CSS S S S L S

2. Municipalities have access to skilled human resources for sanitation advocacy, planning, and the formulation and implementation of technical proposal

1. Large number of cities are mobilised to develop poor‐inclusive City‐wide Sanitation Strategy

1 2 3 4USDP SUPPORT:   USDP CELL  at  PIU ‐ T Roles: Lead (L)/Supporting (S) 2011

USDP‐CELLS TEAMS

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

43 

Bar chart of Activities of USDP Cell at PIU‐T (Cont’d) 

OUTPUTS KEY TASKS AND ACTIVITIES

PMU

AE IF T 1 2 3 45 6

Janu

ary

Februa

ry

March

April

May

June

July

August

Septem

ber

Octob

er

Novem

ber

Decem

ber

3.1 Provide technical assistance and quality assurance to both locally funded and centrally co‐funded proposals arising from SSKs, and to their implementation

Assistance to city Pokja finalizing Draft Program Memorandum (13 initial cities) S S S S L

Assist PIU‐T with preparation ToRs for provincial KMPs S L

Develop Manual/Guideline for the preparation of Draft and Final Program Memorandum S L

Further define supporting role of USDP‐Cell S&D  S S S L

Finalization mapping funding sources and preparation Sanitation Financing guideline  S S L S

Provide technical training material for KMPs S S L S

Assist with delivering of training programs for KMPs S S L S

Provide technical training material for PFs/CFs Program Memorandum training S S S L

Assist with delivering of training programs for PFs / CFs S S L S

Provide general support to the preparation of Draft and Final Program Memoranda S S S S S L

Support organisation of specific coaching clinics for KMPs & CFs/PFs related to PM Phase S S S L

Provide assistance with Workshop on Evaluation and Lessons Learned PM Preparation S S S L

Provide assistance with Road show for 63 cities (for 2012 program) S S S L

3.2Ensure that program memoranda are pro‐poor, address the expressed needs of under served customers and work towards the national target of eliminating open defecationReview SSK focusing on program in the priority area that serve the under served customer S L S S

Review SSK focusing on appropriate technology for program that serve the under served customer S S L S

Develop quality assurance tools and assessment program for Draft and Final PMs S L S

Assist with implementation of quality assurance system of Draft and Final PMs S L S

Assist with the development of MDG specific indicators related to PPSP implementation S S L

3.3 Facilitate small‐scale municipal pilot project to resolve key challenges identified in SSK

Compile and share possible alternative technological solutions related to sanitation S S L

Support performance evaluation of selected DEWATS systems S L S

Assist PIU‐T with the planning, design and tendering of works for 3 pilot projects S L

Develop quality assurance tools and implementation program for pilot programs S L S

Assist with implementation of quality assurance system for pilot projects S L S

4.1 Ensure that municipalities and provincial governments have all necessary standard documents, for city sanitation planning, preparation of technical proposal / program memoranda, procurement and implementationFacilitate compilation and dissemination of manuals, guidelines, standards and norms etc. S S S L

4.2

Advocate for, and support government in, the establishment of operational links between SSK formulation and access to finance for sanitation improvement; clarify and communicate to local governments the available financing options and mechanism, advocate for, and support the development of an urban sanitation investment framework at national level, document and disseminate nationally lessons learned in advocacy to inform strategy and decision making at national levelProvide input on sylabus and implementation of program memoranda and implementation training for TTPS S S S L

Undertake program memoranda and implementation training for TTPS S S S L

4.Technical and administrative guidelines and procedures for the preparation, financing  and implementation of urban sanitation investments developed or updated as necessary, are formally adopted and disseminated widely

3. Quality technical proposals, based on poor‐inclusive SSKs are developed and being implemented with municipalities playing the lead coordinating role.

1 2 3 4USDP SUPPORT:   USDP CELL  at  PIU ‐ T Roles: Lead (L)/Supporting (S) 2011

USDP‐CELLS TEAMS

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

44 

OUTPUTS KEY TASKS AND ACTIVITIES

PMU

AE IF T 1 2 3 45 6

Janu

ary

Februa

ry

March

April

May

June

July

August

Septem

ber

Octob

er

Novem

ber

Decem

ber

5.1 Design of a monitoring framework for PPSP and ensure that lesson learned are used to inform national strategy and decision making

Compile and share lessons learned and necessary feed‐back to improve quality of programs S S S S L

5.2 Monitor the quality of PPSP activities to ensure quality of city planning process, as well as the program memoranda and fostering of municipal ownership

Provide input to the monitoring and evaluation system  S S S L

5.3 Monitor the implementation of the CSS by the cities/regencies  for full range of activities prioritized by the CSS

Review the absorption of SSK program in the annual city development plan during conduct facilitating program memoranda and implementation S S S L

Provide input to the system of SSK absorption in the city planning process S S S L

5.4Monitor the implementation of physical works and the outcome of new investments (small scale work will generally be managed by the municipality, with larger investments implemented by central government via MPW)Develop indicators to monitor implementation physical and non physical works S S L

Support developing MONEV system for Stages 4 and  5  S S L

Support date collection, processing and evaluation process S S L

5.5Establish a system for monitoring of the technical quality of physical works being implemented (under DAK), as well as the effectiveness and equity of benefits related to these worksProvide input to the monitoring for implementation under DAK S S L

Provide input to the system for outcome monitoring of investment under DAK S S L

2 3 4USDP SUPPORT:   USDP CELL  at  PIU ‐ T Roles: Lead (L)/Supporting (S) 2011

USDP‐CELLS TEAMS

5. Systems are operational at national, provincial and city level for monitoring the progress and outcome of new (urban sanitation) investments with particular reference to quality and equity

1

Bar chart of Activities of USDP Cell at PIU‐T (Cont’d) 

 

 

 

 

 

 

 

 

 

 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

45 

4 ISSUES AND RECOMMENDATIONS 

Main  issues  that  have  developed  during  the  past  quarter  are  presented  in  Table  4.1.  The  issues  and recommendations reported in the previous Quarterly Progress Report (QPR), as well as the relevant ones that are still open from earlier QPRs, are now presented in Annex 1 to this report, together with their current status as far as known to us. Several of those issues have today still the same crucial importance to the success of PPSP. 

Table 4.1  Issues and Recommendations 

No  Issues/Constraints Recommendations for  

Remedial Actions Main Actors 

National POKJA AMPL (previously TTPS) and member Ministries 

1  Interactions between Steering Committee and PPSP, as well as coordinating operations by PMU and close cooperation between PMU and PIUs, are hampered by the lack of status and capacity of PMU. 

Implementation  of  an  adequate  system  of communication,  consultations  and  reporting among  PPSP  institutions  with  regard  to operations,  and    solving  any  matter  to  ef‐fectuate the strategic issues and actions. 

Pokja AMPL Nasional PMU and  its Program Director. 

2  Appropriate PPSP program and project digest are yet to be put in the Blue Book.  

In  depth  consultations  with  PMU  and Bappenas to formulate the said program and project digest. 

Pokja AMPL  

3  Implementation actions for the effectuation of INPRES as a new policy are yet to be formulated  

Sound  consultation between  relevant actors at short notice 

Pokja AMPL 

4  Limited  active  involvement  of  member ministries in organization structure of PPSP. 

PPSP  institutional  structures  to  be  set  up with  representation  of  members  of  all relevant  ministries  in  the  specific  Steering Committees for POKJA AMPL, PMU and PIUs; similar  approach  to  be  considered  for  PMU Secretariat 

POKJA AMPL Nasional 

5  Budgets  committed  to  PPSP  are  still  far behind  the  earlier  agreed  outlay  presented in the PPSP Roadmap.  

Pro‐active  initiatives  are  required  to  either increase  considerably  the  funding commitment  volume,  or  consider  a  down‐scaling of PPSP   

POKJA AMPL 

6  Due to inadequate budgeting at the member ministries  the  actual  expenditures  for  PPSP are  considerably  more  lagging  behind planning  as  per  Roadmap  than  the  already constrained budgeting.  

Discussion  between  POKJA  AMPL  and  PPSP members on how the budgeting for 2012 and subsequent  years  can  be  considerably improved  so  as  to  prevent  the  recurring funding constraints of 2011 and 2011. 

POKJA AMPL Member Ministries 

7  Informed  choices  and  decisions  on  all relevant  approaches  and  procedures  for PPSP  implementation,  incl.  its manuals  and products, need  to be clearly communicated to all parties.  

POKJA  AMPL  Nasional  should  send information letter(s) to all PPSP stakeholders at  central,  provincial  and  city  levels  to socialize changes on a regular basis 

POKJA AMPL Nasional 

8  The  current  TOR  of  the  Program  Director contains  no  clear  mandate  for  Program Director and its supporting staff. 

Together  with  PMU  take  initiatives  to formulate adequate TOR and mandates. 

Pokja AMPL Nasional PMU, UC‐PMU 

9  No adequate platform exists to discuss main issues  and  TA  activities,  and  review (potential)  differences  in  expectations, perceptions,  opinion  and  approaches  on USDP’s  services  between  USDP  and Clients/Beneficiaries from the GOI side. 

Establish  as  such  Platform  the  Technical Team  stipulated  in  the  Administrative Arrangement between GOI and EKN re. USDP 

Pokja AMPL Nasional, EKN 

Program Management Unit (PMU) 

1   The  full  involvement  of  PMU  and  PIUs members  in direct advocacy and  facilitation to local governments, in particular regarding public consultations.   

Improve adequate  capacity of  the members to  provide  the  said  public  consultation facilities in a proper way. 

Head  of  PMU  and PIUs 

2  No  clear  formulation  is  available  yet regarding the role and function of the senior advisor  to  the  Program  Director  recently 

Initiate formulation of TOR with proper roles and functions.  

PMU 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

46 

No  Issues/Constraints Recommendations for  

Remedial Actions Main Actors 

recruited by Pokja AMPL Nasional.   

3  Agreement  among  PPSP  institutions  on setting‐up  a  reporting  and  communication mechanism is not yet fully implemented.  

Consider  to  apply  the  stipulations  in  PPSP’s Program  Management  Manual  (PMM) shortly.  

PMU 

4  Lessons learned of PPSP implementation will provide  excellent  inputs  as  basis  for improvement of PPSP implementation in the next period. 

Implement  a  workshop  on  lessons  learned re. PPSP implementation to date 

PMU 

5  Executing qualified staffing for coordination, programming,  Monev  etc  is  in  very  short supply at PMU Secretariat and PIUs. 

Expand  on  staffing  before  PPSP  runs  into serious operational constraints 

PMU 

6  PIU AE members not on board yet.  Formal  letter for PIU AE’s members must be assigned. 

PMU, PIU‐AE 

7  The preparedness and capacity of PMU/PIUs in processing the recruitment and training of PPSP facilitators is very limited. 

PMU/PIUs  should  consider  to  recruit  a Recruitment  Agency;  in  addition  for  long term  institutionalisation  of  training    a Training  Provider  should  be  provided  to implement  training programs  together with, and  under  the  guidance  from,  USDP’s  CBT team. 

PMU 

Program Implementation Units (PIUs) 

1  There  is  an  agreement  among  PPSP institutions  in  setting‐up  a  reporting  and communication mechanism, but this not yet fully  implemented  by  PIUs  (there  is  no reporting being provided to PMU). 

Management  Team  Meetings  at  and between  PPSP  institutions  at  central  level should be provided at least once in a month.  

PMU and PIUs 

2  Although the SK of PIU‐T has been signed by DG,  the  PIU‐T  management  is  not  yet defined  nor  appointed,  the  assignment  of PIU‐T staff to support the implementation of PPSP  is  not  realized  yet,  in  particular  the staff  to run PIU‐T Secretariat. 

It  is  strongly  recommended  that  PPLP undertakes the required actions urgently.  

PPLP, PIU‐T 

3  PIU‐T has decided  that  the scope of KMW’s work will not only be  to  facilitate Pokjas  in developing  WBs  and  CSSs,  but  also  draft Program Memorandum. 

The  facilitation  for  Program  Memorandum development  should  be  clearly  defined,  to avoid  the  overburden  of  KMWs  to  focus  in their  facilitation.  The  facilitation  for  draft Program Memorandum should preferably be assigned  to  dedicated  KMPs,  and  not  be included in KMW’s scope of work. 

PIU‐T 

4  To  guarantee  quality  and  sustainability  of capacity building under PPSP,  it  is a needed to  develop  professional  team  trainers  from PMU  and  PIUs.  Learning  from  TOT implementation  indicated  most  of participants are not ready yet to be a trainer due  to  their  limited  understanding  of substantial matter  of  PPSP  or  their  limited teaching experience. Teaming up with USDP consultants engaged in training programs for one  to  three  times  will  improve  their knowledge and skills.  

It  is  recommended  that  each  directorate  of institutions involved in PPSP’s PMU and PIUs appoint staff that have followed TOT and are considered qualified as member of the team of  trainers.    Budget  allocation  is  needed  to support  improvement  of  quality  of  the potential  trainers.  Moreover,  support  to team trainers in terms of appreciation issued by  the  Director  General’s  decree  is  also consider  important  to  make  PPSP  training more prestigious and sustainable. 

PIUs 

5  PIU‐T lacks a clear internal contracts‐related mechanism for monitoring and evaluating performance of KMWs and KMPs incl. that of their respective city and provincial facilitators. 

Team Monev , UC‐IF and UC‐T can provide tools to support PMU/PIUs monitoring and evaluating performance of KMWs, KMPs and CFs/PFs. 

PMU and PIU‐T + Team Monev, UC‐IF, UC‐T 

6  PIU‐T lacks a clear internal mechanism for monitoring and evaluating the completeness and especially the quality of the WBs, CSSs 

Team Monev, UC‐IF and UC‐T provide tools to support PMU/PIUs monitoring and evaluating the completeness and quality of 

PMU and PIU‐T + Team Monev, UC‐IF, UC‐T 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

47 

No  Issues/Constraints Recommendations for  

Remedial Actions Main Actors 

and DPMs.  the BPs, SSKs and DPMs. 7  Tender process of KMWs and KMPs is 

delayed again, as was the case in 2010. Moreover, similar to 2010, budget allocations for these contracts are considerably underestimated. 

PPSP has to develop alternatives to assist and encourage PPLP/PIU‐T to address these constraints and avoid similar delays in the coming years. 

PIU‐T, PMU 

8  Mobilization of PFs/CFs for both PPSP Stage 3 (WBs and CSSs) and Stage 4 (DPM) is delayed again. 

PIU‐T, supported by PMU, has to find a structural solution to recruit and train the facilitator candidates earlier in the annual PPSP cycle, so as to avoid each time recurring delays. 

PIU‐T, PMU 

9  Cities which have completed or those that will be in the process of completing their Draft Program Memorandum (DPM) have to “shop around” for funding from PU Pusat, from Provinces and from possible other funding sources based on existing procedures of individual Ministries. PPSP has not yet established joint PPSP‐specific funding procedures and regulations, which would truly be conducive to acceleration of sanitation development and more than “business as usual”. 

Accelerate processes, procedures and regulations that truly address and support the challenges of acceleration pursued under PPSP. 

PIU‐T, PMU 

10  Lack of Pokjas’ awareness about PPSP and their roles.  

Road  shows  of  PIU AE  need more  focus  on PPSP agenda, and meet  related  crosscutting SKPD  in  Pokja  (not  only  city/district  health officer). 

PIU‐AE 

11  QA Panel Team of BP & SSK was established with a formal letter. This was followed by 4 meetings for 13 participants for reviewing priority cities/districts. However, no PIU‐AE members attended the last 3 meetings. 

Formal  letter  from  PMU  is  needed  for establishing  the  team  (replacement  of  2 members: Bu Ayu and Pak Wahanudin). 

PIU‐AE 

USDP 

1  Strategic  issues  requiring  TA  in  support  of PPSP are to be formulated in more detail.  

Based  on  those  periodical  consultations  are to be held between PMU‐PIUs and USDP  to define what services USDP may and may not provide  under  its  technical  assistance program.  

USDP Man. Team UC PMU 

2  The regular management meetings between management  of  PMU  and management  of USDP  have  not  been  held  during  the  past couple  of  months.  This  hampers  proper consultations  and  planning  of  support services.  

Reinstate the regular management meetings and  related monitoring  of  agreed  follow‐up activities.  

USDP  Team Manage‐ment PMU 

3  Roles  of  Team‐SSK  and  Team‐SDI  are  still insufficiently  understood  by  some  actors; a.o.    regarding  their  support  to  PPSP stakeholders  with  capacity  building  and training,  while  PMU/PIUs  don’t  have  fixed schedules  to  implement  required  training and workshop to PPSP stakeholders (KMWs, CFs/PFs, Pokjas, KMPs,  etc.). 

USDP  Management  team  should  hold consultations  with  said  actors  at  regular intervals  to  further  clarify  the  nature  and extent  of  USDP  services,  and  get  a  better understanding on the division of roles,  tasks and responsibilities.   

Management USDP USDP  Cell  Coordina‐tors 

4  PIU‐T  doesn’t  have  clear  mechanism  in monitoring  and  evaluating  KMWs’ performance  and  Facilitator’s  performance yet. 

Team  Monev  and  UC‐IF  provide  tools  to support  PMU/PIUs  as  basis  on  monitoring and  evaluating  performance  of  KMWS, CFs/PFs. 

Team Monev and UC‐IF 

5  USDP’s  roles  and  services  meet  over‐expectations by PIU AE members and high‐level official of Health Ministry 

Need  regular  management  team  meeting (between  USDP  and  Pokja  AMPL,  including Health Ministry) for coordination of planning, budgeting, and scheduling. 

USDP  Team Manage‐ment  

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

48 

5 MANAGEMENT 

5.1 General 

The  regular monthly management meetings  between  PMU Management  and USDP Management,  formalised from August 2010, were not held during the first quarter of 2011 as the Chairman of PMU could not spare the time due to his overloaded agenda.  It  is considered very  important that these regular meetings are reinstated, with attendance from the PMU Steering Committee members from the four ministries. 

Another internal USDP brainstorm session was held on 29 March at “Rumah Air” in Bogor to discuss in particular the ways  the USDP Cell at PMU could  improve support  to and mutual relations with PMU and  in particular  its secretariat so as to strengthen and boost the initiating and guiding role of the PMU secretariat, its coordination of PPSP, its guidance and monitoring of the PIUs. The complexity of PPSP requires a strong, experienced and pro‐active PMU Secretariat, but still a  long way  is  to go  to  reach  that  required  level. The  internal USDP workshop focused on strategic  initiatives the various USDP Cells could undertake towards PMU Secretariat and PIUs. The main findings were incorporated in the revised Annual Work plan for 2011. Strategic support issues and informed choices will be further elaborated and get more attention in the coming period. 

The  draft  USDP  Work  Plan  2011  was  submitted  to  EKN  and  PMU  in  January  2011.  Taking  into  account developments, such as delays in PPSP’s implementation program, partly due to financial constraints, a revision is under preparation that will be submitted before the end of April 2011. 

5.2 Staffing 

USDP’s project Director Paul van Ruiten repatriated to the Netherlands and was succeeded by Hans Zewald as the new DHV representative for Indonesia. He doubles as the Project Director for USDP since February 2011. 

The  institutional/technical expert Suhendi was withdrawn  from  the project by his employer Haskoning per 31 March 2011, and will be replaced by Dyah Ernawati per 1st April. 

The overview of mobilization and demobilization of  international Consultants, during the period January‐March 2011, is presented in Table 5.1. 

Table 5.1  Engagement periods of international consultants in Q1‐2011 

#  Name  Position  Firm  Assignment 

        Start  End 

1  Jan Oomen  Project Manager  DHV  05 Jan 2011  04 Mar 2011 

12 Mar 2011  21 Mar 2011 

2  John de Bresser  Capacity Building Specialist 

DHV  24 Jan 2011  02 Apr 2011 

3  Ingeborg Krukkert  Hygiene Promotion Specialist 

IRC  27 Mar 2011  22 Apr 2011 

4  Mees van Krimpen  Environmental and Sanitation Engineer 

DHV  10 Jan 2011  21 Mar 2011 

5  Cees Keetelaar  Sewerage Specialist  DHV  10 Jan 2011  09 Feb 2011 

6  Michael van de Watering   Master Planning  Royal Haskoning 

09 Jan 2011  09 Jan 2011 

12 Jan 2011  28 Jan 2011 

7  Sjoerd M. Kerstens  DED Urban Drainage/Sewerage 

DHV  4,11,18,19,25 January 

1,6‐11,14,16‐18,22 February 

1,8,16,21,22,29 March 

8  Christine Sijbesma  Gender and Pro Poor Development Specialist 

IRC  27 Mar 2011  22 Apr 2011 

 

 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

49 

5.3 Meetings 

An overview of the most relevant Meetings and Workshops in which USDP has participated and/or contributed is presented in Table 5.2 below. 

 Table 5.2  Meetings/Workshops in January – March 2011 in which USDP has participated 

No  Date  Meeting/Workshop  Location 

January 

1  4  Follow‐up meeting on the preparation of WB and CSS training modules (module 2 and module 3). 

Pokja AMPL’s meeting room 

2  6  Meeting on 2011 training schedule.   TTPS secretariat’s meeting room 

3  7  Focus  Group  Discussion  to  formulate  Pokja  AMPL’s  communication strategy.  It  is  in  connection with  the merger of  TTPS  and Pokja AMPL  and  the need  for  new  directions  and  strategies  of  communication  in  the socialization and advocacy with regard to the development of AMPL. 

Wisma Bakrie, 6th floor 

4  10  Preparation  meeting  of  training  modules  and  PPSP  training  centre website. 

TTPS secretariat’s meeting room 

5  14  PPSP and INKINDO training cooperation discussion. In  connection  with  the  implementation  of  the  cooperation  between PPSP with  INKINDO  in  the  implementation  of  training  for  recognition PPSP  of  experts  and  companies  engaged  in  engineering  planning  and sanitation. 

Dit. PPLP’s meeting room, 7th floor 

6  17  USDP management team meeting‐13.  TTPS secretariat’s meeting room 

7  18  Dissemination  meeting  between  PPSP  and  INKINDO  to  prepare  the workshop  &  exhibition  organizers:  the  opportunity  and  the  role  of consultants in capacity building PPSP program. 

TTPS secretariat’s meeting room 

8  18  Team 3, 45 coordination meeting.  TTPS secretariat’s meeting room 

9  21  The 2nd joint meeting of workshop & exhibition organizers: the opportunity and the role of consultants in capacity building PPSP program. 

INKINDO secretariat’s office 

10  25  Pokja AMPL communication strategy focus group discussion.  Pokja AMPL secretariat’s meeting room 

11  25  Consolidation meeting of WB and SSK training modules (module 2 and module 3). 

Pokja AMPL secretariat’s meeting room 

12  27  Meeting with Fred de Bruijn (Witteveen en Bos).  USDP’s office 

13  27  Internal meeting to prepare the INKINDO exhibition, 1‐2 February 2011.  AMPL secretariat’s meeting room 

14  27  PMU‐PIU PPSP coordination meeting.  AMPL secretariat’s meeting room 

15  28  Farewell of Paul van Ruiten.  DHV Indonesia’s office 

16  31  Preparation meeting for INKINDO exhibition, 2 February 2011.  AMPL secretariat’s meeting room 

February 

1  7  Preparation meeting for PPSP site training.  AMPL secretariat’s meeting room 

2  7  USDP management team meeting‐14.  PIU‐T’s meeting room 

3  8  Discussion meeting: draft guidelines of SANIMAS through DAK.  AMPL secretariat’s meeting room 

4  8  Discussion meeting: draft PMM PPSP.  AMPL secretariat’s meeting room 

5  8  Discussion meeting: Program Memorandum PPSP.  Bappeda Province Sumatera Barat 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

50 

No  Date  Meeting/Workshop  Location 

6  10  Discussion of the adjustment of Bantek job description and the sanitation sector Program Memorandum. 

Dit. PPLP’s meeting room, 7th floor 

7  11  Preparation meeting of Help‐Desk (Hub System).  AMPL secretariat’s meeting room 

8  11  Discussion meeting: program criteria for the assessment of MPSS.  Dit. PPLP’s meeting room, 7th floor 

9  16  Consignment meeting on Guidance Books.  The Akmani Hotel 

10  16  PIU‐AE PPSP coordination meeting.  Dit. PL’s meeting room 

11  16  Discussion on recruitment and training for PPSP 2011’s facilitator.  AMPL secretariat’s meeting room 

12  18  Discussion on the needs of network equipment and server for training proposal. 

AMPL secretariat’s meeting room 

13  22  Meeting on the standard guidelines for urban services.  Acacia Hotel 

14  22  Team 3 consolidation and to get same perception on annual workplan of team 3 and its action plan. 

PIU‐T’s meeting room 

15  22  Evaluation and coordination meeting of USDP staff.  AMPL secretariat’s meeting room 

16  24  Discussion meeting on PM assessment criteria.  AMPL secretariat’s meeting room 

17  24  Preparation meeting for Jejaring AMPL evaluation meeting.  AMPL secretariat’s meeting room 

18  25  AKKOPSI board meeting with Banda Aceh mayor.  AMPL secretariat’s meeting room 

19  28  Orientation QA tools meeting and the inaugural meeting of the panel team, agenda: 

- Formulation the workplan assessment by team panel. - Orientation the QA tools. 

AMPL secretariat’s meeting room 

March 

1  3  Evaluation and 2011‐2014 strategic plan workshop of Jejaring AMPL.  Nikko Hotel 

2  3  Orientation QA tools and agreement on the action plan, agenda: - Socialisation the formulation process of WB and CSS. - Socialisation the WB and CSS evaluation tools. - Formulation the review of WB and CSS work plan. 

AMPL secretariat’s meeting room 

3  9  Preparation meeting for Steering Committee meeting.  AMPL secretariat’s meeting room 

4  15  USDP management team meeting‐15.  Dit. PL’s meeting room 

5  16  Preparation meeting for USDP Internal Team Meeting‐2.  AMPL secretariat’s meeting room 

6  17  PPSP socialisation.  German Centre, Tangerang Selatan 

7  17  Integration system information of WASAP E and PPSP.  Seruni Hotel, Cisarua 

8  18  CSS X, Banda Aceh preparation meeting, agenda: - Finalisation the CSS X run‐down activities. - Preparation the lattice. - Determination of resource persons. - Division of roles/tasks. 

Walikota Banda Aceh’s meeting room, Banda Aceh 

9  18  Small team meeting of WB/SSK reviewer.   AMPL secretariat’s meeting room 

10  21  PPSP Training of Trainer.  Puri Denpasar Hotel 

11  23  Echelon 2 breakfast meeting: Coordination the implementation of PPSP 2011, agenda: 

- Determination 2011 PPSP cities/regencies. - 2011 PPSP facilitators’ recruitment. - 2011 PPSP training of trainers. - MOU the activities of sanitation facilities and infrastructure 

guidance and control. 

Ambara Hotel 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

51 

No  Date  Meeting/Workshop  Location 

12  25  Discussion meeting: draft of sanitation investment.  AMPL secretariat’s meeting room 

13  28  Kick‐off meeting Indonesia Urban Water, Sanitation and Hygiene (IUWASH) project. 

SS 1‐2’s meeting room, Bappenas 

14  28  Discussion meeting: clause allocating budgets (APBD) in sanitation field; Funding identification in sanitation field. 

PIU‐IF’s meeting room 

15  29  Meeting on coaching clinic material for sanitation monitoring and evaluation. 

R.R. Kaca, Ditjen Bina Bangda’s meeting room 

16  29  USDP Internal Team Meeting‐2.  Rumah Air, Bogor 

17  31  Workshop on mapping and assessment of urban sanitation situation at Cimahi. 

Aula Gedung B, Kantor Pemerintah Kota Cimahi 

18  31  Discussion on the National Information System (PIN): - Need assessment confirmation. - Presentation and enrichment the concept. - Discussion to set the priority activities. 

Akmani Hotel 

Urban Sanitation Development Program Quarterly Progress Report No. 05, January‐March 2011 

52 

6 COLOPHON 

This document was produced by  the Urban Sanitation Development Program  (USDP). USDP provides Technical Assistance to the ‘Accelerated Sanitation Development for Human Settlements” Program (PPSP), a Government of  Indonesia  Program  implemented  by  the  TTPS,  a  sanitation‐oriented  collaborative  program  between  eight Ministries, with Bappenas as  lead agency. PPSP  is  implemented through a PMU at Bappenas and three PIUs at the Ministries of Health, Home Affairs and Public Works.  USDP’s services focus on facilitation and capacity building and training targeting the principle stakeholders and actors in the PPSP Program. USDP is funded by the Embassy of the Kingdom of the Netherlands. 

DHV  BV  in  association  with  PT Mitra  Lingkungan  Dutaconsult,  Royal  Haskoning  Indonesia, Witteveen  +  Bos Indonesia,  MottMacDonald  Indonesia,  IRC  International  Water  and  Sanitation  Centre  and  PEM  have  been contracted to provided a range of technical services in support of the implementation of PPSP. 

Your letters, e‐mails, enquiries can be forwarded to: 

Urban Sanitation Development Program (USDP) Jl. R.P. Soeroso No. 50, Gondangdia Jakarta 10350, Indonesia Phone: (62‐21) 319 35312, 319 31013, 237 28748 Fax: (62‐21) 392 4113 Email:[email protected]  

For information, please also check our website: www.sanitasi.or.id 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Client  :  Embassy of Kingdom of the Netherland, TTPS – Bappenas Project  :  Urban Sanitation Development Program Length of report  :  65 Pages Including Annexes Author  :  USDP Management Team Project Manager  :  Jan Oomen Project Director  :  Hans Zewald Date  :  06 May 2011 Report Status  :  Final

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

 

  ANNEX 1 

Status Rep

ort o

n Earlier Issues and

 Recom

men

datio

ns

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

A1 ‐ 1  

Annex 1  Status Report on Earlier Issues and Recommendations 

No  Issues  Recommendation  Main Actors 

Status per  

30 April 2011 

TTPS and member Ministries QPR2‐1  Improvement of coordination 

between TTPS, PMU and PIUs, as well as with USDP team. 

Regular meetings between said stakeholders with a formal and clear Agendas and Minutes of the coordination meeting. 

TTPS PMU USDP 

Regular meetings between PMU Management and USDP Management are now institutionalised; attendance from PMU Committee Members should be further uplifted; such regular meetings are not yet held between TTPS and PMU, between PMU and PIUs, and between PIUs and USDP Cells.   

QPR3‐2  Limited involvement of member Ministries in organization structure of PPSP. 

PPSP’s  institutional  set‐up  demands for  active  participation  of  the member  Ministries  at  the  various levels in TTPS, PMU and PIUs.   Gradually the PMU and PIUs are copying the structure of TTPS, having a (inter‐ministerial) Committee and a (professional) Secretariat. It is highly recommended that the Committees of TTPS, PMU and PIUs hold formal meetings at regular intervals in order to give more guidance to their Secretariats.   

TTPS  This may possibly be addressed as part of new SKs for PMU/PIUs. 

QPR3‐3  Lack of clarity about the entity monitoring PMU‐PIUs activities/progress. 

Formalize tasks and responsibilities of the entity supervising PMU and PIUs; monitor the tasks and responsibilities of PMU, PIUs and their subsidiary parties serving them.  

TTPS  Pokja Monev to be further developed. 

QPR 3‐4  Establishment of a Guiding Committee for USDP, referred to as “Technical Team” in the Administrative Arrangement between GOI and EKN.  

Consider to involve one Representative each of INDII, USAID and ADB, next to already earmarked member WSP, to be included in the Technical Team, so as to further stimulate the engagement of other donors in PPSP. 

TTPS  No progress. 

QPR4‐2  Limited involvement of member Ministries in the implementation of the roles and functions of the divisions of the National Pokja AMPL (various working groups and 2nd Echelon). 

Socialization of the new structure and organization of National Pokja AMPL, and pursuing optimum support from its members, particularly from each division, by agreeing on distribution of specific tasks within the system of the integrated activities. 

Committees of Pokja AMPL, PMU and PIUs and their principals to hold formal as well as informal meetings at regular intervals in order to get better synchronized actions among them. 

National Pokja AMPL 

No formal institutionalisation of meeting schedules, agendas, attendance, etc. 

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

A1 ‐ 2  

No  Issues  Recommendation  Main Actors 

Status per  

30 April 2011 

Program Management Unit (PMU) 

QPR1‐7  Legal Status of PPSP as a national program (Draft INPRES documentation prepared by USDP). 

INPRES documentation to be processed urgently; is most relevant for required multi‐year budgeting. 

TTPS PMU 

Draft INPRES docs revised with addition of STBM; draft INPRES now scheduled to be submitted to Office of the President by end of May 2011 

QPR1‐9  Resources, staff and funds, at PMU and PIUs need to be expanded and increased in qualitative and quantitative terms for a program of the size of PPSP.   

Formation plans on staffing (2010‐2014) for PMU and PIUs to be developed; in addition capacity building and training plan.  

TTPS PMU PIUs (USDP) 

Not much progress; no SK exists for PIU‐AE members; for PIU‐T some preliminary appointments were done, but no active attendance yet of staff of planned PIU‐T office at Pejompongan. 

QPR2‐6  Development of PMM of PPSP.  Establish a procedure and division of tasks between PMU/PIUs and USDP; USDP can take care of most of the write up, but essentials of PMM components are to be formulated in consultations with PMU and PIUs. 

PMU USDP 

Draft PMM submitted to TTPS by USDP; needs further internalisation, updating, dissemination and application 

QPR2‐10  USDP Staff observe that KMW consultants need more training in order to prevent that valuable time and resources are lost in “re‐inventing the wheel”. Availability of ISSDP Manuals and Guidelines itself does not guarantee their proper and successful application. Need for more training is also expressed by KMWs. 

Considering quality of intermediate products to date and the limited time available for “learning by doing”, USDP has proposed at several occasions that KMW and facilitators shall be called together more often for consultations and additional training. USDP can provide required training and coaching. 

PMU PIU‐T 

These observations are comprehensively addressed in draft TOR for KMW 2011; although these TOR were simplified by PU and budgets reduced, practice of 2011 will yield further information on the balance between adequate preparation and training versus quality of output. 

QPR4‐5  The Monev  system  is not used for  its  ample  opportunities  to yield  additional  sets of  lessons learned  at  regular  intervals  as improvement inputs. 

Pursue  that  an  active interdepartmental  Monev  “Panel” will  meet  at  regular  intervals  and feed  PMU  and  PIUs  with  relevant information, from the findings of the Monev  system,  enabling  corrective measures  and  remedial  actions  by PMU and PIUs. 

PMU  Gradual improvements in active use of the system are ongoing  

Program Implementation Units (PIUs) QPR1‐13  Resources, staff and funds, at 

PMU and PIUs need to be expanded and increased in qualitative and quantitative terms for a program of the size of PPSP.   

Formation plans for PMU and PIUs to be developed; in addition capacity building and training plan. 

TTPS PMU PIUs (USDP) 

A continuing concern, both regarding adequate budgeting and actual spending of budgets; ������������ ��� ������� ����������� �

QPR1‐19  For the further elaboration of SSKs and development of Program Memorandum the Local Governments are in need of Guidelines and criteria for investment and funding. 

Formalization of Minimum Service Standards (SPM) by PU is urgently required. 

PU PIU‐T 

PU’s  SPM  are  now completed; PPSP needs to  translate  those  in guidelines  for  local governments. 

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

A1 ‐ 3  

No  Issues  Recommendation  Main Actors 

Status per  

30 April 2011 

QPR4‐5  Cities  which  have  completed their  Draft  Program Memorandum  (DPM)  have  to “shop around” for funding from PU  Pusat,  from  Provinces  and from  possible  other  funding sources  based  on  existing procedures  of  individual Ministries.  PPSP  has  not  yet established  joint  PPSP‐specific funding  procedures  and regulations  which  would  truly be conducive to acceleration of sanitation  development  and more than “business as usual”. 

Accelerate  processes,  procedures and  regulations  that  truly  address and  support  the  challenges  of acceleration pursued under PPSP. 

PIU‐T, PMU 

 

USDP 

QPR2‐15  Split between executing (PMU/PIUs) and supporting (USDP) tasks is sometimes not so clear; requires regular consultations. 

Coordinators should have regular consultations to clarify USDP position and prevent misunderstandings; this is part of the dynamics of the different roles. 

USDP Management 

Improving, following regular consultations between PMU/PIUs and USDP Cells; USDP staff are also better equipped to explain what is within our services and what not. 

QPR4‐1  Best  interactions  and  benefits of  the  roles  of  Team  3  (SSK) and  Team  45  (PM)  in supporting  PIU‐T  and  its consultants  KMWs  and  KMPs are  still  not  fully  understood and  developed;  in  particular with regard to support to PPSP stakeholders  on  capacity building  and  training,  while PMU/PIUs  don’t  have resources  or  plans  to implement  required  training and  workshops  for  PPSP stakeholders  concerned (KMWs, KMPs, CFs/PFs, Pokjas, etc.). 

UC‐IF,  in  consultation with  the UC‐T should  prepare  the  grand  design  of capacity  building  and  training activities  in  PPSP  and  propose  and disseminate  the  design  to  PMU  and PIUs (ongoing). In  addition more exchange on  these issues between PMU and PIUs.   

USDP Management, UC‐IF, UC‐T PMU‐PIUs 

Level of discussions and mutual understanding and willingness to cooperate have greatly improved in the past 6 months. Continuing discussions on tasks and responsibilities of PPSP members and USDP support services will gradually result in further clarity and improvement of cooperation 

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

 

 ANNEX 2 

List of C

ompleted

 USD

P Re

ports a

nd Docum

ents 

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

A2 ‐ 1 

Annex 2  List of Completed USDP Reports and Documents 

Urban Sanitation Development Program 

Number  Issued  Report Title  Author 

USDP‐R‐PMU‐10001  April 2010  Inception Report  USDP Management and Coordinators 

USDP‐R‐PMU‐10002  April 2010  Quarterly Progress Report 1  USDP Management and Coordinators 

USDP‐R‐PIU.T‐10003  June 2010  Required additional Procedures and Guidelines related to implementation of Sanitation Development 

Jan Kraaij 

USDP‐R‐PMU‐10004  August 2010  Quarterly Progress Report 2  USDP Management and Coordinators 

USDP‐R‐PIU.T‐10005  June 2010  Laporan Overview SSK dan Identifikasi Kebutuhan Studi Lanjutan Sektor Sanitasi di 13 kota , yaitu: Jambi, Payakumbuh, Blitar, Banjarmasin, Batu, Pekalongan, Pekanbaru, Tegal, Banda Aceh, Kota Bukittinggi, Kota Denpasar, Kota Surakarta dan Kota Kediri 

Team 45 

USDP‐R‐PIU.T‐10006  June 2010  Tabulasi Overview Strategi Sanitasi Kota_13 Kota (Juni 2010) 

Team 45 

USDP‐R‐PIU.T‐10007  April 2010  Laporan Kunjungan Lapangan Dalam Rangka Penyusunan Memorandum Program_Pekalongan_Kediri_Blitar (bulan April 2010) 

Team 45 

USDP‐R‐PIU.T‐10008  April 2010  Laporan Kunjungan Kota Pendahuluan Dalam Rangka Pengenalan USDP & Memorandum Program Sektor Sanitasi_Kota Pekalongan 

Team 45 

USDP‐R‐PIU.T‐10009  April 2010  Laporan Kunjungan Kota Pendahuluan Dalam Rangka Pengenalan USDP & Memorandum Program (DRAFT) Sektor Sanitasi_Kota Blitar 

Team 45 

USDP‐R‐PIU.T‐10010  April 2010  Laporan Kunjungan Kota Pendahuluan Dalam Rangka Pengenalan USDP & Memorandum Program (DRAFT) Sektor Sanitasi_Kota Kediri 

Team 45 

USDP‐R‐PIU.T‐10011    Outline dan Format Isian Memorandum Program 

 

USDP‐R‐PIU.T‐10012  April 2010  Ringkasan Eksekutif Laporan Kunjungan Lapangan Dalam Rangka Penyusunan Memorandum Program_Pekalongan_Kediri_Blitar (bulan April 2010) 

Team 45 

USDP‐R‐PIU.T‐10013  30 July 2010  Laporan Review Strategi Sanitasi Kota (SSK)_13 Kota 

Team 45 

USDP‐R‐PIU.T‐10014  May 2010  Proceeding City Sanitation Summit VII‐Bukittinggi 

USDP Management and Coordinators 

USDP‐R‐PIU.T‐10015  March 2010  Proceeding Rakernas Peran Provinsi  USDP Management and Coordinators 

USDP‐R‐PIU.T‐10016  April 2010  Proceeding Lokakarya Nasional – Penjaringan Minat Kab/Kota Peserta Program PPSP 

USDP Management and Coordinators 

USDP‐R‐PIU.T‐10017  4 August 2010  Pedoman Penyiapan Kelembagaan dan Indikasi Kegiatan Program Percepatan Pembangunan Sanitasi Permukiman Daerah 

Team PPSP 

Urban Sanitation Development Program Quarterly Progress Report No. 05. January‐March 2011 

A2 ‐ 2 

Urban Sanitation Development Program 

Number  Issued  Report Title  Author 

USDP‐R‐PMU‐10018  15 October 2010  Quarterly Progress Report 3  USDP Management and Coordinators 

USDP‐R‐ USDP‐R‐PIU.T‐10019 

October 2010  Draft Program Memorandum Preparation   Team 45 

USDP‐R‐PMU‐10020  October 2010  Draft Manual Pengelolaan Program Percepatan Pembangunan Sanitasi Permukiman (PPSP) 

 

USDP‐R‐PIU.I‐10021  November 2010  Draft Laporan Penilaian Kebutuhan Pelatihan  (Training Needs Assessment) dan Usulan Program Pelatihan 

 

USDP‐R‐PIU.T‐10022  December 2010  Draft Program Memorandum  Team 45 

USDP‐R‐PIU.T‐10023  November 2010  Konsolidasi Data Usulan Program Kegiatan Hasil Road Show MP 

Team 45 

USDP‐R‐PIU.T‐10024  November 2010  Outline Draft Memorandum Program Sektor Sanitasi 

Team 45 

USDP‐R‐PIU.T‐10025  December 2010  Laporan Hasil Kunjungan Lapangan Penyiapan Penyusunan MP PPSP_periode Nov‐Dec'10 

Team 45 

USDP‐R‐PIU.T‐10026  December 2010  Draft Framework TOR KMP  Team 45 

USDP‐R‐PIU.T‐10027 December 2010 

Rekapitulasi Program Kegiatan Studi dan Desain Tahun Anggaran 2011  

Team 45 

USDP‐R‐PIU.T‐10028  December 2010  Rekapitulasi Program Kegiatan Studi dan Desain Tahun Anggaran 2011 ‐ 2014 

Team 45 

USDP‐R‐PMU‐10029    Quarterly Progress Report 4  USDP Management and Coordinators 

USDP‐R‐PMU‐10030  January 2011  Annual Report 2011  USDP Management and Coordinators 

USDP‐R‐PIU.I‐10031  February 2011  Draft TOR INDII: Support to Provincial Pokjas   

USDP‐R‐PIU.T‐10032    TOR KMW   

USDP‐R‐PIU.T‐10033    Laporan Review 17 Buku Putih  (The Assessment of 17 Draft WB) 

 

USDP‐R‐PIU.T‐10034    Laporan Observasi Interim Pendampingan Penyusunan SSK tahun 2010 

 

USDP‐R‐PIU.T‐10035  August 2010  Panduan Praktis Manual EHRA   

USDP‐R‐PIU.T‐10036    Draft Kerangka Acuan Kerja (KAK) Bantuan Teknis Konsultan Fasilitas EHRA  Draft Terms of Reference for the Provision of Technical Assistant by Environmental‐Health Risk‐Assessment Facilitation Consultant. 

 

USDP‐R‐PIU.T‐10037    Panduan Aspek Keuangan dalam Penyusunan MP 

 

USDP‐R‐PMU‐10038    Quarterly Progress Report 5 (1st quarterly of 2011) 

 

USDP‐R‐PIU.AE‐10039    Guidelines CMSS  Christine Sijbesma