View
221
Download
0
Embed Size (px)
8/3/2019 Purab Apartment Final With Add
1/45
8/3/2019 Purab Apartment Final With Add
2/45
Believe in rowthGBelieve in agicMBelieve in bundanceA
Believe you eserveD
Believe you can ffordA
T hi s N ew Y eargive your family the G ift of a L ifetime
SCHEME OPENSDecember 12, 2011
SCHEME CLOSESJanuary 12, 2012
Applyo
nlineat
orconta
ct the
designa
tedban
ks
mentione
datthe
backcover
www.gm
ada.gov
.in
(Please see Salient Featureson the back)
8/3/2019 Purab Apartment Final With Add
3/45
Scheme Opens 12-Dec-2011
Scheme Closes 12-Jan-2012
Uploading of applications data on
www.gmada.gov.in for verification byapplicants
01-Mar-2012
Objections/ Corrections to be intimated
by06-Mar-2012
Draw of lots Type 1 at 9:30 AM, PUDABhawan, Sector 62, Mohali
16-Mar-2012
Draw of lots Type 2 at 9:30 AM, PUDABhawan, Sector 62, Mohali
19-Mar-2012
Draw of lots Type 3 at 9:30 AM, PUDABhawan, Sector 62, Mohali
20-Mar-2012
PUBLICATION OF RESULT OFDRAW (OR NOTICE FORPOSTPONEMENT) IN INDIAN
EXPRESS (DELHI AND PUNJABEDITIONS), PUNJAB KESRI (DELHIAND PUNJAB EDITIONS), ROZANA
AJIT AND WEBSITEwww.gmada.gov.in.
22-Mar-2012
Submission of documents by those
successful in the draw of lots and thoseappearing in waiting list by 23-Apr-2012
LOI to be dispatched by GMADA by 23-May-2012
30% of the price of the apartment(minus earnest money paid with
application) to be deposited by
22-Jun-2012
Please note the important dates and events
*NO INDIVIDUAL INTIMATIONS WILLBE SENT.
* Earnest money of all unsuccessful applicants will be refunded within90 days of closure of scheme (except in case of any factors beyondcontrol of GMADA)
8/3/2019 Purab Apartment Final With Add
4/45
ABOUT MOHALI
With practically no limitations or limits to its expansion and beingvirtually extension of Chandigarh, the state capital, Mohali has
naturally come to be the hub of modern urban growth of Punjab.
With clean air, canal water and ample sunshine Mohali Region is
endowed with all the nature's gifts for a healthy living.
It is not chance but nature's design that this terrain witnessed
one of the earliest civilizations on earth 5000 years back andtoday has one of the most admired examples of urban planning
in the country with easy grid layout of roads, well planned
markets and open areas and has a Cricket Stadium that is
known world over.
With International School of Business, Indian Institute of
Technology(IIT) at 35 kms, Indian Institute of Science and
Research, Biotech Park, National Institute of Biotechnology,Quark, Dell, Semi Conductor Complex to name a few and the
upcoming International Airport, Mohali is only regaining the glory
due to it. With a current population of 2,50,000 and a rapid pace
of in-migration comprising of professionals and those seeking
good education for children and Punjabi diaspora cherishing a
nest back home, Mohali is fast becoming a shining star of North
India.
(i)
8/3/2019 Purab Apartment Final With Add
5/45
Type TotalNumber
Bed-room
Drawing/Dining
Kitchen Bath-room
Servant/
Office
Room
SuperArea
(in Sq.Ft.)Excluding
Car Parking
Price(in Rs/
Lac)
I 900
II 1800
III 1800
1
2
3
1
1
1
1
1
1
1
2
2
1
1
1
BasementParking
1
2
2
1095
1571
2221
37.00345
55.00690
69.00690
No. ofCars
Area(in Sq.Ft.)
APARTMENT TYPES (All 15 Storey)
B elieve and D reamsC ome T rue
8/3/2019 Purab Apartment Final With Add
6/45
DETAIL OF APARTMENTS (*SUBJECT TO CHANGE)
(iii)
Type ( See layout plans,Site Plans andSpecifications fromIndex)
Type1 Type 2 Type 3
Price* (Rs. Lac) 37 55 69
Earnest Money 10%(Rs. lac)
3.7 5.5 6.9
Total %
CategoryCode
Category (* SeeSubcategories also on
backside of Form)900 1800 1800 4500 100
A General 576 1152 1152 2880 64
B Scheduled Caste 135 270 270 675 15
C Defence Personnel 36 72 72 180 4
KLegal Heirs of Defencepersonnel killed on duty
18 36 36 90 2
N100% Disabled Soldiersof Punjab
9 18 18 45 1
R Riot / Terrorist Victims 45 90 90 225 5
D Disabled persons 27 54 54 135 3
F Freedom Fighters 18 36 36 90 2
S Sports persons 18 36 36 90 2
GGallantry AwardWinners
18 36 36 90 2
Number of Apartments
8/3/2019 Purab Apartment Final With Add
7/45
APARTM
ENTAREAS
(iv)
8/3/2019 Purab Apartment Final With Add
8/45
(v)
LAYOUT PLAN
(Subject to minor modifications)
TOTALSITEAREA-
117ACRE
8/3/2019 Purab Apartment Final With Add
9/45
(vi)
TYPICALFLO
OR
PLAN
(TYPE1)
(Subject to minor modifications)
N
S E
W
F
RONT
8/3/2019 Purab Apartment Final With Add
10/45
INTERIOR VIEW (TYPE 1)
(vii)(Subject to minor modifications)
N
S
E
W
8/3/2019 Purab Apartment Final With Add
11/45
(viii)
TYPICALFLO
OR
PLAN
(TYPE2)
(Subject to minor modifications)
N
S E
W
F
RONT
8/3/2019 Purab Apartment Final With Add
12/45
INTERIOR VIEW (TYPE 2)
(ix)(Subject to minor modifications)
N
S
E
W
8/3/2019 Purab Apartment Final With Add
13/45
(x)
TYPICALFLO
OR
PLAN
(TYPE3)
(Subject to minor modifications)
N
S E
W
F
RONT
8/3/2019 Purab Apartment Final With Add
14/45
INTERIOR VIEW (TYPE 3)
(xi)(Subject to minor modifications)
N
S
E
W
(Excl. Almirah)(Excl. Almirah)
(Excl. Almirah)
8/3/2019 Purab Apartment Final With Add
15/45
SALIENT FEATURES
B el i eve, and D r eams come t r ue . 75% open spaces. All locations good. All apartments North- East facing with bigWindows and Balconies. Designed respecting the age old
wisdom of Vaastu. All areas in each apartment designed to letFresh Natural Air flow through and with movement of Sun inview. Minimal requirement of electricity. To be built by firms of national repute, with steel, cement,paints, flooring, prefabricated doors, bathroom fittings andkitchen fittings of only reputed brands (*see overleaf). Pipesonly through open ducts and not walls. Quality of constructionto be supervised by third party independent agencies. 24 hour pressurized water supply. No overhead or rooftopwater tanks. Piped metered LPG/ NPG, Garbage chute. Automatically switching Common Generator backup for fans,lights, TV and Fridge @ 0.8,1 & 1.2 kW per house, as persize. Underground electric cabling no electric poles. Alternatives over parental controls - 3 All Weather 25 meterIndoor Swimming Pools, 8 Lawn Tennis Courts, 2 SkatingRinks, 8 Indoor Badminton Courts & 8 Table Tennis tables,Two 5000 sq. ft Gyms, 8 Basket Ball Courts, 8 Volley Ballcourts, 2 Football Grounds, Over mile long Walking Tracks, aCommunity Centre + Club + Yoga & Meditation Hall with
(xii)
8/3/2019 Purab Apartment Final With Add
16/45
(xiii)
30000 sq. feet covered area and Convenient Shopping for day
to day needs to be provided within 5 minutes walking distance
of every apartment as a matter of right, as soon asconstruction of apartments concludes.
Card plus Finger Print based Common Entry Control for
security. 4 feet high railings for safety.
To be designed and built so as to withstand earthquakes as
per Zone 4 notified by GOI. (7 on Richter scale).
Spacious fast elevators and fire fighting equipment.
Possession to be handed over in 36 months from date ofdraw.
8/3/2019 Purab Apartment Final With Add
17/45
W hy go v er t i cal : Arranging skilled labour and quality materials for houseconstruction and maintaining it thereafter becomingincreasingly difficult for individuals. Apartments allow for professional construction, cost cuttingtechnologies, and quality materials at reasonable rates due toeconomy of scales. Vertical development needs lesser roads, provides more openspace, allows better planning and better orientation of allbuildings for natural ventilation and sunlight. Transportation reduces as amenities are arranged withinwalking / cycling distance leaving more time for fruitfulactivities. Cleaner air comes as bonus. Mass transport like Metro Rail become feasible with higher
population density.
(xiv)
8/3/2019 Purab Apartment Final With Add
18/45
(xv)
LIST OF APPROVED MAKES OF FINISHING ITEMS,
FITTINGS, FIXTURES AND ENGINEERING INSTALLATIONS
Items
Approved make / materials
Civil Finishes
Flooring in Bed Rooms, Living
Full thickness vitrified tiles 600MM X600MM (RAK, Restile, Nitco)
Flooring in Corridors, Balconies,Toilets, Kitchen
Full thickness anti-skid vitrified tiles (RAK,Restile, Nitco)
Staircase Treads Kota StoneFlooring in Lift Lobbies Full body anti-skid vitrified tiles with flame-
torched granite border (makes as above)Wall finishes (interior) Gypsum Punning on walls finis