1 DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014 Public Workshop 2 April 21, 2014 ALTERNATIVES Presentation and Review This is part 2 of 2 of the presentation shown at the April 21 public workshop. This document has been edited and augmented to serve as a stand-alone document providing an overview of the key topics discussed at the Workshop.

Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

1DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Public Workshop 2April 21, 2014ALTERNATIVES Presentation and Review

This is part 2 of 2 of the presentation shown at the April 21 public workshop. This document has been edited and augmented to serve as a stand-alone document providing an overview of the key topics discussed at the Workshop.

Page 2: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

2DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

For additional background information on the Study, please refer to the first half of the presentation, in a separate PDF file.

THIS IS PART 2 of 2.

Page 3: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

3DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Circulation AlternativesThis section of the presentation describes three possible alternatives for changes to the street circulation network. The focus at this stage of the Study is on traffic flow direction and speeds, and how changes to the physical design of streets might improve the walking environment and enhance public spaces downtown. At key intersections such as Upper and Lower Squares and Chestnut/Third Streets, on-street parking spaces and curb cuts to off-street parking areas would be adjusted accordingly.

Page 4: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

4DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A: Enhanced One-way Loop. This keeps the traffic flow directions similar to current conditions, but makes changes to Lower and Upper Squares and Chestnut Street. It also changes Henry Law Avenue to two-way and closes it off from Lower Square.

Summary of Alternatives. Below is an overview of the three circulation alternatives. Later sections of this document will explain more detail about each.

Alternative B: Two-way Loop. Compared to current conditions, this alternative changes the inner loop streets of Main, Washington, and Central to two-way flow; and reverses the direction on Chapel Street.

Alternative C: Enhanced Two-way Loop. This is similar to Alternative B in most respects. But like Alternative A, it changes Henry Law Avenue to two-way and closes it off from Lower Square.

Page 5: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

5DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative AEnhanced One-Way Loop.

The following section describes the elements of Alternative A.

Page 6: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

6DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Lower Square Close Henry Law Ave. access Additional northbound right lane

Upper Square Plaza on western side of square Road diet: Third St. to Fifth St.

Chestnut Street Road diet: Washington St. to Third

St. with bike lanes and median Reconfigured Third St.

intersection

Alternative A: Enhanced One-way Loop

Page 7: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

7DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

At right is a conceptual drawing showing how the streetscape might be realized for the options of Alternative A.

Alternative A: Enhanced One-way Loop

Details of tree locations, pedestrian plazas, crosswalks, and parking spaces are for graphic representation only and do not reflect final proposed locations.

Page 8: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

8DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Lower Square Illustration

Reduce from four approach lanes to three

Henry Law Ave. Closure. The closure would create reclaimed space (3,800 SF) to use for a pedestrian plaza. Emergency vehicle access would be preserved across the pedestrian space.

Additional northbound approach lane

Tightened intersection to improve pedestrian safety at crosswalks.

2034 PM Level of Service improves from F to D

Page 9: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

9DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Lower Square Illustration

Reduce from four approach lanes to three

Additional northbound approach lane

2034 PM Level of Service improves from F to D

Henry Law Ave. Closure. The closure would create reclaimed space (3,800 SF) to use for a pedestrian plaza. Emergency vehicle access would be preserved across the pedestrian space.

Tightened intersection to improve pedestrian safety at crosswalks.

Details of tree locations, pedestrian plazas, crosswalks, and parking spaces are for graphic representation only and do not reflect final proposed locations.

Page 10: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

10DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Lower SquareStreetscape Plan and Perspective

Page 11: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

11DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Implications for access on Williams and George Streets

Closing Henry Law Avenue

Page 12: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

12DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Upper Square

Reduce from four approach lanes to three

Reclaimed plaza space (11,000 SF) ) to use for a pedestrian plaza. Emergency vehicle access would be preserved across the pedestrian space.

Signalized Intersections

One lane in each direction, with left turn pocket for Broadway

2034 PM Level of Service remains LOS D

Parking along street edges

Page 13: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

13DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Upper Square Illustration

Reduce from four approach lanes to three

Signalized Intersections

One lane in each direction, with left turn pocket for Broadway

2034 PM Level of Service remains LOS D

Reclaimed plaza space (11,000 SF) ) to use for a pedestrian plaza. Emergency vehicle access would be preserved across the pedestrian space.

Details of tree locations, pedestrian plazas, crosswalks, and parking spaces are for graphic representation only and do not reflect final proposed locations.

Parking along street edges

Page 14: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

14DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Upper SquareStreetscape Plan and Perspective

Page 15: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

15DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Portland StreetStreetscape Plan

Note: Tree locations are for graphic representation only and do not reflect final proposed locations.

Page 16: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

16DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A Focus: Chestnut Street Chestnut St. is proposed for a

“road diet” – conversion from 4 travel lanes to 3 lanes, making more space for pedestrians. Bike Lane: 5’ lane from

Washington to Fourth Street, converts to a shared lane marking further north

Landscaped Median: +/-6’ width

Third Street Intersection Re-alignment, with reduced

pavement

Bus Stops NB at Orchard Street Lot SB at Riverview Apts

Page 17: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

17DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Current Conditions

Chestnut Street

Page 18: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

18DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Click to edit Master title style

Alternative A: Chestnut Street Road Diet – Cross-Section

Page 19: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

19DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Reconfigured intersection

Consolidate access to Transportation Center

Alternative A Focus: Third Street Intersection Illustration and Diagram

Reconfigured 4-way intersection. Reduced footprint.

Reconfigured access to Transportation Center.

Page 20: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

20DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A: Signalization and Traffic Control

Relocated signals with intersection changes

New signalized intersection

New Stop sign

Page 21: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

21DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative A: Proposed Bicycle Facilities

P

Bicycle lanes

Bicycle Parking/Racks

Bicycle routes

P

Bicycle LockersL L

P

P

PL

P

P

Page 22: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

22DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative BTwo-way Loop.

The following section describes the elements of Alternative B.

Page 23: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

23DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Lower Square Henry Law Ave access remains open Additional northbound right lane

Upper Square Plaza on eastern side of square Reverse flow on Chapel St

Chestnut Street Road diet: Washington St. to Third St.

with on-street parking & median Third St mini-roundabout Signal at Central Ave

Main St/Portland Ave Intersection Aligned with Young St + four-way stop

Alternative B: Two-way Loop

Page 24: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

24DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

At right is a conceptual drawing showing how the streetscape might be realized for the options of Alternative B.

Alternative B: Two-way Loop Illustration

Details of tree locations, pedestrian plazas, crosswalks, and parking spaces are for graphic representation only and do not reflect final proposed locations.

Page 25: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

25DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B Focus: Lower Square

Remains one-way southbound

Two-way traffic flow

Additional northbound approach lane

2034 PM Level of Service improves from F to E

Tightened intersection to improve pedestrian safety at crosswalks.

Page 26: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

26DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B Focus: Lower Square Illustration

Remains one-way southbound

Two-way traffic flow

Additional northbound approach lane

2034 PM Level of Service improves from F to E

Tightened intersection to improve pedestrian safety at crosswalks.

Details of tree locations, pedestrian plazas, crosswalks, and parking spaces are for graphic representation only and do not reflect final proposed locations.

Page 27: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

27DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B Focus: Upper Square

2034 PM Level of Service remains LOS D

Reverse flow along Chapel St

Reclaimed plaza space (13,000 SF)

Signalized Intersections

One lane in each direction, with left turn pocket for Broadway

2034 PM Level of Service remains LOS D

Reconfigured Main St approach into Central Ave.

Parking along street edges

Page 28: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

28DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B Focus: Upper Square Illustration

Reverse flow along Chapel St

Signalized Intersections

Reclaimed plaza space (13,000 SF) to use for a pedestrian plaza or green space.

One lane in each direction, with left turn pocket for Broadway

2034 PM Level of Service remains LOS D

Reconfigured Main St approach into Central Ave.

Note: Tree locations are for graphic representation only and do not reflect final proposed locations.

Parking along street edges

Page 29: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

29DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B Focus: Upper SquareStreetscape Plan and Perspective

Page 30: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

30DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

“Square up” Intersection Four-way Stop

Control LOS C/D in 2034

Alternative B: Main St/Portland Ave

Page 31: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

31DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B: Chestnut Street Illustration and Diagram Road Diet – Conversion from 4 lanes

to 3 lanes On-Street Parking:

• West Side – Washington to Third Street

• Both Sides - North of Third Street

Landscaped Median: +/-12’ width

Third Street Intersection Mini-roundabout Reduced pavement

Bus Stops Northbound at Orchard Street Lot Southbound at Riverview Apts

Signalized intersection at Chestnut and Central Ave

Page 32: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

32DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B: Chestnut Street

Page 33: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

33DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

“Mini roundabout” LOS B in 2034 Consolidate access to

Transportation Center

Alternative B: Third Street Intersection

Mini-roundabout

Reconfigured access to Transportation Center.

Page 34: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

34DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B: Signalization and Traffic Control

Relocated signals with intersection changes

New mini roundabout

New Stop sign

Reorganized Stop signs

Page 35: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

35DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative B: Proposed Bicycle Facilities

PBicycle Parking/Racks

Bicycle routes

P

Bicycle LockersL L

P

P

PL

P

P

Page 36: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

36DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative CEnhanced Two-way Loop

The following section describes the elements of Alternative C.

Page 37: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

37DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Lower Square Close Henry Law Ave access Additional northbound lane

Upper Square Plaza on eastern side of square Reverse flow on Chapel St

Chestnut Street Road diet: Washington St. to Third

St. with bike lane & median Third St mini-roundabout Signal at Central Ave

Main St/Portland Ave Intersection Mini-roundabout

Alternative C: Enhanced Two-way Loop

Page 38: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

38DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C: Enhanced Two-way Loop

At right is a conceptual drawing showing how the streetscape might be realized for the options of Alternative C.

Details of tree locations, pedestrian plazas, crosswalks, and parking spaces are for graphic representation only and do not reflect final proposed locations.

Page 39: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

39DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C Focus: Lower Square Illustration2034 PM Level of Service remains LOS D

Two-way traffic flow

Additional northbound approach lane

Note: Tree locations are for graphic representation only and do not reflect final proposed locations.

Henry Law Ave. Closure. The closure would create reclaimed space (3,800 SF) to use for a pedestrian plaza. Emergency vehicle access would be preserved across the pedestrian space.

Tightened intersection to improve pedestrian safety at crosswalks.

Page 40: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

40DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C Focus: Lower SquareStreetscape Plan and Perspective

Page 41: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

41DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C Focus: Upper Square

2034 PM Level of Service remains LOS D

Reverse flow along Chapel St

Reclaimed plaza space (13,000 SF) to use for a pedestrian plaza or green space.

Signalized Intersections

One lane in each direction, with left turn pocket for Broadway

2034 PM Level of Service remains LOS D

Reconfigured Main St approach into Central Ave.

Parking along street edges

Page 42: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

42DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C Focus: Upper Square Illustration

Reverse flow along Chapel St

Signalized Intersections

One lane in each direction, with left turn pocket for Broadway

2034 PM Level of Service remains LOS D

Reconfigured Main St approach into Central Ave.

Note: Tree locations are for graphic representation only and do not reflect final proposed locations.

Reclaimed plaza space (13,000 SF) to use for a pedestrian plaza or green space.

Parking along street edges

Page 43: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

43DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C Focus: Upper SquareStreetscape Plan and Perspective

Page 44: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

44DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Install mini-roundabout

Traversable center median for trucks and large emergency vehicles

Trucks heading north would take Chapel Street, or make a left onto Main and go up Central

Alternative C: Main St/Portland Ave

Page 45: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

45DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C: Signalization and Traffic Control

Relocated signals with intersection changes

New mini roundabouts

New Stop sign

Page 46: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

46DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternative C: Proposed Bicycle Facilities

P

Bicycle lanes

Bicycle Parking/Racks

Bicycle routes

P

Bicycle LockersL L

P

P

PL

P

P

Page 47: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

47DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Circulation Alternatives: Summary and Comparative Evaluations

Page 48: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

48DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alt A: Enhanced One-way Loop

Summary of Alternatives

Alt B: Two-way Loop Alt C: Enhanced Two-way Loop

Page 49: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

49DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternatives

Alternative A: Alternative B: Alternative C:Enhanced One way Loop Two way Loop Enhanced Two way Loop

Traffic Capacity

Traffic Mobility

Safety Enhancement

Vehicle Emissions

Ped/bike Mobility

Reclaimed Space

Alt A: Enhanced One-way Loop

Alt B: Two-way Loop

Alt C: Enhanced Two way loop

No Build Alt A Alt B Alt C

Upper Square D D D DLower Square E D D D

Main St/Portland Ave C C C CMain St/Washington St C C C C

No Build Alt A Alt B Alt C

Upper Square D D D DLower Square F D E D

Main St/Portland Ave D D D DMain St/Washington St E F D D

2014 PM Peak Hour

2034 PM Peak Hour

9 12 15

Congestion

Performance Indicators

Page 50: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

50DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Alternatives Evaluation Matrix: Safety and Operations

Alternative A: Alternative B: Alternative C:Enhanced One way Loop Two way Loop Enhanced Two way Loop

Traffic Capacity

Traffic Mobility

Safety Enhancement

Vehicle Emissions

Ped/bike Mobility

Reclaimed Space

9 12 15

Page 51: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

51DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Comparative Cost Implications

Alternative A Alternative B Alternative COne-way Loop Two-way Loop Enhanced Two-Way Loop

Type/ Approximate Length (linear feet)

Relative Cost Factor

Type/ Approximate

Length (linear feet)Relative Cost

FactorType/ Approximate Length (linear feet)

Relative Cost Factor

Major Intersection ReconfigurationUpper Square reconstruct high reconstruct high reconstruct highLower Square reconstruct high reconstruct high reconstruct highPortland Street reconstruct high reconstruct high reconstruct highChestnut at Third Street minor change low roundabout high roundabout highNew Intersection SignalizationChestnut at Third Street 1 new signal high N/A N/A N/A N/AMajor Street ReconfigurationChestnut Street 1,450 LF high 1,300 LF high 1,300 LF highStreet and Streetscape ImprovementsCentral Avenue 1680 LF low 1680 LF low 1680 LF lowMain Street 680 LF low 680 LF low 680 LF lowChestnut Street 950 LF low 950 LF low 950 LF lowWilliams Street 380 LF moderate N/A** N/A** 380 LF moderateGeorge Street 600 LF moderate N/A** N/A** 600 LF moderateStreetscape/Sidewalk ImprovementsFirst through Sixth Streets 3,000 LF moderate 3,000 LF moderate 3,000 LF moderateWashington Street 420 LF low 420 LF low 420 LF lowPedestrian PathsEnhanced Off-Street Paths 3,470 LF low 3,470 LF low 3,470 LF low* Costs are relative costs for this type of improvement based on typical area or linear footage (LF) of construction** Improvements to Williams Street and George Street for vehicles and pedestrians are advisable, regardless of whether access is retained or removed from the intersection of Washington Street and Chestnut Street

Page 52: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

52DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Total costs are comparable among all three alternatives

All three alternatives propose substantial reconfiguration of Upper Square, Lower Square and Portland Street/Main Street, and lower Chestnut Street -regardless of the decisions on street directions

Alternative A proposes a new signalized intersection at Chestnut/Third Street, while Alternatives B and C would provide an unsignalized roundabout; the costs would likely be somewhat higher for the roundabout solution.

Alternative A and C would require traffic and pedestrian improvements for Williams Street and George Street, if the intersection of Henry Law at Washington Street/Central Avenue is removed. However, both streets and overall circulation would benefit from improvements to these streets, regardless of the circulation decision.

Comparative Cost Implications

Page 53: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

53DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Comparative Phasing Implications

Construction phasing options for all three alternatives are generally comparable

The Chestnut Street improvements and many streetscape improvements could be accomplished incrementally, and are not dependent upon the overall circulation scheme.

In general, two-way street systems tend to be more adaptable and flexible for accommodating construction over time, because they provide redundant routes.

For any of the alternatives, improvements could occur incrementally, in association with a sequence of major intersection changes followed by lane reassignments.

Page 54: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

54DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

Next Steps

Page 55: Public Workshop 2 - dover.nh.gov€¦ · DOVER Downtown Pedestrian and Vehicular Access Streetscape Study |PUBLIC WORKSHOP 04/21/2014 1 Public Workshop 2 April 21, 2014 ALTERNATIVES

55DOVER Downtown Pedestrian and Vehicular Access Streetscape Study | PUBLIC WORKSHOP 04/21/2014

On-line presentation and information (this document) Access through www.ci.dover.nh.us (Planning and Community Development)

On-line survey: Access beginning April 28 on-line through

www.ci.dover.nh.us (Planning and Community Development)

Alternatives Open House Additional discussion and input May 15, 6 to 8 PM McConnell Center Media room, 61 Locust Street

May-June: selection and refinement of preferred alternative

June: Public Workshop #3

Next Steps