69

Przemyslaw Gwizdala portfolio

Embed Size (px)

DESCRIPTION

Przemyslaw Gwizdala portfolio

Citation preview

P O R T F O L I O

curriculum vitaedate of birth

name and surnamemartial status

englishmobileemail

present address

11 february 1977Przemysław Gwizdałasinglegood+(48) 508 316 [email protected]. Przyjazni 9/78,61-684 Poznan, Poland

driving licencecat. B October 2003-January 2007

1996-2002Poznan University of Technology, ul. Nieszawska 15,

CDF Architekci Biuro Projektowe, ul. Marcelinska 90, 60-324 Poznan, Poland +48/ 61/ 860 21 21, www.cdf.net.pl

March 2007-October 2009HBK Architects, 2 Garvey Studios, 2-14 Longstone St, Lisburn, Northern Ireland +44/ 028/ 9262 8031, www.hbkarchitects.com

+48/ 61/ 867 17 17, www.archimedia.com.plMarch-August 2003Archimedia Architekci & Inzynierowie, ul. Wolsztynska 4, 60-361 Poznan, Poland

+48/ 61/ 860 21 21, www.cdf.net.plJune 2010-December 2011CDF Architekci Biuro Projektowe, ul. Marcelinska 90, 60-324 Poznan, Poland

Faculty of Architecture and Urban Planning,

October/December 2011Investorstage

software used

GV ELK SP. z O.O.in CDF Architekci

Archicad 10from the concept design through the building permission project and up to the tender project for a building B 100%

A SHOPPING MALL COMPLEX IN ELK - A BUILDING Bsite layout

plans elevations

sections

June/August 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, Photoshop CSvisualisation 100%

A STRZESZYN HOUSING NEAR POZNAN - COMPETITION PART I site layoutplans elevations sections

June/August 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, Photoshop CSconcept design 100%, visualisations 100%

A STRZESZYN HOUSING NEAR POZNAN - COMPETITION PART I Isite layout

June/July 2011Investorstage

software used

Harx toolingin CDF Architekci

Archicad 10, 3d studio max, Photoshop CSoutlook design 100%, visualisation 100%

A MODERNIZATION OF A MANUFACTORY NEAR POZNAN - AN OUTLOOK DESIGN

plans of an office building a plan of a workshops first floor a plan of a workshops ground floor

March/April 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, Photoshop CSconcept design 70%, outlook design 100%, visualisation 100%

AN OFFICE BUILDING WITH A WAREHOUSE NEAR POZNAN - A CONCEPT DESIGNa site layoutplans elevations sections

May 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, Photoshop CSvisualisations 100%

A MONUMENT CONCEPT DESIGN - A VISUALISATION

May/June 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, V-ray, Photoshop CSconcept design 50%, layouts 100%, visualisation 100%

A GAS STATION NEAR POZNAN - CONCEPTION

April 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, Photoshop CSvisualisation 100%

the NAPOLEONIC ROAD - A HOUSING CONCEPTIONsite layout

March 2011Investorstage

software used

privatein CDF Architekci

Archicad 10, 3d studio max, Photoshop CSconcept design 30%, outlook design 100%

A WALBRZYSKA STREET - AN APARTMENT BUILDING CONCEPTIONsite layout

sectionsplans

October 2010Investorstage

software used

Ora Greenin CDF Architekci

Archicad 10, 3d studio max, Photoshop CSoutlook design 100%, visualisation 80%

A ZEROMSKIEGO STREET in POZNAN - A HOTEL PROJECT ADAPTATIONsite layout

September/October 2010Investorstage

software used

privatein CDF Architekci

Archicad 10, Artlantis Studio R, Photoshop CSconcept design 100%, outlook design 100%, visualisation 100%

the ZIELONY DWOR HOUSING in POZNAN - A CONCEPTIONsite layoutground floor

elevations

floor plans

November/December 2010Investorstage

software used

Curtis Healthcupsin CDF Architekci

Archicad 10, Artlantis Studio, Photoshop CSoutlook concept design 100%, visualisation 100%, erected 2011

the CURTIS HEALTHCARE - AN OFFICE BUILDING OUTLOOK CONCEPTION

ground floor plan

site layoutfirst flor plan

August/September 2010Investorstage

software used

privatein CDF Architekci

Archicad 10, Artlantis Studio R, Photoshop CSoutlook design 100%, visualisations 100%

A DRAFT CONCEPT OF A HOTEL NEAR HETMANSKA St in POZNANsite layout

August 2009Investorstage

software used

privatein HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CSconcept design 80%

DWELLING REPLACEMENT -HENDERSONs HOUSEground floor plan first floor plan

elevations

BUTTERMILK LONEY

2008-2009investorstage

software used

AJW properties Ltd.in HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 100%, renderings 100%, planning-application 100%

floor plans, elevations of specific units

BUTTERMILK LONEY

2008-2009investorstage

software used

AJW properties Ltd.in HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 100%, renderings 100%, planning-application 100%

July 2009Investorstage

ground floor1st floor

site analysis

software used

privatein HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 100%

CRAWFORDSBURN PRIVATE HOUSE

December - July 2009Investorstage

software used

privatein HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 100%, renderings 100%

BALLYNAHINCH - PRIVATE HOUSEconcept statement floor plans sections

elevations

July 2009Investorstage

software used

privatein HBK Architects

Artlants Studio 2, Photoshop CS2visualisation 100%

KENNEDYs HOUSE

October-February 2009Investorstage

software used

privatein HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 100%, renderings 100%, planning application 100%

HARBERTON PARK BELFAST - APARTMENTS BUILDING 1st versionconcept statement ground floor elevations 2nd floor

1st floor

October-February 2009Investorstage

software used

privatein HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 100%, renderings 100%, planning application 100%

HARBERTON PARK BELFAST - APARTMENTS BUILDING 2nd versionconcept statement site plan elevations

May 2009Investorstage

software used

privatein HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CS2concept design 60%, renderings 100%, tender project 40%

O KANES REFURBISHMENT

June - August 2009Investorstage

software used

WCACin HBK Architects

Archicad 11, Artlantis Studio 2, Photoshop CSconcept design 30%, visualisation, outlook 100%

WEST CORK ARTS CENTRE COMPETITION

basement ground floor plan first floor plan second floor plan

March 2007 - November 2008Investorstage

software used

privatein HBK Architects

Archicad 10, Artlantis R, Photoshop CSconcept design 80%, planning application 100%

HOLLBORN HILL - MARKIEVICZ PHARMACYplans elevations

NORTH CITY BUSINESS CENTRE

November 2007investorstage

software used

privatein HBK Architects

Archicad 10, Artlantis R, Photoshop CSconcept design (outlook) 100%, renderings 100%

floor 8

stage 2

floors 1-7ground floor

October 2006Investorstage

software used

Nickel Sp. z o.o.in CDF Architekci

Archicad 10, Artlants R, Photoshop CSconcept design 60%, renderings 100%

APARTMENTS BUILDING IN POZNAN

ground floorfloor -1

October 2006Investorstage

software used

SQ klub in CDF Architekci

Archicad 10, Artlants R, Photoshop CSconcept design 100%

SQ klub INTERIOR DESIGN

swcond floorfirst floorground floor

January - September 2006Investorstage

software used

Budizol S.A.in CDF Architekci

Archicad 9, Artlants R, Photoshop CS concept design 100%,

WLOCLAWEK SQUARE - WZORCOWNIA - BUILDING D

first floorground floorbasement

January - September 2006Investorstage

software used

Budizol S.A.in CDF Architekci

Archicad 9, Artlants R, Photoshop CS concept design 100%,

WLOCLAWEK SQUARE - WZORCOWNIA - BUILDING A

site plan

January - September 2006Investorstage

software used

Budizol S.A.in CDF Architekci

Archicad 9, Artlants R, Photoshop CS whole concept design 80% (detailed drawings: building A 100%, building D 100%) erected 2009

WLOCLAWEK SQUARE - WZORCOWNIA

site plan

basement 4th floor

1st, 2nd and 3d floor

first and second floor

December 2005Investorstage

software used

O.K. Medical Systemsin CDF Architekci

Archicad 9, Artlants R, Photoshop CSconcept design 100%

PASSAGE 77 - CONCEPT II

1st, 2nd and a 3rd floorfourth floor site plan/ground floor

sections

August 2005Investorstage

software used

O.K. Medical Systemsin CDF Architekci

Archicad 9, Artlants R, Photoshop CSconcept design 100%

PASSAGE 77 - CONCEPT I

ground floorfirst floor

November 2004Investorstage

software used

Pro - San s.c. in CDF Architekci

Archicad 9, Artlants R, Photoshop CSwhole concept design 100% (detailed design - hotel 100%, SPA 20%, apartments 20%)

SET OF BUILDINGS: HOTEL + SPA + APARTMENTS IN KOLOBRZEG - COMPETITION FOR Pro-San s.c.