19
MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi

Prototype TOF test for tracker test @ KEK

  • Upload
    akina

  • View
    51

  • Download
    5

Embed Size (px)

DESCRIPTION

Prototype TOF test for tracker test @ KEK. Osaka university Atsushi Horikoshi. contents. magnetic field of Super Jacee shape of TOF timing resolution test @KEK-PS pi2 Analysis calibration for PhaseⅡ. PhaseⅡsetup (KEK-PS pi2). perpose measurement of momentum emittance reconstruction. - PowerPoint PPT Presentation

Citation preview

Page 1: Prototype TOF test  for tracker test @ KEK

MICE tracker meeting 2005.3

Prototype TOF test for tracker test @ KEK

Osaka universityAtsushi Horikoshi

Page 2: Prototype TOF test  for tracker test @ KEK

contents magnetic field of Super Jacee shape of TOF timing resolution test @KEK-PS pi2 Analysis calibration for PhaseⅡ

Page 3: Prototype TOF test  for tracker test @ KEK

PhaseⅡsetup (KEK-PS pi2)

perpose measurement of momentum emittance reconstruction

Page 4: Prototype TOF test  for tracker test @ KEK

super conducting magnetSuper JACEE , 1T

2.1m

φ850mm

vessel for ballonexperiment

front veiw

side view

Page 5: Prototype TOF test  for tracker test @ KEK

requirement of TOF π/μ PID

3σresolution momentum scan

measurement of absolute value resolution of momentum

keep high timing resolution in magnetic field

Page 6: Prototype TOF test  for tracker test @ KEK

π/μPID momentum of Phase Ⅱ

300 ~ 600Mev/c timing resolution f

or 3σPID upstream 50ps down strean 50ps

3σPID

Page 7: Prototype TOF test  for tracker test @ KEK

momentum timing resolution

upstream 50ps downstream 50ps

momentum resolution p<600MeV Δp/p<5.6%

7

00.25 0.6

Page 8: Prototype TOF test  for tracker test @ KEK

shape of TOF to avoid reduction of timing resolution

fine mesh PMT (used BESS experiment) R6504S (hamamatsu, 19DY)

PMT is parallel to magnetic field long light guide

Page 9: Prototype TOF test  for tracker test @ KEK

magnetic field 1500Gauss ,almost parallel satisfies the condition

コイル

Page 10: Prototype TOF test  for tracker test @ KEK

effect of the ground of iron@PMT

1T

thanks for Arimoto san

TOSCA

Page 11: Prototype TOF test  for tracker test @ KEK

magnetic field of PMT the effect of iron

is small

iron

y

0

geometry

magnetic filed first second third

Page 12: Prototype TOF test  for tracker test @ KEK

prototype test( KEK-PS pi2,2005 Feb)

guide7 simulation timing resolution47ps

setup of beamline

Page 13: Prototype TOF test  for tracker test @ KEK

analysis

ref2)}(ref1σ

ref2)(tofσ

ref1)(tof{σ

(tof)σ

2

2

2

2

1

2

σ(tof-ref1) =64ps

⇒σ ( tof ) =49ps

Page 14: Prototype TOF test  for tracker test @ KEK

position scan,timing resolution

timing resolution[ ps ]

●: PMTR〇: PMTL

under ●weightedmean

distance from center[ cm ]

90

timing resolution is 50ps @ all position

50

0

0 2020

satisfied condition of PID

Page 15: Prototype TOF test  for tracker test @ KEK

position scan 2 , npe npe

600~800 very high npe

attenuation length 118cm

Page 16: Prototype TOF test  for tracker test @ KEK

effective velocity

Veff=15.3cm/ns not good linearity

Page 17: Prototype TOF test  for tracker test @ KEK

calibration for PhaseⅡ we can’t determine hit position from ext

ernal tracker in PhaseⅡ calculation from tdc mean Veff=15.3cm/ns

t(hitR)=tr-(20-z)/Veff t(hitL)=tl-(20-z)/Veff z=(tr-tl)xVeff/2

Page 18: Prototype TOF test  for tracker test @ KEK

timing resolution using tdc mean

position is calculated from tdc , tofrt-toflt

timing resoluiton 50~57ps 48~52ps (using ref1 positio

n) position spread

-0.5~0.4cm

Page 19: Prototype TOF test  for tracker test @ KEK

summary timing resolution

50ps @ all position npe=600~800 Veff=15.3cm/ns

calibration using tdc mean 53ps @ all position , stability is not good