"ft.-
~~
~~~~ 18-~, ~T."i5fN ~ lff1f, <fleet I fbH ml<f,
~~-110016 Government of India
Northern Regional Power Committee 18-A, S. Jeet Singh Marg, Katwaria Sarai,
New Delhi-110016
";3"~/'liilltiiit/113/2016/C3:39 ~ -11
'liR -26513265 ' 6868681 i\;<m" Fax : 26865206
l~e- mail: [email protected]
~Website: www.nrpc.gov.in
faitiCfi- 14.09.2016
~: 'llilltilit <('tJirq4 3q<('tfJ\f(l '*t 127cft" ~ '# 'll'f(11~(1 3tl3i~JI Cfii:QSfiiFt tR' ~
~fl
Subject: Proposed Outage Programmes for consideration in 127th OCC Meeting.
3C"qi&it c:hq~4l t\CI'TU 3C"qlt\it ~ CfiT 'llf(11~(1 ll13i~\il Cfii:QiiiFt ('tiiilctit-Cfi-1) ~ .. " ~ ~ 3C"qit\it chq~:ql vcf qj~iljOI chq~4l ~ 'lif(11~(1 qj~iljOI crc=a'l {'titiictitCfi-
II(A&B)& 'titiictitcti-IIIA(1&2) 1118(1-9) ) CfiT 3tl3i~JI Cfii:QSfiiFt 3.$.ftt.<tt". '*t h-~ (http://www.nrpc.gov.in) tR' 3qtiicU ~ I 3CFa' 31131~\il Cfii:QiiiFt 16.9.2016 Cfi)' 10.30
~ ~ q 23.9.2016 Cfi)' 10.30 ~ ~ 3.$.ftt.<tt". <ttfilql(ii4, iilf ~ '# 3ti4)QI(1
'II ill til it <ttiFt .-a 4 3 q<('t fJ\ ffi '*t 127 eft ~ '# <a C\f4~ t\CI'TU ~-~t Wcr ~ ~ I .. ~ ~
Outage programme of Generating Units proposed by Generating Companies (Annexure-!) and outage programme of Transmission Elements proposed by Generating and Transmission Companies (Annexure-11 (A&B) and AnnexureIIIA(1&2),1118(1-9) has been up-loaded on NRPC's web-site (http://www.nrpc.gov.in). This proposed outage programme is for consideration/approval of the OCC in its 127th meeting to be held on 16th September 2016 (from 10.30 hrs.) & 23rd September 2016, (from 10.30 hrs.) at NRPC Secretariat New Delhi. ,..
r~ l~(~,ul\ (~ ett>lai(aq;•<)
(Ajay Talegaonkar)
31tftfiOT ~ ('II ill til it) vcf ;ri :q)JI Cfi <a C\f4 ' 'II ill til it <a iFt .-q 4 3tr -<a fJ\ ffi
ANNEXURE1 Proposed outages for generating stations for the month of September-October 2016
NTPC
Station/Unit/Capacity Period Remarks From To Days
Singrauli/U#5/200 MW 20.08.16 14.09.16 25 Boiler+ Generator (Unit under over haul since 20.08.16)
Singrauli/U#1/200 MW 25.09.16 09.11.16 45 Capital Over haul
Rihand/U#5/500 MW 15.09.16 09.10.16 25 Boiler+ Generator first inspection+ GRP Replacement+ LPT Inspection+ DPU Software modification
Unchahar#2/210 MW 18.09.16 22.10.16 35 Boiler+ MOP Coupling Inspection+ ESP Augmentation
Dadri Coal #1/210MW 13.10.16 6.11.16 25 Boiler+LP/Gen OH/Generator RLA
THDC India Limited
Station/Unit/Capacity Period Remarks From To Days
Koteshwar HEP /#3/100MW
22.9.16 10.11.16 50 Annual Maintenance work
POWER GRID NORTHERN REGION
DATE TIME DATE TIME
1 PGCIL 800 AGRA BNC PGCIL I INTER Cont For Integration work of Pole-3 with Pole-1 at both end. 17-10-16 08:00 23-10-16 18:00 Agra
2 PGCIL 765 FATEHPUR AGRA PGCIL II INTRA DAILYVariable frequency C&tan delta of L/R, Commissioning of NGR bypassing CB/ AMP
25-10-16 09:00 25-10-16 18:00 Fthpr
3 PGCIL 765 FATEHPUR AGRA PGCIL I INTRA DAILY Commissioning of NGR bypassing CB/ AMP-Fthpr 28-10-16 09:00 28-10-16 18:00 Fthpr
4 PGCIL 765 FATEHPUR SASARAM PGCIL S/C INTRA DAILYVariable frequency C&tan delta of L/R, Commissioning of NGR bypassing CB/ AMP
26-10-16 09:00 26-10-16 18:00 Fthpr
5 PGCIL 765 AGRA JHATIKRA PGCIL S/C INTRA DAILY Installation of Polymer insulators at S/S and line. 03-10-16 09:00 03-10-16 18:00 Jhatikara
6 PGCIL 765 JHATIKRA BHIWANI PGCIL S/C INTRA DAILY Installation of Polymer insulators at S/S and line. 24-10-16 09:00 24-10-16 18:00 Jhatikara
7 PGCIL 765 VARANASI FATEHPUR PGCIL S/C INTRA DAILYCharging of 765KV, 80MVAR Spare L/Reactor-Jumpering etc. Induction problem
04-10-16 11:00 04-10-16 18:00 Fthpr
8 PGCIL 765 VARANASI BALIA PGCIL S/C INTRA DAILYCharging of 765KV, 80MVAR Spare L/Reactor-Jumpering etc. Induction problem
04-10-16 11:00 04-10-16 18:00 Fthpr
9 PGCIL 765 VARANASI KNP GIS PGCIL I INTRA DAILY Attending Hot spots/ Jumper tightening/ Bird Guard etc. 15-10-16 11:00 18-10-16 18:00 Alld
10 PGCIL 765 VARANASI KNP GIS PGCIL II INTRA DAILY Attending Hot spots/ Jumper tightening/ Bird Guard etc. 19-10-16 11:00 22-10-16 18:00 Alld
11 PGCIL 400 ALLHBD SASARAM PGCIL I INTRA Cont
De-jumpering of Varanasi-Sarnath-Sasaram LILO lines and Re-jumpering at Loc.192 for charging Sasaram- Varanasi direct line.
18-10-16 08:00 20-10-16 18:00 RB Kori VNS
12 PGCIL 400 SARNATH SASARAM PGCIL I INTRA Cont
De-jumpering of Varanasi-Sarnath-Sasaram LILO lines and Re-jumpering at Loc.192 for charging direct Sasaram- Varanasi line along with termination for Shifting from NR to ER Bus at Sasaram end as per approved scheme The abandond LILO portion connecting from Sarnath end will continue under s/d for dismantelling/ restringing & charging of new 400kv D/C Varanasi-Sarnath line.
18-10-16 08:00 20-10-16 18:00
TOFROM S/S Remarks
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2A
VOLT LEVEL
(KV)
FROMNAME OF
REQUESTING
AGENCYTO S/S REASON
DAILY/
CONTIN
UOUS
INTER/ INTRA
REGIONAL
OWNER
LINE DETAILS PROPOSED DATE AND TIME
S.N. CKT ID
13 PGCIL 500 HVDC BTB VINDH PGCIL II INTER ContReplacement of resin of Valve Cooling System of Block#2 alongwith AMP works.
04-10-16 08:00 08-10-16 18:00
14 PGCIL 400 SINGRAULI ANPARA PGCIL I INTRA Daily Retrofitment of PLCC and Testing work. 17-10-16 10:00 17-10-16 16:00
15 PGCIL 400 SINGRAULI VINDH PGCIL II INTRA Daily Replacement of LMU. 19-10-16 08:00 19-10-16 18:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B SNO. Request by Element name Owner Mode Reasons FROM DATE
FROMTIME TO DATE TO TIME
1
SLDC_UP [ UTTAR
PRADESH ]
Nara(UP)-
Roorkee(UK) 220KV
Uttar
Pradesh
Daily
For carryout maintenance
works and repairing of conductor and
lopping/chopping of trees lying in the corridor.
09-10-2016
08:00
11-10-2016
18:00
2 SLDC_UP [ UTTAR
PRADESH ]
Agra-Unnao 400KV
Uttar Pradesh
Daily Replacement of old porcelain strings by new
polymer insulator & jumper checking &
tightening.
15-10-2016 08:00 23-10-2016 18:00
3 SLDC_UP [ UTTAR
PRADESH ]
Obra-Sultanpur 400KV
Uttar Pradesh
Daily For dismantling of 54 Metre. Span of 400kV
Transfer Bus For Lopping & Chopping of Tree
Branches and Other M&R Works
17-10-2016 08:00 17-10-2016 18:00
4 SLDC_UP [ UTTAR
PRADESH ]
Sultanpur(UP)-Tanda(NTPC) 2
Uttar Pradesh
Daily For routine testing & commissioning of PLCC
17-10-2016 08:00 18-10-2016 18:00
(220 kV) 5 SLDC_UP
[ UTTAR PRADESH ]
Obra-Sultanpur Uttar Pradesh
Daily For stringing of R, Y, B Phase 54 Metre. Span of
400kV Transfer Bus
23-10-2016 08:00 24-10-2016 18:00
(400 kV) 6 SLDC_UP
[ UTTAR PRADESH ]
Bareily-Unnao 2 400KV
Uttar Pradesh
Daily Lopping Chopping of trees and replacement of
disc insulators with polymer insulators.
24-10-2016 08:00 24-10-2016 18:00
7 SLDC_UP [ UTTAR
PRADESH ]
Rewa Road-Panki 400KV
Uttar Pradesh
Daily For routine testing and other maintenance work.
28-10-2016 08:00 28-10-2016 18:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 8 SLDC_UP
[ UTTAR PRADESH ]
Muzaffarnagar –Mudranagar
400KV
Uttar Pradesh
Daily For replacement of defective CVT at 400KV
S/S Muzaffarnagar
3.10.2016 9.00 3.10.2016 16.00
9 SLDC_UP [ UTTAR
PRADESH ]
Bareily-Unnao 1 400KV
Uttar Pradesh
Daily Lopping Chopping of trees and replacement of
disc insulators with polymer insulators.
3-10-2016 08:00 8-10-2016 18:00
10 SLDC_UP [ UTTAR
PRADESH ]
Raebareli Unchahar 1
220KV
Uttar Pradesh
Daily Lopping Chopping of trees and other M&R
work
9-10-2016 08:00 10-10-2016 18:00
11 SLDC_UP [ UTTAR
PRADESH ]
Raebareli Unchahar 2
220KV
Uttar Pradesh
Daily Lopping Chopping of trees and other M&R
work
11-10-2016 08:00 12-10-2016 18:00
12 SLDC_UP [ UTTAR
PRADESH ]
Khurja-NAPP 220KV
Uttar Pradesh
Daily For replacement of Insulators by Polymer
14-10-2016 08:00 24-10-2016 18:00
13 SLDC_UP [ UTTAR
PRADESH]
400KV Azamgarh-Mau
At 400KV Azamgarh
Uttar Pradesh
Daily Routine Testing 19.10.2016 8.00 19.10.2016 18.00
14 SLDC_UP [ UTTAR
PRADESH]
400KV Azamgarh-
Sarnath At 400KV Azamgarh
Uttar Pradesh
Daily Routine Testing 22.10.2016 8.00 22.10.2016 18.00
15 SLDC_UP [ UTTAR PRADES]
Mudranagar- Agra
400KV
Uttar Pradesh
Daily For tightening of Bay and testing work at 400KV substation Mudranagar
11.10.2016 8.00 11.10.2016 17.00
16 SLDC_UP [ UTTAR PRADES]
Bareily -Pantnagar
220KV
Uttar Pradesh
Daily For T&C Testing, cleaning of isolators and
tightening of jumpers. Bus will not be under
shutdown
19.10.2016 8.00 19.10.2016 18.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 17 SLDC_UP
[ UTTAR PRADES]
Simbhaoli-Narora 220KV
Uttar Pradesh
Daily For replacement of Insulators by Polymer
12.10.2016 9.00 12.10.2016 18.00
18 SLDC_UP [ UTTAR PRADES]
New Tanda –Tanda Thermal
220KV
Uttar Pradesh
Daily For routine testing and commissioning of PLCC
17.10.2016 8.00 18.10.2016 18.00
19 SLDC_UP [ UTTAR PRADES]
Sarnath-Allahabad
PGCIL at Sarnath Sub
station
Uttar Pradesh
Daily General Bay maintenance 27.10.2016 8.00 27.10.2016 18.00
20 SLDC_UP [ UTTAR PRADES]
Azamgarh-Gorakhpur
at Azamgarh Sub station
Uttar Pradesh
Daily Routine testing 26.10.2016 8.00 26.10.2016 18.00
21 SLDC_UP [ UTTAR PRADES]
Sarnath-Anpara L3 Line
at Sarnath Sub station
Uttar Pradesh
Daily General Bay maintenance 25.10.2016 8.00 25.10.2016 18.00
22 SLDC_UP [ UTTAR PRADES]
Sarnath-Anpara L5 Line
at Sarnath Sub station
Uttar Pradesh
Daily General Bay maintenance 23.10.2016 8.00 23.10.2016 18.00
23 SLDC_UP [ UTTAR PRADES]
Sahibabad Gazipur 220kv
Gazipur Sector62
Uttar Pradesh
Continuous For height raising near UP Gate NH24 Crossing
as required by GDA ( Elevated road)
5.10.2016 8.00 15.10.2016 18.00
24 SLDC_UP [ UTTAR PRADES]
Sarojini Nagar –Unanao 400KV
Uttar Pradesh
Daily Checking and tightening of Jumpers and Tree
Cutting For Routine T& C Testing & Bay Maintenance works
8.10.2016 8.00 9.10.2016 18.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 25 SLDC_UP
[ UTTAR PRADES}
Sahrnpur-Khodri 220KV CKT I
Uttar Pradesh
Daily For cleaning and replacement of damaged Suspension disc and to carry out maintenance work and looping and chopping of trees in
corridor
8.10.2016 8.00 10.10.2016 18.00
26 SLDC_UP [ UTTAR
PRADES}
Sultanpur-Azamgarh
400kv
Uttar Pradesh
Daily Lopping and chopping of tree branches and other
M&R works Bay maintenance
12.10.2016 8.00 14.10.2016 18.00
27 SLDC_UP [ UTTAR
PRADES}
Saharnpur-Khodri 220KV CKT II
Uttar Pradesh
Daily For cleaning and replacement of damaged Suspension disc and to carry out maintenance work and looping and chopping of trees in
corridor
14.10.2016 8.00 16.10.2016 18.00
28 SLDC_UP [ UTTAR
PRADES}
400KV Sarojni nagar –PGCIL
Kursi Road Line (Up to LILO)
Uttar Pradesh
Daily Checking and tightening of jumpers and tree
cutting
16.10.2016 8.00 17.10.2016 18.00
29 SLDC_UP [ UTTAR
PRADES}
Sultanpur –PGCIL Lucknow
400KV
Uttar Pradesh
Daily Lopping Chopping of trees and other M&R
work
25.10.2016 8.00 26.10.2016 18.00
30 SLDC-UP (UTTAR
PRADESH)
Bara-Rewa Road Ckt 11
Uttar Pradesh
Daily For LILO of 400KV Rewa Road –Bara CKT 1&2 at
400KV Meja TPS
1.10.2016 8.00 2.10.2016 18.00
31 SLDC-UP (UTTAR
PRADESH)
Panki- Aligarh 400KV
Uttar Pradesh
Daily For checking and tightening of jumpers of
tension tower and maintenance work at
Aligarh Site
1.10.2016 8.00 4.10.2016 18.00
32 SLDC-UP (UTTAR
PRADESH)
Aligarh-Muradnagar
400KV
Uttar Pradesh
Daily For maintenance of Line 4.10.2016 8.00 6.10.2016 18.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 33 SLDC-UP
(UTTAR PRADESH)
Pilibhit-Sitarganj 132KV
Uttar Pradesh
Daily For testing of LILO line 6.10.2016 11.00 6.10.2016 14.00
34 SLDC-UP (UTTAR
PRADESH)
Pilibhit-Khatima 132KV
Uttar Pradesh
Daily For testing of LILO line 7.10.2016 11.00 7.10.2016 14.00
35 SLDC-UP (UTTAR
PRADESH)
Mainpuri(PG)-Parichha Both
CKTS 400KV
Uttar Pradesh
Daily For LILO of OPGW of 400KV Mainpuri-Parichha DC line TL at Mainpuri for
communication links to LDC
7.10.2016 9.00 7.10.2016 15.00
36 SLDC-UP (UTTAR
PRADESH)
Mainpuri(PG)-Parichha Both
CKT2 400KV
Uttar Pradesh
Daily For LILO of OPGW of 400KV Mainpuri-Parichha CKT 2 at 400KV Switch yard of 765/400/33 KV
Mainpuri
12.10.2016 8.00 13.10.2016 18.00
37 SLDC-UP (UTTAR
PRADESH
Parichha –Mainpuri
I&II 400KV
Uttar Pradesh
Daily For laying of OPGW ,jumpering of line at TL NO 281 to 290 in the
UPEIDA diverted route OF 3.4 km .Retightening of section tower jumpers
13.10.2016 8.00 18.10.2016 18.00
38 SLDC-UP (UTTAR
PRADESH)
Parichha – Orai-Mainpuri PGCIL
CKTI 400KV
Uttar Pradesh
Continuous For termination of OPGW ,jumpering of line at 400KV S/S Orai & dismantling and
commissioning of PLCC panel at PARICHA TPS&
400kv S/S ORAI
13.10.2016 8.00 20.10.2016 18.00
39 SLDC-UP (UTTAR
PRADESH)
OBRA –REWA ROAD 400KV
Uttar Pradesh
Continuous For Diversion work of 400kv Obra –Rewa Road Line at Bhadcraumarganj Location due to DFCC &
Jumpering work of 220KV Saranapur PGCIL –
Phulpur Line
13.10.2016 8.00 26.10.2016 18.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 40 SLDC-UP
(UTTAR PRADESH)
Mainpuri-Paricha 400KV CKT 1
Uttar Pradesh
Continuous For LILO of OPGW of 400KV Mainpuri-Parichha CKT 1 at 400KV Switch yard of 765/400/33 KV
Mainpuri
14.10.2016 8.00 15.10.2016 18.00
41 SLDC-UP (UTTAR
PRADESH
Dhampur-Kalagarh
132 KV & 132KV Afzalgarh-Kalagarh
UK interstate line
Uttar Pradesh
Daily For Line Maintenance 18.10.2016 8.00 19.10.2016 18.00
42 SLDC-UP (UTTAR
PRADESH
400KV Sarnath- Sasaram Line at
400kv S/S Sarnath
Uttar Pradesh
Daily General Bay Maintenance 24.10.2016 8.00 24.10.2016 18.00
43 SLDC_DELHI [ DELHI ]
Gazipur(DTL)-Noida Sec 62(UP)
220KV
Uttar Pradesh
Continuous TO CARRY OUT ALIGNMENT OF 220KV
LINE ISOLATOR AT GAZIPUR (DTL) END.
27-10-2016 10:00 10-10-2016 14:00
44 SLDC_DELHI [ DELHI ]
Jhajjar(APCPL)-Mundka(DTL) 1
APCPL Jhajjar
Daily TO CARRY OUT CAPACITANCE AND
TAN DELTA TESTING.
24-10-2016 09:30 24-10-2016 17:30
(400 kV) 45 SLDC_DELHI
[ DELHI ] Jatikala(PG)-
Mundka(DTL) 2 400KV
Delhi Daily TO CARRY OUT CAPACITANCE; TAN
DELTA TESTING AND PREVENTIVE
MAINTAINANCE WORK.
25-10-2016 09:30 25-10-2016 17:30
46 SLDC_ HARYANA
[ HARYANA ]
Daultabad(HVPNL)-Gurgaon(PG) -
1
Haryana Daily For tree cutting and general Maintenance
03-10-2016 09:00 03-10-2016 16:00
(400 kV) 47 SLDC_
HARYANA [ HARYANA ]
Daultabad(HVPNL)-Gurgaon(PG) -
2
Haryana Daily For tree cutting and general Maintenance
04-10-2016 09:00 04-10-2016 16:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B (400 kV)
48 SLDC_ HARYANA
[ HARYANA ]
Daultabad-Dhanonda ckt-1
Haryana Daily For tightening of Nuts and bolts of jumpers,
replacing the worn out jumpers’
07-10-2016 09:00 07-10-2016 16:00
(400 kV) 49 SLDC_
HARYANA [ HARYANA
]
Daultabad-Dhanonda ckt-1
Haryana Daily For tightening of Nuts and bolts of jumpers,
replacing the worn out jumpers
10-10-2016 09:00 10-10-2016 16:00
(400 kV) 50 SLDC_
HARYANA [ HARYANA ]
Daultabad-Dhanonda ckt-1
Haryana Daily For tightening of Nuts and bolts of jumpers,
replacing the worn out jumpers’
13-10-2016 09:00 13-10-2016 16:00
(400 kV) 51 SLDC_
HARYANA [ HARYANA ]
Daultabad-Dhanonda ckt-1
Haryana Daily For tightening of Nuts and bolts of jumpers,
replacing the worn out jumpers’
17-10-2016 09:00 17-10-2016 16:00
(400 kV) 52 SLDC_
HARYANA [ HARYANA
]
Daultabad-Dhanonda ckt-2
Haryana Daily For tightening of Nuts and bolts of jumpers,
replacing the worn out jumpers of line
19-10-2016 09:00 19-10-2016 17:00
(400 kV) 53 SLDC_
HARYANA [ HARYANA
]
Dipalpur-Kabulpur 1
Haryana Daily For checking and cleaning of porcelain
insulators
20-10-2016 09:00 20-10-2016 17:00
(400 kV) 54 SLDC_
HARYANA [ HARYANA
]
Dipalpur-Kabulpur 2
Haryana Daily For checking and cleaning of porcelain
insulators
21-10-2016 09:00 21-10-2016 17:00
(400 kV)
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 55 SLDC_
HARYANA [ HARYANA
]
Khedar-Kirori 1 400KV
Haryana Daily General Maintenance and tree cutting
04-10-2016 09:00 04-10-2016 16:00
56 SLDC_ HARYANA
[ HARYANA ]
Khedar-Kirori 2 400KV
Haryana Daily General Maintenance and tree cutting
06-10-2016 09:00 06-10-2016 16:00
57 SLDC_ HARYANA
[ HARYANA ]
Daultabad-Dhanonda ckt-2
Haryana Daily For tightening of nuts and bolts of jumpers,
replacing the worn out jumpers of line.
21-10-2016 09:00 21-10-2016 17:00
(400 kV) 58 SLDC_
HARYANA [ HARYANA
]
Daultabad-Dhanonda ckt-2
Haryana Daily For tightening of nuts and bolts of jumpers,
replacing the worn out jumpers of line.
24-10-2016 09:00 24-10-2016 17:00
(400 kV) 59 SLDC_
RAJASTHAN
Akal-Jodhpur II Rajasthan Daily 2nd Quarterly Maintenance of Bay
Equipment
06-10-2016 10:00 06-10-2016 16:00
(400 kV) 60 SLDC_
RAJASTHAN Akal-Barmer 1 Rajasthan Daily 2nd Quarterly
Maintenance of Bay Equipment
14-10-2016 10:00 14-10-2016 16:00
(400 kV) 61 SLDC_
RAJASTHAN Jodhpur II-Rajwest 1
400KV
Rajasthan Daily For stringing of 400KV Double circuit Quad
moose Akal-Jodhpur(NEW KANKANI ) line over 400KV Jodhpur Rajweat-1st and 2nd at
crossing point(shut down will be taken by C&M
wing on returnable basis)
13-10-2016 09:00 15-10-2016 18:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 62 SLDC_
RAJASTHAN
Jodhpur II-Rajwest 2
400KV
Rajasthan Daily For stringing of 400KV Double circuit Quad
moose Akal-Jodhpur(NEW KANKANI ) line over 400KV Jodhpur Rajweat-1st and 2nd at
crossing point(shut down will be taken by C&M
wing on returnable basis)
13-10-2016 09:00 15-10-2016 18:00
63 SLDC_ RAJASTHAN
Jodhpur II-Rajwest 2
220KV
Rajasthan Daily For stringing of 400KV Double circuit Quad
moose Akal-Jodhpur(NEW KANKANI ) line over 400KV Jodhpur Rajweat-1st and 2nd at
crossing point(shut down will be taken by C&M
wing on returnable basis)
13-10-2016 09:00 15-10-2016 18:00
64 SLDC_ RAJASTHAN
Charkhi Dadri-Khetri 1
Rajasthan Daily FOR ROUTINE BAY MAINTENANCE
06-10-2016 09:00 06-10-2016 18:00
(220 kV) 65 SLDC_
RAJASTHAN
Charkhi Dadri-Khetri 2
Rajasthan Daily FOR ROUTINE BAY
MAINTENANCE
07-10-2016 09:00 07-10-2016 18:00
(220 kV) 66 SLDC_
RAJASTHAN
RAPP (A )-DEBARI
Rajasthan Daily GENERAL
MAINTENANCE OF BAY AND LINE
06-10-2016 09:30 06-10-2016 17:00
(220 kV) 67 SLDC_
RAJASTHAN Bhilwara-Chhabra
1 400KV
Rajasthan Daily HALF YEARLY
MAINTENANCE OF 400KV BHILWARA-
CHHABRA BAY AND ASSOCIATED EQUIPMENTS
03-10-2016 09:00 03-10-2016 17:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 68 SLDC_
RAJASTHAN Bikaner-
Suratgarh 400KV
Rajasthan Daily PRE-DEEPAWALI MAINTENANCE
14-10-2016 10:00 14-10-2016 17:00
69 SLDC_ RAJASTHAN
Bikaner-Didwana 1
Rajasthan Daily PRE-DEEPAWALI MAINTENANCE
20-10-2016 10:00 20-10-2016 17:00
(400 kV) 70 SLDC_
RAJASTHAN Merta-Ratangarh
220KV Rajasthan Continuous Measurement of timing of
CB & maintenance work of bay equipment
27-10-2016 10:00 28-10-2016 20:00
71 SLDC_ RAJASTHAN
Jodhpur II(RVPNL)-
Kankroli(PG) 1 400KV
Powergrid Daily 3rd Quarterly Maintenance work
21-10-2016 09:00 21-10-2016 18:00
72 SLDC_ RAJASTHAN
Kota(PG)-Merta(RVPNL) 1
400KV
Powergrid Daily III rd QUARTERLY MAINT.WORK OF BAY &
EQUIPMENTS
21-10-2016 09:00 21-10-2016 17:00
73 SLDC_ RAJASTHAN
Shree Cement(CSL)-
Merta(RRVPNL)
Powergrid Daily III rd QUARTERLY MAINT.WORK OF BAY &
EQUIPMENTS
27-10-2016 09:00 27-10-2016 17:00
74 SLDC_ RAJASTHAN
Bikaner-Mareta 400KV
Powergrid Daily Pre-Deepawali Maintenance
7-10-2016 10:00 7-10-2016 17:00
75 BBMB Charkhi Dadri-Khetri 1 220KV
Rajasthan Daily Pre winter maintenance of line and yearly
maintenance of S/S equipment
26-10-2016 08:00 26-10-2016 17:00
76 BBMB Dehar-Panipat BBMB Daily Pre winter maintenance of line and yearly
maintenance of S/S equipment
24-10-2016 08:00 25-10-2016 17:00
77 BBMB Charkhi Dadri-Khetri 2 220KV
Rajasthan Daily Pre winter maintenance of line and yearly
maintenance of S/S equipment
27-10-2016 08:00 27-10-2016 17:00
78 BBMB Charkhi Dadri(BBMB)-Mohindergarh
Haryana Daily Pre winter maintenance of line and yearly
maintenance of S/S
28-10-2016 08:00 28-10-2016 17:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B (HVPNL) 1
220KV equipment
79 BBMB Charkhi Dadri(BBMB)-
Mohindergarh(HVPNL) 2 220KV
BBMB Daily Pre winter maintenance of line and yearly
maintenance of S/S equipment
29-10-2016 08:00 29-10-2016 17:00
80 BBMB Bapora(HVPNL)-Bhiwani(BBMB) 1
Haryana Daily Pre winter maintenance of line and yearly
maintenance of S/S equipment
29-10-2016 08:00 29-10-2016 17:00
(220 kV) 81 BBMB Panipat-Narela 3 BBMB Daily Replacement of Bus
isolator at Panipat 24-10-2016 08:00 25-10-2016 17:00
(220 kV) 82 BBMB Panipat-Charkhi
Dadri BBMB Daily Pre winter maintenance
of line and yearly maintenance of S/S
equipment
27-10-2016 08:00 27-10-2016 17:00
(220 kV) 83 BBMB Ballabhgarh
(BBMB)-Samaypur(BBMB)
- 1
BBMB Continuous Replacement of breaker at Ballabgarh end.
20-10-2016 08:00 27-10-2016 17:00
(220 kV) 84 BBMB Ballabhgarh
(BBMB)-Samaypur(BBMB)
- 2
BBMB Continuous Replacement of breaker at both ends.
12-10-2016 08:00 19-10-2016 17:00
(220 kV) 85 BBMB Ballabhgarh
(BBMB)-Ch.Dadri(BBMB)
BBMB Daily Pre winter maintenance of line & yearly
maintenance of S/S equipment
28-10-2016 08:00 28-10-2016 17:00
(220 kV)
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 86 BBMB Ch.Dadri(BBMB)-
Samaypur(BBMB) BBMB Daily Pre winter maintenance
of line & yearly maintenance of S/S
equipment
29-10-2016 08:00 29-10-2016 17:00
(220 kV) 87 BBMB Barnala(PSEB)-
Bhatinda(PSEB) 220KV
BBMB Daily Pre winter maintenance of line & yearly
maintenance of S/S equipment
27-10-2016 08:00 28-10-2016 17:00
88 BBMB Barnala(PSEB)-Bhatinda(PSEB)
BBMB Daily Pre winter maintenance of line & yearly
maintenance of S/S equipment
18-10-2016 08:00 19-10-2016 17:00
(220 kV) 89 BBMB Jalandhar(BBMB)
-Jamsher(PSEB) 2
220KV
BBMB Daily Pre winter maintenance of line & yearly
maintenance of S/S equipment
29-10-2016 08:00 29-10-2016 17:00
90 POWERGRID [ DELHI ]
Dadri(NTPC)-Malerkotla(PG)
400KV
Powergrid Continuous Replacement of polluted polymer /jumper
tightening. Re-scheduled
01-10-2016 08:00 01-10-2016 18:00
91 POWERGRID [ DELHI ]
Bareilly(PG)-Meerut (PG) 1
Powergrid Continuous Replacement of polluted polymer /jumper
tightening. Re-scheduled
05-10-2016 08:00 05-10-2016 19:00
92 POWERGRID [ DELHI ]
Bareilly(PG)-Meerut (PG) 2
Powergrid Continuous Replacement of polluted polymer /jumper
tightening. Re-scheduled
06-10-2016 08:00 06-10-2016 19:00
93 POWERGRID [ DELHI ]
Varanasi(PG)-Sarnath(UP)
400KV
Powergrid Continuous De-jumpering of Varanasi-Sarnath-
Sasaram LILO lines and Re-jumpering at Loc.192 for charging Sasaram-
Varanasi direct line. The abandoned LILO portion connecting from Sarnath end will continue under
Shut Down for dismantling and
restringing for charging of new 400kv D/C Varanasi-
18-09-2016 08:00 20-09-2016 18:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B Sarnath line. 123rd OCC
Dates rescheduled-ROW issue.
94 POWERGRID [ DELHI ]
Chittorgarh (RVPNL)-RAPS
B(NPC) 1
Powergrid Continuous Disc insulator replacement with polymer
string
24-10-2016 08:00 29-10-2016 18:00
(220 kV) 95 POWERGRI
D [ DELHI ] Bamnauli(DTL)-Jatikala(PG) 1
Powergrid Continuous Installation of Polymer insulators at S/S and line.
17-10-2016 08:00 17-10-2016 18:00
(400 kV) 96 POWERGRI
D [ DELHI ] Bhinmal-Kankroli
400KV Powergrid Continuous L/R Tan delta on variable
frequency. S/D will be taken twice for 15mnts to
isolate L/R.
03-10-2016 11:00 03-10-2016 12:00
97 POWERGRID [ DELHI ]
Kankroli(PG)- RAPS C(NPC) 1
400KV
Powergrid Continuous L/R Tan delta on variable frequency. S/D will be
taken twice for 15mnts to isolate L/R.
05-10-2016 11:00 05-10-2016 12:00
98 POWERGRID [ DELHI ]
Gorakhpur(PG)-Gorakhpur(UP) 2
400KV
Powergrid Continuous Annual maintenance work of Line Bay equipment and Relay testing at
PGCIL Gorakhpur end
18-10-2016 09:00 19-10-2016 17:00
99 POWERGRID [ DELHI ]
Bareilly(PG)-Moradabad(UP) 1
400KV
Powergrid Continuous Line Isolator replacement under add cap at Moradabad end.
10-10-2016 08:00 12-10-2016 18:00
100 POWERGRID [ DELHI ]
Kota-RAPPC 400KV
Powergrid dAILY Disc insulator replacement with polymer
string
24-10-2016 08:00 29-10-2016 18:00
101 POWERGRID [ DELHI ]
Chittorgarh (RVPNL)-RAPS
B(NPC) 2
Powergrid Continuous Disc insulator replacement with polymer
string
17-10-2016 08:00 22-10-2016 18:00
(220 kV) 102 POWERGRI
D [ DELHI ] Mandola-Meerut
3 Powergrid Daily Replacement of polluted
polymer /jumper tightening. Re-scheduled
03-10-2016 08:00 03-10-2016 18:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B (400 kV)
103 POWERGRID [ DELHI ]
Mandola-Meerut 4
(400 kV)
Powergrid Daily Replacement of polluted polymer /jumper
tightening. Re-scheduled
04-10-2016 08:00 04-10-2016 18:00
104 POWERGRID [ DELHI ]
Anpara-Mau Uttar Pradesh
Daily De-stringing of abandoned LILO portion at crossing to facilitate restringing with INVAR-Moose conductor and
jumpering with 400kv D/C Varanasi-Sarnath.
Dates rescheduled-ROW
27-09-2016 08:00 30-09-2016 18:00
(400 kV) 105 POWERGRI
D [ DELHI ] Bamnauli(DTL)-Jatikala(PG) 2
Delhi Daily Installation of Polymer insulators at S/S and line.
18-10-2016 08:00 18-10-2016 18:00
(400 kV) 106 POWERGRI
D [ DELHI ] Jhatikara-Mundka
1 Delhi Daily Installation of Polymer
insulators at S/S and line. 19-10-2016 08:00 19-10-2016 18:00
(400 kV) 107 POWERGRI
D [ DELHI ] Jhatikara -Mundka 2
Delhi Daily Installation of Polymer insulators at S/S and line.
20-10-2016 08:00 20-10-2016 18:00
(400 kV) 108 POWERGRI
D [ DELHI ] Gorakhpur-Lucknow 3
Powergrid Daily Annual maintenance work of Line Bay equipment &
Relay testing
04-10-2016 08:00 04-10-2016 18:00
(220 kV) 109 POWERGRI
D [ DELHI ] Gorakhpur-Lucknow 4
Powergrid Daily Annual maintenance work of Line Bay equipment &
Relay testing
05-10-2016 08:00 05-10-2016 18:00
(400 kV)
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 110 POWERGRI
D [ DELHI ] Gorakhpur-
Gorakhpur II 1 Uttar
Pradesh Daily Annual maintenance work
of Line Bay equipment & Relay testing
08-10-2016 08:00 09-10-2016 18:00
(220 kV) 111 POWERGRI
D [ DELHI ] Agra(PG)-
Auraiya(NTPC) 1 Powergrid Daily Disc insulator
replacement with polymer string.
24-10-2016 08:00 29-10-2016 18:00
(400 kV) 112 POWERGRI
D [ DELHI ] Agra(PG)-
Auraiya(NTPC) 2 400KV
Powergrid Daily Disc insulator replacement with polymer
string.
18-10-2016 08:00 23-10-2016 18:00
113 POWERGRID [ DELHI ]
Anpara(UP)-Singrauli(NTPC)
400KV
Powergrid Daily Disc insulator replacement with polymer
string.
13-10-2016 08:00 17-10-2016 18:00
114 POWERGRID [ DELHI ]
Allahabad PG- Jhusi(UP)
220KV
Uttar Pradesh
Daily Disc insulator replacement with polymer
string. Approved in 124th OCC, Dates Re-
scheduled
05-10-2016 08:00 06-10-2016 18:00
115 POWERGRID [ DELHI ]
Gorakhpur-Gorakhpur-I
400KV
Uttar Pradesh
Daily Annual Maintenance work of Line bay equipment
and relay testing
06-10-2016 09:00 07-10-2016 17:00
116 POWERGRID [ DELHI)
Kaithal-Bagpat-I Uttar Pradesh
Daily Stringing of Dehar-Bagpat line
Rescheduled from 124OCC
4.10.2016 8.00 5.10.2016 18.00
117 POWERGRID [ DELHI}
Kaithal-Bagpat-II Uttar Pradesh
Daily Stringing of Dehar-Bagpat line
Rescheduled from 124OCC
4.10.2016 8.00 5.10.2016 18.00
118 POWER GRID
(DELHI)
Panchkula(PG)-Naptha-Jhakri (NHPC) CKT 1
Power Grid Daily For Annual Maintenance Work
5.10.2016 9.00 5.10.2016 17.00
119 POWER GRID
(DELHI)
Panchkula(PG)-Naptha-Jhakri (NHPC) CKT 2
Power Grid Daily For Annual Maintenance Work
7.10.2016 9.00 7.10.2016 17.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 120 POWER
GRID (DELHI)
Abdullapur(PG)-Panckula (PG)
CKT1
Power Grid Daily For Annual Maintenance Work
14.10.2016 9.00 14.10.2016 17.00
121 POWER GRID
(DELHI)
Abdullapur(PG)-Bawana(DTL)
Power Grid Daily For Annual Maintenance Work
18.10.2016 9.00 18.10.2016 17.00
122 POWER GRID
(DELHI)
Kishenpur(PG)-Wanpoh(PG)
CKT1
Power Grid Daily AMP work /CTs oil sampling for DGA
4.10.2016 9.30 4.10.2016 17.30
123 POWER GRID
(DELHI)
Kishenpur(PG)-Wanpoh(PG)
CKT2
Power Grid Daily AMP work /CTs oil sampling for DGA
5.10.2016 9.30 5.10.2016 17.30
124 POWER GRID
(DELHI)
Kishenpur-Salal (NHPC)
Ckt2
Power Grid Daily AMP work and attending hot spots
22.10.2016 9.30 22.10.2016 17.30
125 POWER GRID
(DELHI)
Panchkula-Panipat 400KV
Power Grid Daily To Install ADDITIONAL Aviation Balls
2.10.2016 10.00 2.10.2016 16.00
126 POWERGRID [ DELHI
Jalandhar-Nakodar 400KV
POWERGRID
Daily For erecting of Tower and Beam of 400KV
Jalandhar-Samba Line 1
1.10.2016 9.00 1.10.2016 18.00
127 SLDC_ PUNJAB
[ PUNJAB ]
Talwandi Sabo - Muktsar CKT-I
400KV
Punjab Daily For S/S General Maintenance
03-10-2016 09:00 03-10-2016 19:00
128 SLDC_ PUNJAB
[ PUNJAB ]
Rajpura - Nakodar PSTCL
CKT-I 400KV
Punjab Daily Tightening of Jumpers of Dead end Towers & Tree
Cutting
05-10-2016 10:00 05-10-2016 16:00
129 SLDC_ PUNJAB
[ PUNJAB ]
Mukatsar-Makhu CKT-1 400KV
Punjab Daily For S/S General Maintenance
07-10-2016 09:00 07-10-2016 19:00
130 SLDC_ PUNJAB
[ PUNJAB ]
Moga-Nakodar 400KV
Punjab Daily Tightening of Jumpers of Dead end Towers & Tree
Cutting
08-10-2016 10:00 08-10-2016 16:00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 131 SLDC_
PUNJAB [ PUNJAB ]
Rajpura - Nakodar PSTCL
CKT-I 400KV
Punjab Daily Tightening of Jumpers of Dead end Towers & Tree
Cutting
11-10-2016 10:00 11-10-2016 16:00
132 SLDC_ PUNJAB
[ PUNJAB ]
Talwandi Sabo - Muktsar CKT-II
Punjab Daily For S/S General Maintenance
12-10-2016 09:00 12-10-2016 19:00
133 SLDC_ PUNJAB
[ PUNJAB ]
Rajpura - Nakodar PSTCL
CKT-II 400KV
Punjab Daily Tightening of Jumpers of Dead end Towers & Tree
Cutting
13-10-2016 10:00 13-10-2016 16:00
134 SLDC_ PUNJAB
[ PUNJAB ]
Mukatsar-Makhu CKT-2 400KV
Punjab Daily For S/S General Maintenance
18-10-2016 09:00 18-10-2016 19:00
135 SLDC_ PUNJAB
[ PUNJAB ]
Moga-Nakodar 400KV
Punjab Daily Tightening of Jumpers of Dead end Towers & Tree
Cutting
18-10-2016 10:00 18-10-2016 16:00
136 SLDC _PUNJAB
[ PUNJAB ]
Talwandi Sabo – Nakodar 400KV
Punjab Daily Tightening of Jumpers of Dead end Towers & Tree
Cutting
25-10-2016 10:00 25-10-2016 16:00
137 SLDC_ PUNJAB
[ PUNJAB ]
Mohali(PSEB)-Nalagarh(PG)-1
220KV
Punjab Daily Tightening of nut bolts of jumpers, dampers,
suspension clamps and cleaning of Disc
insulators of Tower No 35 to 51
25-10-2016 10:00 25-10-2016 17:00
138 SLDC_ PUNJAB
[ PUNJAB ]
Mohali(PSEB)-Nalagarh(PG)-2
220KV
Punjab Daily Tightening of nut bolts of jumpers, dampers,
suspension clamps and cleaning of Disc
insulators of Tower No 12 to 22
26-10-2016 10:00 26-10-2016 17:00
139 SLDC_ PUNJAB
[ PUNJAB ]
Mohali(PSEB)-Nalagarh(PG)-1
220KV
Punjab Daily Tightening of nut bolts of jumpers, dampers,
suspension clamps and cleaning of Disc
insulators of Tower No
22.10.2016 10.00 22.10.2016 17.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 124-138
140 SLDC_ PUNJAB
[ PUNJAB ]
Mohali(PSEB)-Nalagarh(PG)-2
220KV
Punjab Daily Tightening of nut bolts of jumpers, dampers,
suspension clamps and cleaning of Disc
insulators of Tower No 124-138
25.10.2016 10.00 25.10.2016 17.00
141 SLDC_ PUNJAB
[ PUNJAB]
Hamirpur-Chohal 132 KV
Punjab Daily Tightening of jumpers of dead end towers and tree
cutting
19.10.2016 9.00 19.10.2016 17.00
142 KWHEP KWHEP-JHAKRI 400KV
HBPCL Daily To repair the R-PHASE CONDUCTOR strand
between Tower 33-33A by providing repair sleeve
5.10.2016 10.00 5.10.2016 17.00
143 NRSSXXI X
Jalandhar (PG)-Samba(PG)-1
(Line charged as Jalandhar –
Kishanpur Line with contingency
arrangement)
Continuous For removal of contingency arrangement and restoration as it is (
As Jalandhar Moga CKT1 & Kishanpur Samba CKT
1) Samba –Kishanpur Line will be charged within 48
Hrs from the time of shutdown The shutdown
in real time will be availed subject to
confirmation of bay readiness at both ends so
that the 400KV D/C Samba- Jalandhar Line
can be terminated
15.10.2016 7.00 19.10.2016 7.00
PROPOSED OUTAGES FOR TRANSMISSION LINES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 2B 144 NRSSXXI
X Jalandhar (PG)-Samba(PG)-2
(Line charged as Moga –Samba
Line with contingency
arrangement)
Continuous For removal of contingency arrangement and restoration as it is (
As Jalandhar Moga CKT1 & Kishanpur Samba CKT
1) Moga- Jalandhar Line will be charged within 96 Hrs from the time of shutdown The shutdown in real time will be availed subject to readiness at both end so
that the 400KV D/C Samba- Jalandhar Line
can be terminated confirmation of bay readiness at both
substations so that the 400KV Samba-
Jalandhar Line can be terminated
15.10.2016 7.00 19.10.2 7.00
NORTHERN REGION 1&3
DATE TIME DATE TIME
1 PGCIL 765 ICT-I at Jhatikara PGCIL INTRA DAILY Installation of Polymer insulators at S/S and line. 27-10-16 09:00 28-10-16 18:00 Jhatikara
2 PGCIL 765 ICT-II at Jhatikara PGCIL INTRA DAILY Installation of Polymer insulators at S/S and line. 30-10-16 09:00 31-10-16 18:00 Jhatikara
3 PGCIL 765 ICT-III at Jhatikara PGCIL INTRA DAILY Installation of Polymer insulators at S/S and line. 04-10-16 09:00 05-10-16 18:00 Jhatikara
4 PGCIL 765 ICT-IV at Jhatikara PGCIL INTRA DAILY Installation of Polymer insulators at S/S and line. 06-10-16 09:00 07-10-16 18:00 Jhatikara
5 PGCIL 765 BUS-I at FATEHPUR PGCIL INTRA DAILY AMP work/ C&tan delta. 05-10-16 10:00 05-10-16 18:00 KNP
6 PGCIL 765 BUS-II at FATEHPUR PGCIL INTRA DAILY AMP work/ C&tan delta. 07-10-16 10:00 07-10-16 18:00 KNP
7 PGCIL 765 BUS-I at JHATIKRA PGCIL INTRA DAILY Installation of Polymer insulators at S/S and line. 13-10-16 09:00 14-10-16 18:00 Jhatikara
8 PGCIL 765 BUS-II at JHATIKRA PGCIL INTRA DAILY Installation of Polymer insulators at S/S and line. 24-10-16 09:00 25-10-16 18:00 Jhatikara
9 PGCIL 765 Main bay of B/Reactor-I at Bhiwani PGCIL INTRA DAILY AMP work/ C&tan delta. 04-10-16 09:00 05-10-16 18:00 Bhiwani
10 PGCIL 400 BUS-1B at HVDC Agra PGCIL INTRA DAILY Integration work for 400kVPole-3 dia 20-10-16 09:00 21-10-16 18:00
11 PGCIL 400 BUS-2B at HVDC Agra PGCIL INTRA DAILY Integration work for 400kVPole-3 dia 22-10-16 09:00 23-10-16 18:00
12 PGCIL 765 711 Tie bay of ICT-I at Balia PGCIL INTRA DAILY AMP/ CVT C&tan delta. 26-10-16 08:00 26-10-16 18:0013 PGCIL 765 704 Main bay of Lko at Balia PGCIL INTRA DAILY AMP/ CVT C&tan delta. 26-10-16 08:00 26-10-16 18:0014 PGCIL 765 711 Tie bay of ICT-I at Balia PGCIL INTRA DAILY AMP/ CVT C&tan delta. 19-10-16 09:30 19-10-16 18:00
EQUIPEMENT DETAILS
TOVOLT LEVEL
(KV)NAME OF THE ELEMENT OWNER
DAILY/
CONTIN
UOUS
REASON
PROPOSED DATE AND TIME
INTER/ INTRA
REGIONAL
FROM
PROPOSED NLDC TRANSMISSION ELEMENTS FOR THE MONTH OFOCTOBER 2016 ANNEXURE 3A (1)
REMARKSS.N.
NAME OF
REQUESTING
AGENCY
PROPOSED OUTAGES OF TRANSMISSION ELEMETS FOR THE MONTH OF OCTOBER 2016 ANNEXURE3A(2)
RRVPNL
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
1 765 KV3X500MVA, ICT-I at 765KV
GSS PhagiA 13.10.2016 14.10.2016 09.00Hrs 18.00Hrs Daily
1. For the tightening of loose clamps & connectors
of equipments. 2.
Measurement of di-electric loss angle of Bushings.
2 765 KV
400/765 KV ,3X500 MVA ICT
Bank-IIIrd at 765 KV GSS
Anta.
A 17.10.2016 19.10.201609.00
Hrs.20.00 Hrs. Continious Basis
Replacement of Damaged/Broken Disc Insulator
String at 765 KV side between ICT Bank-III & 765 KV
Main Bus -II
1.) ICT Bank-II is
expected by the
end of Sept-16.
2.) During Shut
down 400/765
KV ,3X500 MVA
ICT Bank-II ,will be
available in circuit
3 765 KV765 KV Main Bus-II at 765
KV GSS Anta.A 17.10.2016 19.10.2016
09.00
Hrs.20.00 Hrs. Continious Basis
Replacement of Damaged/Broken Disc Insulator
String at 765 KV side between ICT Bank-III & 765 KV
Main Bus -II
During Shut down
765 KV Main Bus-I
will be available in
circuit.
4 765 KV
765 KV ,3X80 MVAr Reactor
Bank of 765 KV Anta -Phagi
Ckt - I at 765 KV GSS Anta.
A 03.10.2016 03.10.201608.00
Hrs.20.00 Hrs. Daily
Replacement of defective NGR of Line Reactor
Bank of 765KV Anta-Phagi-I
During Shut down
of 765 KV Anta-
Phagi Ckt-II and its
line Reactor will
be available in
circuit.
5 765 KV
765 KV ,3X80 MVAr Reactor
Bank of 765 KV Anta -Phagi
Ckt - II at 765 KV GSS Anta.
A 04.10.2016 04.10.201608.00
Hrs.20.00 Hrs. Daily
Replacement of defective NGR of Line Reactor
Bank of 765KV Anta-Phagi-II
During Shut down
of 765 KV Anta-
Phagi Ckt-I and its
line Reactor will
be available in
circuit.
RemarksPurposeS.No. Details of Transmission element
Category to which
transmission
element belong
(A/B/C/D)
Date Timings
\\PRIYANKA\Users\Public\New folder (5)\ANNEXURE 3 A (2).xlsx Page 1
PROPOSED OUTAGES FOR THE MONTH OF OCTOBER 2016 ANNEXURE 3 B(I)
S.N
o
Cate
gory
Shutdown
Type
Work to be Carrried Reason
Voltag
e Level
Name Date Time Date
Time
1 400 kV 400kV Bus-I at BawanaA Daily Basis
03.10.2016 07:00 hrs 03.10.201617:30 hrs Annual Maintenance and tan delta testing as per OS
mannualLoad will be run through-400kV Bus-II
2 400KV 400kV Bus-II at BawanaA Daily Basis
04.10.2016 07:00 hrs 04.10.201617:30 hrs Annual Maintenance and tan delta testing as per OS
mannualLoad will be run through-400kV Bus-I
3 400 kV 400kV PPCL Bus-I at Bawana (PPCL) A Daily Basis 05.10.2016 07:00 hrs 05.10.2016 17:30 hrs Annual Maintenance and testing as per OS mannual
of connected Isolators
Load will be run through-400kVPPCL Bus-II
4 400KV 400kV PPCL Bus-II at Bawana (PPCL) A Daily Basis 06.10.2016 07:00 hrs 06.10.2016 17:30 hrs Annual Maintenance and testing as per OS mannual
of connected Isolators
Load will be run through-400kVPPCL Bus-I
5400KV
CB NO. 452 of 400kV Bawana- Tikri Kalan ckt-II at Bawana A Daily Basis 11.10.2016 10:00 hrs 11.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 352
6400KV
CB NO. 352 of 400kV Bawana-Tikri Kalan ckt-II at Bawana A Daily Basis 12.10.2016 10:00 hrs 12.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 452
7400KV
CB NO. 252 of 400kV Bawana-Tikri Kalan ckt-I at Bawana A Daily Basis 13.10.2016 10:00 hrs 13.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 152
8400KV
CB NO. 152 of 400kV Bawana- Tikri Kalan ckt-I at Bawana A Daily Basis 18.10.2016 10:00 hrs 18.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 252
9 400KV CB NO. 552 & Tie CB No. 652 of ICT-3 at Bawana A Daily Basis 19.10.2016 10:00 hrs 19.10.2016 17:30 hrs Circuit BreakerTesting & annual maintenance No load will be affected. ICT-3 remain
charge by CB No.-752.10
400KVCB NO.1152 of 400kV Bawana-Abdullapur Ckt at Bawana A Daily Basis 20.10.2016 10:00 hrs 20.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 1252
11400KV
CB NO. 1352 of 400kV Bawana-Dipalpur Ckt at Bawana A Daily Basis 21.10.2016 10:00 hrs 21.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 1452
12400KV
CB NO.1252 of 400kV Bawana- Abdullapur Ckt at Bawana A Daily Basis 24.10.2016 10:00 hrs 24.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 1152
13 400KV CB NO. 1452 of 400kV Dipalpur Ckt at Bawana A Daily Basis 25.10.2016 10:00 hrs 25.10.2016 17:30 hrs Circuit BreakerTesting & annual maintenance No load will be affected. Line remains
charge through other CB No.- 1352
Details of Transmission Element From To
DELHI TRANSCO LIMITED
14400KV
CB NO. 1552 of 400kV Bawana-Mandola Ckt-I at Bawana A Daily Basis 26.10.2016 10:00 hrs 26.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 1652
15400KV
CB NO. 1752 of 400kV Bawana-Mandola Ckt-II at Bawana A Daily Basis 27.10.2016 10:00 hrs 27.10.2016 17:30 hrs
Circuit BreakerTesting & annual maintenance No load will be affected. Line remains charge through other CB No.- 1852
16 400KV CB No.-420-52 of ICT-1at Bawana A Daily Basis 28.10.2016 10:00 hrs 28.10.2016 17:30 hrs Circuit BreakerTesting & annual maintenance No load will be affected. ICT-1 remain
charge through Tie CB No.-421-52.17 400KV CB No.-422-52 of ICT-4 at
Bawana A Daily Basis 29.10.2016 10:00 hrs 29.10.2016 17:30 hrs Circuit BreakerTesting & annual maintenance No load will be affected. ICT-4 remain charge through Tie CB No.-421-52.
18 400kV 315MVA ICT-1 at Bamnauli A Daily Basis 10.10.2016 09:30 hrs 10.10.2016 17:30 hrs For general maintenance and Tan delta testing and routine testing
Load shall be shared by 315MVA ICT-4, 500MVA ICT-2 and 500MVA ICT-3
19 400kV 500MVA ICT-2 at Bamnauli A Daily Basis 13.10.2016 09:30 hrs 13.10.2016 17:30 hrs For general maintenance and Tan delta testing and routine testing
Load Shall be shared by 500MVA ICT-3, 315MVA ICT-1 and 315MVA ICT-4
20 400kV 500MVA ICT-3 at Bamnauli A Daily Basis 14.10.2016 09:30 hrs 14.10.2016 17:30 hrs For general maintenance and Tan delta testing and routine testing
Load Shall be shared by 500MVA ICT-2, 315MVA ICT-1 and 315MVA ICT-4
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
1 400 KV400KV Bus-D at 765KV GSS
PhagiA 20.10.2016 21.10.2016 09:00HRS 18:00Hrs Daily
For the tightening of clamps & connectors of
inter-connection of inverted Y of 5" IPS Al. tube
to 6'' IPS Al. tube of Bus-D for different 400 KV
Bays.
2 400 KV400KV Bus-C at 765KV GSS
PhagiA 05.10.2016 06.10.2016 09:00HRS 18:00Hrs Daily
For the tightening of clamps & connectors of
inter-connection of inverted Y of 5" IPS Al. tube
to 6'' IPS Al. tube of Bus-C for different 400 KV
Bays.
3 400 KV420KV, 125MVAR Bus
Reactor at 765KV GSS PhagiA 26.10.2016 27.10.2016 09:00HRS 18:00Hrs Daily
1. For the maintenance of Reactor.
2. Measurement of Tan-Delta of Bushing.
4 400 KV400/220KV ICT-III at 400KV
GSS AkalA 12.10.2016 12.10.2016 10:00HRS 16:00Hrs Daily 2nd Quarterly Maintenance of Bay Equipment
5 400 KV400 KV MAIN BUS-II at
400KV GSS HindaunA 07.10.2016 07.10.2016 08:30HRS 13:30HRS Daily Quarterly Maintenance
6 400 KV
400KV ICT-I Bay &
400/220/33KV 315MVA Tr.-
I at 400KV GSS Bhilwara
A 04.10.2016 04.10.2016 09:00HRS 17:00HRS Daily
Half Yearly Maintenance of 400KV ICT-I Bay &
associated equipments and 400/220/33KV
315MVA Tr-I
7 400 KV
400KV ICT-II Bay &
400/220/33KV 315MVA Tr.-
II at 400KV GSS Bhilwara
A 05.10.2016 05.10.2016 09:00HRS 17:00HRS Daily
Half Yearly Maintenance of 400KV ICT-II Bay &
associated equipments and various testing of
400/220/33KV 315MVA Tr-II
Remarks
PROPOSED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF OCTOBER 2016 ANNEXURE 3B(2)
RRVPNL
S.No.
Details of Transmission element Category to which
transmission
element belong
(A/B/C/D)
Date Timings
Purpose
\\PRIYANKA\Users\Public\New folder (5)\ANNEXURE 3 B(2).xlsx Page 1
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
RemarksS.No.
Details of Transmission element Category to which
transmission
element belong
(A/B/C/D)
Date Timings
Purpose
8 400 KV
Circuit breaker 352A OF
400/220KV ILT-1ST at
400KV GSS Ratangarh
A 17.10.2016 20.10.2016 10:00 Hrs. 20:00Hrs Continous BasisOverhauling work of CB & maintenance work of
bay equipment and line
9 400 KV
Circuit breaker 452A OF
400/220KV ILT-2nd at
400KV GSS Ratangarh
A 21.10.2016 26.10.2016 10:00 Hrs. 20:00Hrs Continous BasisOverhauling work of CB & maintenance work of
bay equipment and line
10 400 KV400KV MAIN BUS-I at
400KV GSS BikanerA 03.10.2016 12.10.2016 10:00 Hrs. 17:00HRS Continous Basis
Equipment Erection Below Bus-I In Dia-5,6,7
BPI,Isolator,IPS Tube,Alignment of Isolator for
New Bay Erection Work
400 KV Supply Fed
through 400 KV Main
Bus-II
11 400 KV400KV MAIN BUS-I at
400KV GSS BikanerA 07.10.2016 07.10.2016 10:00 Hrs. 17:00HRS Daily Pre-Deepawali Bay Maintenance
400 KV Supply Fed
through 400 KV Main
Bus-II
12 400 KV
315 MVA 400/220 kV ICT-I
& ICT-I Bays at 400KV GSS
Bikaner
A 05.10.2016 05.10.2016 10:00 Hrs. 17:00HRS Daily Pre-Deepawali Bay Maintenance
220 kV feeders will be
fed through 315 MVA
400/220 KV ICT-II
13 400 KV
315 MVA 400/220 kV ICT-II
& ICT-II Bays at 400KV GSS
Bikaner
A 06.10.2016 06.10.2016 10:00 Hrs. 17:00HRS Daily Pre-Deepawali Bay Maintenance
221 kV feeders will be
fed through 315 MVA
400/220 KV ICT-I
14 400 KV400KV MAIN BUS-II at
400KV GSS BikanerA 13.10.2016 22.10.2016 10:00 Hrs. 17:00HRS Continous Basis
Equipment Erection Below Bus-II In Dia-5,6,7
BPI,Isolator,IPS Tube,Alignment of Isolator for
New Bay Erection Work
400 KV Supply Fed
through 400 KV Main
Bus-I
15 400 KV
400 KV 50 MVAR Bus
Reactor & Reactor Bay &
400 KV Main Bus-II at
400KV GSS Bikaner
A 13.10.2016 13.10.2016 10:00 Hrs. 17:00HRS Daily Pre-Deepawali Bay Maintenance
\\PRIYANKA\Users\Public\New folder (5)\ANNEXURE 3 B(2).xlsx Page 2
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
RemarksS.No.
Details of Transmission element Category to which
transmission
element belong
(A/B/C/D)
Date Timings
Purpose
16 400 KV400/220/33 KV ,315 MVA
ILT-I at 400KV GSS MertaA 06.10.2016 06.10.2016 09:00HRS 17:00HRS Daily
III rd QUARTERLY MAINT.WORK OF BAY &
EQUIPMENTS
17 400 KV400/220/33 KV ,315 MVA
ILT-II at 400KV GSS MertaA 07.10.2016 07.10.2016 09:00HRS 17:00HRS Daily
III rd QUARTERLY MAINT.WORK OF BAY &
EQUIPMENTS
18 400 KV400 KV 50 MVAR Reactor-I
at 400KV GSS MertaA 13.10.2016 13.10.2016 09:00HRS 17:00HRS Daily
III rd QUARTERLY MAINT.WORK OF BAY &
EQUIPMENTS
\\PRIYANKA\Users\Public\New folder (5)\ANNEXURE 3 B(2).xlsx Page 3
Voltage
LevelName
1 400 kV400 kV BUS COUPLER ALONG WITH 400 kV MAIN BUS-B Sarojaninagar
01.10.16 20.10.16 09:00 16:00FOR REPLACEMENT OF 400 kV ABCB OF BUS COUPLER BAY BY SF6 CIRCUIT BREAKER
Continous Basis
2 400kV 400kV A bus and Bus coupler Sultanpur 02.10.16 13.10.16 08:00 18:00
For erection and commissioning of New Bus Bar Protection Panel in place of old Bus Bar Protection Panel.
Daily basis
3 400kV400kVBus bar Protection panel and work permit for all 400kV bays at 400kV Sultanpur
02.10.16 31.10.16 08:00 18:00For erection and commissioning of New Bus Bar Protection Panel in place of old Bus Bar Protection Panel.
Daily basis
4 400 kV 400 kV MAIN BUS-A Sarojaninagar 03.10.16 03.10.16 09:00 16:00
FOR REPLACEMENT OF 400 kV ABCB OF BUS COUPLER BAY BY SF6 CIRCUIT BREAKER (DISMANTLING OF PIPE BUS AND OPENING JUMPERS OF BUS COUPLER SECTION)
Daily basis
5 400kV 315MVA ICT-II at 400kV S/S Agra 04.10.16 04.10.16 10:00 14:00 For routine testing & maintenance work. Partial supply loss approx 50MW Daily basis.
6 400kV 400kV Main Bus-II at 400kV S/S Agra 04.10.16 04.10.16 10:00 14:00 For maintenance of Bus. Daily basis.
7 400kV 400kV Main Bus-I at 400kV S/S Agra 05.10.16 05.10.16 10:00 14:00 For maintenance of Bus. Daily basis.
8 400kV 240MVA ICT-I at Sultanpur 05.10.16 06.10.16 08:00 18:00 For dismantling of 36 Mtr. Span of 220kV Transfer Bus and 220kV B bus. Daily basis
9 400kV 315MVA ICT-I at 400kV Sub-station, Muradnagar 07.10.16 07.10.16 08:00 17:00 Tightening of Bay/General Maintenance Daily basis
10 400kV 400kV CB- 92 (ABCB) at 400 kV S/S, Azamgarh. 12.10.16 26.10.16 8.00 18:00 Replacement of existing ABCB with SF-6
CB Continious Basis
PROPOSED OUTAGES FOR TRANSMISSION ELEMENTS FOR THE MONTH OF OCTOBER 2016
ANNEXURE 3B(3)
UPPTCL
Date
RemarkReasonTo
S.N.From To From
TimingsDetails of transmission elements
Date
RemarkReasonTo
S.N.From To From
TimingsDetails of transmission elements
11 400kV 240MVA ICT-I at Sultanpur 13.10.16 16.10.16 08:00 18:00
1. For Erection of 220kV transfer and B Bus 2. For dismantling of 36 Mtr. Span of 220kV A bus. 3. For Erection of 220kV A Bus 4. For dismantling of 54 Mtr. Span of 400kV Transfer Bus
Daily basis
12 400 kV 400/220 kV 315 MVA ICT-I Unnao 14.10.16 14.10.16 09:00 18:00Testing of Transformer and complete overhauling of 29A & 29C Isolator along with Main Bus-A
Daily basis
13 400kV 400/220kV 500MVA ICT-II bay at 400kV S/s Sarnath 15.10.16 16.10.16 8.00 18.00 Replacement of 400kV CT and replacement
of Aircell by M/s ABB
Continous basis. During this shut down load will be taken by both ICTs (315MVA ICT-I & III) under the total load availability of 520MW (260MW on each ICT).
14 400 kV400 kV Panki- Unnao Line main breaker panki end (Line remain charge through TBC)
15.10.16 24.10.16 08:00 18:00 Overhauling of main circuit breaker of Unnao bay at Panki end. Continuous Basis
15 400kV 400kV Main Bus-II at 400kV S/s Sarnath 15.10.16 26.10.16 8.00 18.00 Repairing/ Strengtherning of 400kV Main
Bus-II
No supply will be affected during shut down as all load shall be fed through Main Bus-I.
16 400kV 400kV Transfer Bus Sultanpur 16.10.16 26.10.16 08:00 18:00
For dismantling of 54 Mtr. Span, beam structure etc. of 400kV Transfer Bus For 400kV 315MVA New Transformer Bay erection
Continous Basis
17 400kV 400kV 80MVAR Bus Reactor Sultanpur 16.10.16 26.10.16 08:00 18:00
For dismantling of 54 Mtr. Span, beam structure etc. of 400kV Transfer Bus For 400kV 315MVA New Transformer Bay erection
Continous Basis
18 400 kV 400/220 kV 315 MVA ICT-II Unnao 17.10.16 17.10.16 09:00 18:00 Testing of Transformer and complete overhauling of 29C Isolator Daily basis
Date
RemarkReasonTo
S.N.From To From
TimingsDetails of transmission elements
19 400 kV 315 MVA ICT-(III) Bareilly 17.10.16 17.10.16 08:00 18:00For T&C Testing, Tandelta, cleaning of Isolator and tightening of jumpers. Bus will not be under shutdown.
Daily basis
20 400kV 315MVA ICT-III, 400/220kV at 400kV Sub-station, Muzaffarnagar. 17.10.16 17.10.16 11:00 17:00 For routine testing of protection. Daily basis
21 400kV 400 kV, 315MVA ICT-I bay at 400kV S/s Sarnath 17.10.16 18.10.16 8.00 18.00 General bay maintenance Daily Basis
22 400 kV 400kV Bus -(II) Bareilly 18.10.16 18.10.16 08:00 18:00For changing the contacts of bus side pantograph isolator Transfer bus 29-B Y-phase
Daily basis
23 400kV 240MVA ICT-II at Sultanpur 20.10.16 20.10.16 08:00 18:00 For Pantograph isolator maintenance Daily basis
24 400kV 400 kV, 315MVA ICT-III bay at 400kV S/s Sarnath 20.10.16 21.10.16 8.00 18.00
Cleaning of Insulator stacks, maintenance of isolators & attending oil seepage by M/s EMCO Service Engineer
Continous basis. During this shut down load will be taken by both ICTs (315 MVA ICT-I & 500MVA ICT-II) under the total load availability of 660 MW ( 400MW on 500MVA ICT-II & 260MW on 315MVA ICT-I ICT).
25 400kV 400kV B bus Sultanpur 23.10.16 23.10.16 08:00 18:00 For B bus pantograph isolator maintenance of 400kV obra Bay Daily basis
26 400kV 240MVA ICT-I at Sultanpur 25.10.16 26.10.16 08:00 18:00 For stringing of R,Y,B Phase 54 Mtr. Span of 400kV Transfer Bus Daily basis
DATE TIME DATE TIME
X-2
1 400 KV A 15.10.16 09:00 16.10.16 18:00 DailyFor jumper connection & Busbar stability work for Samba-Jallandahr D/C Bays extension work at Samba end.
2 400 KV A 01.10.16 10:00 01.10.16 13:00 DailyFor isolation of a section of Bus for erection of GIS equipments coming under Bus-2 for Bus-Reactor Commissioning at Dehar.
3 400 KV A 03.10.16 09:30 05.10.16 18:00 Daily
For jumper connection & Bus-bar stability of Jalandhar-Samba D/C bay extension works & same work for 125MVAR Bus-Reactor after shifting in ICT-3 Dia at jalandhar.
4 400 KV A 07.10.16 09:30 09.10.16 18:00 Daily
For jumper connection & Bus-bar stability of Jalandhar-Samba D/C bay extension works & same work for 125MVAR Bus-Reactor after shifting in ICT-3 Dia at jalandhar.
5 400 KV A 04.10.16 09:00 05.10.16 17:30 Daily For Jumper connection & Bus-Bar stability of Malerkotla-Amritsar Line Bay Extension Works.
6 400 KV A 07.10.16 09:00 07.10.16 17:30 Daily For Jumper connection & Bus-Bar stability of Malerkotla-Amritsar Line Bay Extension Works.
7 400 KV A 05.10.16 09:00 06.10.16 17:00 Daily For Jumper connection & Bus-Bar stability of SVC Bay Extension Works at Ludhiana.
8 400 KV A 03.10.16 09:00 03.10.16 15:00 DailyConnection of Tertiary Transformer to ICT-1 for arrangement of Auxiliary supply to SVC TO BE COMMISSIONED AT Ludhiana.
9 400 KV A 15.10.16 10:00 15.01.17 17:00 Continuous
10 400 KV A 15.10.16 10:00 15.01.17 17:00 Continuous
11220 KV A 15.10.16 10:00 15.01.17 17:00 Continuous
X-3
1 400 KV A 19.10.16 09:00 19.10.16 18:00 Daily For Annual maintenance works.
2 400 KV A 20.10.16 09:00 20.10.16 18:00 Daily For Annual maintenance works.3 400 KV A 07.10.16 09:00 07.10.16 17:30 Daily For Annual maintenance works.
4 400 KV A 13.10.16 10:00 22.10.16 18:00 Continuous Overhauling / attending oil leakage work of ICT-2 at Jalandhar S/S
PROPOSED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF OCTOBER 2016 ANNEXURE 3 B(4)
POWERGRID NORTHERN REGION-II
S.N. Details of Transmission Element Category
of element
DURATION Daily/
Continuous
Reason
Voltage
level
(KV)
NAME OF THE ELEMENT AND
SUBSTATION
TOFROM
For construction activity
400 kV Bus-1 Samba Substation
400KV BUS-I at Ludhiana sub-station
315mva ICT-1 at ludhiana sub-station
For O&M activity
400/220/33 KV ICT at BBMB DEHER.Replacement of existing 4X83.3 MVA Transformers with
new 4X105 MVA Transformers and replacement of all
existing equipments in 400 KV and 220 KV associated Bays
for this ICT at BBMB DEHER
Bay no. 401 - Associated 400 KV Bay for above ICT at BBMB Deher.
Bay no. 207 - Associated 220 KV Bay for above ICT at BBMB Deher.
400 KV Bus-1 at Jalandhar Sub-station
400 KV Bus-2 at Jalandhar Sub-station
400 kV Bus-1 at Malerkotla Substation
400 kV Bus-2 BBMB Dehar Substation
ICT-2 at Jalandhar Substation.
315 MVA ICT-2 at Malerkotla Substation
401 kV Bus-2 at Malerkotla Substation
400 KV Bus-2 at Kaithal Substation
400 KV Bus-1 at Kaithal Substation
ANNEXURE 3 B(5)
PROPOSED OUTAGES FOR TRANSMISSION ELEMENTS FOR THE MONTH OF OCTOBER 2016
POWER GRID NR 1AND NR 3S.N.
MODE
DATE TIME DATE TIME
1 315MVA ICT-Iat GORAKHPR
ADaily
20-10-2016 09:00 20-10-2016 17:00AMP work/Bushing C&tan delta
2 315MVA ICT-IIat GORAKHPR
ADaily
21-10-2016 09:00 21-10-2016 17:00AMP work/Bushing C&tan delta
3 315MVA ICT-Iat GURGAON
ADaily
04-10-2016 09:00 04-10-2016 18:00AMP work/Bushing C&tan delta
4 315MVA ICT-II at GURGAON
ADaily
14-10-2016 09:00 14-10-2016 18:00AMP work/Bushing C&tan delta
5 315MVA ICT-III at Bassi
ADaily
12-10-2016 09:00 12-10-2016 18:00AMP work/Bushing C&tan delta
6 315MVA ICT-I at Hissar
ADaily
05-10-2016 09:00 05-10-2016 18:00AMP work/Bushing C&tan delta
7 315MVA ICT-I at Agra
ADaily
15-10-2016 09:00 15-10-2016 18:00
Foundation of equipment for 315MVA ICT-II in excisting 220KV Area Agra
8 100MVA ICT-II at PITHORAGRH
ADaily 13-10-16 09:00 13-10-16 18:00 AMP work/Bushing C&tan delta
9 400kv BUS-I at KANKROLI A Daily 18-10-16 08:00 18-10-16 18:00 Bus Bar protection testing for new SVC bay 416 , 417 and 418
10 400kv BUS-II at KANKROLI A Daily 19-10-16 08:00 19-10-16 18:00 Bus Bar protection testing for new SVC bay 416 , 417 and 418
11 400kv BUS-I at BASSIA
Daily 01-10-16 08:00 02-10-16 18:00 Erection & jumper connection of new Reactor bays extention work.
12 400kv BUS-II at HISSAR A Daily 03-10-16 08:00 03-10-16 18:00 AMP work/CVT C&tan delta
13 400 Kv BUS-I at SONIPAT A DAILY 04-10-16 10:00 04-10-16 18:00 Annual maintenance work
PURPOSE REMARKSLINE/EQUIPT CategoryDURATION
FROM TO
14 400 Kv BUS-II at SONIPAT
ADAILY 05-10-16 10:00 05-10-16 18:00 Annual maintenance work
15 400 Kv BUS-I at Bareilly A DAILY 05-10-16 10:00 05-10-16 18:00 Annual maintenance work
16 400 Kv BUS-II at Bareilly A DAILY 15-10-16 10:00 15-10-16 18:00 Annual maintenance work
17 Bus-1 at Moradabad (UPPTCL) S/S DAILY 03-10-16 09:00 06-10-16 17:00Dejumpering and crane mobilisation for BusIsolator replacement under add cap.
moradabad
18 Bus-II at Moradabad (UPPTCL) S/S DAILY 07-10-16 09:00 10-10-16 17:00Dejumpering and crane mobilisation for BusIsolator replacement under add cap.
Moradabad
19 400kv Main Bay of ICT-II at BaliaA
daily 12-10-16 09:30 12-10-16 17:30 AMP work/ C&tan delta. Ballia
20 Singraulli II Line Main Bay at Allahabd
Adaily 18-10-16 10:00 18-10-16 18:00 AMP work/ C&tan delta.
Allahabad
21 Bus Reactor 2 Main Bay at Allahabad daily 19-10-16 10:00 19-10-16 18:00 AMP work/ C&tan delta. Allahabad
22 400kv GIS Bay ICT-I GURGAON A Cont 03-10-16 09:00 03-10-16 18:00 Maint of Equipuipments of GIS bay
23 400kv GIS Bay ICT-II GURGAON A Cont 04-10-16 09:00 04-10-16 18:00 Maint of Equipuipments of GIS bay
24 220kv GIS Bay ICT-I GURGAON A Cont 05-10-16 09:00 05-10-16 18:00 Maint of Equipuipments of GIS bay
25 220kv GIS Bay ICT-II GURGAON A Cont 06-10-16 09:00 06-10-16 18:00 Maint of Equipuipments of GIS bay
26 400kV Parichha-1 Main Bay at Mnpr
ADaily 06-10-16 09:00 06-10-16 18:00 For Bay AMP works
Mainpuri
27 400kV Parichha-2 Main Bay at Mnpr
ADaily 07-10-16 09:00 07-10-16 18:00 For Bay AMP works
Mainpuri
28 400kV Fatehpur-2 Main Bay at Mnpr A Daily 14-10-16 09:00 14-10-16 18:00 For Bay AMP works Mainpuri
29 400kV Ballabgarh ckt-2 Main Bay at Mnpr A Daily 15-10-16 09:00 15-10-16 18:00 For Bay AMP works Mainpuri
30 400kV Bassi Main Bay at Agra A Daily 14-10-16 09:00 14-10-16 18:00 For Bay AMP works Agra31 400KV ICT-II/ BR-2 TIE BAY at Agra A Daily 15-10-16 09:00 15-10-16 18:00 For Bay AMP works Agra
32 80 MVAR Barh Line I Reactor at Gorakhpur 400Kv A Continous 10-01-16 09:30 10/15/2016 17:00 For erection& commissioning of CB for implementation of switchable GORAKHPUR
33 80 MVAR Barh Line II Reactor at Gorakhpur 400Kv A Continous 10/16/2016 09:30 10/30/2016 17:00 For erection& commissioning of CB for implementation of switchable GORAKHPUR
34 400kv Tie Bay of Singrauli at Fatehpur A Cont 01-10-16 09:00 05-10-16 18:00 S/D for CB pull rod replacement35 400kv Main Bay of Singrauli at Fatehpur A Cont 06-10-16 09:00 10-10-16 18:00 S/D for CB pull rod replacement36 400kv Tie Bay of Mainpuri-II at Fatehpur A Cont 11-10-16 09:00 15-10-16 18:00 S/D for CB pull rod replacement37 400kv Main Bay of Mainpuri-II at Fatehpur A Cont 16-10-16 09:00 20-10-16 18:00 S/D for CB pull rod replacement38 400kv Main Bay of Mainpuri-I at Fatehpur A Cont 21-10-16 09:00 25-10-16 18:00 S/D for CB pull rod replacement39 400kv Main Bay of Alld-3 at Fatehpur A Cont 26-10-16 09:00 30-10-16 18:00 S/D for CB pull rod replacement40 410 Main Bay of ICT-2 A Daily 08.10.2016 09:30 hrs 08.10.2016 18:00 For Bay AMP works FATEHPUR
41 416 Main Bay of Bus Reactor-1
ADaily 10.10.2016 09:30 hrs 10.10.2016 18:00 For Bay AMP works
FATEHPUR
42 419 Main Bay of Bus Reactor-2
ADaily 12.10.2016 09:30 hrs 12.10.2016 18:00 For Bay AMP works
FATEHPUR43 425 Main Bay of 765 KV ICT-1(400 Side) A Daily 18.10.2016 09:30 hrs 18.10.2016 18:00 For Bay AMP works FATEHPUR44 431 Main Bay of 765 KV ICT-2(400 Side) A Daily 19.10.2016 09:30 hrs 19.10.2016 18:00 For Bay AMP works FATEHPUR45 407 Main bay of ICT-1 A Daily 24.10.2016 09:30 hrs 24.10.2016 18:00 For Bay AMP works FATEHPUR
Details of
Transmis
sion
element
Voltage
levelFrom To
From
(Hrs.)
To
(Hrs.)
1 400 KV 400/220 kV 315 MVA ICT -1 04.10.2016 04.10.2016 D 09:00 16:00 General maintenance.
2 400 KV 400/220 kV 315 MVA ICT -2 06.10.2016 06.10.2016 D 09:00 16:00 General maintenance.
3 400 KV 400/220 kV 315 MVA ICT -2 14.10.16 14.10.16 D 09:00 16:00 General maintenance.
4 400 KV 400 kV KABOOLPUR 400 Kv Bus 1 22-10-2016 22-10-2016 D 09:00 13:00
For Yearly Maintenance and
Testing
5 400 KV 400 kV KABOOLPUR 400 Kv Bus 2 22-10-2016 22-10-2016 D 14:00 18:00
For Yearly Maintenance and
Testing
400 kV DOULTABAD
PROPOSED OUTAGES FOR THEMONTH OF OCTOBER 2016 ANNEXURE 3B( 6)
HVPNL
Sr.
No.Name of S/Stn
Name of
transmission
elements
Date
Daily
basis
Timings
FOR Yearly
Maintenance and
Testing
S
No
.
Name of the
Requesting
agency
Voltage
Level
(KV)
Name of the
Element Owner
Inter
Regional/Intr
a Regional
Daily
/Continou
s
Reason From
Date
From
Time
To Date To time Remark
s
1 P&M Org 400400/220KV, 315
MVA ICT No. 2 at 400KV Muktsar
PSTCL Inter regional Daily General Maintenance 21.10.16 9.00 21.10.16 18.00
2 P&M Org 400400/220KV, 315
MVA ICT No. 1 at 400KV Muktsar
PSTCL Inter regional Daily General Maintenance 27.10.16 9.00 27.10.16 19.00
HIMACHAL PRADESH LOAD DESPATCH SIOCIETY
Sno NAME OF TRANSMISSION LINE
Reason From
Date
From
Time
To Date To time
1 220KV Bairasulil-Jassure Feeder Bay 7.10.2016 10.00 7.10.2016 17.00
2 220KV Pong-Jassure Feeder Bay
18.10.2016 10.00 18.10.2016 17.00
PROPOSED OUTAGES OFTRANSMISSION ELEMENTS FOR MONTH OFOCTOBER 2016 ANNEXURE 3B(7)
PSTCL Line Details Proposed Date and Time
Proposed Date and Time
Routine Maintainance of
EQUIPMENT OF FEEDER BAY AT JASSURE END
PLANNED OUTAGE OF TRANSMISSION ELEMENTS FOR OCTOBER 2016 ANNEXURE 3B(8)
PDD J&K Name of Division Name of G/Stn./ Trans.Lines Proposed date and time of shutdown.
1.
TLMD-II, Jammu. 220/132/33 KV Grid Station Gladni. 08-10-2016 0700 Hrs. to 1300 Hrs.
2.
G.C.D, Jammu. 320MVA,220/132/66KV G/Stn.Hiranagar including 220KV Sarna-Hiiranagar & Hiranagar-Gladni Tr. Lines along with 132KV Hiranagar-Sewa-II D/C Tr. Line .
15-10-2016 0700 Hrs. to 1300 Hrs.
3.
TLCD-I, Jammu 220/132 KV G/Station Bishnah and 220KV Hiranagar-Bishnah Trans. Line.
15-10-2016 0700 Hrs. to 1300 Hrs.
4. TLCD-II, Jammu a-220/132/33KV G/S Barn b-220 KV D/C Barn-Kishenpur Trans. Line(BKTL)
22-10-2016 0700 Hrs. to 1300 Hrs.
5. TLMD-III, Udhampur a- 220/132/33KV G/S Ramban
b- 220KV D/C KPTL Kishenpur-Ramban- (Ckt.-I & II)
c- 220/132/33KV Grid Station
Udhampur.
d- 220KV S/C Sarna-Udhampur Trans. Line.
22-10-2016 0700 to 1300 Hrs. 22-10-2016 0700Hrs. to 1300 Hrs. 26-10-2016 0700 Hrs. to 1300 Hrs. 26-10-2016 0700 Hrs. to 1300Hrs.
The shutdown shall be subject to fair weather conditions.
Type of Shutdown
Voltage Level Name From To From To Daily/Continous
Basis
1 400 KV Panipat 450MVA ICT1 3.10.2016 3.10.2016 08:00 17:00 Daily Pre winter maintainance of line and substation
2 400 KV Panipat 450MVA ICT2 5.10.2016 5.10.2016 08:00 17:00 Daily Pre winter maintainance of line and substation
3 400 KV Bhiwani 315MVA ICT 7.10.2016 7.10.2016 08:00 17:00 Daily Pre winter maintainance of line and substation
4 400 KV Panipat 71.66 MVAR B/R 28.10.2016 28.10.2016 08:00 17:00 Daily Pre winter maintainance of line and substation
5 400 KV Bhiwani 50MVAR B/R 13.10.2016 14.10.2016 08:00 17:00 Daily Removal of NGR and yearly maintainance of bayn equipment
Remarks
PROPOSED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF OCTOBER 2016 ANNEXURE 3 B(9)
BBMB
S.No. Details of Transmission element Date Timings
Purpose
\\PRIYANKA\Users\Public\New folder (5)\annexure 3b(9).xlsx Page 1