Upload
agranii-technologies
View
250
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Citation preview
agraNiiTechnologies
Healthsol
Healthcare Information Management System
1
B R E W I N G I . T. W I T H H E A LT H C A R E
agraNiiTechnologies
2
Status : ProprietaryEstablished : Dec 2010Employees : 5
Healthcare Information Management SoftwareHardware & Networking, CC TV & Nurse Calling SystemConsultancy on ISO, NABH, NABL & NABB
Clients: City Central Hospital – Cardiac Hospital with 100 BedRavi Nursing Home – General Surgery & O & G With
100 BedSukshema Hospital – Onco Specialty With 60 BedDeccan Hospital– General Surgery & O & G With 100
Bed
agraNiiTechnologies
3
• State of the art most advanced HIMS solution
• Centralized management software
• Controlling financial activities and monitoring all activities including
administrative and clinical part
• Advanced web enabled solution
• To improve the existing system and give better and patient friendly result
agraNiiTechnologies
4
• Registration Management
• Patient Management
• Financial Management
• Employees Management
• Pharmacy Management
• Store Management
• Integration of HIMS with Financial, HR, Stores and Pharmacy
agraNiiTechnologies
5
Patient Registration
Payment Collection for Registration
Fees &/or Consultance Fees
Token Generation
Consultation & Prescription
Service Order
Service Payment Collection
Service Executation
Reconsultation after Service Executation
Out Patient Module
Pharmacy & EXIT
Pharmacy & EXIT
agraNiiTechnologies
6
• Patient Registration – Every Patient walks into the hospital will be registered and stored for easy
retrieval of Data during Revisit / Re-consultation
• Appointment Scheduling – Patients can Know the availability of Doctors and helps in fixing
appointment
• TMS – Generation of Token Number along with Approximate Time for Meeting Doctor in a specific Room
• Bed Occupancy Statistics – Will Display the bed status like Occupied / Reserved / Maintenance /
Emergency / Vacant, according to the floor / ward and allow the patient to choose there preferential bed
• Personal Scheduler – Allows the Doctors to Plan the Day ahead, If time is blocked Tokens will not be
generated
• ID card generation – A Photo Identity Card with Bar Code is Generated for easy access of Patient Data
Front Desk Management
agraNiiTechnologies
7
• Registration – By scanning the Photo ID Card of the patient registration is done to the particular
doctor and the patient name is displayed on the QMS System
• Billing – Related to registration, revisit and service charges for all financial application and collection of
MRD Data.
• Consultation – Doctor writes prescription on a regular paper with a pen which is captured as an
image and stored for future reference. These prescription can be referred to other Doctors and can be viewed
from IP also.
• Service Request – The lab reports is directly accessed by the Primary Consultant, There is
complete financial check on the service order
OP Management
agraNiiTechnologies
8
In Patient Module
Patient Registration
Advance Payment / Insurance Approval
Ward Allotment
Doctors Note
Nurse Note
Operation Theatre
Scheduleing
Anesthesia Records
Ward Management
Discharge Summary
Final Settlement / Debit Note
from Insurance
Physical Discharge
Data Archived
agraNiiTechnologies
9
IP Management
• Admission / Billing – Depending on the type of patient the bill is designed, for Insurance, Corporate
Credit facility is provided.
• Case Sheet Management – Doctors Note, Nurse Note, Service Order, Treatment Chart, Discharge
Request, Discharge Summary, Physical Discharge
• Ward Management – (Admission, Discharge and Transfer)As the patient moves from each ward the
billing patron is also changed
• OT Management – Registration, OT Records, Anesthesia Records
• Labour Management – Master, Registration , Baby Birth Chart
agraNiiTechnologies
10
Doctors & Nurse Note
Doctors Note - Basic health record
• Past medical history
• Current medication; Computerized Provider Order Entry
• Details of ailment including allergy, disability, chronic diseases, addiction, etc.,
Nurse Note - Easy access to patient basic health records
• Viewing of patient medication history & laboratory test results
• Appointment for tests
• Recording sample collection details
• Generation of Service Orders by Service Points like Clinics, Wards, OT, etc.
• Electronic processing
• Service Order Tracking, including Service Point account for material consumption against Service Order, detection
of material wastage, detection of loss of revenue at service point, etc.,
agraNiiTechnologies
11
OT Management
• Maintenance of OT & staff calendar;
• OT Scheduling including scheduling of providers & resources;
• Material requisition;
• Recording operation details like list of staff present, date of operation, start
& end time of operation, details of procedure notes & nurse instructions, pre
& Post operation care procedures, etc.
agraNiiTechnologies
12
Blood Bank Management (WIP)
Blood Bank - • Blood collection, storage & supply from voluntary donors;
• Maintenance of Blood Stock Register;
• Maintenance of Donor Database;
• Confirm availability for anticipated use (for operation, accident patients, etc.);
• Capturing detailed information about blood samples;
• Replacement of blood against borrowings;
• Processing of service requests;
• Maintenance of inventory / interface to existing inventory system, billing, etc.
• Condemnation of blood, etc.
agraNiiTechnologies
13
Electronic Medical Records
Collated & formatted information on patients, as required;
Search on patient records by patient name, patient ID, etc.;
Complete clinical data repository, capturing basic patient demographic details, medical history, consultations,
diagnosis, laboratory reports, medical images, medical treatment records, etc.
Built-in reports and user-oriented report-writing capabilities, etc.
agraNiiTechnologies
14
Inventory Management (WIP)
Supplier Database
Purchase Order Tracking
Goods Receipt Note
Purchase Return
Indent Supply
Indent Return
Stock Statement
Billing Integration
agraNiiTechnologies
15
HR Module (WIP)
Employees Database
Contract & Temporary Staff Database
Consultants Database
Referral Doctors Database
Doctor & Hospital Share Information
Pay Roll Management
Leave Management
agraNiiTechnologies
16
Finance Module
Patient Ledger
Consultants Share Ledger
Journal Entries
Accounts Payable
Accounts Receivable
Bank Reconciliation Statement
Insurance Reconciliation Statement
Trial Balance
Profit & Loss Account
Balance Sheet
agraNiiTechnologies
17
Reports
MIS Reports
Registration Fees Statement
Consultation Statement
Service Collection Statement
User Wise Statement
Department Wise Statement
agraNiiTechnologies
18
Essential Standards
International Statistical Classification of Diseases & Related Health Problems
10th Revision (ICD-10) • Controls for ICD coding of discharge diagnosis details
Current Procedural Terminology (CPT) • Support for coding of services
Clinical Physician Order Entry (CPOE) • Support for ease in data entry for physician, which helps in user adoption as well as ergonomics of the
solution.
agraNiiTechnologies
19
Application Architecture
Application Architecture - Proposed implementation of HMIS is aimed at deriving benefits for the patient, doctor as well as administrator in more ways than one. To site a few benefits -
Patient
• Computerized medical record
• Preventive healthcare
• Appointment booking on web, phone and mobile
Physician
• Online access to patient health records
• Computerized prescription
• Online referrals
• Paperless virtual office
Administrator
• Optimum resource utilization
• Computerized scheduling of staff and services
• Online reports
agraNiiTechnologies
20
Application Architecture
The application architecture should be such that it has capability to deliver the expectations of the University. Following are some of the salient points that are desired from the architecture design:
Scalability
• New servers can be added dynamically to increase capacity , Load balancing can be used to ensure that the
servers are proportionately utilized
Performance
• Application framework designed to ensure good performance Use of caching techniques
Network Security
• Data encryption , Firewall and DMZ provides security from outside attacks , Application level security in
terms of user roles & responsibilities
• Security must be addressed through OS security and application Security. Please give details of the security
architecture for the following Log in security Network security , Operating System security , Application
related security , Antivirus measures , Intrusion Detection measures , Intrusion prevention measures
Availability
• 24 x 7 availability
agraNiiTechnologies
21
Third Party Integration
ERP – Integration with ERP like SAP, Oracle, GP, Navision, AX
Bar Code – For easy and error free access of Patient data at various location
Take Note Pad – Converting Prescription into picture and store for future reference
DICOM – Towards integration of Medical Equipment's for easy access and portability
PACS – Towards better imaging solution.
agraNiiTechnologies
22
agraNiiTechnologies
23
Project Scope
Phases Project Particulars Coverage Time Line
Phase –1
Solution Demo Customer Feedback Analysis Customization Customer Approval
Product Demo Customization Training Trial Run Prepare and Setup “Go-Live”
environment “Go-Live” “Go-Live” Support
1 Month
Phase – 2
Admission and Billing Module Case Sheet Management Ward Management OT Management Laboratory Management Training
Prepare and Setup “Go-Live” environment
Training “Go-Live” “Go-Live” Support
1 Month
Phase – 3
Blood Bank Management EMR Inventory Management HR Module Finance Module Training
Prepare and Setup “Go-Live” environment Training “Go-Live” Support
1 Month
Phase – 4
Integration with existing ERP Report Preparation
Prepare and Setup “Go-Live” environment Training “Go-Live” Support
1 Month
Onsite / Off-shore Support
Hand holding the users Support
Train the Internal IT TeamProduct related problem supportPerformance fine turning
Continuous
agraNiiTechnologies
24
Project Organization
Steering Committee
Team agraNiiSPOC
Functional Support
Technical Support
Team Client SPOC
agraNiiTechnologies
25
Deliverables
• Client should provide all the inputs which are need to be in the Solution
• Client should provide all the images & logo to agraNii for putting into the Solution
• All the documents need to provide by soft copy format to agraNii team• Client should provide space for agraNii team during the time of
implementation & training for the Solution• agraNii will provide the Solution related details in the soft copy format
agraNiiTechnologies
26
Terms & Conditions
Warranty Terms
• Warranty for the delivered product will be for a period of 6 months from the date of go live
• We warrant that the software delivered by us will meet the requirements as specified in the proposal
• This warranty will not include any further enhancement or customization requests from SSIMS.
Maintenance Services
• For a long term relationship with Client, agraNii will take the maintenance support for the Solution along with the future enhancement on TIME & MATERIAL basis based on the mutual discussion between both the parties.
IPR
• All the product or solution related IPR owned by agraNii & not transferable
agraNiiTechnologies
27
Terms & Conditions
Exclusion
• All hardware and Networking require for this project• All System software includes OS, Database, special tools
Language of Communication
• The official language for communication on this assignment will be English.
Letter of Acceptance
• As the first step for the assignment, Client will issue agraNii Technologies a letter of Acceptance along with the initial payment. This letter will refer to the proposal and confirm its acceptance.
Project Co-Ordination
• Client will provide timely clarifications and feedback sought by agraNii Technologies project team during the period of this assignment. Client’s Director will fix appointments with various Client personnel and provide local assistance to agraNii Technologies project personnel.
agraNiiTechnologies
28
Terms & Conditions
Change Management Procedure
• Any changes required for the deliverable must go through a formal change Management procedure. They should also be logged as Change Management Requests (CMRs) for which evaluation in terms of time, cost and effort will be conducted by agraNii Solutions and Client. Extra effort for such changes will be based on Time and Material basis.
Status Reporting
• The agraNii Technologies project leader will interact with the Client project co-coordinator on the progress of work and seek timely resolution in case agraNii Technologies team feels any lack of participation from Client.
agraNiiTechnologies
29
Terms & Conditions
Force Majeure
• If the performance as specified in this proposal is prevented, restricted, delayed or interfered by reason of:
• Fire, explosion, cyclone, floods;• War, revolution, acts of public enemies, blockage or embargo;• Any law, order, proclamation, ordinance, demand or requirements of
any Government or authority or representative of any such government including restrictive trade practices or regulations;
• Strikes, shutdowns or labor disputes which are not instigated for the purpose of avoiding obligations herein, or;
• Any other circumstances beyond the control of the parties affected
agraNiiTechnologies
30
Terms & Conditions
Termination
• agraNii Technologies and Client will have the right to terminate the agreement resulting from this proposal by giving a one-month notice to the other upon situations arising due to non-compliance of the stipulations of this proposal. The termination notice will be held valid only if it is preceded by a corresponding non-compliance notice issued at least 30 days prior to the date of the termination notice and if the non-compliance has continued up to the date of the termination notice.
• If agraNii Technologies issues the termination notice, then Client will pay agraNii Technologies all payments due to the on-going phase as of the termination date stated in the notice, including those for the proportion of work completed in the above phase, until termination.
• If Client issues the termination notice, then they will pay agraNii Technologies all amounts due to the on-going phase as of the termination date stated in the notice as well as the payment that would have become due upon completion of the for the above phase encompassing the termination date.
agraNiiTechnologies
31
Terms & Conditions
Acceptance of Services
• The steering committee consisting of top management from Client and agraNii Technologies consultants will review the progress on a regular basis. Fortnightly progress reports prepared by the agraNii Technologies team and Client coordinator will form the basis of these discussions.
Additional Service Request
• Any services not defined in the scope of this assignment, if required to be provided, would be communicated to the agraNii Technologies management and separate service agreement to be agreed upon.
agraNiiTechnologies
32
Contact Us
Ananda Theertha
Chief Executive Officer
agraNii Technologies
310-B, 10th Cross, I.H.Township, Rajarajeshwari Nagar, Bangalore 560 098 INDIA
Phone: +91 99 01 999 424 / +91 98 45 324 012
E-Mail: [email protected]
Website: http://www.agraniitechnologies.com