Executed Project Details & References

Executed Project Details & References

ByMr. Kiran.K.S

I-FLEX SOFTWARE TECH PARK BANGALORE

Office Block

Corporate Block

PROJECT DESCRIPTION I-FLEX SOFTWARE PARK, BANGALORE

Project Developer:M/s Iflex India Pvt Ltd.Project Management Consultants:Equis India Pvt Ltd,BangaloreProject Architects:M/s DSP Architects,MumbaiStructural Consulants:Cruthi Consulants,Bangalore.Civil Contractor:M/s Shapoorji Pallonji Constuvtion Pvt LtdPre stressing Vendor:VSL(India)Ltd Project Features:Total Built up Area:1,75,000sftCost of Project: 6Crores.Ground Floor+4 floors of 1,00,000sft of Office Block and Corporate Block of 75,000sft. Reference: L-Krishna Murthy,Senior Services Manager-Equis India. Mobile No:-9845585195

GARUDA MALL, BANGALORE

Project Description:Garuda Mall, Bangalore

Project Developer:M/s EuroAmer Garuda India Pvt Ltd.Project Management Consultants:Synergy Property Development Service Pvt Ltd.BangaloreProject Architects:M/s Sundaram Architects,BangaloreStructural Consulants:M/s Sundaram Architects ,Bangalore.Main Civil Contractor:M/s CCCL Contractors-ChennaiProject Features:Total Built up Area:800,000sftCost of Project:80Crores.Ground Floor+4 floors of 2,50,000sft of Commercial Block and Hotel Block of 1,50,000sft.11 floors of Multi-level car parking. Concrete and Block Work-Shell and Core Consisted of 3 floors of Commercial area ,3 floors of Multiplex(5 theatres) area with 11 floors of Multilevel Car Park (including 2 Basements of 325car Park);HVAC-Installation of 365TR ,250TRx2 nos Chillers, Common area AC works and Basement Ventilation.Building Faade-Spider glazing and ACP worksLifts and Escalator-7Lifts and 19 escalators installationFire Fighting works and Smoke Detection works.External Landscape Works.Installation of 3x1500kva DG sets.Reference:K.Giridhar:Chief Engineer.-Garuda DevelopersMobile No:98450-74140.

EMBASSY CREST

Completed Base Building works for Embassy Crest(3,20,000sft) a software Facility for M/s Embassy Group Bangalore as Project Manager

Project Developer:M/s Embassy Group Project Management Consultants: Synergy Property Development Service Pvt Ltd. BangaloreProject Architects:M/s RSP Architects,BangaloreStructural Consulants:M/s Potential Services Consulants,Bangalore.Main Civil Contractors: M/s Indu Projects,Bangalore Project Features:Total Built up Area: 3,20,000sftCost of Project:48Crores.Ground Floor+5 floors of 3,20,000sft of Office Space.Concrete and Block Work-Shell and Core Consisted of 6 floors of Office Area and A Basement for 250 car Park.HVAC- Common area AC works and Basement Ventilation.Building Faade-Structural Glazing and ACP works

Lifts and Escalator-5Lifts and 1-Service LiftFire Fighting works and Smoke Detection works.External Landscape Works.Installation of 3x1500kva DG sets.Service Package includedFire Fighting and Smoke Detection.Lifts-5nos-16 Passenger Lifts and One Service Lift-1500kgInstallation of Plumbing System.STP.Basement Ventilation and Lift Pressurization system.External Developement WorksFaade System included Curtain Wall Glazing, Structural Glazing and ACP Cladding works together and Strip Windows.Interior Finishes of Common Area,Lift Lobby and Entrance Lobby.

M/s Ingersoll Rand Engineering Centre Bidadi

Completion and Handing Over of Base Building works for M/s Ingersoll Rand Engineering Centre at Bidadi Industrial Area, Bangalore. With an overall development area of 8 Acres.

Project Developer:M/s Ingeroll Rand India Pvt Ltd Project Management Consultants:Synergy Property Development Service Pvt Ltd.BangaloreProject Architects:M/s Mindspace Architects,BangaloreStructural Consulants:M/s Semac Consulants,Bangalore.Main Civil Contractors:M/s DAN constrcutions. Project Features:Total Built up Area: 1,20,000sftCost of Project:23Crores.Ground Floor+3 floors of 1,20,000sft of Office Space.Service Package includedFire Fighting and Smoke Detection.Lifts-3nos-16 Passenger Lifts and One Service Lift-1500kgInstallation of Plumbing System.STP.External Development WorksFaade System included Structural Glazing.Interior Finishes of Common Area,Lift Lobby and Entrance Lobby. Reference:Mr Venkat Narayan:Head of Facilities-M/s Ingersoll Rand Engineering Centre,.99808-39357.

MALL OF MYSORE-raddison five star hotel(THE FIRST MULTIPLEX IN MYSORE-india)

Completion and Handing Over of Base Building works for Mall of Mysore(the First Multiplex and five star hotel in Mysore)with a total built up area of 5,00,000sft.for M/s DM south India Hospitality Group from New Delhi.

Project Developer:M/s DM South India Hospitality,New Delhi.Project Management Consultants:Synergy Property Development Service Pvt Ltd.BangaloreProject Architects:M/s PG Patki,MumbaiStructural Consulants:M/s Design Tree,Bangalore.Project Features:Total Built up Area:5,00,000sftCost of Project:73Crores.Ground Floor+4 floors of 2,50,000sft of Commercial Block and Hotel Block of 1,50,000sft and 2 Basement for car parking. Concrete and Block Work-Shell and Core Consisted of 3 floors of Commercial area ,3 floors of Multiplex(5 theatres) area with 2 Basements of 325 car Parks). Reference: Mr S N Mahesh:9845111007,Consultant DMSouth India Hospitality

FROM INITIATION TO COMPLETION OF INTERIOR Works for RELIANCE TECHNOLOGY GROUP OF m/S Reliance industries .with a total built up area of 3,50,000sft. Situated at corporate office in navi mumbai-india.

view of False ceilingview of corridor.

view of Laminated Partition

view of Workstations

view of Metallic false ceiling

view of typical workstation.

Completion and hand over of interiors works for olam risk management services.

Thank you!