  • Building External Areas Upgrade in Administration

    Area at Ras-Laffan

    CONTRACT: CT/RG27/L029/12

    MONTHLY PROGRESS REPORT NO: 20

    FOR THE MONTH OF JUNE 2014

  • CLIENT CONSULTANT CONTRACTOR

    TABLE OF CONTENTS

    1. PROJECT INFORMATION ............................................................................................................

    1.1. SCOPE OF WORK .....................................................................................................................

    1.2. PROJECT WEIGHTAGE ..........................................................................................................

    3. POGRESS WEIGHTAGE .................................................................................................................

    4. OVERALL PROGRESS SUMMARY .............................................................................................

    5. QA/QC STATUS ................................................................................................................................

    6. HEATH AND SAFETY .....................................................................................................................

    8. SUMMARY OF MATERIAL SUBMITTAL .................................................................................

    9. SUMMARY OF DESIGN DRAWING SUBMITTAL .................................................................

    10. MATERIAL SUBMITTAL LOG .....................................................................................................

    11. DESIGN DRAWING SUBMITTAL LOG ..................................................................................

    12. PROGRESS UPDATED WBS SUMMARY ..............................................................................

    13. ONE MONTH LOOK-AHEAD ....................................................................................................

    14. PROGRESS UPDATED PROGRAMME ...................................................................................

    15. PROGRESS PHOTOS ....................................................................................................................

  • 1. PROJECT INFORMATION Project Title: CT/RG27/L029/12

    Location: Ras Laffan

    Client: Ras gas Company Limited

    Contractor: Qatar Building Engineering Company W.L.L., (QBEC)

    Project Start Date: 21 Oct 2012

    Contract Duration: 28 Months

    Completion for Construction Works: 16 Months

    Completion for Operation & Maintenance: 12 Months

    Extension of time: 90 days secured

    1.1. SCOPE OF WORK

    Site survey and study of the existing site situation including trial pits needed to verify the

    physical characteristics of the site elements.

    Engineering analysis and design for and shade structures and signages, including

    irrigation piping network and electrical system based on the FEED design.

    Development of the detailed engineering drawings and procedures based on the FEED

    documents. Supply, install/construct, test and commission the work related to the Civil,

    Structural, Plumbing and Electrical works.

    Provision of new landscaping, which includes plants, trees, shrubs, ground cover and

    climbers.

    Provision of new irrigation piping, distribution network and associated accessories such

    as drips, sprinklers, bubblers and valves.

    Relocation and modifications to the existing planting, utilities, plumbing / mechanical and

    lighting works according to the new works.

    Maintenance of existing landscaping and planting during project execution and until the

    Provisional Acceptance.

    Operation and maintenance of new landscaping and irrigation for a period of one (1) year

    i.e. during Warranty period.

    All the associated demolition and reinstatement works resulting from the above works.

    All the other works as indicated in the relevant FEED drawings.

  • 1.2. PROJECT WEIGHTAGE

    Activity Name Overall Wt. Budgeted Cost

    Construction Mobilisation and Finalisation of key subcontractor & key suppliers

    5.00 1025000.31

    Contractor Mobilisation 2.39 489204.73

    Submission of Early Documentation & Key Deliverables 0.91 186363.66

    Key Subcontractors and Suppliers 1.70 349431.92

    ENGINEERING 5.00 1024999.83

    Site Survey and Trial pit Excavation 0.43 87172.24

    Submission and Approval of Design Calculations 0.92 189599.54

    Submission and Approval of Detailed Engineering Drawings 3.65 748228.05

    PROCUREMENT 17.00 3485000.97

    Materials Submission and Approval 5.91 1211165.46

    Interlock pavers, kerb stones and tree guards 0.66 134573.94

    Foundation bolts 0.66 134573.94

    Main piping material 0.66 134573.94

    Shade structures including fabric material 0.66 134573.94

    Signage structures 0.66 134573.94

    Fountain sculpture 0.66 134573.94

    Electrical Poles, DBs and Field Controls 0.66 134573.94

    Valves and pumps 0.66 134573.94

    Irrigation distribution accessories 0.66 134573.94

    Placing of Orders and First Delivery to Project Site 11.09 2273835.51

    Interlock pavers, kerb stones and tree guards 0.34 69607.21

    Foundation bolts 0.61 125292.98

    Main piping material 1.49 306271.72

    Shade structures including fabric material 1.13 232024.03

    Signage structures 1.15 236664.51

    Fountain sculpture 1.77 361957.49

    Electrical Poles, DBs and Field Controls 1.40 287709.80

    Valves and pumps 2.17 445486.14

    Irrigation distribution accessories 1.02 208821.63

    CONSTRUCTION 62.00 12710002.80

    Phase 1 Works 22.00 4510001.07

    Phase 2 Works 16.00 3280000.62

    Phase 3 Works 17.00 3485000.74

    Phase 4 Works 7.00 1435000.37

    TESTING AND COMMINSIONING 5.00 1025000.30

    FINAL DOCUMENTATION 6.00 1230000.35

    Total 100.00 20500004.53

  • 2. POGRESS WEIGHTAGE

    SR Physical % Overall Wt.Planned Wt.

    (Original BL)

    Planned Wt. (Revised

    BL)-RGCP-472-PEP-

    QTR-001 REV. D)

    Achieved Wt. Variation

    1 100.00% 5.00 5.00 5.00 5.00 0.00

    1.1 100.00% 2.39 2.39 2.39 2.39 0.00

    1.2 100.00% 0.91 0.91 0.91 0.91 0.00

    1.3 100.00% 1.70 1.70 1.70 1.70 0.00

    2 100.00% 5.00 5.00 5.00 5.00 0.00

    2.1 100.00% 0.43 0.43 0.43 0.43 0.00

    2.2 100.00% 0.92 0.92 0.92 0.92 0.00

    2.3 100.00% 3.65 3.65 3.65 3.65 0.00

    3 100.00% 17.00 17.00 17.00 17.00 0.00

    3.1 100.00% 5.91 5.91 5.91 5.91 0.00

    3.1.1 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.2 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.3 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.4 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.5 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.6 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.7 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.8 100.00% 0.66 0.66 0.66 0.66 0.00

    3.1.9 100.00% 0.66 0.66 0.66 0.66 0.00

    3.2 100.00% 11.09 11.09 11.09 11.09 0.00

    3.2.1 100.00% 0.34 0.34 0.34 0.34 0.00

    3.2.2 100.00% 0.61 0.61 0.61 0.61 0.00

    3.2.3 100.00% 1.49 1.49 1.49 1.49 0.00

    3.2.4 100.00% 1.13 1.13 1.13 1.13 0.00

    3.2.5 100.00% 1.15 1.15 1.15 1.15 0.00

    3.2.6 100.00% 1.77 1.77 1.77 1.77 0.00

    3.2.7 100.00% 1.40 1.40 1.40 1.40 0.00

    3.2.8 100.00% 2.17 2.17 2.17 2.17 0.00

    3.2.9 100.00% 1.02 1.02 1.02 1.02 0.00

    4 99.01% 62.00 62.00 62.00 61.39 -0.61

    4.1 98.76% 18.00 18.00 18.00 17.78 -0.22

    98.53% 4.00 4.00 4.00 3.94 -0.06

    4.2 98.94% 12.00 12.00 12.00 11.87 -0.13

    98.53% 4.00 4.00 4.00 3.94 -0.06

    4.3 99.35% 13.00 13.00 13.00 12.92 -0.08

    98.53% 4.00 4.00 4.00 3.94 -0.06

    4.4 100.00% 7.00 7.00 7.00 7.00 0.00

    5 60.407% 5.00 5.00 5.00 3.02 -1.98

    6 45.667% 6.00 6.00 4.40 2.74 -1.66

    100.00% 94.15% -5.85%

    98.40% 94.15% -4.25%

    Phase 1:Testing & commissioning

    Phase 2:Testing & commissioning

    Phase 3:Testing & commissioning

    Electrical Poles, DBs and Field Controls

    Valves and pumps

    Irrigation distribution accessories

    Interlock pavers, kerb stones and tree guards

    Foundation bolts

    Activity Name

    ENGINEERING

    PROCUREMENT

    Materials Submission and Approval

    Summary of progress report as of 30 June 2014

    Site Survey and Trial pit Excavation

    Submission and Approval of Design Calculations

    Submission and Approval of Detailed Engineering Drawings

    Contractor Mobilisation

    Construction Mobilisation and Finalisation of key subcontractor & key

    suppliers

    TESTING AND COMMINSIONING (PROVISIONAL ACCEPTENACE

    CERTIFICATE)

    Submission of Early Documentation & Key Deliverables

    Key Subcontractors and Suppliers

    Interlock pavers, kerb stones and tree guards

    Foundation bolts

    Main piping material

    Placing of Orders and First Delivery to Project Site

    Main piping material

    Shade structures including fabric material

    Signage structures

    Phase 3: Construction work

    Shade structures including fabric material

    Phase 4 Works

    CONSTRUCTION

    Signage structures

    Fountain sculpture

    Fountain sculpture

    Electrical Poles, DBs and Field Controls

    Total (Revised BL-RGCP-472-PEP-QTR-001 REV. D)

    Total (Original BL)

    FINAL DOCUMENTATION

    Irrigation distribution accessories

    Phase 1: Construction work

    Phase 2: Construction work

    Valves and pumps

  • 3. OVERALL PROGRESS SUMMARY

    20,950,917.53

    21-Oct-12

    20-Jul-14

    Submission Signature Date Remarks

    Prepared By

    Reviewed By Nabhan. S Al Qasem QBEC: Project Manager

    Endorsed By

    KEY INFORMATION

    (RG27-L029) EPC OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROGRESS REPORT

    Progress Status as on 30 June 2014

    CLIENT - RasGas

    CONSULTANT - Assiociated Consulting Engineers

    CONTRACTOR - Qatar Building Engineering Company

    CONTRACT AMOUNT in QAR

    PROJECT START DATE

    PROJECT COMPLETION DATE

    CLIENT CONSULTANT

    Assiociated Consulting EngineersRsGas

    CONTRACTOR

    Qatar Building Engineering Company

    Bhaskar Challa

    Designation

    QBEC: Planning Engineer

    RG: Project Specialist

    NOTE:

    Name

    Ahamed Ziyath

    20,950,917.53

    15,243,037.53

    5,707,880.00 INVOICE STATUS

    TOTAL AMOUNT

    INVOICED AMOUNT

    REMAINING INVOICE

    638

    618

    20PROJECT DURATION

    PROJECT DURATION

    COMPLETED DURATION

    REMAINING DURATION

    98.40%

    94.15%

    -4.25% PROGRESS

    PLANNED PROGRESS

    ACTUAL PROGRESS

    VARIANCE

    100.00%

    100.00%

    100.00%

    100.00%

    100.00%

    73.37%

    100.00%

    99.58%

    99.92%

    99.01%

    60.41%

    45.67%

    10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

    Preliminary

    Engineering

    Procurement

    Construction

    Testing/Com

    Final Document

    % Completion PROGRESS BAR CHART - BREAKDOWN PROGRESS

    PLANNED % ACTUAL %

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Oct

    -12

    No

    v-1

    2

    Dec

    -12

    Jan

    -13

    Feb

    -13

    Mar

    -13

    Ap

    r-1

    3

    May

    -13

    Jun

    -13

    Jul-

    13

    Au

    g-1

    3

    Sep

    -13

    Oct

    -13

    No

    v-1

    3

    Dec

    -13

    Jan

    -14

    Feb

    -14

    Mar

    -14

    Ap

    r-1

    4

    May

    -14

    Jun

    -14

    Jul-

    14

    % C

    om

    ple

    tio

    n

    Time

    S - CURVE CUML. PLANNED %

    Planned Progress : 98.40%

    Actual Progress : 94.15%

    18

    18

    0

    0

    0

    18

    0

    26

    14

    0

    0

    12

    26

    12

    61

    61

    0

    0

    0

    61

    0

    20

    20

    0

    0

    0

    20

    0

    23

    23

    0

    0

    0

    23

    0

    20

    1

    0

    0

    12

    13

    7

    1

    0

    0

    0

    1

    1

    1

    45

    31

    0

    14

    0

    45

    14

    229

    183

    0

    14

    25

    222

    34

    0 50 100 150 200 250 300 350 400 450 500

    TOTAL NO

    IFC

    CODE A

    CODE B

    CODE D

    CUM.

    YET TO SUBMIT

    TOTAL NO IFC CODE A CODE B CODE D CUM.YET TOSUBMIT

    Design Calculation 18 18 0 0 0 18 0

    General 26 14 0 0 12 26 12

    Landscape & Civil 61 61 0 0 0 61 0

    Signage & Road Marking 20 20 0 0 0 20 0

    Irrigation 23 23 0 0 0 23 0

    Plumbing 20 1 0 0 12 13 7

    Instrumentation 1 0 0 0 1 1 1

    Electrical 45 31 0 14 0 45 14

    TOTAL NO 229 183 0 14 25 222 34

    DESIGN DRAWING SUBMITTAL STATUS

    62

    62

    42

    2

    0

    0

    4

    4

    4

    0

    0

    0

    29

    29

    27

    2

    0

    0

    25

    25

    21

    4

    0

    0

    26

    7

    7

    0

    0

    19

    155

    136

    110

    8

    0

    19

    0 50 100 150 200 250 300 350

    TOTAL NO

    SUBMITTED

    APPROVED

    REVISED

    UNDER REVIEW

    YET TO SUBMIT

    TOTAL NO SUBMITTED APPROVED REVISEDUNDERREVIEW

    YET TOSUBMIT

    Civil / Architecture 62 62 42 2 0 0

    Shade Structure 4 4 4 0 0 0

    Irrigation & Plantation 29 29 27 2 0 0

    Electrical 25 25 21 4 0 0

    Fountain 26 7 7 0 0 19

    Total 155 136 110 8 0 19

    MATERIAL SUBMITTAL STATUS

    100.

    00%

    100.

    00%

    100.

    00%

    100.

    00%

    100.

    00%

    70.1

    2%

    0.00%

    20.00%

    40.00%

    60.00%

    80.00%

    100.00%

    ONE WEEK LOOKAHEAD

    0 This Week YTD 2014 Year 2014

    0 29 1,784 1,784

    1 Item Description All Good Concern

    4 B-Safe Checklist 0 156 0

    4 53 0

    3,235 3,235 0

    Item Description This Week YTD 2014 Year 2014

    6 447 447

    Total Man Power This Week 726 Safety Walkabouts 0 26 17

    Cum. Total Man Power 74,244

    7,260

    Cum. Total Man Hours 748,174 0 16

    HEALTH AND SAFETY

    Activity Summary

    Restricted Work Case

    (RWC)0

    Property Damage &

    Equipment Failure4 0

    Medical Treatment Case

    (MTC)

    Motor Vehicle Accident

    (MVA)1

    0

    First Aid Case (FAC) 0

    39

    LTI FREE SAFE WORK DAYS ACHIEVED/ MAN HOURS

    0 Observation Card

    PTW Audit onshore

    JSA / RA / Safety

    Reviews

    Safety

    Representation in

    Meetings

    Lost Time Injury (LTI)Fire Incident

    Environment Incident

    Security Incident

    Near Miss

    PTW Failure / Violation eSafety

    PTW Violation PTW Coordinator

    Report0

    MAN HOURS

    Man Hours This Week0 10

    B-Safe Meetings

    Total PTW

    Item Description

    Safety Inspections

    69

    69

    42

    0

    42

    42

    42

    121

    121

    121

    0

    121

    121

    121

    0

    50

    100

    150

    Man

    pow

    er (N

    os.)

    Days of Month

    MANPOWER HISTOGRAM PLANNED ACTUAL

    Physical

    %Overall Wt.

    Planned Wt.

    (Original BL)

    Planned Wt.

    (Revised BL)-RGCP-

    472-PEP-QTR-001

    REV. D)

    Achieved Wt. Variation

    100.00% 5.00 5.00 5.00 5.00 0.00

    100.00% 2.39 2.39 2.39 2.39 0.00

    100.00% 0.91 0.91 0.91 0.91 0.00

    100.00% 1.70 1.70 1.70 1.70 0.00

    100.00% 5.00 5.00 5.00 5.00 0.00

    100.00% 0.43 0.43 0.43 0.43 0.00

    100.00% 0.92 0.92 0.92 0.92 0.00

    100.00% 3.65 3.65 3.65 3.65 0.00

    100.00% 17.00 17.00 17.00 17.00 0.00

    100.00% 5.91 5.91 5.91 5.91 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 0.66 0.66 0.66 0.66 0.00

    100.00% 11.09 11.09 11.09 11.09 0.00

    100.00% 0.34 0.34 0.34 0.34 0.00

    100.00% 0.61 0.61 0.61 0.61 0.00

    100.00% 1.49 1.49 1.49 1.49 0.00

    100.00% 1.13 1.13 1.13 1.13 0.00

    100.00% 1.15 1.15 1.15 1.15 0.00

    100.00% 1.77 1.77 1.77 1.77 0.00

    100.00% 1.40 1.40 1.40 1.40 0.00

    100.00% 2.17 2.17 2.17 2.17 0.00

    100.00% 1.02 1.02 1.02 1.02 0.00

    99.01% 62.00 62.00 62.00 61.39 -0.61

    98.76% 18.00 18.00 18.00 17.78 -0.22

    98.53% 4.00 4.00 4.00 3.94 -0.06

    98.94% 12.00 12.00 12.00 11.87 -0.13

    98.53% 4.00 4.00 4.00 3.94 -0.06

    99.35% 13.00 13.00 13.00 12.92 -0.08

    98.53% 4.00 4.00 4.00 3.94 -0.06

    100.00% 7.00 7.00 7.00 7.00 0.00

    60.41% 5.00 5.00 5.00 3.02 -1.98

    45.67% 6.00 6.00 4.40 2.74 -1.66

    100.00% 94.15% -5.85%

    98.40% 94.15% -4.25%

    Main piping material

    Shade structures including fabric material

    Phase 3: Construction work

    Phase 3:Testing & commissioning

    Placing of Orders and First Delivery to Project Site

    Fountain sculpture

    Electrical Poles, DBs and Field Controls

    Valves and pumps

    Irrigation distribution accessories

    Phase 1: Construction work

    Signage structures

    Phase 1:Testing & commissioning

    Interlock pavers, kerb stones and tree guards

    Fountain sculpture

    CONSTRUCTION

    Contractor Mobilisation

    Submission of Early Documentation & Key Deliverables

    Key Subcontractors and Suppliers

    Site Survey and Trial pit Excavation

    Submission and Approval of Design Calculations

    Submission and Approval of Detailed Engineering Drawings

    Foundation bolts

    Summary of progress report as of 30 June 2014

    Materials Submission and Approval

    ENGINEERING

    PROCUREMENT

    Activity Name

    Construction Mobilisation and Finalisation of key subcontractor

    & key suppliers

    Total (Revised BL-RGCP-472-PEP-QTR-001 REV. D)

    Total (Original BL)

    FINAL DOCUMENTATION

    Interlock pavers, kerb stones and tree guards

    Main piping material

    Shade structures including fabric material

    Signage structures

    Electrical Poles, DBs and Field Controls

    Valves and pumps

    Irrigation distribution accessories

    Foundation bolts

    Phase 4 Works

    Phase 2: Construction work

    Phase 2:Testing & commissioning

    TESTING AND COMMINSIONING (PROVISIONAL ACCEPTENACE

    CERTIFICATE)

    0.00%

    -0.42%

    -0.08%

    -0.99%

    -39.59%

    -27.70%

    -50

    %

    -25

    %

    0%

    25

    %

    50

    %

    Preliminary

    Engineering

    Procurement

    Construction

    Testing/Com

    Final Document

    SCHEDULE VARIANCE (SV)

  • 4. QA/QC STATUS

    Documents Status:

    Document Total

    Submitted

    Status

    (Approved) Remarks

    P.Q.P. (Main contractor QBEC) 1 1 IFC

    Sub-Contractor P.Q.P. (Total 5) 0 0

    ITP Submitted 8 8 IFC

    Balance (Fountain ) - -

    Procedures

    (Method of

    Statements)

    Submitted 23 23 IFC

    Balance (Fountain

    works) - -

    Inspection Status: (CA Civil, EL Electrical, MA Mechanical)

    Total RFI

    Inspected Accepted Rejected Cancelled

    Remark

    s

    Discipline CA EL MA CA EL MA CA EL MA CA EL MA

    This week RFI 13 02 04 13 02 04 01 00 00 00 00 00

    Cumulative

    RFI 724 68 90 724 65 89 26 03 01 18 01 00

    QUALITY OBJECTIVES

    Sl.

    No.:

    K.P.I /

    QUALITY OBJECTIVES TERGET RESPONSIBILITY

    FREQUENCY OF

    REVIEW RESULTS ACHIEVED

    1) % of RFI approval against submitted More than 95% P.M / C.M. Quarterly 96.7%

    2) % of Material approval against

    inspected More than 95% P.M / C.M. Quarterly 99.00%

  • 5. HEATH AND SAFET

    Date & Time - 19/03/2013 15:10 hours

    TRIR

    LTIR

    1st

    Quarter

    0.00

    0.00

    Cumulative

    0.00

    0.00

    0.00

    0.00

    First Aid Case (FAC)

    Environment Incident

    Near Miss

    0

    0

    PTW Violation PTW Coordinator

    PTW Failure / Violation eSafety

    1

    5

    0

    Period

    QBEC Weekly Safety Report Week 75

    0.000.00

    3rd

    Quarter 4th

    Quarter

    4

    0

    0

    - -

    453

    30%

    10

    C

    C

    Safety SHE Monthly Focus

    Training

    39

    YTD

    CWeekly mass safety tool box talk conducted

    this morning (03-07-2014)

    26

    C

    C

    Total Monthly

    Man-power

    Update

    Attendants

    75 247

    % (Percentage

    Attended)

    Item Description

    Total

    NA

    0

    B-Safe Meetings

    0JSA / RA / Safety Reviews

    Current Week

    Safety Walkabouts

    3275

    PTW Audit Onshore 40

    160

    Concern

    0

    6

    3275

    Safety Inspections

    Sub Total

    6

    .- VE

    NAPTW Audit Offshore

    Item Description

    40

    .- VE

    - `

    16

    4

    Year 2013

    5

    -

    Man Hours

    NA

    - - -

    1,811

    Daily Toolbox talk being conducted on daily

    basis

    On Shore

    -

    On Shore

    -

    -

    Qatar Building Engineering Co.

    Off Shore

    -

    121 -

    -

    -

    -

    -

    Total % Safe

    -

    Total Man Power

    Current Week Item Description

    -

    Observation Card

    9

    YTD 2013

    161

    Good

    .- VE

    NA1811

    All

    .- VEB-Safe Checklist

    Project Safety Highlights / Achievements

    Current

    Week

    Cum. Man Hours

    YTD

    -

    -

    -

    2nd

    Quarter

    776,824

    0

    6,560

    0.00 0.00

    No Body Get Hurt- Zero Incident Target

    Total Cumulative

    Man-hours

    00

    0 00

    770,264

    Item Description

    0

    3-Jul

    Motor Vehicle Accident (MVA)

    0

    28-Jun

    Item Description

    Medical Treatment Case (MTC)

    Restricted Work Case (RWC)

    LTI free safe work days achieved

    0

    2014To

    Lost Time Injury (LTI)

    INCIDENT:

    0 0

    This

    Month

    0

    0

    0

    1

    4

    1

    0

    Cut-off Period From

    Year to

    Date

    0

    Current

    Week

    PTW Failure / Violations

    Security Incident

    Fire Incident

    Property Damage & Equipment

    0

    0

    0

    0

    0

    5

    0

    0

    0

    4

    0 0

    0

    0

    Days

    Cumm PTD

    0

    529

    0

    4

    0

    0

    0

    1

    No.Total Man

    HoursOff Shore

    -

    YTD

    Activity Summary

    Total Cum. Man Hrs To Date 121

    -

    -

    -

    7

    3

    - -

    Man Power

    Man Power & Man Hours

    CONTRACTOR

    -

    6,560 1 121

    2

    770,264

    -

    -

    5

    Year 2012

    6,560 6,560

    -

    - -

    776,824 -

    - - -

    -

    -

    -

    C

    Rev 1 - Jan 2013

    Safety Representation in Meetings

    Safety Campaign HEAT

    STRESS PREVENTION"

    8 - - - -

  • 6. PROGRESS S-CURVE

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Oct

    -12

    No

    v-12

    Dec

    -12

    Jan

    -13

    Feb

    -13

    Mar

    -13

    Ap

    r-13

    May

    -13

    Jun

    -13

    Jul-

    13

    Au

    g-13

    Sep

    -13

    Oct

    -13

    No

    v-13

    Dec

    -13

    Jan

    -14

    Feb

    -14

    Mar

    -14

    Ap

    r-14

    May

    -14

    Jun

    -14

    Jul-

    14

    % C

    om

    ple

    tio

    n

    Time

    S - CURVE CUML. PLANNED % CUML. ACTUAL %

    Planned Progress : 98.40%

    Actual Progress : 94.15%

  • 7. SUMMARY OF MATERIAL SUBMITTAL Drawing Title Total IFC CODE

    A CODE B

    CODE D

    Cumulative Total Remaining

    Remarks

    Design Calculations

    18 18 0 0 0 18 0

    General 26 14 0 0 12 26 12

    Landscape & Civil 61 61 0 0 0 61 0

    Shades 15 15 0 0 0 15 0

    Signage & Road Marking

    20 20 0 0 0 20 0

    Irrigation 23 23 0 0 0 23 0

    Plumbing 20 1 0 0 12 13 7 Regency - New design

    Instrumentation 1 0 0 0 1 1 1 Regency - New design

    Electrical 45 31 0 14 0 45 14

    TOTAL 229 183 0 14 25 222 34

    8. SUMMARY OF DESIGN DRAWING SUBMITTAL Drawing Title Total IFC CODE

    A CODE B

    CODE D

    Cumulative Total Remaining

    Remarks

    Design Calculations

    18 18 0 0 0 18 0

    General 26 14 0 0 12 26 12

    Landscape & Civil 61 61 0 0 0 61 0

    Shades 15 15 0 0 0 15 0

    Signage & Road Marking

    20 20 0 0 0 20 0

    Irrigation 23 23 0 0 0 23 0

    Plumbing 20 1 0 0 12 13 7 Regency - New design

    Instrumentation 1 0 0 0 1 1 1 Regency - New design

    Electrical 45 31 0 14 0 45 14

    TOTAL 229 183 0 14 25 222 34

  • 9. MATERIAL SUBMITTAL LOG

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    RGCP-472-CA-001 READYMIX CONCRETE 48N , 28N (Blinding) Qatar ReadyMix Qatar W.L.L 800.00 m3 RGX-S-64-1320-902 3/12/2013 A 3/27/2013 3/26/2013 3/28/2013 A 3/30/2013 4/24/1913 2/5/2013 AS REQUIRED

    RGCP-472-CA-002 WASHED SAND 50mm thick QatarQatar National

    Cement Company668.64 m

    3 RGX-S-80-134-003A 3/12/2013 C 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 5/1/2013 2/5/2013 AS REQUIRED

    RGCP-472-CA-003 DUNE SAND S-80-134A-003 QatarQatar National

    Cement Company800.00 m3 S-80-134A-003 3/12/2013 A 3/4/2013 3/26/2013 3/11/2013 A 3/30/2013 5/1/2013 2/5/2013 AS REQUIRED

    RGCP-472-CA-004 PAVING TILES80mm, 60mm Gray / 60mm Red,

    YellowQatar

    Al-Sehmiah Cement

    Products Factory7395.00 m2 S-80-134A-003 3/12/2013 A 12/31/2012 3/26/2013 1/22/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013

    RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Gray QatarAl-Sehmiah Cement

    Products Factory3254.00 m2 S-80-134A-003 3/12/2013 A 12/31/2012 3/26/2013 1/22/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013

    RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Red QatarAl-Sehmiah Cement

    Products Factory2827.00 m2 S-80-134A-003 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013

    RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Yellow QatarAl-Sehmiah Cement

    Products Factory168.00 m2 RG6-S-00-1317-901 3/12/2013 A 2/27/2013 3/26/2013 3/7/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013

    RGCP-472-CA-005 CEMENT OPC S-80-134A-003 QatarQatar National

    Cement Company34.00 tons RGX-S-80-134-003A 3/12/2013 B 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 4/24/1913 1/5/2013 EXSTOCK

    RGCP-472-CA-006 KERBSTONES 150mmX305mm QatarAl-Sehmiah Cement

    Products Factory10391.00 m S-80-134A-003, 2.2.16 3/12/2013 A 4/16/2013 3/26/2013 4/18/2013 A 3/30/2013 4/17/1913 2/5/2013 5/5/2013 6/5/2013

    RGCP-472-CA-006-1 PRECAST CONCRETE FLUSH KERB 8/27/2013 A 8/27/2013 A

    RGCP-472-CA-007 STEEL REINFORCEMENT 20mm,16mm,12mm,10mm Qatar Qatar Steel 91.00 tons ASTM-A615 Grade 460 3/12/2013 A 12/31/2012 3/26/2013 1/2/2013 A 3/30/2013 4/22/1913 5/5/2013 5/5/2013

    RGCP-472-CA-007 STEEL REINFORCEMENT 8mm Qatar Qatar Steel 1.00 tons ASTM-A615 Grade 460 3/12/2013 A 12/31/2012 3/26/2013 1/2/2013 A 3/30/2013 4/22/1913 5/5/2013 5/5/2013

    RGCP-472-CA-008 CONCRETE FLAG STONES 450mmx450mmX60mm QatarAl-Sehmiah Cement

    Products Factory500.00 m2 S-80-134A-003 ,2.2.7 3/12/2013 B 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013

    RGCP-472-CA-009 POLYTHELENE SHEET 1000 Guage QatarAl-Moudi Plastic

    Factory4100.00 m2 RGX-S-64-1320-902 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/21/1913 5/5/2013 5/5/2013

    RGCP-472-CA-010 PROTECTION BOARD 6mm Qatar Sodamco-Qatar W.L.L 3311.00 m2 RGXS-64-1320-902-01 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/23/1913 5/5/2013 5/5/2013 6/5/2013

    RGCP-472-CA-010A PROTECTION BOARD 9/4/2014 A

    RGCP-472-CA-011 WATERPROOF BITUMEN PAINT (Master Seal) Qatar Sodamco-Qatar W.L.L 6621.56 m2 RGX-S-64-1320-902-01 3/12/2013 B 5/21/2013 5/22/2013 D 3/30/2013 12/5/2013 20/05/2013

    RGCP-472-CA-012 AGGREGATE 2CM Qatar 1335.07 m3 S-80-134A-003 3/12/2013 B 5/23/2013 5/25/2013 5/27/2013 A 3/30/2013 20-5-2013 15/05/2013

    RGCP-472-CA-013 DRAIN CHANNEL WITH GRATING 300MM Qatar no. RG6-S-00-134A-010 3/12/2013 B 5/21/2013 5/27/2013 A 3/30/2013 25-5-2013 20/05/2013

    RGCP-472-CA-013-1 CHANNEL GRATING &FRAMES Kiswok 29 Nos RG6-S-00-134A-010 08-09-13 B 17-Sep-13 A

    RGCP-472-CA-014 EDGERS FOR PLANTS & SHRUBS 5CM QatarAl-Sehmiah Cement

    Products Factory4614.13 m D-80-134A-104 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/17/1913 6/5/2013 5/5/2013

    RGCP-472-CA-015 PLASTIC SPACERS 7CM QatarModern Building

    Accessories Factory1000.00 no. S-80-134A-0095 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/29/2013 5/5/2013 5/5/2013

    RGCP-472-CA-016 GEOTEXTILE MEMBRANE 1000G 26701.36 m2 S-80-134A-003 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/23/1913 20-5-2013 10/5/2013

    RGCP-472-CA-018 MASONARY BLOCKS 200mm QatarAl-Sedriah Cement

    Products Factory2000.00 m2 S-80-134A-003 3/12/2013 B 2/21/2013 3/26/2013 3/4/2013 A 3/30/2013 4/27/1913 10/5/2013 5/5/2013

    RGCP-472-CA-020ADHESIVE FOR GRANITE7MOSAIC TILES IN

    WATERFEATURE20mm S-80-134A-003 25-Nov-13 B 3/26/2013 30-Nov-13 A 3/30/2013 25-5-2013 15/06/2013

    RGCP-472-CA-021 EXPANSION JOINT FILLER S-80-134A-003 3/12/2013 A 5/15/2013 3/26/2013 5/22/2013 A 3/30/2013 25-5-2013 15/06/2013

    RGCP-472-CA-022 GROUT S-80-134A-003 05-Aug-13 C 5/21/2013 3/26/2013 8/19/2013 A 3/30/2013 25-5-2013 15/06/2013

    RGCP-472-CA-023 KERBSTONE PAINT S-80-134A-003 3/12/2013 B 8/17/2013 8/19/2013 A 25-5-2013 15/06/2013

    RGCP-472-CA-024 SUBBASE S-80-134A-003 3/12/2013 A 5/15/2013 3/26/2013 5/22/2013 D 3/30/2013 25-5-2013 15/06/2013

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    CIVIL / ARCHITECTURAL

    APPROVAL

    Reviewed With No

    Comments

    Page 1 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-CA-025STRUCTTURAL CONCRETE REPAIR MORTAR-

    RENDROC- LAXtra24-Jul-13 A 25-Jul-13 A

    RGCP-472-CA-027 ROAD MARKING 11-Jul-13 A 18-Jul-13 A

    Page 2 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-CA-028NITOSEAL MS60 SEALANT FOR EXPANSION

    JOINTS24-Jul-13 A 28-Jul-13 A

    RGCP-472-CA-029STRUCTTURAL CONCRETE REPAIR MORTAR-

    RENDROC- LAXtra24-Jul-13 A 25-Jul-13 A

    RGCP-472-CA-030 PVC WATER STOP 08-Sep-13 B 17-Sep-13 A

    RGCP-472-CA-031 WATERPROOF MENBRANE 20-Aug-13 A 26-Aug-13 A

    RGCP-472-CA-032NITOSEAL MS600 SEALANT FOR EXPANSION

    JOINTS14-Aug-13 A 8/19/2013 A

    RGCP-472-CA-033 WATERPROOFING FOR WATERFEATURE 25-Nov-13 B 30-Nov-13 A

    RGCP-472-CA-034GROUT FOR GRANITE7MOSAIC TILES IN

    WATERFEATURE25-Nov-13 B 30-Nov-13 A

    RGCP-472-CA-035 ADHESIVE FO REXTERNAL GRANITE CLADDING SODAMCO 31-Aug-13 A 10/23/2013 24-Oct-13 A

    RGCP-472-CA-036 GROUT FOR EXTERNAL GRANITE CLADDING SODAMCO 31-Aug-13 B 10/23/2013 24-Oct-13 A

    RGCP-472-CA-037 CONCRETE CURING COMPOUND 31-Aug-13 B 05-Sep-13 A

    RGCP-472-CA-038

    VERY HIGH STRENGTH SHRINKAGE

    COMPENSATED GROUT FOR USE UDER BASE

    PLATES OF LAMP POSTS

    08-Sep-13 A 17-Sep-13 A

    RGCP-472-CA-039 ANCHOR BOLTS SIGNAGE (GULF STEEL) 25-Sep-13 B 02-Oct-13 A

    RGCP-472-CA-040 GRANITE (BLCK GALAXY) 14-Sep-13 A 19-Sep-13 A

    RGCP-472-CA-041 GRANITE (LIGHT & DARK GREY) 19-Sep-13 B 02-Oct-13 A

    RGCP-472-CA-042 Drop Sculpture (Acrylic sheet) 29-Dec-13 A 08-Jan-14 A

    RGCP-472-CA-043 PLASTIC EDGING FOR PLANTING AREA 25-Nov-13 C 27-Nov-13 A

    RGCP-472-CA-043APLASTIC EDGING FOR PLANTING AREA

    (Alternative)28-Jan-14 A 02-Feb-14 A

    RGCP-472-CA-044FOSROC THIOFLEX 600 SEALANT FOR

    EXPANSION JOINTS18-Nov-13 A 20-Nov-13 A

    RGCP-472-CA-045PAINT SYSTEM FOR CONCRETE ZONE ID

    SIGNAGE01-Jan-14 B 08-Jan-14 A

    RGCP-472-CA-047GRANITE (CHINA BLACK G654) FOR ROADWAY

    AT ENTRANCE PLAZA01-Jan-14 A 08-Jan-14 A

    RGCP-472-CA-048PAINT SYSTEM FOR CONCRETE ABOVE

    GROUND13-Nov-13 A 20-Nov-13 A

    RGCP-472-CA-049SOLVENT BASED BITUMINOUS PRIMER FOR

    DERMABIT WATER PROOFING23-Nov-13 A 27-Nov-13 A

    RGCP-472-CA-052MOSAIC TILES FOR WATER FEATURE-

    SPECTRUM KK11379 OPT 4 FOR FOUNTAIN23-Nov-13 A 27-Nov-13 A

    RGCP-472-CA-053 GRANITE (BLACK GALAXY) FOR FOR FOUNTAIN 22-Dec-13 A 12-Jan-14 A

    RGCP-472-CA-054DROP SCULPTURE (STAINLESS STEEL 316L) FOR

    FOUNTAIN22-Dec-13 A 12-Jan-14 D

    RGCP-472-CA-056 Bonding Agent 09-Apr-14 B 17-Jun-14 A

    RGCP-472-CA-057Fostoc Nitocote CM 210 for balancing

    tank in zone 229-Apr-14 A A

    RGCP-472-CA-058Epoxy coating for Pump room and

    Enclosure flooring13-Apr-14 A 09-Jun-14 A

    RGCP-472-CA-059 Paint for Pump room Internal Walls 13-Apr-14 A 09-Jun-14 B

    RGCP-472-CA-060 GRC PANEL COVERS 14-Apr-14 B 17-Jun-14 A

    RGCP-472-CA-061Material Submittal-G.I Ladder ,Checkered Plate

    & Brackets, G.I Bollards &Handrail06-Jun-14 A 12-Jun-14 A

    Page 3 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-CA-062CEMENT BASED WATERPROOFING FOR PUMP

    ROOM

    Page 4 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-CT-001Tensile Roof Shade - Hot Dip Galvanized

    SteelS-80-134A-003 Qatar Qatar Steel 361.00 m2 RG6-D-00-1330-002 4/6/2013 A 2/26/2013 4/18/2013 3/4/2013 A 4/22/2013 5/1/2013 6/2/2013 5/30/2013

    RGCP-472-CT-002 Shade Structure Painting System S-80-134A-003 Qatar Juton Paints 104.00 m2 RG6-D-00-1330-004 4/6/2013 A 2/26/2013 4/18/2013 3/4/2013 A 4/22/2013 5/1/2013 6/2/2013 5/30/2013

    RGCP-472-CT-003 PVC Fabric for Shades S-80-134A-003 France Ferrari S-80-134A-003 4/6/2013 C 5/5/2013 4/18/2013 6/5/2013 A 4/22/2013 6/2/2013 5/30/2013

    RGCP-472-CT-003D FABRIC SHADE COLOR S-80-134A-003 France Ferrari B 9/10/2013 10/23/2013 A

    RGCP-472-CT-004Hot Dip Galvanizing Process for Signage

    PipeS-80-134A-003 Qatar

    Gulf Building

    Material146.00 Nos RG6-D-00-1330-002 06-Mar-13 A 04-Mar-13 20-Mar-13 11-Mar-13 A 25-Mar-13 01-May-13 05-May-13 02-May-13

    RGCP-472-CT-005 GI Pipe for Signage S-80-134A-003 QatarGulf Building

    Material280.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-006 STAINLESS STEEL TUBE 100X50X2MM S-80-134A-003 Qatar Hidayath 378.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-007Rectangular Hollow Section Support for

    SignageS-80-134A-003 Qatar

    Gulf Building

    Material1040.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 02-Apr-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-008 3M Sticker for Signage Reflective Traffic Sign UAE 3M 378.00 m2 S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-009 Aluminum Extruded Profile for Signage 4.3 support Syste, 6061& 6065 Qatar Al-Jaber 320.00 no. S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-010 Aluminum Sheet 3mm Thick for signage S-80-134A-003 Qatar Alubond 520.00 m2 S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-011 SS SHEET 2MM THICK S-80-134A-003 Qatar Hidayath 45.00 m2 S-80-134-A003 06-Mar-13 A 20-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13

    RGCP-472-CT-012 Paint System for Signage 07-Oct-13 A

    RGCP-472-CT-013 PVC Fabric for Shades 27-May-14 A D

    RGCP-472-PI-002 HDPE Pipes and Fittings4" * 90o Elbow -

    CompressionQatar Hepworth 10.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings3" * 90o Elbow -

    CompressionQatar Hepworth 4.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings3 * 2 Reducer Socket -

    CompressionQatar Hepworth 2.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings 3" Equal TEE - Compression Qatar Hepworth 4.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings4 * 4 * 2 Reducer TEE -

    CompressionQatar Hepworth 11.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings4 * 4 * 3 Reducer TEE -

    CompressionQatar Hepworth 3.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings3 * 3 * 2 Reducer TEE -

    CompressionQatar Hepworth 2.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings 3" End Caop - Compression Qatar Hepworth 1.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002 HDPE Pipes and Fittings 2" End Caop - Compression Qatar Hepworth 9.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013

    RGCP-472-PI-002-1 HDPE Pipes and Fittings A 21-May-13 30-May-13 A

    RGCP-472-PI-003 Sleeves U.P.V.C Sleeve 6AND 1.5 " Qatar qatar pipe line 300.00 m S-80-134A-002 13-Apr-13 B 01-May-13 08-May-13 A 29-Apr-13 21-May-13 20/05/2013

    RGCP-472-PI-003-1 Sleeves A 21-May-13 30-May-13 A

    RGCP-472-PI-AG-001 Remote Control Solenoid Valve Rain BirdEFB-CP-R Brass

    ValvesUSA Rainbird 81.00 no. D-80-134A-70 26-Feb-13 B 18-Mar-13 12-Mar-13 26-Mar-13 A 17-Mar-13 17-Apr-13 06-Jun-13 15-May-13

    RGCP-472-PI-AG-002 Dripline Rain Bird U.S.A RAIN BIRD D-80-134A-70 A 18-03-13 26-Mar-13 D 17-Mar-13 06-Jun-13 15-May-13

    SHADE STRUCTURE FABRICATION

    SIGNAGE WORK

    IRRIGATION & PLANTATION

    By Email

    Page 5 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-PI-AG-003 Gate Valve PEGLER1065 Forged

    Glass USA Pegler 25.00 no. D-80-134A-70 26-Feb-13 B 18-Mar-13 12-Mar-13 26-Mar-13 A 17-Mar-13 17-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-004 Quick Coupling Valve Rain Bird 44LRC U.S.A Rainbird D-80-134A-70 B 18-03-13 26-Mar-13 A 17-Mar-13 15-Jun-13

    RGCP-472-PI-AG-005 ROTOR SPRINKLERS Rain Bird 5500 Series USA Rainbird 180.00 no. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 31-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-006 Bubblers Rain Bird 1400 Series U.S.A Rainbird D-80-134A-70 B 18-03-13 31-Mar-13 A 29-Apr-13 04-Jun-13

    RGCP-472-PI-AG-007 Irrigation Controller Rain BirdESP-LXME

    ControllerU.S.A Rainbird D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-008 Valve Boxes Jumbo Rectangular Series Rain Bird VB-JMB U.S.A Rainbird 25.00 no. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-009 Sprayer Pop-Up sprinkler Rain BirdUNI Spray

    SeriesU.S.A Rainbird 200.00 no. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-010 XFD on Surface Driline Rain Bird U.S.A Rainbird D-80-134A-74 A 13-03-13 18-Apr-13 D 04-Jun-13

    RGCP-472-PI-AG-011 Agriculture Soil Mix S-80-134A-003 Qatar Municipality 12396.17 m3 D-80-134A-70 13-Apr-13 A 28-Feb-13 25-Apr-13 07-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-012 Irrigation Control Cable Paige Rain Bird U.S.A Rainbird 5000.00 m D-80-134A-70 13-Apr-13 A 27-Feb-13 25-Apr-13 04-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13

    RGCP-472-PI-AG-013 Compost S-80-134A-003 KSAAL Safi Fertilizer

    Factory6000.00 bag D-80-134A-70 12-Mar-13 A 28-Feb-13 26-Mar-13 07-Mar-13 A 30-Mar-13 17-Apr-13 08-May-13 04-May-13

    RGCP-472-PI-AG-014 Peat Moss S-80-134A-003SAB Turba

    Peat 340Germany SAB Syker 500.00 bag D-80-134A-70 12-Mar-13 B 26-Mar-13 26-Mar-13 28-Mar-13 A 30-Mar-13 17-Apr-13 08-May-13 04-May-13

    RGCP-472-PI-AG-018 PLANT LIST S-80-134A-003 KSA & Qatar A.G D-80-134A-71 12-Mar-13 A 13-Mar-13 26-Mar-13 24-Mar-13 A 30-Mar-13 17-Apr-13 08-Apr-13 04-May-13

    RGCP-472-PI-AG-019IRRIGATION & PLUMBING WARNING

    TAPE200MM

    Uniplast

    QatarA 22-May-13 30-May-13 A

    RGCP-472-PI-AG-020 MULCH A 24-Sep-13 26-Sep-13 A

    RGCP-472-EL-001 BOLLARD LIGHT (70 WATTS)

    1000 mm hight - corrosion

    resistant die-cast aluminum IP65 ,

    UV-stabilized diffuser with integral

    junction box - 15 amp single pole

    and neutral cut-out/MCB

    Qatar Q-Light 12.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 03-Mar-13 10-Apr-13 07-Mar-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013

    RGCP-472-EL-002 POLE LIGHT 6M

    6 meters hight hot dip galvanized

    steel octagonal type pole with

    removable door of IP55 - ready for

    mounting HPSV flood light fittings

    Qatar Q-Light 14.00 no. D-80-134A-284 section 10.2 27-Mar-13 A 03-Mar-13 10-Apr-13 10-Mar-13 A 15-Apr-13 20-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-003 HPSV FLOOD LIGHT (100 WATTS)Die-cast aluminium housing with

    heat resistant glass of IP65 and

    corrosion resistant material

    D-80-134A-284 section 10.3 27-Mar-13 A 03-Apr-13 10-Apr-13 07-Apr-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013

    RGCP-472-EL-004 LIGHTING POLE CUTOUT BOX15 amp single pole and neutral cut-

    out/MCB of IP55D-80-134A-284 section 10.12 30-Jul-13 B 28-Apr-13 10-Apr-13 01-Aug-13 A 15-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-005 WALL MOUNTED WALKWAY LIGHT (36 WATTS)

    Decorative ressed square shape

    light of IP65, cool white light lamp

    and die-cast aluminium sheet

    reflector

    Qatar Q-Light 8.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013

    RGCP-472-EL-006 CEILING / WALL MOUNTED LIGHTS (1 X 36 WATTS) Rectangular flurocent type with

    single linear 36 watts lamp and

    polycarbonate cover of IP65

    Qatar Q-Light 9.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013

    RGCP-472-EL-007 CEILING MOUNTED LIGHTS (2X 36 WATTS)Rectangular flurocent type with

    double linear 36 watts lamp and

    polycarbonate cover of IP65

    Qatar Q-Light 8.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013

    ELECTRICAL

    AS LISTED

    Page 6 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-EL-010 FEEDER PILLARStainless steel encloure of IP55

    with a protective canopy fitted

    with a photocell and timer

    D-80-134A-283 27-Mar-13 B 18-Aug-13 26-Aug-13 C

    RGCP-472-EL-011 CABLE LUGS

    Nickel plated brass weather proof

    cable gland of IP55 High

    conductivity non-insulated tinned

    copper

    Qatar FANCY 325.00 no. D-80-134A-284 section 10.5 27-Mar-13 A 07-Mar-13 10-Apr-13 12-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013

    RGCP-472-EL-011 CABLE GLAND

    Nickel plated brass weather proof

    cable gland of IP55 High

    conductivity non-insulated tinned

    copper

    Qatar FANCY 55.00 no. D-80-134A-284 section 10.5 27-Mar-13 A 07-Mar-13 10-Apr-13 12-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013

    RGCP-472-EL-012 PVC PIPES, JUNCTION BOXES AND ACCESSORIESThick-walled havey duty type , UV

    stabilized materialQatar Al-Amer Group 300.00 no.

    D-80-134A-284 section 10.9 ,

    10.1127-Mar-13 A 10-Mar-13 10-Apr-13 14-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013

    RGCP-472-EL-013 GI PIPES AND ACCESSORIES Hot dip galvanized steel of IP55 Qatar FANCY 200.00 no.D-80-134A-284 section 10.9 ,

    10.1127-Mar-13 A 04-Mar-13 10-Apr-13 11-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-013-1 GI PIPES AND ACCESSORIES 25-Aug-13 C 26-Aug-13 C

    RGCP-472-EL-014 XLPE/SWA/PVC CABLES - PVC/ECC CABLESArmoured cables of hight

    conductivity copper Qatar Al-Amer Group 1000.00 m D-80-134A-284 section 10.4 27-Mar-13 A 18-Mar-13 10-Apr-13 18-Mar-13 B 15-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-014-1 ELECTRICAL CABLES A 19-May-13 22-May-13 D

    RGCP-472-EL-014-2 ELECTRICAL CABLES (Ducab) 25-Aug-13 B 26-Aug-13 C

    RGCP-472-EL-015 HR PVC FLEXIBLE CABLES Copper 3 core flexible cables Qatar Al-Amer Group D-80-134A-284 section 10.4 27-Mar-13 A 13-Mar-13 10-Apr-13 18-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-017 CABLES WARNING TAPEYellow Danger marker PVC

    strip/tapeQatar UNIPLAST 300.00 m

    Refrence to D-80-134A-284

    section 10.627-Mar-13 A 20-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 22-Apr-13 04-Jun-13 15/05/2013

    Page 7 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    RGCP-472-EL-018 CABLE TRAY /TRUNKINGRefrence to D-80-134A-284

    section 10.627-Mar-13 A 18-Mar-13 10-Apr-13 20-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-019 WIRING ACCESSORIESRefrence to D-80-134A-284

    section 10.627-Mar-13 A 15-May-13 22-May-13 A 15-Apr-13 04-Jun-13 20/05/2013

    RGCP-472-EL-020 PRECAST CABLE TILE PROTECTION AND CABLE ROUTE MARKERS 31-Aug-13 A 05-Sep-13 A

    RGCP-472-EL-021 LABELS FOR WIRING 27-Aug-13 A 05-Sep-13 A

    RGCP-472-EL-022 EARTHING MATERIALS 31-Aug-13 A 05-Sep-13 A

    RGCP-472-EL-023 POLYURATHANE FOAM CAULKING 04-Sep-13 A 11-Sep-13 A

    RGCP-472-EL-024 HEAT SHHRINK SLEEVES FOR CABLES SHEZNON 04-Sep-13 A 23-Oct-13 24-Oct-13 A

    RGCP-472-EL-025 PRE CAST CABLE ROUTE MRKERS 12-Nov-13 A 11-Dec-13 A

    RGCP-472-EL-026 SURFACE MOUNTED ELECTRICAL JUNCTION BOX FOR LIGHTING CABLES 13-Nov-13 A 20-Nov-13 A

    RGCP-472-EL-027 UPVC Sleeves & Accessories for Electrical 13-Jan-14 A 20-Jan-14 A

    RGCP-472-EL-028 Material Submittal-Electrical Cables 08-Jun-14 A 12-Jun-14 A

    RGCP-472-PI-016 MEP MATERIAL FOR WATER FEATURE 05-Oct-13 B A

    1. Fountain Nozzle

    2. Jet Nozzle

    3. Sculpture Water Pump

    4. Cascade Water Pump

    5. Jet Nozzle and Filters

    6. Scupture sand filter

    7. Cascade water sand filter

    8. Drain Pump/Submersible Pump

    9. Valve and fittings

    10. Main Drain

    11. Inlet for water cascade

    12. Overflow filter

    13. Suction / Vacuum Filter

    14. Water level regulator

    15. Underwater lights for nozzle

    16. Underwater light for fountain base

    FOUNTAIN

    Page 8 of 9 Updated on : 7/7/2014

  • A Approved B Approved W Comments C DReviwed with

    CommentsR Rejected Submitted

    PLAN DATE REV ACTUAL REQD DATE OF

    APPROVAL

    ACTUAL DATE OF

    APPROVALSTATUS

    PLANNED DATE FOR

    ORDER

    ACTUAL DATE OF

    ORDERDATE REQD. AT SITE

    EXPECTED DATE OF

    DELIVERY

    ACTUAL DATE OF

    DELIVERY

    DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT

    PROCUREMENT LOG

    PROCUREMENTCOUNTRY OF

    ORIGINSPECIFICATION MODEL MANUFACTURER

    SUBMITTAL

    RASGAS SPEC REF.

    ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN

    LEGEND

    APPROVAL

    Reviewed With No

    Comments

    17. Transformer for Lights

    18. Underwater LED lights

    19. Power supply for lighting

    21. Connector for lights

    22, Under water junction box

    23. Chemical Dosing Pot

    RGCP-472-PI-017 PRESSURE REDUCING VALVE 12-Nov-13 A 03-Dec-13 A

    RGCP-472-PI-018 Gate Valve 12-Nov-13 A 03-Dec-13 A

    RGCP-472-PI-019ELECTRIC JUNCTION BOX FOR TOP OF WATER

    FEATURE WALL FOR LIGHTING13-Nov-13 A 20-Nov-13 A

    RGCP-472-PI-020CAST IRON Y STRAINER FOR WATER FEATURE

    ECON TYPE STAINER18-Nov-13 A 03-Dec-13 A

    RGCP-472-PI-021PRESURE REDUCING VALVE FOR WATER

    FEATURE25-Nov-13 A 03-Dec-13 A

    RGCP-472-PI-022Fresh Air Centrifugal in Line Duct Fans for

    Pump Room18-Jun-14 A

    RGCP-472-PI-023 MOTORIZED VALVES

    RGCP-472-PI-024 PLC

    RGCP-472-PI-025 PUMP ROOM LIGHTS

    RGCP-472-PI-026 PUMP ROOM EARTHING

    Page 9 of 9 Updated on : 7/7/2014

  • 10. DESIGN DRAWING SUBMITTAL LOG

  • A B C D Submitted

    Rev Submit Date Reply DateApproval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    Status

    1 Design calculation for balancing tank C-80-134A-006 RGCP-472-T-QTR-642 16-Jan-13 A 17-Jan-13 23-Jan-13 D E 17-Aug-13 21-Aug-13 A 0 05-Sep-13 30-Sep-13 IFC 2

    2 Design calculation for Signage C-80-134A-007 RGCP-472-T-QTR-641 21-Jan-13 A 24-Feb-13 27-Feb-13 D C 08-Jul-13 25-Jul-13 A 0 05-Sep-13 30-Sep-13 IFC All Zones

    3 Uncovered carpark lighting calculation C-80-134A-008 RGCP-472-T-QTR-166 21-Jan-13 A 22-Jan-13 23-Jan-13 B B 10-Feb-13 14-Feb-13 A 0 26-Feb-13 27-Feb-13 IFC 1,14

    4 Bus Plaza, Entrance Plaza, Covered Parking & Lighting Calculations C-80-134A-009 RGCP-472-T-QTR-292 A 03-Feb-13 5-Feb-13 B 0 31-Mar-13 1-Apr-13 IFC 19

    5 LV Cable Sizing Calculation C-80-134A-010 RGCP-472-T-QTR-520 A 13-May-13 15-May-13 B 0 19-Jun-13 23-Jun-13 IFC

    6 Water Feature Plumbing works Calculation C-80-134A-011 RGCP-472-T-QTR-750 A 10-Mar-13 20-Mar-13 C C 01-Oct-13 03-Oct-13 D 1 12-Nov-13 04-Dec-13 IFC 2

    7 Pump Room Calculation Heat Loading C-80-134A-011A RGCP-472-T-QTR-860 0 16-Dec-13 24-Dec-13 D 1 24-Apr-14 19-May-14 B

    8 Design Calculation for walkway Shade (Type 1) C-80-134A-012 RGCP-472-T-QTR-741 A 03-Apr-13 10-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 6

    9 Design Calculation for walkway Shade (Type 2) C-80-134A-013 RGCP-472-T-QTR-742 A 03-Apr-13 10-Apr-13 D E 07-Oct-13 08-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 7,12,15

    11 Design Calculation for Warehouse Plaza Shade XK-32 and XK-03 C-80-134A-015 RGCP-472-T-QTR-698 A 03-Apr-13 09-Apr-13 D E 12-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC 11

    12 Pump Room Lighting Calculation C-80-134A-016 RGCP-472-T-QTR-634 A 28-Apr-13 01-May-13 D C 11-Aug-13 28-Aug-13 A 0 31-Aug-13 05-Sep-13 IFC 11

    13 Design Calculation for Flag pole C-80-134A-017 RGCP-472-T-QTR-640 A 11-May-13 14-May-13 D C 18-Jul-13 04-Aug-13 A 0 12-Sep-13 23-Sep-13 IFC

    14 Design Calculation for Carpark Shade C-80-134A-018 RGCP-472-T-QTR-697 A 14-May-13 16-May-13 D E 16-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC

    15 Design Calculation for Mosque Plaza C-80-134A-019 RGCP-472-T-QTR-695 A 05-Sep-13 09-Sep-13 D B 16-Sep-13 18-Sep-13 A 0 24-Sep-13 26-Sep-13 IFC

    16 Design Calculation for bus plaza near Admin C-80-134A-020 RGCP-472-T-QTR-696 A 24-Aug-13 27-Aug-13 D C 05-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC

    17 Adequacy Check for Power Source C-80-134A-021 RGCP-472-T-QTR-556 A 29-Jun-13 30-Jun-13 D B 08-Jul-13 10-Jul-13 A 0 16-Jul-13 29-Jul-13 IFC

    18 LV Cable Schedule C-80-134A-022 RGCP-472-T-QTR-764 A 05-Sep-13 05-Sep-13 B 1 29-Sep-13 29-Sep-13 A 2 13-Nov-13 01-Dec-13 IFC

    19 Structural Calculation for Water Feature C-80-134A-028 RGCP-472-T-QTR-639 A 11-Jul-13 29-Jul-13 B B 11-Aug-13 19-Aug-13 A 0 05-Sep-13 23-Sep-13 IFC

    20 Design Calculation for Bus Plaza Shade near XK-26 C-80-134A-029 RGCP-472-T-QTR-718 A 18/Aug/13 22/Aug/13 D B 24-Sep-13 26-Sep-13 A 0 05-Oct-13 06-Oct-13 IFC

    21 Structural Calculations for 0.50m and 1.00m Retaining Walls C-80-134A-030 RGCP-472-T-QTR-827 A 06-Jan-14 12-Jan-14 A

    22 Structural Calculations for Special Foundation Cases for shade C-80-134A-031 RGCP-472-T-QTR-840 0 22-Feb-14 23-Feb-14 B

    23 Structural Calculation for Enclosure Calculation C-80-134A-032 RGCP-472-T-QTR-854 A 18-Mar-14 20-Mar-14 A

    24 Structural Calculation for water Tank Top Slab C-80-134A-033 RGCP-472-T-QTR-850 A 11-Mar-14 11-Mar-14 A

    25 Structural Calculations for Drop Sculpture Structure C-80-134A-034 RGCP-472-T-QTR-895 A 13-May-14 29-May-14 D

    26Structural Calculation for shades foundation Modification at axes B-1

    and B-3 (Bus plaza near XK-26)C-80-134A-035 RGCP-472-T-QTR-879 A 24-Apr-14 24-Apr-14 A

    27 Structural Calculation for V-Ditch Slabs C-80-134A-036 RGCP-472-T-QTR-884 A 24-Apr-14 24-Apr-14 A

    1 General Notes D-80-134A-101 1 of 1 RGCP-472-T-QTR-085 20-Jan-13 A 03-Feb-13 10-Feb-13 C 0 21-Feb-13 24-Feb-13 IFC All Zones

    2 Demolition And Reinstatement works layout D-80-134A-105 1 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones

    3 Demolition And Reinstatement works layout D-80-134A-105 2 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones

    4 Demolition And Reinstatement works layout D-80-134A-105 3 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones

    5 Demolition And Reinstatement works layout D-80-134A-105 4 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones

    6 Work Sequence Layout D-80-134A-107 1 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones

    7 Work Sequence Layout D-80-134A-107 2 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones

    8 Work Sequence Layout D-80-134A-107 3 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones

    9 Work Sequence Layout D-80-134A-107 4 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones

    10Planting & Irrigation Works Demolition & Reinstatement of Planting

    WorkD-80-134A-068X 1 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11

    11Planting & Irrigation Works Demolition & Reinstatement of Planting

    WorkD-80-134A-068X 2 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11

    12Planting & Irrigation Works Demolition & Reinstatement of Planting

    WorkD-80-134A-068X 3 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11

    13Planting & Irrigation Works Demolition & Reinstatement of Planting

    WorkD-80-134A-068X 4 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11

    14Planting & Irrigation Works Demolition & Reinstatement of Planting

    WorkD-80-134A-068X 5 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11

    15 General Layout for Civil Works D-80-134A-103 1 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    16 General Layout for Civil Works D-80-134A-103 2 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    17 General Layout for Civil Works D-80-134A-103 3 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    18 General Layout for Civil Works D-80-134A-103 4 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 1 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    19 General Layout for Civil Works D-80-134A-103 5 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    20 General Layout for Civil Works D-80-134A-103 6 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472

    No of

    Sheets

    LEGEND

    Zone

    DESIGN DRAWING SUBMITTAL LOG

    Issued for Construction As-Built

    Approved/IFC Approved with

    Comments

    Reviewed W No

    Comments

    Reviewed with

    Comments

    Issue for ApprovalQBEC Transmittal

    Reference

    Sl.

    No.Drawing Title

    Issue for Review

    DESIGN CALCULATIONS

    Plan

    Submission

    date

    Drawing Number

    GENERAL

    MDR_Master Document Register 1 of 6 Updated on : 7/7/2014

  • A B C D Submitted

    Rev Submit Date Reply DateApproval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    Status

    EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472

    No of

    Sheets

    LEGEND

    Zone

    DESIGN DRAWING SUBMITTAL LOG

    Issued for Construction As-Built

    Approved/IFC Approved with

    Comments

    Reviewed W No

    Comments

    Reviewed with

    Comments

    Issue for ApprovalQBEC Transmittal

    Reference

    Sl.

    No.Drawing Title

    Issue for ReviewPlan Submission

    date

    Drawing Number

    21 General Layout for Civil Works D-80-134A-103 7 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    22 General Layout for Civil Works D-80-134A-103 8 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    23 General Layout for Civil Works D-80-134A-103 9 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    24 General Layout for Civil Works D-80-134A-103 10 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    25 General Layout for Civil Works D-80-134A-103 11 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    26 General Layout for Civil Works D-80-134A-103 12 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    26 General Layout for Civil Works D-80-134A-103 13 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    26 General Layout for Civil Works D-80-134A-103 14 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones

    27 General Layout for Civil Works D-80-134A-103 15 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-13 B All Zones

    28 Under Ground Maintenance Complex(XK-10) Area Plot Plan RG-2044 1 of 1 12-Nov-13 B 05-Dec-13 B All Zones

    29 Walkway Shade Structure Layout &Details D-80-134AX-56 1 TO 35 RGCP-472-T-QTR-832 A 28-Jan-14 0 28-Jan-14 02-Feb-14 B All Zones

    1 General Landscape Layout D-80-134A-102 1 of 3 RGCP-472-T-QTR-820 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones

    2 General Landscape Layout D-80-134A-102 2 of 3 RGCP-472-T-QTR-820 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones

    3 General Landscape Layout D-80-134A-102 3 of 3 RGCP-472-T-QTR-820 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones

    4 General Layout for Walkways/ Pavement D-80-134A-096 1 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    5 General Layout for Walkways/ Pavement D-80-134A-096 2 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    6 General Layout for Walkways/ Pavement D-80-134A-096 3 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    7 General Layout for Walkways/ Pavement D-80-134A-096 4 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    8 General Layout for Walkways/ Pavement D-80-134A-096 5 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    9 General Layout for Walkways/ Pavement D-80-134A-096 6 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    10 General Layout for Walkways/ Pavement D-80-134A-096 7 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    11 General Layout for Walkways/ Pavement D-80-134A-096 8 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    12 General Layout for Walkways/ Pavement D-80-134A-096 9 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    13 General Layout for Walkways/ Pavement D-80-134A-096 10 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    14 General Layout for Walkways/ Pavement D-80-134A-096 11 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    15 General Layout for Walkways/ Pavement D-80-134A-096 12 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    16 General Layout for Walkways/ Pavement D-80-134A-096 13 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    17 General Layout for Walkways/ Pavement D-80-134A-096 14 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    18 General Layout for Walkways/ Pavement D-80-134A-096 15 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    19 General Layout for Walkways/ Pavement D-80-134A-096 16 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    20 General Layout for Walkways/ Pavement D-80-134A-096 17 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    21 General Layout for Walkways/ Pavement D-80-134A-096 18 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    22 General Layout for Walkways/ Pavement D-80-134A-096 19 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    23 General Layout for Walkways/ Pavement D-80-134A-096 20 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones

    24 General Layout For Planting D-80-134A-068 1 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    25 General Layout For Planting D-80-134A-068 2 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    26 General Layout For Planting D-80-134A-068 3 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    27 General Layout For Planting D-80-134A-068 4 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    28 General Layout For Planting D-80-134A-068 5 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    29 General Layout For Planting D-80-134A-068 6 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    30 General Layout For Planting D-80-134A-068 7 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones

    31 Typical Planting Details D-80-134A-069 1 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones

    32 Typical Planting Details D-80-134A-069 2 of 4 RGCP-472-T-QTR-824 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 1 2-Jan-14 7-Jan-14 IFC All Zones

    33 Typical Planting Details D-80-134A-069 3 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones

    34 Typical Planting Details D-80-134A-069 4 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones

    35 Entrance Plaza - Detailed Plan D-80-134A-108 1 of 1 RGCP-472-T-QTR-454 21-Jan-13 A 21-Feb-13 28-Feb-13 D B 13-May-13 16-May-13 B 0 25-May-13 28-May-13 IFC 2

    36 Entrance Plaza - Detail Section and Details D-80-134A-109 1 of 2 RGCP-472-T-QTR-679 21/Jan/13 A 21-Feb-13 28-Feb-13 D D 18-Jul-13 21-Jul-13 B 0 18-Sep-13 03-Oct-13 IFC

    LANDSCAPING AND CIVIL

    MDR_Master Document Register 2 of 6 Updated on : 7/7/2014

  • A B C D Submitted

    Rev Submit Date Reply DateApproval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    Status

    EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472

    No of

    Sheets

    LEGEND

    Zone

    DESIGN DRAWING SUBMITTAL LOG

    Issued for Construction As-Built

    Approved/IFC Approved with

    Comments

    Reviewed W No

    Comments

    Reviewed with

    Comments

    Issue for ApprovalQBEC Transmittal

    Reference

    Sl.

    No.Drawing Title

    Issue for ReviewPlan Submission

    date

    Drawing Number

    37 Entrance Plaza - Detail Section and Details D-80-134A-109 2 of 2 RGCP-472-T-QTR-679 21/Jan/13 A 21-Feb-13 28-Feb-13 D D 18-Jul-13 21-Jul-13 B 0 18-Sep-13 03-Oct-13 IFC

    38 Water Feature Details D-80-134A-110 1 of 1 RGCP-472-T-QTR-754 27-Jan-13 A 21-Feb-13 27-Feb-13 D 0 18-Sep-13 23-Sep-13 B 2 28-Oct-13 29-Oct-13 IFC 2

    39 Civil Work Fountain Plan Details D-80-134A-192 1 of 2 RGCP-472-T-QTR-686 27-Jan-13 A 21-Feb-13 27-Feb-13 D D 11-Sep-13 15-Sep-13 A 0 24-Sep-13 02-Oct-13 IFC 2

    40 Civil Work Fountain Plan Details D-80-134A-192 2 of 2 RGCP-472-T-QTR-686 27-Jan-13 A 21-Feb-13 27-Feb-13 D D 11-Sep-13 15-Sep-13 A 0 24-Sep-13 02-Oct-13 IFC 2

    41 Bus Plaza in Front of Admin (Typ. Of 2 noc.)-plan section and details D-80-134A-194 1 of 1 RGCP-472-T-QTR-270 24-Jan-13 A 11-Feb-13 21-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 2

    42 Bus plaza near XK-26-Plan, Section and Details D-80-134A-195 1 of 1 RGCP-472-T-QTR-271 21-Jan-13 A 11-Feb-13 19-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 9-Apr-13 IFC All Zones

    43 Mosque Plaza Detail -Plan ,Section and Details D-80-134A-197 1 of 1 RGCP-472-T-QTR-504 28-Jan-13 A 12-May-13 14-May-13 D B 25-May-13 28-May-13 B 0 10-Jun-13 11-Jun-13 IFC 4

    44 Open Parking Area 1 at Admin - Detail-Plan D-80-134A-090 1 of 1 RGCP-472-T-QTR-432 24-Jan-13 A 17-Feb-13 21-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 3-Apr-13 IFC 1

    45 Open Parking Area 1 at Admin - Sections D-80-134A-091 1 of 1 RGCP-472-T-QTR-433 24-Jan-13 A 17-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 22/5/2013 BY EMAIL 1

    46 Parking Area 2 at XK-10-Detail Plan and Sections D-80-134A-093 1 of 1 RGCP-472-T-QTR-434 24-Jan-13 A 17-Feb-13 24-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 14-Apr-13 IFC 1

    47 Parking Area 3 at XK-10-Detail Plan and Sections D-80-134A-095 1 of 1 RGCP-472-T-QTR-321 24-Jan-13 A 17-Feb-13 24-Feb-13 D B 13-Mar-13 20-Mar-13 B 0 9-Apr-13 11-Apr-13 IFC 19

    48 Civil Work Structural details Sheet 1 to 2 D-80-134A-097 1 of 2 RGCP-472-T-QTR-623 22-Jul-13 A 22-Jul-13 24-Jul-13 D C 24-Aug-13 26-Aug-13 B 0 29-Aug-13 08-Sep-13 IFC

    49 Civil Work Structural details Sheet 2 to 2 D-80-134A-097 2 of 2 RGCP-472-T-QTR-623 22-Jul-13 A 22-Jul-13 24-Jul-13 D C 24-Aug-13 26-Aug-13 B 0 29-Aug-13 08-Sep-13 IFC

    50 Courtyard Detail-Plan, Section D-80-134A-098 1 of 1 RGCP-472-T-QTR-267 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 1

    51 XK-03Plaza Detail -Plan ,Section and Details D-80-134A-099 1 of 1 RGCP-472-T-QTR-268 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 17

    52 XK-32 Ware House Plaza Detail - Plan, Section and Details D-80-134A-111A 1 of 1 RGCP-472-T-QTR-269 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-03-13 28-Mar-13 IFC 11

    53 General Civil Works Details D-80-134A-104 1 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28-Feb-13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones

    54 General Civil Works Details D-80-134A-104 2 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28-Feb-13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones

    55 General Civil Works Details D-80-134A-104 3 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28/Feb/13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones

    56 Reinstatement works details D-80-134A-106 1 of 1 RGCP-472-T-QTR-609 24-Jan-13 A 09-Apr-13 11-Apr-13 D B 18-Apr-13 21-Apr-13 A 0 27-Aug-13 03-Sep-13 IFC All Zones

    57 Foundation for signage D-80-134A-081 1 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones

    58 Foundation for signage D-80-134A-081 2 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones

    59 Foundation for signage D-80-134A-081 3 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones

    60 Water Tank General Arrangement D-80-134A-121 1 of 1 RGCP-472-T-QTR-519 B 16-Jun-13 16-Jun-13 B 0 18-Jun-13 29-Jul-13 IFC

    61 Civil Works water tank structural detail D-80-134A-122 1 of 1 RGCP-472-T-QTR-849 A 23-Jan-13 30-Jan-13 D B 26-Aug-13 06-Oct-13 B C 11-Mar-14 11-Mar-14 B

    62 Civil works Entrance Plaza Tile Layout D-80-134AX-055 1 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC

    63 Civil works Entrance Plaza Tile Layout D-80-134AX-055 2 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC

    64 Civil works Entrance Plaza Tile Layout D-80-134AX-055 3 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC

    65 Civil Works Fountain Structural Detail sheet 1of 6 D-80-134A-470A 1 o f6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D

    66 Civil Works Fountain Structural Detail sheet 2 of 6 D-80-134A-470A 2 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D

    67 Civil Works Fountain Structural Detail sheet 3of 6 D-80-134A-470A 3 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D

    68 Civil Works Fountain Structural Detail sheet 4 to 6 D-80-134A-470A 4 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D

    69 Civil Works Fountain Structural Detail sheet 5 to 6 D-80-134A-470A 5 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D

    69 Civil Works Fountain Structural Detail sheet 6 to 6 D-80-134A-470A 6 of 6 RGCP-472-T-QTR-917 B 19-Jun-14 23-Jun-14 D

    69Bus Plaza Shade Structure near XK-26 modification of foundation in

    Grid B-1 and B-3D-80-134AX-60 RGCP-472-T-QTR-880 A 22-Apr-14 24-Apr-14 B

    69 Civil Works-V-Ditch Cover Slab Details D-80-134AX-61 RGCP-472-T-QTR-901 A 24-Apr-14 22-May-14 B B 28-May-14 06-Jun-14 A

    1 Bus Plaza Shade Structure -Plan, Elevation and Details D-80-134A-102A 1 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    2 Bus Plaza Shade Structure -Plan, Elevation and Details D-80-134A-102A 2 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    3 Bus Plaza Shade Structure -Plan, Elevation and Details D-80-134A-102A 3 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    4 Bus Plaza Shade Structure Near XK-26 -Plan, Elevation and Details D-80-134A-103A 1 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones

    5 Bus Plaza Shade Structure Near XK-26 -Plan, Elevation and Details D-80-134A-103A 2 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones

    6 Bus Plaza Shade Structure Near XK-26 -Plan, Elevation and Details D-80-134A-103A 3 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones

    7 Mosque Plaza Shade Structure - Plan, Elevation and Details D-80-134A-104A 1 of 2 RGCP-472-T-QTR-690 5-Sep-13 A 5-Sep-13 9-Sep-13 D B 16-Sep-13 19-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    8 Mosque Plaza Shade Structure - Plan, Elevation and Details D-80-134A-104A 2 of 2 RGCP-472-T-QTR-690 5-Sep-13 A 5-Sep-13 9-Sep-13 D B 16-Sep-13 19-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    9 XK-03Plaza Shade Structure -Plan , Elevation and Details D-80-134A-105A 1 of 2 RGCP-472-T-QTR-691 A 03-Apr-13 9-Apr-13 D D 12-Sep-13 15-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    10 XK-03Plaza Shade Structure -Plan , Elevation and Details D-80-134A-105A 2 of 2 RGCP-472-T-QTR-691 A 03-Apr-13 9-Apr-13 D D 12-Sep-13 15-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    11 XK-32 Warehouse Plaza Shade Structure -Plan ,Elevation and Details D-80-134A-106A 1 of 2 RGCP-472-T-QTR-692 A 03-Apr-13 9-Apr-13 D C 29-Aug-13 11-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    SHADES

    MDR_Master Document Register 3 of 6 Updated on : 7/7/2014

  • A B C D Submitted

    Rev Submit Date Reply DateApproval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    StatusRev Submit Date Reply Date

    Approval

    Status

    EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472

    No of

    Sheets

    LEGEND

    Zone

    DESIGN DRAWING SUBMITTAL LOG

    Issued for Construction As-Built

    Approved/IFC Approved with

    Comments

    Reviewed W No

    Comments

    Reviewed with

    Comments

    Issue for ApprovalQBEC Transmittal

    Reference

    Sl.

    No.Drawing Title

    Issue for ReviewPlan Submission

    date

    Drawing Number

    12 XK-32 Warehouse Plaza Shade Structure -Plan ,Elevation and Details D-80-134A-106A 2 of 2 RGCP-472-T-QTR-692 A 03-Apr-13 9-Apr-13 D C 29-Aug-13 11-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones

    13Walkway shade structure (Type 1) typical plan, elevation section and

    detailsD-80-134A-107A 1 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC All Zones

    14Walkway shade structure (Type 2) typical plan, elevation section and

    detailsD-80-134A-107A 2 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC All Zones

    15 Walkway shade stuctures typical plan, elevation section and details D-80-134A-107A 3 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC

    16 Parking Area 2 at XK-10 - Shade Structure -Plan , Elevation and Details D-80-134A-108A 1 of 2 RGCP-472-T-QTR-693 A 16-May-13 21-May-13 D 1 05-Sep-13 16-Sep-13 B 2 24-Sep-13 25-Sep-13 IFC All Zones

    17 Parking Area 2 at XK-10 - Shade Structure -Plan , Elevation and Details D-80-134A-108A 2 of 2 RGCP-472-T-QTR-693 A 16-May-13 21-May-13 D 1 05-Sep-13 16-Sep-13 B 2 24-Sep-13 25-Sep-13 IFC All Zones

    1 General Layout for signage location 1 D-80-134A-075 1 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    2 General Layout for signage location 2 D-80-134A-075 2 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    3 General Layout for signage location 3 D-80-134A-075 3 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    4 General Layout for signage location 4 D-80-134A-075 4 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    5 General Layout for signage location 5 D-80-134A-075 5 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    6 General Layout for signage location 6 D-80-134A-075 6 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    7 General Layout for signage location 7 D-80-134A-075 7 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    8 General Layout for signage location 8 D-80-134A-075 8 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    9 General Layout for signage location 9 D-80-134A-075 9 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones

    10 General Layout for Traffic Signage D-80-134A-076 1 of 2 RGCP-472-T-QTR-782 A 21-Apr-13 22-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 23-Nov-13 26-Nov-13 IFC All Zones

    11 General Layout for Traffic Signage D-80-134A-076 2 of 2 RGCP-472-T-QTR-782 A 21-Apr-13 22-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 23-Nov-13 26-Nov-13 IFC All Zones

    12 Typical Signage Detail - Plan, Elevation and Details D-80-134A-077 1 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones

    13 Typical Signage Detail - Plan, Elevation and Details D-80-134A-077 2 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones

    14 Typical Signage Detail - Plan, Elevation and Details D-80-134A-077 3 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones

    15 Schedule of Signs D-80-134A-078 1 of 1 RGCP-472-T-QTR-482 A 31-Mar-13 9-Apr-13 D B 7-May-13 15-May-13 D 0 2-Jun-13 10-Jun-13 IFC All Zones

    16 Traffic Signage Details D-80-134A-079 1 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones

    17 Traffic Signage Details D-80-134A-079 2 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones

    18 Traffic Signage Details D-80-134A-079 3 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones

    19 Traffic Signage Details D-80-134A-079 4 of 4 RGCP-472-T-QTR-783 A 31-Mar-13 9-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 24-Nov-13 26-Nov-13 IFC All Zones

    20 Road Marking Details D-80-134A-140 1 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC All Zones

    21 Road Marking Details D-80-134A-140 2 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC

    22 Road Marking Details D-80-134A-140 3 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC

    1 Irrigation Main line (Primary and Secondary) layout D-80-134A-002A 1 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones

    2 Irrigation Main line (Primary and Secondary) layout D-80-134A-003A 2 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones

    3 Irrigation Main line (Primary and Secondary) layout D-80-134A-004A 3 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones

    4 Irrigation Main line (Primary and Secondary) layout D-80-134A-005A 4 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones

    5 Irrigation Main line (Primary and Secondary) layout D-80-134A-006A 5 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones

    6 Irrigation Layout lateral Lines D-80-134A-007A 1 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones

    7 Irrigation Layout lateral Lines D-80-134A-008A 2 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones

    8 Irrigation Layout lateral Lines D-80-134A-009A 3 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones

    9 Irrigation Layout lateral Lines D-80-134A-010A 4 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones

    10 Irrigation Layout lateral Lines D-80-134A-011A 5 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones

    11 Solenoid Valve Schedule D-80-134A-012A 1 of 1 RGCP-472-T-QTR-445 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 D 0 21-May-13 23-May-13 IFC All Zones

    12 Piping & Instrumentation Diagram - irrigation & Landscape D-80-134A-013A 1 of 1 RGCP-472-T-QTR-700 A 31-Mar-13 2-Apr-13 A 1 17-Aug-13 3-Sep-13 B 2 24-Sep-13 2-Oct-13 IF