Building External Areas Upgrade in Administration
Area at Ras-Laffan
CONTRACT: CT/RG27/L029/12
MONTHLY PROGRESS REPORT NO: 20
FOR THE MONTH OF JUNE 2014
CLIENT CONSULTANT CONTRACTOR
TABLE OF CONTENTS
1. PROJECT INFORMATION ............................................................................................................
1.1. SCOPE OF WORK .....................................................................................................................
1.2. PROJECT WEIGHTAGE ..........................................................................................................
3. POGRESS WEIGHTAGE .................................................................................................................
4. OVERALL PROGRESS SUMMARY .............................................................................................
5. QA/QC STATUS ................................................................................................................................
6. HEATH AND SAFETY .....................................................................................................................
8. SUMMARY OF MATERIAL SUBMITTAL .................................................................................
9. SUMMARY OF DESIGN DRAWING SUBMITTAL .................................................................
10. MATERIAL SUBMITTAL LOG .....................................................................................................
11. DESIGN DRAWING SUBMITTAL LOG ..................................................................................
12. PROGRESS UPDATED WBS SUMMARY ..............................................................................
13. ONE MONTH LOOK-AHEAD ....................................................................................................
14. PROGRESS UPDATED PROGRAMME ...................................................................................
15. PROGRESS PHOTOS ....................................................................................................................
1. PROJECT INFORMATION Project Title: CT/RG27/L029/12
Location: Ras Laffan
Client: Ras gas Company Limited
Contractor: Qatar Building Engineering Company W.L.L., (QBEC)
Project Start Date: 21 Oct 2012
Contract Duration: 28 Months
Completion for Construction Works: 16 Months
Completion for Operation & Maintenance: 12 Months
Extension of time: 90 days secured
1.1. SCOPE OF WORK
Site survey and study of the existing site situation including trial pits needed to verify the
physical characteristics of the site elements.
Engineering analysis and design for and shade structures and signages, including
irrigation piping network and electrical system based on the FEED design.
Development of the detailed engineering drawings and procedures based on the FEED
documents. Supply, install/construct, test and commission the work related to the Civil,
Structural, Plumbing and Electrical works.
Provision of new landscaping, which includes plants, trees, shrubs, ground cover and
climbers.
Provision of new irrigation piping, distribution network and associated accessories such
as drips, sprinklers, bubblers and valves.
Relocation and modifications to the existing planting, utilities, plumbing / mechanical and
lighting works according to the new works.
Maintenance of existing landscaping and planting during project execution and until the
Provisional Acceptance.
Operation and maintenance of new landscaping and irrigation for a period of one (1) year
i.e. during Warranty period.
All the associated demolition and reinstatement works resulting from the above works.
All the other works as indicated in the relevant FEED drawings.
1.2. PROJECT WEIGHTAGE
Activity Name Overall Wt. Budgeted Cost
Construction Mobilisation and Finalisation of key subcontractor & key suppliers
5.00 1025000.31
Contractor Mobilisation 2.39 489204.73
Submission of Early Documentation & Key Deliverables 0.91 186363.66
Key Subcontractors and Suppliers 1.70 349431.92
ENGINEERING 5.00 1024999.83
Site Survey and Trial pit Excavation 0.43 87172.24
Submission and Approval of Design Calculations 0.92 189599.54
Submission and Approval of Detailed Engineering Drawings 3.65 748228.05
PROCUREMENT 17.00 3485000.97
Materials Submission and Approval 5.91 1211165.46
Interlock pavers, kerb stones and tree guards 0.66 134573.94
Foundation bolts 0.66 134573.94
Main piping material 0.66 134573.94
Shade structures including fabric material 0.66 134573.94
Signage structures 0.66 134573.94
Fountain sculpture 0.66 134573.94
Electrical Poles, DBs and Field Controls 0.66 134573.94
Valves and pumps 0.66 134573.94
Irrigation distribution accessories 0.66 134573.94
Placing of Orders and First Delivery to Project Site 11.09 2273835.51
Interlock pavers, kerb stones and tree guards 0.34 69607.21
Foundation bolts 0.61 125292.98
Main piping material 1.49 306271.72
Shade structures including fabric material 1.13 232024.03
Signage structures 1.15 236664.51
Fountain sculpture 1.77 361957.49
Electrical Poles, DBs and Field Controls 1.40 287709.80
Valves and pumps 2.17 445486.14
Irrigation distribution accessories 1.02 208821.63
CONSTRUCTION 62.00 12710002.80
Phase 1 Works 22.00 4510001.07
Phase 2 Works 16.00 3280000.62
Phase 3 Works 17.00 3485000.74
Phase 4 Works 7.00 1435000.37
TESTING AND COMMINSIONING 5.00 1025000.30
FINAL DOCUMENTATION 6.00 1230000.35
Total 100.00 20500004.53
2. POGRESS WEIGHTAGE
SR Physical % Overall Wt.Planned Wt.
(Original BL)
Planned Wt. (Revised
BL)-RGCP-472-PEP-
QTR-001 REV. D)
Achieved Wt. Variation
1 100.00% 5.00 5.00 5.00 5.00 0.00
1.1 100.00% 2.39 2.39 2.39 2.39 0.00
1.2 100.00% 0.91 0.91 0.91 0.91 0.00
1.3 100.00% 1.70 1.70 1.70 1.70 0.00
2 100.00% 5.00 5.00 5.00 5.00 0.00
2.1 100.00% 0.43 0.43 0.43 0.43 0.00
2.2 100.00% 0.92 0.92 0.92 0.92 0.00
2.3 100.00% 3.65 3.65 3.65 3.65 0.00
3 100.00% 17.00 17.00 17.00 17.00 0.00
3.1 100.00% 5.91 5.91 5.91 5.91 0.00
3.1.1 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.2 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.3 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.4 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.5 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.6 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.7 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.8 100.00% 0.66 0.66 0.66 0.66 0.00
3.1.9 100.00% 0.66 0.66 0.66 0.66 0.00
3.2 100.00% 11.09 11.09 11.09 11.09 0.00
3.2.1 100.00% 0.34 0.34 0.34 0.34 0.00
3.2.2 100.00% 0.61 0.61 0.61 0.61 0.00
3.2.3 100.00% 1.49 1.49 1.49 1.49 0.00
3.2.4 100.00% 1.13 1.13 1.13 1.13 0.00
3.2.5 100.00% 1.15 1.15 1.15 1.15 0.00
3.2.6 100.00% 1.77 1.77 1.77 1.77 0.00
3.2.7 100.00% 1.40 1.40 1.40 1.40 0.00
3.2.8 100.00% 2.17 2.17 2.17 2.17 0.00
3.2.9 100.00% 1.02 1.02 1.02 1.02 0.00
4 99.01% 62.00 62.00 62.00 61.39 -0.61
4.1 98.76% 18.00 18.00 18.00 17.78 -0.22
98.53% 4.00 4.00 4.00 3.94 -0.06
4.2 98.94% 12.00 12.00 12.00 11.87 -0.13
98.53% 4.00 4.00 4.00 3.94 -0.06
4.3 99.35% 13.00 13.00 13.00 12.92 -0.08
98.53% 4.00 4.00 4.00 3.94 -0.06
4.4 100.00% 7.00 7.00 7.00 7.00 0.00
5 60.407% 5.00 5.00 5.00 3.02 -1.98
6 45.667% 6.00 6.00 4.40 2.74 -1.66
100.00% 94.15% -5.85%
98.40% 94.15% -4.25%
Phase 1:Testing & commissioning
Phase 2:Testing & commissioning
Phase 3:Testing & commissioning
Electrical Poles, DBs and Field Controls
Valves and pumps
Irrigation distribution accessories
Interlock pavers, kerb stones and tree guards
Foundation bolts
Activity Name
ENGINEERING
PROCUREMENT
Materials Submission and Approval
Summary of progress report as of 30 June 2014
Site Survey and Trial pit Excavation
Submission and Approval of Design Calculations
Submission and Approval of Detailed Engineering Drawings
Contractor Mobilisation
Construction Mobilisation and Finalisation of key subcontractor & key
suppliers
TESTING AND COMMINSIONING (PROVISIONAL ACCEPTENACE
CERTIFICATE)
Submission of Early Documentation & Key Deliverables
Key Subcontractors and Suppliers
Interlock pavers, kerb stones and tree guards
Foundation bolts
Main piping material
Placing of Orders and First Delivery to Project Site
Main piping material
Shade structures including fabric material
Signage structures
Phase 3: Construction work
Shade structures including fabric material
Phase 4 Works
CONSTRUCTION
Signage structures
Fountain sculpture
Fountain sculpture
Electrical Poles, DBs and Field Controls
Total (Revised BL-RGCP-472-PEP-QTR-001 REV. D)
Total (Original BL)
FINAL DOCUMENTATION
Irrigation distribution accessories
Phase 1: Construction work
Phase 2: Construction work
Valves and pumps
3. OVERALL PROGRESS SUMMARY
20,950,917.53
21-Oct-12
20-Jul-14
Submission Signature Date Remarks
Prepared By
Reviewed By Nabhan. S Al Qasem QBEC: Project Manager
Endorsed By
KEY INFORMATION
(RG27-L029) EPC OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROGRESS REPORT
Progress Status as on 30 June 2014
CLIENT - RasGas
CONSULTANT - Assiociated Consulting Engineers
CONTRACTOR - Qatar Building Engineering Company
CONTRACT AMOUNT in QAR
PROJECT START DATE
PROJECT COMPLETION DATE
CLIENT CONSULTANT
Assiociated Consulting EngineersRsGas
CONTRACTOR
Qatar Building Engineering Company
Bhaskar Challa
Designation
QBEC: Planning Engineer
RG: Project Specialist
NOTE:
Name
Ahamed Ziyath
20,950,917.53
15,243,037.53
5,707,880.00 INVOICE STATUS
TOTAL AMOUNT
INVOICED AMOUNT
REMAINING INVOICE
638
618
20PROJECT DURATION
PROJECT DURATION
COMPLETED DURATION
REMAINING DURATION
98.40%
94.15%
-4.25% PROGRESS
PLANNED PROGRESS
ACTUAL PROGRESS
VARIANCE
100.00%
100.00%
100.00%
100.00%
100.00%
73.37%
100.00%
99.58%
99.92%
99.01%
60.41%
45.67%
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Preliminary
Engineering
Procurement
Construction
Testing/Com
Final Document
% Completion PROGRESS BAR CHART - BREAKDOWN PROGRESS
PLANNED % ACTUAL %
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Oct
-12
No
v-1
2
Dec
-12
Jan
-13
Feb
-13
Mar
-13
Ap
r-1
3
May
-13
Jun
-13
Jul-
13
Au
g-1
3
Sep
-13
Oct
-13
No
v-1
3
Dec
-13
Jan
-14
Feb
-14
Mar
-14
Ap
r-1
4
May
-14
Jun
-14
Jul-
14
% C
om
ple
tio
n
Time
S - CURVE CUML. PLANNED %
Planned Progress : 98.40%
Actual Progress : 94.15%
18
18
0
0
0
18
0
26
14
0
0
12
26
12
61
61
0
0
0
61
0
20
20
0
0
0
20
0
23
23
0
0
0
23
0
20
1
0
0
12
13
7
1
0
0
0
1
1
1
45
31
0
14
0
45
14
229
183
0
14
25
222
34
0 50 100 150 200 250 300 350 400 450 500
TOTAL NO
IFC
CODE A
CODE B
CODE D
CUM.
YET TO SUBMIT
TOTAL NO IFC CODE A CODE B CODE D CUM.YET TOSUBMIT
Design Calculation 18 18 0 0 0 18 0
General 26 14 0 0 12 26 12
Landscape & Civil 61 61 0 0 0 61 0
Signage & Road Marking 20 20 0 0 0 20 0
Irrigation 23 23 0 0 0 23 0
Plumbing 20 1 0 0 12 13 7
Instrumentation 1 0 0 0 1 1 1
Electrical 45 31 0 14 0 45 14
TOTAL NO 229 183 0 14 25 222 34
DESIGN DRAWING SUBMITTAL STATUS
62
62
42
2
0
0
4
4
4
0
0
0
29
29
27
2
0
0
25
25
21
4
0
0
26
7
7
0
0
19
155
136
110
8
0
19
0 50 100 150 200 250 300 350
TOTAL NO
SUBMITTED
APPROVED
REVISED
UNDER REVIEW
YET TO SUBMIT
TOTAL NO SUBMITTED APPROVED REVISEDUNDERREVIEW
YET TOSUBMIT
Civil / Architecture 62 62 42 2 0 0
Shade Structure 4 4 4 0 0 0
Irrigation & Plantation 29 29 27 2 0 0
Electrical 25 25 21 4 0 0
Fountain 26 7 7 0 0 19
Total 155 136 110 8 0 19
MATERIAL SUBMITTAL STATUS
100.
00%
100.
00%
100.
00%
100.
00%
100.
00%
70.1
2%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
ONE WEEK LOOKAHEAD
0 This Week YTD 2014 Year 2014
0 29 1,784 1,784
1 Item Description All Good Concern
4 B-Safe Checklist 0 156 0
4 53 0
3,235 3,235 0
Item Description This Week YTD 2014 Year 2014
6 447 447
Total Man Power This Week 726 Safety Walkabouts 0 26 17
Cum. Total Man Power 74,244
7,260
Cum. Total Man Hours 748,174 0 16
HEALTH AND SAFETY
Activity Summary
Restricted Work Case
(RWC)0
Property Damage &
Equipment Failure4 0
Medical Treatment Case
(MTC)
Motor Vehicle Accident
(MVA)1
0
First Aid Case (FAC) 0
39
LTI FREE SAFE WORK DAYS ACHIEVED/ MAN HOURS
0 Observation Card
PTW Audit onshore
JSA / RA / Safety
Reviews
Safety
Representation in
Meetings
Lost Time Injury (LTI)Fire Incident
Environment Incident
Security Incident
Near Miss
PTW Failure / Violation eSafety
PTW Violation PTW Coordinator
Report0
MAN HOURS
Man Hours This Week0 10
B-Safe Meetings
Total PTW
Item Description
Safety Inspections
69
69
42
0
42
42
42
121
121
121
0
121
121
121
0
50
100
150
Man
pow
er (N
os.)
Days of Month
MANPOWER HISTOGRAM PLANNED ACTUAL
Physical
%Overall Wt.
Planned Wt.
(Original BL)
Planned Wt.
(Revised BL)-RGCP-
472-PEP-QTR-001
REV. D)
Achieved Wt. Variation
100.00% 5.00 5.00 5.00 5.00 0.00
100.00% 2.39 2.39 2.39 2.39 0.00
100.00% 0.91 0.91 0.91 0.91 0.00
100.00% 1.70 1.70 1.70 1.70 0.00
100.00% 5.00 5.00 5.00 5.00 0.00
100.00% 0.43 0.43 0.43 0.43 0.00
100.00% 0.92 0.92 0.92 0.92 0.00
100.00% 3.65 3.65 3.65 3.65 0.00
100.00% 17.00 17.00 17.00 17.00 0.00
100.00% 5.91 5.91 5.91 5.91 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 0.66 0.66 0.66 0.66 0.00
100.00% 11.09 11.09 11.09 11.09 0.00
100.00% 0.34 0.34 0.34 0.34 0.00
100.00% 0.61 0.61 0.61 0.61 0.00
100.00% 1.49 1.49 1.49 1.49 0.00
100.00% 1.13 1.13 1.13 1.13 0.00
100.00% 1.15 1.15 1.15 1.15 0.00
100.00% 1.77 1.77 1.77 1.77 0.00
100.00% 1.40 1.40 1.40 1.40 0.00
100.00% 2.17 2.17 2.17 2.17 0.00
100.00% 1.02 1.02 1.02 1.02 0.00
99.01% 62.00 62.00 62.00 61.39 -0.61
98.76% 18.00 18.00 18.00 17.78 -0.22
98.53% 4.00 4.00 4.00 3.94 -0.06
98.94% 12.00 12.00 12.00 11.87 -0.13
98.53% 4.00 4.00 4.00 3.94 -0.06
99.35% 13.00 13.00 13.00 12.92 -0.08
98.53% 4.00 4.00 4.00 3.94 -0.06
100.00% 7.00 7.00 7.00 7.00 0.00
60.41% 5.00 5.00 5.00 3.02 -1.98
45.67% 6.00 6.00 4.40 2.74 -1.66
100.00% 94.15% -5.85%
98.40% 94.15% -4.25%
Main piping material
Shade structures including fabric material
Phase 3: Construction work
Phase 3:Testing & commissioning
Placing of Orders and First Delivery to Project Site
Fountain sculpture
Electrical Poles, DBs and Field Controls
Valves and pumps
Irrigation distribution accessories
Phase 1: Construction work
Signage structures
Phase 1:Testing & commissioning
Interlock pavers, kerb stones and tree guards
Fountain sculpture
CONSTRUCTION
Contractor Mobilisation
Submission of Early Documentation & Key Deliverables
Key Subcontractors and Suppliers
Site Survey and Trial pit Excavation
Submission and Approval of Design Calculations
Submission and Approval of Detailed Engineering Drawings
Foundation bolts
Summary of progress report as of 30 June 2014
Materials Submission and Approval
ENGINEERING
PROCUREMENT
Activity Name
Construction Mobilisation and Finalisation of key subcontractor
& key suppliers
Total (Revised BL-RGCP-472-PEP-QTR-001 REV. D)
Total (Original BL)
FINAL DOCUMENTATION
Interlock pavers, kerb stones and tree guards
Main piping material
Shade structures including fabric material
Signage structures
Electrical Poles, DBs and Field Controls
Valves and pumps
Irrigation distribution accessories
Foundation bolts
Phase 4 Works
Phase 2: Construction work
Phase 2:Testing & commissioning
TESTING AND COMMINSIONING (PROVISIONAL ACCEPTENACE
CERTIFICATE)
0.00%
-0.42%
-0.08%
-0.99%
-39.59%
-27.70%
-50
%
-25
%
0%
25
%
50
%
Preliminary
Engineering
Procurement
Construction
Testing/Com
Final Document
SCHEDULE VARIANCE (SV)
4. QA/QC STATUS
Documents Status:
Document Total
Submitted
Status
(Approved) Remarks
P.Q.P. (Main contractor QBEC) 1 1 IFC
Sub-Contractor P.Q.P. (Total 5) 0 0
ITP Submitted 8 8 IFC
Balance (Fountain ) - -
Procedures
(Method of
Statements)
Submitted 23 23 IFC
Balance (Fountain
works) - -
Inspection Status: (CA Civil, EL Electrical, MA Mechanical)
Total RFI
Inspected Accepted Rejected Cancelled
Remark
s
Discipline CA EL MA CA EL MA CA EL MA CA EL MA
This week RFI 13 02 04 13 02 04 01 00 00 00 00 00
Cumulative
RFI 724 68 90 724 65 89 26 03 01 18 01 00
QUALITY OBJECTIVES
Sl.
No.:
K.P.I /
QUALITY OBJECTIVES TERGET RESPONSIBILITY
FREQUENCY OF
REVIEW RESULTS ACHIEVED
1) % of RFI approval against submitted More than 95% P.M / C.M. Quarterly 96.7%
2) % of Material approval against
inspected More than 95% P.M / C.M. Quarterly 99.00%
5. HEATH AND SAFET
Date & Time - 19/03/2013 15:10 hours
TRIR
LTIR
1st
Quarter
0.00
0.00
Cumulative
0.00
0.00
0.00
0.00
First Aid Case (FAC)
Environment Incident
Near Miss
0
0
PTW Violation PTW Coordinator
PTW Failure / Violation eSafety
1
5
0
Period
QBEC Weekly Safety Report Week 75
0.000.00
3rd
Quarter 4th
Quarter
4
0
0
- -
453
30%
10
C
C
Safety SHE Monthly Focus
Training
39
YTD
CWeekly mass safety tool box talk conducted
this morning (03-07-2014)
26
C
C
Total Monthly
Man-power
Update
Attendants
75 247
% (Percentage
Attended)
Item Description
Total
NA
0
B-Safe Meetings
0JSA / RA / Safety Reviews
Current Week
Safety Walkabouts
3275
PTW Audit Onshore 40
160
Concern
0
6
3275
Safety Inspections
Sub Total
6
.- VE
NAPTW Audit Offshore
Item Description
40
.- VE
- `
16
4
Year 2013
5
-
Man Hours
NA
- - -
1,811
Daily Toolbox talk being conducted on daily
basis
On Shore
-
On Shore
-
-
Qatar Building Engineering Co.
Off Shore
-
121 -
-
-
-
-
Total % Safe
-
Total Man Power
Current Week Item Description
-
Observation Card
9
YTD 2013
161
Good
.- VE
NA1811
All
.- VEB-Safe Checklist
Project Safety Highlights / Achievements
Current
Week
Cum. Man Hours
YTD
-
-
-
2nd
Quarter
776,824
0
6,560
0.00 0.00
No Body Get Hurt- Zero Incident Target
Total Cumulative
Man-hours
00
0 00
770,264
Item Description
0
3-Jul
Motor Vehicle Accident (MVA)
0
28-Jun
Item Description
Medical Treatment Case (MTC)
Restricted Work Case (RWC)
LTI free safe work days achieved
0
2014To
Lost Time Injury (LTI)
INCIDENT:
0 0
This
Month
0
0
0
1
4
1
0
Cut-off Period From
Year to
Date
0
Current
Week
PTW Failure / Violations
Security Incident
Fire Incident
Property Damage & Equipment
0
0
0
0
0
5
0
0
0
4
0 0
0
0
Days
Cumm PTD
0
529
0
4
0
0
0
1
No.Total Man
HoursOff Shore
-
YTD
Activity Summary
Total Cum. Man Hrs To Date 121
-
-
-
7
3
- -
Man Power
Man Power & Man Hours
CONTRACTOR
-
6,560 1 121
2
770,264
-
-
5
Year 2012
6,560 6,560
-
- -
776,824 -
- - -
-
-
-
C
Rev 1 - Jan 2013
Safety Representation in Meetings
Safety Campaign HEAT
STRESS PREVENTION"
8 - - - -
6. PROGRESS S-CURVE
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Oct
-12
No
v-12
Dec
-12
Jan
-13
Feb
-13
Mar
-13
Ap
r-13
May
-13
Jun
-13
Jul-
13
Au
g-13
Sep
-13
Oct
-13
No
v-13
Dec
-13
Jan
-14
Feb
-14
Mar
-14
Ap
r-14
May
-14
Jun
-14
Jul-
14
% C
om
ple
tio
n
Time
S - CURVE CUML. PLANNED % CUML. ACTUAL %
Planned Progress : 98.40%
Actual Progress : 94.15%
7. SUMMARY OF MATERIAL SUBMITTAL Drawing Title Total IFC CODE
A CODE B
CODE D
Cumulative Total Remaining
Remarks
Design Calculations
18 18 0 0 0 18 0
General 26 14 0 0 12 26 12
Landscape & Civil 61 61 0 0 0 61 0
Shades 15 15 0 0 0 15 0
Signage & Road Marking
20 20 0 0 0 20 0
Irrigation 23 23 0 0 0 23 0
Plumbing 20 1 0 0 12 13 7 Regency - New design
Instrumentation 1 0 0 0 1 1 1 Regency - New design
Electrical 45 31 0 14 0 45 14
TOTAL 229 183 0 14 25 222 34
8. SUMMARY OF DESIGN DRAWING SUBMITTAL Drawing Title Total IFC CODE
A CODE B
CODE D
Cumulative Total Remaining
Remarks
Design Calculations
18 18 0 0 0 18 0
General 26 14 0 0 12 26 12
Landscape & Civil 61 61 0 0 0 61 0
Shades 15 15 0 0 0 15 0
Signage & Road Marking
20 20 0 0 0 20 0
Irrigation 23 23 0 0 0 23 0
Plumbing 20 1 0 0 12 13 7 Regency - New design
Instrumentation 1 0 0 0 1 1 1 Regency - New design
Electrical 45 31 0 14 0 45 14
TOTAL 229 183 0 14 25 222 34
9. MATERIAL SUBMITTAL LOG
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
RGCP-472-CA-001 READYMIX CONCRETE 48N , 28N (Blinding) Qatar ReadyMix Qatar W.L.L 800.00 m3 RGX-S-64-1320-902 3/12/2013 A 3/27/2013 3/26/2013 3/28/2013 A 3/30/2013 4/24/1913 2/5/2013 AS REQUIRED
RGCP-472-CA-002 WASHED SAND 50mm thick QatarQatar National
Cement Company668.64 m
3 RGX-S-80-134-003A 3/12/2013 C 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 5/1/2013 2/5/2013 AS REQUIRED
RGCP-472-CA-003 DUNE SAND S-80-134A-003 QatarQatar National
Cement Company800.00 m3 S-80-134A-003 3/12/2013 A 3/4/2013 3/26/2013 3/11/2013 A 3/30/2013 5/1/2013 2/5/2013 AS REQUIRED
RGCP-472-CA-004 PAVING TILES80mm, 60mm Gray / 60mm Red,
YellowQatar
Al-Sehmiah Cement
Products Factory7395.00 m2 S-80-134A-003 3/12/2013 A 12/31/2012 3/26/2013 1/22/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013
RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Gray QatarAl-Sehmiah Cement
Products Factory3254.00 m2 S-80-134A-003 3/12/2013 A 12/31/2012 3/26/2013 1/22/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013
RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Red QatarAl-Sehmiah Cement
Products Factory2827.00 m2 S-80-134A-003 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013
RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Yellow QatarAl-Sehmiah Cement
Products Factory168.00 m2 RG6-S-00-1317-901 3/12/2013 A 2/27/2013 3/26/2013 3/7/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013
RGCP-472-CA-005 CEMENT OPC S-80-134A-003 QatarQatar National
Cement Company34.00 tons RGX-S-80-134-003A 3/12/2013 B 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 4/24/1913 1/5/2013 EXSTOCK
RGCP-472-CA-006 KERBSTONES 150mmX305mm QatarAl-Sehmiah Cement
Products Factory10391.00 m S-80-134A-003, 2.2.16 3/12/2013 A 4/16/2013 3/26/2013 4/18/2013 A 3/30/2013 4/17/1913 2/5/2013 5/5/2013 6/5/2013
RGCP-472-CA-006-1 PRECAST CONCRETE FLUSH KERB 8/27/2013 A 8/27/2013 A
RGCP-472-CA-007 STEEL REINFORCEMENT 20mm,16mm,12mm,10mm Qatar Qatar Steel 91.00 tons ASTM-A615 Grade 460 3/12/2013 A 12/31/2012 3/26/2013 1/2/2013 A 3/30/2013 4/22/1913 5/5/2013 5/5/2013
RGCP-472-CA-007 STEEL REINFORCEMENT 8mm Qatar Qatar Steel 1.00 tons ASTM-A615 Grade 460 3/12/2013 A 12/31/2012 3/26/2013 1/2/2013 A 3/30/2013 4/22/1913 5/5/2013 5/5/2013
RGCP-472-CA-008 CONCRETE FLAG STONES 450mmx450mmX60mm QatarAl-Sehmiah Cement
Products Factory500.00 m2 S-80-134A-003 ,2.2.7 3/12/2013 B 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013
RGCP-472-CA-009 POLYTHELENE SHEET 1000 Guage QatarAl-Moudi Plastic
Factory4100.00 m2 RGX-S-64-1320-902 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/21/1913 5/5/2013 5/5/2013
RGCP-472-CA-010 PROTECTION BOARD 6mm Qatar Sodamco-Qatar W.L.L 3311.00 m2 RGXS-64-1320-902-01 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/23/1913 5/5/2013 5/5/2013 6/5/2013
RGCP-472-CA-010A PROTECTION BOARD 9/4/2014 A
RGCP-472-CA-011 WATERPROOF BITUMEN PAINT (Master Seal) Qatar Sodamco-Qatar W.L.L 6621.56 m2 RGX-S-64-1320-902-01 3/12/2013 B 5/21/2013 5/22/2013 D 3/30/2013 12/5/2013 20/05/2013
RGCP-472-CA-012 AGGREGATE 2CM Qatar 1335.07 m3 S-80-134A-003 3/12/2013 B 5/23/2013 5/25/2013 5/27/2013 A 3/30/2013 20-5-2013 15/05/2013
RGCP-472-CA-013 DRAIN CHANNEL WITH GRATING 300MM Qatar no. RG6-S-00-134A-010 3/12/2013 B 5/21/2013 5/27/2013 A 3/30/2013 25-5-2013 20/05/2013
RGCP-472-CA-013-1 CHANNEL GRATING &FRAMES Kiswok 29 Nos RG6-S-00-134A-010 08-09-13 B 17-Sep-13 A
RGCP-472-CA-014 EDGERS FOR PLANTS & SHRUBS 5CM QatarAl-Sehmiah Cement
Products Factory4614.13 m D-80-134A-104 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/17/1913 6/5/2013 5/5/2013
RGCP-472-CA-015 PLASTIC SPACERS 7CM QatarModern Building
Accessories Factory1000.00 no. S-80-134A-0095 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/29/2013 5/5/2013 5/5/2013
RGCP-472-CA-016 GEOTEXTILE MEMBRANE 1000G 26701.36 m2 S-80-134A-003 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/23/1913 20-5-2013 10/5/2013
RGCP-472-CA-018 MASONARY BLOCKS 200mm QatarAl-Sedriah Cement
Products Factory2000.00 m2 S-80-134A-003 3/12/2013 B 2/21/2013 3/26/2013 3/4/2013 A 3/30/2013 4/27/1913 10/5/2013 5/5/2013
RGCP-472-CA-020ADHESIVE FOR GRANITE7MOSAIC TILES IN
WATERFEATURE20mm S-80-134A-003 25-Nov-13 B 3/26/2013 30-Nov-13 A 3/30/2013 25-5-2013 15/06/2013
RGCP-472-CA-021 EXPANSION JOINT FILLER S-80-134A-003 3/12/2013 A 5/15/2013 3/26/2013 5/22/2013 A 3/30/2013 25-5-2013 15/06/2013
RGCP-472-CA-022 GROUT S-80-134A-003 05-Aug-13 C 5/21/2013 3/26/2013 8/19/2013 A 3/30/2013 25-5-2013 15/06/2013
RGCP-472-CA-023 KERBSTONE PAINT S-80-134A-003 3/12/2013 B 8/17/2013 8/19/2013 A 25-5-2013 15/06/2013
RGCP-472-CA-024 SUBBASE S-80-134A-003 3/12/2013 A 5/15/2013 3/26/2013 5/22/2013 D 3/30/2013 25-5-2013 15/06/2013
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
CIVIL / ARCHITECTURAL
APPROVAL
Reviewed With No
Comments
Page 1 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-CA-025STRUCTTURAL CONCRETE REPAIR MORTAR-
RENDROC- LAXtra24-Jul-13 A 25-Jul-13 A
RGCP-472-CA-027 ROAD MARKING 11-Jul-13 A 18-Jul-13 A
Page 2 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-CA-028NITOSEAL MS60 SEALANT FOR EXPANSION
JOINTS24-Jul-13 A 28-Jul-13 A
RGCP-472-CA-029STRUCTTURAL CONCRETE REPAIR MORTAR-
RENDROC- LAXtra24-Jul-13 A 25-Jul-13 A
RGCP-472-CA-030 PVC WATER STOP 08-Sep-13 B 17-Sep-13 A
RGCP-472-CA-031 WATERPROOF MENBRANE 20-Aug-13 A 26-Aug-13 A
RGCP-472-CA-032NITOSEAL MS600 SEALANT FOR EXPANSION
JOINTS14-Aug-13 A 8/19/2013 A
RGCP-472-CA-033 WATERPROOFING FOR WATERFEATURE 25-Nov-13 B 30-Nov-13 A
RGCP-472-CA-034GROUT FOR GRANITE7MOSAIC TILES IN
WATERFEATURE25-Nov-13 B 30-Nov-13 A
RGCP-472-CA-035 ADHESIVE FO REXTERNAL GRANITE CLADDING SODAMCO 31-Aug-13 A 10/23/2013 24-Oct-13 A
RGCP-472-CA-036 GROUT FOR EXTERNAL GRANITE CLADDING SODAMCO 31-Aug-13 B 10/23/2013 24-Oct-13 A
RGCP-472-CA-037 CONCRETE CURING COMPOUND 31-Aug-13 B 05-Sep-13 A
RGCP-472-CA-038
VERY HIGH STRENGTH SHRINKAGE
COMPENSATED GROUT FOR USE UDER BASE
PLATES OF LAMP POSTS
08-Sep-13 A 17-Sep-13 A
RGCP-472-CA-039 ANCHOR BOLTS SIGNAGE (GULF STEEL) 25-Sep-13 B 02-Oct-13 A
RGCP-472-CA-040 GRANITE (BLCK GALAXY) 14-Sep-13 A 19-Sep-13 A
RGCP-472-CA-041 GRANITE (LIGHT & DARK GREY) 19-Sep-13 B 02-Oct-13 A
RGCP-472-CA-042 Drop Sculpture (Acrylic sheet) 29-Dec-13 A 08-Jan-14 A
RGCP-472-CA-043 PLASTIC EDGING FOR PLANTING AREA 25-Nov-13 C 27-Nov-13 A
RGCP-472-CA-043APLASTIC EDGING FOR PLANTING AREA
(Alternative)28-Jan-14 A 02-Feb-14 A
RGCP-472-CA-044FOSROC THIOFLEX 600 SEALANT FOR
EXPANSION JOINTS18-Nov-13 A 20-Nov-13 A
RGCP-472-CA-045PAINT SYSTEM FOR CONCRETE ZONE ID
SIGNAGE01-Jan-14 B 08-Jan-14 A
RGCP-472-CA-047GRANITE (CHINA BLACK G654) FOR ROADWAY
AT ENTRANCE PLAZA01-Jan-14 A 08-Jan-14 A
RGCP-472-CA-048PAINT SYSTEM FOR CONCRETE ABOVE
GROUND13-Nov-13 A 20-Nov-13 A
RGCP-472-CA-049SOLVENT BASED BITUMINOUS PRIMER FOR
DERMABIT WATER PROOFING23-Nov-13 A 27-Nov-13 A
RGCP-472-CA-052MOSAIC TILES FOR WATER FEATURE-
SPECTRUM KK11379 OPT 4 FOR FOUNTAIN23-Nov-13 A 27-Nov-13 A
RGCP-472-CA-053 GRANITE (BLACK GALAXY) FOR FOR FOUNTAIN 22-Dec-13 A 12-Jan-14 A
RGCP-472-CA-054DROP SCULPTURE (STAINLESS STEEL 316L) FOR
FOUNTAIN22-Dec-13 A 12-Jan-14 D
RGCP-472-CA-056 Bonding Agent 09-Apr-14 B 17-Jun-14 A
RGCP-472-CA-057Fostoc Nitocote CM 210 for balancing
tank in zone 229-Apr-14 A A
RGCP-472-CA-058Epoxy coating for Pump room and
Enclosure flooring13-Apr-14 A 09-Jun-14 A
RGCP-472-CA-059 Paint for Pump room Internal Walls 13-Apr-14 A 09-Jun-14 B
RGCP-472-CA-060 GRC PANEL COVERS 14-Apr-14 B 17-Jun-14 A
RGCP-472-CA-061Material Submittal-G.I Ladder ,Checkered Plate
& Brackets, G.I Bollards &Handrail06-Jun-14 A 12-Jun-14 A
Page 3 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-CA-062CEMENT BASED WATERPROOFING FOR PUMP
ROOM
Page 4 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-CT-001Tensile Roof Shade - Hot Dip Galvanized
SteelS-80-134A-003 Qatar Qatar Steel 361.00 m2 RG6-D-00-1330-002 4/6/2013 A 2/26/2013 4/18/2013 3/4/2013 A 4/22/2013 5/1/2013 6/2/2013 5/30/2013
RGCP-472-CT-002 Shade Structure Painting System S-80-134A-003 Qatar Juton Paints 104.00 m2 RG6-D-00-1330-004 4/6/2013 A 2/26/2013 4/18/2013 3/4/2013 A 4/22/2013 5/1/2013 6/2/2013 5/30/2013
RGCP-472-CT-003 PVC Fabric for Shades S-80-134A-003 France Ferrari S-80-134A-003 4/6/2013 C 5/5/2013 4/18/2013 6/5/2013 A 4/22/2013 6/2/2013 5/30/2013
RGCP-472-CT-003D FABRIC SHADE COLOR S-80-134A-003 France Ferrari B 9/10/2013 10/23/2013 A
RGCP-472-CT-004Hot Dip Galvanizing Process for Signage
PipeS-80-134A-003 Qatar
Gulf Building
Material146.00 Nos RG6-D-00-1330-002 06-Mar-13 A 04-Mar-13 20-Mar-13 11-Mar-13 A 25-Mar-13 01-May-13 05-May-13 02-May-13
RGCP-472-CT-005 GI Pipe for Signage S-80-134A-003 QatarGulf Building
Material280.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-006 STAINLESS STEEL TUBE 100X50X2MM S-80-134A-003 Qatar Hidayath 378.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-007Rectangular Hollow Section Support for
SignageS-80-134A-003 Qatar
Gulf Building
Material1040.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 02-Apr-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-008 3M Sticker for Signage Reflective Traffic Sign UAE 3M 378.00 m2 S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-009 Aluminum Extruded Profile for Signage 4.3 support Syste, 6061& 6065 Qatar Al-Jaber 320.00 no. S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-010 Aluminum Sheet 3mm Thick for signage S-80-134A-003 Qatar Alubond 520.00 m2 S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-011 SS SHEET 2MM THICK S-80-134A-003 Qatar Hidayath 45.00 m2 S-80-134-A003 06-Mar-13 A 20-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13
RGCP-472-CT-012 Paint System for Signage 07-Oct-13 A
RGCP-472-CT-013 PVC Fabric for Shades 27-May-14 A D
RGCP-472-PI-002 HDPE Pipes and Fittings4" * 90o Elbow -
CompressionQatar Hepworth 10.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings3" * 90o Elbow -
CompressionQatar Hepworth 4.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings3 * 2 Reducer Socket -
CompressionQatar Hepworth 2.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings 3" Equal TEE - Compression Qatar Hepworth 4.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings4 * 4 * 2 Reducer TEE -
CompressionQatar Hepworth 11.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings4 * 4 * 3 Reducer TEE -
CompressionQatar Hepworth 3.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings3 * 3 * 2 Reducer TEE -
CompressionQatar Hepworth 2.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings 3" End Caop - Compression Qatar Hepworth 1.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002 HDPE Pipes and Fittings 2" End Caop - Compression Qatar Hepworth 9.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013
RGCP-472-PI-002-1 HDPE Pipes and Fittings A 21-May-13 30-May-13 A
RGCP-472-PI-003 Sleeves U.P.V.C Sleeve 6AND 1.5 " Qatar qatar pipe line 300.00 m S-80-134A-002 13-Apr-13 B 01-May-13 08-May-13 A 29-Apr-13 21-May-13 20/05/2013
RGCP-472-PI-003-1 Sleeves A 21-May-13 30-May-13 A
RGCP-472-PI-AG-001 Remote Control Solenoid Valve Rain BirdEFB-CP-R Brass
ValvesUSA Rainbird 81.00 no. D-80-134A-70 26-Feb-13 B 18-Mar-13 12-Mar-13 26-Mar-13 A 17-Mar-13 17-Apr-13 06-Jun-13 15-May-13
RGCP-472-PI-AG-002 Dripline Rain Bird U.S.A RAIN BIRD D-80-134A-70 A 18-03-13 26-Mar-13 D 17-Mar-13 06-Jun-13 15-May-13
SHADE STRUCTURE FABRICATION
SIGNAGE WORK
IRRIGATION & PLANTATION
By Email
Page 5 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-PI-AG-003 Gate Valve PEGLER1065 Forged
Glass USA Pegler 25.00 no. D-80-134A-70 26-Feb-13 B 18-Mar-13 12-Mar-13 26-Mar-13 A 17-Mar-13 17-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-004 Quick Coupling Valve Rain Bird 44LRC U.S.A Rainbird D-80-134A-70 B 18-03-13 26-Mar-13 A 17-Mar-13 15-Jun-13
RGCP-472-PI-AG-005 ROTOR SPRINKLERS Rain Bird 5500 Series USA Rainbird 180.00 no. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 31-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-006 Bubblers Rain Bird 1400 Series U.S.A Rainbird D-80-134A-70 B 18-03-13 31-Mar-13 A 29-Apr-13 04-Jun-13
RGCP-472-PI-AG-007 Irrigation Controller Rain BirdESP-LXME
ControllerU.S.A Rainbird D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-008 Valve Boxes Jumbo Rectangular Series Rain Bird VB-JMB U.S.A Rainbird 25.00 no. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-009 Sprayer Pop-Up sprinkler Rain BirdUNI Spray
SeriesU.S.A Rainbird 200.00 no. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-010 XFD on Surface Driline Rain Bird U.S.A Rainbird D-80-134A-74 A 13-03-13 18-Apr-13 D 04-Jun-13
RGCP-472-PI-AG-011 Agriculture Soil Mix S-80-134A-003 Qatar Municipality 12396.17 m3 D-80-134A-70 13-Apr-13 A 28-Feb-13 25-Apr-13 07-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-012 Irrigation Control Cable Paige Rain Bird U.S.A Rainbird 5000.00 m D-80-134A-70 13-Apr-13 A 27-Feb-13 25-Apr-13 04-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13
RGCP-472-PI-AG-013 Compost S-80-134A-003 KSAAL Safi Fertilizer
Factory6000.00 bag D-80-134A-70 12-Mar-13 A 28-Feb-13 26-Mar-13 07-Mar-13 A 30-Mar-13 17-Apr-13 08-May-13 04-May-13
RGCP-472-PI-AG-014 Peat Moss S-80-134A-003SAB Turba
Peat 340Germany SAB Syker 500.00 bag D-80-134A-70 12-Mar-13 B 26-Mar-13 26-Mar-13 28-Mar-13 A 30-Mar-13 17-Apr-13 08-May-13 04-May-13
RGCP-472-PI-AG-018 PLANT LIST S-80-134A-003 KSA & Qatar A.G D-80-134A-71 12-Mar-13 A 13-Mar-13 26-Mar-13 24-Mar-13 A 30-Mar-13 17-Apr-13 08-Apr-13 04-May-13
RGCP-472-PI-AG-019IRRIGATION & PLUMBING WARNING
TAPE200MM
Uniplast
QatarA 22-May-13 30-May-13 A
RGCP-472-PI-AG-020 MULCH A 24-Sep-13 26-Sep-13 A
RGCP-472-EL-001 BOLLARD LIGHT (70 WATTS)
1000 mm hight - corrosion
resistant die-cast aluminum IP65 ,
UV-stabilized diffuser with integral
junction box - 15 amp single pole
and neutral cut-out/MCB
Qatar Q-Light 12.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 03-Mar-13 10-Apr-13 07-Mar-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013
RGCP-472-EL-002 POLE LIGHT 6M
6 meters hight hot dip galvanized
steel octagonal type pole with
removable door of IP55 - ready for
mounting HPSV flood light fittings
Qatar Q-Light 14.00 no. D-80-134A-284 section 10.2 27-Mar-13 A 03-Mar-13 10-Apr-13 10-Mar-13 A 15-Apr-13 20-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-003 HPSV FLOOD LIGHT (100 WATTS)Die-cast aluminium housing with
heat resistant glass of IP65 and
corrosion resistant material
D-80-134A-284 section 10.3 27-Mar-13 A 03-Apr-13 10-Apr-13 07-Apr-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013
RGCP-472-EL-004 LIGHTING POLE CUTOUT BOX15 amp single pole and neutral cut-
out/MCB of IP55D-80-134A-284 section 10.12 30-Jul-13 B 28-Apr-13 10-Apr-13 01-Aug-13 A 15-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-005 WALL MOUNTED WALKWAY LIGHT (36 WATTS)
Decorative ressed square shape
light of IP65, cool white light lamp
and die-cast aluminium sheet
reflector
Qatar Q-Light 8.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013
RGCP-472-EL-006 CEILING / WALL MOUNTED LIGHTS (1 X 36 WATTS) Rectangular flurocent type with
single linear 36 watts lamp and
polycarbonate cover of IP65
Qatar Q-Light 9.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013
RGCP-472-EL-007 CEILING MOUNTED LIGHTS (2X 36 WATTS)Rectangular flurocent type with
double linear 36 watts lamp and
polycarbonate cover of IP65
Qatar Q-Light 8.00 no. D-80-134A-284 section 10.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013
ELECTRICAL
AS LISTED
Page 6 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-EL-010 FEEDER PILLARStainless steel encloure of IP55
with a protective canopy fitted
with a photocell and timer
D-80-134A-283 27-Mar-13 B 18-Aug-13 26-Aug-13 C
RGCP-472-EL-011 CABLE LUGS
Nickel plated brass weather proof
cable gland of IP55 High
conductivity non-insulated tinned
copper
Qatar FANCY 325.00 no. D-80-134A-284 section 10.5 27-Mar-13 A 07-Mar-13 10-Apr-13 12-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013
RGCP-472-EL-011 CABLE GLAND
Nickel plated brass weather proof
cable gland of IP55 High
conductivity non-insulated tinned
copper
Qatar FANCY 55.00 no. D-80-134A-284 section 10.5 27-Mar-13 A 07-Mar-13 10-Apr-13 12-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013
RGCP-472-EL-012 PVC PIPES, JUNCTION BOXES AND ACCESSORIESThick-walled havey duty type , UV
stabilized materialQatar Al-Amer Group 300.00 no.
D-80-134A-284 section 10.9 ,
10.1127-Mar-13 A 10-Mar-13 10-Apr-13 14-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013
RGCP-472-EL-013 GI PIPES AND ACCESSORIES Hot dip galvanized steel of IP55 Qatar FANCY 200.00 no.D-80-134A-284 section 10.9 ,
10.1127-Mar-13 A 04-Mar-13 10-Apr-13 11-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-013-1 GI PIPES AND ACCESSORIES 25-Aug-13 C 26-Aug-13 C
RGCP-472-EL-014 XLPE/SWA/PVC CABLES - PVC/ECC CABLESArmoured cables of hight
conductivity copper Qatar Al-Amer Group 1000.00 m D-80-134A-284 section 10.4 27-Mar-13 A 18-Mar-13 10-Apr-13 18-Mar-13 B 15-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-014-1 ELECTRICAL CABLES A 19-May-13 22-May-13 D
RGCP-472-EL-014-2 ELECTRICAL CABLES (Ducab) 25-Aug-13 B 26-Aug-13 C
RGCP-472-EL-015 HR PVC FLEXIBLE CABLES Copper 3 core flexible cables Qatar Al-Amer Group D-80-134A-284 section 10.4 27-Mar-13 A 13-Mar-13 10-Apr-13 18-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-017 CABLES WARNING TAPEYellow Danger marker PVC
strip/tapeQatar UNIPLAST 300.00 m
Refrence to D-80-134A-284
section 10.627-Mar-13 A 20-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 22-Apr-13 04-Jun-13 15/05/2013
Page 7 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
RGCP-472-EL-018 CABLE TRAY /TRUNKINGRefrence to D-80-134A-284
section 10.627-Mar-13 A 18-Mar-13 10-Apr-13 20-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-019 WIRING ACCESSORIESRefrence to D-80-134A-284
section 10.627-Mar-13 A 15-May-13 22-May-13 A 15-Apr-13 04-Jun-13 20/05/2013
RGCP-472-EL-020 PRECAST CABLE TILE PROTECTION AND CABLE ROUTE MARKERS 31-Aug-13 A 05-Sep-13 A
RGCP-472-EL-021 LABELS FOR WIRING 27-Aug-13 A 05-Sep-13 A
RGCP-472-EL-022 EARTHING MATERIALS 31-Aug-13 A 05-Sep-13 A
RGCP-472-EL-023 POLYURATHANE FOAM CAULKING 04-Sep-13 A 11-Sep-13 A
RGCP-472-EL-024 HEAT SHHRINK SLEEVES FOR CABLES SHEZNON 04-Sep-13 A 23-Oct-13 24-Oct-13 A
RGCP-472-EL-025 PRE CAST CABLE ROUTE MRKERS 12-Nov-13 A 11-Dec-13 A
RGCP-472-EL-026 SURFACE MOUNTED ELECTRICAL JUNCTION BOX FOR LIGHTING CABLES 13-Nov-13 A 20-Nov-13 A
RGCP-472-EL-027 UPVC Sleeves & Accessories for Electrical 13-Jan-14 A 20-Jan-14 A
RGCP-472-EL-028 Material Submittal-Electrical Cables 08-Jun-14 A 12-Jun-14 A
RGCP-472-PI-016 MEP MATERIAL FOR WATER FEATURE 05-Oct-13 B A
1. Fountain Nozzle
2. Jet Nozzle
3. Sculpture Water Pump
4. Cascade Water Pump
5. Jet Nozzle and Filters
6. Scupture sand filter
7. Cascade water sand filter
8. Drain Pump/Submersible Pump
9. Valve and fittings
10. Main Drain
11. Inlet for water cascade
12. Overflow filter
13. Suction / Vacuum Filter
14. Water level regulator
15. Underwater lights for nozzle
16. Underwater light for fountain base
FOUNTAIN
Page 8 of 9 Updated on : 7/7/2014
A Approved B Approved W Comments C DReviwed with
CommentsR Rejected Submitted
PLAN DATE REV ACTUAL REQD DATE OF
APPROVAL
ACTUAL DATE OF
APPROVALSTATUS
PLANNED DATE FOR
ORDER
ACTUAL DATE OF
ORDERDATE REQD. AT SITE
EXPECTED DATE OF
DELIVERY
ACTUAL DATE OF
DELIVERY
DESCRIPTION OF MATERIALSUBMITTAL NO. QTY REQD. UNIT
PROCUREMENT LOG
PROCUREMENTCOUNTRY OF
ORIGINSPECIFICATION MODEL MANUFACTURER
SUBMITTAL
RASGAS SPEC REF.
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN
LEGEND
APPROVAL
Reviewed With No
Comments
17. Transformer for Lights
18. Underwater LED lights
19. Power supply for lighting
21. Connector for lights
22, Under water junction box
23. Chemical Dosing Pot
RGCP-472-PI-017 PRESSURE REDUCING VALVE 12-Nov-13 A 03-Dec-13 A
RGCP-472-PI-018 Gate Valve 12-Nov-13 A 03-Dec-13 A
RGCP-472-PI-019ELECTRIC JUNCTION BOX FOR TOP OF WATER
FEATURE WALL FOR LIGHTING13-Nov-13 A 20-Nov-13 A
RGCP-472-PI-020CAST IRON Y STRAINER FOR WATER FEATURE
ECON TYPE STAINER18-Nov-13 A 03-Dec-13 A
RGCP-472-PI-021PRESURE REDUCING VALVE FOR WATER
FEATURE25-Nov-13 A 03-Dec-13 A
RGCP-472-PI-022Fresh Air Centrifugal in Line Duct Fans for
Pump Room18-Jun-14 A
RGCP-472-PI-023 MOTORIZED VALVES
RGCP-472-PI-024 PLC
RGCP-472-PI-025 PUMP ROOM LIGHTS
RGCP-472-PI-026 PUMP ROOM EARTHING
Page 9 of 9 Updated on : 7/7/2014
10. DESIGN DRAWING SUBMITTAL LOG
A B C D Submitted
Rev Submit Date Reply DateApproval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
Status
1 Design calculation for balancing tank C-80-134A-006 RGCP-472-T-QTR-642 16-Jan-13 A 17-Jan-13 23-Jan-13 D E 17-Aug-13 21-Aug-13 A 0 05-Sep-13 30-Sep-13 IFC 2
2 Design calculation for Signage C-80-134A-007 RGCP-472-T-QTR-641 21-Jan-13 A 24-Feb-13 27-Feb-13 D C 08-Jul-13 25-Jul-13 A 0 05-Sep-13 30-Sep-13 IFC All Zones
3 Uncovered carpark lighting calculation C-80-134A-008 RGCP-472-T-QTR-166 21-Jan-13 A 22-Jan-13 23-Jan-13 B B 10-Feb-13 14-Feb-13 A 0 26-Feb-13 27-Feb-13 IFC 1,14
4 Bus Plaza, Entrance Plaza, Covered Parking & Lighting Calculations C-80-134A-009 RGCP-472-T-QTR-292 A 03-Feb-13 5-Feb-13 B 0 31-Mar-13 1-Apr-13 IFC 19
5 LV Cable Sizing Calculation C-80-134A-010 RGCP-472-T-QTR-520 A 13-May-13 15-May-13 B 0 19-Jun-13 23-Jun-13 IFC
6 Water Feature Plumbing works Calculation C-80-134A-011 RGCP-472-T-QTR-750 A 10-Mar-13 20-Mar-13 C C 01-Oct-13 03-Oct-13 D 1 12-Nov-13 04-Dec-13 IFC 2
7 Pump Room Calculation Heat Loading C-80-134A-011A RGCP-472-T-QTR-860 0 16-Dec-13 24-Dec-13 D 1 24-Apr-14 19-May-14 B
8 Design Calculation for walkway Shade (Type 1) C-80-134A-012 RGCP-472-T-QTR-741 A 03-Apr-13 10-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 6
9 Design Calculation for walkway Shade (Type 2) C-80-134A-013 RGCP-472-T-QTR-742 A 03-Apr-13 10-Apr-13 D E 07-Oct-13 08-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 7,12,15
11 Design Calculation for Warehouse Plaza Shade XK-32 and XK-03 C-80-134A-015 RGCP-472-T-QTR-698 A 03-Apr-13 09-Apr-13 D E 12-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC 11
12 Pump Room Lighting Calculation C-80-134A-016 RGCP-472-T-QTR-634 A 28-Apr-13 01-May-13 D C 11-Aug-13 28-Aug-13 A 0 31-Aug-13 05-Sep-13 IFC 11
13 Design Calculation for Flag pole C-80-134A-017 RGCP-472-T-QTR-640 A 11-May-13 14-May-13 D C 18-Jul-13 04-Aug-13 A 0 12-Sep-13 23-Sep-13 IFC
14 Design Calculation for Carpark Shade C-80-134A-018 RGCP-472-T-QTR-697 A 14-May-13 16-May-13 D E 16-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC
15 Design Calculation for Mosque Plaza C-80-134A-019 RGCP-472-T-QTR-695 A 05-Sep-13 09-Sep-13 D B 16-Sep-13 18-Sep-13 A 0 24-Sep-13 26-Sep-13 IFC
16 Design Calculation for bus plaza near Admin C-80-134A-020 RGCP-472-T-QTR-696 A 24-Aug-13 27-Aug-13 D C 05-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC
17 Adequacy Check for Power Source C-80-134A-021 RGCP-472-T-QTR-556 A 29-Jun-13 30-Jun-13 D B 08-Jul-13 10-Jul-13 A 0 16-Jul-13 29-Jul-13 IFC
18 LV Cable Schedule C-80-134A-022 RGCP-472-T-QTR-764 A 05-Sep-13 05-Sep-13 B 1 29-Sep-13 29-Sep-13 A 2 13-Nov-13 01-Dec-13 IFC
19 Structural Calculation for Water Feature C-80-134A-028 RGCP-472-T-QTR-639 A 11-Jul-13 29-Jul-13 B B 11-Aug-13 19-Aug-13 A 0 05-Sep-13 23-Sep-13 IFC
20 Design Calculation for Bus Plaza Shade near XK-26 C-80-134A-029 RGCP-472-T-QTR-718 A 18/Aug/13 22/Aug/13 D B 24-Sep-13 26-Sep-13 A 0 05-Oct-13 06-Oct-13 IFC
21 Structural Calculations for 0.50m and 1.00m Retaining Walls C-80-134A-030 RGCP-472-T-QTR-827 A 06-Jan-14 12-Jan-14 A
22 Structural Calculations for Special Foundation Cases for shade C-80-134A-031 RGCP-472-T-QTR-840 0 22-Feb-14 23-Feb-14 B
23 Structural Calculation for Enclosure Calculation C-80-134A-032 RGCP-472-T-QTR-854 A 18-Mar-14 20-Mar-14 A
24 Structural Calculation for water Tank Top Slab C-80-134A-033 RGCP-472-T-QTR-850 A 11-Mar-14 11-Mar-14 A
25 Structural Calculations for Drop Sculpture Structure C-80-134A-034 RGCP-472-T-QTR-895 A 13-May-14 29-May-14 D
26Structural Calculation for shades foundation Modification at axes B-1
and B-3 (Bus plaza near XK-26)C-80-134A-035 RGCP-472-T-QTR-879 A 24-Apr-14 24-Apr-14 A
27 Structural Calculation for V-Ditch Slabs C-80-134A-036 RGCP-472-T-QTR-884 A 24-Apr-14 24-Apr-14 A
1 General Notes D-80-134A-101 1 of 1 RGCP-472-T-QTR-085 20-Jan-13 A 03-Feb-13 10-Feb-13 C 0 21-Feb-13 24-Feb-13 IFC All Zones
2 Demolition And Reinstatement works layout D-80-134A-105 1 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones
3 Demolition And Reinstatement works layout D-80-134A-105 2 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones
4 Demolition And Reinstatement works layout D-80-134A-105 3 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones
5 Demolition And Reinstatement works layout D-80-134A-105 4 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones
6 Work Sequence Layout D-80-134A-107 1 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones
7 Work Sequence Layout D-80-134A-107 2 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones
8 Work Sequence Layout D-80-134A-107 3 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones
9 Work Sequence Layout D-80-134A-107 4 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones
10Planting & Irrigation Works Demolition & Reinstatement of Planting
WorkD-80-134A-068X 1 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11
11Planting & Irrigation Works Demolition & Reinstatement of Planting
WorkD-80-134A-068X 2 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11
12Planting & Irrigation Works Demolition & Reinstatement of Planting
WorkD-80-134A-068X 3 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11
13Planting & Irrigation Works Demolition & Reinstatement of Planting
WorkD-80-134A-068X 4 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11
14Planting & Irrigation Works Demolition & Reinstatement of Planting
WorkD-80-134A-068X 5 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2,3,4,6,7,8,9,11
15 General Layout for Civil Works D-80-134A-103 1 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
16 General Layout for Civil Works D-80-134A-103 2 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
17 General Layout for Civil Works D-80-134A-103 3 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
18 General Layout for Civil Works D-80-134A-103 4 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 1 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
19 General Layout for Civil Works D-80-134A-103 5 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
20 General Layout for Civil Works D-80-134A-103 6 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472
No of
Sheets
LEGEND
Zone
DESIGN DRAWING SUBMITTAL LOG
Issued for Construction As-Built
Approved/IFC Approved with
Comments
Reviewed W No
Comments
Reviewed with
Comments
Issue for ApprovalQBEC Transmittal
Reference
Sl.
No.Drawing Title
Issue for Review
DESIGN CALCULATIONS
Plan
Submission
date
Drawing Number
GENERAL
MDR_Master Document Register 1 of 6 Updated on : 7/7/2014
A B C D Submitted
Rev Submit Date Reply DateApproval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
Status
EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472
No of
Sheets
LEGEND
Zone
DESIGN DRAWING SUBMITTAL LOG
Issued for Construction As-Built
Approved/IFC Approved with
Comments
Reviewed W No
Comments
Reviewed with
Comments
Issue for ApprovalQBEC Transmittal
Reference
Sl.
No.Drawing Title
Issue for ReviewPlan Submission
date
Drawing Number
21 General Layout for Civil Works D-80-134A-103 7 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
22 General Layout for Civil Works D-80-134A-103 8 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
23 General Layout for Civil Works D-80-134A-103 9 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
24 General Layout for Civil Works D-80-134A-103 10 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
25 General Layout for Civil Works D-80-134A-103 11 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
26 General Layout for Civil Works D-80-134A-103 12 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
26 General Layout for Civil Works D-80-134A-103 13 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
26 General Layout for Civil Works D-80-134A-103 14 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones
27 General Layout for Civil Works D-80-134A-103 15 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-13 B All Zones
28 Under Ground Maintenance Complex(XK-10) Area Plot Plan RG-2044 1 of 1 12-Nov-13 B 05-Dec-13 B All Zones
29 Walkway Shade Structure Layout &Details D-80-134AX-56 1 TO 35 RGCP-472-T-QTR-832 A 28-Jan-14 0 28-Jan-14 02-Feb-14 B All Zones
1 General Landscape Layout D-80-134A-102 1 of 3 RGCP-472-T-QTR-820 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones
2 General Landscape Layout D-80-134A-102 2 of 3 RGCP-472-T-QTR-820 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones
3 General Landscape Layout D-80-134A-102 3 of 3 RGCP-472-T-QTR-820 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones
4 General Layout for Walkways/ Pavement D-80-134A-096 1 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
5 General Layout for Walkways/ Pavement D-80-134A-096 2 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
6 General Layout for Walkways/ Pavement D-80-134A-096 3 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
7 General Layout for Walkways/ Pavement D-80-134A-096 4 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
8 General Layout for Walkways/ Pavement D-80-134A-096 5 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
9 General Layout for Walkways/ Pavement D-80-134A-096 6 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
10 General Layout for Walkways/ Pavement D-80-134A-096 7 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
11 General Layout for Walkways/ Pavement D-80-134A-096 8 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
12 General Layout for Walkways/ Pavement D-80-134A-096 9 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
13 General Layout for Walkways/ Pavement D-80-134A-096 10 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
14 General Layout for Walkways/ Pavement D-80-134A-096 11 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
15 General Layout for Walkways/ Pavement D-80-134A-096 12 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
16 General Layout for Walkways/ Pavement D-80-134A-096 13 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
17 General Layout for Walkways/ Pavement D-80-134A-096 14 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
18 General Layout for Walkways/ Pavement D-80-134A-096 15 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
19 General Layout for Walkways/ Pavement D-80-134A-096 16 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
20 General Layout for Walkways/ Pavement D-80-134A-096 17 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
21 General Layout for Walkways/ Pavement D-80-134A-096 18 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
22 General Layout for Walkways/ Pavement D-80-134A-096 19 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
23 General Layout for Walkways/ Pavement D-80-134A-096 20 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones
24 General Layout For Planting D-80-134A-068 1 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
25 General Layout For Planting D-80-134A-068 2 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
26 General Layout For Planting D-80-134A-068 3 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
27 General Layout For Planting D-80-134A-068 4 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
28 General Layout For Planting D-80-134A-068 5 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
29 General Layout For Planting D-80-134A-068 6 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
30 General Layout For Planting D-80-134A-068 7 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones
31 Typical Planting Details D-80-134A-069 1 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones
32 Typical Planting Details D-80-134A-069 2 of 4 RGCP-472-T-QTR-824 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 1 2-Jan-14 7-Jan-14 IFC All Zones
33 Typical Planting Details D-80-134A-069 3 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones
34 Typical Planting Details D-80-134A-069 4 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones
35 Entrance Plaza - Detailed Plan D-80-134A-108 1 of 1 RGCP-472-T-QTR-454 21-Jan-13 A 21-Feb-13 28-Feb-13 D B 13-May-13 16-May-13 B 0 25-May-13 28-May-13 IFC 2
36 Entrance Plaza - Detail Section and Details D-80-134A-109 1 of 2 RGCP-472-T-QTR-679 21/Jan/13 A 21-Feb-13 28-Feb-13 D D 18-Jul-13 21-Jul-13 B 0 18-Sep-13 03-Oct-13 IFC
LANDSCAPING AND CIVIL
MDR_Master Document Register 2 of 6 Updated on : 7/7/2014
A B C D Submitted
Rev Submit Date Reply DateApproval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
Status
EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472
No of
Sheets
LEGEND
Zone
DESIGN DRAWING SUBMITTAL LOG
Issued for Construction As-Built
Approved/IFC Approved with
Comments
Reviewed W No
Comments
Reviewed with
Comments
Issue for ApprovalQBEC Transmittal
Reference
Sl.
No.Drawing Title
Issue for ReviewPlan Submission
date
Drawing Number
37 Entrance Plaza - Detail Section and Details D-80-134A-109 2 of 2 RGCP-472-T-QTR-679 21/Jan/13 A 21-Feb-13 28-Feb-13 D D 18-Jul-13 21-Jul-13 B 0 18-Sep-13 03-Oct-13 IFC
38 Water Feature Details D-80-134A-110 1 of 1 RGCP-472-T-QTR-754 27-Jan-13 A 21-Feb-13 27-Feb-13 D 0 18-Sep-13 23-Sep-13 B 2 28-Oct-13 29-Oct-13 IFC 2
39 Civil Work Fountain Plan Details D-80-134A-192 1 of 2 RGCP-472-T-QTR-686 27-Jan-13 A 21-Feb-13 27-Feb-13 D D 11-Sep-13 15-Sep-13 A 0 24-Sep-13 02-Oct-13 IFC 2
40 Civil Work Fountain Plan Details D-80-134A-192 2 of 2 RGCP-472-T-QTR-686 27-Jan-13 A 21-Feb-13 27-Feb-13 D D 11-Sep-13 15-Sep-13 A 0 24-Sep-13 02-Oct-13 IFC 2
41 Bus Plaza in Front of Admin (Typ. Of 2 noc.)-plan section and details D-80-134A-194 1 of 1 RGCP-472-T-QTR-270 24-Jan-13 A 11-Feb-13 21-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 2
42 Bus plaza near XK-26-Plan, Section and Details D-80-134A-195 1 of 1 RGCP-472-T-QTR-271 21-Jan-13 A 11-Feb-13 19-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 9-Apr-13 IFC All Zones
43 Mosque Plaza Detail -Plan ,Section and Details D-80-134A-197 1 of 1 RGCP-472-T-QTR-504 28-Jan-13 A 12-May-13 14-May-13 D B 25-May-13 28-May-13 B 0 10-Jun-13 11-Jun-13 IFC 4
44 Open Parking Area 1 at Admin - Detail-Plan D-80-134A-090 1 of 1 RGCP-472-T-QTR-432 24-Jan-13 A 17-Feb-13 21-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 3-Apr-13 IFC 1
45 Open Parking Area 1 at Admin - Sections D-80-134A-091 1 of 1 RGCP-472-T-QTR-433 24-Jan-13 A 17-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 22/5/2013 BY EMAIL 1
46 Parking Area 2 at XK-10-Detail Plan and Sections D-80-134A-093 1 of 1 RGCP-472-T-QTR-434 24-Jan-13 A 17-Feb-13 24-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 14-Apr-13 IFC 1
47 Parking Area 3 at XK-10-Detail Plan and Sections D-80-134A-095 1 of 1 RGCP-472-T-QTR-321 24-Jan-13 A 17-Feb-13 24-Feb-13 D B 13-Mar-13 20-Mar-13 B 0 9-Apr-13 11-Apr-13 IFC 19
48 Civil Work Structural details Sheet 1 to 2 D-80-134A-097 1 of 2 RGCP-472-T-QTR-623 22-Jul-13 A 22-Jul-13 24-Jul-13 D C 24-Aug-13 26-Aug-13 B 0 29-Aug-13 08-Sep-13 IFC
49 Civil Work Structural details Sheet 2 to 2 D-80-134A-097 2 of 2 RGCP-472-T-QTR-623 22-Jul-13 A 22-Jul-13 24-Jul-13 D C 24-Aug-13 26-Aug-13 B 0 29-Aug-13 08-Sep-13 IFC
50 Courtyard Detail-Plan, Section D-80-134A-098 1 of 1 RGCP-472-T-QTR-267 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 1
51 XK-03Plaza Detail -Plan ,Section and Details D-80-134A-099 1 of 1 RGCP-472-T-QTR-268 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 17
52 XK-32 Ware House Plaza Detail - Plan, Section and Details D-80-134A-111A 1 of 1 RGCP-472-T-QTR-269 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-03-13 28-Mar-13 IFC 11
53 General Civil Works Details D-80-134A-104 1 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28-Feb-13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones
54 General Civil Works Details D-80-134A-104 2 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28-Feb-13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones
55 General Civil Works Details D-80-134A-104 3 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28/Feb/13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones
56 Reinstatement works details D-80-134A-106 1 of 1 RGCP-472-T-QTR-609 24-Jan-13 A 09-Apr-13 11-Apr-13 D B 18-Apr-13 21-Apr-13 A 0 27-Aug-13 03-Sep-13 IFC All Zones
57 Foundation for signage D-80-134A-081 1 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones
58 Foundation for signage D-80-134A-081 2 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones
59 Foundation for signage D-80-134A-081 3 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones
60 Water Tank General Arrangement D-80-134A-121 1 of 1 RGCP-472-T-QTR-519 B 16-Jun-13 16-Jun-13 B 0 18-Jun-13 29-Jul-13 IFC
61 Civil Works water tank structural detail D-80-134A-122 1 of 1 RGCP-472-T-QTR-849 A 23-Jan-13 30-Jan-13 D B 26-Aug-13 06-Oct-13 B C 11-Mar-14 11-Mar-14 B
62 Civil works Entrance Plaza Tile Layout D-80-134AX-055 1 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC
63 Civil works Entrance Plaza Tile Layout D-80-134AX-055 2 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC
64 Civil works Entrance Plaza Tile Layout D-80-134AX-055 3 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC
65 Civil Works Fountain Structural Detail sheet 1of 6 D-80-134A-470A 1 o f6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D
66 Civil Works Fountain Structural Detail sheet 2 of 6 D-80-134A-470A 2 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D
67 Civil Works Fountain Structural Detail sheet 3of 6 D-80-134A-470A 3 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D
68 Civil Works Fountain Structural Detail sheet 4 to 6 D-80-134A-470A 4 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D
69 Civil Works Fountain Structural Detail sheet 5 to 6 D-80-134A-470A 5 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D
69 Civil Works Fountain Structural Detail sheet 6 to 6 D-80-134A-470A 6 of 6 RGCP-472-T-QTR-917 B 19-Jun-14 23-Jun-14 D
69Bus Plaza Shade Structure near XK-26 modification of foundation in
Grid B-1 and B-3D-80-134AX-60 RGCP-472-T-QTR-880 A 22-Apr-14 24-Apr-14 B
69 Civil Works-V-Ditch Cover Slab Details D-80-134AX-61 RGCP-472-T-QTR-901 A 24-Apr-14 22-May-14 B B 28-May-14 06-Jun-14 A
1 Bus Plaza Shade Structure -Plan, Elevation and Details D-80-134A-102A 1 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
2 Bus Plaza Shade Structure -Plan, Elevation and Details D-80-134A-102A 2 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
3 Bus Plaza Shade Structure -Plan, Elevation and Details D-80-134A-102A 3 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
4 Bus Plaza Shade Structure Near XK-26 -Plan, Elevation and Details D-80-134A-103A 1 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones
5 Bus Plaza Shade Structure Near XK-26 -Plan, Elevation and Details D-80-134A-103A 2 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones
6 Bus Plaza Shade Structure Near XK-26 -Plan, Elevation and Details D-80-134A-103A 3 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones
7 Mosque Plaza Shade Structure - Plan, Elevation and Details D-80-134A-104A 1 of 2 RGCP-472-T-QTR-690 5-Sep-13 A 5-Sep-13 9-Sep-13 D B 16-Sep-13 19-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
8 Mosque Plaza Shade Structure - Plan, Elevation and Details D-80-134A-104A 2 of 2 RGCP-472-T-QTR-690 5-Sep-13 A 5-Sep-13 9-Sep-13 D B 16-Sep-13 19-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
9 XK-03Plaza Shade Structure -Plan , Elevation and Details D-80-134A-105A 1 of 2 RGCP-472-T-QTR-691 A 03-Apr-13 9-Apr-13 D D 12-Sep-13 15-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
10 XK-03Plaza Shade Structure -Plan , Elevation and Details D-80-134A-105A 2 of 2 RGCP-472-T-QTR-691 A 03-Apr-13 9-Apr-13 D D 12-Sep-13 15-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
11 XK-32 Warehouse Plaza Shade Structure -Plan ,Elevation and Details D-80-134A-106A 1 of 2 RGCP-472-T-QTR-692 A 03-Apr-13 9-Apr-13 D C 29-Aug-13 11-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
SHADES
MDR_Master Document Register 3 of 6 Updated on : 7/7/2014
A B C D Submitted
Rev Submit Date Reply DateApproval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
StatusRev Submit Date Reply Date
Approval
Status
EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472
No of
Sheets
LEGEND
Zone
DESIGN DRAWING SUBMITTAL LOG
Issued for Construction As-Built
Approved/IFC Approved with
Comments
Reviewed W No
Comments
Reviewed with
Comments
Issue for ApprovalQBEC Transmittal
Reference
Sl.
No.Drawing Title
Issue for ReviewPlan Submission
date
Drawing Number
12 XK-32 Warehouse Plaza Shade Structure -Plan ,Elevation and Details D-80-134A-106A 2 of 2 RGCP-472-T-QTR-692 A 03-Apr-13 9-Apr-13 D C 29-Aug-13 11-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones
13Walkway shade structure (Type 1) typical plan, elevation section and
detailsD-80-134A-107A 1 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC All Zones
14Walkway shade structure (Type 2) typical plan, elevation section and
detailsD-80-134A-107A 2 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC All Zones
15 Walkway shade stuctures typical plan, elevation section and details D-80-134A-107A 3 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC
16 Parking Area 2 at XK-10 - Shade Structure -Plan , Elevation and Details D-80-134A-108A 1 of 2 RGCP-472-T-QTR-693 A 16-May-13 21-May-13 D 1 05-Sep-13 16-Sep-13 B 2 24-Sep-13 25-Sep-13 IFC All Zones
17 Parking Area 2 at XK-10 - Shade Structure -Plan , Elevation and Details D-80-134A-108A 2 of 2 RGCP-472-T-QTR-693 A 16-May-13 21-May-13 D 1 05-Sep-13 16-Sep-13 B 2 24-Sep-13 25-Sep-13 IFC All Zones
1 General Layout for signage location 1 D-80-134A-075 1 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
2 General Layout for signage location 2 D-80-134A-075 2 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
3 General Layout for signage location 3 D-80-134A-075 3 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
4 General Layout for signage location 4 D-80-134A-075 4 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
5 General Layout for signage location 5 D-80-134A-075 5 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
6 General Layout for signage location 6 D-80-134A-075 6 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
7 General Layout for signage location 7 D-80-134A-075 7 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
8 General Layout for signage location 8 D-80-134A-075 8 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
9 General Layout for signage location 9 D-80-134A-075 9 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones
10 General Layout for Traffic Signage D-80-134A-076 1 of 2 RGCP-472-T-QTR-782 A 21-Apr-13 22-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 23-Nov-13 26-Nov-13 IFC All Zones
11 General Layout for Traffic Signage D-80-134A-076 2 of 2 RGCP-472-T-QTR-782 A 21-Apr-13 22-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 23-Nov-13 26-Nov-13 IFC All Zones
12 Typical Signage Detail - Plan, Elevation and Details D-80-134A-077 1 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones
13 Typical Signage Detail - Plan, Elevation and Details D-80-134A-077 2 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones
14 Typical Signage Detail - Plan, Elevation and Details D-80-134A-077 3 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones
15 Schedule of Signs D-80-134A-078 1 of 1 RGCP-472-T-QTR-482 A 31-Mar-13 9-Apr-13 D B 7-May-13 15-May-13 D 0 2-Jun-13 10-Jun-13 IFC All Zones
16 Traffic Signage Details D-80-134A-079 1 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones
17 Traffic Signage Details D-80-134A-079 2 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones
18 Traffic Signage Details D-80-134A-079 3 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones
19 Traffic Signage Details D-80-134A-079 4 of 4 RGCP-472-T-QTR-783 A 31-Mar-13 9-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 24-Nov-13 26-Nov-13 IFC All Zones
20 Road Marking Details D-80-134A-140 1 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC All Zones
21 Road Marking Details D-80-134A-140 2 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC
22 Road Marking Details D-80-134A-140 3 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC
1 Irrigation Main line (Primary and Secondary) layout D-80-134A-002A 1 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones
2 Irrigation Main line (Primary and Secondary) layout D-80-134A-003A 2 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones
3 Irrigation Main line (Primary and Secondary) layout D-80-134A-004A 3 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones
4 Irrigation Main line (Primary and Secondary) layout D-80-134A-005A 4 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones
5 Irrigation Main line (Primary and Secondary) layout D-80-134A-006A 5 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones
6 Irrigation Layout lateral Lines D-80-134A-007A 1 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones
7 Irrigation Layout lateral Lines D-80-134A-008A 2 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones
8 Irrigation Layout lateral Lines D-80-134A-009A 3 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones
9 Irrigation Layout lateral Lines D-80-134A-010A 4 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones
10 Irrigation Layout lateral Lines D-80-134A-011A 5 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones
11 Solenoid Valve Schedule D-80-134A-012A 1 of 1 RGCP-472-T-QTR-445 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 D 0 21-May-13 23-May-13 IFC All Zones
12 Piping & Instrumentation Diagram - irrigation & Landscape D-80-134A-013A 1 of 1 RGCP-472-T-QTR-700 A 31-Mar-13 2-Apr-13 A 1 17-Aug-13 3-Sep-13 B 2 24-Sep-13 2-Oct-13 IF