Procurement Contract Manual 1

Table of Contents 2 DEFINITIONS 3 CHAPTER 1: Introduction 4

Roles and Responsibilities 4 Department 4 Procurement Services Team 4 Other University Offices 5

Signature Authority 7 Standard University Agreements/Contracts 8

CHAPTER 2: Preparing for a Contract Submission 9 Gather Contract Details 9 Locate Supplier ID 10 Register a Supplier in the Financial System 11 Facility Use Agreements 14

CHAPTER 3: Contract Review Process 15 Instructions to Submit a Contract for Review 15 Where do I find my Signed Agreement? 25

CHAPTER 4: Administration of Contracts 26 Contract Status 27 Contract Amendments 28

CHAPTER 5: Tutorials 44 How to Submit a Contract 44 How to Check the Status of a Contract and Search Previously Signed Contracts 45 How to Submit a Contract Amendment 46

CHAPTER 6: Resources 47 Employee vs. Independent Contractor 47 Checklist for Determination of Independent Contractor Status 47 Purchases from Employees 48 State of North Carolina Contract Administration and Monitoring Guide 48

CHAPTER 7: Best Practices 49

Page 3: Procurement Contract Manual - NCSU

Page 3 | 49 Return to Table of Contents

DEFINITIONS

Contract An agreement between two or more parties governed by a written document.

Goods Products or commodities used in everyday business activities.

Independent Contractor

Individual or supplier that provides a service for a specific amount of time.

Services Aid or helpful activity performed by a person or company provided under contract by an entity not affiliated with the University.

Signature Authority Only the Chancellor and those delegated by the Chancellor have Signature Authority to execute contracts that legally bind the University to an outside party.

Sole Source­ Any contract entered into without a competitive process, based on a justification that only one known source exists or that only one single supplier can fulfill the requirements.

Standard University Agreements

The Office of General Counsel (OGC) has drafted a set of Standard University Agreements that can be used for: procurement of goods or services, allowing others to use University facilities, University personnel providing services for groups or individuals not related to the University, and others.

Page 4: Procurement Contract Manual - NCSU

Page 4 | 49 Return to Table of Contents

CHAPTER 1: Introduction

A contract is any document that legally binds the University to another party. Contracts can take many forms, including affiliation agreements, memoranda of understanding (MOUs), terms and conditions (T&Cs), letters of agreement, online click­through agreements, and a variety of other labels. Not all contracts involve the payment of money.

Roles and Responsibilities

Department > Upload contract and all necessary documents into Procurement Contract Portal. > Be available for follow­up questions, when needed. > Understand the scope of the contract. > Ensure that all contractual obligations are met and that contract monitoring is

documented by utilizing the Contract Monitoring Checklist. > Make sure that deliverables and milestones are met in a timely manner. > Know when your contract expires and when they may need to be renewed or extended. > Make sure that you note, in writing, of any deficiencies or problems in the performance

of the contract. > If needing to terminate an agreement due to lack of performance or breach of contract

on behalf of the contractor, notify Contract Review Services immediately.

Procurement Services Team > Review contract and supporting documentation for compliance with State and University

guidelines including: > Acceleration of Payment > Arbitration > Assignment of Rights > Exercising Control over Litigation > Governing Law > Indemnity; Hold Harmless; Assumption of Liability > Limitation of Liability > Liquidated Damages > Material Breach; Irreparable Harm > Statute of Limitations > Non­Compete Clause

> Prepare the contract for signature processing by routing to the appropriate University administrator.

> Provide Support for administration of contracts.

Page 5: Procurement Contract Manual - NCSU

Page 5 | 49 Return to Table of Contents

Other University Offices As a State agency, NC State University is subject to certain legal requirements and restrictions that affect its ability to accept certain contract terms. Therefore, the review and execution of all university agreements MUST follow the appropriate university procedure as administered by these offices:

CONTRACT CATEGORY RESPONSIBLE FOR REVIEW

Goods Purchased Contract Review Services

Services Rendered Contract Review Services

Confidentiality Agreement Contract Review Services or Office of Technology Commercialization and New Ventures (OTCNV)

Testing Agreements Sponsored Research & Regulatory Compliance Services (SPARCS)

Research or Sponsored Programs Sponsored Research & Regulatory Compliance Services (SPARCS)

Conflicts of Interest Office of Technology Commercialization and New Ventures (OTCNV)

Real Property (Lease or Purchase) Real Estate

Employment Contracts Human Resources

Academic (student focused) Provost Office

Page 6: Procurement Contract Manual - NCSU

Page 6 | 49 Return to Table of Contents

Page 7: Procurement Contract Manual - NCSU

Page 7 | 49 Return to Table of Contents

Signature Authority Only the Chancellor and those delegated by the Chancellor have the authority to execute contracts for the University. Anyone else executing a contract that purports to bind the University or its subunits is acting without authority and could be held personally liable for the breach of the contract or for the full value of the contract.

The Delegation of Signature Authority chart summarizes the signature delegations for all categories of University agreements, including sponsored programs, extension services, and design/construction. For general business agreements (goods purchased and services rendered), the Chancellor delegated the signature authority to:

POSITION DELEGATED AUTHORITY

Assistant Director of Procurement & Business Services Up to $5,000

Director of Procurement & Business Services Up to $50,000

Associate Vice Chancellor of Finance & Administration Up to $250,000

Vice Chancellor of Finance & Administration Over $250,000

Only the CHANCELLOR and those delegated by the Chancellor have the AUTHORITY to execute contracts

that legally bind the University to an outside party.

Page 8: Procurement Contract Manual - NCSU

Page 8 | 49 Return to Table of Contents

Standard University Agreements/Contracts The Standard University Agreements/Contracts have been designed to simplify the contracting process by providing secure PDF fillable contract forms. The Office of General Counsel (OGC) has drafted a set of Standard University Agreements that can be used for:

1. Procurement of goods or services. 2. Allowing others to use University facilities. 3. University personnel providing services for groups or individuals not related to the

University. Available agreements include:

> Academic > Athletics > Extension > Equipment > Facilities Use > General Business > Independent Contractor > Research

These agreements cannot be modified without the prior approval from the Office of General Counsel or from Contract Review Services.

Select this link to access the Standard University Agreements/Contracts Library.

Questions?

Contact Contract Review Services at [email protected]

Page 9: Procurement Contract Manual - NCSU

Page 9 | 49 Return to Table of Contents

CHAPTER 2: Preparing for a Contract Submission

1. Gather Contract Details Before submitting a contract request for review, be sure you know/have the following information handy:

> Contract Type

> Contract Value

> Project ID Required for all expense contracts.

> Supplier/Vendor ID Required for all expense contracts. Click on this link to learn how to add a supplier to the Financial System.

> Supplier Contact Name and Email This information will be used to contact the supplier for questions and to route DocuSign for external signature.

> Contract Document, including Scope of Services If appropriate. The preferred format is MS Word or University template.

> Waiver of Competitive Bidding Memorandum Under certain conditions, if approved by Procurement Services, certain goods and services may be purchased without competitive bidding. A memo provided by the requester must be based on one of the reasons listed on the Procurement Services Website. Required for services above $5,000. Click on this link to access an example of a Waiver of Competitive Bidding Memo

> Independent Contractor Checklist Use when appropriate.

Once you have all of these items, you are ready to submit your contract for review!

Page 10: Procurement Contract Manual - NCSU

Page 10 | 49 Return to Table of Contents

2. Locate Supplier ID When submitting a contract for review, a supplier name is required. For all expense contracts, a Supplier/Vendor ID is also required. Having a Supplier ID means that the supplier has been set up in the Financial System. To locate an existing supplier and supplier ID for your contract, follow the steps outlined below:

1. Go to MyPack Portal > Financial System Homepage > Financials Quick Nav > Voucher & Supplier Maint > Supplier Center.

2. Under New Request, click on Update/Search Supplier.

3. Type the name of the supplier into the Supplier Name field.

4. If you locate your supplier in the Financial System you will be able to select them from the autofill or magnifying glass search options when submitting a contract via the Contract User Portal.

Page 11: Procurement Contract Manual - NCSU

Page 11 | 49 Return to Table of Contents

3. Register a Supplier in the Financial System If you cannot find your supplier with the Look Up Supplier tool, the supplier has not been registered in the Financial System yet. You must set them up first with Accounts Payable. To set up a new supplier in the Financial System follow the steps outlined below.

1. Contact Accounts Payable or your department’s business office to request an ACH Enrollment form.

2. Send the ACH enrollment form and the W­9 Form to the supplier and ask them to fill it out and return it to you.

Once you have these forms, you can start the process of setting up the supplier in the Financial System.

3. Go to MyPack Portal > Financial System Homepage > Financials Quick Nav > Supplier Center.

4. Under New Request, select Add Supplier and then select Supplier.

5. Enter the name of the supplier as it appears on the W-9. Do not enter any punctuation in this field.

6. Select Add.

7. Complete the rest of the required information:

Page 12: Procurement Contract Manual - NCSU

Page 12 | 49 Return to Table of Contents

> Supplier Details > Location > Email > Order Information

Page 13: Procurement Contract Manual - NCSU

Page 13 | 49 Return to Table of Contents

8. Check the box to acknowledge that you have verified that the information is correct and select Submit for Approval.

You will receive an email with the Request ID and will be directed to the Request Details and Documentation page. Next, you will need to upload the required supplier documentation.

9. Select the Upload Document button and upload the completed W­9 and ACH Enrollment forms in separate attachments.

10. Click on Complete Request.

You will be redirected to the main page of the Supplier Center, where you can review the status of the suppliers you have requested in the Recent Requests box.

Page 14: Procurement Contract Manual - NCSU

Page 14 | 49 Return to Table of Contents

Once Accounts Payable approves the request you will receive an email notification with the new Supplier/Vendor ID. After waiting a day for the overnight feed to occur, you will now be able to search for the supplier in the contract portal. Helpful Links:

> Vendor Center User Guide > Vendor Payments

Facility Use Agreements To process a Facility Use Agreement, download a Facility Use Agreement template. Once completed, route it through the Contracts Portal for approval and signature.

Page 15: Procurement Contract Manual - NCSU

Page 15 | 49 Return to Table of Contents

CHAPTER 3: Contract Review Process

The Contract Review Services Team must review all purchase agreements, no matter the value, whenever there is a written contract, agreement, or purchase order involved. To submit a contract for review, follow the instructions outlined below.

Instructions to Submit a Contract for Review

1. Log into the Contract User Portal.

2. Click on Submit a Contract.

3. This will take you to the Contract Details tab, where the specific information about your contract needs to be entered. (These fields will change based on the contract type you select.)

4. Enter the contract Start Date.

Page 16: Procurement Contract Manual - NCSU

Page 16 | 49 Return to Table of Contents

5. Enter the contract End Date.

6. If payments are being made by the University, you will need to enter the Project ID of the funding source.

7. Enter the Contract Value.

Page 17: Procurement Contract Manual - NCSU

Page 17 | 49 Return to Table of Contents

8. The Comments Field can be used to provide additional information, if needed.

9. Answer the dropdown questions regarding if your supplier is an individual.

10. Key in the name of your supplier and, if shown, select the name from the autofill.

Page 18: Procurement Contract Manual - NCSU

Page 18 | 49 Return to Table of Contents

The magnifying glass can also be used to search and select your supplier. The Supplier ID will auto populate when selecting your supplier via the autofill or magnifying glass.

11. A Supplier ID is required for any contract if payments are being made by the University.

If required, you will not be able to submit your contract until a Supplier ID has been established.

Page 19: Procurement Contract Manual - NCSU

Page 19 | 49 Return to Table of Contents

Instructions on how to locate a supplier ID can be found on the "Can't Find your Supplier?" link.

12. Enter your supplier contact name.

13. Enter your supplier contact email.

Page 20: Procurement Contract Manual - NCSU

Page 20 | 49 Return to Table of Contents

At any time, you can save your work as a draft by clicking on the Save button. Clicking Save will remove you from the contract record.

Using the dropdown arrow and choosing Save and Continue will save your work and keep you in your current contract record.

14. Your drafts can be found on the My Contracts tab.

Page 21: Procurement Contract Manual - NCSU

Page 21 | 49 Return to Table of Contents

15. You can click on the contract number or on the Edit icon to return to your record.

16. Click on the Documents tab, to upload your contract and any supporting documents.

17. Click on the Upload button.

Page 22: Procurement Contract Manual - NCSU

Page 22 | 49 Return to Table of Contents

18. Use the dropdown menu to classify the type of document you are attaching.

19. You can Drag & Drop your document or click on Attach/Manage.

Please note: only one document can be associated with each attachment type but multiple attachments can be uploaded.

Page 23: Procurement Contract Manual - NCSU

Page 23 | 49 Return to Table of Contents

For example, we can attach a contract, an Independent Contractor Checklist, and a Sole Source Justification.

20. When all your documents are attached, click the green Submit button to submit your contract for review.

Page 24: Procurement Contract Manual - NCSU

Page 24 | 49 Return to Table of Contents

Your submission will remain in Draft status until you submit it. To view the status of any contract you have submitted, click on the My Contracts tab.

The submitted contract and supporting information are reviewed for standard legal terms and conditions. Negotiations may be required between the University department, the contractor, Contract Review Services, and the Office of General Counsel. The department will receive an email notification when their contract is fully signed. The signed agreement can be found in the Contract User Portal > My Contracts > Contract Number > Documents tab.

> Click on this link to watch a video tutorial of how to submit a contract.

> Click on this link to watch a video tutorial of how to check the status of a contract and search previously signed contracts.

Once you submit your contract for review, you no longer have the ability to edit the contract. If you need to make a change on a contract request,

please contact Contract Review Services.

Page 25: Procurement Contract Manual - NCSU

Page 25 | 49 Return to Table of Contents

Where do I find my Signed Agreement? Once a contract is fully approved, a DocuSign envelope is sent to each party to obtain signature(s). Once all signatures have been collected, a copy of the signed agreement is sent to each of the signatories. The requester (you) will receive an email indicating that the contract has been signed, which will include a link to view the contract:

Contract User Portal > Documents tab > Signed Agreement

Click on the Attached File to view and download a copy of the signed agreement.

Page 26: Procurement Contract Manual - NCSU

Page 26 | 49 Return to Table of Contents

CHAPTER 4: Administration of Contracts

It is the responsibility of each University department to ensure that all contractual obligations are met and that contract monitoring is documented. A Contract Monitoring Checklist has been developed to serve departments during the contract monitoring process. Each contract is unique and the department may download and edit this checklist as required to meet its particular circumstances. In addition, departments should pay special attention to the following aspects of administration of contracts:

> Understand the scope of the contract.

> Make sure that deliverables and milestones are met in a timely manner.

> Know when your contract expires and when they may need to be renewed or extended.

> Make sure that you note, in writing, of any deficiencies or problems in the performance of the contract.

> If needing to terminate an agreement due to lack of performance or breach of contract on behalf of the contractor, notify Contract Review Services immediately.

Page 27: Procurement Contract Manual - NCSU

Page 27 | 49 Return to Table of Contents

Contract Status Each contract has a status that provides a general idea of where the contract is in the review process. The table below explains what each status means: STATUS DESCRIPTION

Draft An unsubmitted contract OR a previously submitted contract that was rejected during the approval process.

Pending Approval Your submitted contract is currently being reviewed by necessary approvers and is still awaiting full approval.

Waiting on Department Purchasing needed further information, reached out via email or phone, and is awaiting department user response.

Negotiating with Supplier Your contract has been sent to supplier and is currently being negotiated.

Approved Your contract has been reviewed and approved by all approvers and the DocuSign envelope is being sent out to the appropriate signatories.

Pending Signature A DocuSign envelope has been sent to the signing parties and is awaiting signature.

Signed Your contract has been fully signed by all parties and you have been notified by email.

Active Your signed contract’s term is currently in effect.

Expired Your signed contract’s term is no longer in effect.

Page 28: Procurement Contract Manual - NCSU

Page 28 | 49 Return to Table of Contents

Contract Amendments There are three possible contract amendment scenarios:

> Amending an existing contract that has a contract number above 60000.

> Amending an existing contract or contract amendment that has an original contract number below 60000 and has not previously been amended in the new contract portal.

> Amending an existing contract or contract amendment that has an original contract number below 60000 and also has previously been amended in the new contract portal.

The next section will provide step­by­step instructions and examples for how to submit contract amendments according to the three scenarios outlined above.

Page 29: Procurement Contract Manual - NCSU

Page 29 | 49 Return to Table of Contents

Amending an existing contract that has a contract number above 60000.

1. Click the Submit a Contract link or tab.

This will take you to the Contract Details tab where the specific information about your amendment needs to be entered.

Page 30: Procurement Contract Manual - NCSU

Page 30 | 49 Return to Table of Contents

2. Change the record type from Contract to Amendment.

3. Enter the Parent Contract Number.

Page 31: Procurement Contract Manual - NCSU

Page 31 | 49 Return to Table of Contents

This will populate the basic supplier information based on the original contract and provide a link to the original contract record.

4. Enter the Amendment Number.

Page 32: Procurement Contract Manual - NCSU

Page 32 | 49 Return to Table of Contents

5. Enter the Contract End Date.

6. Enter the Project ID.

The Contract End Date and Project ID may be the same or they may have changed from the original agreement.

Page 33: Procurement Contract Manual - NCSU

Page 33 | 49 Return to Table of Contents

7. Enter the Contract Value. The contract value is the total value of the amendment plus the value of the original contract including any other previous amendments.

8. Enter the Amendment Value. The amendment value is only the value associated with the amendment you are submitting.

9. Answer the tiered questioning: Is the supplier an individual?

Page 34: Procurement Contract Manual - NCSU

Page 34 | 49 Return to Table of Contents

10. Answer the tiered questioning: Is the supplier an employee of NC State University?

Page 35: Procurement Contract Manual - NCSU

Page 35 | 49 Return to Table of Contents

11. Enter the supplier contact information.

12. Click on the Documents tab.

Page 36: Procurement Contract Manual - NCSU

Page 36 | 49 Return to Table of Contents

13. Attach your Contract Amendment.

14. Click Save.

15. Click the green Submit button to submit your contract amendment for review.

Page 37: Procurement Contract Manual - NCSU

Page 37 | 49 Return to Table of Contents

Amending an existing contract or contract amendment that has an original contract number below 60000 and has not previously been amended in the new contract portal.

For this scenario, you will submit the amendment as if you are submitting a new contract.

1. Change the Record Type to Contract.

2. Enter the Contract Type.

3. Enter the Contract Start Date.

Page 38: Procurement Contract Manual - NCSU

Page 38 | 49 Return to Table of Contents

4. Enter the Contract End Date.

5. If payments are being made by the University you will need to enter the Project ID of the funding source.

Page 39: Procurement Contract Manual - NCSU

Page 39 | 49 Return to Table of Contents

6. Enter the Contract Value. The contract value is the total value of the amendment plus the value of the original contract including any previous amendments.

7. You will need to reference the old contract number in the Comments field.

Page 40: Procurement Contract Manual - NCSU

Page 40 | 49 Return to Table of Contents

Continue to fill out the rest of the form, upload your contract amendment, and submit it for review.

Page 41: Procurement Contract Manual - NCSU

Page 41 | 49 Return to Table of Contents

Amending an existing contract or contract amendment that has an original contract number below 60000 and also has previously been amended in the new contract portal.

For this scenario, you will submit an amendment to the new contract number which was generated when the contract was first amended in the new system.

1. Change the Record Type to Amendment.

2. Enter the Parent Contract number.

3. Enter the Amendment Number. The amendment number you input in the system in this

scenario is based on the number of amendments processed under the contract number

Page 42: Procurement Contract Manual - NCSU

Page 42 | 49 Return to Table of Contents

in the new system. If you are unsure how many previous amendments have been processed under a contract, click on the contract link:

Click on the Related Contracts tab of the original contract number to see the other amendments.

Page 43: Procurement Contract Manual - NCSU

Page 43 | 49 Return to Table of Contents

In this example the Amendment Number you would enter is 3. (If there were no related contracts, your Amendment Number would be 1.)

Continue to fill out the rest of the form, upload your contract amendment, and submit it for review.

Page 44: Procurement Contract Manual - NCSU

Page 44 | 49 Return to Table of Contents

CHAPTER 5: Tutorials

1. How to Submit a Contract Click on the image below to watch the video tutorial.

Video URL: https://youtu.be/v81hHObh72A

Page 45: Procurement Contract Manual - NCSU

Page 45 | 49 Return to Table of Contents

2. How to Check the Status of a Contract and Search Previously Signed Contracts

Click on the image below to watch the video tutorial.

Video URL: https://youtu.be/5c_u81VAsnw

Page 46: Procurement Contract Manual - NCSU

Page 46 | 49 Return to Table of Contents

3. How to Submit a Contract Amendment Click on the image below to watch the video tutorial.

Video URL: https://youtu.be/ve4LwHcOVmg

Page 47: Procurement Contract Manual - NCSU

Page 47 | 49 Return to Table of Contents

CHAPTER 6: Resources

Employee vs. Independent Contractor An employee is an individual who performs a service for the University and is working under the direction and control of the University or its employees. An employee is paid through the payroll system and required Federal and State taxes are withheld and/or paid on the employee’s behalf. An independent contractor is an individual engaged by the University to perform a specific function or task and who is free to perform this function or task completely at the individual's own discretion with regard to means and methods. No taxes are required to be withheld or paid on compensation disbursed.

An active employee can NEVER be an independent contractor!

Select this link to access the Employee vs. Independent Contractor Reference Guide. Select this link to access the Controller's Office Tax Compliance page.

Checklist for Determination of Independent Contractor Status The University has developed a checklist to help departments determine if an individual providing services can be classified as an independent contractor. Departments must complete this checklist and include it with the contract sent to Procurement Services. Select this link to access the Checklist for Determination of Independent Contractor Status.

Page 48: Procurement Contract Manual - NCSU

Page 48 | 49 Return to Table of Contents

Purchases from Employees Every reasonable effort shall be made to avoid making purchases from employees of any state agency. Prior written approval from the State Purchasing Officer (SPO) is required for instances which may develop when doing business with such personnel. To obtain SPO approval, a request must first be submitted to Procurement Services for preliminary approval. If approved, Procurement Services will forward the request to the SPO for final approval. Select this link for detailed information concerning Purchases from University Employees.

State of North Carolina Contract Administration and Monitoring Guide The purpose of the Contract Administration/Monitoring Guide (CAMG) is to provide agency contract administrators guidance on improving existing contract management processes. Throughout this guide, the term Administrator, Contract Monitor or Contract Manager are used interchangeably.

Page 49: Procurement Contract Manual - NCSU

Page 49 | 49 Return to Table of Contents

CHAPTER 7: Best Practices

1. NEVER SIGN A CONTRACT!

Only the Chancellor and those delegated by the Chancellor have the authority to execute contracts for the University. Any executing a contract that purports to bind the University or its subunits is acting without authority and could be held person for the breach of the contract or for the full value of the contract.

2. ADMINISTER YOUR CONTRACTS

Monitor and verify that the contractor is performing the services as outlined in the contract.

3. DETERMINE THE CORRECT CONTRACT CATEGORY AND THE APPROPRIATE OFFICE FOR REVIEW

Refer to the Standard Contracts Library prior to initiating a contract.

4. FOLLOW THE CORRECT PROCESS FOR SUBMITTING A PURCHASE CONTRACT FOR REVIEW

Refer to the tutorials listed in Chapter 5.