Page 1: Presentation CET Govora

RETROFIT AND ECOLOGY PROGRAMRETROFIT AND ECOLOGY PROGRAM

A rehabilitation project funded by SOP Environment A rehabilitation project funded by SOP Environment

Member COGEN Romania Oct 2011Member COGEN Romania Oct 2011

Page 2: Presentation CET Govora

CET Govora

ACTIVITIES OF CET GOVORA

► Electricity production – Conection to NES and OLTCHIM by 110 KV lines;► Industrial steam production – Industrial Platform South Rm. Vâlcea;► District Heating for Rm. Vâlcea;► District Heating for Călimăneşti (geotermal);► District Heating for Băile Olăneşti;

Turnover: 74 mil euro/2008 - 70 mil Euro/2009, 2010.

Oct 2011

TitleAdd your text

Page 3: Presentation CET Govora

ACTUAL TECHNOLOGIC DIAGRAM OF CET GOVORA

4 turbines * 50 MW2 new turbines = 11MW

C7 C6 C5 C4 C3

140 bar

35 bar

13 bar

6 bar

DH

130 grd C

TA6 TA5 TA4 TA3

Stack nr. 3 LCP 3

Stack nr. 2 LCP 2

Stack nr.1 LCP1

2 natural gas

boilers reserve

Oltchim 70 t/hUSG 45 t/h

Oltchim 120 t/hUSG 72 t/h

Oltchim 65 t/hUSG 1 t/h

Internal Serv. 60 t/h

Rm Valcea SACET Summer 20 MW

Winter 160 MW

3 lignite boilersbase operation

TA9

TA8

1,2 bar

SRM GN

TRANSGAZ

Ash deliveryAshbunk

deposit

CHP Vilcetproject

Page 4: Presentation CET Govora

CET Govora Oct 2011

CET GOVORA – ENVIRONMENT PROBLEMS Environment problem - Objectives Conformation Term

Ecologic evacuation, depositing and utilisation of ash, slag and desulphurization products – technology of dense fluid

dec. 2012Ash certification for

concrete and for cementCO2 certificates for the period 2008 – 2012 dec. 2012

SolvedDust emissions below 50 mg/NmcElectrofilters retrofit

Boilers 5 and 6 – dec. 2011Leasing tender in process

Boiler 7– dec. 2010partially solved

SO2 emissions below 200 mg/Nm3

Actual emissions = 6000-9000 mg/Nmc Boilers 5 and 6 – dec. 2013

Boiler 7 – dec. 2011SOP Environment

NOx emissions below 200 mg/Nm3

Actual emissions = 250 mg/Nm3Boilers 5 and 6 – dec 2013

Boiler 7 – dec. 2011SOP Environment

Waste water neutralising and evacuation to dense fluid installation dec. 2011partially solved

Waste management – Selective collecting, temporary depositing permanentSolved

Page 5: Presentation CET Govora

MAIN CLIENTS OF CET GOVORA

CET Govora Oct 2011

CET Govora delivers electricity produced in cogeneration based on contracts with the distributors CEZ, ENEL and some divisions of ELECTRICA S.A. as well

on the concurential markets (day ahead market and equilibration market).

OOltchimltchim:: delivery of steam based on an energetic agreementand on yearly contracts;

District Heating Rm. ValceaDistrict Heating Rm. Valcea:: CET Govora has a concession contract for CET Govora has a concession contract for DH servicesDH services for 25 years, having direct comercial relationships with the clientsfor 25 years, having direct comercial relationships with the clients -- individual consumers, institutions individual consumers, institutions and and companies;companies;

Sodic factories Govora Ciech (U.S.G.):Sodic factories Govora Ciech (U.S.G.): delivery of steam based on delivery of steam based on aa 10 years 10 years ccontractontract (2007-2017);(2007-2017);

Page 6: Presentation CET Govora

CLIENT – DISTRICT HEATING

• SSource: CET Govora –ource: CET Govora – able to deliver up to 225 MW;able to deliver up to 225 MW;• Transport network 29 km - belongs to CET GovoraTransport network 29 km - belongs to CET Govora an was partially retrofited;an was partially retrofited;• 40 thermal points – concession from the municipality Rm. V40 thermal points – concession from the municipality Rm. Vââlcealcea -- retrofited retrofited 100%100% and fully automaticand fully automatic• Distribution network – 250 km –Distribution network – 250 km – concession from the municipality Rm. Vconcession from the municipality Rm. Vââlcealcea –– retrofitedretrofited partially• Investment of CET Govora during 2002Investment of CET Govora during 2002 -- 2010 = 15 milion2010 = 15 milionss Euro Euro

CET Govora Oct 2011

CONSUMERSCONSUMERS

Total population Rm. VTotal population Rm. Vââlcea: 130.000 inhabitans, 33.000 dwellings;lcea: 130.000 inhabitans, 33.000 dwellings;Connected to DH : 90.000 inhabitants, 28.000 dwellings;Connected to DH : 90.000 inhabitants, 28.000 dwellings;Disconections : Disconections : 6%6%Yearly deliveries = 280.000 Gcal = 325.000 MWh;Yearly deliveries = 280.000 Gcal = 325.000 MWh;Base consumptionBase consumption - hot tap water = 18 MW; summer operation 5000 h/an- hot tap water = 18 MW; summer operation 5000 h/anAverage winter – heat and hot tap water = 100 MW;Average winter – heat and hot tap water = 100 MW;PeakPeak – heat and hot tap water– heat and hot tap water =160 MW; peak operation 1500 h/an; =160 MW; peak operation 1500 h/an;

THE DH SYSTEM:THE DH SYSTEM:

Page 7: Presentation CET Govora

SOURCES OF HEAT FOR DH

CET Govora Oct 2011

Single sourceSingle source CET Govora CET Govora with the equipments with the equipments: : - Boiler nr.Boiler nr. 77 on lignite retrofited and boiler nr.on lignite retrofited and boiler nr. 44 on natural gason natural gas asas reserve as winter source.reserve as winter source. A rehabilitation project funded by SOP Environment - New cogeneration plant on - New cogeneration plant on biomasbiomass as summer souces as summer souce ““ECOCET Govora”ECOCET Govora”

The investments program for retrofit of boiler nr.7The investments program for retrofit of boiler nr.7 is financed by is financed by SOP Environement SOP Environement == 70 70 milio milionns euro s euro (incl TVA) and includes(incl TVA) and includes::-- AA desulphurization plant to achieve SO2 emissionsdesulphurization plant to achieve SO2 emissions 2 24343 mg/Nm mg/Nm33-- Retrofit of the combustion installations to achieveRetrofit of the combustion installations to achieve NOx NOx emissionsemissions 197197 mg/Nm mg/Nm33 -- Ret Retrofit of two feed water pumps of the boiler by installing frequency convertersrofit of two feed water pumps of the boiler by installing frequency converters- Retrofit of the transport pumping system by installing 4 new pumps with frequency Retrofit of the transport pumping system by installing 4 new pumps with frequency converters.converters.

Additional investments program for retrofit DH systemAdditional investments program for retrofit DH systemInvestment estimatedInvestment estimated = 30= 30 milion Euro (cofinancing 50% SOP Enviromilion Euro (cofinancing 50% SOP Environnment)ment)

Page 8: Presentation CET Govora

CET Govora Oct 2011

CET GOVORA – THE CONFIGURATION OF THE SOURCE FOR DH AFTER 2013

C7

BV1

BV2

40 Gcal/h

40 Gcal/hEPRTf I EPRTf V

BB3

80 Gcal/h

TA6

G

50 MW

EPRTf Tr.II

Retur

Tur

CET Govora – Coal and gas – Winter surce

Sursa en.termica

biomasa

ORC Turnine

Boiler VaraEPRTt V

G4.6 MW

ECOCET Govora – CHP Biomass- summer surce

Acumulator caldura

Page 9: Presentation CET Govora

PROJECT FOR SUMMER SOURCE - THE BIOMASS PLANT

CET Govora Oct 2011

The yearly deliveries of the biomass plants will be:- Heat = 120.000 MWh;

- Electricity = 34.000 MWh;The yearly biomass demand 81.500 tons

1. The wood availabilities in an area of 150 km are of 120.000 t/year wood wastes fromwood industries

2. During the 3 last years some quantities of biomass were coincinerated with coal in the coal boilers:- year 2008 = 40.000 t- year 2009 =16.000 t- year 2010 = 12.500 t

3. The investment is mandatory by the strategy for DH of the city Rm. Vâlcea.

4. The investment in the plant and annex facilities (biomass storage, grinders, transporters) is estimated at 22.5 mil euro and is feasible until december 2013; the repay of the credit will be

realised by selling the green certificates on the market, in aproximatively 5 years after start up.

Page 10: Presentation CET Govora

Thank you for your attention !