NATIONAL HOUSING AL-BARSHA SOUTH 1 CONSTRUCTION OF 1240 VILLAS

Presentation - 1240 Villas

Embed Size (px)

Citation preview

Page 1: Presentation - 1240 Villas

NATIONAL HOUSING AL-BARSHA SOUTH

1

CONSTRUCTION OF 1240 VILLAS

Page 2: Presentation - 1240 Villas

ARABTEC CONSTRUCTIONA.L.D.

PROJECT MANAGERISSAM M. AL FAQIR

2

1. LIAISING WITH DIFFERENT GOVERNMENT AUTHORITIES FOR VARIOUS MATTERS SUCH AS PROJECT INSURANCE POLICIES, BUILDING PERMITS, NOCS, DEMARCATIONS, FINAL SURVEY CERTIFICATES, APPROVALS ETC.

2. DEALING WITH ALL SECURITY MATTERS OF THE DIVISION, ARRANGING/DEALING/CONTROLLING ACCOMMODATION AND TRANSPORTATION ISSUES AND MATTERS

3. RECRUITING/HIRING STAFF/MANPOWER AS PER THE PROJECTS REQUIREMENT IN COORDINATION WITH HEAD OFFICE.

Page 3: Presentation - 1240 Villas

3

4. PROJECT-WISE DAILY/WEEKLY AND MONTHLY RECORDING/UPDATING OF TOTAL MANPOWER AND CALCULATION OF TOTAL MAN-HOURS/TOTAL WAGES/TOTAL OVERTIME AND KEEPING PERCENTAGEWISE RECORDS OF THE SAME FOR THE COST CONTROL PURPOSE.

5. OVERALL CONTROL OF ADMINISTRATION AND HR MATTERS OF THE ALD1 PROJECTS/DEPARTMENT AND OFFICES AND WELLBEING OF STAFF AND LABOURS

6. ARRANGING WORK PERMIT CARDS/EMIRATES ID CARDS/ INSURANCE CARDS/VISA RENEWALS/VISA MEDICALS FOR ALL THE EMPLOYEES IN COORDINATION WITH HEAD OFFICE.

Page 4: Presentation - 1240 Villas

QA/QC OFFICE

4. INSPECTION & TESTING OF MATERIALS AS PER ITP

2. PREPARATION OF METHOD STATEMENT & ITP SCHEDULE3. METHOD STATEMENT & ITP PREPARATION AS

PER SCHEDULE

PROJECT LEVEL QA/QC PROGRAMME1. PREPARATION OF PROJECT SPECIFIC QUALITY

PLAN

4

Page 5: Presentation - 1240 Villas

8. ISSUE SITE OBSERVATION REPORT/ NON- CONFORMANCE REPORT FOR NON-COMPLIANCE OF WORK DURING EXECUTION (IF ANY) 9. PERIODIC INTERNAL AUDIT AS PER INTERGATED MANAGEMENT SYSTEM

6. QA/QC VERIFICATION OF WORKS AS PER QUALITY CONTROL CHECKLIST 7. SITE INSPECTION REQUEST SUBMISSION TO CONSULTANT FOR INSPECTION & APPROVAL

PROJECT LEVEL QA/QC PROGRAMME 5. WORK START NOTIFICATION PRIOR TO COMMENCEMENT OF EACH ACTIVITY

5

Page 6: Presentation - 1240 Villas

13. HANDING OVER

12. PREPARE & SUBMIT THE CLOSE-OUT DOCUMENTS

11. CARRY OUT THE SNAGGING & DE-SNAGGING PROCESS

PROJECT LEVEL QA/QC PROGRAMME10. CARRY OUT THE TESTING & COMMISSIONING OF ALL INSTALLED ITEMS

6

Page 7: Presentation - 1240 Villas

VILLAS CONSTRUCTION SEQUENCE SUMMERY (TUNNEL FORM WORKS )

7

First Stage Second Stage Third Stage

Substructure Superstructure Finishing

1

Excavation & Earth WorksIncluding leveling and compaction

1

RCC Columns & Walls Kickers Kicker: like the column necks to facilitate tunnel form installation

1

First Fix for MEP WorksAll embedded conduits and pipes to be installed in block walls

2Anti-termite (chemical spray)

2Tunnels Forms Installation Using mobile cranes cranes

2Wooden Doors Subframes12mm plywood

3PCC & Blinding50mm plain concrete below foundation

3RCC Works for Columns, Walls & Slab (GF, FF, etc.)

3

Plaster Works Plaster preparation including rush coat, fiber mesh, angle beads ..etc. Then filling by cement sand plaster

4RCC FoundationReinforced Strip Foundation

4

Roof Parapet, Staircase & Miscellaneous RCC Works as per architectural shop drawings

4

Roof Waterproofing Works Getting the slope by foam concrete then using membrane system and polystyrene for heat insulation and finally protected by natural gravel and concrete tiles

Page 8: Presentation - 1240 Villas

8

First Stage Second Stage Third Stage

Substructure Superstructure Finishing

Stub WallsAll around the center line of the strip foundation to suit the tunnel design

5

Block Works (Insulation)50 mm polystyrene is used between two block walls (100mm & 200mm) Total wall thickness is 350 mm

5

Tile & Marble WorksIncluding floor and wet area walls and staircase step and vanities and kitchen tops

6Damp ProofingBitumen Paint

    6

Second Fix MEP (A/C System, High level Drainage) especially above false ceiling survices

7

Backfilling (Compaction on Layers) Including underground drainage and MEP services

    7

External Works: Precast, Boundary Walls, External Drainage, Paving & landscaping.

8 Anti-termite     8False Ceiling WorksSuspension & Gypsum board installation.

Page 9: Presentation - 1240 Villas

9

First Stage Second Stage Third Stage

Substructure Superstructure Finishing

9Slab on grade100mm reinforced concrete

    9Painting WorksInternal & External

       10

UPVC & Aluminum WorksIncluding doors, windows and railings and other decorative items

       11

Doors & Joinery WorksIncluding wardrobes and kitchen cabinets, wooden handrail and pergolas

       12

MEP Final Fix (Electrical Accessories, Light Fittings, Sanitary Wares …etc.

       13

Testing & Commissioning

       14

Snagging & Handing overSpecial team for clearance and preparing the villas for final handing over to the end user.

Page 10: Presentation - 1240 Villas

Click icon to add picture

EXCAVATION & LEVELING

1240 Villas Progress Photos

10

Page 11: Presentation - 1240 Villas

PCC 11

Page 12: Presentation - 1240 Villas

Click icon to add picture

CASTED STRIP FOOTING 12

Page 13: Presentation - 1240 Villas

Click icon to add picture

CASTED STRIP FOOTING 13

Page 14: Presentation - 1240 Villas

Click icon to add picture

CASTED GROUND SLAB 14

Page 15: Presentation - 1240 Villas

GROUND FLOOR TUNNEL 15

Page 16: Presentation - 1240 Villas

GROUND FLOOR TUNNEL 16

Page 17: Presentation - 1240 Villas

FIRST FLOOR TUNNEL REINFORCEMENT WORKS 17

Page 18: Presentation - 1240 Villas

FIRST FLOOR TUNNEL WORKS 18

Page 19: Presentation - 1240 Villas

Click icon to add picture

PARAPET WORKS 19

Page 20: Presentation - 1240 Villas

BLOCK WORKS 20

Page 21: Presentation - 1240 Villas

PLASTER WORKS 21

Page 22: Presentation - 1240 Villas

BOUNDARY WALL PCC 22

Page 23: Presentation - 1240 Villas

Click icon to add picture

BOUNDARY WALL INSTALLATION 23

Page 24: Presentation - 1240 Villas

CLAY ROOF TILES 24

Page 25: Presentation - 1240 Villas

Click icon to add picture

ROOF WATER PROOFING 25

Page 26: Presentation - 1240 Villas

Click icon to add picture

GRC WORKS 26

Page 27: Presentation - 1240 Villas

Click icon to add picture

TILING WORKS 27

Page 28: Presentation - 1240 Villas

Click icon to add picture

DRAINAGE WORKS 28

Page 29: Presentation - 1240 Villas

SWEET SOIL FILLING 29

Page 30: Presentation - 1240 Villas

ELECTRIC PANEL BOARD 30

Page 31: Presentation - 1240 Villas

INTERNAL PAINTING OF WALL FINAL COAT 31

Page 32: Presentation - 1240 Villas

Click icon to add picture

TILE GROUT WORKS 32

Page 33: Presentation - 1240 Villas

Click icon to add picture

GARAGE GRAVEL FILLING 33

Page 34: Presentation - 1240 Villas

MARBLE VANITY TOP 34

Page 35: Presentation - 1240 Villas

WARDROBE SHUTTER FIXING (JOINERY WORKS) 35

Page 36: Presentation - 1240 Villas

JOINERY WORKS 36

Page 37: Presentation - 1240 Villas

JOINERY WORKS 37

Page 38: Presentation - 1240 Villas

FALSE CEILING WORKS38

Page 39: Presentation - 1240 Villas

UPVC WORKS - AREA 0339

Page 40: Presentation - 1240 Villas

Click icon to add picture

CAST ALUMINIUM WORKS – AREA 03

40

Page 41: Presentation - 1240 Villas

Click icon to add picture

STAIRCASE RAILING WORKS – AREA 03

41

Page 42: Presentation - 1240 Villas

Click icon to add picture

GARAGE PAVING BLOCKS WORKS 42

Page 43: Presentation - 1240 Villas

Click icon to add picture

ROOF AC MACHINE INSTALLATION 43

Page 44: Presentation - 1240 Villas

Click icon to add picture

HEEL KERB FIXING 44

Page 45: Presentation - 1240 Villas

EXTERNAL WALL PRIMER PAINT 45

Page 46: Presentation - 1240 Villas

Click icon to add picture

EXTERNAL WALL FINAL PAINTING WORKS 46

Page 47: Presentation - 1240 Villas

MEP SERVICES ABOVE FALSE CEILING WORKS 47

Page 48: Presentation - 1240 Villas

MEP SERVICES ABOVE KITCHEN FALSE CEILING WORKS 48

Page 49: Presentation - 1240 Villas

FALSE CEILING WORKS 49

Page 50: Presentation - 1240 Villas

FALSE CEILING GYPSUM BOARD FIXING 50

Page 51: Presentation - 1240 Villas

PAINTING OF GARAGE WALL 51

Page 52: Presentation - 1240 Villas

Click icon to add picture

GARAGE PAVING BLOCKS 52

Page 53: Presentation - 1240 Villas

KITCHEN CABINET SHUTTER FIXING 53

Page 54: Presentation - 1240 Villas

KITCHEN COOKER HOOD FIXING 54

Page 55: Presentation - 1240 Villas

SANITARY FIXTURE INSTALLATION 55

Page 56: Presentation - 1240 Villas

MANHOLE COVER PAINTING 56

Page 57: Presentation - 1240 Villas

HEEL KERB FIXING 57

Page 58: Presentation - 1240 Villas

Click icon to add picture

SWEET SOIL FILLING 58

Page 59: Presentation - 1240 Villas

Click icon to add picture

GARAGE ROAD BASE FOR COMPACTION 59

Page 60: Presentation - 1240 Villas

EXTERNAL ELECTRICAL OUTLET INSTALLATION 60

Page 61: Presentation - 1240 Villas

Click icon to add picture

ALUMINUM MAIN ENTRANCE GATE FIXING 61

Page 62: Presentation - 1240 Villas

Click icon to add picture

ROOF A/C MACHINE INSTALLATION 62

Page 63: Presentation - 1240 Villas

Click icon to add picture

ROOF A/C MACHINE INSTALLATION 63

Page 64: Presentation - 1240 Villas

ROOF SLAB PAVING BLOCKS AND GRAVEL 64

Page 65: Presentation - 1240 Villas

Click icon to add picture

ROOF WATERPROOFING LEAKAGE TEST 65

Page 66: Presentation - 1240 Villas

ATTACHED VILLA GAS ENCLOSURE INSTALLATION 66