21
Preparation process for WRC-19 Xingguo Zhou Radiocommunication Bureau, ITU ICAO Preparatory Workshop to ITU World Radiocommunication Conference 2019 (WRC-19) 6 – 7 February 2018, Mexico City, Mexico 1/28/18 1 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

Preparation process forWRC-19

Xingguo ZhouRadiocommunication Bureau, ITU

ICAO Preparatory Workshop to ITU World RadiocommunicationConference 2019 (WRC-19)

6 – 7 February 2018, Mexico City, Mexico

1/28/18 1ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 2: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

ØFoundedon17May1865

Ø193MemberStates,>700SectorMembers,Associates&Academia

ØHQinGeneva,Switzerland;4regionalofficesand8areaoffices

ØThreeITUSectors:ITU-D,ITU-TandITU-R

2

ITU

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 3: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

3

Structure of ITU-R

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

1906 2017

From the first International

Radiotelegraph Convention, 1906

to the Radio Regulations, 2016

RR follow and anticipate

technological advancements

Page 4: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

TheRadiocommunication SectorofITU(ITU-R)ØWorldRadiocommunication Conferences(WRC): establishandamendtheRadioRegulations(RR)- animportantinternationaltreatygoverningtheuseofradiocommunications;

ØRadioRegulationBoard(RRB):clarifiesambiguousanddifficultprovisionsoftheRRthroughadoptionofRulesofProcedures;

ØRadiocommunication Assemblies(RA):approvetheITU-Rrecommendationssupportingthedevelopmentandcompatibilityofradiosystem;

ØStudyGroups(SG): developthetechnicalbasesforWorldRadiocommunication ConferencesanddevelopglobalstandardsintheformofRecommendations;

ØRadiocommunication Bureau(BR): isITU-Rsecretariatresponsiblefor dailywork,e.g.registrationoffrequencies,resolvinginterference,etc.

4

Structure of ITU-R

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 5: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

Objectives:ØAllocatespectrum/orbitresourceforemergingradiotechnologiesandapplications,whileprotectingtheexistingusage

ØMaintaintherightbalancebetweenthespectrumrequirementsofallradiocommunication services,includingaeronautical services

ØAchieveglobalspectrumharmonizationforeconomiesofscaleandinteroperabilityoftheequipment

ØCreateregulatorycertaintyforusers,regulatorsandindustryinutilizingspectrum

5

WRC

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 6: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

Mainroles:

ØTorevisetheRadioRegulations,aninternationaltreatywhichisratifiedbytheITUMemberStatesandismandatoryforapplications

• Spectrumallocation

• FrequencyassignmentandallotmentPlans

• ProceduresofCoordinationandNotification

• Resolutions

• Administrativeandoperationalprocedures

ØToaddressanyradiocommunication matterwithworldwidenature,e.g. majorcasesof interferencewhichcannotbesolvedbyBR,RRB

ØTodeterminequestionsforfuturestudyunderthefutureWRCs’AgendaItems

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico 6

WRC

Page 7: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

WRC cycle

Develops agenda for the next WRC and preliminary agenda for subsequent WRCWRC-n

CPM-1 1st Conference Preparatory Meeting (CPM)organizes ITU-R preparatory studies to WRC

Study regulatory, technical, operational and procedural solutions for WRCITU-Rstudies

Consolidates results of studies and tries to reconcile regulatory solutionsCPM-2

Allocation/identification of bands, regulations WRC-n+1

3-4years

1/28/18 7ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 8: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

International level

1/28/18 8ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 9: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

CPM

1/28/18 9ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

ØCPM-1:immediatelyafterWRCü Organizepreparationsü Openstudiesü Nomorethantwodays

ØCPM-2:atleast8monthsbeforeWRCüTrytoreconcileregulatorysolutionsüPreparetheFinalReportforthenextWRCüEnsurepublicationoftheFinalReportatleastsixmonthsbeforethenextWRC

üNotexceedingtwoweeks

Page 10: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

10

ITU-R studies of WRC-19 Agenda Items

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 11: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

11

Structure of the draft CPM Report to WRC-19

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Chapters of the Report

Ø Chapter 1 - Land mobile and fixed services -Ms K. ZHU (CHN)Ø Chapter 2 - Broadband applications in mobile service -Mr J Arias Franco

(MEX) Ø Chapter 3 - Satellite services – Mr N. Varlamov (RUS)Ø Chapter 4 - Science services – Mr V. Meens (F)Ø Chapter 5 - Maritime, aeronautical and amateur services - Mr El Sayed

(EGY)Ø Chapter 6 - General issues – Mr P.N. Ngige (KEN)

Structure of textsØ Executive summaryØ BackgroundØ Summary and analysis of ITU-R studies Ø Methods to satisfy Agenda ItemØ Regulatory and procedural considerations

Page 12: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

Ø thedraftCPMReportdevelopedbytheresponsiblegroups,e.g.ITU-RWP5BistheresponsiblegroupofAgendaItem1.10

Ø ContributionsfromITU-Rmemberships

Ø ICAOpositionissubmittedasaninformationaldocument,butithasagreatimpactonthediscussionsofaeronauticalserviceAIs.

*Up-to-dateinformationonlineat:http://www.itu.int/en/ITU-R/study-groups/rcpm/Pages/wrc-19-studies.aspx

12

Final CPM Report to WRC-19

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 13: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

131/28/18

ITU-R study status of WRC-19 AIs

ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

http://www.itu.int/go/rcpm-wrc-19-studies

ITU-R Responsible Group

Latest documents

Agenda Item

WRC Resolution

Page 14: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

14

RA-19 and WRC-19 will take place in Sharm el-Sheikh by consulting ITU Member States.

1/28/18

Timetable towards WRC-19

ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 15: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

Reginal level

1/28/18 15ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 16: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

16

•5th CPG-19: 8-11 Jan.2018, Budapest, Hungary

•3rd APG-19: [12-16 March 2018, Australia]

•5th RCC WG: [tbd 2018]

See details at www.itu.int/go/wrc-19-regional

Asia Pacific Telecommunity

African Telecommunications Union

European Conference of Postal and Telecommunications Administrations

WRC Regional Preparation

•3rd ASMG: [tbd 2018]

•3rd APM-19: [17-21 Sep. 2018, venue tbd]

Inter-American Telecommunication Commission

•30th PCC.II: 27 Nov.-1 Dec. 2017, Barranquilla, CLM

Arab Spectrum Management Group

1/28/18 ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Regional Commonwealth in the field of Communications

Page 17: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

1/28/18 17

ITU Inter-regional Workshop on WRC-19 Preparation

1st Workshopon21- 22Nov.2017,washeldhalfwaythroughthepreparatorycycle-Presentationandreviewoftheon-goingpreparatorystudiesoftheITU-RresponsiblegroupsforCPM-19-Presentationoftheorganization,preliminaryviews,draftprioritiesandpositionsoftheregionalgroups&thepreliminarypositionsfrominternationalorganizationslikeICAO,IMO,WMO

2nd Workshop[21-23Nov.2018],tobescheduledfewmonthspriortoCPM19-2-PresentationoftheDraftCPMReporttoWRC-19(explanationofthedraftMethodstosatisfytheWRC-19agendaitems)-Presentationandreviewoftheregionalgroups’draftviews,positionsandcommonproposals&thedraftpositionsfrominternationalorganizationslikeICAO,IMO,WMO

3rd Workshop[Q32019],TobescheduledfewmonthspriortoWRC-19-PresentationofthefinalizedCPM&Dir.ReportstoWRC-19-Presentationandreviewoftheregionalgroups’draftviews,positionsandcommonproposals&thedraftpositionsfrominternationalorganizationslikeICAO,IMO,WMO

ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 18: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

ØDiscussionsanddecisionsofWRCarebasedonthefollowingdocuments:

üContributionsfromtheITUMemberStates: multi-countriesproposalsorindividualcountryproposal.

üRegional Commonproposals ofRegionalGroupsandgroupsofcountries

ØThefollowingdocumentsaretakenintoaccountintoWRCdiscussions:

üCPMReport- areferencedocumentwithtechnicalbasisforWRC-19(3yearsofstudies);

üPositionsofthemainUNpartners,i.e.ICAO,IMO,WMO–informationalbutextremelyimportantdocuments.

1/28/18 18

Proposals to WRC-19

ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 19: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

1/28/18 19

WRC-19 challenges

ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Ø WRC-19 will considers virtually all radiocommunication services.

Ø The main focus will be on broadband technologies provided by different platforms, e.g. GSO space, NGSO, IMT, HAPS, WiFi, etc.

Ø Several technologies target the same bands -> need for studies between them

Ø ICAO has 2 principle aeronautical AIs and has several other to follow and ensure protection

Page 20: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

ØWRC-19preparationsaremadeat3levels

üNational:thestartingpointinWRCsprocessofthecountry

üRegional:thepositionisfurtherdevelopedtakingintoaccountofinterestofothercountries

üInternational:ITUandstakeholders

1/28/18 20

Summary

ICAO FSMP, WRC-19 RPG, Mexico City, Mexico

Page 21: Preparation process for WRC-19...-Presentation and review of the on-going preparatory studies of the ITU-R responsible groups for CPM-19 -Presentation of the organization, preliminary

Thankyouforyourattention!

Q&A

1/28/18 21ICAO FSMP, WRC-19 RPG, Mexico City, Mexico