139
FMRDP Project ID DPWH Project ID Funding Year Name of the Project Region Province Municipality/ City Implementing Office Congressional District Barangay Name of Proponent ADDITIONAL PROJECT INFORMATION Proponent's Classification ADDITIONAL PROJECT INFORMATI ON Estimated No. of Beneficiaries Source of Fund SARO Date SARO Code Scope of Works PRE- CONSTRU CTION Pre- Engineering FMR Detailed Engineering Design Planned Date PRE- CONSTRU CTION Pre- Engineering FMR Detailed Engineering Design Actual Date PRE- CONSTRU CTION Pre- Engineering Program of Works Planned Date PRE- CONSTRU CTION Pre- Engineering Program of Works Actual Date PRE- CONSTRU CTION Pre- Engineering PERT-CPM Planned Date PRE- CONSTRU CTION Pre- Engineering PERT-CPM Actual Date PRE-CONSTRUCTION Pre-Engineering Remarks PRE- CONSTRUC TION Procurement Advertised Planned Date PRE- CONSTRUC TION Procurement Advertised Actual Date PRE- CONSTRUC TION Procurement Date of Bidding Planned Date PRE- CONSTRUC TION Procurement Date of Bidding Actual Date PRE- CONSTRUC TION Procurement Amount of Bid PRE-CONSTRUCTION Procurement Bidders PRE- CONSTRUC TION Procurement Contract Approved Planned Date PRE- CONSTRUC TION Procurement Contract Approved Actual Date PRE- CONSTRUC TION Procurement MOA Planned Date PRE- CONSTRUC TION Procurement MOA Actual Date PRE- CONSTRUC TION Procurement Notice of Award Actual Date PRE- CONSTRUC TION Procurement Notice to Proceed Planned Date PRE- CONSTRUC TION Procurement Notice to Proceed Actual Date PRE-CONSTRUCTION Procurement Status PRE- CONSTRUCTION Status PRE-CONSTRUCTION Remarks CONSTRUCTIO N Contractor CONSTRUCTION Financial Targets Approved Amount CONSTRUCTION Financial Targets Contract Amount CONSTRUCTION Financial Targets Obligated Amount CONSTRUCTION Financial Targets Disbursement CONSTRUC TION Physical Targets Planned Target (%) CONSTRUC TION Physical Targets Actual Accomplishm ent (%) CONSTRUC TION Physical Targets Slippage (%) CONSTRUC TION Physical Targets Target (km.) CONSTRUC TION Physical Targets Actual (km.) CONSTRUC TION Physical Targets Planned Start Date CONSTRUC TION Physical Targets Actual Start Date CONSTRUC TION Physical Targets Target Date of Expiry CONSTRUC TION Physical Targets Revised Date of Expiry CONSTRUC TION Physical Targets Actual Date of Expiry CONSTRUCTION Construction Status CONSTRUCTION Remarks REALIGNMENT Date of Realignment Request Approved REALIGNMENT Remarks FIELD MONITORIN G DETAILS Pre- Implementati on Date of Validation FIELD MONITORIN G DETAILS Pre- Implementati on Validator FIELD MONITORING DETAILS Pre- Implementatio n KMZ Beginning Coordinates FIELD MONITORING DETAILS Pre- Implementatio n KMZ End Coordinates FIELD MONITORING DETAILS Pre- Implementatio n KMZ DBM Code FIELD MONITORIN G DETAILS Pre- Implementati on KMZ KMZ File FIELD MONITORING DETAILS Pre-Implementation Remarks FIELD MONITORING DETAILS Post- Implementation Date of Validation FIELD MONITORING DETAILS Post- Implementation Validator FIELD MONITORING DETAILS Post- Implementation Status of Implementation FIELD MONITORING DETAILS Post- Implementation Actual Length Constructed FIELD MONITORING DETAILS Post- Implementation Actual % of Accomplishment FIELD MONITORING DETAILS Post- Implementation Actual Slippage % "FIELD MONITORING DETAILS Post- Implementation Start Coordinates" FIELD MONITORING DETAILS Post- Implementation End Coordinates FIELD MONITORING DETAILS Post- Implementation Updated KMZ file FIELD MONITORING DETAILS Post- Implementation Date of turn-over by DPWH to DA FIELD MONITORING DETAILS Post- Implementation Date of turn-over by DA to LGU FIELD MONITORING DETAILS Post-Implementation Remarks FOLLOW-UP Name FOLLOW-UP Contact Number FOLLOW-UP Date and Time FOLLOW-UP Remarks AS PER SDS M&E FMR ID (SDS) AS PER SDS M&E Length (km) (based on SDS kmz) AS PER SDS M&E Scope of Work (concrete/regravell ing/etc) AS PER SDS M&E Remarks 2010 Barangay Bahaya Bohe Bato - Sitio Kasanyangan, Brgy. Basak ARMM Basilan Sumisip Basak 488 5,000,000.00 4.880 completed Status as of March 31, 2016 2010 Sitio Kasanyangan - Sitio Bileyan, Brgy Basak ARMM Basilan Sumisip Basak 488 5,000,000.00 4.880 completed Status as of March 31, 2016 2010 Brgy. Tambara FMR ARMM Lanao del Sur Malabang Tambara 337 10,000,000.00 3.370 completed Status as of March 31, 2016 2010 Gravelling of Brgy. Bubong- Brgy. Cabasaran ARMM Lanao del Sur Mulondo Brgy. Bubong- Brgy. Cabasaran 0 3,000,000.00 completed Status as of March 31, 2016 2010 Kapatagan FMR Road Network ARMM Lanao del Sur Kapatagan Kapatagan 2,000 50,000,000.00 20.000 completed Status as of March 31, 2016 2010 Construction of Sultan Barodi FMR ARMM Lanao del Sur Kapatagan Sultan Barodi 0 50,000,000.00 completed Status as of March 31, 2016 2010 Rehab of Brgy. Tuka 1 FMR ARMM Lanao del Sur Bacolod- Kalawi Tuka 1 0 10,000,000.00 completed Status as of March 31, 2016 2010 Rehab of Brgy. Sugod FMR ARMM Lanao del Sur Bacolod- Kalawi Sugod 0 10,000,000.00 completed Status as of March 31, 2016 2010 Rehab of Barorao FMR ARMM Lanao del Sur Balabagan Barorao 2,500 50,000,000.00 25.000 completed Status as of March 31, 2016 9421 - - 2010 Pandan-Saramuray FMR ARMM Maguindanao South Upi Pandan- Saramuray 1,490 13,000,000.00 14.900 completed Status as of March 31, 2016 9410 - - 2010 Kaus-Pilar FMR ARMM Maguindanao South Upi Kaus-Pilar 1,062 12,000,000.00 10.620 completed Status as of March 31, 2016 9411 - - 2010 Lamin-Pamtad Road and Lipawan- Mercedes Road ARMM Maguindanao Barira Lamin-Pamtad 2,500 50,000,000.00 25.000 completed Status as of March 31, 2016 9412 - - 2010 Korosoyan-Gadung-Parang Road ARMM Maguindanao Barira Korosoyan- Gadung-Parang 2,500 50,000,000.00 25.000 completed Status as of March 31, 2016 9413 - - 2010 Bakat-Pagetin Road Secion ARMM Maguindanao Shariff Saydona Mustapha Bakat-Pagetin 1,500 30,000,000.00 15.000 completed Status as of March 31, 2016 9414 - - 2010 Rehab of Kusiong-Tapian, Dimapatoy-Badak, Awang and Nekitan Road ARMM Maguindanao Datu Odin Sinsuat Kusiong-Tapian, Dimapatoy- Badak, Awang and Nekitan 2,500 50,000,000.00 25.000 completed Status as of March 31, 2016 9415 - - 2010 Brgy. Guiday Biruar Rd-Poblacion ARMM Maguindanao Parang Brgy. Guiday Biruar 1,650 25,000,000.00 16.500 completed Status as of March 31, 2016 9416 - - 2010 Brgy. Cabuan Road-Orandang ARMM Maguindanao Parang Brgy. Cabuan 1,050 25,000,000.00 10.500 completed Status as of March 31, 2016 9417 - - 2010 Repair/Rehab FMR ARMM Maguindanao Buldon 2,500 50,000,000.00 25.000 completed Status as of March 31, 2016 9418 - - 2010 Sitio Sarakan to Tangkal, Brgy. Bugasan Norte ARMM Maguindanao Matanog Bugasan Norte 1,050 20,000,000.00 10.500 completed Status as of March 31, 2016 9419 - - 2010 Rehab of Sapakan-Dapantis- Pidsandawan-Bakat-Malibpulok- Tabungao-Panadtaban-Mileb- Gauan-Baital FMR ARMM Maguindanao Rajah Buayan Sapakan- Dapantis- Pidsandawan- Bakat- Malibpulok- Tabungao- Panadtaban- Mileb-Gauan- Baital 2,500 50,000,000.00 25.000 completed Status as of March 31, 2016 9420 - - 2010 (funded under 11) Rehab/Improv't of Kapaya to Pitogo FMR ARMM Sulu Luuk Kapaya to Pitogo 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Bual to Imbang FMR ARMM Sulu Luuk Bual to Imbang 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Sucuban to Kapaya FMR ARMM Sulu Omar Sucuban to Kapaya 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Kan Muharram to Kan Jundam FMR ARMM Sulu Omar Kan Muharram to Kan Jundam 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Kan Taas to Guimbaon FMR ARMM Sulu Kalingalan Caluang Kan Taas to Guimbaon 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Tubig Samin to Lambago FMR ARMM Sulu Luuk Tubig Samin to Lambago 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Urot to Lambago FMR ARMM Sulu Luuk Urot to Lambago 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Masjid Bayle to Duhol Bud FMR ARMM Sulu Kalingalan Caluang Masjid Bayle to Duhol Bud 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Duhol Bud to Pang FMR ARMM Sulu Kalingalan Caluang Duhol Bud to Pang 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Rehab/Improv't of Manggis to Kan Piyawa FMR ARMM Sulu Luuk Manggis to Kan Piyawa 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kambing - Kamba FMR ARMM Sulu Kalingalan Caluang Kambing - Kamba 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Lagay Pitogo FMR ARMM Sulu Kalingalan Caluang Kan Lagay Pitogo 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Pitogo - Kan Taas FMR ARMM Sulu Kalingalan Caluang Pitogo - Kan Taas 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Maskid Bayle - Tabuh Samal FMR ARMM Sulu Kalingalan Caluang Maskid Bayle - Tabuh Samal 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Masquid Punjungan - Mangal Mangal FMR ARMM Sulu Kalingalan Caluang Masquid Punjungan - Mangal Mangal 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Mundoc - Niog Niog FMR ARMM Sulu Kalingalan Caluang Kan Mundoc - Niog Niog 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Unga - Kan Busi FMR ARMM Sulu Kalingalan Caluang Kan Unga - Kan Busi 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Simbahan - Poblacion Road ARMM Sulu Pangutaran Simbahan - Poblacion 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Lantung Tubig - Salang Road ARMM Sulu Pangutaran Lantung Tubig - Salang 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kehe Neog - Patutol Road ARMM Sulu Pangutaran Kehe Neog - Patutol 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Bangkelay - Panitikan Road ARMM Sulu Pangutaran Bangkelay - Panitikan 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Pandan Neog - Kawitan Road ARMM Sulu Pangutaran Pandan Neog - Kawitan 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Repair/Rehabilitation of Tandu Patong - Anak Jatih FMR ARMM Sulu Maimbung Tandu Patong - Anak Jatih 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Repair/Rehabilitation of Lantong - Kapok Pungol Road ARMM Sulu Maimbung Lantong - Kapok Pungol 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Repair/Rehabilitation of Labah - Bulabog Road ARMM Sulu Maimbung Labah - Bulabog 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kulasi - Bato Ugis Road ARMM Sulu Maimbung Kulasi - Bato Ugis 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Lantong - Lagasan Road ARMM Sulu Maimbung Lantong - Lagasan 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Tubig Putih - Kan Jarira FMR ARMM Sulu Luuk Tubig Putih - Kan Jarira 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Lambago - Bulangsi FMR ARMM Sulu Luuk Lambago - Bulangsi 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Tambak - Kan Nonoy FMR ARMM Sulu Luuk Tambak - Kan Nonoy 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Baling - Kan Taas FMR ARMM Sulu Luuk Kan Baling - Kan Taas 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Hajili - Sapang FMR ARMM Sulu Luuk Kan Hajili - Sapang 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Bulangsih - Bud FMR ARMM Sulu Luuk Bulangsih - Bud 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Juddin - Iskul FMR ARMM Sulu Omar Kan Juddin - Iskul 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Lahing lahing - Tabuk FMR ARMM Sulu Omar Lahing lahing - Tabuk 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Murphy - Siok FMR ARMM Sulu Omar Kan Murphy - Siok 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Sucuban - Kan Siga FMR ARMM Sulu Omar Sucuban - Kan Siga 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Andalan - Kan Awa FMR ARMM Sulu Omar Andalan - Kan Awa 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Angilan - Kan Muni FMR ARMM Sulu Omar Angilan - Kan Muni 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under 11) Const/Repair/Rehab of Kan Awah - Subangan FMR ARMM Sulu Omar Kan Awah - Subangan 210 5,000,000.00 2.100 completed Status as of March 31, 2016 2010 (funded under RFU9) Impv't/Regravelling of Tairan- Lawila-Subaan FMR ARMM Basilan Lantawan Tairan-Lawila- Subaan 600 10,000,000.00 6.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Upper Benembengan - Manggal FMR ARMM Basilan Sumisip Benembengan - Manggal 100 2,000,000.00 1.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Bohe Suyak - Tpngbatu FMR ARMM Basilan Ungkaya Pukan Bohe Suyak - Tpngbatu 150 3,000,000.00 1.500 completed Status as of March 31, 2016 2010 (funded under RFU9) Kan Simba - Sanaw ARMM Sulu Luuk Kan Simba - Sanaw 300 5,000,000.00 3.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Guimbaon-Kan Taas ARMM Sulu Luuk Guimbaon-Kan Taas 300 5,000,000.00 3.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Lingah - Kan Jarira ARMM Sulu Luuk Lingah - Kan Jarira 300 5,000,000.00 3.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Lambago-Baylie ARMM Sulu Kalinggalan Caluang Lambago-Baylie 300 5,000,000.00 3.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Barangay Pasil - Barangay Manggis ARMM Sulu Indanan Barangay Pasil - Barangay Manggis 125 5,000,000.00 1.250 completed Status as of March 31, 2016 2010 (funded under RFU9) Barangay Bukid-Barangay Tukay ARMM Sulu Parang Barangay Bukid- Barangay Tukay 125 5,000,000.00 1.250 completed Status as of March 31, 2016 2010 (funded under RFU9) Construction of Laum Maimbung- Brgy. Gulangan ARMM Sulu Maimbung Construction of Laum Maimbung- Brgy. Gulangan 500 10,000,000.00 5.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Barangay Biid - Liyang FMR ARMM Sulu Parang Barangay Biid - Liyang 100 5,000,000.00 1.000 completed Status as of March 31, 2016 2010 (funded under RFU9) Sanga-Sanga-Tubig Basag FMR (Phase I) ARMM Tawi-Tawi Bongao Sanga-Sanga 33 5,000,000.00 0.334 completed status as of March 31, 2016 2010 (funded under RFU9) Tubigbasag-Lakitlakit FMR (Phase I) ARMM Tawi-Tawi Bongao Tubigbasag 33 5,000,000.00 0.334 completed status as of March 31, 2016 2010 (funded under RFU9) Bolobok-Mandulan FMR (Phase I) ARMM Tawi-Tawi Bongao Bolobok 175 5,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Construction of Nalil FMR ARMM Tawi-Tawi Bongao Nalil 33 5,000,000.00 0.334 completed status as of March 31, 2016 2010 (funded under RFU9) Parang Pantay - Kula FMR ARMM Tawi-Tawi Languyan Parang Pantay 33 5,000,000.00 0.334 completed status as of March 31, 2016 2010 (funded under RFU9) Darussalam-Sinatang FMR ARMM Tawi-Tawi Languyan Darussalam 175 5,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Tandu-Owak FMR Phase I ARMM Tawi-Tawi Sibutu Tandu-Owak 175 5,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Tando-Owak FMR Phase 2 ARMM Tawi-Tawi Sibutu Tandu-Owak 50 5,000,000.00 0.500 completed status as of March 31, 2016 2010 (funded under RFU9) Nunukan-Busaing FMR Phase 1 ARMM Tawi-Tawi Sibutu Nunukan 175 5,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Nunukan-Busaing FMR Phase 2 ARMM Tawi-Tawi Sibutu Nunukan 175 5,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Larap-Tungusung FMR Phase 1 ARMM Tawi-Tawi Sitangkai Larap 175 5,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) East-West Sipangkot FMR Phase 1 ARMM Tawi-Tawi Sitangkai East-West Sipangkot 33 5,000,000.00 0.334 completed status as of March 31, 2016 2010 (funded under RFU9) Sunsang FMR ARMM Tawi-Tawi Sapa - Sapa Sunsang 175 1,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Sunsang FMR ARMM Tawi-Tawi Sapa - Sapa Sunsang 175 4,000,000.00 1.750 completed status as of March 31, 2016 2010 (funded under RFU9) Basnunuk - Siraso FMR ARMM Tawi-Tawi Languyan Basnunuk 175 5,000,000.00 1.750 completed status as of March 31, 2016

PRE-CONSTRUCTION PRE- PRE-CONSTRUCTION CONSTRUCTIO … · 2017. 9. 14. · Panitikan Road ARMM Sulu Pangutaran Bangkelay - Panitikan 210 5,000,000.00 2.100 completed Status as of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

City
Implementing
Office
Congressional
District
PROJECT
INFORMATION
Proponent's
Classification
ADDITIONAL
PROJECT
INFORMATI
ON
Estimated
Length (km)
Scope of Work
2010 Barangay Bahaya Bohe Bato -
Sitio Kasanyangan, Brgy. Basak ARMM Basilan Sumisip Basak 488 5,000,000.00 4.880 completed
Status as of March 31,
2016
Brgy Basak ARMM Basilan Sumisip Basak 488 5,000,000.00 4.880 completed
Status as of March 31,
2016
2010 Brgy. Tambara FMR ARMM Lanao del Sur Malabang Tambara 337 10,000,000.00 3.370 completed Status as of March 31,
2016
Brgy. Bubong-
2016
2010 Kapatagan FMR Road Network ARMM Lanao del Sur Kapatagan Kapatagan 2,000 50,000,000.00 20.000 completed Status as of March 31,
2016
2010 Construction of Sultan Barodi
FMR ARMM Lanao del Sur Kapatagan Sultan Barodi 0 50,000,000.00 completed
Status as of March 31,
2016
2010 Rehab of Brgy. Tuka 1 FMR ARMM Lanao del Sur Bacolod-
Kalawi Tuka 1 0 10,000,000.00 completed
Status as of March 31,
2016
2010 Rehab of Brgy. Sugod FMR ARMM Lanao del Sur Bacolod-
Kalawi Sugod 0 10,000,000.00 completed
Status as of March 31,
2016
2010 Rehab of Barorao FMR ARMM Lanao del Sur Balabagan Barorao 2,500 50,000,000.00 25.000 completed Status as of March 31,
2016 9421 - -
Saramuray 1,490 13,000,000.00 14.900 completed
Status as of March 31,
2016 9410 - -
2010 Kaus-Pilar FMR ARMM Maguindanao South Upi Kaus-Pilar 1,062 12,000,000.00 10.620 completed Status as of March 31,
2016 9411 - -
Mercedes Road ARMM Maguindanao Barira Lamin-Pamtad 2,500 50,000,000.00 25.000 completed
Status as of March 31,
2016 9412 - -
Gadung-Parang 2,500 50,000,000.00 25.000 completed
Status as of March 31,
2016 9413 - -
Shariff
Saydona
Mustapha
Bakat-Pagetin 1,500 30,000,000.00 15.000 completed Status as of March 31,
2016 9414 - -
2016 9415 - -
2010 Brgy. Guiday Biruar Rd-Poblacion ARMM Maguindanao Parang Brgy. Guiday
Biruar 1,650 25,000,000.00 16.500 completed
Status as of March 31,
2016 9416 - -
2010 Brgy. Cabuan Road-Orandang ARMM Maguindanao Parang Brgy. Cabuan 1,050 25,000,000.00 10.500 completed Status as of March 31,
2016 9417 - -
2016 9418 - -
Bugasan Norte ARMM Maguindanao Matanog Bugasan Norte 1,050 20,000,000.00 10.500 completed
Status as of March 31,
2016 9419 - -
2016 9420 - -
Kapaya to
2016
2010
(funded
Rehab/Improv't of Bual to Imbang
FMR ARMM Sulu Luuk Bual to Imbang 210 5,000,000.00 2.100 completed
Status as of March 31,
2016
2010
(funded
Sucuban to
2016
2010
(funded
Kan Muharram
Status as of March 31,
2016
2010
(funded
Guimbaon FMR ARMM Sulu
2016
2010
(funded
Tubig Samin to
2016
2010
(funded
Rehab/Improv't of Urot to
Lambago FMR ARMM Sulu Luuk Urot to Lambago 210 5,000,000.00 2.100 completed
Status as of March 31,
2016
2010
(funded
Kalingalan
Caluang
Status as of March 31,
2016
2010
(funded
Pang FMR ARMM Sulu
2016
2010
(funded
Manggis to Kan
2016
2010
(funded
2016
2010
(funded
2016
2010
(funded
Kalingalan
Caluang
2016
2010
(funded
Kalingalan
Caluang
Status as of March 31,
2016
2010
(funded
Kalingalan
Caluang
Masquid
Punjungan -
2016
2010
(funded
Kalingalan
Caluang
Status as of March 31,
2016
2010
(funded
Kalingalan
Caluang
2016
2010
(funded
Simbahan -
2016
2010
(funded
Lantung Tubig -
2016
2010
(funded
Kehe Neog -
2016
2010
(funded
Bangkelay -
2016
2010
(funded
Pandan Neog -
2016
2010
(funded
Tandu Patong -
Status as of March 31,
2016
2010
(funded
Lantong - Kapok
2016
2010
(funded
Repair/Rehabilitation of Labah -
Bulabog Road ARMM Sulu Maimbung Labah - Bulabog 210 5,000,000.00 2.100 completed
Status as of March 31,
2016
2010
(funded
Kulasi - Bato
2016
2010
(funded
Lantong -
2016
2010
(funded
Tubig Putih -
Status as of March 31,
2016
2010
(funded
Lambago -
2016
2010
(funded
Tambak - Kan
2016
2010
(funded
Kan Baling -
Status as of March 31,
2016
2010
(funded
Kan Hajili -
2016
2010
(funded
Const/Repair/Rehab of Bulangsih -
Bud FMR ARMM Sulu Luuk Bulangsih - Bud 210 5,000,000.00 2.100 completed
Status as of March 31,
2016
2010
(funded
Kan Juddin -
2016
2010
(funded
Lahing lahing -
2016
2010
(funded
Kan Murphy -
2016
2010
(funded
Sucuban - Kan
2016
2010
(funded
Andalan - Kan
2016
2010
(funded
Angilan - Kan
2016
2010
(funded
Kan Awah -
2016
2010
(funded
under
RFU9)
Tairan-Lawila-
2016
2010
(funded
under
RFU9)
2016
2010
(funded
under
RFU9)
Pukan
2016
2010
(funded
under
RFU9)
Sanaw 300 5,000,000.00 3.000 completed
Status as of March 31,
2016
2010
(funded
under
RFU9)
Taas 300 5,000,000.00 3.000 completed
Status as of March 31,
2016
2010
(funded
under
RFU9)
Jarira 300 5,000,000.00 3.000 completed
Status as of March 31,
2016
2010
(funded
under
RFU9)
Status as of March 31,
2016
2010
(funded
under
RFU9)
2016
2010
(funded
under
RFU9)
Barangay Tukay 125 5,000,000.00 1.250 completed
Status as of March 31,
2016
2010
(funded
under
RFU9)
Construction of
Laum Maimbung-
Brgy. Gulangan
2016
2010
(funded
under
RFU9)
Liyang 100 5,000,000.00 1.000 completed
Status as of March 31,
2016
2010
(funded
under
RFU9)
(Phase I) ARMM Tawi-Tawi Bongao Sanga-Sanga 33 5,000,000.00 0.334 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Tubigbasag-Lakitlakit FMR (Phase
I) ARMM Tawi-Tawi Bongao Tubigbasag 33 5,000,000.00 0.334 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Bolobok-Mandulan FMR (Phase I) ARMM Tawi-Tawi Bongao Bolobok 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Construction of Nalil FMR ARMM Tawi-Tawi Bongao Nalil 33 5,000,000.00 0.334 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Parang Pantay - Kula FMR ARMM Tawi-Tawi Languyan Parang Pantay 33 5,000,000.00 0.334 completed status as of March 31, 2016
2010
(funded
under
RFU9)
2010
(funded
under
RFU9)
Tandu-Owak FMR Phase I ARMM Tawi-Tawi Sibutu Tandu-Owak 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Tando-Owak FMR Phase 2 ARMM Tawi-Tawi Sibutu Tandu-Owak 50 5,000,000.00 0.500 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Nunukan-Busaing FMR Phase 1 ARMM Tawi-Tawi Sibutu Nunukan 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Nunukan-Busaing FMR Phase 2 ARMM Tawi-Tawi Sibutu Nunukan 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Larap-Tungusung FMR Phase 1 ARMM Tawi-Tawi Sitangkai Larap 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
East-West
Sipangkot 33 5,000,000.00 0.334 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Sunsang FMR ARMM Tawi-Tawi Sapa - Sapa Sunsang 175 1,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Sunsang FMR ARMM Tawi-Tawi Sapa - Sapa Sunsang 175 4,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Basnunuk - Siraso FMR ARMM Tawi-Tawi Languyan Basnunuk 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Maraning - Cawa Cawa FMR ARMM Tawi-Tawi Languyan Maraning 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Tubig Dayang Tampakan FMR ARMM Tawi-Tawi South Ubian Tubig Dayang
Tampakan 175 5,000,000.00 1.750 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Busaing - Buton FMR 2 ARMM Tawi-Tawi Sibutu Busaing 33 5,000,000.00 0.330 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Busaing - Buton FMR 2 ARMM Tawi-Tawi Sibutu Busaing 33 5,000,000.00 0.330 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Brgy. Tarawakan FMR ARMM Tawi-Tawi Bongao Tarawakan 76 5,000,000.00 0.763 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Brgy. Duhol Bato-Barangay Sapa ARMM Tawi-Tawi Mapun Duhol Bato 76 5,000,000.00 0.763 completed status as of March 31, 2016
2010
(funded
under
RFU9)
Barangay Nunukan ARMM Tawi-Tawi Sibuto Nunukan 76 5,000,000.00 0.763 completed status as of March 31, 2016
2010
(funded
under
RFU9)
2011 Timanan-Likoliko-Balete-Pete-
Pandan, Pilar,
Romangaob
(Pob)
750 10,000,000.00 7.500 completed status as of March 31, 2016 9436 - -
2011
(DAP)
under
RFU10
Dilabayan-Poblacion FMR ARMM Lanao del Sur Butig Dilabayan 42 5,000,000.00 0.417 completed status as of March 31, 2016 9377 0.61 Concreting
2011
(DAP)
under
RFU10
Brgy. Kilikili East FMR ARMM Lanao del Sur Wao Kilikili East 25 3,000,000.00 0.250 completed status as of March 31, 2016 9378 0.265 Concreting
2011
(DAP)
under
RFU10
Brgy. Kilikili West FMR ARMM Lanao del Sur Wao Kilikili West 23 3,000,000.00 0.234 completed status as of March 31, 2016 9379 0.242 Concreting
2011
(DAP)
under
RFU10
ARMM Lanao del Sur Wao Extension
Poblacion 100 12,000,000.00 1.000 completed status as of March 31, 2016 9380 - Concreting
2011
(DAP)
under
RFU10
Brgy. Sumugot FMR ARMM Lanao del Sur Bumbaran Sumugot 58 7,000,000.00 0.583 completed status as of March 31, 2016 9381 0.53 Concreting
2011
(DAP)
under
RFU10
Buot-Milaya FMR ARMM Lanao del Sur Wao Milaya 250 30,000,000.00 2.500 completed status as of March 31, 2016 9382 2.55 Concreting
2011
(DAP)
under
RFU10
Buadipuso
Buntong Ragondingan 116 15,000,000.00 1.160 completed status as of March 31, 2016 9383 1.29 Concreting
2011
(DAP)
under
RFU10
Ramain Linamon 15,000,000.00 status as of March 31, 2016 9384 - -
2011
(DAP)
under
RFU10
Sungod Pantar FMR ARMM Lanao del Sur Bubong Sungod Pantar 15,000,000.00 status as of March 31, 2016 9385 - -
2011
(DAP)
under
RFU10
Maguing Burwa 7,500,000.00 status as of March 31, 2016 9386 - -
2011
(DAP)
under
RFU10
Maguing Malungon 7,500,000.00 status as of March 31, 2016 9387 - -
2011
(DAP)
under
RFU10
Lacadun FMR ARMM Lanao del Sur Masiu Lacadun 7,500,000.00 status as of March 31, 2016 9388 - -
2011
(DAP)
under
RFU12
Brgy. Benolen FMR ARMM Maguindanao Datu Odin
Sinsuat Benolen 50 10,000,000.00 0.500 completed status as of March 31, 2016 9422 - -
2011
(DAP)
under
RFU12
Purok Makabayan FMR ARMM Maguindanao Upi Nangi 782,774.00 completed status as of March 31, 2016 9423 - -
2011
(DAP)
under
RFU12
Purok Begonia FMR ARMM Maguindanao Upi Borongotan 50 830,331.00 0.500 completed status as of March 31, 2016 9424 - -
2011
(DAP)
under
RFU12
Brgy. Nituan FMR ARMM Maguindanao Parang Nituan 50 5,000,000.00 0.500 on going status as of March 31, 2016 9425 - -
2011
(DAP)
under
RFU12
Main Camp MILF FMR ARMM Maguindanao Sultan
Kudarat Darapanan 50 10,000,000.00 0.500 completed status as of March 31, 2016 9426 - -
2011
(DAP)
under
RFU12
Upper Hot Spring FMR ARMM Maguindanao Datu Odin
Sinsuat Benolen 50 6,000,000.00 0.500 completed status as of March 31, 2016 9427 - -
2011
(DAP)
under
RFU12
2011
(DAP)
under
RFU12
Northern
Kabuntalan Indatuan 50 20,000,000.00 0.500 completed status as of March 31, 2016 9429 - -
2011
(DAP)
under
RFU12
Brgy. Montay FMR ARMM Maguindanao Datu Piang Montay 50 5,000,000.00 0.500 on going status as of March 31, 2016 9430 - -
2011
(DAP)
under
RFU12
Brgy. Romongaob FMR ARMM Maguindanao South Upi Romongaob 50 10,000,000.00 0.500 on going status as of March 31, 2016 9431 - -
2011
(DAP)
under
RFU12
2011
(DAP)
under
RFU12
Brgy. South Binangga FMR ARMM Maguindanao Talayan South Binangga 50 3,000,000.00 0.500 on going status as of March 31, 2016 9433 - -
2011
(DAP)
under
RFU12
Brgy. Banaba-Paitan FMR ARMM Maguindanao Abdullah
Sangki Banaba-Paitan 50 15,000,000.00 0.500 on going status as of March 31, 2016 9434 - -
2011
(DAP)
under
RFU12
2011
(DAP)
under
RFU9
Tambak FMR
ARMM Basilan Tipo-Tipo Lagayas 39 3,000,000.00 0.385 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
brgy Balas to Brgy. Kalugusan
Junction
ARMM Basilan Lamitan Sengal 40 3,000,000.00 0.400 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Kalut to Brgy. Mahawid Junction ARMM Basilan Tuburan Lahi-lahi 2,000,000.00 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Bohe Tambak to Sitio
Kebukkan FMR, Bohe Tambak ARMM Basilan Tuburan Bohe Tambak 25 2,000,000.00 0.250 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Sitio Limbo Tinoong FMR ARMM Basilan Tipo-Tipo Limbo Tinoong 2,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Sitio Boheh Bitih FMR ARMM Basilan Tipo-Tipo Bancoang 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Bohe Baka to Brgy. Bohe
Lebbung FMR ARMM Basilan Tipo-Tipo Bohe Baka 2,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Baas to Brgy. Lebbuh FMR ARMM Basilan Lamitan Baas 2,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Limook to Brgy. Balobo
FMR ARMM Basilan Lamitan Limook 3,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Balobo to Brgy. Bulingan
FMR ARMM Basilan Lamitan Balobo 5,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Buahan to Brgy. Kalusugan
FMR ARMM Basilan Lamitan Buahan 3,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Sengal to Brgy. Balas FMR ARMM Basilan Lamitan Sengal 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Kalut to Brgy. Mahawid FMR ARMM Basilan Tuburan Kalut 2,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Sitio Kinkalan FMR ARMM Basilan Tuburan Bohe Tambis 1,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Lahi-lahi to Brgy. Dugaa
FMR ARMM Basilan Tuburan Lahi-lahi 2,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Pukan Materling 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Paho ARMM Basilan
Pukan Bohe Paho 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Pukan Bohe Paho 2,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Sitio Plantation, Brgy. Upper Bato-
Bato to Lower Bato-Bato FMR ARMM Basilan Akbar Upper Bato-Bato 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Sitio Masilung, Brgy. Lower Bato-
Bato ARMM Basilan Akbar Lower Bato-Bato 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Subaan to Brgy. Lawila ARMM Basilan Lantawan Subaan 2,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Upper Bato-Bato FMR ARMM Basilan Akbar Upper Bato Bato 1,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Lower Bato Bato ARMM Basilan Akbar Lower Bato Bato 16,500,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Caddayan FMR ARMM Basilan Akbar Caddayan 32,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Luuk Poblacion-Sigumbal
FMR ARMM Sulu Tongkil Sigumbal 476 10,000,000.00 4.760 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Biid-Liyang-Alu Kaha FMR ARMM Sulu Parang Biid 58 7,000,000.00 0.583 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Tandu-Bato-bato-Itum FMR ARMM Sulu Luuk Tandu-Bato 5,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
2011
(DAP)
under
RFU9
Kulabutah-Anuling FMR ARMM Sulu Patikul Kulabutah 15,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Lahi FMR ARMM Sulu Maimbung Lahi 10,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Matatal-Darul Jambangan FMR ARMM Sulu Maimbung Matatal 10,000,000.00 status as of March 31, 2016
2011
(DAP)
under
RFU9
Matatal-Anak Jati FMR ARMM Sulu Maimbung Matatal 10,000,000.00 status as of March 31, 2016
2011
under
RFU10
Masiu FMR ARMM Lanao del Sur Masiu Labay 5,000,000.00 0.500 status as of March 31, 2016 9389 - -
2011
under
RFU10
Poblacion &
Dulungan 5,000,000.00 0.500 status as of March 31, 2016 9390 - -
2011
under
RFU10
Dulungan &
Dinganun 5,000,000.00 0.500 status as of March 31, 2016 9391 - -
2011
under
RFU10
Brgy Poblacion-Brgy Malungan ARMM Lanao del Sur Butig Brgy Poblacion-
Brgy Malungan 5,000,000.00 0.500 status as of March 31, 2016 9392 0.19 Concreting
2011
under
RFU10
Brgy Dilabayan - Brgy Poblacion ARMM Lanao del Sur Butig Brgy Dilabayan -
Brgy Poblacion 2,000,000.00 0.200 status as of March 31, 2016 9393 0.17 Concreting
2011
under
RFU10
Basak, Palao,
Pantar and
Pantar Proper
2011
under
RFU12
Sibuto FMR ARMM Maguindanao
Datu Odim
Sinsuat Brgy Sibuto 343 5,000,000.00 3.425 completed status as of March 31, 2016 9437 - -
2011
under
RFU12
Brgy Poblacion 8 ARMM Maguindanao Cotabato City Brgy Poblacion
8 100 2,500,000.00 1.000 completed status as of March 31, 2016 9438 - -
2011
under
RFU12
Poblacion-Sitio Tangguapo FMR ARMM Maguindanao Datu Piang Poblacion-Sitio
Tangguapo 10 2,000,000.00 0.100 completed status as of March 31, 2016 9439 - -
2011
under
RFU12
Tambunan II-Kalumamis FMR ARMM Maguindanao Guindulungan Tambunan II-
Kalumamis 10 2,000,000.00 0.100 completed status as of March 31, 2016 9440 - -
2011
under
RFU12
Brgy Benolen &
Brgy Bagoinged
660 10,000,000.00 6.600 completed status as of March 31, 2016 9441 - -
2011
under
RFU9
Lukbuton FMR, Malamawi
2011
under
RFU9
Sta Clara FMR ARMM Basilan Lamitan Sta Clara 2,500,000.00 0.250 status as of March 31, 2016
2011
under
RFU9
Phase 4 FMR ARMM Sulu Panglima Blank 5,000,000.00 0.500 status as of March 31, 2016
2011
under
RFU9
Dungon-Lahnag Brgy. Road ARMM Sulu Tongkil Dungon 5,000,000.00 0.500 status as of March 31, 2016
2011
under
RFU9
2011
(DAP)
under
RFU9
Umus Mataha FMR ARMM Tawi-Tawi Mapun Umus Mataha 72 5,000,000.00 0.720 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Brgy. Tabulian FMR ARMM Tawi-Tawi Mapun Tabulian 72 5,000,000.00 0.720 completed status as of March 31, 2016
2011
(DAP)
under
RFU9
Sugala Bato-bato 100,000,000.00 status as of March 31, 2016
2011
under
RFU9
Sapa FMR ARMM Tawi-Tawi Mapun Sapa 60 5,000,000.00 0.762 completed status as of March 31, 2016
2011
under
RFU9
Ungus-Ungus-Tandu Owak FMR ARMM Tawi-Tawi Sibutu Ungus 105 5,000,000.00 0.762 completed status as of March 31, 2016
2011
under
RFU9
Lakit-Lakit - Mandulan FMR ARMM Tawi-Tawi Bongao Lakit-Lakit 50 5,000,000.00 0.762 completed status as of March 31, 2016
2011
under
RFU9
2011
under
RFU9
2011
under
RFU9
Bagid-Bakong FMR ARMM Tawi-Tawi Simunul Bagid 90 5,000,000.00 0.762 completed status as of March 31, 2016
2011
under
RFU9
Sibakloon FMR ARMM Tawi-Tawi Tandubas Sibakloon 80 5,000,000.00 0.762 completed status as of March 31, 2016
2011
under
RFU9
Buton FMR ARMM Tawi-Tawi Sibutu Buton 60 5,000,000.00 0.762 completed status as of March 31, 2016
2011
under
RFU9
Parang Pantay FMR ARMM Tawi-Tawi Languyan Parang Pantay 39 5,000,000.00 0.385 completed status as of March 31, 2016
2011
under
RFU9
Languyan Proper FMR ARMM Tawi-Tawi Languyan 39 5,000,000.00 0.385 completed status as of March 31, 2016
2011
under
RFU9
Sibakloon FMR ARMM Tawi-Tawi Tandubas Sibakloon 39 5,000,000.00 0.385 completed status as of March 31, 2016
2011
under
RFU9
Bikad-Boki Road ARMM Tawi-Tawi Mapun Bikad 39 5,000,000.00 0.385 completed status as of March 31, 2016
2012 Rehab/Improvement of Brgy.
Northern
Kabuntalan Gayonga 8,000,000.00 completed status as of March 31, 2016
2012 Construction of and Concreting of
Sambolawan-Tee-Butilen FMR ARMM Maguindanao Datu Salibo 5,000,000.00 0.500 completed status as of March 31, 2016
2012
(MRDP)
Balobo-Upper
2012
(MRDP)
Macadar-
2012
(MRDP)
Lumbaca
Unayan Brgy Kalalon 1,600,000.00 0.710 status as of March 31, 2016
2012
(MRDP)
Datu Blah
2012
(MRDP)
2012
(MRDP)
Datu Odin
Sitio Silingan 2,681,000.00 1.830 status as of March 31, 2016
2012
(MRDP)
Ampatuan Elian-Kurungan 2,124,000.00 2.200 status as of March 31, 2016
2012
(MRDP)
Ampatuan Kitango-Pikeg 2,290,000.00 2.200 status as of March 31, 2016
2012
(MRDP)
2012
(MRDP)
Nituan-
2012
(MRDP)
PRJ Sampalok-
2012
(MRDP)
Rehabilitation of PRJ -Manion
FMR ARMM Maguindanao Parang PRJ -Manion 2,715,000.00 3.000 status as of March 31, 2016
2012
(MRDP)
Construction of Kabuling-Lepak
FMR ARMM Maguindanao Parang Kabuling-Lepak 2,485,000.00 2.500 status as of March 31, 2016
2012
under
RFU9
2012
under
RFU9
2012
(MRDP)
to Maraning FMR ARMM Tawi-Tawi Languyan Bakkaw-Bakkaw 958 4,400,000.00 6.000 status as of March 31, 2016
2012
(MRDP) Constructio of Himba FMR ARMM Tawi-Tawi Tandubas Himba 988 5,873,000.00 4.500 status as of March 31, 2016
2012
under
RFU9
Concreting Of Lookan -
Tonggusong Fmr ARMM Tawi-Tawi Sapa-Sapa Lookan 60 10,000,000.00 1.250 not yet started
status as of March 31,
2016;
Concreting Of Tabawan - Likud
Fmr ARMM Tawi-Tawi South Ubian Tabawan 60 10,000,000.00 1.100 not yet started
status as of March 31,
2016;
Concreting Of Tampakan-Sollogan
Fmr ARMM Tawi-Tawi South Ubian Tampakan 30 5,000,000.00 0.550 status as of March 31, 2016
2012
under
RFU9
Concreting Of Ungus - Ungus Fmr ARMM Tawi-Tawi Bongao Ungus 50 10,000,000.00 1.250 not yet started
status as of March 31,
2016;
Concreting Of Pakias –
Karungdong Fmr ARMM Tawi-Tawi Bongao Pakias 50 10,000,000.00 1.250 not yet started
status as of March 31,
2016;
Concreting Of Bakong - Pagasinan
Fmr ARMM Tawi-Tawi Simunul Bakong 20 10,000,000.00 1.100 not yet started
status as of March 31,
2016;
(Bitayan)-Basak Proper FMR ARMM Basilan Sumisip Basak Proper 292 30,000,000.00 1.000 completed status as of March 31, 2016
2013 Basak - Sahaya Bohe Bato FMR ARMM Basilan Sumisip Basak - Sahaya
Bohe Bato 92 10,000,000.00 1.000 completed status as of March 31, 2016
2013 Limbocandis - Baiwas FMR ARMM Basilan Sumisip Limbocandis -
Baiwas 142 15,000,000.00 1.000 completed status as of March 31, 2016
2013 Brgys. Buadi Amaloy-Laila
Buadi Amaloy &
Laila Lumbac 63 5,000,000.00 0.625 status as of March 31, 2016 9397 - -
2013 Brgys. Sambowang Atawa-Buisan
Sambowang
Atawa & Buisan 63 5,000,000.00 0.625 status as of March 31, 2016 9398 - -
2013 Alip Lalabuan FMR ARMM Lanao del Sur Masiu Alip Lalabuan 25 2,000,000.00 0.250 status as of March 31, 2016 9399 - -
2013 Brgy. Bansayan-Palao FMR ARMM Lanao del Sur Bubong Bansayan-Palao 20 2,000,000.00 0.200 status as of March 31, 2016 9403 - -
2013 Brgy. Mantapoli-Kalaw FMR ARMM Lanao del Sur Marantao Mantapoli-Kalaw 20 2,000,000.00 0.200 status as of March 31, 2016 9404 0.5 concreting
2013 Brgy. Natangcopan-Salaman FMR ARMM Lanao del Sur Bumbaran Natangcopan-
Salaman 20 2,000,000.00 0.200 status as of March 31, 2016 9406 0.17 concreting
2013 Brgy. Pindolonan FMR ARMM Lanao del Sur Kapal Pindolonan 20 2,000,000.00 0.200 status as of March 31, 2016 9407 0.334 concreting
2013 Brgy. Poblacion FMR ARMM Lanao del Sur Saguairan Poblacion 20 2,000,000.00 0.200 status as of March 31, 2016 9408 - -
2013 Brgy. Bago-Inged FMR ARMM Maguindanao Datu odin
Sinsuat Bago-Inged 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Brgy. Benolen FMR ARMM Maguindanao Datu odin
Sinsuat Benolen 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Brgy. Kiram FMR ARMM Maguindanao Datu odin
Sinsuat Kiram 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Brgy. Nituan FMR ARMM Maguindanao Datu odin
Sinsuat Nituan 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Tandu Bagua FMR ARMM Sulu Patikul Tandu Bagua 18 3,000,000.00 0.300 on-going
status as of March 31,
2016;
90% accomplished
2013 Biid Liang-Alu Kaha FMR ARMM Sulu Parang Biid Liang & Alu
Kaha 18 3,000,000.00 0.300 on-going
status as of March 31,
2016;
Tumangas 12 2,000,000.00 0.200 on-going
status as of March 31,
2016;
Poblacion 12 2,000,000.00 0.200 on-going
status as of March 31,
2016;
Kabungkol,
Kandilo &
Tuyang
2016;
Buadi
Dayomangga &
Somiorang
100 10,000,000.00 0.730 completed status as of March 31, 2016 9409 - -
2013
Bayabao
Ragayan-
Bubong 20 2,000,000.00 0.240 completed status as of March 31, 2016 9400 - -
2013
Buadi Arorao -
Maruhomsallo 20 2,000,000.00 0.135 completed status as of March 31, 2016 9401 - -
2013
Balagunun-
Bolao 20 2,000,000.00 0.200 completed status as of March 31, 2016 9402 - -
2013
10
Brgy. Kalanganan FMR ARMM Lanao del Sur Piagapo Kalanganan 20 2,000,000.00 0.160 completed status as of March 31, 2016 9405 - -
2013
under
RFU9
Basilan City ARMM Basilan Isabela City Calvario 2,000,000.00 0.150 completed status as of March 31, 2016
2013 Bas-Bas FMR ARMM Tawi-tawi Languyan Bas-Bas 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Languyan Proper FMR ARMM Tawi-tawi Languyan Languyan
Proper 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Cawa-Cawa-Maraning FMR ARMM Tawi-tawi Languyan Cawa-Cawa &
Maraning 50 5,000,000.00 0.500 status as of March 31, 2016
2013 Tubig Dayang FMR ARMM Tawi-tawi South Ubian Tubig Dayang 50 5,000,000.00 0.500 status as of March 31, 2016
2014
Poblacion Municipal Road
Junction FMR ARMM Basilan Sumisip Buli-Buli 62 3,000,000.00 0.300 status as of March 31, 2016
2014
Junction National Highway (Phase
Bacung 420 12,000,000.00 1.200 status as of March 31, 2016
2014
Junction Bailey Bridge-Lower Lo-
ok FMR ARMM Basilan Lamitan City Lo-ok 120 5,000,000.00 0.500 status as of March 31, 2016
2014
(Batch 8) Junction Reservoir-Look Proper ARMM Basilan Lamitan City Lo-ok 204 5,000,000.00 0.500 status as of March 31, 2016
2014
(Batch 8) Juntion Lo-ok FMR ARMM Basilan Lamitan City Lo-ok 300 5,000,000.00 0.500 status as of March 31, 2016
2014
(Batch 8) Juntion Lo-ok FMR ARMM Basilan Lamitan City Lo-ok 5,000,000.00 status as of March 31, 2016
2014
Lower
Sinangkapan 342 5,000,000.00 0.500 status as of March 31, 2016
2014
Lower
Sinangkapan 342 5,000,000.00 0.500 status as of March 31, 2016
2014
Junction National Highway (Phase
Bacung 420 10,000,000.00 1.000 status as of March 31, 2016
2014
Ungkaya
Pukan Bohe Pahuh 60 5,000,000.00 0.500 status as of March 31, 2016
2014
Ungkaya
Pukan Bohe Pahuh 75 5,000,000.00 0.500 status as of March 31, 2016
2014
Tipo-Tipo
Proper 50 5,000,000.00 0.500 status as of March 31, 2016
2014
Tipo-Tipo
Proper 50 5,000,000.00 0.500 status as of March 31, 2016
2014
Paaling-
2014
Buadipuso -
2014
(Batch 6) Upper Pugaan-Patani Sugod FMR ARMM Lanao del Sur
Ditsain
2014
(Batch 9) Brgy. Micolabo FMR ARMM Lanao del Sur Picong Micolabo 200 10,000,000.00 1.000 status as of March 31, 2016
2014
Buadiposo-
Buntong Tangcal 500 5,000,000.00 0.600 status as of March 31, 2016
2014
(Batch 10) Basingan FMR ARMM Lanao del Sur Bubong Basingan 250 2,000,000.00 0.250 status as of March 31, 2016
2014
(Batch 10) Bualan Manas FMR ARMM Lanao del Sur Bubong Bualan Manas 250 2,000,000.00 0.250 status as of March 31, 2016
2014
(Batch 10) Pindolanan FMR ARMM Lanao del Sur Kapai Pindolanan 200 2,000,000.00 0.200 status as of March 31, 2016
2014
Cawayan-
Dialongana 150 2,000,000.00 0.200 status as of March 31, 2016
2014
Ditsaan
Ramain Upper Pugaan 60 4,000,000.00 0.422 status as of March 31, 2016
not included in the DPWH
status report
Bubong-
Bayabao 342 3,000,000.00 0.307 status as of March 31, 2016
2014
(Batch 10) Moncado-Kadingilan FMR ARMM Lanao del Sur Marawi City Mocado 500 6,000,000.00 0.640 status as of March 31, 2016
2014
Ditsaan
Ramain
Pagalongan
Maiso-on 1,103 3,000,000.00 0.211 status as of March 31, 2016
2014
(Batch 10) Maul Ilian (Tuca) FMR ARMM Lanao del Sur Marantao
Maul Ilian
(Tuca) 316 3,000,000.00 0.300 status as of March 31, 2016
2014
(Batch 10) Madanding-Bubong Ramain FMR ARMM Lanao del Sur Bubong Madanding 121 8,000,000.00 0.800 status as of March 31, 2016
2014
(Batch 11) Sandab FMR ARMM Lanao del Sur Butig Sandab 100 50,000,000.00 0.500 status as of March 31, 2016
2014
(Batch 15) Brgy. Bubong FMR ARMM Lanao del Sur Saguiran Bubong 20 2,000,000.00 0.200 status as of March 31, 2016
2014
(Batch 15) Dasomalong FMR ARMM Lanao del Sur Tamparan Dasomalong 20 2,000,000.00 0.200 status as of March 31, 2016
2014
(Batch 15) Brgy. Kabasaran-Tambara FMR ARMM Lanao del Sur Malabang Kabasaran 100 10,000,000.00 1.000 status as of March 31, 2016
2014
Tamontaka-V to Taviran Gambar
Road Phase 1A ARMM Maguindano Cotabato City Tamontaka 5 213 20,000,000.00 1.200 status as of March 31, 2016
2014
Tamontaka-V to Diocalano
Section FMR Pahse 1B ARMM Maguindano Cotabato City Tamontaka 5 213 20,000,000.00 0.800 status as of March 31, 2016
2014
Upper Taviran Section FMR
Phase 1C ARMM Maguindano Kabuntalan Taviran 213 15,000,000.00 0.600 status as of March 31, 2016
2014
Taviran-Gambar Section FMR
Phase 1D ARMM Maguindano Kabuntalan Taviran 213 15,000,000.00 0.600 status as of March 31, 2016
2014
Sultan
Mastura Tariken 250 18,481,752.46 1.800 status as of March 31, 2016
2014
(Batch 15) Laum Buwahan FMR ARMM Sulu Parang Laum Buwahan 100 10,000,000.00 1.000 status as of March 31, 2016
2014
(Batch 15) Laum Suah FMR ARMM Sulu Parang Laum Suah 100 10,000,000.00 1.000 status as of March 31, 2016
2014
(Batch 15) Linuho FMR ARMM Sulu Parang Linuho 100 10,000,000.00 1.000 status as of March 31, 2016
2014
(Batch 7) Tubig Basag FMR ARMM Tawi-Tawi Bongao Tubig Basag 534 17,000,000.00 1.700 status as of March 31, 2016
2015 Bohe Pahu-Sitio Bohe Basilan
FMR ARMM Basilan
Ungakaya
Pukan Bohe Pahu 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Bohe Pahu-Sitio Block 41 FMR ARMM Basilan Ungkaya
Pukan Bohe Pahu 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Basak-Sitio Diata Kud FMR ARMM Basilan Sumisip Basak 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Junction National Highway Bacung-
Sitio Diata Kud Brgy Bacung FMR ARMM Basilan Sumisip Bacung 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Brgy Pangadapun FMR ARMM Lanao del Sur Piagapo Pangadapun 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Brgy Ratian FMR ARMM Lanao del Sur Piagapo Ratian 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Brgy Barorao to Poblacion FMR ARMM Lanao del Sur Balabagan Barorao 200 20,000,000.00 2.000 status as of March 31, 2016
2015
Gambar, Kabuntulan (Phase 2)
FMR
ARMM Maguindano Cotabato City Tamontaka 5 300 30,000,000.00 3.000 status as of March 31, 2016
2015 Kuya to Selaklak to Ugah FMR
Phase 1 ARMM Maguindano South Upi Kuya 150 15,000,000.00 1.500 status as of March 31, 2016
2015 Wanni Piyanjihan-Brgy. Alu Kaha-
Brgy. Alu Layag FMR ARMM Sulu Parang
Wanni
2016; pre-construction
Laumsuwah 100 10,000,000.00 1.000
2016; pre-construction
2015 Brgy. Singko FMR Phase 1 ARMM Sulu Siasi Singko 100 10,000,000.00 1.000 status as of March 31, 2016
2015 Sumangat- Luuk FMR ARMM Tawi-Tawi Bongao Sumangat 50 5,000,000.00 0.500 status as of March 31, 2016
2015 Bagid- Tubig Indanga FMR ARMM Tawi-Tawi Simunul Bagid 100 10,000,000.00 1.000 status as of March 31, 2016
2016 Concreting of Tandoh- Tongsi-
Kotong FMR ARMM Basilan Sumisip Tandoh 10,000,000.00 1.000 status as of March 31, 2016
2016 Concreting of Sitio Matias FMR ARMM Basilan Sumisip Tumahubong 10,000,000.00 1.000 status as of March 31, 2016
2016 Concreting of Malna FMR ARMM Lanao del Sur Kapai Malna 5,000,000.00 0.500 status as of March 31, 2016
2016 Concreting of Bangon FMR ARMM Lanao del Sur Buadipuso-
Buntong Bangon 3,000,000.00 0.300 status as of March 31, 2016
2016 Bantayao-Poblacion to Sabala –
Lumba
Bayabao
Bantayao-
Sabala
Bantayao
realigned from Salolodin-
Banuar, Luma Bayabao,
Lanao del Sur 7M
2016 Barangay Kianodan FMR ARMM Lanao del Sur Maguing Kianodan 3,000,000.00 0.300 status as of March 31, 2016
2016 Concreting of Brgy. Lalangitun
FMR ARMM Lanao del Sur
Lumba
Bayabao Lalangitun 2,000,000.00 0.200 status as of March 31, 2016
2016
Tangcal, Buadipuso-Buntong,
Buntong 4,000,000.00 0.200 status as of March 31, 2016
Realigned from
Dasomalong, Tamparan,
Bubong, Saguiran, Lanao
del Sur 2M
FMR ARMM Lanao del Sur Masiu
Manalocon
2016 Concreting of Cawayan-
Cawayan-
Dialongana 4,000,000.00 0.400 status as of March 31, 2016
2016 Concreting of Dimagalin FMR ARMM Lanao del Sur Kapai Dimagalin 3,000,000.00 0.300 status as of March 31, 2016
2016 Concreting of Sagonsongan FMR ARMM Lanao del Sur Marawi City Sagonsongan 3,000,000.00 0.300 status as of March 31, 2016
2016 Concreting of Doronan FMR ARMM Lanao del Sur Kapai Doronan 2,000,000.00 0.200 status as of March 31, 2016
2016
FMR
ARMM Lanao del Sur Pagayawan Linindingan 15,000,000.00 1.500 status as of March 31, 2016
2016 Construction of Datu Macarimbang-
Litayen FMR ARMM Maguindano Parang
Datu
2016 Construction of Dagudtungan-
Tuka Maror FMR ARMM Maguindano Parang Dagudtungan 10,000,000.00 1.000 status as of March 31, 2016
2016 Concreting of Brgy. Madia FMR ARMM Maguindano Datu Saudi
Ampatuan Madia 15,000,000.00 1.500 status as of March 31, 2016
2016
Sulu
ARMM Sulu Patikul Bungkaung 3,000,000.00 0.300 status as of March 31, 2016
2016
Linuho, Parang, Sulu
ARMM Sulu Parang Linuho 3,000,000.00 0.300 status as of March 31, 2016
2016
Brgy. Lumbaan Mahaba FMR
Parang, Sulu
ARMM Sulu Parang Laum Suwah 3,000,000.00 0.300 status as of March 31, 2016
2016
Parang, Sulu
ARMM Sulu Parang Biid 3,000,000.00 0.300 status as of March 31, 2016
2016
Brgy. Alu Layag-Layag FMR,
Brgy. Liang, Parang, Sulu
ARMM Sulu Parang Liang 2,000,000.00 0.200 status as of March 31, 2016
2016
Sulu
ARMM Sulu Patikul Gandasuli 3,000,000.00 0.300 status as of March 31, 2016
2016
Brgy. Pandan Niog, Pangutaran,
Sulu
ARMM Sulu Pangutaran Pandan Niog 3,000,000.00 0.300 status as of March 31, 2016
2016
Patikul, Sulu
ARMM Sulu Patikul Gandasuli 3,000,000.00 0.300 status as of March 31, 2016
2016 Concreting of Pasil FMR (Phase
1), Brgy. Pasil, Indanan, Sulu ARMM Sulu Indanan Pasil 3,000,000.00 0.300 status as of March 31, 2016
2016 Concreting of Kandaga-Kunaw
FMR, Brgy. Talipao, Talipao, Sulu ARMM Sulu Talipao Talipao 4,000,000.00 0.400 status as of March 31, 2016
2016 Concreting of Tambak Bual FMR,
Brgy. Bual, Luuk, Sulu ARMM Sulu Luuk Bual 10,000,000.00 1.000 status as of March 31, 2016
2016 Concreting of Tongmageng-
Tongusong FMR ARMM Tawi-Tawi Sitangkai Tongmageng 10,000,000.00 1.000 status as of March 31, 2016
2016 Concreting of Tandu-Owak FMR ARMM Tawi-Tawi Sibutu Tandu Owak 5,000,000.00 0.500 status as of March 31, 2016
FMR-2017-P-
FMR-2017-P-
Lebben 10,000,000.00 1.000
ARMM Lanao del Sur Maguing 1st Brgy. Cambong 3,000,000.00 0.300
FMR-2017-P-
Cabasaran 3,000,000.00 0.300
Sur
ARMM Lanao del Sur Marantao 1st Brgy. Ilian 3,000,000.00 0.300
FMR-2017-P-
Sur
Bayabao 1st
Brgy. Dimayon
Brgys. Buisa,
Sur
ARMM Lanao del Sur Piagapo 1st Brgy. Paridi 7,000,000.00 0.700
FMR-2017-P-
ARMM Lanao del Sur Maguing 1st Brgy. Maguing
Proper 3,000,000.00 0.300
& Caramiyan 3,000,000.00 0.300
Bayabao 1st Brgy. Kalupaan 3,000,000.00 0.300
FMR-2017-P-
Dilimbayan 5,000,000.00 0.500
Brgy. Punod, Calanogas, Lanao
ARMM Lanao del Sur Calanogas 2nd Brgy. Punod 5,000,000.00 0.500
FMR-2017-P-
Kapatagan, Lanao del Sur
Igabay 8,000,000.00 0.800
Kapatagan 15,000,000.00 1.500
ARMM Lanao del Sur Kapatagan 2nd Brgy. Pinantao 7,000,000.00 0.700
FMR-2017-P-
ARMM Lanao del Sur Kapatagan 2nd Brgy. Daguan 11,000,000.00 1.100
FMR-2017-P-
ARMM Lanao del Sur Kapatagan 2nd Brgy. Tabuan 9,000,000.00 0.900
FMR-2017-P-
Sinsuat, Maguindanao
FMR-2017-P-
Sinsuat, Maguindanao
Sinsuat, Maguindanao
FMR-2017-P-
Sinsuat, Maguindanao
FMR-2017-P-
Sinsuat,
Maguindanao
FMR-2017-P-
Maguindanao
FMR-2017-P-
Maguindanao
FMR-2017-P-
FMR-2017-P-
Construction of Brgy. Adalan
FMR, Brgy. Adalan, Talipao, Sulu ARMM Sulu Talipao 1st Brgy. Adalan 15,000,000.00 1.500
FMR-2017-P-
FMR-2017-P-
Sangasanga 15,000,000.00 1.500
Funding
Year
City
Implementing
Office
Congressio
BAGUIO CITY
2014
BAGUIO CITY
2014
BAGUIO CITY
DEO Dontogan
GRAVEL TO
2014
BAGUIO CITY
2014
BAGUIO CITY
DEO Kias
GRAVEL TO
2014
BAGUIO CITY
DEO Ambiong
GRAVEL TO
2014
BAGUIO CITY
2014
BAGUIO CITY
DEO Guisad
GRAVEL TO
2014
Sta. Rosa,
2014
(Batch 1) Bulbulala FMR CAR Abra La Paz ABRA DEO
Toon, Bulbulala
2014
Abaquid,
Danglas &
Nagaparan
CONCRETIN
G
2014
Yuyeng, Alinaya
& Sitio Tambor
to the contractor. 60 days Time
suspension/extension on process.
Bangued &
2014
(Batch 1) Sulvec FMR CAR Abra Pidigan ABRA DEO Sulvec
GRAVEL TO
Based on approved 60 days time
extension slippage is -4.00 %.
2014
(Batch
10)
Tangadan-Labaan
CONCRETIN
G
DELTON
CONSTRUCTION &
ELECTRICAL
SERVICES
10,000,000.00 9,950,000.00
100 0
1.000 1.1 24-Nov-15 27-Jun-16 COMPLETED status as of March 31, 2016
2014
(Batch
11)
Brgy. Palaquio FMR CAR Abra Bucay ABRA DEO Palaquio CONCRETIN
G
THUNDER
CONSTRUCTION 5,000,000.00 4,975,000.00
100 0 0.500 0.5 COMPLETED status as of March 31, 2016
2014
(Batch
11)
G
THUNDER
2014
(Batch
11)
Mogao-Sucao FMR CAR Abra Licuan-Baay ABRA DEO Mogao GRAVEL TO
PAVED
DELTON
CONSTRUCTION &
ELECTRICAL
SERVICES
0.500 0.84 23-Feb-16 27-Apr-16 COMPLETED STATUS AS OF MAY 2017
2014
(Batch
11)
G
DELTON
CONSTRUCTION &
ELECTRICAL
G
DELTON
CONSTRUCTION &
ELECTRICAL
CONCRETIN
G
THUNDER
Based on approved 30 days time
extension/suspension slippage is -
DEO
Cacalaggan,
Malibang
100 0
2.300 2.3 19-Jan-15 30-Sep-15 COMPLETED status as of March 31, 2016
2014
APAYAO 2ND
ENTERPRISES 24,000,000.00 22,680,300.00
100 0 2.0 2.500 19-Jan-15 30-Sep-15 COMPLETED status as of March 31, 2016
2014
(Batch 1) Buluan-Daga FMR CAR Apayao Conner Buluan & Daga 24,000,000.00 1.858 COMPLETED status as of March 31, 2016
2014
2,000,000.00 1,877,300.00
100 0
.160 0.2 5-Jan-15 30-Apr-15 COMPLETED status as of March 31, 2016
2014
2014
APAYAO 2ND
2014
APAYAO 2ND
DEO Panay
GRAVEL TO
2014
APAYAO 1ST
DEO Karikitan
GRAVEL TO
2014
DEO
2014
APAYAO 2ND
DEO Consuelo
GRAVEL TO
It appears to be exception in the e
PLC due to actual start date is greater
than the revised or planned start date. 2014
(Batch 1) Bangan-Macalino FMR CAR Apayao Calanasan
APAYAO 2ND
DEO Macalino
GRAVEL TO
2014
2014
APAYAO 2ND
DEO Marag
GRAVEL TO
2014
APAYAO 2ND
2014
DEO Sta. Filomena
6,000,000.00 5,897,300.00 100 0
.500 1.135 5-Jan-15 15-Mar-15 COMPLETED status as of March 31, 2016
2014
2014
BENGUET 1ST
BENGUET 1ST
DEO 1ST
BENGUET 2ND
schedule
2014
BENGUET 1ST
Monitoring System 2014
BENGUET 1ST
2014
(Batch
BENGUET 1ST
2014
(Batch
10)
DEO 2ND
BENGUET 1ST
DEO 1ST
Eddet, Bashot,
2014
(Batch
10)
BENGUET 1ST
(Batch
10)
Daclan, Bangho FMR CAR Benguet Tublay Daclan 2,000,000.00 0.283 pre-
construction status as of March 31, 2016
2014
(Batch
10)
Sagpawe-Bengao
BENGUET 1ST
DEO 1ST
Shilan and
PROJECT ON-GOING AS PER
(Batch
10)
Poyopoy-Toking-
BENGUET 1ST
PROJECT ON-GOING AS PER
(Batch
10)
DEO 1ST Tadiangan
(Batch
10)
DEO 1ST Tuding
(Batch
10)
2014
2014
IFUGAO 1ST
DEO 1ST
Olilicon, Tupaya,
IFUGAO 1ST
IFUGAO 1ST
IFUGAO 1ST
DEO 1ST
Mompolia and
CONSTRUCTION 2,000,000.00 1,871,700.00
100 0 0.160 0.16 completed status as of March 31, 2016
2014
IFUGAO 1ST
2014
IFUGAO 2ND
DEO 2ND
2014
IFUGAO 1ST
DEO 1ST
(Batch 8)
Pacco, Nayon-
Panopdopan FMR CAR Ifugao Lamut Nayon 5,000,000.00 0.691 completed status as of March 31, 2016
2014
2014
Nambutuwan 25,000,000.00 2.080 completed status as of March 31, 2016
2014
2014
(Batch 1) Puapo-Dangtalan FMR CAR Kalinga Pasil Dangtalan 2,500,000.00 0.210 completed status as of March 31, 2016
2014
Norte 2,500,000.00 0.210 completed status as of March 31, 2016
2014
Junction 2,000,000.00 0.160 completed status as of March 31, 2016
2014
Liwan West Cemetery-
Busor FMR CAR Kalinga Rizal Liwan West 2,000,000.00 0.160 completed status as of March 31, 2016
2014
(Batch 1) San Quintin FMR CAR Kalinga Rizal San Quintin 2,000,000.00 0.160 completed status as of March 31, 2016
2014
CAR Kalinga Tabuk City KALINGA DEO LONE Bulanao GRAVEL TO
PAVED
MELS
CONSTRUCTION &
CONCRETE
PRODUCTS
completed.
2014
(Batch 1) Cabaritan-Dugpa FMR CAR Kalinga Tabuk City KALINGA DEO LONE Cabaritan
GRAVEL TO
2014
(Batch 1) Butbut-Loccong FMR CAR Kalinga Tinglayan KALINGA DEO LONE Loccong
GRAVEL TO
2014
(Batch 1) Butbut-Tulgao FMR CAR Kalinga Tinglayan KALINGA DEO LONE Butbut, Tulgao
GRAVEL TO
2014
CAR Kalinga Tabuk City KALINGA DEO LONE Bulanao GRAVEL TO
PAVED
JEP
2014
(Batch
GRAVEL TO
Project implementation on-going but
(Batch 1)
2014
2014
Mountain
2014
PAVED 2,000,000.00 2,000,000.00
2014
Mountain
PAVED 2,000,000.00 2,000,000.00
2014
Mountain
PAVED 2,000,000.00 2,000,000.00 100 0 0.160 0.16 14-Nov-16 31-Mar-15 COMPLETED
2014
Mountain
2014
Mountain
2014
PAVED 28,000,000.00 27,859,600.00
2014
Mountain
2014
2014
PAVED 10,000,000.00 9,950,000.00 100 0 ,.800 0.790 25-Aug-15 6-Jan-16 COMPLETED
0 28.974
Paved
process
2015
DPWH
REPORT
2015
DPWH
Paved
NORBANO
2015 Pinsao Proper Brgy.
DPWH
Paved
JFALMAZAN
CONSTRUCTION
REPORT
2015
DPWH
2015
Improvement/Reha
Gravel to
DEO LONE Pakiling
2015 Vira-Caganayan FMR CAR Abra Tineg DPWH ABRA
DEO LONE
Vira and
RAF GENERAL
CONSTRUCTION 5,000,000.00 0.650 not yet started status as of March 31, 2016
2015 San Jose-Ayyeng FMR CAR Abra Manabo DPWH ABRA
DEO LONE
San Jose,
DEO LONE Luzong
- status as of January 2017
2015 Poblacion FMR CAR Abra San Quintin DPWH ABRA
DEO LONE Poblacion
Paved 5,000,000.00 0.500 COMPLETED status as of March 31, 2016
2015 Tangadan FMR CAR Abra San Quintin DPWH ABRA
DEO LONE Tangadan
2015 Baac FMR CAR Abra Langiden DPWH ABRA
DEO LONE
Baac and
2015 Tamac-Poblacion FMR CAR Abra Villaviciosa DPWH ABRA
DEO LONE
Tamac and
DPWH ABRA
DEO LONE
Dao-angan and
2015
DEO LONE Bakiro
2015 Malibang-Upper Atok-
Pudtol and
For revision in the PMS. Plan
accomplishment for February 29, 2015
Capannikian-San
Antonio-Bagutong
Cappanikian-San
For revsion in the PMS. Additional
30CD was approved due to variation
2015 Mallig-Malayugan
continuous rain in the locality.
2015 Salvacion-Cabatacan
was already completed but the
contractor will be charging with the
2015 Matutong-Negro FMR CAR Apayao Sta. Marcela DPWH ABRA
DEO LONE
Marcela, Nueva
& San Antonio
Gravel to
2015 Buluan-Daga FMR CAR Apayao Conner DPWH
APAYAO DEO I LONE Buluan
CONCRETIN
2015 Madduang-Dagara-
Maragat FMR
DPWH
2015 Sabangan-Malungog-
DPWH
For revision in the PMS. Plan
accomplishment for February 15,
2016=96.50%, Actual=97.20%
Project completed
DPWH
BENGUET
DPWH
BENGUET
DPWH
BENGUET
DPWH
BENGUET
DPWH
2015 Rehabilitation of
DPWH
BENGUET
DPWH
BENGUET
DPWH
BENGUET
DPWH
BENGUET
DPWH
BENGUET
DPWH
BENGUET
Paved
POLO
ENGINEERING &
CONSTRUCTION
DPWH
BENGUET
DPWH
BENGUET
0.200 0.2 COMPLETED
2015 Concreting of Old Old Poblacion FMR CAR Benguet Tublay DPWH LONE Tublay Central Gravel to POLO 2,000,000.00 1,898,700.00 100 0
0.200 0.2 COMPLETED
2015 Improvement of
DPWH
BENGUET
2015
BENGUET LONE Poblacion
DPWH
BENGUET
DPWH
BENGUET
CAR, Benguet
1st District
2015 Payawan-Lawig FMR CAR Ifugao Lamut DPWH
IFUGAO DEO I LONE
2015 Regimental FMR CAR Ifugao Lamut DPWH
IFUGAO DEO I LONE REGIMENTAL
GRAVEL TO
PAVED 2,000,000.00 0.200 COMPLETED status as of March 31, 2016
2015 Umilag-Magulon FMR CAR Ifugao Lamut DPWH
IFUGAO DEO I LONE
DPWH
2015 Farm to MArket
DPWH
GRAVEL TO
2015 Construction of
DPWH
GRAVEL TO
DPWH
DPWH REPORT
IFUGAO DEO I LONE Anao
GRAVEL TO
2015 Ahin FMR CAR Ifugao Tinoc DPWH
IFUGAO DEO I LONE Ahin
GRAVEL TO
IFUGAO DEO I LONE Abatan
GRAVEL TO
2015 Poblacion FMR CAR Ifugao Hungduan DPWH
IFUGAO DEO I LONE Poblacion South
GRAVEL TO
contract was bid out short of award.
Additional documents required to
IFUGAO II LONE Inwaloy
IFUGAO DEO II LONE Inwaloy
GRAVEL TO
IFUGAO DEO II LONE Halag
GRAVEL TO
IFUGAO DEO II LONE Pula
GRAVEL TO
PAVED 2,000,000.00 0.200 not yet started status as of March 31, 2016
2015 Busilac FMR CAR Ifugao Alfonso Lista DPWH
IFUGAO DEO II LONE Busilac
GRAVEL TO
IFUGAO DEO II LONE San Marcos
GRAVEL TO
IFUGAO DEO II LONE San Jose
GRAVEL TO
IFUGAO DEO II LONE Laya
GRAVEL TO
GRAVEL TO
2015
DPWH
Gravel to
2015
Construction/Contin
due to delays caused by prohibition of
adjacent lot owners on the proposed
2015
Construction/Contin
2015
Concreting/Improve
Gravel to
2015
Concreting/Improve
KALINGA DEO LONE Dangtalan
DPWH
2015
KALINGA DEO LONE
DPWH
DPWH
Gravel to
DPWH
2015
Concreting/Improve
KALINGA DEO LONE Bulanao
DPWH
GRAVEL TO
NO CONTRACTOR SPECIFIED IN
PAVED 4,000,000.00 0.400 completed status as of March 31, 2016
2015
NO CONTRACTOR SPECIFIED IN
Mountain
NO CONTRACTOR SPECIFIED IN
REPORT
2015
Improvement/Reha
NO CONTRACTOR SPECIFIED IN
PAVED 3,000,000.00 0.300 completed status as of March 31, 2016
2015
Improvement/Reha
PAVED 2,000,000.00 1,907,800.00
NO CONTRACTOR SPECIFIED IN
NO CONTRACTOR SPECIFIED IN
REPORT
2015
Construction/Upgra
NO CONTRACTOR SPECIFIED IN
to the contractor
Province Bontoc
DPWH MTN
NO CONTRACTOR SPECIFIED IN
South FMR CAR Abra Bangued ABRA DEO LONE Brgy. Calaba
CONCRETIN
G
Brgy.
Bangbangar
CONCRETIN
2016
G 5,000,000.00
2016 Concreting of Las-ud-
Tayawa FMR CAR Abra La Paz ABRA DEO LONE Brgy. Buli
CONCRETIN
2016
G 5,000,000.00 4,722.54
2016
G 10,000,000.00 9,403.87
2016
G
Bazar, Brgy. Gangal CAR Abra Sallacapan ABRA DEO LONE Gangal
CONCRETIN
2016 Concreting of Cautit-
CONCRETIN
2016 Concreting of Arab-
CONCRETIN
G
2016
G 7,000,000.00 6,611.17
2016 Concreting of Mallig-
APAYAO 2ND
2016 Concreting of Buluan-
APAYAO 1ST
2016
DEO LONE
2016
2016
DEO LONE
2016 Concreting of Sta.
APAYAO 2ND
2016 Concreting of Swan-
APAYAO 2ND
2016
2016
2016 Concreting of Carlos-
APAYAO 2ND
2016
2016 Concreting of San
APAYAO 2ND
G 2,000,000.00 1,969.75
2016 Concreting of San
APAYAO 2ND
G 2,000,000.00 1,969.63
2016 Concreting of San
APAYAO 2ND
2016
2016 Concreting of Allig-
APAYAO 2ND
2016 Concreting of Calafug-
APAYAO 1ST
DEO LONE
2016
2016
2016 Improvement of
BENGUET 2ND
2016 Improvement of Karao-
CAR-
2016 Improvement of Wakal
FMR CAR Benguet Bokod
2016
2016 Improvement of
CAR-
2016 Improvement of Kawal-
CAR-
2016
2016
2016 Improvement of
CAR-
2016 Improvement of Petal-
CAR-
2016 Improvement of
CAR-
2016 Improvement of Acop-
CAR-
2016 Improvement of
CAR-
2016
2016
2016 Improvement of Namat-
CAR-
2016 Improvement of Lubas
FMR CAR Benguet Tuba
2016 Improvement of Taneg-
Suyoc FMR CAR Mankayan
2016 Improvement of
CAR
2016 Improvement of
CAR-
2016
2016 Improvement of
CAR-
2016 Improvement of
CAR-
2016 Improvement of
Datakan-Labueg FMR CAR Benguet Kapangan LONE Labueg 2,000,000.00 1,964.94 .308 COMPLETED
2016 Improvement of Lower
CAR-
2016
Construction/Improve
DEO LONE Duit
2016
Construction/Improve
DEO LONE Poblacion
DEO LONE Bolog
DEO LONE Pugo-Bolog
2016
Construction/Improve
DEO LONE Pugol
2016
Construction/Improve
DEO LONE Tanap-Lawig
2016
Construction/Improve
DEO LONE Sanafe
2016
Construction/Improve
DEO LONE Magulon
2016
Construction/Improve
DEO LONE Panopdopan
DEO LONE Luhong-Danggo
DEO LONE Wangwang
IFUGAO 1ST
2016
Construction/Improve
DEO LONE Bangbang
DEO LONE
2016
Construction/Improve
DEO LONE San Fernando
IFUGAO 2ND
2016
Construction/Improve
DEO LONE Chalalo
2016
Construction/Improve
DEO LONE Aduyongan
DEO LONE
2016
Construction/Improve
DEO LONE Bangar
2016
Construction/Improve
DEO LONE Ngileb
2016
Construction/Improve
DEO LONE Dolowog
2016 Improvement of Brgy.
IFUGAO 2ND
2016 Concreting of Ducligan-
UPPER
2016 Concreting of Talalang-
UPPER
2016 Concreting of Awichon
FMR CAR Kalinga Lubuagan
2016 Concreting of Amdalao-
UPPER
2016
2016
2016
2016
CONCRETIN
G
86 14 .240 1-Jan-2017 ON-GOING status as of MAY 2017
2016 Concreting of Taggay-
DPWH-LOWER
2016
2016
KALINGA LONE Dagupan
2016 Concreting of Gobgob
DPWH-LOWER
2016
KALINGA LONE Bulo
2016 Concreting of
DPWH-LOWER
2016
KALINGA LONE Magsaysay
2016 Concreting of Makilo
DPWH-LOWER
G ADEB's Construction 2,500,000.00 2,456,958.30
0 0 .396 0 NO STATUS status as of MAY 2017
2016
KALINGA DEO LONE
2016
KALINGA DEO LONE Bulanao
2016
2016 Concreting of Butbut-
UPPER
CONSTRUCTION 5,000,000.00 4,871,930.00
2.1 0 .700 12-Oct-16 NO STATUS status as of JUNE 2017
2016 Concreting of Butbut-
UPPER
2016 Concreting of Puapo-
UPPER
2016 Concreting of Belong
UPPER
CONCRETIN
G
LUMINGAY
2.1 0 .450 11-Oct-16 ON-GOING status as of JUNE 2017
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
CONSTRUCTION 10,000,000.00 9,580,000.00
88.8 0 1.000 0 8-Sep-17 ON-GOING status as of JUNE 2017
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
2016
Construction/Improve
WHILE IN DPWH ITS 4M
2016
Construction/Improve
Benben 10,000,000.00 1.000
Tayawa 5,000,000.00 0.500
2017
2017
2017
2017
2017
Rehabilitation/Improve
and Daga 10,000,000.00 1.000
and Allig 3,000,000.00 0.300
and Imelda 3,000,000.00 0.300
2017
Improvement/Concreti
2017
Improvement/Concreti
2017
Improvement/Concreti
2017
Improvement/Concreti
2017
Improvement/Concreti
2017
Improvement/Concreti
2017
Improvement/Concreti
2017
Improvement.Concreti
2017
Improvement/Concreti
Barrio 2,000,000.00 0.200
2017
Tomas Proper, 3,000,000.00 0.300
Hollow 3,000,000.00 0.300
Tomas Proper 3,000,000.00 0.300
Central, 3,000,000.00 0.300
2017
2017
and Abinuan 5,000,000.00 0.500
Banga 2,000,000.00 0.200
2017
and Pitan, 5,000,000.00 0.500
2017
2017
2017
2017
Malucsad 6,000,000.00 0.600
2017
2017
2017
2017
2017
Construction/Improve
ment/Rehabilitation/Up
2017
Construction/Improve
ment/Rehabilitation/Up
2017
Construction/Improve
ment/Rehabilitation/Up
Funding
Year
City
Implementing
Office
Congressional
District
PROJECT
INFORMATION
Proponent's
Classification
ADDITIONAL
PROJECT
INFORMATIO
N
Length (km)
Scope of Work
Remarks
2011 Sta. Ana-Palingon-Calsada FMR NCR Metro Manila Taguig City 18 3,500,000.00 0.178
FMRDP Project
City
Implementing
Office
Congressional
District
PROJECT
INFORMATION
Proponent's
Classification
ADDITIONAL
PROJECT
INFORMATIO
N
Length (km)
Scope of Work
Remarks
2010 Brgy. Tuguis FMR 6 Negros Occidental Hinigaran Tuguis 76 5,000,000.00 0.76 completed status as of March 31, 2016
2010 Brgy. Pilar FMR 6 Negros Occidental Hinigaran Pilar 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 Brgy. Palayog FMR 6 Negros Occidental Hinigaran Palayog 35 1,000,000.00 0.35 completed status as of March 31, 2016
2010 Brgy. Nanunga FMR 6 Negros Occidental Hinigaran Nanunga 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 Brgy. Bato FMR 6 Negros Occidental Hinigaran Bato 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 Brgy. Payao-Manolita Road 6 Negros Occidental Binalbagan Payao-Manolita 76 5,000,000.00 0.76 completed status as of March 31, 2016
2010 Brgy. Bagroy FMR 6 Negros Occidental Binalbagan Bagroy 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 Brgy. Santol FMR 6 Negros Occidental Binalbagan Santol 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 Had. Isabel, Brgy. Sag-ang FMR 6 Negros Occidental La Castellana Sag-ang 100 5,000,000.00 1.00 completed status as of March 31, 2016
2010 Brgy. Camandag FMR 6 Negros Occidental La Castellana Camandag 35 1,000,000.00 0.35 completed status as of March 31, 2016
2010 Brgy. Caradio-an FMR 6 Negros Occidental Himamaylan Caradio-an 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 Brgy. Carabalan FMR 6 Negros Occidental Himamaylan Carabalan 45 1,000,000.00 0.45 completed status as of March 31, 2016
2010 So. Moises Brgy. Camangcamang
FMR 6 Negros Occidental Isabela Camangcamang 35 1,000,000.00 0.35 completed status as of March 31, 2016
2010 Brgy. Makilignit FMR 6 Negros Occidental Isabela Makilignit 35 1,000,000.00 0.35 completed status as of March 31, 2016
2010 Banog-Banog FMR 6 Negros Occidental Isabela Banog-Banog 60 1,500,000.00 0.60 completed status as of March 31, 2016
2010 Odiong FMR 6 Negros Occidental Moises
Padilla Odiong 35 1,000,000.00 0.35 completed status as of March 31, 2016
2010 Montilla FMR 6 Negros Occidental Moises
Padilla Montilla 35 1,000,000.00 0.35 completed status as of March 31, 2016
2010 Guiupana-an FMR 6 Negros Occidental Moises
Padilla Guiupana-an 20 500,000.00 0.20 completed status as of March 31, 2016
2010 Construction/Rehabilitation of Brgy.
Granada FMR 6 Negros Occidental Bacolod City Granada 0 10,000,000.00 completed status as of March 31, 2016
2010 Rehabilitation of Silay-Guimbalaon
Silay-
Guimbalaon 0 5,000,000.00 completed status as of March 31, 2016
2010
Bungabong- Alangahag-
6 Negros Occidental Escalante city Tamlang 300 2,000,000.00 3.00 completed status as of March 31, 2016
2010
Homelot-Sitio Napungalan, Brgy.
6 Negros Occidental Escalante city Jonobjonob 150 1,000,000.00 1.50 completed status as of March 31, 2016
2010
Mudrocks, Brgy. Pinapugasan-
6 Negros Occidental Escalante city Pinapugasan-
Dian-ay Proper 300 2,000,000.00 3.00 completed status as of March 31, 2016
2010 Regravelling of Baviera-Colonia
Baviera-Colonia
Divina 105 1,000,000.00 1.05 completed status as of March 31, 2016
2010 Regravelling of Baviera-Sewahon
Baviera-
Sewahon 105 1,000,000.00 1.05 completed status as of March 31, 2016
2010 Regravelling of Bato-Baviera FMR 6 Negros Occidental Sagay city Bato-Bavier 105 1,000,000.00 1.05 completed status as of March 31, 2016
2010 Regravelling of Martinez-Hupac
FMR 6 Negros Occidental Sagay city Martinez-Hupac 0 1,000,000.00 completed status as of March 31, 2016
2010 Regravelling of Puey FMR 6 Negros Occidental Sagay city Puey 0 1,000,000.00 completed status as of March 31, 2016
2010 Repair/improvement of Brgy. V.F.
Gustilo- Brgy. C.S. Villacin FMR 6 Negros Occidental Cadiz city V.F. Gustilo 757 5,000,000.00 7.57 completed status as of March 31, 2016
2010 Rehabilitation of Brgy. San Pablo
FMR 6 Negros Occidental Manapla San Pablo 0 5,000,000.00 completed status as of March 31, 2016
2010
6 Negros Occidental E.B.
Magalona San Isidro 500 5,000,000.00 5.00 completed status as of March 31, 2016
2010
Louie 0 5,000,000.00 completed status as of March 31, 2016
2010
Louisiana-
638 5,000,000.00 6.38 completed status as of March 31, 2016
2010 Construction/Rehabilitation Sitio
Campo, Brgy. Tabao Rizal FMR 6 Negros Occidental San Enrique Tabao Rizal 0 5,000,000.00 completed status as of March 31, 2016
2010 Rehabilitation of Hda. Guba -
Bayabas Proper-Lacaron FMR 6 Negros Occidental Valladolid
Bayabas Proper-
Lacaron 200 2,084,000.00 2.00 completed status as of March 31, 2016
2010 Rehabilitation of Alijis-Doldol FMR 6 Negros Occidental Valladolid Alijis-Doldol 220 2,916,000.00 2.20 completed status as of March 31, 2016
2010
Cabadiangan FMR
6 Negros Occidental Sipalay City Cabadiangan 0 5,000,000.00 completed status as of March 31, 2016
2010 Pacuan-Ampanangon Rd.,
Pacuan-
Ampanangon 0 5,000,000.00 completed status as of March 31, 2016
2010 Pacuan-Nasunggan Rd., La
Pacuan-
Nasunggan 0 3,000,000.00 completed status as of March 31, 2016
2010 Pacuan-Elecia Rd., La Libertad 7 Negros Oriental La Libertad Pacuan-Elecia 0 2,000,000.00 completed status as of March 31, 2016
2010 Balugo-Hinakpan Brgy. Luz Rd.,
Guihulngan 7 Negros Oriental Guihulngan
Balugo-
Hinakpan 0 7,500,000.00 completed status as of March 31, 2016
2010 Sto. Niño Rd., Tanjay City 7 Negros Oriental Tanjay City Sto. Niño 0 3,000,000.00 completed status as of March 31, 2016
2010 Pal-ew Rd., Tanjay City 7 Negros Oriental Tanjay City Pal-ew 0 2,000,000.00 completed status as of March 31, 2016
2010 Camansi-Bahian Rd., Tanjay City 7 Negros Oriental Tanjay City Camansi-
Bahian 0 1,000,000.00 completed status as of March 31, 2016
2010 Catalina-Panusuan-Tuybo Rd.,
Catalina-
Panusuan-
Tuybo
Tara 0 2,000,000.00 completed status as of March 31, 2016
2010 Mantiquil-Tamlang Rd., Siaton-Sta.
Catalina 7 Negros Oriental
Tamlang 0 20,000,000.00 completed status as of March 31, 2016
2010 Malabuhan-Bonbonon Rd., Siaton 7 Negros Oriental Siaton Malabuhan-
Bonbonon 27 2,000,000.00 0.27 completed status as of March 31, 2016
2010 Maninihon-San Isidro Rd., Duyan-
duyan Section, Bayawan City 7 Negros Oriental Bayawan City
Maninihon-San
Isidro 0 1,000,000.00 completed status as of March 31, 2016
2010 Alangilan Rd., Sta. Catalina 7 Negros Oriental Sta. Catalina Alangilan 0 1,000,000.00 completed status as of March 31, 2016
2010 Sto. Rosario Rd., Sta. Catalina 7 Negros Oriental Sta. Catalina Sto. Rosario 50 1,000,000.00 0.50 completed status as of March 31, 2016
2010 Milagrosa Rd., Sta. Catalina 7 Negros Oriental Sta. Catalina Milagrosa 0 1,000,000.00 completed status as of March 31, 2016
2010 Mayabon FMR, Zamboanguita 7 Negros Oriental Zamboanguita Mayabon 0 2,000,000.00 completed status as of March 31, 2016
2010 Malaunay Rd., Sitio Dunga,
Valencia 7 Negros Oriental Valencia Malaunay 0 1,000,000.00 completed status as of March 31, 2016
2010 East Balabag Rd., Valencia 7 Negros Oriental Valencia East Balabag 8 500,000.00 0.08 completed status as of March 31, 2016
2010 Pulangbato-Cambucad Rd,
Pulangbato-
Cambucad 71 500,000.00 0.71 completed status as of March 31, 2016
2010 Bindoy-Cabcaban-Nalundan-Luho-
Bindoy-
Cabcaban-
Nalundan-Luho-
Candanaay
0 5,000,000.00 completed status as of March 31, 2016
2010 Concreting of Brgy San Isidro FMR 7 Negros Oriental Pamplona San Isidro 0 1,000,000.00 completed status as of March 31, 2016
2010 Concreting of Sitio Cambayongon
FMR 7 Negros Oriental Bais City
Sitio
Cambayongon 0 1,000,000.00 completed status as of March 31, 2016
2010 Concreting of Sitio Cang-abok-Sitio
Nalandan FMR 7 Negros Oriental Bais City
Sitio Cang-abok-
Sitio Nalandan 0 1,000,000.00 completed status as of March 31, 2016
2010 Rehab of Brgy Bahian FMR 7 Negros Oriental Tanjay City Bahian 0 500,000.00 completed status as of March 31, 2016
2010 Impvt/Rehab of Bulon-Pal-ew Rd 7 Negros Oriental Tanjay City Bulon-Pal-ew 0 2,000,000.00 completed status as of March 31, 2016
2010 Rehab of Brgy Sto. Niño FMR 7 Negros Oriental Tanjay City Sto. Niño 0 500,000.00 completed status as of March 31, 2016
2010 Concreting of Brgy Enrique
Villanueva FMR 7 Negros Oriental Sibulan
Enrique
Villanueva 0 2,000,000.00 completed status as of March 31, 2016
2010 Concreting of Brgy Himocdongon
FMR 7 Negros Oriental Mabinay Himocdongon 0 2,000,000.00 completed status as of March 31, 2016
2010 Balogo-Hinakpan-Brgy Luz FMR 7 Negros Oriental Guihulngan
Balogo-
Hinakpan-Brgy
Luz
Talaon 0 1,600,000.00 completed status as of March 31, 2016
2010 Jimalalud-Lacawon FMR 7 Negros Oriental Jimalalud Jimalalud-
Lacawon 105 1,700,000.00 1.05 completed status as of March 31, 2016
2010 Mantiquil-Tamlang FMR 7 Negros Oriental Siaton Mantiquil-
Tamlang 0 20,000,000.00 completed status as of March 31, 2016
2011 Brgy. Buenavista FMR 6 Negros Occidental Murcia Buenavista 45 5,000,000.00 0.45 completed status as of March 31, 2016
2011 Alijis-Pangpang FMR 6 Negros Occidental Valladolid Alijis 75 4,850,000.00 0.75 completed status as of March 31, 2016
2011 Paloma-Palima Proper 6 Negros Occidental Valladolid Paloma 100 1,000,000.00 1.00 completed status as of March 31, 2016
2011 Jct. Pulupandan-Pulupandan Pier
Rd. 6 Negros Occidental Pulupandan Blank 266 1,000,000.00 2.66 completed status as of March 31, 2016
2011 Jct. Pulupandan-Pulupandan Pier
Rd. 6 Negros Occidental Pulupandan Blank 180 2,000,000.00 1.80 completed status as of March 31, 2016
2011 Palencia-Aral-al-Campsite Rd. 6 Negros Occidental La Carlota
City Blank 500 2,000,000.00 5.00 completed status as of March 31, 2016
2011 Sum-ag-Abuanan-Atipuluan Rd. 6 Negros Occidental Bacolod City Sum-ag 416 2,000,000.00 4.16 completed status as of March 31, 2016
2011 Sum-ag-Abuanan-Atipuluan Rd. 6 Negros Occidental Bacolod City Sum-ag 524 2,000,000.00 5.24 completed status as of March 31, 2016
2011 Jct. Murcia-Abuanan-Atipuluan Rd. 6 Negros Occidental Murcia Blank 401 2,000,000.00 4.01 completed status as of March 31, 2016
2011 Jct. Murcia-Abuanan-Atipuluan Rd. 6 Negros Occidental Murcia Blank 536 2,000,000.00 5.36 completed status as of March 31, 2016
2011 Brgy V.F. Gustilo FMR 6 Negros Occidental Cadiz City V.F. Gustilo 3,000,000.00 0.30 completed status as of March 31, 2016
2011 Brgy Baviera FMR 6 Negros Occidental Sagay City Baviera 3,000,000.00 0.30 completed status as of March 31, 2016
2011 Sitio Tayunan-Kalahi Hanging
Bridge, Brgy San Rafael FMR 6 Negros Occidental Hinobaan San Rafael 85 6,000,000.00 0.60 completed status as of March 31, 2016
2011 Brgy Proper Alangilan National
High School Section 6 Negros Occidental Bacolod City Alangilan 4,200,000.00 0.42 completed status as of March 31, 2016
2011 Hacienda Guanzon Road-National
section Road 6 Negros Occidental Bacolod City Mansilingan 3,000,000.00 0.30 completed status as of March 31, 2016
2011 Balayong-Inawasan-Calicanan
Inawasan,
792 2,000,000.00 3.50 completed status as of March 31, 2016
2011 Banban-Arebasore-Barras FMR 7 Negros Oriental Mabinay
Banban,
Arebasore,
Barras
3,930 3,000,000.00 5.00 completed status as of March 31, 2016
2011 Danao-Ppinangimnan/Sitio Danao
FMR 7 Negros Oriental Sta Catalina Obat 1,000,000.00 0.10 completed status as of March 31, 2016
2011 Buntod-Timbanga Road 7 Negros Oriental Bacong Buntod,
Timbanga 3,000,000.00 0.30 completed status as of March 31, 2016
2011 Brgy Luyang-Abis Road FMR 7 Negros Oriental Mabinay Luyang-Abis 500 2,000,000.00 5.00 completed status as of March 31, 2016
2011 Brgy Linantayan FMR 7 Negros Oriental Basay Linantayan 11 1,000,000.00 0.11 completed status as of March 31, 2016
2011 Brgy Sitio Guintana-an, Tawayan
FMR 7 Negros Oriental Bayawan Tawayan 28 2,000,000.00 0.28 completed status as of March 31, 2016
2011 Brgy Combado FMR 7 Negros Oriental Bacong Combado 20 1,000,000.00 0.20 completed status as of March 31, 2016
2011 Brgy Timbao FMR 7 Negros Oriental Bacong Timbao 25 1,000,000.00 0.25 completed status as of March 31, 2016
2011 Brgy Tubod FMR 7 Negros Oriental Bacong Tubod 2 1,000,000.00 0.02 completed status as of March 31, 2016
2011 Brgy Sagbang FMR 7 Negros Oriental Valencia Sagbang 2 1,000,000.00 0.02 completed status as of March 31, 2016
2011 Brgy Malabo 7 Negros Oriental Valencia Malabo 2 1,000,000.00 0.02 completed status as of March 31, 2016
2011 Brgy Balili 7 Negros Oriental Valencia Balili 2 1,000,000.00 0.02 completed status as of March 31, 2016
2011 Brgy Cambucad 7 Negros Oriental Valencia Cambucad 23 1,000,000.00 0.23 completed status as of March 31, 2016
2011 Brgy Cabcaban 7 Negros Oriental Bindoy Cabcaban 8 1,000,000.00 0.08 completed status as of March 31, 2016
2011 Brgy Budlasan-Bucalan 7 Negros Oriental Canlaon City Budlasan-
Bucalan 8 1,000,000.00 0.08 completed status as of March 31, 2016
2011 Brgy Pob. Sitio Nabilog-Brgy
Tambulan 7 Negros Oriental Tayasan
Pob. Sitio
8 1,000,000.00 0.08 completed status as of March 31, 2016
2011 Brgy Atabay 7 Negros Oriental Ayungon Atabay 1,000,000.00 0.10 completed status as of March 31, 2016
2011 Improvement of FMR, Bong-bong 7 Negros Oriental Valencia Bong-bong 1,500,000.00 0.15 completed status as of March 31, 2016
2011 Improvement of FMR, Malongcay
Dacu 7 Negros Oriental Valencia Malongcay Dacu 1,000,000.00 0.10 completed status as of March 31, 2016
2011 Improvement of FMR, Malongcay
Dacu 7 Negros Oriental Dauin Malungcay Dacu 1,000,000.00 0.10 completed status as of March 31, 2016
2011 Improvement of FMR, Alangilanan 7 Negros Oriental Sta. Catalina Alangilanan 1,500,000.00 0.15 completed status as of March 31, 2016
2011 Improvement of FMR, Olandao 7 Negros Oriental Basay
Olandao,
Linantayan,
2011 Improvement of FMR, Bongalonan 7 Negros Oriental Basay Bongalonan 2,000,000.00 0.20 completed status as of March 31, 2016
2011 Poblacion-Bacong-Timbao Road 7 Negros Oriental Bacong Poblacion-
Bacong-Timbao 5,000,000.00 0.50 completed status as of March 31, 2016
2012 Concreting of PhilRice Negros
FMR 6 Negros Occidental Murcia 140 10,000,000.00 1.40 completed status as of March 31, 2016
2012 Concreting of Divina Colonia FMR 6 Negros Occidental Sagay city Divina Colonia 250 5,000,000.00 0.53 not yet started
status as of March 31, 2016;
for submission of
Katilingban FMR 6 Negros Occidental Talisay City Katilingban 80 1,000,000.00 0.25 completed status as of March 31, 2016
2012 Concreting/Improvement of Brgy.
Sta. Cruz FMR 6 Negros Occidental Murcia Sta. Cruz 70 1,000,000.00 0.10 completed status as of March 31, 2016
2012 Concreting of Brgy. Consing FMR 6 Negros Occidental E.B.
Magalona Consing 304 2,000,000.00 0.48 for implementaion status as of March 31, 2016
2012 Concreting of Brgy. Gahit FMR 6 Negros Occidental E.B.
Magalona Gahit 124 1,000,000.00 0.24 for implementaion status as of March 31, 2016
2012 Concreting of Brgy. Latasan FMR 6 Negros Occidental E.B.
Magalona Latasan 180 500,000.00 0.11 for implementaion status as of March 31, 2016
2012 Concreting of Brgy. Sibucao-
Guinturilan-Sagasa FMR 6 Negros Occidental San Enrique
Sibucao-
Guinturilan-
Sagasa
674 10,000,000.00 0.58 completed status as of March 31, 2016
2012 Concreting of Brgy. Cabug FMR 6 Negros Occidental Bacolod City Cabug 83 10,000,000.00 1.29 completed status as of March 31, 2016
2012 Rehabilitation/Concreting of
Celestino Villacin FMR 6 Negros Occidental Cadiz City Celestino Villacin 533 5,000,000.00 1.45 completed status as of March 31, 2016
2012
Construction/Improvement/Rehabili
Ana FMR
362 2,000,000.00 0.15 completed status as of March 31, 2016
2012 Construction of Sitio Casa- Brgy.
Concepcion road 6 Negros Occidental Talisay City Concepcion 504 1,000,000.00 0.08 completed status as of March 31, 2016
2012 Sitio Guba FMR 7 Negros Oriental Sta. Catalina Sitio Guba 22 1,000,000.00 0.22 not yet started
status as of March 31, 2016;
due to unliquidated previous
fund transfer
2012 Olandao FMR 7 Negros Oriental Basay Olandao 16 1,000,000.00 0.16 completed status as of March 31, 2016
2012 Bongalonan FMR 7 Negros Oriental Basay Bongalonan 33 2,000,000.00 0.33 completed status as of March 31, 2016
2012 Malungcay Dacu FMR 7 Negros Oriental Dauin Malungcay Dacu 19 1,000,000.00 0.33 completed status as of March 31, 2016
2012 Malungcay Diot FMR 7 Negros Oriental Zamboanguita Malungcay Diot 38 2,000,000.00 0.25 completed status as of March 31, 2016
2012 Poblacion - Nalundan FMR 7 Negros Oriental Bindoy Poblacion -
Nalundan 4,000,000.00 not yet started
status as of March 31, 2016;
Documents on Process
2012 Budlasan - Lumapao FMR 7 Negros Oriental Canlaon City Budlasan -
Lumapao 4,000,000.00 not yet started
status as of March 31, 2016;
Documents on Process
Tanlad 4,000,000.00 not yet started
status as of March 31, 2016;
Documents on Process
2012 Talaon - Aya FMR 7 Negros Oriental La Libertad Talaon - Aya 3,000,000.00 not yet started status as of March 31, 2016;
Documents on Process
Santol FMR, Binalbagan 6 Negros Occidental Binalbagan Santol 509 3,000,000.00 0.420 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
2013 Upgrading/Improvement of Brgy.
Himaya FMR 6 Negros Occidental Hinigaran Himaya 638 1,000,000.00 0.090 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Bag-as FMR 6 Negros Occidental Hinigaran Bag-as 670 1,000,000.00 0.110 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Camba-og FMR 6 Negros Occidental Hinigaran Camba-og 623 2,000,000.00 0.315 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Riverside FMR 6 Negros Occidental Isabela Riverside 278 2,000,000.00 0.315 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Moises
Padilla Macagahay 289 2,000,000.00 0.190 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Puso FMR 6 Negros Occidental La Castellana Puso 442 3,000,000.00 0.420 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Himamaylan
City San Antonio 452 2,000,000.00 0.190 completed status as of March 31, 2016
2013 Upgrading/Improvement of Brgy.
Himamaylan
City Cabadiangan 269 2,000,000.00 0.210 completed status as of March 31, 2016
2013 Concreting of Sitio Tayunan-Kalahi
Hanging Bridge FMR 6 Negros Occidental Hinoba-an San Rafael 850 6,000,000.00 0.480 completed status as of March 31, 2016
2013 Hi-way-Mangapa FMR, Masulog 7 Negros Oriental Canlaon City Masulog 50 4,000,000.00 0.621 not yet started status as of March 31, 2016
2013 Brgy. Malaiba-Brgy. Panubigan
Brgy. Malaiba-
Brgy. Panubigan 13 1,000,000.00 0.153 not yet started status as of March 31, 2016
2013 Lag-asan FMR 7 Negros Oriental Guihulngan
City Lag-asan 13 1,000,000.00 0.150 on-going status as of March 31, 2016
2013 Candalanon-Punong FMR 7 Negros Oriental Guihulngan
City
Candalanon-
Punong 38 3,000,000.00 0.440 on-going status as of March 31, 2016
2013 Pacuan-Busilac FMR 7 Negros Oriental La Libertad Pacuan-Busilac 50 4,000,000.00 0.635 on-going status as of March 31, 2016
2013 Cantimlad to Sitio Abocado FMR 7 Negros Oriental Jimalalud Cantimlad to
Sitio Abocado 25 2,000,000.00 0.325 on-going status as of March 31, 2016
2013 Boundary Dayoyo-Cangharay to
Dayoyo-
25 2,000,000.00 0.330 on-going status as of March 31, 2016
2013 Bago-Pindahan FMR 7 Negros Oriental Tayasan Bago-Pindahan 25 2,000,000.00 0.330 on-going status as of March 31, 2016
2013 Pindahan - Tanlad FMR 7 Negros Oriental Tayasan Pindahan -
Tanlad 25 2,000,000.00 0.325 on-going status as of March 31, 2016
2013 Jandalamon FMR 7 Negros Oriental Ayungon Jandalamon 199 1,000,000.00 0.164 completed status as of March 31, 2016
2013 Candanaay FMR 7 Negros Oriental Ayungon Candanaay 152 1,000,000.00 0.166 completed status as of March 31, 2016
2013 Kilaban FMR 7 Negros Oriental Ayungon Kilaban 290 1,000,000.00 0.163 completed status as of March 31, 2016
2013 Gomentoc FMR 7 Negros Oriental Ayungon Gomentoc 1,035 1,000,000.00 0.165 completed status as of March 31, 2016
2013 Camudlas-Tubod-Manseje Road 7 Negros Oriental Bindoy Camudlas-
Tubod-Manseje 25 2,000,000.00 0.315 completed status as of March 31, 2016
2013 Poblacion-Brgy. Nalundan FMR 7 Negros Oriental Bindoy Poblacion-Brgy.
Nalundan 38 3,000,000.00 0.482 completed status as of March 31, 2016
2013 Sta. Cruz Viejo FMR 7 Negros Oriental Tanjay City Sta. Cruz Viejo 50 4,000,000.00 0.500 not yet started status as of March 31, 2016
2013 Azagra FMR 7 Negros Oriental Tanjay City Azagra 44 3,500,000.00 0.438 not yet started status as of March 31, 2016
2013 Brgy. San Isidro FMR 7 Negros Oriental Tanjay City San Isidro 44 3,500,000.00 0.438 not yet started status as of March 31, 2016
2013 Brgy. San Jose FMR 7 Negros Oriental Tanjay City San Jose 44 3,500,000.00 0.438 not yet started status as of March 31, 2016
2013 Brgy.Novallas FMR 7 Negros Oriental Tanjay City Novallas 44 3,500,000.00 0.438 not yet started status as of March 31, 2016
2013 Brgy. Manipis FMR 7 Negros Oriental Tanjay City Manipis 44 3,500,000.00 0.438 not yet started status as of March 31, 2016
2013 Brgy. Luca FMR 7 Negros Oriental Tanjay City Luca 44 3,500,000.00 0.438 not yet started status as of March 31, 2016
2013 Sitio Ganas to Main Road 7 Negros Oriental Mabinay Sitio Ganas 50 4,000,000.00 0.380 completed status as of March 31, 2016
2013 Brgy.Himocdongon FMR 7 Negros Oriental Mabinay Himocdongon 38 3,000,000.00 0.280 completed status as of March 31, 2016
2013 Tara-Sitio Danawan FMR 7 Negros Oriental Mabinay Tara-Sitio
Danawan 53 4,200,000.00 0.358 completed status as of March 31, 2016
2013 Tara-Sitio Pansalagon FMR 7 Negros Oriental Mabinay Tara-Sitio
Pansalagon 48 3,800,000.00 0.300 completed status as of March 31, 2016
2013 Nagasua-Mangganay-Mabunao
Nagasua-
Mangganay-
Mabunao
316 25,277,000.00 3.160 on-going status as of March 31, 2016
2013 Bais-Cambaguio FMR 7 Negros Oriental Bais City Bais-Cambaguio 127 10,152,000.00 1.036 completed status as of March 31, 2016
2013 Mabunao-Mansangaban-
Mabunao-
Mansangaban-
Cambaguio
139 11,159,000.00 1.395 on-going status as of March 31, 2016
2013 Construction of Bantolinao-
Candabong FMR 7 Negros Oriental Manjuyod Bantolinao 113 10,000,000.00 1.360 completed status as of March 31, 2016
2013 Construction of Cabanlutan-
Panalaan Road 7 Negros Oriental Bais City Cabanlutan 38 3,000,000.00 0.243 on-going status as of March 31, 2016
2013 Const./Rehab of Amio-Cansumalig
FMR 7 Negros Oriental
Sta.Catalina-
Bayawan Amio 500 18,000,000.00 0.865 completed status as of March 31, 2016
2013 Const./Rehab of Guintanaan-
Tawayan FMR 7 Negros Oriental Bawayan Tawayan 1,100 18,000,000.00 0.866 completed status as of March 31, 2016
2014
(Batch 6) Sitio Lawis FMR 6 Negros Occidental Escalante Alimango 174 10,000,000.00 0.387 completed status as of March 31, 2016 completed 0.759
2014
(Batch 4) Alegria FMR 6 Negros Occidental Murcia Alegria 1,500 8,000,000.00 0.670 completed status as of March 31, 2016 completed 0.608
2014
(Batch 4) Abo-Abo FMR 6 Negros Occidental Murcia Abo-Abo 1,125 4,000,000.00 0.330 completed status as of March 31, 2016 completed 0.320
2014
(Batch 4) Iglau-an FMR 6 Negros Occidental Murcia Iglau-an 1,500 4,000,000.00 0.330 completed status as of March 31, 2016 completed 0.255
2014
(Batch 4) Amayco FMR 6 Negros Occidental Murcia Amayco 1,125 4,000,000.00 0.330 completed status as of March 31, 2016 completed 0.255
2014
(Batch 4) Cabatangan FMR 6 Negros Occidental Talisay City Cabatangan 1,125 2,000,000.00 0.170 completed status as of March 31, 2016 completed 0.150
2014
(Batch 4) Brgy. Canlandog FMR 6 Negros Occidental Murcia Canlandog 273 5,000,000.00 0.420 completed status as of March 31, 2016 completed 0.320
2014
(Batch 4) Buenavista FMR 6 Negros Occidental Murcia Buenavista 1,500 2,000,000.00 0.170 completed status as of March 31, 2016 completed 0.150
2014
La Carlota
City Ayungon 450 4,200,000.00 0.420 completed status as of March 31, 2016 completed 0.304
2014
La Carlota
City Batuan 73 5,100,000.00 0.510 completed status as of March 31, 2016 completed 0.453
2014
La Carlota
City Yubo 1,400 5,000,000.00 0.500 completed status as of March 31, 2016 completed 0.356
2014
La Carlota
City Batuan 359 5,000,000.00 0.500 completed status as of March 31, 2016 completed 0.300
2014
La Carlota
City Batuan 246 4,700,000.00 0.470 completed status as of March 31, 2016 completed 0.486
2014
FMR 6 Negros Occidental Valladolid Mabini 300 3,000,000.00 0.300 completed status as of March 31, 2016 completed 0.170
2014
(Batch 7) Sitio Nanas FMR 6 Negros Occidental Valladolid Bagonawa 70 5,000,000.00 0.500 completed status as of March 31, 2016 completed 0.320
2014
Himamaylan
City Suay 80 5,000,000.00 0.420 completed status as of March 31, 2016 completed 0.440
2014
(Batch 4) Brgy. Paticui FMR 6 Negros Occidental Hinigaran Paticui 120 10,000,000.00 0.830 completed status as of March 31, 2016 completed 0.840
2014
Sitio Cabadiangan, Brgy.
Camandag FMR 6 Negros Occidental La Castellana Camandag 150 5,000,000.00 0.420 completed status as of March 31, 2016
name in report: Upgrading of
Camandag FMR completed 0.370
2014
(Batch 4) Santol FMR 6 Negros Occidental Binalbagan Santol 1,072 10,000,000.00 0.830 completed status as of March 31, 2016
name in report: Upgrading of
Santol FMR completed 0.870
2014
(Batch 4) Bi-ao FMR 6 Negros Occidental Binalbagan Bi-ao 1,185 5,000,000.00 0.420 completed status as of March 31, 2016
name in report: Upgrading of
Bi-ao FMR completed 0.410
Himamaylan
City Libacao 306 5,000,000.00 0.420 completed status as of March 31, 2016
name in report: Upgrading of
Libacao FMR completed 0.387
Sitio Langguni to Sitio Bonbon,
Brgy. Inawayan FMR 6 Negros Occidental Cauayan Inayawan 350 2,000,000.00 0.142 completed status as of March 31, 2016 completed 0.142
2014
Cartagena FMR 6 Negros Occidental Cauayan Elijan 120 2,000,000.00 0.151 completed status as of March 31, 2016 completed 0.151
2014
FMR 6 Negros Occidental Cauayan Camalandaan 350 2,000,000.00 0.146 completed status as of March 31, 2016 completed 0.157
2014
Sitio Mantamilok-Sitio Tis-an-Brgy.
Isio FMR 6 Negros Occidental Cauayan Isio 450 2,000,000.00 0.115 on-going status as of March 31, 2016 on-going
65%
accomplished
2014
Tambacunao) FMR 6 Negros Occidental Hinoba-an Alim 345 2,000,000.00 0.151 completed status as of March 31, 2016 completed 0.151
2014
Brgy. Talacagay FMR 6 Negros Occidental Hinoba-an Talacagay 420 2,000,000.00 0.129 completed status as of March 31, 2016 completed 0.129
2014
(Batch 6) Purok 8-9 FMR, Brgy. Culipapa 6 Negros Occidental Hinoba-an Culipapa 900 2,000,000.00 0.141 on-going status as of March 31, 2016 on-going
10%
accomplished
2014
(Batch 6) Purok 3-4, Brgy. Sangke FMR 6 Negros Occidental Hinoba-an Sangke 270 2,000,000.00 0.100 completed status as of March 31, 2016 completed 0.100
2014
(Batch 6) Magballo-Canlamay FMR 6 Negros Occidental ilog 700 3,000,000.00 0.480 completed status as of March 31, 2016 completed 0.225
2014
Kabankalan
City Tabugon 150 3,000,000.00 0.191 completed status as of March 31, 2016 completed 0.191
2014
6 Negros Occidental Kabankalan
City Magballo 800 3,000,000.00 0.227 completed status as of March 31, 2016 completed 0.227
2014
Kabankalan
City Tagukon 575 3,000,000.00 0.178 completed status as of March 31, 2016 completed 0.178
2014
Zone 2- Sitio Canhambog, Brgy.
Nabulao FMR 6 Negros Occidental Sipalay City Nabulao 295 2,000,000.00 0.148 completed
status as of March 31, 2016;
Request for Deletion in the
PMS
obligation until 12/31/2015
Manlucahoc FMR 6 Negros Occidental Sipalay City Manlucahoc 256 2,000,000.00 0.154 completed status as of March 31, 2016 on-going
75%
accomplished
2014
Calangcang to Camp Valdes-
Brgy.4 FMR 6 Negros Occidental Sipalay City Brgy.4 207 2,000,000.00 0.151 completed status as of March 31, 2016 completed 0.119
2014
Balunggay (cansauro)-Brgy. Gill
Montilla FMR
6 Negros Occidental Sipalay City Gil Montilla 417 2,000,000.00 0.119 completed status as of March 31, 2016 on-going 85%
accomplished
2014
Crossing Mais to Nauhang-Brgy.
Canturay FMR 6 Negros Occidental Sipalay City Canturay 130 2,000,000.00 0.100 completed status as of March 31, 2016 completed 0.100
2014
Sitio Dungga-Sitio Binutusan, Brgy.
Maricalum FMR 6 Negros Occidental Sipalay City Maricalum 212 2,000,000.00 0.140 completed status as of March 31, 2016 completed 0.144
2014
(Batch 9) Brgy. Concepcion FMR 6 Negros Occidental Talisay City Concepcion 50 2,000,000.00 0.175 completed status as of March 31, 2016 Not in RFO report
2014
(Batch 9) Brgy. Cabatangan FMR 6 Negros Occidental Talisay City Cabatangan 60 5,000,000.00 0.369 completed status as of March 31, 2016
Name: Sitio Mambucano,
2014
(Batch 9) Brgy. Katilingban FMR 6 Negros Occidental Talisay City Katilingban 825