Pradhana Mantri Awas Yojana
Housing for all
Presented By
D. Kaval Kumar, Regional Cordinator (South) Programme Management Unit
Pradhan Mantri Awas Yojana Housing for All (URBAN)
Pradhan Mantri Awas Yojana
PMAY- Housing for All by 2022 launched by MoHUPA,
GoI.
Mission will be implemented as Centrally Sponsored
Scheme (CSS) except for the component of credit linked
subsidy which will be implemented as a Central Sector
Scheme.
Beneficiary defined as a family comprising husband, wife
and unmarried children. Further, Beneficiary should not
have any pucca house anywhere in India to be eligible to
receive support under the mission.
PMAY- Housing for All by 2022, a
comprehensive urban housing scheme
to achieve the objective that “By the
time the Nation completes 75
years of its Independence, every
family will have a Pucca house”.
Four Verticals of PMAY-Housing for All (Urban)
"In situ" Slum Redevelopme
nt
“In-situ” using land as a resource
with private participation
Extra FSI/FAR and TDR if
required
GoI grant Rs. 1 lakh per house
Credit Linked Subsidy
(CLS)
*Subsidy for EWS and LIG for new
house or incremental
housing
Upfront subsidy @
6.5% for EWS and
LIG for loans upto
Rs. 6 lakh,
calculated at NPV
basis
Affordable Housing in
Partnership (AHP)
with private sector or public sector including
Para-statal agencies
- CentralAssistance of Rs.1.5 lakh per EWShouse in projects
where 35%houses for EWS
category.
Subsidy for beneficiary-led
individual house construction
(BLC)
For individuals of EWS category for
new house or enhancement
Cities to prepare a separate
integrated project for such
beneficiaries Central assistance of Rs.1.5 lakh per
beneficiary.
Beneficiary can take advantage under one component only
Scope of the Project
Demand Survey
• Initiative Demand Survey
•Survey Training•Conducting Survey•Focus Group Discussion
Data Verification and Validation
•Data Entry
•Data Compilation
•Data Verification and Validation
Analysis
GIS
• Base map Preparation
•Plotting Slum -Non Slum urban poor pockets
Preparation of Housing for all Plan of Action
Community participation &
Stakeholder meeting
Preparing PoA and assisting respective state governments
till approved MoHUPA
Task- 1: Inception and Conducting Demand Survey
Job 1: Consultation with respective Government authorities
Job 2: Conducting Demand Survey
Step 2A: Initiate Demand Survey
Step 2B: Survey Training
Step 2C: Focus Group Discussion (FGD)
Job 3: Completing Demand Survey
Job 4: Verification and Validation
Task- 2: Conducting Physical survey of the slum
Used By ETS(Electronic Total Station Survey)
• Task- 3: Approval of Demand Survey by Municipality
After incorporation of comments and suggestions from Municipality officials,
the Demand Survey report will be submitted in compliance with specific requirements of Municipal officials
Job 1: Consultation with respective Government authorities
Survey Training and focus group discussion
Demand Survey
Survey Format:
Format will be prepared by local language as the requirement
Step 1: Over view of the programme
Step 2: Approach methodology
Step 3: City Profile & Overview
A. preparation of a city profile
Collection of primary and secondary data from various sources field visits
B. Existing Policies and Programmes
Review the existing policies and programmes
If any past developments in housing projects etc.
C. Existing Situation
Study of Documents, Maps and Reports through secondary and field visit.
Step 4: Data analysis
A. Slum Dwellers
B. Other Urban Poor
Step 5: Exploring Various Funding Sources & Choosing Verticals
Step 6: Preparation of Annual Implementation Plan
The preparation of HFAPoA involves the following steps
The preparation of HFAPoA involves the following steps
Identification of slums and demand assessment
Set data Collection & Confirmation of beneficiary list
Examination and identification of tenable & untenable slums
Mapping of slums
Adopt strategies available under mission or by the local authority
fiscal & technical viability assessment of the project
Slum redevelopment phasing
Categorization of intended beneficiaries
Preparation and implementation of AIP
Preparation of Housing for All Plan of Action
Meeting withCommissioner and other officials
Preparation of Questionnaires
Training toInternal Team
Demand Survey
Focus Group Discussion (FGD)for Ground Truth Analysis of Data
Meetings with Regional
Coordinator, Managing
Director (Respective
department), Chief Engineer
and Section Engineer are
planned to undertake at each
stage of plan preparation
process and feed-back is
incorporated.
Preparation of
Questionnaires required
for the survey at ULB &
Slum level with the
supervision of
consultation ULB to
assess the ground reality
Significant Training
sessions to enumerators
who perform survey
exercise have been
provided on survey
formats as prescribed in
mission.
This will consist of consultations with all households in
the identified areas as per the format given in the Housing
for All guidelines. In assistance with a nodal officer from
ULB and an expert on-behalf of consultancy
FGD report would cover;
discussion on four verticals of
PMAY-HFA guidelines, size of
dwelling units and
beneficiaries to be covered
under project, percentage of
households not having access
to basic sanitation and any
suggestions/feedback from
potential beneficiaries are
covered along with details of
the suggested by the ULB.
SERIES OF ACTIVITIES
Data Entry, Data Compilation, Verification and Validation
CASE STUDY
ATMAKUR MUNICIPALITY- SPSR NELLORE DISTRICT-A.P
DEMOGRAPHIC DETAILS
PARAMETER UNIT Value
Population (2011
census)
No. 29419
Area 58.66
SQ.KMS
No. Of Municipal
Wards
No. 23
Literacy rate % 75.28%
Male literacy Rate % 82.47%
Female literacy Rate % 68.15%
Sex Ratio (2011) No. 1002
Total no. of
households
7654
Average Household No. 4
SC Population ST Population
Male 2279 1477
Female 2908 1431
Total 4704(15.98%) 2908(9.88%)
SOCIO-ECONOMIC PROFILE OF MUNICIPALITY
S. NoType of
workersTotal Workers
Male
Workers
Female
workers
1 Total workers 11,547 8069 3478
2 Main Workers 8976 6914 2062
3 Marginal 2571 1155 1416
4 Non-workers 17872 6627 11245
Training to Internal Team
FOCUS GROUP DISCUSSION
SLUM PROFILE OF ATMAKUR
S.N
O
No.
1 No. of notified slums 0
2 No. of non-notified slums 22
3 Total slums 22
Total Slum population 12151
6 Percentage of slum population 41.03%
7 Total Slum Households 2965
8 Percentage of Slum Households 38.73%
S.No Slum Name Population No. of Households
1 A.C. Subbareddy Colony 613 153
2 Anantharaya Yani 250 63
3 Arundhatiya palem 1300 325
4 Erukalasani nagar 530 133
5 Harijanawada 1206 302
6 Jammala palem 304 76
7 Vulavadibba 182 46
8 Modal S.T Colony 182 46
9 Narsapuram S.T. Colony 425 106
10 Pera reddy palli 425 106
11 Jyothi Nagar 425 106
12 weavers Colony 425 106
13 Nellore palem S.C Colony 220 55
14 Santhi nagar S.C Colony 216 54
15 T.Musthapuram S.C. Colony 216 54
16 Narsapuram S.C. Colony 216 54
17 Ekalavya Colony 819 205
18 Vanduru gunta 819 205
19 Sivalam Colony 819 205
20 S.T.Colony 616 154
21 Tekkey Veedhi 680 170
22 Venkatarao Palli Colony 1263 316
Total 12151 2965
S.NO Slum NameDwelling
Units
Percentages
Pucca Semi Pucca Kutcha
1 A.C.Subbareddy Colony 203 59% 26% 15%
2 Anantharaya Yani 55 82% 9% 9%
3 Arundhatiya palem 118 66% 21% 13%
4 Erukalasani nagar 106 60% 17% 23%
5 Harijanawada 359 62% 34% 4%
6 Jammala palem 78 82% 15% 3%
7 Vulavadibba 45 73% 16% 11%
8 Modal S.T Colony 45 73% 16% 11%
9 Narsapuram S.T. Colony 108 81% 10% 9%
10 Pera reddy palli 108 81% 10% 9%
11 Jyothi Nagar 108 81% 10% 9%
12 Weavers Colony 108 81% 10% 9%
13 Nellore palem S.C Colony 47 85% 4% 11%
14 Santhi nagar S.C Colony 58 79% 2% 19%
15 T.Musthapuram S.C. Colony 58 79% 2% 19%
16 Narsapuram S.C. Colony 58 79% 2% 19%
17 Ekalavya Colony 184 72% 21% 7%
18 Vanduru gunta 184 72% 21% 7%
19 Sivalam Colony 184 72% 21% 7%
20 S.T.Colony 154 75% 9% 16%
21 Tekkey Veedhi 95 53% 31% 16%
22 Venkatarao Palli Colony 232 78% 8% 14%
In-situ
Development
Credit linked
subsidy
Affordable
Housing in
Partnership
Beneficiary led Housing
New-
construction
BLC_
Enhancement
0 200 1932 930 500
Components Central Share/DU State Share/DUBeneficiary
Share/DUBank Loan
In-situ Development 1.0 lakhs/ house Nil Nil Nil
Credit linked Subsidy 1.95 Lakhs Nil Nil 6.0 Lakhs
Affordable Housing in
Partnership1.5 lakhs 1.5 lakhs Nil Nil
Beneficiary led Housing
– new Construction1.5 lakhs 1 lakhs 0.25 lakhs 0.75
Beneficiary led Housing_
Enhancement1.5 lakhs Nil Nil Nil
BENEFICIARIES UNDER FOUR VERTICALS AND FUNDING PATTERN IN A.P
Year wise Proposed Interventions
YearInsitu
Credit Linked
Subsidy scheme
Affordable Housing
in Partnership
Beneficiary-led
Individual House
construction
Beneficiary-led
Individual House
Enhancement
Total
Beneficiarie
sCost
Beneficiarie
sCost Beneficiaries Cost
Beneficiaries
-Cost Beneficiaries Cost
Beneficiari
esCost
2015-16 0 0 0 0.00 1028 3,084.00 0 0.00 0 0.00 1028 3,084.002016-17 0 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.002017-18 0 0 200 390.00 0 0.00 930 3,255.00 500 750.00 1130 4,395.002018-19 0 0 0 0.00 904 2,712.00 0 0.00 0 0.00 904 2,712.002019-20 0 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.002020-21 0 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.002021-22 0 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Total 0 0 200 390.00 1932 5,796.00 930 3,255.00 500 750.00 3562 10,191.0
0
Year
Total Project
cost for CLS
Beneficiaries
Total Project
cost for AHP
Beneficiaries
Total Project
cost for BLC
Beneficiaries
Resource Mobilization (Rs.In lakhs
Central
ShareState Share Beneficiary share Bank Loan
Total Project
Cost
2015-16 0.00 3,084.00 0.00 0.00 1,542.00 1,542.00 0.00 0.00
2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2017-18 390.00 0.00 3,255.00 750.00 2,535.00 930.00 232.50 697.50
2018-19 0.00 2,712.00 0.00 0.00 1,356.00 1,356.00 0.00 0.00
2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2020-21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2021-22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 390.00 5,796.00 3,255.00 750.00 5,433.00 3,828.00 232.50 697.50
PROPOSED LAYOUT