40
Pradhan Mantri Krishi Sinchayee Yojana- Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Embed Size (px)

Citation preview

Page 1: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Pradhan Mantri Krishi Sinchayee Yojana-Watersheds(erstwhile IWMP)

ANDHRA PRADESH

DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Page 2: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Andhra PradeshLand treatment Strategic Plan

• Total geographical area of A.P : 160.20 Lakh Ha• Untreatable area : 34.18 Lakh Ha• (Assured Irrigation, Barren Rocky etc)• Treatable area in the State : 126.02 Lakh Ha•   

• - Area already treated under Watershed                              : 13.43 Lakh Ha•     (Under DPAP, DDP, IWDP etc.,)• - Area treated under schemes of other Ministries                : 2.66 Lakh Ha

• - Area already treated under IWMP                                         : 18.10 Lakh Ha•    (From 2009-10 batch to 2014-15 batch)                                 --------------------• Total area already treated under Watershed projects      : 34.19 Lakh Ha•                                                                                                                    

--------------------• Balance area to treated : 91.84 Lakh Ha • Proposed area to be treated under other Watershed Programmes and Urban areas : 21.98 Lakh Ha

(Under Other Watershed Projects implemented by Agriculture Dept, NABARD etc.,)Balance area to be treated : 69.86 Lakh Ha

Page 3: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

PMKSY-Watersheds (erstwhile IWMP) Batch wise Project details

BatchNo .of

Projects

Area (Lakh Ha.)

Project Cost

(Rs. in Crores)

Amount(Rs. in Crores)

Released

Exp. Balance

Batch-I (2009-10) 62 2.75 330.42 222.92 189.35 33.57Batch-II (2010-11) 97 4.15 502.06 253.93 241.04 12.89Batch-III (2011-12) 102 4.4 528.68 176.95 165.46 11.49Batch-IV (2012-13) 56 2.33 303.81 69.17 54.56 14.61Batch-V (2013-14) 56 2.22 322.65 23.07 5.08 17.99Batch-VI (2014-15) 59 2.25 302.37 2.46 0.63 1.83

TOTAL 432 18.10 2290.00 748.50 656.01 92.49

Total Fund releasedUnspent

Balance as on 31.10.2015

Central State TOTAL

604.27 144.23 748.50 92.49

Page 4: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

EXPENDITURE FACTSHEET (PROJECT FUND) (As on 31.10.2015)

(Amount Rs. in crore)

Budget Component

Amount released for projects sanctioned during (Central share + State share)

Total expenditure incurred(at all levels) % of

Exp.Unspent Balance

2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Total 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Total

DPR 3.30 5.02 5.29 3.04 2.90 1.55 21.10 2.68 4.82 4.03 1.76 1.43 0.55 15.27 72

92.49

EPA 13.22 20.08 22.02 12.85 8.12 0.26 76.55 7.76 15.59 15.02 4.69 0.00 0.00 43.06 56

Institution & cap. building

9.28 13.06 9.90 2.95 2.96 0.14 38.29 6.05 8.36 9.31 1.67 0.31 0.05 25.75 67

Admn. cost 20.01 27.38 21.47 9.67 3.46 0.51 82.50 19.95 27.34 21.32 9.26 3.16 0.03 81.06 98

Watershed works

129.26 124.96 74.29 20.28 2.36 0.00 351.15 110.31 123.96 72.29 18.28 0.00 0.00 324.84 93

Livelihood activities for the asset-less

26.99 41.46 26.74 15.49 0.00 0.00 110.68 26.99 41.46 26.74 15.49 0.00 0.00 110.68 100

Production system & micro-enterprises

13.57 16.71 12.84 3.32 1.60 0.00 48.04 13.51 16.22 12.79 2.74 0.00 0.00 45.26 94

Monitoring 4.85 3.19 3.97 1.42 1.52 0.00 14.95 2.03 3.20 3.84 0.56 0.18 0.00 9.81 66

Evaluation 2.44 2.07 0.44 0.15 0.15 0.00 5.24 0.07 0.09 0.12 0.00 0.00 0.00 0.28 5

Consolidation Phase

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

Total 222.92 253.93 176.95 69.17 23.07 2.46 748.50 189.35 241.04 165.46 54.45 5.08 0.63 656.01 88

Page 5: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

PHYSICAL ACHIEVEMENTS UNDER IWMP

Success Indicator UnitAchievement up to

31.03.2014

Achievement during 2014-15

Target for 2015-16

Achievement during 2015-16

(From 01.04.2015 to

31.10.2015)

Total Achievement as on 31.10.2015

Creation of new Rainwater Harvesting Structures

Number 15134 11934 19378 6862 27,955

Renovation/ restoration of old rain water harvesting structures

Number 226 705 8545 2328 2,931

Additional area brought under irrigation

Ha 27,485 24,562 -- 22,090 60,138

Plantation including afforestation & horticulture

Ha 12134 9473 17073 4308 25,936

Formation of Self Help Groups (SHGs)

Number 35,557 5595 6435 -- 41,152

Providing livelihoods to households

Number 36,991 6,196 11340 -- 43,187

Page 6: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Institutional Fund utilization V/s Project Fund Utilization (as on 31.10.2015)

Institutional Fund Project Fund

Total Institutional Fund received from

Central

Total Institutional

Funds Utilized% Utilization

Total available Funds under Project Fund

(Central+ State+ Miscellaneous receipt)

Total Project Fund

utilized

% Utilization

3.64 3.83 105% 766.07 656.01 87.64%

Note : Excess expenditure met from interest accrued on fund

Page 7: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Management of Institutional Support Fund(as on 31.10.2015)

(a) Institutional preparedness - Financial

(Rs. In lakhs)

Total Central assistance Other miscellaneous receipts (incl. interest accrued),if any

Total Fund available Total Expenditure

For SLNA

For WCDCs

Total For SLNAFor

WCDCs Total For SLNA

For WCDCs

Total For SLNAFor

WCDCs Total

111.25 252.90 364.15 18.42 0 18.42 129.67 252.9 382.57 165.86 216.71 382.57

(b). Total non-recurring fund released and its expenditure. (Rs. In lakhs)

Central Releases Expenditure Balance

102.03 102.03 0

Page 8: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

ABSTRACT OF PROJECT FUNDS RECEIVED & EXPENDITURE DURING 2015-16

(AS ON 31.10.2015)

(Amount Rs in Crore)

Opening balance as on 01.04.2015

Central Share released during 2015-16

State Share released during 2015-16 

Misc. receipts during 2015-16

Expenditure during 

2015-16                      ( upto 

October,2015)

%  of Expenditure

Total available 

funds during 2015-16as on 

31.10.2015

0 86.73 86.73 0.03 68.40 39 92.49

Note:-There  is  a  shortfall  as  on  01.04.2015  is  Rs  12.60  Crores  expenditure  met  from MGNRGES and other Scheme on reimbursable basis during the FY 2015-16.

Page 9: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

INSTITUTIONAL ARRENGEMENT FOR IMPLEMENTATION OF IWMP

Institution

No. of experts & staff be engaged as per guideline issued by DoLR

No. of experts & staff actually engaged

2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15

SLNA 43 21

WCDC 72 46

PIA /

WDTs996 856

WCs 3799 3407

Total 4910 4330

Page 10: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Status of appointment of Technical Staff at SLNA (as on 31.10.2015)

S. No.

NameGovt. Employee /

ContractIf Govt. then Designation

Full time orPart Time

Area of Specialization

Date of appointment

of contractual Staff

Honorarium / Salary Paid per

month from Institutional Funds (Rs.)

The amount

paid from Govt.

funds, if any (Rs.)

1 N.V.Ramana Murthy Govt. EmployeeDy. Executive

EngineerFull Time NRM 01.11.2015 1,11,589

Nil

2 G.Srinivas Govt. EmployeeAssistant Director

Full Time IT 01.12.2011 96,963

3 B.Venkatesulu Naik

Fixed Tenure Employees (FTEs)

State Tech. Expert

Full Time Livelihoods 01-08-2012 44711

4 G.BharathiState Tech.

Expert Full Time PSI 11-04-2005 46962

5 SVN Raja Mouli Asst. Tech.

Expert Full Time NRM 01.09.1998 32433

6 B. Suresh Kumar ContractAsst. Tech.

Expert Full Time IT 06.09.2014 23,000

7 N.Venkata Subbaiah ContractProgramme

ManagerFull Time Pre-IWMP 01.04.2015 21,200

Page 11: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Progress in DPR Preparation (as on 31.10.2015)

ParticularsNo. of project

sanctioned

No. of DPRs

already prepared & approved by SLNA

Timeline for

completion of

remaining DPRs

No. of DPRs

uploaded in the

website of the Nodal

Dept.

URL of the web-site

No. of projects in which Watershed

Works have Commenced

For projects sanctioned during 2009-10

62 62 - 62

http://iwmp.ap.gov.in/W

ebReports/UI/DPR/DPR

Files.aspx

62

For projects sanctioned during 2010-11

97 97 - 97 97

For projects sanctioned during 2011-12

102 102 - 102 102

For projects sanctioned during 2012-13

56 56 - 56 56

For projects sanctioned during 2013-14

56 56 - 56 56

For projects sanctioned during 2014-15

59 - 03/2016 - -

Page 12: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Status of Evaluation of Preparatory Phase and Works Phase of IWMP Projects (as on 31.10.2015)

Batch

Status of Evaluation of Preparatory Phase (indicate Yes/No)

Status of Evaluation of Works Phase(indicate Yes/No) No of Batch I and

Batch II projects likely to be

completed during 2015-16

CompletedUnder Process

If not done likely date

of completion

CompletedUnder Process

If not done likely date of completion

I Yes

No Guidelines awaited from DoLR

62(However requested for extension of one

more year upto 31.03.2017)

II Yes

III Yes

IV

Yes (report in the process of submission to DoLR)

NoJust completed preparatory phase and entered works phase

V No June, 2016 No Not applicable

VI

Page 13: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Status of engagement of Concurrent Monitoring & Evaluation Agency

No. Selected AgencyDistricts & Projects

covered

No. of projects & Area (Ha) covered

Rate per Ha. (Amount in

Rs.)

Total Project Value (Rs. in

lakhs)

IRemote Sensing Instruments (RSI)

Ananthapur (85) & Kadapa (38)

123 Projects (5,16,496 Ha.)

90 390.17

IIGrameen Vikas

Trust (GVT)Kurnool (59) & Chittoor(58)

117 Projects (5,04,797 Ha.)

90 376.99

III NABCONSPrakasam (62) & Guntur (4)

66 Projects (2,98,540 Ha.)

102 256.21

IV WAPCOS Pvt. Ltd.,W G(3), EG (14), VIZN (10), VSKP(15) & SKLM(24)

66 Projects (2,63,817 Ha.)

98 249.19

TOTAL 1272.60

4 Agencies have been finalised and engaged through Technical cum financial  bidding  process  for  undertaking  MEL&D  upto  Batch-V Projects and MoU entered on 15.12.2014 for a period of five years. Details of allotment of IWMP clusters are as follows;

Page 14: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Action taken on Benchmarking of Watershed Management Outcomes 

Progress on action taken on Bench Marking of Watershed outcomes:• Selected 7 projects from batch II & III • Communicated guidelines, indicators and selected projects to MEL&D 

agencies as pilot. • Draft report received. Submission to DoLR by end of November’ 2015 

Sl. No. Agro climatic Zone District Project Batch Agency

1 Krishna-Godavari Zone Prakasam Mangalikunta II NABCONS

2 North Coastal Zone Srikakulam Sancham II WAPCOS Limited

3 Southern Zone

Chittoor & Badikayalapalle III Grameen Vikas Trust (GVT)

Kadapa Devapatla II Remote Sensing Instruments (RSI)

4 Scarce Rainfall Zone

Anantapur & Bandameedipalli II Remote Sensing Instruments (RSI)

Kurnool Gani III Grameen Vikas Trust (GVT)

5 High Altitude and Tribal areas Srikakulam Tarlakota III WAPCOS Limited

Page 15: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Capacity Building

Sl. No.

Capacity Building Particulars Status

1 Role of SLNA in Capacity Building Facilitating in preparation of annual action plans, modules & materials for different stake holders.

2Status of preparation of Capacity Building Plan for state (for all Levels of Stakeholders )

Conducting workshops, meeting & reviews etc., at state level to know the status of implementation of various components and planning for new interventions.

3Status of preparation of Modules of Training have been prepared or not (for all levels of stakeholders)

Prepared training Modules such as 1. Entry Point Aactivity,2. Technical manual on NRM, 3.Production System improvement 4. Animal Husbandry,5. Small ruminants, 7. CMSA, 8.Soil moisture conservation & Water Harvesting Structures, 9. Manual for Watershed Assistants etc.,

4Status of preparation of     Modules  of Training in local language 

All the above Training Modules are prepared in local language (Telugu).

5Status of preparation of   Calendar of training for 2015-16 

Prepared the training calendar for 2015-16 at district level and approved by the Collectors concerned.

6Total budget proposed for Capacity building during 2015-16. Rs. 1300 Lakhs

Page 16: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Proposed Capacity Building Plan for 2015-16

Level of Stakeholder

No. of training

No. of Beneficiaries

Subject of Training ProgramName of

Training Institute

Proposed Expenditure (Rs in Lacs.)

SLNA Level 252 1500

PRA & PNP, DPR , NRM, Software, EPA, LH, PSI, Watershed Mngt, Geo-Hydrology, GPS, M&E ,ASTI, TSFA & Exposures

APSIRD, MCRHRD,

MANAGE, NIRD, CRIDA, NRSC,

AU etc.,

97

District Level (DLRC) 620 31,000

Watershed concept, PRA/PNP,DPR,NRM, Technical, Geo,HydrologyPSI,EPA,LH,AH,Agri

DLRC, TTDC, Mahila

Pranganam,320

WDT Level (CLRC) 9042 4,52,100

Watershed Concept, LH,Fund management, VO, SHG,MS,UG,WSC,NRM,EPA,PSI,AH.Agri

CLRC 600

WC Level (Village) 12,393 6,19,650Concepts on Watershed, UG, WSC, WRP, SHG, VO, LH, PSI, AH &AG etc.,

WCC, MS, GP, 283

Total : 22,307 11,04,250 1300

Page 17: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Status of Pre – IWMP (As on 31.10.2015)

SchemeNo. of

Projects sanctioned

Area covered (in lakh

ha.)

Project Cost in Rs. Crore

Projects completed No. (All the instalment

received and total project area treated)

Project Closed No. (All the instalment

released by DoLR but total project area not treated by the State)

Projects Non performing (All the instalment not received)

DPAP 1275 6.38 382.50 1266

Nil

9

IWDP 612 3.06 183.60 597 15

DDP 848 4.24 254.40 846 2

TOTAL 2735 13.68 820.50 2709 Nil 26

State-wise list of Pending UCs:

No. of Pending UCs Amount (Rs. crore)

- NIL - - NIL -

Furnishing of documents for Completed/ non performing projects for formal closure

Completed Projects

2709 PCRs have already been submitted to DOLR as on date as against 2735.

The balance PCRs are planned to submit by the end of December '2015.

Non-Performing Projects

26 Non Performing watersheds closure documents were already submitted to GOI.

Page 18: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Implementation of Public Finance Management System (PFMS)

• AP  is  implementing  Electronic  Fund  Management System  (eFMS)  since  2011  for  IWMP  financial transactions at all levels. 

• DoLR,  GoI  agreed  that  AP  shall  continue  with  the existing  IT  (eFMS  system)  and  the  state  will  share  the data  as  required  by  PFMS  for  MIS  purposes  as  in  the format desired.

Page 19: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Implementation of Process Management Software(PMS)

BatchNo of

projectsNo of PIA registered

No of projects for which legacy data in the excel sheet has been provided

I 62

NILState level training programme is

scheduled in the month of January,2016.

II 97

III 102

IV 56

V 56

VI 59

Total 432

Page 20: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Status of online IWMP-MIS as on 31.10.2015 upto Batch-IV

S.No

Parameters Status Details of pending projects Remarks

1 Baseline Survey completed 315 / 317Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13.

Two projects proposed for cancellation (ATP-26 & CDP-41)

2Financial Action Plans fed up

to date287 / 317

Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13

• Two projects proposed for cancellation (ATP-26 & CDP-41).

• 28 Projects are not reflecting though data already fed.3

Financial Achievement fed up to date 31-10-2015

287/ 317Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13

4Physical Action Plan fed up to

date250 / 317

Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13

• Two projects proposed for cancellation (ATP-26 & CDP-41).

• 65 Projects are not reflecting though data already fed5

Physical Achievement fed up to date 31-10-2015

250 / 317Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13

6Capacity Building Plan fed up

to date315 / 317

Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13

Two projects proposed for cancellation (ATP-26 & CDP-41)

7CB Achievement fed up to

date 31-03-2015.315 / 317

Anantapur-IWMP-26/2010-11, Cuddapah-IWMP-41/2012-13

Two projects proposed for cancellation (ATP-26 & CDP-41)

Status / Issues:1.The progress up to 30-09-2015 will be completed by 30th Nov, 2015 at WCDC (DWMA) Level. 2.At SLNA level all plans have been fed and entered achievement up to 02-06-2014. Once the site is bifurcated among Andhra Pradesh & Telangana States, the achievement data will be fed up to date.3.Requested to provide interface to upload data automatically from TCS to NIC sever on regular intervals on the similar lines of MGNREGS

Page 21: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Implementation of Bhuvan Software status (Srishti & Drishti)

Batch /Year No of projects

No of projects for which

shape files have been sent

to NRSC

No of projects for which project

information and implementation

status (prep, work,

consolidation) is provided

No of projects for which DPRs,

Treatment maps, Annual Action Plan etc., are

uploaded/ provided to

NRSC

No of projects for which

photographs have been uploaded

2009-10 62 62 62 62 12,415 photos were 

uploaded in Bhuvan . After moderation, 3500 photos 

were accepted, 356

photos rejected & 

8,559 yet to be moderated

2010-11 97 97 97 972011-12 102 102 102 1022012-13 56 56 56 56 2013-14 56 56 56 562014-15 59 59 59

Total 432 432 432 373

Page 22: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Requirements for field level monitoring of Bhuvan – Dhrusti

• 12,415 photos were uploaded in Bhuvan . After moderation, 3500 photos were accepted, 356 photos rejected & 8559 yet to be moderated 

• Moderation of photos at SLNA is made available now, but this facility need to be extended at district level also.

• Moderation of photos is taking time due to response from the server is very slow State abstract on BHUVAN-DRISHTI uploading status.

•  Rejected photo data  /information shall be pushed back to the mobile, so that they can re-uploaded  with correct photos.

• District wise, project wise status of uploading report is required to monitor the uploading status.

•  Selection of multiple micro-watersheds is required for attribute updation.•  Provision for editing and deletion of uploaded photos at District level during 

moderation.•  Configuration of mobile instrument for uploading BHUVAN as it is not working in 

some of the mobiles.• Required provision to upload existing photographs available in www.iwmp.ap.gov.in 

into Bhuvan. 

Page 23: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

State specific issues

a) Policy level• Tagging of Projects of Khammam district, Telangana to Andhra Pradesh.

During the bifurcation of united Andhra Pradesh State,   area pertaining to 4 projects of Khammam district is merged into newly formed residual Andhra Pradesh state as shown below. Requested for formal orders from DoLR, GoI for re-allotting the projects to residual Andhra Pradesh.

• Cancellation of Projects:  Two projects proposed for cancellation Anantapur-IWMP-26/2010-11(Kummatha Project), YSR-Kadapa -IWMP-41/2012-13 (Kodur Project).

• Sanction of 146 watershed projects with an area of 5.59 Lakh Ha under PMKSY for the FY 2015-16, to with stand the drought conditions.

b) Implementation level• Software issues: DOLR is requested to share the schema & logics for developing interface module to 

port the data from AP customized IWMP application to DOLR MIS at regular intervals on the similar lines of MGNREGS.

• Release the balance funds for FY 2015-16 for better implementation of ongoing watershed projects.   

S.No Batch No Project Name Mandal Merged into the District1 2009-10 Pedda Mattapalle Vararamachandrapuram

East Godavari District2 2013-14 Abhicherla Kunavaram3 2013-14 Surakunta Chinthoor4 2013-14 Kukkunuru Kukkunuru West Godavari District

Page 24: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

AP - Initiates

• Transaction based software since 2011.• Exclusive Watershed Computer Centers (WCC).• E-DPR & E-Estimates, E-Payments, E-Asset Registers.• Electronic Fund Management System (eFMS).• Aadaar enabled biometric payments for wage payments.• Convergence with line Departments and other Schemes.• Neeru-Chettu as drought initiative .• Renovation of Existing Waters Harvesting Structures• GPS Coordinates & Photos in three stages as mandatory.• Exclusive Quality control wing.• Social Audit for all IWMP works.

Page 25: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP
Page 26: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Electronic Fund Management System (eFMS)

• No parking of funds.• Access to all the IWMP projects.• Registration of all mandal, district level officers under eFMS.

• All the work payments, salaries and other payments through eFMS only.

• Fund transfer orders (FTOs) generated and uploaded by mandal level officers.

• Payments electronically transferred through core banking system.

Page 27: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Flow chart on Electronic Fund Management System (eFMS)

IWMP Server

Page 28: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Convergence with various Programmes & Line Departments

Forest Department

Horticulture Department

Animal Husbandry Dept.

MG-NREGS-AP

NRSC/APSRAC

Sericulture

Agriculture DepartmentSSAAT

NREDCAP

Page 29: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Best practices

Convergence with EGS scheme•Wage extensive works with EGS funds•WHS like PT, MPT, Farm Ponds, Dug out Ponds,•SMC works like Earthen bunds, CCT, ST •Repairs &renovations to existing WHS•Plantation works to the beneficiaries eligible under EGS •Rural SSR approved under EGS for wage rates.•Estimate generation in WCC by IWMP staff•Musters for unskilled works maintained by IWMP staff.•Payments in WCC by IWMP staff through EFMS.

Page 30: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Best practices

Convergence with EGS scheme

•A total of Rs. 205.97 cr expenditure made with EGS funds.

• Rs. 79.52 cr as wage, Rs. 126.45 cr as material.• 79.52 lakh mandays wage employment in IWMP

villages.

•During 15-16 so far a total of Rs. 89.98 cr expenditure made with EGS funds.

• Rs. 25.65 cr as wage, Rs. 64.33 cr as material• 21.37 lakh mandays wage employment in IWMP

villages.

Page 31: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

CONVERGENC WITH SERP (SRLM)

STRATEGY:

• Selection of PoP by VO

• Household Livelihood

Action Plans (HLPs) by VO

• Release of LH component to

CEO, SERP and to Sri Nidhi

Bank.

• Sri Nidhi Bank releases LH

component to VO

• Asset grounding, repayment

of loan combinedly

monitored by SRLM and

IWMP staff

Beneficiary coverage: 43,187 households, 41,152 SHGs with an investment of over Rs. 110.69 Crore

Livelihood activities undertaken

28%

16%

10%

6%

Page 32: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

Convergence with SERP (SRLM)

FUND FLOW

Page 33: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

ASSETS CREATED

Sl. No

Name of the Activity Nos.Additional area brought under irrigation in Ha.

No of farmers benefited

1 Soil Moisture Conservation works 20,643 10,272 20,643

2 Water Harvesting Structures 31,125 60,138 31,125

3 Afforestation works 10,705 -- 5,352

4 Horticulture Works (in acres) 49,117 -- 20,232

5 Live stock Related Works 4,938 2,500 4,938

Page 34: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

PROGRESS OF

SOIL MOISTURE CONSERVATION WORKS(AS ON 25.06.2014)

Rock Fill Dam

Water Absorption TrenchStaggered Trenches

Sunken pits

WORK Nos.

Staggered Trenches (in acres)

1408

Water Absorption Trenches 1244

Loose Boulders 9340

Rock Fill Dams 7698

Sunken Pits 492

Others 461

TOTAL 20643

Page 35: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

WATER HARVESTING STRUCTURES

Farm Pond

Mini Percolation Tank

Name of the Activity Nos.

Mini Percolation Tank 1485

Farm Pond & Dug out ponds 21855

Percolation Tanks 1342 Check dam 2660 Check wall 637Others 3146

TOTAL 31125

Check Dam

Page 36: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

PROGRESS OF NRM IN AP

1,05,259 works with an expenditure  of Rs 528.20 Crores since inception.

  Rs 133.77 Crores wage expenditure  with 1,11,47,500 mandays 

34,979 works with an expenditure  of Rs 134.06 Crores during 2015-16

Rs 28.43 Crores wage expenditure  with  23,63,000 mandays during 2015-16

Page 37: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

AFFORESTATION – PLANTATIONS, HORTICULTURE & NURSERIES

Nursery Dry Land Horticulture

Bund Plantation Avenue Plantation

Name of the Activity Nos.

Barren Hill Afforestation (in Acres)

204

Dry Land Horticulture ( in Acres)

19595

Block Plantation( in Acres)

963

Bund Plantation( in Acres)

1877

Block Plantation (In Private Lands) ( in Acres)

1005

Avenue Plantation (in Kms)

3324

Nurseries (in Nos) 124

Page 38: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

ENTRY POINT ACTIVITIES IN CONVERGENCE WITH AH, RWS & NEDCAP

38

Animal Health Camps (2166 with Rs.435.00 lakhs)

Village Knowledge centers – 17 with Rs.27.00 lakhs

Trevices (489 with Rs.61.00 lakhs)

Drinking water Trough (3301 with Rs.484.05 lakhs)

Water purification plants (192 with Rs.527.00 lakhs)

Solar street lights (2417 with Rs.1264.00 lakhs)

Page 39: Pradhan Mantri Krishi Sinchayee Yojana-Watersheds (erstwhile IWMP) ANDHRA PRADESH DEPARTMENT OF RURAL DEVELOPMENT, GoAP

PSI ACTIVITIES IN CONVERGENCE WITH AGRICULTURE DEPARTMENT

Activity Nos.

Farm Mechanization 8053

Implement Service Stations (ISS) 628

Custom Hiring Stations(CHC) 74

Addl.Farm Mechanization

Implements Service StationCustom Hiring Center