Upload
yosie-malinda
View
337
Download
14
Embed Size (px)
DESCRIPTION
Sistem Manajemen Mutu Konstruksi Hoover Dam yang merupakan salah satu bendungan terbesar di dunia.
Citation preview
PowerPoint Presentation
PROYEK HOOVER DAM DI BLACK CANYON,SUNGAI COLORADOJakarta, 20 Juni 2015DISUSUN OLEH :
Wilie Hade Santoso (41113120109)Agus Susanto (41113120030)Miftah Fauzi(41111120087)Meindra Putri W.(41113120052)Utami Sutjitraningdyah (41113120098)Yosie Malinda (41113120118)
DOSEN : Budi Santosa, ST., MT.
JURUSAN TEKNIK SIPILUNIVERSITAS MERCU BUANA
PENDAHULUAN HOOVER DAM
HOOVER DAM
TUJUAN PROYEK HOOVER DAM
DIVERSION TUNNELS
Two 50-foot diametyer tunnels drilled into the canyonThe tunnels diverted the water around the damn while it was being constructedThe Tunnels area combined 3 miles in length
Building MaterialsUse of quick-dry concreteThis called for the concrete to be required to be moved quickly from the production plant to the dam siteIf it was not moved quickly enough it would set, and had to be scraped out by hand
PROSES KONSTRUKSI HOOVER DAM PENGEBORAN DINDING BATU
PEMBERSIHAN TEMBOK LEMBAH BLACK CANYONPELAKSANAAN KONSTRUKSI HOOVER DAMBANGUNAN PENGAMBILAN AIR BAKU (INTAKE)FAKTOR YANG MEMPENGARUHI LOKASI INTAKEPERLENGKAPAN INTAKEKRITERIA PERENCANAAN/DESAIN INTAKEJEMBATAN HOOVER DAMGbr . Jembatan Hoover Dam yang sudah selesai dibangun TAHAPAN PEMBANGUNAN HOOVER DAM BRIDGESPEMBUATAN PONDASI UNTUK KOLOM-KOLOM JEMBATANPEMBUATAN KOLOM PENYANGGA JEMBATANPEMBUATAN PILAR MELENGKUNG PADA STRUKTUR JEMBATANGbr . Kedua ujung pelengkung Hoover Dam Bridge dihubungkan.PEMBANGUNAN PLAT LANTAIGbr . Pembangunan plat lantai beton pada Hoover Dam BridgeA