  • Power Supply Business Plan (RUPTL) PT PLN (Persero) 2012-2021

    Jakarta, 7 February 2013

  • Background of Preparation of RUPTL 2012-2021

    2

    Project slippage

    Expansion of IPP existing

    Demand forecast Updating

    Backbone Plan 500 kV Sumatera

    Having Additional plan for cross island inter connection plan

    Considering natural gas and LNG supply prospect

  • Projection of Electricity Demand 2012-2021

    3

    IB : 10,5%

    26

    TWh

    62

    TWh

    IT : 11,4%

    14

    TWh

    37

    TWh

    JB : 7,9%

    132

    TWh

    259

    TWh

    2012 2021

    Average of national electricity demand growth 2012-2021 is 8,65% annually.

  • Additional Capacity per Type of Power Plant

    4

    Additional Capacity :

    PLTU (steam) : 38 GW

    PLTP (geothermal) : 6,3

    GW

    PLTGU (Gas and Steam)

    : 2,5 GW

    PLTG (gas)/PLTMG

    (machine gas) : 4 GW

    PLTA (hydro)/PLTM (mini

    hydro): 6,3 GW

    Lainnya : 0,28 GW

    MW

  • -

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

    2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    GW

    h

    Impor Biomass Surya/Hybrid HSD MFO LNG Gas Batubara Geothermal Hydro

    Hydro

    Geothermal

    Coal

    Gas

    LNG

    Oil

    5

    Projection of Energy Mix (Total Indonesia including IPP)

    Surya=solar, batubara=coal

  • No. FUEL TYPE 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    1 HSD (juta liter ) 6.269 4.785 1.987 955 1.041 625 703 817 898 973

    2 MFO (juta liter) 2.788 2.826 2.348 377 13 22 36 57 37 37

    3 Gas (bcf) 388 407 534 515 465 321 312 304 299 334

    4 LNG (bcf) 46 53 93 121 146 237 230 232 264 265

    5 Batubara (juta ton) 51 61 66 79 91 101 108 114 123 134

    6 Biomass (ribu ton) 49 49 49 49 49 49 49 49 49 49

    6

    Kebutuhan Energi Primer (Total Indonesia Termasuk IPP)

    Juta liter=million litre

    Ribu ton =thousand tons

  • Plan for Development of Jawa-Bali Electricity System

    7

    GITET 500 kV eksisting

    SUTET eksisting

    Kit 500 kV eksisting

    SURALAYA

    PLTU Jawa Tengah #1: 1.000 MW (2017) #2: 1.000 MW (2018)

    PLTU Indramayu #4: 1.000 MW (2018) #5: 1.000 MW (2020)

    Upper Cisokan PS #1: 260 MW (2017) #2: 260 MW (2017) #3: 260 MW (2017) #4: 260 MW (2017)

    PLTU Adipala #1: 660 MW (2014)

    PLTU Jawa-6 #1: 1.000 MW (2021) #2: 1.000 MW (2021)

    PLTU Banten #1: 625 MW (2016)

    PLTU Jawa-4 #5: 1.000 MW (2019) #6: 1.000 MW (2020)

    PLTU Jawa-1 #2: 1.000 MW (2017)

    PLTU Jawa-5 #1: 1.000 MW (2018) #2: 1.000 MW (2019)

    AMPLA

    CILEGON

    M.TAWAR

    CIBATU

    CIRATA

    SAGULING

    BEKASI

    TASIKMALAYA

    BANDUNG SELATAN

    UNGARAN

    T.JATI B

    PEDAN

    KEDIRI PAITON

    GRATI

    KRIAN

    GRESIK

    NEW SURALAYA

    NGIMBANG

    CAWANG

    SURALAYA

    KEMBANGAN

    BANGIL

    KESUGIHAN /RAWALO

    CILACAP

    GANDUL

    TAMBUN

    CAWANG-2

    BANTUL

    KAPAL

    SURABAYA SELATAN

    TANDES CIGERELENG

    ADIPALA

    DEPOK

    HVDC

    CIBINONG

    M.KARANG PRIOK

    CIBATU-2

    CISOKAN

    INDRAMAYU

    UJUNGBERUNG

    MANDIRANCAN

    JAWA-1 JAWA-3

    T.JATI A

    MATENGGENG

    PEMALANG

    JATENG

    DURIKOSAMBI

    NEW BLRJA LENGKONG

    BANTEN

    HVDC

    BOGOR-X

    PLTU Jawa-3 #1: 660 MW (2018) #2: 660 MW (2020)

    Matenggeng PS #1: 225 MW (2020) #2: 225 MW (2020) #3: 225 MW (2021) #4: 225 MW (2021)

    PLTU Cilacap #3: 600 MW (2014)

    PLTGU Jawa-2 #3: 750 MW (2021)

    PLTGU Jawa-1 #4: 750 MW (2015/16)

    GITET 500 kV rencana

    SUTET rencana

    Kit 500 kV rencana

  • Plan for Develepment of Sumatera Electricity System

    8 Sistem

    JAWA

    P

    U

    A

    A

    ~

    U

    ~

    ~

    ~~

    ~

    ~

    P

    A

    P

    ~

    ~

    U

    U

    ~

    ~

    ~~

    P

    PU

    A U

    U

    U

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    U

    UU

    U

    P

    P

    P~

    P

    ~

    ~

    P

    P

    U~

    G

    G

    G

    G

    G

    P

    P

    Prabumulih

    Baturaja

    Tarahan

    Tes HEPP

    Sukamerindu

    Bangko

    Tl. Kelapa

    MarianaLubuk

    Linggau

    Payo Selincah

    Adijaya

    B. Tegi

    HEPP

    1 . PLTG Apung

    2. PLTG Ex Pulo Gadung3 . IPP Palembang Timur

    KiliranjaoSalak

    Lubuk Alung Pauh

    Limo

    S.Haru

    Bagan Batu

    Kulim

    S.Penuh

    PagarAlam

    Singkarak

    HEPP

    Pd. Luar

    Teluk

    Lembu

    Duri

    Banda AcehSigli

    Bireun Lhokseumawe

    Idie

    Tele

    Brastagi

    K. Tanjung

    G.Para

    P. Siantar

    Porsea

    Kisaran

    Aek Kanopan

    R. Prapat

    K. Pinang

    Panyabungan

    Asahan IHEPP

    Meulaboh

    Takengon

    Tembilahan

    Muara Bungo

    Bagan

    Siapi- api

    P. Kerinci

    Maninjau

    HEPP

    Manna

    Bangkinang

    Sibolga

    Glugur

    Mabar

    T . Morawa

    KIM

    Pd. Panjang

    Keramasan

    Simpang 3

    Sribawono

    Borang

    Gumawang

    New

    Tarahan

    Kalianda

    Sp.Banyak

    Mukomuko

    Simpang 4

    Tapak Tuan

    Sabulusalam

    PLTU

    P. Susu

    P. Pangarayan

    PLTU Riau

    Kemitraan

    Musi HEPP

    Sumbar Pessel

    PLTUL. Angin

    PLTG G. Megang

    Sistem

    JAWA

    Suka

    rame

    B. Umpu

    Tualang Cut

    Jantho

    Seulawah

    New

    G.Sakti

    Garuda

    Sakti

    TNB

    Malaysia

    Malaka

    5

    67

    12

    34

    P. Pasir

    T. Tinggi

    Labuhan

    Tegineneng

    Sutami

    Binjai

    P.Geli

    Namorambe

    Titi KuningDenai

    Galang

    P. Brandan

    Batusangkar

    Ombilin

    Payakumbuh

    Perawang

    Tenayan

    Siak Sri Indra Pura

    T. Kuantan

    Bungus

    Indarung

    Kt. Panjang

    HEPP

    Merangin

    HEPP

    Peusangan 1-2HEPP

    Blangkjeren

    Kuta Cane

    Lawe MamasHEPP

    Pasir Putih

    Perbaungan

    Lamhotma

    Aur Duri

    PLTUJambi

    (KPS)

    Lahat

    Bukit

    Asam

    Betung

    PLTUS. Belimbing

    PLTUBanjarsari

    PLTUK. Agung

    KotabumiBukit

    Kemuning

    PLTP

    L.Balai

    Liwa

    Bengkunat

    NatarGd. Tataan

    Tlk .

    Betung

    Tlk. Ratai

    WampuHEPP

    Metro

    PLTP Wai Ratai

    S. Lilin

    B. Lincir

    M. ENIM

    PLTUMeulaboh

    Pd . Sidempuan

    PLTPUluBelu

    Pagelaran

    K.Agung

    PLTPRajabasa

    Langkapura

    Besai HEPP

    PLTPS. Sekincau

    Menggala

    P. Ratu

    PLTP

    Hulu Lais

    PLTP

    R.Dedap

    Muara

    Dua

    PLTP

    D. Ranau

    T.Tinggi

    Sekayu

    Kayu

    Agung

    T.Api-api

    GIS Kota I

    P.Baai

    Muara Bulian

    Sarolangun

    Muara

    Rupit

    K. Tungkal

    Kambang

    Pariaman

    PIP

    GIS Kota

    Solok

    PLTP

    G. Talang

    Kandis

    Minas

    Dumai

    KID

    D. Sanggul

    TarutungPLTPP. Bukit

    Sidikalang

    Renun HEPP

    G.Tua

    PLTPSarulla&

    Sipaholon

    Simangkok Asahan IIIHEPP

    Asahan IV&VHEPP

    Sei.Sei

    Rotan

    PLTPS. Merapi

    K.Namu

    P. Batu

    Ulee

    Kareng

    Samalanga

    C. Trueng

    P. Labu

    Rengat

    D

    Blang Pidie

    Pekalongan

    Argamakmur

    Mesuji

    Dipasena

    PLTA

    B. Toru

    Langsa

    UU

    A

    P

    S. Rumbai

    A

    G

    275 kV AC

    500 kV AC

    PLTP Seulawah

    110 MW-2018

    PLTU Riau Kemitraan

    (PLN-TNB-PTBA)

    1200 MW-2018

    PLTU Jambi KPS

    800 MW-2019/20

    PLTU Sumsel 5 & 7

    600 MW-2015/16

    PLTU Banjarsari

    230 MW-2015

    PLTU Keban Agung

    227 MW-2015/16

    PLTU Sumsel-1 MT

    600 MW-2017

    PLTU Sumsel-6

    600 MW-2018

    PLTU Sumsel-8,9,10

    3000 MW-2016/17/18

    PLTU Pangkalan Susu

    #1,2 : 440 MW-2014

    #3,4 : 400 MW-2016

    PLTG/MG Arun &

    P. Brandan

    400 MW-2014

    PLTU Nagan Raya

    #1,2 : 200 MW-2013

    #3,4 : 400 MW-2017/18

    PLTA Batang Toru 510 MW-2019

    PLTP Danau Ranau 110 MW-2020

    PLTP Suoh Sekincau 220 MW-2018/19

    PLTP Ulubelu 220 MW-2012 & 16/17

    PLTP Rajabasa 220 MW-2017

    PLTA Merangin 350 MW-2018

    PLTP Lumut Balai 220 MW-2015/16

    PLTP Rantau Dedap 220 MW-2016/17

    PLTU Sumbar Pesisir 224 MW-2013

    PLTP Hulu Lais 110 MW-2016

    PLTP Kepahiyang 220 MW-2020

    PLTP Muara Laboh 220 MW-2016/17

    PLTP Bonjol 165 MW-2020

    PLTG/MG Peaking

    Riau & Jambi

    300 MW-2015

    PLTP Sarulla I&II 440 MW-2016/17

    PLTP Sorik Merapi 240 MW-2018

    PLTA Asahan III 174 MW-2016

    PLTG/MG Peaking

    Lampung & Bangka

    200 MW-2015

    HVDC

  • Plan for Development Kalimantan Electrciicty System

    SABAH (MALAYSIA)

    SULAWESI

    SELATAN

    SULAWESI TENGAH