Power Supply Business Plan (RUPTL) PT PLN (Persero) 2012-2021

Jakarta, 7 February 2013

Background of Preparation of RUPTL 2012-2021

2

• Project slippage

• Expansion of IPP existing

• Demand forecast Updating

• Backbone Plan 500 kV Sumatera

• Having Additional plan for cross island inter connection plan

• Considering natural gas and LNG supply prospect

Projection of Electricity Demand 2012-2021

3

IB : 10,5%

26

TWh

62

TWh

IT : 11,4%

14

TWh

37

TWh

JB : 7,9%

132

TWh

259

TWh

2012 2021

Average of national electricity demand growth 2012-2021 is 8,65% annually.

Additional Capacity per Type of Power Plant

4

Additional Capacity :

PLTU (steam) : 38 GW

PLTP (geothermal) : 6,3

GW

PLTGU (Gas and Steam)

: 2,5 GW

PLTG (gas)/PLTMG

(machine gas) : 4 GW

PLTA (hydro)/PLTM (mini

hydro): 6,3 GW

Lainnya : 0,28 GW

MW

-

50.000

100.000

150.000

200.000

250.000

300.000

350.000

400.000

450.000

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

GW

h

Impor Biomass Surya/Hybrid HSD MFO LNG Gas Batubara Geothermal Hydro

Hydro

Geothermal

Coal

Gas

LNG

Oil

5

Projection of Energy Mix (Total Indonesia including IPP)

Surya=solar, batubara=coal

No. FUEL TYPE 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

1 HSD (juta liter ) 6.269 4.785 1.987 955 1.041 625 703 817 898 973

2 MFO (juta liter) 2.788 2.826 2.348 377 13 22 36 57 37 37

3 Gas (bcf) 388 407 534 515 465 321 312 304 299 334

4 LNG (bcf) 46 53 93 121 146 237 230 232 264 265

5 Batubara (juta ton) 51 61 66 79 91 101 108 114 123 134

6 Biomass (ribu ton) 49 49 49 49 49 49 49 49 49 49

6

Kebutuhan Energi Primer (Total Indonesia Termasuk IPP)

Juta liter=million litre

Ribu ton =thousand tons

Plan for Development of Jawa-Bali Electricity System

7

GITET 500 kV eksisting

SUTET eksisting

Kit 500 kV eksisting

SURALAYA

PLTU Jawa Tengah #1: 1.000 MW (2017) #2: 1.000 MW (2018)

PLTU Indramayu #4: 1.000 MW (2018) #5: 1.000 MW (2020)

Upper Cisokan PS #1: 260 MW (2017) #2: 260 MW (2017) #3: 260 MW (2017) #4: 260 MW (2017)

PLTU Adipala #1: 660 MW (2014)

PLTU Jawa-6 #1: 1.000 MW (2021) #2: 1.000 MW (2021)

PLTU Banten #1: 625 MW (2016)

PLTU Jawa-4 #5: 1.000 MW (2019) #6: 1.000 MW (2020)

PLTU Jawa-1 #2: 1.000 MW (2017)

PLTU Jawa-5 #1: 1.000 MW (2018) #2: 1.000 MW (2019)

AMPLA

CILEGON

M.TAWAR

CIBATU

CIRATA

SAGULING

BEKASI

TASIKMALAYA

BANDUNG SELATAN

UNGARAN

T.JATI B

PEDAN

KEDIRI PAITON

GRATI

KRIAN

GRESIK

NEW SURALAYA

NGIMBANG

CAWANG

SURALAYA

KEMBANGAN

BANGIL

KESUGIHAN /RAWALO

CILACAP

GANDUL

TAMBUN

CAWANG-2

BANTUL

KAPAL

SURABAYA SELATAN

TANDES CIGERELENG

ADIPALA

DEPOK

HVDC

CIBINONG

M.KARANG PRIOK

CIBATU-2

CISOKAN

INDRAMAYU

UJUNGBERUNG

MANDIRANCAN

JAWA-1 JAWA-3

T.JATI A

MATENGGENG

PEMALANG

JATENG

DURIKOSAMBI

NEW BLRJA LENGKONG

BANTEN

HVDC

BOGOR-X

PLTU Jawa-3 #1: 660 MW (2018) #2: 660 MW (2020)

Matenggeng PS #1: 225 MW (2020) #2: 225 MW (2020) #3: 225 MW (2021) #4: 225 MW (2021)

PLTU Cilacap #3: 600 MW (2014)

PLTGU Jawa-2 #3: 750 MW (2021)

PLTGU Jawa-1 #4: 750 MW (2015/16)

GITET 500 kV rencana

SUTET rencana

Kit 500 kV rencana

Plan for Develepment of Sumatera Electricity System

8 Sistem

JAWA

P

U

A

A

~

U

~

~

~~

~

~

P

A

P

~

~

U

U

~

~

~~

P

PU

A U

U

U

~

~

~

~

~

~

~

~

U

UU

U

P

P

P~

P

~

~

P

P

U~

G

G

G

G

G

P

P

Prabumulih

Baturaja

Tarahan

Tes HEPP

Sukamerindu

Bangko

Tl. Kelapa

MarianaLubuk

Linggau

Payo Selincah

Adijaya

B. Tegi

HEPP

1 . PLTG Apung

2. PLTG Ex Pulo Gadung3 . IPP Palembang Timur

KiliranjaoSalak

Lubuk Alung Pauh

Limo

S.Haru

Bagan Batu

Kulim

S.Penuh

PagarAlam

Singkarak

HEPP

Pd. Luar

Teluk

Lembu

Duri

Banda AcehSigli

Bireun Lhokseumawe

Idie

Tele

Brastagi

K. Tanjung

G.Para

P. Siantar

Porsea

Kisaran

Aek Kanopan

R. Prapat

K. Pinang

Panyabungan

Asahan IHEPP

Meulaboh

Takengon

Tembilahan

Muara Bungo

Bagan

Siapi- api

P. Kerinci

Maninjau

HEPP

Manna

Bangkinang

Sibolga

Glugur

Mabar

T . Morawa

KIM

Pd. Panjang

Keramasan

Simpang 3

Sribawono

Borang

Gumawang

New

Tarahan

Kalianda

Sp.Banyak

Mukomuko

Simpang 4

Tapak Tuan

Sabulusalam

PLTU

P. Susu

P. Pangarayan

PLTU Riau

Kemitraan

Musi HEPP

Sumbar Pessel

PLTUL. Angin

PLTG G. Megang

Sistem

JAWA

Suka

rame

B. Umpu

Tualang Cut

Jantho

Seulawah

New

G.Sakti

Garuda

Sakti

TNB

Malaysia

Malaka

5

67

12

34

P. Pasir

T. Tinggi

Labuhan

Tegineneng

Sutami

Binjai

P.Geli

Namorambe

Titi KuningDenai

Galang

P. Brandan

Batusangkar

Ombilin

Payakumbuh

Perawang

Tenayan

Siak Sri Indra Pura

T. Kuantan

Bungus

Indarung

Kt. Panjang

HEPP

Merangin

HEPP

Peusangan 1-2HEPP

Blangkjeren

Kuta Cane

Lawe MamasHEPP

Pasir Putih

Perbaungan

Lamhotma

Aur Duri

PLTUJambi

(KPS)

Lahat

Bukit

Asam

Betung

PLTUS. Belimbing

PLTUBanjarsari

PLTUK. Agung

KotabumiBukit

Kemuning

PLTP

L.Balai

Liwa

Bengkunat

NatarGd. Tataan

Tlk .

Betung

Tlk. Ratai

WampuHEPP

Metro

PLTP Wai Ratai

S. Lilin

B. Lincir

M. ENIM

PLTUMeulaboh

Pd . Sidempuan

PLTPUluBelu

Pagelaran

K.Agung

PLTPRajabasa

Langkapura

Besai HEPP

PLTPS. Sekincau

Menggala

P. Ratu

PLTP

Hulu Lais

PLTP

R.Dedap

Muara

Dua

PLTP

D. Ranau

T.Tinggi

Sekayu

Kayu

Agung

T.Api-api

GIS Kota I

P.Baai

Muara Bulian

Sarolangun

Muara

Rupit

K. Tungkal

Kambang

Pariaman

PIP

GIS Kota

Solok

PLTP

G. Talang

Kandis

Minas

Dumai

KID

D. Sanggul

TarutungPLTPP. Bukit

Sidikalang

Renun HEPP

G.Tua

PLTPSarulla&

Sipaholon

Simangkok Asahan IIIHEPP

Asahan IV&VHEPP

Sei.Sei

Rotan

PLTPS. Merapi

K.Namu

P. Batu

Ulee

Kareng

Samalanga

C. Trueng

P. Labu

Rengat

D

Blang Pidie

Pekalongan

Argamakmur

Mesuji

Dipasena

PLTA

B. Toru

Langsa

UU

A

P

S. Rumbai

A

G

275 kV AC

500 kV AC

PLTP Seulawah

110 MW-2018

PLTU Riau Kemitraan

(PLN-TNB-PTBA)

1200 MW-2018

PLTU Jambi KPS

800 MW-2019/20

PLTU Sumsel 5 & 7

600 MW-2015/16

• PLTU Banjarsari

230 MW-2015

• PLTU Keban Agung

227 MW-2015/16

• PLTU Sumsel-1 MT

600 MW-2017

• PLTU Sumsel-6

600 MW-2018

• PLTU Sumsel-8,9,10

3000 MW-2016/17/18

PLTU Pangkalan Susu

#1,2 : 440 MW-2014

#3,4 : 400 MW-2016

PLTG/MG Arun &

P. Brandan

400 MW-2014

PLTU Nagan Raya

#1,2 : 200 MW-2013

#3,4 : 400 MW-2017/18

PLTA Batang Toru 510 MW-2019

PLTP Danau Ranau 110 MW-2020

PLTP Suoh Sekincau 220 MW-2018/19

PLTP Ulubelu 220 MW-2012 & 16/17

PLTP Rajabasa 220 MW-2017

PLTA Merangin 350 MW-2018

PLTP Lumut Balai 220 MW-2015/16

PLTP Rantau Dedap 220 MW-2016/17

PLTU Sumbar Pesisir 224 MW-2013

PLTP Hulu Lais 110 MW-2016

PLTP Kepahiyang 220 MW-2020

PLTP Muara Laboh 220 MW-2016/17

PLTP Bonjol 165 MW-2020

PLTG/MG Peaking

Riau & Jambi

300 MW-2015

PLTP Sarulla I&II 440 MW-2016/17

PLTP Sorik Merapi 240 MW-2018

PLTA Asahan III 174 MW-2016

PLTG/MG Peaking

Lampung & Bangka

200 MW-2015

HVDC

Plan for Development Kalimantan Electrciicty System

SABAH (MALAYSIA)

SULAWESI

SELATAN

SULAWESI TENGAH

Kuaro

U

Sangatta

Bontang U

Tj. Selor

Tj. Redep

U

U

U

Karangjoang

Manggarsari

Industri

G

U

Petung

G

G

Maloi

Melak

Malinau

Tidang Pale

Kota Bangun

A

G

G

A

U

UBarikin

Tanjung

Rantau

Buntok

Palangkaraya

Kuala

Kurun

Puruk

Cahu

Muara

Teweh

Kasongan

Sampit

Seberang

Barito

Selat

TrisaktiMantuil

Ulin

Cempaka

Batu

Licin

Kayutangi

U

D

D

D

D

D

D

D

D

U

Amuntai

Pelaihari

A

New

Palangkaraya

Kotabaru

SatuiBandara

G

Sukamara

Nangabulik

Pangkalan

Bun

Kuala

Pambuang

Pangkalan

Banteng

U D

UU

U

Parenggean

U

U

U

A

G

U

U

U

U

U

U

Ketapang

Sukadana

Sukadana

Tayan

Ngabang

Bengkayang

Sambas

Singkawang

Mempawah

Parit BaruSiantan

Sei RayaKota Baru

Sanggau

Sekadau

Sintang

Putussibau

Nanga

Pinoh

Kota Baru

SERAWAK (MALAYSIA)

9

PLTG/MG Pontianak 100 MW-2019

PLTU Ketapang

PLN : 20 MW-2015

IPP : 14 MW-2015

PLTU Parit Baru 100 MW-2014

PLTU Pantai Kura-Kura 55 MW-2014

PLTU Parit Baru Loan China 100 MW-2015

PLTU Kalbar-1

200 MW-2018/19

PLTA Nanga Pinoh

98 MW-2020

• PLTG/MG Tj. Selor

20 MW-2013/15

• PLTU Tj. Selor

14 MW-2014

PLTU Tj. Redep

14 MW-2014

• PLTU Embalut (Eksp.)

50 MW-2015

• PLTG Kaltim Peaking

100 MW-2013

• PLTG Kaltim Peaker 1

100 MW-2017

PLTA Kelai 75 MW-2020

PLTU Kaltim-2 200 MW-2016

PLTG/MG Bangkanai

280 MW-2014/15/16

PLTU Kaltim-3

200 MW-2018/19

PLTGU Senipah

117 MW-2013/15

PLTU Muara Jawa

220 MW-2014

PLTU Kalsel-1

65 MW-2019

PLTA Kusan

200 MW-2016/17

PLTU Asam-Asam 130 MW-2013

PLTU Kalselteng-2 200 MW-2017/18 PLTG/MG Kalselteng Peaker

50 MW-2018 PLTU Pulang Pisau 120 MW-2014

PLTU Sampit 50 MW-2014

PLTU Kalselteng-3 100 MW-2016

U

U

G

U

U

A

U U

U

GU

U

U

A

U

U U

U

U

A G

G

PLTU Kalselteng-1 200 MW-2017/18

U

9

SULAWESI

TENGAH

JenepontoBulukumba

Sinjai

Bone

Kajuara

Soppeng

Sengkang

Siwa

Palopo

Wotu

Malili

Makale

Enrekang

SidrapPare

Pinrang

Barru

Pangkep Tonasa

Maros

Bosowa

A

AA

U

U

UU

A

D

G

D

A

Tello

Sungguminasa

Tallasa

U

GUG

Bakaru

SULAWESI

BARAT

BantaengPunagaya

U

D

UG

A

U

P

Likupang

Bitung

Tonsealama

SawanganTasik Ria

Teling Ranomut

Paniki

Kema

Lopana

Tomohon

Kawangkoan

Otam

LolakBintauna

Buroko

P

PP

U

Molibagu

Isimu

U

Botupingge

U

U

Marisa

G

SULAWESI

SELATAN

Lasusua

Kolaka

UnaahaKendari

Raha

U

P

U

U

A

U

U

UU

Bau-Bau

UA

GORONTALO

SULAWESI UTARA

SULAWESI

TENGGARA

KALIMANTAN

TIMUR

Poso

Kolonedale

A

Palu Baru

Silae

Talise

UP

Ampana

Tentena

G

Toili

Bunta

Luwuk

Moutong

Leok

Tolitoli

Siboa

U

Polman

Majene

MamujuU

Pasangkayu

Topoyo

Mamuju Baru

A

A

U

U

U

1. PLTU Sulut 3 100 MW-2017/18

2. PLTG/MG Minahasa 75 MW-2015/16

3. PLTA Sawangan 12 MW-2016

4. PLTU Sewa 50 MW-2014

5. PLTP Lahendong V & VI 40 MW-2015/17

6. PLTU Sulut I 50 MW-2014

7. PLTU TLG 20 MW-2013

8. PLTU Gorontalo 50 MW-2014

9. PLTG Gorontalo 25 MW-2017

10. PLTU Tolitoli 45 MW-2014/15

11. PLTU PJPP #3,4 30 MW-2015

12. PLTU Palu 3 100 MW-2017

13. PLTA Poso 2 130 MW-2020

14. PLTA Karama 450 MW-2018/19

15. PLTU Mamuju 50 MW-2015

16. PLTA Malea 90 MW-2016

17. PLTA Bonto Batu 100 MW-2016

18. PLTA Bakaru II 126 MW-2020

19. PLTGU Sengkang 180 MW-2013

20. PLTU Sulsel Barru 2 100 MW-2016

21. PLTU Jeneponto PLN 200 MW-2014/15

22. PLTU Jeneponto 2 200 MW-2016

23. PLTA Wotunohu 1 20 MW-2017

24. PLTU Kolaka 20 MW-2016

25. PLTA Konawe 50 MW-2016/17

26. PLTU Kendari 3 100 MW-2017

27. PLTP Laenia 20 MW-2019

28. PLTU Kendari 50 MW-2016

29. PLTU Raha 6 MW-2014

30. PLTU Bau-Bau 20 MW & 14 MW-2014

31. PLTU Wangi 6 MW-2013/14

1

2

3 4

5 6

7

8

9

10

11

13

12

14 15

16 17

18

19 20

21 22

25 23

24 27

28

26

31 30

29

10

Plan for Development of Sulawesi Electricity System

1. PLTU Wai I, II 45 MW-2013/14-2016

2. PLTP Tulehu 20 MW-2016

3. PLTM Tene 4 MW-2013

4. PLTA Wai Tala 54 MW-2017/18

5. PLTM Ruwapa 1,2 MW-2013

6. PLTM Mala 6 MW-2014

7. PLTM Wae Mala 2 MW-2013

8. PLTM Nua 6 MW-2016

9. PLTM Makariki 4 MW-2013

10. PLTU Tidore I, II 28 MW-2013/2015

11. PLTU Sofifi 6 MW-2014

12. PLTP Jailolo 10 MW-2016

13. PLTP Songa W 5 MW-2017

14. PLTGB Tobelo 8 MW-2014

P

U

A

A

A

A

A

Bula

Masohi

Haruku

Waai

Tulehu

4 MW ( 2013 )

A

ACSR 1 x 240 mm 2

110 km ( 2017 )

ACSR 1 x 240 mm 2

55 km ( 2014 )

U

Kairatu

2 cct , Kabel laut

7 km ( 2017 )

2 cct , Kabel laut 5 km ( 2017 )

ACSR 1 x 240 mm 2

15 km ( 2017 )

Sirimau

Passo Wayame

8

1 2

3

4 5

6

7

9

M

Jailolo

Tobelo

ACSR 1 x 240 mm 2

1 10 km ( 2017 )

ACSR 1 x 240 mm 2

42 km ( 2016 )

ACSR 1 x 240 mm 2

72 km ( 2016 )

ACSR 1 x 240 mm 2

23 km ( 2016 )

U

G

10

12

11

14

11

Plan for Development of Maluku Electricity System

Plan for Development of Papua Electricity System

1 2

6

7

11

1. PLTU Holtekam 1&2 50 MW-2013&15

2. PLTU Skouw 30 MW-2016

3. PLTA Genyem 1&2 30 MW-2013&15

4. PLTU Merauke 1&2 28 MW-2016/17

5. PLTA Baliem 50 MW-2016-18

6. PLTU Timika 28 MW-2014/15

7. PLTU Nabire 14 MW-2016

8. PLTU Biak 14 MW-2016

9. PLTU Manokwari 14 MW-2016

10. PLTA Warsamson 47 MW-2017/18

11. PLTU Sorong 30 MW-2016

8 9

4

3

5

10

12

U

U

U

U P

A

A

A

D

G

GI Pringgabaya

GI Selong

GI Sengkol

GI Kuta

GI Jeranjang

GI Ampenan

ACSR 1 x 240 mm 2

38 km - 2013

ACSR 1 x 240 mm 2

30 km - 2013

ACSR 1 x 240 mm 2

15 km 2014

ACSR 1 x 240 mm 2

15 km - 2013

ACSR 1 x 240 mm 2

10 , 5 km - 2013

GI Tanjung

GI Bayan

ACSR 1 x 240 mm 2

35 km - 2019 ACSR 1 x 240 mm

2

41 km ( 2019 )

GI Mantang

ACSR 1 x 240 mm 2

15 km - 2013

U

ACSR 1 x 240 mm 2

15 km 2017

4

1

3

7

5

2

6

1. PLTU Lombok Jrjang 75 MW-2013

2. PLTU Sewa 56 MW-2014

3. PLTAG/MG Peaker 90 MW-2015/16

4. PLTU Lombok FTP2 50 MW-2015/16

5. PLTU Lombok Timur 50 MW-2016

6. PLTU Lombok 2 50 MW-2017

7. PLTP Sembalum 40 MW-2019

13

Plan for Development of Lombok Electricity System

U

U

A P

U

ACSR 1 x 240 mm 2

142 km ( 2016 ) ACSR 1 x 240 mm 2

30 km ( 2016 )

ACSR 1 x 240 mm 2

60 km ( 2011 )

GI Dompu GI Labuhan

GI Bima

GI Taliwang

2 cct 1 xOstrich 15 km - 2013

ACSR 1 x 240 mm 2

7 km ( 2013 )

GI Woha

GI Sape

ACSR 1 x 240 mm 2

142 km ( 2016 )

GI Empang 2 cct 1 xOstrich

10 km - 2013

GI Alas / Tano

2 cct 1 xOstrich 60 km - 2013

ACSR 1 x 240 mm 2

30 km - 2016

2 cct 1 xOstrich

35 km - 2015

1

2 3

5

4

1. PLTU Bima 40 MW-2014-16

2. PLTP Hu’u 60 MW-2017-19

3. PLTA Brang Beh 12 MW-2016

4. PLTU Sumbawa 20 MW-2014/15

5. PLTU Sumbawa Barat 14 MW-2014/15

14

Plan for Development of Sumbawa Electricty System

PLTU Kupang FTP 1 2 x 16 , 5 MW ( 2013 ) PLTU Kupang 2

2 x 15 MW ( 2018 / 19 )

PLTU Kupang IPP 2 x 15 MW ( 2016 / 17 )

PLTU Kupang Peaker 1 20 MW ( 2015 ) G

PLTU Kupang Peaker 2 , 3 , 4

3 x 20 MW ( 2015 / 18 / 20 )

U

PLTU Atambua 1 x 6 MW ( 2013 ) 3 x 6 MW ( 2014 )

Atambua

Kefamenanu

Soe / Nonohonis

Naibonat

Maulafa

Bolok

Atapupu

ACSR 1 x 240 mm 2

75 km - 2013

ACSR 1 x 240 mm 2

18 km - 2013

ACSR 1 x 240 mm 2

51 km - 2013

ACSR 1 x 240 mm 2

51 km - 2013

ACSR 1 x 240 mm 2

31 km - 2013 ACSR 1 x 240 mm

2

15 km - 2013

TIMOR LESTE

TIMOR LESTE

1

4

1

1. PLTU Kupang 33 MW-2013

2. PLTU Kupang2 30 MW-2018/19

3. PLTU Kupang IPP 30 MW-2016/17

4. PLTMG Kupang Peaker 80 MW-2015/18/20

5. PLTU Atambua 24 MW-2014/15

2 3

15

Plan for Development of Timor Electricity System

Ruteng

Ende

Bajawa

Maumere

Ropa

P

A

P

G

P

U

Labuan Bajo ACSR 1 x 240 mm 2

85 km - 2014

ACSR 1 x 240 mm 2

60 km - 2014

ACSR 1 x 240 mm 2

95 km - 2014 ACSR 1 x 240 mm 2

44 km - 2013 ACSR 1 x 240 mm

2

10 km - 2014

ACSR 1 x 240 mm 2

120 km - 2014

ACSR 1 x 240 mm 2

ACSR 1 x 240 mm 2

33 km - 2016

1

2

4 6

5

3

8 7

1. PLTU Ropa 14 MW-2013

2. PLTP Sokoria 20 MW-2017-20

3. PLTP Mataloko 15 MW-2018/19

4. PLTP Ulumbu 20 MW-2013-19

5. PLTA Wae Rancang 17MW-2016/17

6. PLTMG Maumere 8 MW-2015

7. PLTGB Larantuka 8 MW-2014

8. PLTP Oka Larantuka 3 MW-2019

16

Plan for Development of Flores Electricity System