POST- CLEARANCE ENVIRONMENTAL REPORT OF ELEMENT .POST- CLEARANCE ENVIRONMENTAL REPORT OF ELEMENT

  • View
    212

  • Download
    0

Embed Size (px)

Text of POST- CLEARANCE ENVIRONMENTAL REPORT OF ELEMENT .POST- CLEARANCE ENVIRONMENTAL REPORT OF ELEMENT

  • POST- CLEARANCE ENVIRONMENTAL REPORT OF

    ELEMENT ONE

    (Commercial Project)

    Village Fatehpur, Sector 47 & 49 GURGAON, HARYANA

    Prepared by

    SHIMI RESEARCH CENTER PVT. LTD.

    Submitted to

    MINISTRY OF ENVIRONMENT & FORESTS (New Delhi & Panchkula)

    SIXTH REPORT,JUNE 2015

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    2

    SALIENT FEATURES OF THE PROPOSED PROJECT Name of Project : Element One

    Name of Company : M/s Clarion Properties Ltd.

    Location: Village Fatehpur, Sector 47 & 49,

    Gurgaon, Haryana

    Land Title : Licence No. 86 of 2011 dated 20/9/11,

    Town & Country Planning Department

    Haryana

    Plot size : 2.7625 Acres (11,179.35 SQ.M) for both A-

    Block (Sector 47) and B- block (Sector 49)

    HUDA Norm :

    Permissible FAR: 1.75 (19563.87 SQ.M)

    Proposed FAR: 1.749 (19555.36 SQ.M)

    Permissible G. Coverage: 40% (4471.74

    SQ.M)

    Proposed G. Coverage: 35.099% (3994.65 SQ.M)

    Project Concept : Commercial colony in two blocks, i) Block

    A in Sector 47 and Block B in Sector 49

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    3

    Project Structure :

    Project consist of two blocks A & B

    Block A located in Sector 47, Gurgaon

    Block B located in Sector 49, Gurgaon

    Both blocks are separated by 30 m wide

    sector road

    Block A consists of Basement + Ground+

    First floor

    Block B consists of 3 Basements +

    Ground + 8 floors

    Project Areas :

    Total Plot Area = 11,179.35 SQ.M (2.7625

    acres)

    Total Built up Area 34,331.583 SQ.M

    Permissible G. Coverage: 40% i.e. 4,471.74

    SQ.M

    Proposed G. Coverage: 35.10% i.e.

    3,994.65 SQ.M

    Permissible F.A.R. Area (175%) :19,563.87

    SQ.M

    Proposed F.A.R. Area (174.9%) :

    19,562.464 SQ.M (174.999%)

    Basement Area : 12,050.304 SQ.M

    Service Area : 2,718.815 SQ.M

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    4

    STATUARY APPROVALS Land Registry : 4th December 2010

    Electric Connection : Applied for 2822 KVA load and received a

    Copy of letter from HVPNL to DHBVNL

    vide Memo

    No. Ch.70/NCR/GRG-192/Vol.-II

    dated 114/03/2012

    Zoning Planning : Approved vide Memo No. ZP-755/JD(BS)/

    Approval 2011/15985 dated 31/10/2011

    Drawing Approval : Approved vide drawing No. DG,TCP-2815

    dated 21/10/2011

    Pollution NOC : Consent received having ref. No.

    HSPCB/Consent: 2821213GUNOCTE

    124912 dated 25 Sep 2013

    Environmental : Clearance Received having Ref

    Clearance No. SEIAA/HR/2012/241 dated 03/08/2012

    Aravalli Notification : Aravali Notification received vide Memo

    DC Gurgaon No /03/MB dated 21 Mar 2013

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    5

    PROJECT STATUS The project status of Element One, Block - B is as follows:

    1. 95% of all structural work is complete.

    2. Construction of all ramps are complete.

    3. Masonry work of basement, GF to 6th floors are complete.

    4. Masonry work of 7th & 8th floors are under progress.

    5. Laying of firefighting lines is under progress.

    6. Electrical work is under progress.

    7. HVAC work is under progress.

    8. Trimix flooring of the 1st & 2nd basement is complete.

    9. Trimix flooring of the 3rd basement(90% complete)

    10. A temporary site office has been set up at Block - B.

    11. There are 4 DG sets with acoustic enclosures at the site.

    12. A batching plant is used at the site.

    13. Primary water treatment plant is installed at site to utilize the STP

    treated water during the construction.

    14. Cement bags are stored in closed area.

    15. Workers are using safety helmets in the premises.

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    6

    16. No hazardous material and bituminous material has been

    generated from site. Every precaution has been taken to prevent

    groundwater from contamination.

    17. No stagnant water formation is found in the premises.

    18. Regular water spray is being used to suppress the dust generated

    from haul road inside the construction site.

    The project status of Element One, Block - A is as follows: 1. Basement slab is complete.

    2. Slab shuttering of the 1st floor is under progress.

    3. All ramps are complete.

    4. The labor camp area is located in the Block A of the project site.

    5. Temporary labor camp with adequate sanitation has been provided

    for the labors

    Green Belt Development The site is under the initial phase of construction and so far no green belt development has been done at site. S. No. Year Area

    Covered No. of Plants Planted

    Species of Plants Planted

    Expenditure Incurred

    1 June 2015

    Nil Nil N/A Nil

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    7

    SAFETY MEASURES The other safety measures to be followed during the construction period

    by Project Manager/Deputy Project Manager

    That no staff should go to the project site without wearing helmets

    and safety shoes

    Wearing helmets need to be mandatory for visitors

    Safety net should be used at risky areas

    That access to and from site should clear

    That proper signboards should be available about safety and safe

    exit points

    All water tanks at site should be properly covered for further use.

    TESTING Ambient Air Quality The ambient air quality monitoring was conducted in May 2015.

    Monitoring was carried out at two stations for 7 days. The guidelines for

    selections of ambient air monitoring stations as given in IS 5182 part

    14, were followed. These guidelines state that, when the objective of air

    sampling is to identify the contribution from specific sources of pollution,

    the sampling locations should be located in upwind and the downwind of

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    8

    such sources. The location of air quality monitoring stations should

    satisfy the following conditions:

    1. The site should be representative of the area selected;

    2. The station should be set up and operated so as to yield data that

    can be compared with those from stations within the network

    Sampling Stations: Station A-1: Center of Block B Station A-2: Near batching plant, Block B

    Duration of Sampling Duration : 7 days during May 2015

    Period : Sampling was done 24 hourly continuous of

    SPM/RSPM and 8 hourly for gaseous parameters.

    Sampling Procedure Time averaged in site sampling was adopted by passing a known

    volume of air through a trap, and a collecting medium (filter paper and

    bubbler). Repairable Dust Sampler was used for the purpose.

    This procedure was adopted because there are no short-term variations

    and low concentration of gaseous pollutants was expected.

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    9

    Analytical methods followed for ambient air quality monitoring (i) Suspended Particular Matter (SPM): The samples for SPM were collected on GF/A Filter paper by Respirable

    Dust Sampler (RDS), operated at maximum rate of 1.5 cu.m./min. and

    concentration were determined gravimetrically on 24 hrs basis.

    (ii) Sulphur dioxide (SO2): Sulphur dioxide collection was done by aspirating a measured volume of

    air through a dilute acidified solution of hydrogen peroxide. For analysis,

    TCM method was followed (Ref. Chapter 700, Standard Method of Air

    Sampling and Analysis, 2nd edition, APHA, 1977).

    (iii) Nitrogen Oxides (IS: 5182; Part VI 1975 ):

    Nitrogen oxides were estimated by bubbling air through 0.1 N Sodium

    hydroxide solution and measured as nitrate through spectrophotometer

    at 540 nm.

    Results

    Air quality is a complex and dynamic characteristic of any area. Most of

    the areas in Gurgaon and adjoining locations reel under air pollution and

    construction activity is the major contributor of pollutants. The climatic

    conditions and high rise buildings aid and abet their dispersion in the

    adjoining areas. The ambient air quality results are summarized in

    following tables:

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    10

    SPM g/m3

    DATE A-1 A-2 Max Min Mean Max Min Mean 01.05.15 402 130 331 384 175 252 02.05.15 328 182 220 368 241 314 03.05.15 375 215 271 390 230 315 04.05.15 372 160 318 418 183 298 05.05.15 357 213 302 354 212 292 06.05.15 393 195 286 389 198 297 07.05.15 379 215 263 390 198 313

    RSPM g/m3DATE A-1 A-2

    Max Min Mean Max Min Mean 01.05.15 262 1119 162 158 78 112 02.05.15 302 137 267 210 78 148 03.05.15 325 158 235 167 89 132 04.05.15 332 131 265 201 198 134 05.05.15 283 158 245 186 85 138 06.05.15 296 134 212 176 72 113 07.05.15 294 115 238 201 88 126

    SPMLevelsatProjectSite

    mg/m3

    Dates

  • Element One, Commercial Project, Sector 47 & 49, Gurgaon

    11

    The results show that the SPM level near to the batching plant of Block

    B is higher than the other location due to transpor

Recommended

View more >