7
WORK EXPERIENCE

Portfolio - Work Experience

Embed Size (px)

DESCRIPTION

work experience section

Citation preview

Page 1: Portfolio - Work Experience

work experience

Page 2: Portfolio - Work Experience

work experience1

qpk design

Page 3: Portfolio - Work Experience

1991

Entrance / Egress Corridor

Egress Corridor

1991 D A

T E

R E V I S I O N

S

P R

O J E C

T N O

.

SUCH ALTERATIO

N, AN

D A SPECIFIC D

ESCRIPTION

OF TH

E ALTERATION

.NOTATIO

N 'ALTERED BY' FOLLO

WED BY HIS SIGNATURE AND THE DATE O

FIF ALTERED, THE ALTERING ARCHITECT SHALL AFFIX HIS SEAL AND

THEDIRECTION OF A LICENSED ARCHITECT, TO ALTER THIS DOCUM

ENT IN ANY WAY.

IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE

1991

1ST FLOOR PLAN

BASEMENT FLOOR PLAN

Salin

a Stre

et

Bank

Alle

y

Basement - No Storage Use

UP

UP

UP DN

UP DN

RETAIL SPACE TENANT PARKING

(7) CARS1

2

3 4 5 6 7

(1,190 SF)

(3,480 SF)

3-5'' Concrete Overlay Slab

(6,338 SF)

(5,647 SF)

N

RETAIL AND HOUSING

317 - 319 SOUTH SALINA STREET

CONCEPT DEVELOPMENT

SK-3

April 4 2006

DW

2ND - 5TH FLOOR PLAN

Kitchen

Study

Living Area

Closet

Bath

Closet

Dining

DN

UP

DN

UP

UNIT 'A' TYPICAL UNIT 'B' TYPICAL

Study/Bedroom

DW

Kitchen

Living Area

DiningBedroom

(5,266 SF)

1100 SF 1175 SF

8 TYPE 'A' UNITS

8 TYPE 'B' UNITS

DW

Kitchen

Living Area

DW

Living Area

Bedroom

Study

Study

Closet

Bath

Roof

Bel

ow

199119911991 SK-1

Electrical MEP

C.I.P Foundation

C.I.P Foundation

Raised Pit10'' C.I.P Walls to First Floor

Check Wall Type, Thicknessand Condition

- Where are Utility Entrances?

- Sprinkler Headand Equiptment

Check Fire Rating ofColumn Enclosures

Floor of Bldg Above

C.I.P Foundation

Acheiving Pitch for Draining and Floor Drains is Necessary.

Existing Wood Framing. Requires Engineering.

2 HR Construction

Mailboxes

2 HR Ceiling Required

Toilet Room

2 Story Space PotentialConnect to Basementvia Internal Stair?

Tenant Fit Up

2 HR Construction

2 HR Ceiling Required

Curb

Side

wal

k with

Bas

emen

t Bel

ow

Hist

oric

Rest

orat

ion

Stor

e Fr

ont?

Cem

ent B

oard

, Wai

nsco

tt an

d Bu

lkhe

ad

Slope

Slop

eSl

ope

Slope

Drain

New Concrete Apron

Motorized OverheadDoor. 10'X10'

New Concrete

Apron

Louver

Need Spot Elevationof Bank Alley to 1stFloor Elevation

Existing (3) Wythe Brick Partywall12'' Nominal Width

Existing (3) Wythe Brick Partywall

12'' Nominal Width

- Joist Direction: Assumed Running N-S

Need Floor to Floor Heights

Bath

Dining

WD

WD

Bath

Unit Electrical Panel Location?

Suspended Lay in Celing

Re-Circulation Hood Only

Supply BelowSAN. to Wet Wall

9 1/4" Wet Wall

Bedroom

BedroomSAN.

Plumbing and Supply Riser Furnace

Hot Water Heater

(1) Stair (either) to Roof TopPenthouse (Equiptment Maintenance)

Sprinkler Riser

Penthouse for Overrun SpaceHouse BeamHatch = 3% Shaft Area

Electrical RisersCur. M.J. Air Chase

Floor Panel

WD

WD

FurnaceHot Water Heater

Accoustical Wall (Typ.)

KitchenDining

Exhaust

SAN.Exhaust

9'-0"

10'-6" or 11'-0"Check Ceiling Height

Floors 2 and 3

Roof Plan- RTU's

- Vents- Hatches- Curb- Roof Equiptment- Railing Enclosure

Garage Air Handling Equiptment

Hydraulic Elevator MachineRoom

- MDC Would Like to PursueCentral Domestic H.W Tankwith Recirculating Distribution

Scale: 1/8" = 1'-0"

Scale: 1/8" = 1'-0"

Scale: 1/8" = 1'-0"

Page 4: Portfolio - Work Experience

work experience2

AUsTin design

Page 5: Portfolio - Work Experience
Page 6: Portfolio - Work Experience

work experience3

MeRRiLL BARn

Page 7: Portfolio - Work Experience