12
DG7 WG1 DG1 WG2 WG3 DG 9 DG3 DG4 DG6 DG5 DG11 DG2 WG4 WG5 DG 10 DG8 TV K TV K B W F 400 2,600 1,585 552 1,922 440 1,022 552 676 450 1,218 1,498 1,436 1,265 1,400 1,795 300 1,000 2,100 900 1,227 1,135 1,227 1,135 1,565 1,135 4,315 8,432 2,915 568 667 2,710 2,240 9,767 339 327 440 max 2m 460 450 min. 300mm 1,022 337 5,052 2,015 2,700 3,362 low level radiator Soundblock fire wall to underside of stair. Service zone to full length of party wall. CO positioned to manufacturer's instructions Isolator for future shower Shaver point 50mm service zone behind boiler for pipework Boxing out of pipework Door chimes at door head height For fence position see dwg no. P/06 Service zone to party wall RWP Bedroom 2 Bedroom 1 FDS30 FDS30 75mm acoustic quilt to all bathroom walls. FDS30 Brick dimensions Storage. 2 2 2 2 Brick dimensions SD Brick dimensions P1 P2 2 2 P2 P4 2 Refer to detail 19 GM EM P5 GP GP P1 EM GM BT BT RWP Refer to detail 19 DW or TD DB RWP SVP SD 1.2x1.2 platt 1.8x1.2 platt RWP Brick dimensions DF5 DF9 DF6 DF7 DF1 DF8 DF3 DF2 WF1 WF4 WF3 WF5 WF6 DF10 WF2 DF4 W TV F 3,362 2,715 3,013 440 1,922 553 676 1,585 2,690 562 2,700 4,050 553 910 552 900 1,135 50 1,895 1,135 1,227 1,135 1,227 1,008 1,135 1,565 2,600 600 2,100 1,000 min. 300mm Service zone to full length of party wall. Second bedroom window to south elevation only Box in pipework Service zone to full length of party wall. CO positioned to manufacturer's instructions Isolator for future shower 50mm service zone behind boiler for pipework Bedroom 1 Bedroom 2 RWP SVP Attic hatch RWP PSV PSV FDS30 FDS30 FDS30 75mm acoustic quilt to all bathroom walls. FDS30 P1 DB P4 DW or TD Door bell chimes at high level GP GP SD DALLMAN JOHNSTONE ARCHITECTURE PROJECT MANAGEMENT REGENERATION Cottage flats plan - Ground Floor Cottage flats plan - Upper Floor FORT STREET MOTHERWELL CAIRN HOUSING ASSOCIATION

Portfolio Gniewosz Plucinski

Embed Size (px)

DESCRIPTION

Project I have worked on.

Citation preview

Page 1: Portfolio Gniewosz Plucinski

DG7

WG1

DG

1

WG2

WG

3

DG 9DG3 DG4

DG

6

DG5

DG11

DG

2

WG4 WG5

DG 10

DG8

TV

K

TV

KB

W

F

P

P

P

P

P

P

P

P

P

P

P

P

P

400

2,60

0

1,585552 1,922 440

1,022 552

676

450

1,21

8

1,498

1,43

6

1,26

5

1,400

1,79

5

300

1,00

0

2,100

900

1,227 1,135 1,227 1,135 1,565 1,135

4,31

5

8,432

2,915 568

6672,7102,240

9,76

7

339

327

440

max

2m

460

450

min. 300mm1,02

233

75,

052

2,01

52,

700

3,36

2

low levelradiator

Soundblockfire wall toundersideof stair.

Service zone tofull length ofparty wall.

CO positionedto manufacturer'sinstructions

Isolator forfuture shower

Shaver point

50mm service zone behindboiler for pipework

Boxing outof pipework

Door chimesat door head

height

For fence positionsee dwg no. P/06

Service zoneto party wall

RWP

Bedroom 2

Bedroom 1

FDS30

FDS30

75mm acousticquilt to allbathroom walls.

FDS30

Brick dimensions

Storage.

22

2 2

Brick dimensions

SD

Brick dimensions

P1P2

22

P2

P4

2

Refer todetail 19

GMEM

P5

GP GP

P1 EM GMBT

BT

RWP

Refer todetail 19

DW

or TD

DB

RWPSVP

SD1.2x1.2 platt

1.8x1.2 platt

RWP

Bric

k di

men

sion

s

DF5DF9

DF6D

F7D

F1

DF8 DF3 DF2

WF1

WF4

WF3

WF5WF6

DF10

WF2

DF4

W

TV

F

P

P

P

P

P

P

P

P

P

P

P

P

P

3,36

2

2,715

3,013

440 1,922 553 676 1,585 2,690

562

2,70

0

4,05

055

391

055

290

01,

135

50

1,89

5

1,135 1,227 1,135 1,2271,008 1,135 1,565

2,60

0

600

2,100

1,00

0min. 300mm

Service zone tofull length of

party wall.

Second bedroomwindow to southelevation only

Box inpipework

Service zone tofull length ofparty wall.

CO positionedto manufacturer'sinstructions

Isolator forfuture shower

50mm service zone behindboiler for pipework

Bedroom 1

Bedroom 2

RWP

SVP

Attichatch

RWP

PSVPSV

FDS30

FDS30

FDS30

75mm acousticquilt to allbathroom walls.

FDS30

P1DB P4

DW

or TD

Door bellchimes athigh level

GP GP

SD

DALLMAN JOHNSTONEARCHITECTUREPROJECT MANAGEMENTREGENERATION

Cottage flats plan - Ground Floor

Cottage flats plan - Upper Floor

FORT STREETMOTHERWELL

CAIRN HOUSINGASSOCIATION

Page 2: Portfolio Gniewosz Plucinski

DF3

DF5

WF3 WF4

DF2

WF2

WF1

DF7

DF6

DF4

DF8

P

P

P

P

P

P

P

P

2,934

2,663

1,190

1,585

3,1457821,002 1,360

1,135 1,453 1,1351,452

2,245450

3,29

8

1,30

54,

097

3,39

7

3,99

0

2,481

1,46

3

1,30

0

893

3,037

50

792

Shaverpoint

Sunpipe Sunpipe

Tiled shelf

75mm acoustic quiltto all bathroompartition walls

75mm acousticquilt to bedroompartition walls

FutureStair liftprovision

Intermediateswitch

Isolater forbathroomshower

Box outpipework

Bedroom 3

Bedroom 1

Bedroom 2

3

Bedroom 2

Attichatch

PSV

Attichatch

PSVPSV

PSV

SVPRWP

3

3

PSV

Brick sizing dimensions

Brick sizing dimensions

SD

Refer todetail 19

Refer todetail 19

DF1

WG3

DG4

DG

8

DG5

WG4

DG 2

WG

2

WG1

DG1

WG6DG6

WG

5

X

DG

7

DG

3

N

W

F

TD

P

P

P

P

P

TV

P

P

P

P

TV

P

P

DB

400

3001,40

1

770

252

778

400

1,810 685890 1,022 557440

1,60

3

1,009

3,037 3,145

4,15

2

1,523

1,20

01,022 445

1,452 1,360 2,128 1,022

6,182 overall size

659

4,299

4,13

1

1,85

1m

in. 3

00m

m

1,000

Provision forfuture stair lift

75mm acoustic quiltto wc partition wall 75mm acoustic quilt

to wc partition wall

MK gridplus metalclad front

plate

Door chimes atdoor head height

Service zone to innerleaf of external kitchenwall to accommodateservices. Extends to50mm behind boiler

Gas connectionfor cooker

CO positionedto manufacturer'sinstructions

For fence positionsee dwg no. P/06

2

2

PSV

2

22

3

SVP

2

2

STORAGE STORAGE

2

32

2

2 2

Brick sizing dimensions

PSV

Brick sizing dimensions

DWP1P2

P2

All pipework to beenclosed and not toperforate externalwalls or party walls.No perforationsof any kind throughparty walls.

GM

Refer todetail 19

P5

EM

Refer todetail 19,26 and 40

RWP

RE

RE

RE

Refer todetail 26

RE

D.I.C.D.I.C.immediately

inside curtilage

RE

RE

SVP

BT

SD

PSV

DALLMAN JOHNSTONEARCHITECTUREPROJECT MANAGEMENT

FORT STREETMOTHERWELL

Typical house plan - Ground Floor

Typical house plan - Upper Floor

CAIRN HOUSINGASSOCIATION

REGENERATION

Page 3: Portfolio Gniewosz Plucinski

The Studio, 24 New Kirk Road Bearsden Cross Glasgow G61 3SLT: 0141 942 3025 W: dallmanjohnstone.co.ukE: [email protected]: 0141 942 8777

F

F D:2

0D

:21

D:31

W:1

3W

:25

W:1

5D

:30

D:1

6

D:1

2

D:1

7

W:15

W:20

Sill 90090

01,

500

W:17 W:18 W:19W:16

W:04W:06 W:05W:07

D:0

2D

:01

D:2

6

W:2

1W

:03

W:10 W:09 W:08W:11 D:28

D:03

D:08 D:07 D:06 D:05 D:04

D:1

4

W:1

2

D:19

D:1

1

W:0

1W

:02

D:1

8

D:2

4D

:23

D:2

2

D:09

D:3

4

D:25

D:15D:13

D:10

TV

TV

15L/s

15L/s

60L/s15L/s

60L/s

144

1,0134,

950

4,73

5

1,14

7

3,00

0

1,23

5

3,4563,456

2,265 910 1,565 910 3,815 910 1,565 910 3,815 910 1,590 860 2,127

1,79

068

52,

475

910

2,91

5

min. 2000mm

4,83

7

1,01

2

2,57

868

52,

240

910

1,45

391

01,

452

1,02

21,

115

910

3,36

5

552

1,47

357

378

067

278

02,

023

2,000

1,13

5

4,70

0

1,615

1,56

0

2,430

1,27

2

4,6755,2535,695

857

2,070 1,11

5

990

4,88

5

1,34

0

1,09

5

6,85

3

866

794

300

694

694

694

300

1,500

1,50

0

1,955

1,79

61,

500

1,50

0

173

173

896

173

6,21

1

1733,430

1733,426

1733,426

1733,437

173

1,000 400 600

600 1,000 400

1,6001,600

1,84

060

0

700 600

1,84

0

600

1,84

0

800

1,60

0

7001,600

700

1,60

0

800

800

1,84

060

0

800

1,60

0

7001,600

600

1,84

0

1,600

1,84

060

0

1,600700

2.30 m22.83 m2

10.87 m2

14.87 m2

Dadotrunking

Dadotrunking

Dadotrunking

Dadotrunking

StorageSpace

18

9

10

11

27

28

29 30

2

3

2324

25

26

363534333231

E

E E

E E

E

FDS30 FDS30FDS30FDS30 FDS30

FDS30

FDS30

FDS30

FDS

30

FDS30

FDS

30

EX

IT

Area for future Extension116.30m2

(shown hatched)

34%

FDS30

18192122 20 17 16 15 14 13 12

6 7

37 38

4 5

EX

IT

FES

.

FES

.

D:2

7

MJ

MJ

MJMJ

MJ

MJ

MJ

MJ

52.47

52.54

F.F.L. 52.825

52.55

52.48

52.825

52.51

52.55

52.55

MJ

FDS

30

FDS30

Boiler roomShower room

Storage

(suspended ceiling)

2 R. @ 110 mm

1 T. @ 350 mm

MJ MJ

MJ

MJMJ

52.55 52.55

52.5552.55

D/04D/04

1800mmturning circle

1800mmturning circle

866 866 866 866

866

866

866

866

866

866

FDS

30

866

800

844

FES.

FES

.

FES

.

Position ofCWS above.

E

E

E

E

E

E

Consultants Room 1 Consultants Room 2 Consultants Room 3 Consultants Room 5Treatment Room

Disabled toilet

Disabled toilet

ManagerAdministration

comm

Staff Room

Cleaner's

StorageMeeting Room

waiting area 36 persons

Consultants Room 3

Storage

Circulation

Female T.

Male toilet

- Through careful planning circulation reduced to 12.5% (32% allowed) this allowed more space for working at records A and also a spacious meeting room B within the overall area allowed by the Health Board.

What the doctors need:- Healthy building- Low maintenance- Flexible for future change- Sustainable- Energy efficient- A functional building- Good working environment- Safe for staff & patients

What the patients need:- Easy orientation- Provision of privacy & dignity- Comfortable environment- Natural light- Calm building- Healthy materials

1 2

3

4 5

1

2

3

4

5

AllanderSurgery

ARCHITECT:Dallman Johnstone Architects

STRUCTURAL ENGINEER:Roy Easton & Company

QUANTITY SURVEYOR:Doig & Smith

CONTRACTOR:David H Allan

What does the Health Board Need:- A building that promotes good health not dis-ease- Good value for money- Low maintenance- Flexible enough to allow for change- Sustainable- Energy efficient which allows for cost savings year after year

futu

re e

xpan

sion

We can walk you through the spacewith a 3600 3D image.

doctors public staff

B

A

Page 4: Portfolio Gniewosz Plucinski

min

. 150

mm

Protan sealantProtan termination bar

Fastener withweatherproof washer

Protan membrane

40mm weld

Protan membraneProtan cord

Protan restraint bar & fastenerProtan cover strip

Protan vapour control layer

10mm plywood

50mm Kingspan TR21LPC/FM or Quinntherm QF

40mm weld

Protan membrane

40mm weld

Protan restraint bar & fastener

Protan cover strip40mm weld

Protan fleece

200mm rafters

150mm Kingspan K7 or Quinntherm QW

12.5mm plasterboard

timber joists, heights vary to form water fall

150mm rafter ties

10mm plywood

Gutters temporary removed for access

Tyvek sarking membrane

325mm strip of BS8747 Type 5U or equivalentUV durable underlay dressed into gutter

Marley ludlow major eaves clip

Marley Eternit 25mm over fascia strip ventilator

Marley Eternit felt support tray

Marley Eternit continuous rafer roll

Tilting fillet

18mm sarking board

F

W

Fz

DW

RE

TV

TV

TV

RE

F/Fz

SD

SD

RE15

0

150

900

±0.000

-0.300 -0.540

-0.300

-0.440-0.300A

A

AA

BB

door removed openingwidened, new glazed doors

wall infilled

window infilled & new door

wall removed

new rooflights

new rooflight

Door re-hung

new gas fire & vent throughfloor-min.10cm2 air vent size

tap repositioned

existing drainage pipescut below floor & sealed

assumed line ofexisting drainage

existing fire place opened

existing lathe & plaster removednew insulation & plasterboardfitted, see spec. point 4.2.

gas meter

new fanlight

existing stone retainedbelow worktop height

underfloor ventilation duct

under wall units lights

window removed wall infilled withstone & lime mortar to match existing

TV & power pointeye level mounted

extractor fan placedat min.1,7m height

telescopic air brick ventilators 215x65mm

50mm insulated doorwith 10mm ply facing& draught sealed

Cill to be fixed

pipe chase

new partitions

folding sliding doors see spec 10.1.

Existing hearth

telescopic air brickventilator 215x65mm

Sun room

Garage

wc

Utility

Study/bedroom 3

Kitchen

SVP

RWP

WP

activityspace

800x1100

GM

WP

new floorhatch

existingfloorhatch

removed

speaker point (ceiling height)

speaker point (floor level)

one way switch

two way switch

dimmer switch

light fittingAll new fixed light fittings installed to below energy type. Internal Kosnic 4WLED GU10 lights. 4000K Cool white.

light fitting with move detector

light wall fittinglow level double socketwith high level switch

high level double socket

pop-up 3 point power point

telephone point

TV point

rodding eye

ventilation extract fan

smoke detector

sub floor access below doors

Aga cooker mains supplyconnect point with highlevel switched fuse

RE

Broomcupboard

PIR

PIR

3x100x250

V

V

VVV

V

V

RWP

RE

existing walls removed

V

V

V

V

150

door removed, wall infilled

new walls

wall infilled

non combustible hearth min.125mm thick concrete slab

AGA Total Control complywith AGA installation guide

Gou

nd le

vel t

o be

low

ered

by

150m

m &

gra

velle

d

150

see spec. par. 6.

see spec. par. 4.

see spec. p. 3.10.

see spec. p. 3.15.

new concrete foundation

See spec. par. 6.

Single ply membranegutter & 150mm upstand

telescopic air vent

insulated wallsee spec. p.4.6.

new fanlight

timber finish

Insulated door& draught seals

see spec. p. 6.15.

UtilitySunroom Garage

House Extension, Bearsden DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Private HousesBefore

After - visualization

Page 5: Portfolio Gniewosz Plucinski

Fz

RE

SVP

W

DW

V

V

F

V

V

D01

1,126

3,712

450 2,372 890

TO TURN OUT 3712

3,90

01,

180

TTO

797

1,67

891

04,

152

A62 A62

A63

existingconservatoryremoved

existing utility removed

walls removed

wall removed

new beams

existing svp removed

existing boundary

existing drainage extendedto new rodding eye

floor sockets

cupboardremoved

New rooflights

rooflights overkitchen worktops

vent grilleabove door

new boiler position

new study

hall

TV room

new sitting roomnew

diningnew kitchen

en-suite

newutility

O

newlarder

RWP

RWP

Sub floor ventilationextended by

100mm dia. duct

Sub floor ventilationextended by

100mm dia. duct

manouveringspace

manouvering space

Sub floor ventilationextended by

100mm dia. duct

Sub floor ventilationextended by

100mm dia. duct

Sub floor ventilationextended by

100mm dia. ductSub floor ventilation

extended by100mm dia. duct

Sub floor ventilationextended by

100mm dia. duct

Sub floor ventilationextended by

100mm dia. duct

brick sizes brick sizes

bric

k si

zes

activity space

O

PIR PIR

RWP

wall removed

SVP

AA

B

C C

150

14°

Refer to specificationparagraph 3.

Refer to specificationparagraph 5.

150mm lead upstand

Smooth red engineeringbullnose brick cill

Existing sub floor ventilationextended via new flat ductsthrough floating floor construction.

larder kitchen

House Extension, Bearsden DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Private HousesBefore After

Page 6: Portfolio Gniewosz Plucinski

300

All new timber windows to achieve u-value of 1.8W/m2K

DPM linked to DPC

Existing door

Dwarf wall to hold beam endExisting foundation extended to incorporate dwarf wall 75mm Kingspan TF70

150mm Hardcore

75mm area for under floor heating

50mm sand blinding100mm concrete slabmin 150mm ventilated space

stone floor

beam and block floor system

Perp vents at 900ctr Floor brought to single level(existing loggia steps removed).

DPC

Break out floor to incorporatenew underfloor heating system

Code 5 lead flashing with min150mmupstand raggled into existing wall

20mm ply

tapered battens min of 50mm at low end to allow for ventilationmin 50mm ventilated space to be maintained throughout

100mm Kingspan TP10

Roof structure toengineer's recommendations

Lead (code 5) on geo textile layer to LSA's recommendations

DPC

Walls to bestrapped and lined

Lead (code 8)to gutter

New FFL to be170mm below existingliving room FFL

New plasterboard ceiling

Roof vent

Vapour control layer

Roof deck

Breather membrane

D02

D03

cavity barriers giving 30minute fire resistancewrapped in DPC

DPC

Vapour control LayerREFLEX vapour permeable membrane (with a vapourresistance of no more than0.25 MN. s/g)

Code 8 lead to gutterCode 5 lead to roof

200x75x23 PFC

220x75 timber beambolted back to steelwork

insect screen vent

25mm continuouseaves vent

Plasterboard ceiling

Painted ply panelled soffit.Primed prior to installation.

min overlap 75mm

220x47 C16 joist

Eternit grey cill 165mm

185 200

42

142

00

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Private Houses

Garden room, Bearsden

75

Vapour control Layer

150x50 timber

200x75x23 PFC

150x75 PFC

Code 8 lead to gutter

Plasterboard 12.5mm

insect screen vent

220x75 timber beambolted back to steelwork

Code 5 lead to roof

insect screen vent

25mm continuouseaves vent

Plasterboard ceiling

15mm painted ply panelled soffit.Primed prior to installation.

insect screen vent25mm vent

min overlap 75mm

Min overlap 75mm

Min overlap 75mm

220x47 C16 joist

195x50 timber

Fillets @ 400mm

20mm ply for painting.Primed prior to installation.

Direct glazing

Geotextile feltunderneath leadto LSA'srecommendations

Geotextile feltunderneath leadto LSA'srecommendations

Code 5 leadcladding

Code 5 leadcladding

185200

124142

00

Visualization

Page 7: Portfolio Gniewosz Plucinski

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Private Houses

Garden room, Clahan of Campsie

2,56

0

Granite setsbedded on mortar

Refer to Specification, paragraph 2.

Refer to Specification, Paragraph 5.

New timber trusses stained black

LV cable lighting

Refer to Specification, point 7.2.

Glazing to south gable

DPC injection

Wall re-built

Roughcast

Kingspan Nilvent Breathable sarking membrane.Horizontal lap between runs of breathablesarking membrane with 75mm wide doublesided acrylic adhesive tape.

Galvanized steel beam exposed

2x25mm Kingspan K7insulation inside steel beam1x25mm Kingspan K18 insulatedplasterboard to inside face of steel flanges

1x25mm Kingspan K18 insulatedplasterboard to inside face of steel columns

Before

After - visualization

Page 8: Portfolio Gniewosz Plucinski

F DWW

V

SD

SD

TV

V

350 350

350

350

350

150 300min.840

min

.840

150

1,00

0

6,150

3,10

0

350

new boiler

door removedwall infilled

electric meter &fusebox repositioned

door re-hung

walls removed

new beam

U-value 1.8 W/m2K

Phone socket removed& power points removed

Renew aerial

Power point removed

Stair ballustrade replaced

Existing stove & hearth repositioned. Hearth - min.125mm thick concrete slab.Non combustible solid decorative finish arround stove.New double wall flue - distance of min.25mm is required between flue inner walland any combustible material where flue penetrates roof & ceiling - see D01.Spillage test required to living/kitchen/dining after works completed by contractorto determine the internal/external pressure difference which caused spillage atvarious thermal outputs.The test to be carried out in accordance with BRE paper IP 7/94.

new beam, refer toengineer's drawing

RWP

RWP

RWP

RWP SVP

RWP

Bedroom

Bedroom

Bathroom Kitchen

Living room

Hall

Dining

Boiler

R

R

R

R

R

R

R

timber deck

WP

E

E

E

E

activ

ity s

pace

R

LED light fitting

LED wall light fitting

LED floor light fitting

1 gang 1 way switch

1 gang 2 way switch

low level double socket

high level double socket

extract fan

external lights on a solar controller time

clock with PIR & switchable over-ride

smoke detector

phone socket

TV point

outside tap

E

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Private Houses

House Extension, Strachur

Before

After - visualization

Page 9: Portfolio Gniewosz Plucinski

Min

.150

mm

Header joist

Brick tie Cullen B50/304SS with SS nails

Breather membrane/Tyvek Reflex

12mm Ply Sheathing

Skirting board

Seal

Bottom railLocator plate specified

Sole plate

12.5mm/60mmKooltherm K17

25mm air space

18mm floor decking

18mm ply decking

Floor joist

Netlon

DPM

perpend vent @ 900 crs

100 mm concrete slab

Periscope vent

110 mm KingspanThermafloor TF70

DPC

120mm TW55Kinspan Thermawall

Vapour control layer

200mm Mineral wool

Insect mesh to ventilationof timber cladding

9.5mm Ply Sheathing

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Private Houses

House Extension, Bearsden

WTD

L F

RE

RE

D03900

1,730

2,162 622 750 622 930

750

660

750

660

750

6,600

4,35

0

AA

E-02

E-0

8

E-0

9

Extract

Door moved

Wall removedNew steel beam

Ceramictiled floor

Ceramictiled floor

Ceramictiled floor

Durgo automaticair admittance valve

Boun

dary

line

New kitchen

New Garden Room

New utilityroom

New toilet

Existing living room

Existing hall

RWP

RWP

R

R

R

R

Ass

umed

line

of e

xist

ing

com

bine

d dr

aina

ge

Timber parquetflooring

Garagedemolished

TRAP

TRAP SVP

Sarnatherm 160mm

Flashing

Insulated rainwater\outlet

Sarnafill mechanicallyfastened

Sarnafill mechanicallyfastened

Rafters

Vapour control layer

Plywood

Kooltherm K7 75mm

Kooltherm K1820mm/12.5mm

Page 10: Portfolio Gniewosz Plucinski

D02

D08

D10D10

D/13

2,280

2m m

in he

adro

om

2,500

2,410

2,410

2,280

1,100

77.5mm K17 insulated plasterboard mechanically fixed.

72.5mm K17 insulatedplasterboard on dabs.

60 min FR ceilingRefer to detail D0760 min FR

partitions

60 min FR partition

60 min FR ceiling 30 min FR ceiling

Raised ties

Envirograf Intumescentnon - fibrous fire-stop60 mins blocks SIB1

60 min FR ceilingRefer to detail D08

2x100mm TW55 Kingspaninsulation on existing ties

See specificationparagraph 3.5.

30 min FR partition

Non combustiblesteel stair to bothflights.

Reopen vent to gable

Riser 167mmGoing 250mmPitch 33.8 deg.

All service perforations greater than 40mm through60min protected zone (floor or ceiling) to have 60mmfire protection with Promat Promoseal or equal andapproved.

Existing steelwork

2 layers of 12.5mm FireLine.60 mins fire resistant ceilingBritish Gypsum ref.: C106053Refer to detail D08

70mm Kingspan K7 insulationbetween existing rafters

70mm Kingspan K18 insulatedcore under rafters

50mm ventilation gap

120mm Kingspan TW55between existing studs

2x100mm KingspanTW55 insulation

See elevations forvent details

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Conservation

Church alterations, Stirling

Before

After - visualization

After - visualization

Page 11: Portfolio Gniewosz Plucinski

16

x 17

0 =

2.72

0 m

RE

D.I.C.

FESFES

V V

V

FES

SD

SD

SD

SD

SDSDSD

CO

FES

RE

RE

D01

D08D11

D18

6,000 6,000 6,000 6,000

15,7

40

24,740

12,2

50

2,500

675 910

1,790 3,835 2,240 3,835 2,240 3,835 1,115 3,835 440 910 665

1,115 910 2151,115 910 215

2,710 1,100

1,226

1,247 4,100 653 1,322 4,100 578 1,397 4,100 503 347 4,100 1,553

2,00

7

1,478

3,83

71,

920

1,91

81,

832

2,00

73,

292

7m to

ker

b

2,153

1m b

ench

14,9

40

1,50

01,

240

1,24

025

0

3,478 140 2,252

140

1,84

4

1,150

350

350 350350

220

80350 350 35035

0

300

900

350

1,41

51,

800

1,57

5

A

A12

Existing manhole

skylights

Mezzanine above

Incoming servicepop ups 4x150 o

Wheelchairplatform space

Future gas meter

Future door spaceFuture door space

Drain pop up

Future gas meter

Future gas meter

Refer to specificationparagraph 3.10.

Block partition

Bollards

Refer to specificationparagraph 3.

Future shower

Landlord's electricsupply

o100mm Spigot

New fence

Demolished building line Incoming servicepop ups 4x150 oIncoming service

pop ups 4x150 o

Air compressor

o100mmService ductair, electrics

YARD

RWP RWP

RWP RWP

Kitchen

block sizesblock sizes

block overall size

block sizes block sizes

SVP

FDS30

FDS30

steelwork sizes

exis

ting

drai

nage

/

1 2 3 4 5

A

B

C

D

1:8

1:8

1:8

1:8

New

fenc

e lin

e

Exi

stin

g bu

ildin

g de

mol

ishe

d60

0mm

thic

k ha

rdco

re

Existing ground turnedover & made good //

/

Male

Accessible/Female

Meterstore

GMGMGM GMD02

Gas meter

Wor

king

/Mai

nten

ance

Pit

from

"Pre

mie

r Pits

"ht

tp://

ww

w.p

rem

ierp

its.c

om/fu

ll_ra

nge.

php,

Tel

: 017

75 8

21 2

221,

4m d

eep

F.G.L. Varies F.G.L. Varies

DPC min 225mm above F.G.L.

Drip flashing

Kingspan KS1000 RW

100mm thick PIR board insulation used to fill gaps, if required.

DPM

Hardcore

50mm thermal insulationachieving λ-value of 0.023W/mK

50mm sand

200mm Concrete slab

DPM linked to DPCDPC min 225mm above F.G.L.

Alfas C foam seal

Internal closure flashing

Insulation

15mm Expansion joint

102

5010

014

0

134

100mm thermal insulationachieving λ-value of 0.021W/mK

50mm thermal insulationachieving λ-value of 0.021W/mK.Insulation fixed by mechanical fasteners

12.5mm plasterboard

expanding foam insulation

100mm thermal insulationachieving λ-value of 0.021W/mK

70mm thermal insulationachieving λ-value of 0.021W/mK

50mm thermal insulationachieving λ-value of 0.021W/mK

Door Rail

2mm Polyester Powdercoated steel ingo

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Industrial

Garage workshops, Glasgow

Page 12: Portfolio Gniewosz Plucinski

E5

E7

29.77 m2

5.29 m23.40 m2

26.42 m2

13.03 m2

28.30 m2

EN-SUITE

DINING/KITCHEN

UTILITY

LIVING ROOM

BEDROOM 1

HALL

TOILETUNHEATEDBUFFER ZONE

Surface waterdrainage to loch

4.27 m2

6,50

0

3,500

DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN

Gniewosz Plucinski Conceptions

Innerleithen Bike Park

Low energy house, St Catherine's

BEDROOM 3

BEDROOM 1 EN-SUITEUNHEATEDBUFFERSPACE