1
A A s +21.824 DMD PROPOSED GATE LEVEL CONCOURSE ROUTE C.02 62 62 24 24 10 3 C.370 C.200 C.124 3 3 3 C.369 4 1 2 C.201 WBS: 598 DISTRICT C 1,488.00 Sq.m COMMERCIAL FIRE FIGHTING N 2762252.587 E 481801.259 ELECTRICAL N 2762273.308 E 481857.781 IRRIGATION N 2762263.813 E 481800.813 SEWER (24.64 M³/DAY) H.C. IL = 18.91m N 2762256.452 E 481800.405 SECURITY N 2762269.232 E 481799.897 ICT N 2762267.733 E 481799.956 POTABLE WATER N 2762268.585 E 481800.623 GAS N 2762260.227 E 481800.255 PLOT BOUNDARY LINE PLOT BOUNDARY LINE 15 MAX. BUILDING ENVELOPE CONCOURSE 12 6.25 18 6.25 49 10 ASSIGNED BUILDING HEIGHT SETBACK LINE SETBACK LINE 3 DESCRIPTION DEMAND FLOW SIZE MIN. PRESSURE TOTAL CONNECTED LOAD 721.69 KW N/A Single core cables 630 mm2 N/A AVERAGE WATER DEMAND 27.38 M³/DAY 0.317 l/s 32 mm 1 (bar) AVERAGE SEWAGE FLOW 24.64 M³/DAY 0.285 l/s 200 mm N/A AVERAGE IRRIGATION DEMAND 1.87 M³/DAY 0.022 l/s 32 mm 3.5 (bar) PEAK GAS DEMAND (LPG) 2.35 M³/HR TBC 32 mm 1.2 (bar) FIREFIGHTING NETWORK N/A 350 g/m 200 mm 6.9 (bar) 1 2 3 4 481860.630 2762251.954 481859.678 2762275.936 2762249.493 2762273.474 481798.679 481797.727 TOTAL FLOOR AREA LESS (AREA OF PARKING LOTS, ACCESS ROADS, LOADING/ UNLOADING BAYS, COVERED WAYS, SWIMMING POOLS, BASEMENTS FLOORS ALLOCATED FOR PARKING AND SERVICES, MECHANICAL SERVICES FLOORS, ROOF SERVICE FLOORS, NON-CLOSED BALCONIES AND TERRACES) BY THE AREA OF THE PLOT. EXPO 2020 DUBAI - PLOT : DEFINITIONS DATE THE RATIO RESULTING FROM DIVIDING THE GFA OVER THE TOTAL PLOT AREA. AREAS EXCLUDED FROM THE CALCULATION OF THE TOTAL BUILT UP AREA AS PER DM DEFINITION. FLOOR AREA RATIO (FAR)(DM) GROSS FLOOR AREA (GFA) PLOT CODE LOCATION PLAN PLOT GUIDELINES SECTION - A PLOT DETAILS LAND USE BUILDING TYPOLOGY PLOT AREA M2 MAXIMUM BUILDABLE ZONE INDICATIVE FAR (DM) ASSIGNED BUILDING HEIGHT NUMBER OF BASEMENT LEVELS INDICATIVE GFA (DM) UTILITY ALLOCATION PLOT SHEET NUMBER WBS : PARTICIPANT PLOT COORDINATES TABLE KEY EAST NORTH POINT BUILDING ENVELOPE REVISION N M DUBAI MUNICIPALITY DM TOTAL COVERED AREA IN A BUILDING OR STRUCTURE MEASURED FROM THE EXTERNAL SIDES OF THE BUILDING, INCLUSIVE OF BALCONIES, TERRACES AND OTHER PROJECTION AS WELL AS ANY OTHER COVERED SPACE SUCH AS CHUTES, LOADING / UNLOADING BAYS, SERVICE FLOORS, SWIMMING POOLS, STRUCTURED QUEUING AREAS AND ANY OTHER STRUCTURES ON THE PLOTS. BUILD UP AREA (BUA) MASTER PLAN Rev. 26 NOTES 1. This plot sheet is subject to change. 2. Refer to 'self build pavilion guide' and self-build pavilion delivery guide where appropriate for design guides & controls. 3. All dimensions and coordinates are approximate until final survey is carried out by the organiser. All dimensions indicated are in meters. 4. All coordinates are based on Dubai local traverse Mercator (DLTM) coordinate system. 5. Plot details are based on master plan ref. 10002-DWG-H02000-MP-200003 rev.26 and may be subject to minor changes. 6. Participants should abide by Dubai Municipality and Dubai South codes and other authorities as noted in the guidelines. 7. All levels are in meters based on Dubai Municipality Datum (DMD). 8. Levels may be subject to change and will be communicated as necessary. Level tolerance +/- 50 mm, at time of plot handover to participant. 9. GFA does not include basements, please refer to BUA definition for further information. 10. Infrastructure allocation is based on DM GFA definition. 11. All utility tie-in connections are extended up to 2m inside the plot boundary. However, the exact locations of utility tie-in connections are subject to change and shall be coordinated with the organiser. 12. Utility will be protected at the back of house (BOH) access. Participants will be responsible for any additional protection if BOH access is changed. 13. Participants are responsible to settle all utility connection fees before the service activation/ deactivation. 14. The organiser will build a plot substation (SS) and trench up to 2m within the plot. The participants are responsible to design and build the connection from the tie-in point up to the Main Distribution Board (MDB) or the Air Circuit Breaker (ACB). The maximum distance from the plot SS to the MDB or ACB is 15 meters. 15. The storm water drainage shall be designed to discharge from the plot onto front of house (FOH) or back of house (BOH) in accordance with DM standards and guidelines. 16. If storm waste storage is required it must be designed for 1 in 10 years storm event for 24 hours.The discharge by pumping from the plot storm storage tank to the main network takes place after storm event. 17. The participant is responsible to design and implement an effective temporary works system to avoid any impact or damages to adjacent plots, on plot services or surrounding services during excavation and construction works. 18. Plot construction access will be limited to the BOH area. The organiser will install hoarding around the plot boundary. The hoarding maybe shifted by the organiser to allow other projects activities to be completed. 19. All tower cranes must be approved by the organiser before erection to manage height and interface coordination. 20. The participant is responsible for the protection of underground utilities during all phases ( construction, event and decommissioning). 21. Please refer to 10008-SKT-H030000-CE-000798, for typical section detail for utility connections. 22. Development on top of the utility easement at the FOH are restricted. Permitted landscaping is limited to interlock paving, grass, low shrubs or any similar removable surface. Other surfaces will require an exceptional permission request. SETBACK BUILDING ENVELOPE BUILDABLE ZONE MAX. BUILDING ENVELOPE INDICATIVE MAIN PUBLIC ENTRANCE PLOT COORDINATES VIEW ANGLE - MASSING PUBLIC STREET EDGE SERVICE EDGE SHARED EDGE BETWEEN PLOTS BOH ACCESS / SERVICE ACCESS PLOT BOUNDARY LINE 1 s FINISH GROUND LEVEL EL.00 PLOT 11 KV SUBSTATION (CAPACITY - 1x1000KV TRANSFORMER) OTHER 11 KV SUBSTATION UTILITY EASEMENT 1 level within buildable zone 15 m 1.61 2,395.68 sq.m 882.00 sq.m 1,488.00 sq.m COUNTRY SMALL COMMERCIAL SELF BUILD PAVILION MAR - 2019 C.201 REPUBLIC OF COLOMBIA 05007-PLP-IPA0034787-AR-000001 598 1 SHADE STRUCTURE NOTES COLUMN DIAMETER - 400M, SHADE STRUCTURE HEIGHT - 12000 MM INDICATIVE SHADE STRUCTURE DIAGRAM 0 10 20 30 50

PLOT DETAILS LOCATION PLAN PLOT GUIDELINES MASTER … · balconies and terraces) by the area of the plot. expo 2020 dubai - plot : definitions date the ratio resulting from dividing

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLOT DETAILS LOCATION PLAN PLOT GUIDELINES MASTER … · balconies and terraces) by the area of the plot. expo 2020 dubai - plot : definitions date the ratio resulting from dividing

A

A

s

+21.824 DMD

PROPOSED

GATE LEVEL

CO

NC

OU

RS

E

RO

UT

E

C.02

62

62

24

24

10

3

C.370

C.200

C.124

3

3

3

C.369

4

1

2

C.201

WBS: 598

DISTRICT C

1,488.00 Sq.m

COMMERCIAL

FIRE FIGHTING

N 2762252.587

E 481801.259

ELECTRICAL

N 2762273.308

E 481857.781

IRRIGATION

N 2762263.813

E 481800.813

SEWER

(24.64 M³/DAY)

H.C. IL = 18.91m

N 2762256.452

E 481800.405

SECURITY

N 2762269.232

E 481799.897

ICT

N 2762267.733

E 481799.956

POTABLE WATER

N 2762268.585

E 481800.623

GAS

N 2762260.227

E 481800.255

PL

OT

B

OU

ND

AR

Y L

IN

E

PL

OT

B

OU

ND

AR

Y L

IN

E

15MAX. BUILDING ENVELOPE

CONCOURSE

12

6.25 18 6.2549 10

ASSIGNED

BUILDING

HEIGHT

SE

TB

AC

K L

IN

E

SE

TB

AC

K L

IN

E

3

DESCRIPTION DEMAND FLOW SIZE

MIN.

PRESSURE

TOTAL CONNECTED

LOAD

721.69 KW N/A

Single core

cables

630 mm2

N/A

AVERAGE WATER

DEMAND

27.38 M³/DAY 0.317 l/s 32 mm

1 (bar)

AVERAGE SEWAGE

FLOW

24.64 M³/DAY 0.285 l/s 200 mm N/A

AVERAGE IRRIGATION

DEMAND

1.87 M³/DAY 0.022 l/s 32 mm

3.5 (bar)

PEAK GAS DEMAND

(LPG)

2.35 M³/HR TBC 32 mm

1.2 (bar)

FIREFIGHTING

NETWORK

N/A

350 g/m

200 mm

6.9 (bar)

coach parking

1

2

3

4

481860.6302762251.954

481859.678 2762275.936

2762249.493

2762273.474

481798.679

481797.727

TOTAL FLOOR AREA LESS (AREA OF PARKING LOTS,

ACCESS ROADS, LOADING/ UNLOADING BAYS, COVERED

WAYS, SWIMMING POOLS, BASEMENTS FLOORS

ALLOCATED FOR PARKING AND SERVICES, MECHANICAL

SERVICES FLOORS, ROOF SERVICE FLOORS, NON-CLOSED

BALCONIES AND TERRACES) BY THE AREA OF THE PLOT.

EXPO 2020 DUBAI - PLOT :

DEFINITIONS

DATE

THE RATIO RESULTING FROM DIVIDING THE GFA OVER THE

TOTAL PLOT AREA. AREAS EXCLUDED FROM THE

CALCULATION OF THE TOTAL BUILT UP AREA AS PER DM

DEFINITION.

FLOOR AREA

RATIO (FAR)(DM)

GROSS FLOOR

AREA (GFA)

PLOT CODE

LOCATION PLAN PLOT GUIDELINES

SECTION - A

PLOT DETAILS

LAND USE

BUILDING TYPOLOGY

PLOT AREA M2

MAXIMUM BUILDABLE ZONE

INDICATIVE FAR (DM)

ASSIGNED BUILDING HEIGHT

NUMBER OF BASEMENT LEVELS

INDICATIVE GFA (DM)

UTILITY ALLOCATION

PLOT SHEET NUMBER

WBS :

PARTICIPANT

PLOT COORDINATES TABLE

KEY

EASTNORTH

POINT

BUILDING ENVELOPE

REVISION

N

M

DUBAI MUNICIPALITYDM

TOTAL COVERED AREA IN A BUILDING OR STRUCTURE

MEASURED FROM THE EXTERNAL SIDES OF THE BUILDING,

INCLUSIVE OF BALCONIES, TERRACES AND OTHER

PROJECTION AS WELL AS ANY OTHER COVERED SPACE

SUCH AS CHUTES, LOADING / UNLOADING BAYS, SERVICE

FLOORS, SWIMMING POOLS, STRUCTURED QUEUING

AREAS AND ANY OTHER STRUCTURES ON THE PLOTS.

BUILD UP AREA

(BUA)

MASTER PLAN Rev. 26

NOTES

1. This plot sheet is subject to change.

2. Refer to 'self build pavilion guide' and self-build pavilion delivery guide where

appropriate for design guides & controls.

3. All dimensions and coordinates are approximate until final survey is carried out

by the organiser. All dimensions indicated are in meters.

4. All coordinates are based on Dubai local traverse Mercator (DLTM) coordinate

system.

5. Plot details are based on master plan ref. 10002-DWG-H02000-MP-200003

rev.26 and may be subject to minor changes.

6. Participants should abide by Dubai Municipality and Dubai South codes and

other authorities as noted in the guidelines.

7. All levels are in meters based on Dubai Municipality Datum (DMD).

8. Levels may be subject to change and will be communicated as necessary. Level

tolerance +/- 50 mm, at time of plot handover to participant.

9. GFA does not include basements, please refer to BUA definition for further

information.

10. Infrastructure allocation is based on DM GFA definition.

11. All utility tie-in connections are extended up to 2m inside the plot boundary.

However, the exact locations of utility tie-in connections are subject to change

and shall be coordinated with the organiser.

12. Utility will be protected at the back of house (BOH) access. Participants will be

responsible for any additional protection if BOH access is changed.

13. Participants are responsible to settle all utility connection fees before the service

activation/ deactivation.

14. The organiser will build a plot substation (SS) and trench up to 2m within the plot.

The participants are responsible to design and build the connection from the

tie-in point up to the Main Distribution Board (MDB) or the Air Circuit Breaker

(ACB). The maximum distance from the plot SS to the MDB or ACB is 15

meters.

15. The storm water drainage shall be designed to discharge from the plot onto front

of house (FOH) or back of house (BOH) in accordance with DM standards and

guidelines.

16. If storm waste storage is required it must be designed for 1 in 10 years storm

event for 24 hours.The discharge by pumping from the plot storm storage tank to

the main network takes place after storm event.

17. The participant is responsible to design and implement an effective temporary

works system to avoid any impact or damages to adjacent plots, on plot services

or surrounding services during excavation and construction works.

18. Plot construction access will be limited to the BOH area. The organiser will install

hoarding around the plot boundary. The hoarding maybe shifted by the organiser

to allow other projects activities to be completed.

19. All tower cranes must be approved by the organiser before erection to manage

height and interface coordination.

20. The participant is responsible for the protection of underground utilities during all

phases ( construction, event and decommissioning).

21. Please refer to 10008-SKT-H030000-CE-000798, for typical section detail for

utility connections.

22. Development on top of the utility easement at the FOH are restricted. Permitted

landscaping is limited to interlock paving, grass, low shrubs or any similar

removable surface. Other surfaces will require an exceptional permission

request.

SETBACK BUILDING ENVELOPE

BUILDABLE ZONE

MAX. BUILDING ENVELOPE

INDICATIVE MAIN PUBLIC ENTRANCE

PLOT COORDINATES

VIEW ANGLE - MASSING

PUBLIC STREET EDGE

SERVICE EDGE

SHARED EDGE BETWEEN PLOTS

BOH ACCESS / SERVICE ACCESS

PLOT BOUNDARY LINE

1

s

FINISH GROUND LEVEL

EL.00

PLOT 11 KV SUBSTATION

(CAPACITY - 1x1000KV TRANSFORMER)

OTHER 11 KV SUBSTATION

UTILITY EASEMENT

1 level within buildable zone

15 m

1.61

2,395.68 sq.m

882.00 sq.m

1,488.00 sq.m

COUNTRY SMALL

COMMERCIAL

SELF BUILD PAVILION

MAR - 2019

C.201REPUBLIC OF COLOMBIA 05007-PLP-IPA0034787-AR-000001

598

1

SHADE STRUCTURE NOTES

COLUMN DIAMETER - 400M, SHADE STRUCTURE HEIGHT - 12000 MM

INDICATIVE

SHADE

STRUCTURE

DIAGRAM

0 10 20 30 50

AutoCAD SHX Text
EL 21.348
AutoCAD SHX Text
EL 21.881
AutoCAD SHX Text
EL 20.964
AutoCAD SHX Text
EL 21.770