Open House No. 2 WELCOME June 19, 2013 PLESSIS ROAD Underpass

PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

Open House No. 2

WELCOME

June 19, 2013

PLEssis ROadUnderpass

Page 2: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Welcome

This second Plessis Road Underpass Open House is your opportunity to: » Review comments received at the last open house

» Review design updates

» Review the latest construction information

» Ask questions of the project team

» Provide comments you may have

1

Page 3: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Project Background

» The City`s 2012 capital budget identified $77-million for the Plessis Road twinning and grade separation at the CN Rail Redditt subdivision, including cost-sharing between the Federal (Building Canada Fund; $25-million), Provincial ($25-million) and City ($27-million) governments.

» The project will involve twinning Plessis Road between Dugald Road and Pandora Avenue W. and constructing an underpass at the CN Rail Redditt subdivision.

» Plessis Road, within the project area, is the highest volume two-lane street in the city and a priority for widening.

» The combination of limited street capacity and train movements results in congestion in the area.

» The City of Winnipeg is coordinating the design and construction of the project in conjunction with local engineering firms and contractors:

• AECOM / Dillon is responsible for the design of the project

• MMM Group is facilitating the public engagement process

2

Page 4: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass

CN

Rail

Kernaghan ave.

Barry ave.

Peake ave.

Pandora ave. W.

Mission Gardens

Paul Martin d

r.

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

stewn ave.

Robson st.

Pandora ave. W.

Crescent Multi-Foods

TransconaCountry

Club

Transcona Golf

Course

East sideself storage

Freshwater FishCorporation

GraceCanadianReformed

ChurchLocation of Future Plessis

Underpass

Project LocationN

Birch G

rove

3

Page 5: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Project Benefits

The project, once complete, will provide for the safe and efficient movement of vehicles, pedestrians and cyclists in the area. Following completion, benefits of the project will include:

» Elimination of delays at the rail crossing

» Improved response times for emergency vehicles

» Improvements to the Active Transportation sidewalk and bike path network

» Improved traffic flow by twinning Plessis Road between Pandora Avenue W. and Dugald Road and adding additional lanes at the Dugald Road intersection

4

Page 6: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Open House No. 1

» Following the Open House, all story boards were posted on the project website with a digital version of the feedback form available for completion. In total, 158 responses were submitted online.

» On February 28, 2013 an Open House was held for the Plessis Road Underpass Project. The Open House provided the public with an opportunity to meet with the project team, review the underpass design and provide feedback.

» The Open House was attended by 307 registered guests and feedback forms were available for all attendees. Feedback forms were completed by 181 attendees at the Open House.

5

Page 7: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass What We Heard

The following themes were most frequently discussed in the feedback form responses:

In the past, drainage in the area has been an issue.

Therefore the new underpass should be designed to

accommodate spring melt and heavy rainfall.

It is recognized the underpass construction will take time and

there may be temporary impacts to local businesses and residents. However, the project will benefit

the area in the long-term.

It was recommended that pedestrian safety, especially in the vicinity of Bernie Wolfe School, be considered during

the implementation of temporary alternate routes.

With the CN line currently slowing traffic movement along Plessis Road, the

project is welcome as it will reduce traffic congestion.

The landscaping and design of the underpass should be

visually appealing to travellers along Plessis Road.

Paths and sidewalks are a welcome addition, as they will provide linkages to the existing network of pedestrian and bike

paths in the area.

6

Page 8: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass

2012 2013 2014

Project Start-Up(July 2012)

We Are Here

Construction Completed

(December 2014)

Preliminary Design Approved

Preliminary DesignUnderpass & Roadway Construction

Project schedule

Detailed Design

First Public Open House

(February 2013)

Rail DiversionConstruction Start

(June 2013)

Plessis Road Temporarily Closed

(July 2013)

Notes:

Watermain shutdown No. 1: » Between end of June 2013 and

October 2013 and is anticipated to last approximately 4-6 hours.

» Any disruptions in service will be coordinated by the City of Winnipeg and notification will be sent to affected homes and businesses directly.

Watermain shutdown No. 2: » Between September 2013 and

October 2013 and is anticipated to last approximately 48 hours.

» Any disruptions in service will be coordinated by the City of Winnipeg and notification will be sent to affected homes and businesses directly.

» Temporary water will be supplied by the Contractor for the duration of the interruption.

Utility Disruptions

7

Page 9: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Underpass & Roadway Plan

N

CN

Rail

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

Kernaghan ave.

Barry ave.

Peake ave.

New dry Pond

New Liftstation

New sidewalk

New Traffic Lanes

New Median

NewMulti-Use

Path

New second Left Turn Lane

New acceleration

Lane

New deceleration

Lane

Pandora ave. W.

New Retaining

Wall

N

CN

Rail

CN

Rail

Plessis Rd.

Plessis Rd.

Dugald R

d.D

ugald Rd.

Kernaghan Ave.

Barry Ave.

Peake Ave.

New Dry Pond

New LiftStation

New Sidewalk

New Traffic Lanes

New Median

NewMulti-Use

Path

New Second Left Turn Lane

New Acceleration

Lane

New Deceleration

Lane

Pandora Ave. W.

New Retaining

Wall

RighttuRnLane

thRuLane

thRuLane

LefttuRnLane

thRuLane

thRuLane

aCCeL./MeRge

Lane

Underpass Cross-Section

South ElevationScale 1:300

3.5 m WiDe MuLti uSe Path

SiDeWaLK

SOuth BOunD nORth BOunD

BaSe Of RaiL

Underpass Profile

8

Page 10: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Landscaping & aesthetics

CN

Rail

CN

Rail

Plessis Rd.

dugald R

d.d

ugald Rd.

Kernaghan ave.

Barry ave.

Peake ave.

Pandora ave. W.

salt Tolerant GrassesTo be seeded in ditches and along

edge of road.

dry PondThe upper slope of the pond will have native shrub planting and

seeded with low growing grasses.

No Mow ZonesWill help promote native grasses

and wildflowers, conserve soil moisture and save energy.

Tree & shrub PlantingsHardy native species of shrubs

and trees.

TreesHardy tree plantings to include a

diverse mixture of species.

9

Retaining WallsPossible images for concrete

Rest area

Pump House

Page 11: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass drainage Plans

CN

Rail

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

Paul Martin d

r.Robson st.

New dry Pond

New Liftstation

JEN - FYI

LAND DRAINAGE

UNDERPASS LDS (LAND DRAINAGE SYSTEM)

WASTEWATER SEWER

ABANDON LDS

Land Drainage

Underpass Land Drainage System (LDS)

Wastewater Sewer

Abandon LDS

To Existing Drainage

» During heavy precipitation events, all discharge from the underpass will be stored in the dry pond. The dry pond will be sized to store the 100-year storm event as a minimum.

» Discharge from the dry pond drainage system to the receiving drainage systems will be restricted to preconstruction flows during a heavy precipitation event.

» Pumped discharge from the dry pond to the receiving drainage systems will only occur after levels in the receiving system have subsided to normal levels, after a major storm event, so that there will be no increase of peak water levels in those systems.

10

Page 12: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Construction activities

» In order to complete construction by the end of 2014, a full closure of Plessis Road from Dugald Road to Kernaghan Avenue will be required during construction from July 2013 to the end of 2014 (local access to Mission Gardens will be maintained).

» Traffic flow will be monitored on an ongoing basis during construction.

» Ongoing discussions with Bernie Wolfe Community School are taking place with respect to traffic flow around the school grounds during construction.

PLE

SS

IS

RD

BARRY AVE

PEAKE AVE

KERNAGHAN AVE

RO

BS

ON

S

T

PLE

SS

IS

RD

PANDORA AVE W

DUGALD RD

PANDORA AVE W

PAUL MARTIN DR

PAUL MARTIN DR

RO

BS

ON

S

T

LOCAL ACCESS ONLYDURING CONSTRUCTION

CLOSED DURINGCONSTRUCTION

C.N.R. REDDITT

FUTURE UNDERPASSLOCATION

11

Page 13: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass alternative Routes

» Plessis Road will be temporarily closed from July 2013 until completion in 2014.

» The closing of Plessis Road during construction is expected to increase traffic volumes on adjacent streets. The City`s intent is to maximize the use of regional street alternatives (e.g., Regent Avenue W.) and minimize traffic increases on non-regional streets (e.g., Bournais Drive) without restricting access for local residents.

» Advance signage, at nearby major regional street intersections, will advise drivers of the road closure on Plessis Road and direct them to alternate regional street routes.

» Intersections on Plessis Road directly affected by the closure (Regent Avenue W., Pandora Avenue W. and Dugald Road) will have their traffic signals retimed. These changes will improve the flow of traffic and encourage drivers to stay on the regional street system.

RA

VE

NH

UR

ST

ST

DUGALD RD

PE

RIM

ETE

R 1

01 H

WY

PANDORA AVE W

PLE

SS

IS

RD

REGENT AVE W

LAG

IMO

DIE

RE

B

LVD

TRANS-CANADA HWY

PLE

SS

IS

RD

CONSTRUCTION ZONE

ALTERNATE ROUTES

SIGNAL RETIMING

REGIONAL INFORMATION SIGN

EXAMPLE REGIONALINFORMATION SIGN :

PLESSIS RDCLOSED

DUGALD RD TO KERNAGHAN AVEJULY 2013 TO DEC 2014

12

Page 14: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Bournais Drive Traffic Management Plan

The Concern » Many people are concerned that the closing of Plessis Road during construction will increase traffic on Bournais Drive.

» Bernie Wolfe School is located on Bournais Drive and the crossing already receives large volumes of traffic, especially during school hours (buses, parent’s dropping off kids, etc.)

The approach » The City will not be promoting or encouraging use of Bournais Drive as a detour route during construction. Regional information

signage will promote the use of Lagimodiere Boulevard and Ravenhurst Street as north-south detour routes.

» Bournais Drive will remain open during construction in order to continue to accommodate movements in and out of the neighbourhood and provide access to Bernie Wolfe Community School.

» The intent of the construction traffic management plan is to move traffic as efficiently as possible on streets such as Regent Avenue and Dugald Road in order to minimize the incentive to shortcut through the neighbourhood.

» The City continues to meet with Bernie Wolfe Community School and the River East Transcona School Division to plan for and address potential issues around the school. At this time, provision has been made for additional adult crossing guards and a request has been made for enforcement of traffic regulations by the Winnipeg Police Services around the school in September 2013.

» Traffic will be monitored prior to and during construction to determine if traffic movements during construction are consistent with expectations.

13

Page 15: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass alternate Transit Routes

Winnipeg Transit routes will be temporarily modified to maintain service in the area. The re-routes will temporarily increase transit traffic on Bournais Drive and Pandora Avenue W. Winnipeg Transit will be implementing the route changes effective June 30, 2013.

ROUTE 49: dUGaLd

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

ROUTE 87: SOUTH TRANSCONA - CROSSROADS STATION

ROUTE 49: DUGALD

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

ROUTE 87: SOUTH TRANSCONA - CROSSROADS STATION

ROUTE 49: DUGALD

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

ROUTE 87: sOUTH TRaNsCONa - CROssROads sTaTiON

14

Page 16: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Conceptual Future Plessis Road Twinning

6:1

3:14:1

6:1

EXIST.WEST ROW

3:1 4:1

FUTURESOUTHBOUND

FUTURENORTHBOUND

EXISTING ROAD

Existing Road

dug

ald

Rd.

Cam

iel s

ys s

t. N

Future southboundFuture Northbound

» The future twinning as shown here is not included in the Plessis Underpass budget. No funding has been allocated to the twinning of Plessis south of Dugald beyond the intersection improvements and it has not been identified as a priority.

15

Page 17: PLEssis ROad Underpass - Winnipeg€¦ · Preliminary Design Approved Preliminary Design Underpass & Roadway Construction Project schedule Detailed Design First Public Open House

PLEssis ROadUnderpass Thank You

For further information on the project, please visit the City of Winnipeg’s website at:

http://winnipeg.ca/PlessisUnderpass

Or contact:

Call 311 or email [email protected]

Thank you for attending, please fill out a comment form before you leave.