DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS Republic of the Philippines CONSTRUCTION OF TOILET FACILITIES Prepared by : OIC, Assistant Secretary for Project Management Regional Infrastructure Coordinator EDMUND B. BILANG Sheet Content: Sheet No.: Sheet No.: TS S - - - - P S R A F N A R T M T O T N E O O C D N A T R A N O I T P C I N U A E D S N O I T M M PROJECT NAME : Regional Director Atty AMINOLA P. ABATON GUILLERMO L. LEONARDO ATTY. EFREN C. MONCUPA Undersecretary for Project Implementation and Special Concerns LOCATION : LTO REGINAL OFFICE No.9 TOILET FOUNDATION PLAN F1 - C1 F1 - C1 F1 - C1 F1 - C1 F1 - C1 F1 - C1 WF WF WF WF WF WF WF WF WF LENGTH LENGTH / 4 LENGTH / 4 TYPICAL DETAIL OF BEAM 10mm stirrups spaced @ 5-.05 m 5-.10 m 5-.15 m rest @ .20 m 12 mm horizontal bars 12161 600 600 4154 5154 1000 BUILDING LINE FIREWALL 2"X3" C-PURLINS 1.2 THICK TRUSS TRUSS TRUSS TRUSS TRUSS TRUSS TRUSS FASCIA FASCIA FASCIA TOILET ROOF FRAMING PLAN 10961 800 250 800 250 4-12mmØ VERT. BARS W/ 10mmØ LATERAL TIES SPACED; 3 @ 50mm, 3@100mm, 3@ 150mm, REST @ 200mm 7-16mmØ MATTING BARS BOTHWAYS PLAN 300 800 N.G.L. SECTION 4-12mmØ VERT. BARS W/ 10mmØ LATERAL TIES SPACED; 3 @ 50mm, 3@100mm, 3@ 150mm, REST @ 200mm F1-C1 TRUSS DETAIL DIAGRAM 6" CONCRETE HOLLOW BLOCKS PRE-PAINTED RIB TYPE ROOFING 2" X 4" C-PURLINS 2" X 6" CHANNEL BAR RAFTER ORDINARY GUTTER FASCIA BOARD 250 NAT. GRD. LINE FIN. GRD. LINE FIN. FLR. LINE 600 VERIFY 200 150mm THK. CHB WITH 10mmØ HOR. AND VERTICAL BARS @ 600mm O.C. 3-10mmØ LONG BARS 450 ELEVATION DIPOLOG CITY DISTRICT OFFICE UPPER TURNO , DIPOLOG CITY AS SHOWN LTO.9.CR.P2.W1.L1.1 LTO.9.CR.P2.W1.L1.0 LTO.9.CR.P2.W1.L1.2 Submitted by: Recommending Approval: Approved by:

PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

  • Upload
    buidien

  • View
    361

  • Download
    2

Embed Size (px)

Citation preview

Page 1: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

CONSTRUCTION OF TOILETFACILITIES

Prepared by :

OIC, Assistant Secretary for Project Managem

ent

Regional Infrastructure Coordinator

EDMUND B. BILANG

Sheet Content:

Sheet No.:Sheet No.:

TSS

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

PROJECT NAME :

Regional DirectorAtty AMINOLA P. ABATON

GUILLERMO L. LEONARDO

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

LOCATION :

LTO REGINAL OFFICE No.9

TOILET FO

UN

DATIO

N PLAN

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

WF

WF

WF

WF

WF

WFWF

WF

WF

LENGTH

LENGTH / 4LENGTH / 4

TYPICAL DETAIL O

F BEAM

10mm stirrups spaced @ 5-.05 m5-.10 m5-.15 mrest @

.20 m

12 mm horizontal bars

12161

600600

4154

5154

1000

BUILD

ING

LINE

FIREW

ALL

2"X3" C

-PURLIN

S 1.2 THICK

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

FASCIA

FASCIA

FASCIA

TOILET RO

OF FR

AMIN

G PLAN

10961

800

250

800

2504

-12m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

7-1

6m

MATTIN

G B

ARS B

OTH

WAYS

PLAN

300 800

N.G

.L.

SEC

TION

4-1

2m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

F1-C

1

TRUSS D

ETAIL DIAG

RAM

6" CON

CRETEH

OLLO

W BLO

CKS

PRE-PAIN

TED R

IB TYPE ROO

FING

2" X 4" C-PURLIN

S

2" X 6" CHAN

NEL BAR R

AFTER

ORD

INAR

Y GU

TTER

FASCIA BOARD

250

NAT. GRD. LINE

FIN. GRD. LINE

FIN. FLR. LINE

600 VERIFY 200

150

mm

THK. C

HB W

ITH 1

0m

HO

R.AND

VER

TICAL B

ARS

@ 6

00m

m O

.C.

3-1

0m

LONG

BARS

450ELE

VA

TION

DIPOLOG CITY DISTRICT OFFICEUPPER TURNO , DIPOLOG CITY

AS SHOWN

LTO.9.C

R.P2.W

1.L1.1LTO

.9.CR

.P2.W1.L1.0

LTO.9.C

R.P2.W

1.L1.2

Submitted by:

Recomm

ending Approval:

Approved by:

Page 2: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSA

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

850850

8501700

977 952 979

PW

D

765

600

1500 600

3308

RAM

P-UP

TOILET FLO

OR

PLAN

AA

B B

33048304

TOILET FLO

OR

PLAN

9379

4308

FRON

T ELEVATION

10104

1850 900

2750

2000

2734 360 1428 319

SE

E TR

USS-1

G.I. S

HEETS

FIRE

WALL

#26 CO

RR

UG

ATED

W.C

.

GU

TTER

FAS

CIA

TOILET ELEVATIO

N/SECTIO

N "B-B"

TOILET SECTIO

N "A-A"

1850651900

1850 900

2750

8891700W

.C.

LAV.

1729

260317293166

LEFT ELEVATION

RIG

HT ELEVATIO

N

5007

5007

33083308

900

6411157

600

600

2100

SCHED

ULE O

F DO

OR

S AND

WIN

DO

WS ( CLASS-A)

Regional DirectorAtty AMINOLA P. ABATON

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 BALANGASAN DISTRICT

PAGADIAN CITY

LTO.9.C

R.P4.N

1.L1.2

LTO.9.C

R.P4.N

1.L1.1

LTO.9.C

R.P4.N

1.L1.0

AS SHOWN

LTO.9.C

R.P4.N

1.L1.2LTO

.9.CR

.P4.N1.L1.1

LTO.9.C

R.P4.N

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 3: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSP

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

TO SEPTIC TAN

K

F.D.

F.D.

C.O

.

F.D.

TOILET SAN

ITARY LAYO

UT

10mm

Ø V

ER

TICA

L BARS SPAC

ED@

400mm

ON

CEN

TERS

10mm

Ø H

OR

IZON

TAL BARS

PLA

CE

D E

VE

RY

2 LAYER

S OF C

HB

11-10mm

Ø M

ATTIN

G BAR

SS

PA

CE

D E

QU

ALLY AS SH

OW

N

1024200

1024205

DIG

ES

TIVE

CH

AM

BE

R

LEA

CH

ING

CH

AM

BE

R

300

25

WA

TER

LEVELW

ATE

R LEVEL

AIR

SPAC

EA

IR S

PACE

500500

61

6" THIC

K CH

B

12mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

MA

NH

OLE

4" Ø P

VC

OU

TLET

1500

500

MA

NH

OLE

MA

NH

OLE

P1

400200

01:20

DE

TA

ILE

D P

LA

N O

F S

EP

TIC

TA

NK

5P1

400200

01:20

DE

TA

ILE

D S

EC

TIO

N O

F S

EP

TIC

TA

NK

4

205

128

LEA

CH

ING

CH

AM

BE

R

25

WA

TER

LEVEL

AIR

SPAC

E

300

10mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

4" Ø P

VC

OU

TLET

MA

NH

OLE

500

500

40002000

10001000

VENT STACK THRU ROOF

PLUMBING LEGEND:

VENT STACKVSVSTR

WM

GV

HB FWATER METER

HOSE BIBB

FAUCET

GATE VALVE

WC

CO URFDCLEAN-OUT

WATER CLOSET

FLOOR DRAINURINAL

LAVLAVATORY

CVCHECK VALVE

FCOFLOOR CLEAN-OUT

RDROOF DRAIN

CBCATCH BASIN

DSDOW

NSPOUTG.I.P.

GALVANIZED IRON PIPE

SPECIFICATION :

LICENSED MASTER PLUMBER.8. ALL W

ORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULYDOUBLE CHECKED TO ENSURE W

ATER TIGHT PLUMBING SYSTEM.7. ALL W

ORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE

OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE W

ATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS

1/2" diameter PVC PIPES.5. MAIN W

ATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE

4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.

3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.

2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FOR

LOCATION AND PURPOSE.

PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.

1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE W

ITH THE PROVISION OF THE

Regional DirectorAtty AMINOLA P. ABATON

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 BALANGASAN DISTRICT

PAGADIAN CITY

AS SHOWN

LTO.9.C

R.P4.N

1.L1.2LTO

.9.CR

.P4.N1.L1.1

LTO.9.C

R.P4.N

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by:

Recomm

ending Approval:

Approved by :

Page 4: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSE

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

ba

Sab

SS

S

LIGH

TING

LAYOU

T PLAN ( CLASS-B)

POW

ER LAYOU

T PLAN ( CLASS-B)

FRO

M ELEC

TRICALPO

WER

SOURCE

FRO

M ELEC

TRICALPO

WER

SOURCE

Legend & Sym

bols:

32 WATTS CIRCULAR FLUORESCENT LAMP

SSINGLE SW

ITCH

DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET

S3

TRIPLEX SWITCH

1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENT

FIXTURE, MIRRORIZED REFLECTOR AND LUOVER

CONDUIT RUN EMBEDDED ON WALLS & CEILING

1.

All electrical w

orks herein shall be done in accordance with the provisions of

the latest edition of the Philippine Electrical C

ode, existing rules and

ordinances of the Local Governm

ent, and with requirem

ents of the Local

Power C

ompany.

2.

Type of power service shall be 2

30

volts, 2-w

ire, 60 hz., single phase, line

to ground.

3.

All w

irings shall be installed in standard PVC/R

SC pipes inside a concrete

structure and inside ceiling spaces.

4.

All m

aterials to be used shall be brand new and of approved type.

5.

Minim

um size of w

ire and conduit to be used shall be 2.0

mm

. sq. and 20

mm

. dia. respectively.

6.

Wherever required and necessary, pull boxes or junction boxes of proper

sizes shall be installed at convenient and inconspicuous locations, although

such boxes are not shown on the plan nor m

entioned in the specifications.

7.

The electrical works shall be done under the direct and im

mediate supervision

of a duly licensed electrical practitioner.

General notes:

Regional DirectorAtty AMINOLA P. ABATON

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 BALANGASAN DISTRICT

PAGADIAN CITY

AS SHOWN

LTO.9.C

R.P4.N

1.L1.2LTO

.9.CR

.P4.N1.L1.1

LTO.9.C

R.P4.N

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 5: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

CONSTRUCTION OF TOILETFACILITIES

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Sheet Content:

Sheet No.:Sheet No.:

TSA

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

PROJECT NAME :

Recomm

ending Approval:

Regional DirectorAtty AMINOLA P. ABATON

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

LOCATION :

LTO REGINAL OFFICE No.9 ZAMBOANGA CITY DISTRICT OFFICE

VETERANS AVE, ZAMBOANGA CITY

11250

5139

26506750

1575

3638

32994746

3225

FLOO

R PLAN

900

6411157

600

600

2100

SCHED

ULE O

F DO

OR

S AND

WIN

DO

WS ( CLASS-A)

11250

5139

1575

3638

32994746

3225

REFLECTED

CEILING

PLAN

3250

4023FRO

NT ELEVATIO

N

4023

21003250

4023

LEFT SIDE ELEVATIO

N

RIG

HT SID

E ELEVATION

4023

3250

4023

LON

GITU

DIN

AL SECTION

W.C

.W

.C.

W.C

.LA

V.

AS SHOWN

LTO.9.C

R.P1.N

1.L1.0

LTO.9.C

R.P1.N

1.L1.1

LTO.2.C

R.P1.N

1.L1.2

LTO.9.C

R.P1.N

1.L1.0LTO

.9.CR

.P1.N1.L1.1

LTO.9.C

R.P1.N

1.L1.2

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Approved by :

Page 6: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

CONSTRUCTION OF TOILETFACILITIES

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Sheet Content:

Sheet No.:Sheet No.:

TSS

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

PROJECT NAME :

Regional DirectorAtty AMINOLA P. ABATON

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

LOCATION :

LTO REGINAL OFFICE No.9 ZAMBOANGA CITY DISTRICT OFFICE

VETERANS AVE, ZAMBOANGA CITY

5139

3638

FOU

ND

ATION

PLAN

11250

2063

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

WF

WF

WF

WF

WF

WF

800

250

800

2504

-12m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

7-1

6m

MATTIN

G B

ARS B

OTH

WAYS

PLAN

300 800

N.G

.L.

SEC

TION

4-1

2m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

F1-C

1

250

NAT. GRD. LINE

FIN. GRD. LINE

FIN. FLR. LINE

600 VERIFY 200

150

mm

THK. C

HB W

ITH 1

0m

HO

R.AND

VER

TICAL B

ARS

@ 6

00m

m O

.C.

3-1

0m

LONG

BARS

450ELE

VA

TION

LENGTH

LENGTH / 4LENGTH / 4

TYPICAL DETAIL O

F BEAM

10mm stirrups spaced @ 5-.05 m5-.10 m5-.15 mrest @

.20 m

12 mm horizontal bars

PRE-PAIN

TED R

IB TYPE ROO

FING

2" X 4" C-PURLIN

S

2" X 6" CHAN

NEL BAR R

AFTER

ORD

INAR

Y GU

TTER

FASCIA BOARD

11250

5139

1575

3638

32994746

3225

RO

OF FRAM

ING

PLAN

2" X 6" CH

AN

NEL BA

R RAFTER

2" X 4" C-PU

RLINS

GU

TTER

GU

TTER

AS SHOWN

LTO.9.C

R.P1.N

1.L1.0LTO

.9.CR

.P1.N1.L1.1

LTO.9.C

R.P1.N

1.L1.2

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 7: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

CONSTRUCTION OF TOILETFACILITIES

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Sheet Content:

Sheet No.:Sheet No.:

TSE

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

PROJECT NAME :

Regional DirectorAtty AMINOLA P. ABATON

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

LOCATION :

LTO REGINAL OFFICE No.9 ZAMBOANGA CITY DISTRICT OFFICE

VETERANS AVE, ZAMBOANGA CITY

11250

5139

26506750

1575

3638

32994746

3225

POW

ER LAY O

UT PLAN

FRO

M ELEC

TRICALPO

WER

SOURCE

11250

5139

26506750

1575

3638

32994746

3225

LIGH

TING

LAY OU

T PLAN

SS

SS

FRO

M ELEC

TRICALPO

WER

SOURCE

Legend & Sym

bols:

32 WATTS CIRCULAR FLUORESCENT LAMP

SSINGLE SW

ITCH

DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET

S3

DOUBLE GANG SWITCH

1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENT

FIXTURE, MIRRORIZED REFLECTOR AND LUOVER

CONDUIT RUN EMBEDDED ON WALLS & CEILING

1.

All electrical w

orks herein shall be done in accordance with the provisions of

the latest edition of the Philippine Electrical C

ode, existing rules and

ordinances of the Local Governm

ent, and with requirem

ents of the Local

Power C

ompany.

2.

Type of power service shall be 2

30

volts, 2-w

ire, 60 hz., single phase, line

to ground.

3.

All w

irings shall be installed in standard PVC/R

SC pipes inside a concrete

structure and inside ceiling spaces.

4.

All m

aterials to be used shall be brand new and of approved type.

5.

Minim

um size of w

ire and conduit to be used shall be 2.0

mm

. sq. and 20

mm

. dia. respectively.

6.

Wherever required and necessary, pull boxes or junction boxes of proper

sizes shall be installed at convenient and inconspicuous locations, although

such boxes are not shown on the plan nor m

entioned in the specifications.

7.

The electrical works shall be done under the direct and im

mediate supervision

of a duly licensed electrical practitioner.

General notes:

AS SHOWN

LTO.9.C

R.P1.N

1.L1.0LTO

.9.CR

.P1.N1.L1.1

LTO.9.C

R.P1.N

1.L1.2

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 8: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

CONSTRUCTION OF TOILETFACILITIES

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Sheet Content:

Sheet No.:Sheet No.:

TSP

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

PROJECT NAME :

Regional DirectorAtty AMINOLA P. ABATON

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

LOCATION :

LTO REGINAL OFFICE No.9 ZAMBOANGA CITY DISTRICT OFFICE

VETERANS AVE, ZAMBOANGA CITY

11250

5139

26506750

1575

3638

32994746

3225

PLUM

BING

LAY OU

T

VENT STACK THRU ROOF

PLUMBING LEGEND:

VENT STACKVSVSTR

WM

GV

HB FWATER METER

HOSE BIBB

FAUCET

GATE VALVE

WC

CO URFDCLEAN-OUT

WATER CLOSET

FLOOR DRAINURINAL

LAVLAVATORY

CVCHECK VALVE

FCOFLOOR CLEAN-OUT

RDROOF DRAIN

CBCATCH BASIN

DSDOW

NSPOUTG.I.P.

GALVANIZED IRON PIPE

SPECIFICATION :

LICENSED MASTER PLUMBER.8. ALL W

ORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULYDOUBLE CHECKED TO ENSURE W

ATER TIGHT PLUMBING SYSTEM.7. ALL W

ORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE

OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE W

ATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS

1/2" diameter PVC PIPES.5. MAIN W

ATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE

4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.

3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.

2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FOR

LOCATION AND PURPOSE.

PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.

1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE W

ITH THE PROVISION OF THE

10mm

Ø V

ER

TICA

L BARS SPAC

ED@

400mm

ON

CEN

TERS

10mm

Ø H

OR

IZON

TAL BARS

PLA

CE

D E

VE

RY

2 LAYER

S OF C

HB

11-10mm

Ø M

ATTIN

G BAR

SS

PA

CE

D E

QU

ALLY AS SH

OW

N

1024200

1024205

DIG

ES

TIVE

CH

AM

BE

R

LEA

CH

ING

CH

AM

BE

R

300

25

WA

TER

LEVELW

ATE

R LEVEL

AIR

SPAC

EA

IR S

PACE

500500

61

6" THIC

K CH

B

12mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

MA

NH

OLE

4" Ø P

VC

OU

TLET

1500

500

MA

NH

OLE

MA

NH

OLE

P1

400200

01:20

DE

TA

ILE

D P

LA

N O

F S

EP

TIC

TA

NK

5P1

400200

01:20

DE

TA

ILE

D S

EC

TIO

N O

F S

EP

TIC

TA

NK

4

205

128

LEA

CH

ING

CH

AM

BE

R

25

WA

TER

LEVEL

AIR

SPAC

E

300

10mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

4" Ø P

VC

OU

TLET

MA

NH

OLE

500

500

40002000

10001000

AS SHOWN

LTO.9.C

R.P1.N

1.L1.0LTO

.9.CR

.P1.N1.L1.1

LTO.9.C

R.P1.N

1.L1.2

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 9: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSA

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

850850

8501700

977 952 979

PW

D

765

600

1500 600

3308

RAM

P-UP

TOILET FLO

OR

PLAN

AA

B B

33048304

TOILET FLO

OR

PLAN

9379

4308

FRON

T ELEVATION

10104

1850 900

2750

2000

2734 360 1428 319

SE

E TR

USS-1

G.I. S

HEETS

FIRE

WALL

#26 CO

RR

UG

ATED

W.C

.

GU

TTER

FAS

CIA

TOILET ELEVATIO

N/SECTIO

N "B-B"

TOILET SECTIO

N "A-A"

1850651900

1850 900

2750

8891700W

.C.

LAV.

1729

260317293166

LEFT ELEVATION

RIG

HT ELEVATIO

N

5007

5007

33083308

900

6411157

600

600

2100

SCHED

ULE O

F DO

OR

S AND

WIN

DO

WS ( CLASS-A)

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 DIPOLOG CITY DISTRICT OFFICE

UPPER TURNO , DIPOLOG CITY

Regional DirectorAtty AMINOLA P. ABATON

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

AS SHOWN

LTO.9.C

R.P2.W

1.L1.1

LTO.9.C

R.P2.W

1.L1.0LTO

.9.CR

.P2.W1.L1.2

HE

SH

E

LTO.9.C

R.P2.W

1.L1.1LTO

.9.CR

.P2.W1.L1.0

LTO.9.C

R.P2.W

1.L1.2

Submitted by:

Recomm

ending Approval:

Approved by:

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Page 10: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSP

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

TO SEPTIC TAN

K

F.D.

F.D.

C.O

.

F.D.

TOILET SAN

ITARY LAYO

UT

10mm

Ø V

ER

TICA

L BARS SPAC

ED@

400mm

ON

CEN

TERS

10mm

Ø H

OR

IZON

TAL BARS

PLA

CE

D E

VE

RY

2 LAYER

S OF C

HB

11-10mm

Ø M

ATTIN

G BAR

SS

PA

CE

D E

QU

ALLY AS SH

OW

N

1024200

1024205

DIG

ES

TIVE

CH

AM

BE

R

LEA

CH

ING

CH

AM

BE

R

300

25

WA

TER

LEVELW

ATE

R LEVEL

AIR

SPAC

EA

IR S

PACE

500500

61

6" THIC

K CH

B

12mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

MA

NH

OLE

4" Ø P

VC

OU

TLET

1500

500

MA

NH

OLE

MA

NH

OLE

P1

400200

01:20

DE

TA

ILE

D P

LA

N O

F S

EP

TIC

TA

NK

5P1

400200

01:20

DE

TA

ILE

D S

EC

TIO

N O

F S

EP

TIC

TA

NK

4

205

128

LEA

CH

ING

CH

AM

BE

R

25

WA

TER

LEVEL

AIR

SPAC

E

300

10mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

4" Ø P

VC

OU

TLET

MA

NH

OLE

500

500

40002000

10001000

VENT STACK THRU ROOF

PLUMBING LEGEND:

VENT STACKVSVSTR

WM

GV

HB

FWATER METER

HOSE BIBB

FAUCET

GATE VALVE

WC

CO URFDCLEAN-OUT

WATER CLOSET

FLOOR DRAINURINAL

LAVLAVATORY

CVCHECK VALVE

FCOFLOOR CLEAN-OUT

RDROOF DRAIN

CBCATCH BASIN

DSDOW

NSPOUTG.I.P.

GALVANIZED IRON PIPE

SPECIFICATION :

LICENSED MASTER PLUMBER.8. ALL W

ORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULYDOUBLE CHECKED TO ENSURE W

ATER TIGHT PLUMBING SYSTEM.7. ALL W

ORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE

OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE W

ATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS

1/2" diameter PVC PIPES.5. MAIN W

ATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE

4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.

3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.

2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FOR

LOCATION AND PURPOSE.

PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.

1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE W

ITH THE PROVISION OF THE

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 DIPOLOG CITY DISTRICT OFFICE

UPPER TURNO , DIPOLOG CITY

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Regional DirectorAtty AMINOLA P. ABATON

AS SHOWN

LTO.9.C

R.P2.W

1.L1.1LTO

.9.CR

.P2.W1.L1.0

LTO.9.C

R.P2.W

1.L1.2

Submitted by:

Recomm

ending Approval:

Approved by :

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Page 11: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSE

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

ba

Sab

SS

S

LIGH

TING

LAYOU

T PLAN ( CLASS-B)

POW

ER LAYOU

T PLAN ( CLASS-B)

FRO

M ELEC

TRICALPO

WER

SOURCE

FRO

M ELEC

TRICALPO

WER

SOURCE

Legend & Sym

bols:

32 WATTS CIRCULAR FLUORESCENT LAMP

SSINGLE SW

ITCH

DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET

S3

TRIPLEX SWITCH

1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENT

FIXTURE, MIRRORIZED REFLECTOR AND LUOVER

CONDUIT RUN EMBEDDED ON WALLS & CEILING

1.

All electrical w

orks herein shall be done in accordance with the provisions of

the latest edition of the Philippine Electrical C

ode, existing rules and

ordinances of the Local Governm

ent, and with requirem

ents of the Local

Power C

ompany.

2.

Type of power service shall be 2

30

volts, 2-w

ire, 60 hz., single phase, line

to ground.

3.

All w

irings shall be installed in standard PVC/R

SC pipes inside a concrete

structure and inside ceiling spaces.

4.

All m

aterials to be used shall be brand new and of approved type.

5.

Minim

um size of w

ire and conduit to be used shall be 2.0

mm

. sq. and 20

mm

. dia. respectively.

6.

Wherever required and necessary, pull boxes or junction boxes of proper

sizes shall be installed at convenient and inconspicuous locations, although

such boxes are not shown on the plan nor m

entioned in the specifications.

7.

The electrical works shall be done under the direct and im

mediate supervision

of a duly licensed electrical practitioner.

General notes:

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 DIPOLOG CITY DISTRICT OFFICE

UPPER TURNO , DIPOLOG CITY

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Regional DirectorAtty AMINOLA P. ABATON

AS SHOWN

LTO.9.C

R.P2.W

1.L1.1LTO

.9.CR

.P2.W1.L1.0

LTO.9.C

R.P2.W

1.L1.2

Submitted by:

Recomm

ending Approval:

Approved by:

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Page 12: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSS

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special ConcernsTO

ILET FOU

ND

ATION

PLAN

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

WF

WF

WF

WF

WF

WFWF

WF

WF

LENGTH

LENGTH / 4LENGTH / 4

TYPICAL DETAIL O

F BEAM

10mm stirrups spaced @ 5-.05 m5-.10 m5-.15 mrest @

.20 m

12 mm horizontal bars

12161

600600

4154

5154

1000

BUILD

ING

LINE

FIREW

ALL

2"X3" C

-PURLIN

S 1.2 THICK

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

FASCIA

FASCIA

FASCIA

TOILET RO

OF FR

AMIN

G PLAN

10961

800

250

800

2504

-12m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

7-1

6m

MATTIN

G B

ARS B

OTH

WAYS

PLAN

300 800

N.G

.L.

SEC

TION

4-1

2m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

F1-C

1

TRUSS D

ETAIL DIAG

RAM

6" CON

CRETEH

OLLO

W BLO

CKS

PRE-PAIN

TED R

IB TYPE ROO

FING

2" X 4" C-PURLIN

S

2" X 6" CHAN

NEL BAR R

AFTER

ORD

INAR

Y GU

TTER

FASCIA BOARD

250

NAT. GRD. LINE

FIN. GRD. LINE

FIN. FLR. LINE

600 VERIFY 200

150

mm

THK. C

HB W

ITH 1

0m

HO

R.AND

VER

TICAL B

ARS

@ 6

00m

m O

.C.

3-1

0m

LONG

BARS

450ELE

VA

TION

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9IPIL DISTRICT OFFICE

POB. IPIL, ZAMBOANGA SIBUGAY

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Regional DirectorAtty AMINOLA P. ABATON

AS SHOWN

LTO.9.C

R.P3.W

1.L1.2LTO

.9.CR

.P3.W1.L1.1

LTO.9.C

R.P3.W

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by:

Recomm

ending Approval:

Approved by:

Page 13: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSA

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

Recomm

ending Approval:

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

850850

8501700

977 952 979

PW

D

765

600

1500 600

3308

RAM

P-UP

TOILET FLO

OR

PLAN

AA

B B

33048304

TOILET FLO

OR

PLAN

9379

4308

FRON

T ELEVATION

10104

1850 900

2750

2000

2734 360 1428 319

SE

E TR

USS-1

G.I. S

HEETS

FIRE

WALL

#26 CO

RR

UG

ATED

W.C

.

GU

TTER

FAS

CIA

TOILET ELEVATIO

N/SECTIO

N "B-B"

TOILET SECTIO

N "A-A"

1850651900

1850 900

2750

8891700W

.C.

LAV.

1729

260317293166

LEFT ELEVATION

RIG

HT ELEVATIO

N

5007

5007

33083308

900

6411157

600

600

2100

SCHED

ULE O

F DO

OR

S AND

WIN

DO

WS ( CLASS-A)

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Regional DirectorAtty AMINOLA P. ABATON

LOCATION :

LTO REGINAL OFFICE No.9IPIL DISTRICT OFFICE

POB. IPIL, ZAMBOANGA SIBUGAY

AS SHOWN

LTO.9.C

R.P3.W

1.L1.2

LTO.9.C

R.P3.W

1.L1.1

LTO.9.C

R.P3.W

1.L1.0

LTO.9.C

R.P3.W

1.L1.2LTO

.9.CR

.P3.W1.L1.1

LTO.9.C

R.P3.W

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Approved by :

Page 14: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSP

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

TO SEPTIC TAN

K

F.D.

F.D.

C.O

.

F.D.

TOILET SAN

ITARY LAYO

UT

10mm

Ø V

ER

TICA

L BARS SPAC

ED@

400mm

ON

CEN

TERS

10mm

Ø H

OR

IZON

TAL BARS

PLA

CE

D E

VE

RY

2 LAYER

S OF C

HB

11-10mm

Ø M

ATTIN

G BAR

SS

PA

CE

D E

QU

ALLY AS SH

OW

N

1024200

1024205

DIG

ES

TIVE

CH

AM

BE

R

LEA

CH

ING

CH

AM

BE

R

300

25

WA

TER

LEVELW

ATE

R LEVEL

AIR

SPAC

EA

IR S

PACE

500500

61

6" THIC

K CH

B

12mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

MA

NH

OLE

4" Ø P

VC

OU

TLET

1500

500

MA

NH

OLE

MA

NH

OLE

P1

400200

01:20

DE

TA

ILE

D P

LA

N O

F S

EP

TIC

TA

NK

5P1

400200

01:20

DE

TA

ILE

D S

EC

TIO

N O

F S

EP

TIC

TA

NK

4

205

128

LEA

CH

ING

CH

AM

BE

R

25

WA

TER

LEVEL

AIR

SPAC

E

300

10mm

Ø M

ATTING

BA

RS

SP

ACED

@400m

m O

NC

EN

TERS

3-10mm

.Ø H

OR

IZON

TALTE

MP

ER

ATU

RE BAR

S

MA

NH

OLE

4" Ø P

VC

OU

TLET

MA

NH

OLE

500

500

40002000

10001000

VENT STACK THRU ROOF

PLUMBING LEGEND:

VENT STACKVSVSTR

WM

GV

HB

FWATER METER

HOSE BIBB

FAUCET

GATE VALVE

WC

CO URFDCLEAN-OUT

WATER CLOSET

FLOOR DRAINURINAL

LAVLAVATORY

CVCHECK VALVE

FCOFLOOR CLEAN-OUT

RDROOF DRAIN

CBCATCH BASIN

DSDOW

NSPOUTG.I.P.

GALVANIZED IRON PIPE

SPECIFICATION :

LICENSED MASTER PLUMBER.8. ALL W

ORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULYDOUBLE CHECKED TO ENSURE W

ATER TIGHT PLUMBING SYSTEM.7. ALL W

ORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE

OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE W

ATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS

1/2" diameter PVC PIPES.5. MAIN W

ATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE

4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.

3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.

2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FOR

LOCATION AND PURPOSE.

PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.

1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE W

ITH THE PROVISION OF THE

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Regional DirectorAtty AMINOLA P. ABATON

LOCATION :

LTO REGINAL OFFICE No.9IPIL DISTRICT OFFICE

POB. IPIL, ZAMBOANGA SIBUGAY

AS SHOWN

LTO.9.C

R.P3.W

1.L1.2LTO

.9.CR

.P3.W1.L1.1

LTO.9.C

R.P3.W

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 15: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSE

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special Concerns

ba

Sab

SS

S

LIGH

TING

LAYOU

T PLAN ( CLASS-B)

POW

ER LAYOU

T PLAN ( CLASS-B)

FRO

M ELEC

TRICALPO

WER

SOURCE

FRO

M ELEC

TRICALPO

WER

SOURCE

Legend & Sym

bols:

32 WATTS CIRCULAR FLUORESCENT LAMP

SSINGLE SW

ITCH

DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET

S3

TRIPLEX SWITCH

1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENT

FIXTURE, MIRRORIZED REFLECTOR AND LUOVER

CONDUIT RUN EMBEDDED ON WALLS & CEILING

1.

All electrical w

orks herein shall be done in accordance with the provisions of

the latest edition of the Philippine Electrical C

ode, existing rules and

ordinances of the Local Governm

ent, and with requirem

ents of the Local

Power C

ompany.

2.

Type of power service shall be 2

30

volts, 2-w

ire, 60 hz., single phase, line

to ground.

3.

All w

irings shall be installed in standard PVC/R

SC pipes inside a concrete

structure and inside ceiling spaces.

4.

All m

aterials to be used shall be brand new and of approved type.

5.

Minim

um size of w

ire and conduit to be used shall be 2.0

mm

. sq. and 20

mm

. dia. respectively.

6.

Wherever required and necessary, pull boxes or junction boxes of proper

sizes shall be installed at convenient and inconspicuous locations, although

such boxes are not shown on the plan nor m

entioned in the specifications.

7.

The electrical works shall be done under the direct and im

mediate supervision

of a duly licensed electrical practitioner.

General notes:

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

Regional DirectorAtty AMINOLA P. ABATON

LOCATION :

LTO REGINAL OFFICE No.9IPIL DISTRICT OFFICE

POB. IPIL, ZAMBOANGA SIBUGAY

AS SHOWN

LTO.9.C

R.P3.W

1.L1.2LTO

.9.CR

.P3.W1.L1.1

LTO.9.C

R.P3.W

1.L1.0

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :

Page 16: PLAN F1-C1 - DOTr - Homedotr.gov.ph/images/Alternative_Methods_Procurement... · f1 - c1 f1 - c1 f1 - c1 f1 - c1 f1 - c1 wf wf wf wf wf wf wf wf wf length length / 4 length / 4 typical

DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS

Republic of the Philippines

Sheet Content:

Sheet No.:Sheet No.:

TSS

--

--

PSRA

F

NARTMT

OTNE

O

O

CDN

AT

RA

NOI

T

P

CI N U

AE

DS

NOI

T

MM

ATTY. EFREN C. MONCUPAUndersecretary for Project

Implem

entation and Special ConcernsTO

ILET FOU

ND

ATION

PLAN

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

F1 - C1

WF

WF

WF

WF

WF

WFWF

WF

WF

LENGTH

LENGTH / 4LENGTH / 4

TYPICAL DETAIL O

F BEAM

10mm stirrups spaced @ 5-.05 m5-.10 m5-.15 mrest @

.20 m

12 mm horizontal bars

12161

600600

4154

5154

1000

BUILD

ING

LINE

FIREW

ALL

2"X3" C

-PURLIN

S 1.2 THICK

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

FASCIA

FASCIA

FASCIA

TOILET RO

OF FR

AMIN

G PLAN

10961

800

250

800

2504

-12m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

7-1

6m

MATTIN

G B

ARS B

OTH

WAYS

PLAN

300 800

N.G

.L.

SEC

TION

4-1

2m

VER

T. BAR

S W

/ 10m

LATER

AL TIES

SPAC

ED; 3

@ 5

0m

m,

3@

100

mm

, 3@

150

mm

, REST @

200

mm

F1-C

1

TRUSS D

ETAIL DIAG

RAM

6" CON

CRETEH

OLLO

W BLO

CKS

PRE-PAIN

TED R

IB TYPE ROO

FING

2" X 4" C-PURLIN

S

2" X 6" CHAN

NEL BAR R

AFTER

ORD

INAR

Y GU

TTER

FASCIA BOARD

250

NAT. GRD. LINE

FIN. GRD. LINE

FIN. FLR. LINE

600 VERIFY 200

150

mm

THK. C

HB W

ITH 1

0m

HO

R.AND

VER

TICAL B

ARS

@ 6

00m

m O

.C.

3-1

0m

LONG

BARS

450ELE

VA

TION

Regional DirectorAtty AMINOLA P. ABATON

Prepared by :

Regional Infrastructure Coordinator

EDMUND B. BILANG

CONSTRUCTION OF TOILETFACILITIES

PROJECT NAME :

LOCATION :

LTO REGINAL OFFICE No.9 BALANGASAN DISTRICT

PAGADIAN CITY

LTO.9.C

R.P4.N

1.L1.2LTO

.9.CR

.P4.N1.L1.1

LTO.9.C

R.P4.N

1.L1.0

AS SHOWN

OIC, Assistant Secretary for Project Managem

ent

GUILLERMO L. LEONARDO

Submitted by :

Recomm

ending Approval:

Approved by :