Upload
ramya
View
24
Download
2
Tags:
Embed Size (px)
DESCRIPTION
PHILIPPINE COFFEE CONFERENCE “ GOLD in COFFEE : A Brewing Success” November 5 – 6, 2013 Hotel Supreme, Magsaysay Avenue, Baguio City. Philippine Coffee Conference November 5 – 6, 2013, Hotel Supreme, Magsaysay Avenue, Baguio City. NO. OF INVITEES. Philippine Coffee Conference - PowerPoint PPT Presentation
Citation preview
PHILIPPINE COFFEE CONFERENCE
“GOLD in COFFEE: A Brewing Success”
November 5 – 6, 2013Hotel Supreme, Magsaysay Avenue,
Baguio City
Philippine Coffee ConferenceNovember 5 – 6, 2013, Hotel Supreme, Magsaysay Avenue, Baguio City
NO. OF INVITEES
Province/ Region
Confirmation
TotalDTI LGU/ Govt
Private Sector
Abra 17 38 55
Apayao 18 6 24
Bgo-Bgt 17 63 80
Ifugao 11 22 33
Kalinga 10 23 33
MP 11 20 31
CAR RLAs 35 35
DTI HO 15 15
Region 1 2 4 6
Region 2 3 6 9
Region 3 3 6 9
Region 4 3 10 13
Province/ Region
Confirmation
TotalDTI LGU/ Govt
Private Sector
Region 4B
2 3 5
Region 5 2 5 7
Region 6 3 4 7
Region 7 2 2 4
Region 8 2 2 4
Region 9 2 2 4
Region 10
3 6 9
Region 11
3 4 7
Region 12
3 5 8
CARAGA 3 3 6
ARMM 2 2 4
NCR 3 4 7
TOTAL 56 119 240 415
Philippine Coffee ConferenceNovember 5 – 6, 2013, Hotel Supreme, Magsaysay Avenue, Baguio City
NO. OF PAX – 10-17-13 (12 nn)
Province/ Region
Confirmation
TotalDTI LGU/ Govt
Private Sector
Abra 8 12 20
Apayao
Bgo-Bgt 2 2
Ifugao
Kalinga
MP
CAR RLAs 2 2 4
DTI HO 3 3
Region 1
Region 2 2 2 4
Region 3
Region 4 2 3 5
Province/ Region
Confirmation
TotalDTI LGU/ Govt
Private Sector
Region 4B
Region 5 1 1
Region 6
Region 7
Region 8
Region 9
Region 10
4 1 5
Region 11
Region 12
CARAGA
ARMM 1 1
NCR 6 6
TOTAL 17 12 22 51
Programme of Activities
COMMITTEESCommittee Functions
RO Pointperson
Request from POs
A. Steering Com./ General Directions
Provide over-all directions
RD, ARD, PDs All PDs are members of this committee
B. Over-all Program Manager
Approvals RD
C. Over-all Committee Supervision
Over-seer of committee functions and status of implementations
ARD CCU, DC Remy
1. Secretariat and Registration
Invitations, confirmations, registration
Dorie All POs to assign one staff for Ushering
2. Publicity and Promotions
advocacy Art Art to provide media press release template to Pos for publication in the provincial level
3. Program Proper
Smooth flow of program, time management
Bing PD Val to assist in the smooth flow of the program (time mgmt)
4. Physical Arrangement
lay-out/arrangement of venue
Fely DTI-Benguet to assign one staff to assist in this committee
COMMITTEES (cont.)Committee Functions
RO Pointperson
Request from POs
5. Technical Requirements & Equipment
Ensure availability of facilities/equipments
Jodees
6. Side Eventsa. Coffee Value Chain
Exhibitb. Coffee Investment
Forum cum Techno Demo
c. Project Site Visitsd. City Tour
Coffee exhibit (seed to cup)
Lectures (Investing in Coffee business, actual demo)Visit at BSU Visit at tourist sites
DC Remy DTI-Benguet to assign staff to assist in the project site and city tour. DTI Bgt to coordinate with BSU re: Project site visit
7. Finance, Ways and Means
Coordinate sources of funds, disbursements and liquidations
DC Florence
8. Documentation Photo, video and written Carol OIC Juliet and Ms. Wena to assist in this committee
COMMITTEES (cont.)Committee Functions
RO Pointperson
Remarks
9. Transportation Arrangements
Arrange transportation of Resource speakers and other guests, vehicles for plant site visits
Karen All provincial vehicles to be utilized during the event proper (ferry provincial delegates)
10. Draft Speech Committee
Preparation of speeches/ presentation materials of Resource Speakers
ARD CCU, PD Grace, DC Remy, Atty. Marvie
PD Grace to assist in the preparation of speeches/presentation materials of DTI Speakers (Sec, Usec and RD)
11. Committee on Fellowship Night
Preparations for the Fellowship night
ARD CCU, Bing All POs to ensure attendance of participants
12. Masters of Ceremony
Emcees – ensure smooth flow of program and time management
PD Grace, Atty. Sam
PD Grace as one of the Master of Ceremonies
Thank you!