Title: Module Name User Manual FI10.02 Period End – Plan Cost Allocation Controlling Module Controlling – Period End Plan cost Allocation Plan Cost can be allocated from one cost centre to another cost centre via a cost element through Distribution and assessment. Basically through this process cost is allocated based on pre-defined rules at the backend. In this case no financial transaction will get generated as only plan cost is transferred inter and intra circle. Document will get posted only in the controlling module. Overview: Business Process Procedure Overview For BSNL actual cost collected in cost centres within circle and business area will be allocated within business area either if required through actual period end allocation processing or through manual allocation process. At the month end these actual cost will be copied to planning version 1. Based on the plan cost copied from actual allocation, assessment cycle for plan cost will be run. This will post the plan cost to different cost centre at circle level from where same will be allocated to COPA segment. Flow of cost will be as under: Copy Actual Cost to Plan Version Cost. From Cost centre at SSAs to Cost centre at Circle. From Cost centre at Non-territorial circle to Cost Centre at Circles. From Cost centre at Corporate Office to Cost centre at Circles. From Cost Centre at Territorial Circle to COPA segments. Input - Required Fields Field Value / Comments Period Allocation Cycle Output – Results Comments Allocation Document Posted Tips and Tricks Last changed on: Last changed by: Version: 1.0 Page: 10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 1 of 16

Period End – Plan Cost Allocation

Embed Size (px)

DESCRIPTION

Period End – Plan Cost Allocation

Citation preview

Page 1: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Controlling – Period End Plan cost Allocation

Plan Cost can be allocated from one cost centre to another cost centre via a cost element through Distribution and assessment. Basically through this process cost is allocated based on pre-defined rules at the backend. In this case no financial transaction will get generated as only plan cost is transferred inter and intra circle. Document will get posted only in the controlling module.

Overview:

Business Process Procedure OverviewFor BSNL actual cost collected in cost centres within circle and business area will be allocated within business area either if required through actual period end allocation processing or through manual allocation process. At the month end these actual cost will be copied to planning version 1. Based on the plan cost copied from actual allocation, assessment cycle for plan cost will be run. This will post the plan cost to different cost centre at circle level from where same will be allocated to COPA segment.

Flow of cost will be as under: Copy Actual Cost to Plan Version Cost. From Cost centre at SSAs to Cost centre at Circle. From Cost centre at Non-territorial circle to Cost Centre at Circles. From Cost centre at Corporate Office to Cost centre at Circles. From Cost Centre at Territorial Circle to COPA segments.

Input - Required Fields Field Value / CommentsPeriodAllocation Cycle

Output – Results CommentsAllocation Document Posted

Tips and Tricks

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 1 of 12

Page 2: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Procedural Steps

FI10.02.01 - Access to copy actual cost to plan by:

Via Menus Accounting Controlling Cost Centre Accounting PlanningPlanning AidsCopy Actual to Plan

Via Transaction Code KP98

From the SAP R/3 Easy Access Screen, access as shown below

On screen “Copy Actual to Plan: Initial Screen”, enter information in the fields as specified in the table below:

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 2 of 12

Page 3: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Field Name Description R/O/C User Action and Values CommentsCost Centre Group Cost Centre Group Code RTemplate (Actual) Period

Enter Period R

Fiscal Year Fiscal Year RTarget (Plan) Version

Plan Version R For BSNL we will use Plan Version 1

Plan Period Enter Period RFiscal Year Fiscal Year RActual Data All Actual Data OActual Data Structure with values OExisting Plan Data Reset and overwrite OTest Run Tick for the first time ODetail List Detail information O

Execute

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 3 of 12

Page 4: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 4 of 12

Page 5: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Procedural Steps

FI10.02.02 - Access to create plan distribution of cost by:

Via Menus Accounting Controlling Cost Centre Accounting Planning Allocations Distribution

Via Transaction Code KSVB

From the SAP R/3 Easy Access Screen, access as shown below

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 5 of 12

Page 6: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

On screen “Execute Plan Distribution: Initial Screen”, enter information in the fields as specified in the table below:

Field Name Description R/O/C User Action and Values CommentsPeriod Distribution Period (month) RCycle Distribution Cycle Name R These cycle will

be pre-configured to be available to the user

Start Date Cycle creation date RTest Run Tick for first time only O Tick test run for

first time executing the transaction, if output is desired one un-tick the same and execute

Detail List Detail information on allocation done

O

EXECUTE

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 6 of 12

Page 7: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

On screen “Display CCA: Plan Distribution Basic List”, enter information in the fields as specified in the table below:

Tips & Tricks

Distribution cycle allocates cost from source object to receiver using source cost element, i.e. cost element itself from sender gets allocated to receiving cost objects. For BSNL we will not use Distribution cycle.

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 7 of 12

Page 8: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Procedural Steps

FI10.02.03 - Access to create plan assessment of cost by:

Via Menus Accounting Controlling Cost Centre Accounting Planning Allocations Assessment

Via Transaction Code KSUB

From the SAP R/3 Easy Access Screen, access as shown below

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 8 of 12

Page 9: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

On screen “Execute Plan Assessment: Initial Screen”, enter information in the fields as specified in the table below:

Field Name Description R/O/C User Action and Values CommentsPeriod Assessment Period (month) RCycle Assessment Cycle Name R These cycle will

be pre-configured to be available to the user

Start Date Cycle creation date RTest Run Tick for first time only O Tick test run for

first time executing the transaction, if output is desired one un-tick the same and execute

Detail List Detail information on allocation done

O

EXECUTE

On screen “Display CCA: Plan Assessment Basic List”, enter information in the fields as specified in the table below:

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 9 of 12

Page 10: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 10 of 12

Page 11: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Procedural Steps

FI10.02.04 - Access to create Assessment of plan cost to COPA by:

Via Menus Accounting Controlling Profitability Analysis Transfer Cost Centre Planning/ Process Planning Assessment

Via Transaction Code KEUB

From the SAP R/3 Easy Access Screen, access as shown below

On screen “Execute Plan Assessment: Initial Screen”, enter information in the fields as specified in the table below:

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 11 of 12

Page 12: Period End – Plan Cost Allocation

Title:Module Name

User Manual FI10.02

Period End – Plan Cost AllocationControlling Module

Field Name Description R/O/C User Action and Values CommentsPeriod Assessment Period (month) RCycle Assessment Cycle Name R These cycle will

be pre-configured to be available to the user

Start Date Cycle creation date RTest Run Tick for first time only O Tick test run for

first time executing the transaction, if output is desired one un-tick the same and execute

Detail List Detail information on allocation done

O

Tips & Tricks

Assessment cycle used for allocation of plan cost from cost centre to COPA characteristic is similar to the assessment cycle discussed above used for cost centre to cost centre allocation. Only receiver object has changed from cost centre to COPA characteristics.

Last changed on: Last changed by: Version: 1.0 Page:10-Jun-10 Ravi Shankar Gupta Release: ECC 6.0 12 of 12