Project Management

PERFORMANCE MAYO 2011 – MAYO 2013

SACHA FIELD

Page 2: Performance Review  - Copy.pptx

FOR INTERNAL USE ONLY

HSE/SQ Performance Review – PM Rio Napo

MAYO 2013

2

Page 3: Performance Review  - Copy.pptx

OK , THERE IS A SMALL CHANGE….RED BAG HAS THE SANDWICHES AND THE GREEN BAG IS YOUR PARACHUTE

Page 4: Performance Review  - Copy.pptx

Programa “Stop Work Authority”

Dar a todos los empleados la autoridad y responsabilidad para intervenir o detener una tarea sin miedo de represalias si ellos observan actos o condiciones insegura en el Sitio de Trabajo, o tienen una preocupación referente a un riesgo de HSE.

Suplir cualquier otro programa de SWA provisto a Halliburton bajo un contrato o acuerdo de operación en el sitio de trabajo.

Cuando múltiples acuerdos o estándares proveen SWA, los empleados de Halliburton y contratistas deberán utilizar el estándar mas seguro aplicable.

Page 5: Performance Review  - Copy.pptx

RVIR

LTIR

TRIR

PM Ecuador - HSE Incident RatesOctober Recordable Incidents *

00 - Fatal Incident 00 - LTI 00 - Restricted Work Cases 00 - Medical Cases 00 - RVI 00 - Recordable Environmental Incident* Details on the next slides

By PSL Mth YTD By Facilities Mth YTD

BAR 00 00 Argentina 00 00

B & C 00 00 Bolivia 00 00

CMT 00 00 Brazil 00 00

C&PM 00 03 Colombia 00 00

HCT 00 00 Ecuador 00 03

HDBS 00 00 Mexico 00 00

Landmark 00 00 Peru 00 00

PE 00 00 Suriname 00 00

SDS 00 00 Trinidad 00 00

T&SS 00 00 Venezuela 00 00

WP 00 00

Contract 00 00

Rate Incident Number

2011 Mth YTD

Miles Driven - - -

Hours Worked 531.062 31,452 307,856

Total STOP/ECO Alerts 0 0 0

2010 Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 Apr 12 May 12 Jun 12 Jul 12 Aug 12 Sept 12 Oct 120.0

0.5

1.0

1.5

2.0

2.5

3.0

0 0 0 0 0 0 1 0 0 0 0 0 0 00.00 0.00 0.00 0.00 0.00 0.00

2.15

1.621.29

1.08 0.93 0.81 0.72 0.65

2010 Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 Apr 12 May 12 Jun 12 Jul 12 Aug 12 Sep 12 Oct 120.0

0.2

0.4

0.6

0.8

1.0

0 0 0 0 0 0 0 0 0 0 0 0 0 00.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2010 Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 Apr 12 May 12 Jun 12 Jul 12 Aug 12 Sept 12 Oct 120.0

1.0

2.0

3.0

4.0

5.0

0 0 0 0 0 0 2 0 0 0 0 0 0 00.00 0.00 0.00 0.00 0.00 0.00

4.31

3.232.59

2.161.86 1.63 1.45 1.30

0.45

0.12

0.23

Page 6: Performance Review  - Copy.pptx

PM Ecuador - HSE Summary

LTI

RWC

RHS 582169EcuadorMar

Subcontractor. During cementing of well Sacha 300V, two employees from a subcontractor were in the mud tanks area moving hoses. They support on the hand rail that fails, falling the two employees from a height of approximately 2.5m to the ground. They were moved to a medical center for evaluation and no fractures were founded. They were diagnosed with lumbar trauma and prescribe resting.

RHS 582300 EcuadorMar

Subcontractor employee was painting a BOP he slipped and fell trapping his finger between the floor and the stair he was using causing a 3cm injury on his third finger that required stitches for treatment.

Page 7: Performance Review  - Copy.pptx

FOR INTERNAL USE ONLY

STOP ECO PARTICIPATION

Page 8: Performance Review  - Copy.pptx

FOR INTERNAL USE ONLY

STOP ECO – TENDENCY BY BEHAVIOR

Page 9: Performance Review  - Copy.pptx

FOR INTERNAL USE ONLY

DESEMPEÑO HSE