55
PENDAWAIAN RANGKAIAN Bab 2 SKS 3124

PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Embed Size (px)

Citation preview

Page 1: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

PENDAWAIAN RANGKAIAN

Bab 2 SKS 3124

Page 2: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Merancang Struktur Pendawaian Rangkaian

• Mengenal pasti elemen-elemen dalam piawaian struktur

pendawaian

a. Horizontal cabling

b. Backbone cabling

c. Work area

d. Equipment room

e. Telecommunication closet

f. Entrance facility

g. Administration

Page 3: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

• Mengenal pasti panjang maksimum kabel bagi:

a. Horizontal cabling

b. Backbone cabling

c. Patch cable

d. Station cable

• Mengenal pasti kepentingan pembumian dalam pemasangan kabel rangkaian

Page 4: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Praktikal

• Merekabentuk struktur pendawaian

• Membuat piping dan trunking rangkaian

• Melaksanakan langkah-langkah penarikan kabel:

a.Cable pulls

b.Limit bends in cable run

c.Support running cable

d.Test the connection

Page 5: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

# Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian # Mengenalpasti panjang maksimum kabel

Page 6: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

PENDAWAIAN RANGKAIAN

• Sebelum tahun 1990an, pendawaian rangkaian:

i. Spesifikasi dari vendor dan hak mutlak vendor.

ii. Tidak fleksibel :guna sistem baru perlu menaiktaraf pendawaian rangkaian

iii. Tahun 1991 TIA/EIA buat piawaian (standard) yang dikenali sebagai TIA/EIA 568: Commercial Building Telecommunication Cabling Standard.

Page 7: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

• Agensi – agensi yang terlibat dengan piawaian ialah: • TIA (Telecommunications Industry Association) • EIA (Electronics Industries Alliance) • ANSI (American National Standard Institute) • IEEE (Institute of Electrical and Electronics Engineers, Inc.) • ISO (International Organization for Standardization)

Page 8: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 9: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

• Dalam pendawaian rangkaian, terdapat enam subseksyen utama iaitu:

• Horizontal Cabling

• Backbone Cabling

• Telecommunications Room (TR)

• Work Area (WA)

• Equipment Room (ER)

• Entrance Facility (EF)

Page 10: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

HORIZONTAL CABLING

• Dipanggil horizontal cabling kerana kabel dipasang secara horizontal di atas siling atau di bawah lantai dari telecommunication room pada floor yang sama.

• Merangkumi segala perkara dari TR cross-connects hingga telecommunications outlets di WA iaitu:

i. Kabel dari patch panel ke work area

ii. Telecommunication outlets

iii. Cable terminations

iv. Cross-connections

v. Transition point

vi. Cross-connections in telecommunications room or enclosures

vii. (mudah cerita: segala galanya yang berada di antara telecommunication room cross-connects ke outlets di work area)

Page 11: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Horizontal cable

Page 12: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 13: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

JARAK HORIZONTAL CABLING

• Jarak maximum bagi horizontal cabling.

i. Horizontal run: dari telecommunications outlet ke horizontal cross-connect ialah 90 meters (295.3 ft.) .

ii. Work-area patch cable: 5 meters (16.4 ft.)

iii. Jumlah keseluruhan panjang kabel dari work area dan cross-connect patch cable,equipment cables, jumpers, etc: 10 meters (32.8 ft.).

Page 14: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

• Main cross-connect (MC): Transition point between the entrance cables and backbone cabling.

• Intermediate cross-connect (IC): Transition point between the backbone cable of the MC and HC.

• Horizontal cross-connect (HC): Transition point between backbone cabling and horizontal cabling, typically serving a single floor or portion of a floor.

Page 15: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 16: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

KABEL DAN PENYAMBUNG

• Boleh menggunakan secara individu atau gabungan kabel:

i. 4-pair, 100-ohm UTP or ScTP cable (24 AWG, solid conductors) (EIA/TIA-568-B.2).

ii. 2-fiber (or more) 50- and 62.5-micron fiber optic cable (EIA/TIA-568-B.3).

iii. 150-ohm shielded twisted-pair cable (not recommended)

• Kalau copper cable, guna yang solid cable

• Penyambung yang selalu digunakan:

i. RJ45

ii. SC and ST fiber connectors.

iii. Small form-factor fiber connectors

Page 17: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 18: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

BACKBONE CABLING

• Backbone Cabling merangkumi kesemua kabel di antara, telecommunication rooms, equipment rooms, entrance facilities dan antara bangunan.

• Juga dikenali vertical cabling.

Page 19: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Backbone

Page 20: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 21: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 22: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

JARAK BACKBONE CABLING

• Bergantung kepada jenis kabel yang digunakan.

• Kebiasaannya dua jenis kabel yang digunakan iaitu:

i. Fiber optic

ii. Cooper cable

iii. Kabel fiber optic adalah lebih baik namun kos tinggi

iv. Organisasi yang kecil lebih suka menggunakan cooper cable (CAT 5e >) untuk menjimatkan kos

Page 23: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 24: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

WORK AREA (WR)

• Work area merangkumi segala komponen antara telecommunication outlet dan desktop pengguna. Ini termasuk:

i. Telecommunications outlets, (termasuk wallplates, faceplates, surface-mount boxes dll.)

ii. Patch cables.

iii. Adapters, termasuk penyambung dan modular jacks.

iv. Workstation equipment, seperti PCs, telephones, printers, etc.

Page 25: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Work Area

Page 26: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 27: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

TELECOMMUNICATION ROOMS (TR)

• Lokasi segala peralatan / kabel yang menyambungkan horizontal wiring ke backbone wiring.

• Sesebuah bangunan perlu mempunyai sekurang-kurangnya 1 TR.

• Sebaik-baiknya setiap tingkat mempunyai TR sendiri.

• Juga dikenali telecommunication closet

Page 28: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Telecommunications Room

Page 29: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 30: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 31: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Telecommunication Room Equipments :

Equipment racks

Patch Panel Hubs/Switches, Servers

Uninterruptible Power Supplies (UPSs)

Page 32: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

EQUIPMENT ROOM (ER)

• Bilik yang menempatkan segala perkakasan rangkaian

• PBXs, servers, routers, main switch dan mechanical terminations.

• Berbeza dengan telecommunication room kerana equipment room lebih kompleks.

• Selalunya entrance facility berada di equipment room.

• Minimum recommended size = 14 m 2 (150.7 ft.2).

• The general rule is to allow 0.07 m2 (0.75 ft.2) for every 10 m2 (107.6 ft.2) of usable floor space.

• Pintu equipment room perlu direka besar untuk memasukkan perkakasan rangkaian yang besar

• Minimum pintu = 910 mm (35.8 in.) wide and 2000 mm (78.7 in.) high.

Page 33: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Equipment Room

Page 34: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

• Perlu ada power backup

• Sesuai menggunakan double door

• Minimum ketinggian siling = 2.4 meters (7.8 ft.)

• Pencahayaan sekurang2nya 500 lux (500 foot candles).

• Beban lantai minimum 4.8 kPa (100 lbf/ft2).

• Elak bina equipment room bawah paras air.

• Equipment room perlu 24/7/356 HVAC. Suhu bilik perlu dijaga

• Peralatan keselamatan perlu diambil kira

• Debu/habuk: udara 100 micrograms/cubic meter of dust per day

Page 35: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 36: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 37: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

ENTRANCE FACILITY

• Entrance facility = titik sambungan outdoor cable dengan backbone cable bangunan/ rangkaian dalaman

• Entrance facility mengikut piawaian TIA/EIA-568- B dan TIA/EIA-569-B. Ini termasuk:

• Cables.

• Connecting hardware.

• Protection devices.

• Lokasi berhampiran dengan backbone cabling

• Demarcation point mungkin merupakan salah satu komponen dalam entrance facility.

Page 38: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

Entrance Facility

Page 39: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 40: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

ADMINISTRATION

• Rujuk ms 30 dan 31

Page 41: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

RUMUSAN

Page 42: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

RUMUSAN

Page 43: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

TEKA- TEKI

Cari panjang maksimum untuk patch cable dan station kabel?

Page 44: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

MENGENAL PASTI KEPENTINGAN PEMBUMIAN DALAM PEMASANGAN KABEL RANGKAIAN

Page 45: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

PEMBUMIAN / GROUNDING

• Pembumian ialah suatu sistem sambungan yang dibuat di antara logam dalam pemasangan pendawaian elektrik dengan jisim am bumi.

• Apabila berlaku arus voltan yang bocor, arus tersebut akan dialirkan ke bumi.

• Kepentingan pembumian dalam sesuatu pendawaian rangkaian/elektrik: • Memberi keselamatan kepada pengguna daripada bahaya renjatan

elektrik dan kebakaran apabila arus bocor ke bumi mengalir ke bahagian-bahagian logam yang boleh membawa arus.

• Mengelakkan berlakunya kerosakan pada peralatan-peralatan.

• Kepentingan pembumian pada kabel rangkaian (kuprum kabel): • Membawa hingar (carries noise) yang disebabkan oleh electromagnetic

interference (EMI) pada persekitaran dibumikan melalui penebat (foil shield)

Page 46: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

• Perkara yang perlu dibumikan ialah: • Semua struktur logam dalam sistem pendawaian yang

bukan membawa arus. • Semua struktur logam yang terdedah bagi semua peralatan

yang berkaitan dengan elektrik.

Page 47: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

PENGALIR IKATAN / BONDING

• Adalah kaedah pembumian kepada struktur pendawaian rangkaian

• Perkakasan seperti ini selalu terdapat dalam TR dan Equipment room seperti patch panel, rak patch panel dan lain-lain.

• Antara bonding yang digunakan ialah:

a) Telecommunications Main Grounding Busbar (TMGB)

• digunakan di antara pendawaian bangunan dengan infrastruktur telekomunikasi.

• Hanya satu per bangunan. Berada di Entrance facility room.

b) Telecommunications Grounding Busbar (TGB)

• Pengalir ikatan untuk pembumian

• Dipasang pada panel board di TR.

c) Telecommunications Bonding Backbone(TBB)

• TMGB dan TGB disambung kepada TBB untuk mengurangkan/ menyamakan sistem pembumian dalam sistem telekomunikasi.

Page 48: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

BAGAIMANA IA BERFUNGSI

• Kabel rangkaian akan di alirkan (bonded) melalui laluan konduktor kepada (TGB) dalam TR.

• Kabel dimatikan pada patch panel grounding strip (outlet) di TR semasa pemasangan patch panel di TR.

• Panel akan dibumikan pada equipment rack / metal pathway melalui 6 AWG wire yang akan disambungkan pada panel ground lug.

• Wire 6 AWG akan diambungkan melalui rak di TGB.

Page 49: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

1. Bonding conductor for telecommunications: A conductor that interconnects the telecommunications bonding infrastructure to the building's service equipment (power) ground.

2. Telecommunications bonding backbone (TBB): A conductor that interconnects the telecommunications main grounding busbar (TMGB) to the telecommunications grounding busbar (TGB).

3. Telecommunications grounding busbar (TGB): The interface to the building telecommunications grounding system generally located in telecommunications room. A common point of connection for telecommunications system and equipment bonding to ground, and located in the telecommunications room or equipment room.

4. Telecommunications main grounding busbar (TMGB): A busbar placed in a convenient and accessible location and bonded by means of the bonding conductor for telecommunications to the building service equipment (power) ground.

Page 50: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

PIAWAIAN PEMBUMIAN

• National Electric Code (NEC)

• Underwriters laboratories UL-497: Protectors for paired Conductors Communitication Circuits

• IEEE Standard 12-1991: Grounding of Industrial and Commercial Power System

•ANSI/EIA/TIA-607: Commercial Building Grounding and Bonding Requirements for Telecommunications

Page 51: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 52: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a

1. Grounding Busbar - Provides a central ground attachment point for equipment located in the data center or equipment room.

2. Compression Lugs and Taps - Connect copper or tinned copper conductors to busbars, CPI Racks, Cabinets, Cable Runway or other conductors.

3. Two-Mounting Hole Ground Terminal Block - Provides a convenient way to attach ground wires to racks or cabinets.

4. Ground Wire and Jumpers - Insulated conductor connects equipment, racks, cabinets, pedestals and pipes to the rack and Grounding Busbars.

5. Rack Busbars - Consolidate equipment grounds on racks and cabinets.

6. Pedestal Clamp with Grounding Connector - Connect raised access floor pedestals to the Grounding Busbar or support bare ground wires to make a signal reference and grid.

7. Pipe Clamp with Grounding Connector - Attach ground wires to metal pipes.

8. Cable Runway Ground Strap Kit - Bond CPI Cable Runway across splices.

Page 53: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 54: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a
Page 55: PENDAWAIAN RANGKAIANcikgupc.weebly.com/uploads/2/6/6/9/26698954/bab2...Merancang Struktur Pendawaian Rangkaian • Mengenal pasti elemen-elemen dalam piawaian struktur pendawaian a