Sp 13 P&C ht 1m Brick Paving Brick Paving T a r m a c T a r m a c T/P ng Brick Paving A B C D H I J 1 2 3 4 5 X 6 7 8 9 10 14 15 11 P R O Y 13 Z 5548 5511 5511 4140 3684 8767 1254 4658 5998 1701 10601 V W 5959 M E F G K L 5598 N S 10040 1244 10607 12 17 T 3113 U 1400 10480 5716 7622 9329 C-C 252 E-E 253 F-F 253 B-B 251 A-A 2 51 G 254 D-D 252 D-D 252 16 01 401 02 401 03 401 01 402 02 402 03 402 01 403 02 403 03 40 3 01 4 04 02 404 01 405 02 405 03 405 SVP SVP GF SVP LOCATION TBC SVP SVP SVP SVP SVP SVP SVP SVP SVP GF SVP LOCATION TBC SVP SVP SVP SVP SVP SVP SVP SVP SVP RWP SVP SVP G RWP RWP G G G G G EXT. RWP EXT. RWP EXT. RWP G SVP SVP SVP SVP SVP SVP SVP EXT. RWP EXT. RWP EXT. RWP SVP SVP RWP RWP RWP FA LL FALL FALL F A LL UNIT 4A BELLA ITALIA 338.5sqm 3644sqf UNIT 4B TENANT TBC 368.2sqm 3963sqf 11 24 12 5 11 7 4 19 13 2 3 12 26 1 14 ELECTRICAL SUBSTATION CINEMA GAS 4 6 5 7 8 10 9 1 1 1 3 2 5 6 7 9 8 10 12x165x250 1 3 2 4 7 8 6 10 VUE CINEMA ENTRANCE 13 15 14 17 16 5 2 1 3 9 4 7 6 8 11 10 13 16 14 15 17 20 28.728 18 21 22 25 23 12 10 11 8 9 6 5 2 3 1 BICYCLE STORE BLOCK 3 12 CINEMA ELEC. FE STAIR 2 CWS TANK FE STAIR 5 WATER BOOSTER SET UNIT 4B FLUE FE STAIR 4 UNIT 4D REFUSE FE STAIR 1 CINEMA REFUSE LIFT 2 (2150w 1850d) FE STAIR 3 CO2 STORAGE UNIT 4C REFUSE HGV HARD STANDING FOR CO2 FILL POINT 28.896 27.216 29.233 12x165x250 UNIT 4D FLUE (ABOVE DOOR) UNIT 4A REFUSE ENTRANCE COURTYARD UNIT 4C HARVESTER 417.7sqm 4497sqf UNIT 4D GBK GOURMET BURGER KITCHEN 308.1sqm 3316sqf 450x450 GAS VENT RISER 1700x1200x100 PLINTH 330x330 HOLE H.L. FOR WALL MOUNTED EXTRACT FAN 250x250HL BCWC TA 3000x2000x2000 COLD WATER TANK DRAW PIT 3X INCOMING DUCTS 250x250 E/D POWER & CONTROLS TO ESCALATORS PITS 9 18 DUCT AND DRAW WIRE FOR POWER UNIT 4A SEATING AREA UP DOWN CO2 FILL POINT CO2 FP 26.470 26.860 26.880 26.880 26.880 RAISED PAVEMENT AREA AUTOMATIC DOOR LIFT 1 (2150w 1850d) UNIT 4B REFUSE 10 BICYCLE SPACES DUCT AND DRAW WIRE FOR POWER DUCT AND DRAW WIRE FOR POWER A G A 26.880 26.880 W 26.880 26.880 26.550 26.880 26.860 SSL 27.925 19 SSL 26.995 13 14 15 4 SSL 26.505 26.580 26.880 26.880 26.45 26.630 26.420 26.390 26.540 26.880 26.410 27.384 26.820 SSL 26.880 SSL 26.880 29.233 26.880 SSL 26.860 26.880 3350 26.880 26.790 1 : 2 1 FALL SSL 26.430 FFL 26.505 SSL 26.860 SSL 26.860 SSL 26.860 SSL 26.860 26.860 26.880 26.880 26.880 26.880 26.880 SSL 26.505 FALL 26.820 G W G BT 2280 W BT D W BT W G BT D 550 E 1000 150 BT 26.880 G D 26.880 4641 26.505 26.840 26.800 26.470 VUE POSTER CASE 1200Wx870H TO CURTAIN WALLING SUBCONTRACTOR DESIGN 26.880 26.800 26.457 FFL 26.430 E ROUTE OF 200Ømm REFUSE STORE EXTRACT DUCT H.L. 2500 1970 2400 6700 4654 2200 1000 1000 600 E E FULLY LOUVRED DOOR TO LOBBY AREA FULLY LOUVRED DOOR TO LOBBY CO2 ROOM 525 FIRE RATED FLY AND VERMIN PROOF PASSIVE VENTILATION LOUVRES (MIN. AREA: 0.2sq.m./per refuse) FOR UNIT 4C AND FOR UNIT 4D AND CINEMA REFUSE UNIT 4A PLANT MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ Ø150mm HOLE IN THE WALL FOR CO2 PIPEWORK UNI T 4C EXTERNAL SEATING AREA UNI T 4A EXTERNAL SEATI NG AREA MJ MJ MJ MJ MJ CW00.13 MJ CW0 0.15 MJ MJ MJ MJ MJ MJ CW00. 04 MJ MJ CW00.01 UNIT 4D SEATING AREA MJ FS00.04 CW00.14 UNIT 4B SEATING AREA CW00.09 ED00.04 CW00.10 ED00.07 CW00.03 CW00.07 CW00.05 CW00.08 FS00.02 CW0 0.0 2 FS00.03 ED00. 01 ED00.02 ED0 0.05 ED00.08 ED00.06 ED00.09 E D00 .10 ED00.13 ED00.11 E D00 .15 ED0 0.16 ED00.19 26.49 D 00.02 CW00 .12 CW00.11 ED00.12 ED00.18 ED00.14 D00. 01 ED00.17 D00.03 D00 . 0 4 EL00.01 EL00. 02 EL00.03 UNIT 4A FLUE CW00.06 26.905 ED00.03 6060 ELEC CBD ED00.20 26.880 4594 475 25.880 25.880 1028 140 3486 2502 140 1350 675 ED00.21 MJ MJ MJ MJ FFL 26.880 26.600 26.44 26.38 26.530 1:13 RAMP LOUVERED PANEL L OUV ERED PANEL LOUVERED PANEL 26.840 A A A A A A Gas Electric Water BT 1 2 3 5 4 6 Waiter Station Parasol base HGV HARD STANDING FOR CO2 FILL POINT RELOCATED SUBSTATION ELEV 01 205 GF - ELEV 02 205 GF - ELEV 03 205 ELEV 01 205 ELEV 04 206 GF - ELEV 05 206 ELEV 06 206 ELEV 07 206 GF - ELEV 08 207 GF - ELEV 09 207 GF - ELEV 10 207 ELEV 14 208 ELEV 15 208 ELEV 17 209 ELEV 16 208 GF - ELEV 18 209 GF - ELEV 19 209 GF - ELEV 20 209 WEST ELEV - 04 200 GF - ELEV 05 206 NORTH ELEV - 01 202 EAST ELEV - 03 201 SOUTH ELEV - 02 203 ARCADE EAST ELEV - 05 204 ARCADE WEST ELEV - 06 204 1 421 3 423 8 428 9 429 10 430 431 11 12 432 13 433 14 434 1-3 302 1-6 301 1-4 352 1-5 304 1-3 303 02 422 4 423 5 425 6 426 7 427 15 435 1-3 451 1-5 350 1-4 351 AFL GIA · UNIT 4A 325 m² / 3500 ft² · UNIT 4B N/A · UNIT 4C 418m² / 4500 ft² · UNIT 4D N/A CURRENT GIA · UNIT 4A 338.5 m² / 3644 ft² · UNIT 4B 368.2m² / 3963 ft² · UNIT 4C 417.7m² / 4497 ft² · UNIT 4D 308.1m² / 3316 ft² GND FLOOR AREA SCHEDULE: BRN-MPI-A31-BK4-GA-GND-(1253)0100 PROJECT ORIGINATOR/ ISSUER DISCIPLINE/ TRADE BUILDING/ AREA TYPE LEVELS & LOCATIONS SEQUENCE NUMBER REVISION FILENAME General Notes This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and errors and omissions to be reported to the architects. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relavent British Standard specifications and codes of practice. If this drawing forms part of an application for planning application on behalf of the applicant named below, it shall not be used for any other purpose without the express permission of Mountford Pigott LLP. This drawing may incorporate information from other professionals. Mountford Pigott LLP cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative as listed below. LIST OF INFORMANTS : REVISIONS DATE DRN CKD REV ISSUE STATUS CLIENT TITLE DRAWN CHECKED SCALE DATE PROJECT Surrey KT3 3LZ Mountford Pigott LLP 50 Kingston Road New Malden T: +44 (0)20 8942 8942 F: +44 (0)20 8942 8944 [email protected] www.mountfordpigott.com Architecture Masterplanning Design © Mountford Pigott LLP 2012 Reproduction in whole or in part by any means is prohibited without the prior permission of Mountford Pigott LLP. GENERAL NOTES · These drawings are to be read in conjunction with the employer's requirements & design specification and all other relevant consultants' drawings · Compatibility of DPC materials must be checked with the architect prior to procurement and/or site usage · All products specified on this drawing must be installed in accordance with the manufacturers' instructions, relevant british and european standards codes of practice and relevant bba certificates MOUNTFORD PIGOTT LLP CONSTRUCTION STATEMENT · Should the contractor wish to vary the specification of products and/or components or their equivalent etc., from those indicated by the Design Team, specific approval from the appropriate Design Team member must be obtained. DRAWING, SPECIFICATION & SCHEDULE CO-ORDINATION NOTES:- Drawings, specifications and schedules are to be read in conjunction with the following where applicable: - a)Employer's Requirements documents b) Agreements to Lease c) Structural Engineer's drawings and specifications d)Civil Engineer's drawings and specifications. e)Survey drawings f) Party Wall / Boundary Awards g)Other specialist design consultant's requirements as appointed by the contractor h) Other specialist design sub-contractor's requirements as appointed by the contractor i) Steel sub-contractor is to check with cladding sub-contractor to ensure all necessary steelwork has been provided and located as required for the full completion of both sub-contracts j) The Contractor will have the final responsibility for ensuring the interface requirements of the design sub-contractors is fully accounted for in his tender k) The Contractor will be responsible for procuring the sub-contractors' design (or sub-contractors' information) in sufficient time to allow the Design Team to co-ordinate their works into the scheme within the production information programme. l) Contractors proposals. CONTINUITY OF INSULATION AND SEALED BUILDING The design and installation of all elements and components must ensure that there are no thermal bridges caused by gaps within and between elements of construction, and that the completed building will achieve an air leakage rate in accordance with the requirements of the SBEM calculations or requirements of tenants, whichever is more onerous. The main contractor and specialist subcontractors will be responsible for ensuring all installations meet these requirements within the elements of construction for which they are responsible and at junctions with adjoining elements of construction. FINAL CONSTRUCTION BOUYGUES CONSTRUCTION BEDFORD RIVERSIDE BLOCK 4 - LEVEL 0 GA GROUND FLOOR PLAN MS TS 1:100 @ A1 30.09.14 INFORMANT 1 INFORMANT 2 INFORMANT 3 INFORMANT 4 INFORMANT 5 BRN MPI A31 BK4 GA GND (1253)0100 Z GUTTERS, DOWNPIPES AND ROOF OUTLETS WHERE SHOWN ARE INDICATIVE ONLY AND SUBJECT TO DETAIL DESIGN DESIGN OF GUTTERS, OUTLETS & RAINWATER PIPES IS TO BE BY THE ROOFING SUB-CONTRACTOR, IN ACCORDANCE WITH THE REQUIREMENTS OF BS EN 12056-3:2000. FOR SIPHONIC SYSTEMS THE DESIGN SHOULD ALSO BE IN ACCORDANCE WITH BS 8490:2007 AND DESIGNED & INSTALLED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE SIPHONIC ROOF DRAINAGE ASSOCIATION. REFER TO MPLLP DESIGN RESPONSIBILITY SCHEDULE NUMBER, LOCATION & SIZE OF RWOs & RWPs TO BE ADVISED AT THE EARLIEST OPPORTUNITY. FLOW RATES MUST BE CONFIRMED BY THE DESIGN SUB-CONTRACTOR AT EACH RWP TO ENSURE THAT THE ABOVE AND BELOW GROUND DRAINAGE IS COORDINATED. RAINWATER DRAINAGE CALCULATIONS TO BE PROVIDED FOR SUBMISSION TO BUILDING CONTROL WEIR OVERFLOWS TO BE PROVIDED TO ALL ROOF AREAS IN ACCORDANCE WITH BS EN 12056-3:2000 RODDING ACCESS TO ALL RWPs TO BE PROVIDED AT LOW LEVEL DESIGN OF ABOVE GROUND FOUL DRAINAGE INDICATIVE ONLY. FINAL DESIGN BY SPECIALIST. VENTING OF FOUL DRAINAGE WHICH IS NOT SHOWN TO BE DESIGNED BY SPECIALIST. RAINWATER DRAINAGE DESIGN KEY: SVP TBC - SOIL VENT PIPE - POSITION TBC SVP HL - SOIL VENT PIPE @ HIGH LEVEL SVP - SOIL VENT PIPE DP - DOWN PIPE RWO - RAIN WATER OUTLET RWP - RAIN WATER PIPE RWP HL - RAIN WATER PIPE @ HIGH LEVEL RWO HL - RAIN WATER OUTLET @ HIGH LEVEL G - GULLY G HL - GULLY @ HIGH LEVEL BLOCK 5 INDICATIVE ONLY, PLEASE REFER TO ARCH. DRAWING BRN-MPI-A31-BK5-GA-GND-(1253)0100 FOR DETAILS. BLOCK 3 INDICATIVE ONLY, PLEASE REFER TO ARCH. DRAWING BRN-MPI-A31-BK3-GA-GND-(1253)0100 FOR DETAILS. CYCLE PATH TO BE CLOSED FOR MOE PURPOSES LEGEND: CRITICAL DIMENSIONS KEY PLAN N.T.S. FIRE SHUTTERS/CURTAINS BY TENANT FINAL CONSTRUCTION ISSUE THIS DRAWING HAS BEEN REVISED WITH AMENDMENTS ADVISED BY THE MAIN CONTRACTOR AND CONFIRMATION FROM THEM THAT ALL OTHER ASPECTS OF THE BUILDING HAVE BEEN CONSTRUCTED FULLY IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS CONTAINED HEREIN. MPLLP CANNOT BE HELD RESPONSIBLE WHERE THEIR DESIGN INTENT HAS NOT BEEN FOLLOWED WITHOUT PRIOR NOTIFICATION OF ANY CHANGES FOR ALL DETAILS OF ALL SPECIALIST ELEMENTS OF CONSTRUCTION REFER TO RELEVANT SUBCONTRACTOR'S DRAWING UPDATED TO GLAZING MANUFACTURE 06.09.16 DAC TS X FINAL CONSTRUCTION ISSUE 09.03.17 DAC TS Y FIRE SHUTTER FS00.01 REMOVED 27.03.17 HR TS Z AS-BUILT

Paving GH13 Brick Paving AS-BUILT

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

T a r m
1
2
3
4
5
X
6
7
8
9
10
14
15
11
UNIT 4B TENANT TBC 368.2sqm
3963sqf
11
1 2 x 1 6 5 x 2 5 0
1 3 2 4 7 8 6
10
5
2
FE STAIR 1
LIFT 2(2150w1850d)
U N IT
HGV HARD STANDING
UNIT 4D FLUE
ENTRANCE COURTYARD
UNIT 4C
450x450
UNIT 4A SEATING
26.470
26.860
26.880
26.880
26.880
10 BICYCLE SPACES
EXTRACT DUCT H.L.
VENTILATION LOUVRES (MIN.
UNIT 4A PLANT
FOR CO2 PIPEWORK
U N IT
4 C E
E A T IN
4
C W
7
CW00.03
2
3
2
1
2
3
6 0 6 0
t a t io
b a s e
LE V - 03
· UNIT 4B N/A
· UNIT 4D N/A
· UNIT 4B 368.2m² / 3963 ft²
· UNIT 4C 417.7m² / 4497 ft²
· UNIT 4D 308.1m² / 3316 ft²
GND FLOOR AREA SCHEDULE:
General Notes
This drawing shall not be scaled. All dimensions are in mm unless otherwise stated.
All dimensions shall be checked on site prior to commencing the works and errors and omissions to be reported to the architects.
All works shall conform to the current edition of the building regulations and other statutory requirements.
All materials and workmanship shall conform with the relavent British Standard
specifications and codes of practice.
If this drawing forms part of an application for planning application on behalf
of the applicant named below, it shall not be used for any other purpose
without the express permission of Mountford Pigott LLP.
This drawing may incorporate information from other professionals. Mountford
Pigott LLP cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to
such information should be sought from the relevant profession or their appointment representative as listed below.
LIST OF INFORMANTS :
ISSUE STATUS
[email protected]
www.mountfordpigott.com
Architecture
Masterplanning
Design
© Mountford Pigott LLP 2012 Reproduction in whole or in part by any means is prohibited without the prior
permission of Mountford Pigott LLP.
GENERAL NOTES
· These drawings are to be read in conjunction with the employer's
requirements & design specification and all other relevant consultants' drawings
· Compatibility of DPC materials must be checked with the architect prior to
procurement and/or site usage
· All products specified on this drawing must be installed in accordance with
the manufacturers' instructions, relevant british and european standards codes of practice and relevant bba certificates
MOUNTFORD PIGOTT LLP CONSTRUCTION STATEMENT
· Should the contractor wish to vary the specification of products and/or components or their equivalent etc., from those indicated by the Design Team,
specific approval from the appropriate Design Team member must be obtained.
DRAWING, SPECIFICATION & SCHEDULE CO-ORDINATION NOTES:-
Drawings, specifications and schedules are to be read in conjunction with the
following where applicable: -
c) Structural Engineer's drawings and specifications d)Civil Engineer's drawings and specifications.
e)Survey drawings
contractor
h) Other specialist design sub-contractor's requirements as appointed by the contractor
i) Steel sub-contractor is to check with cladding sub-contractor to ensure all
necessary steelwork has been provided and located as required for the full completion of both sub-contracts
j) The Contractor will have the final responsibility for ensuring the interface requirements of the design sub-contractors is fully accounted for in his tender
k) The Contractor will be responsible for procuring the sub-contractors' design
(or sub-contractors' information) in sufficient time to allow the Design Team to co-ordinate their works into the scheme within the production information programme.
l) Contractors proposals.
CONTINUITY OF INSULATION AND SEALED BUILDING
The design and installation of all elements and components must ensure that there are no thermal bridges caused by gaps within and between elements of construction, and that the completed building will achieve an
air leakage rate in accordance with the requirements of the SBEM
calculations or requirements of tenants, whichever is more onerous. The main contractor and specialist subcontractors will be responsible for
ensuring all installations meet these requirements within the elements of construction for which they are responsible and at junctions with adjoining
elements of construction.
MS TS 1:100 @ A1 30.09.14
INFORMANT 1 INFORMANT 2 INFORMANT 3 INFORMANT 4 INFORMANT 5
BRN MPI A31 BK4 GA GND (1253)0100 Z
GUTTERS, DOWNPIPES AND ROOF OUTLETS
WHERE SHOWN ARE INDICATIVE ONLY AND
SUBJECT TO DETAIL DESIGN
DESIGN OF GUTTERS, OUTLETS &
ROOFING SUB-CONTRACTOR, IN
SYSTEMS THE DESIGN SHOULD ALSO BE IN
ACCORDANCE WITH BS 8490:2007 AND
DESIGNED & INSTALLED IN ACCORDANCE
SIPHONIC ROOF DRAINAGE ASSOCIATION.
SCHEDULE
RWPs TO BE ADVISED AT THE EARLIEST
OPPORTUNITY. FLOW RATES MUST BE
CONFIRMED BY THE DESIGN
ENSURE THAT THE ABOVE AND BELOW
GROUND DRAINAGE IS COORDINATED.
RAINWATER DRAINAGE CALCULATIONS TO
BUILDING CONTROL
12056-3:2000
PROVIDED AT LOW LEVEL
DRAINAGE INDICATIVE ONLY. FINAL DESIGN BY SPECIALIST. VENTING OF FOUL
DRAINAGE WHICH IS NOT SHOWN TO BE DESIGNED BY SPECIALIST.
RAINWATER DRAINAGE DESIGN
KEY:
SVP TBC - SOIL VENT PIPE - POSITION TBC SVP HL - SOIL VENT PIPE @ HIGH LEVEL
SVP - SOIL VENT PIPE DP - DOWN PIPE
RWO - RAIN WATER OUTLET RWP - RAIN WATER PIPE
RWP HL - RAIN WATER PIPE @ HIGH LEVEL RWO HL - RAIN WATER OUTLET @ HIGH LEVEL
G - GULLY G HL - GULLY @ HIGH LEVEL
BLOCK 5
BLOCK 3
LEGEND:
FIRE SHUTTERS/CURTAINS BY TENANT
FINAL CONSTRUCTION ISSUE THIS DRAWING HAS BEEN REVISED WITH AMENDMENTS ADVISED BY THE MAIN
CONTRACTOR AND CONFIRMATION FROM THEM THAT ALL OTHER ASPECTS OF THE BUILDING HAVE BEEN CONSTRUCTED FULLY
IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS CONTAINED HEREIN. MPLLP CANNOT BE HELD RESPONSIBLE
WHERE THEIR DESIGN INTENT HAS NOT BEEN FOLLOWED WITHOUT PRIOR NOTIFICATION OF ANY CHANGES
FOR ALL DETAILS OF ALL SPECIALIST ELEMENTS OF CONSTRUCTION REFER TO
RELEVANT SUBCONTRACTOR'S DRAWING
FINAL CONSTRUCTION ISSUE 09.03.17 DAC TS Y
FIRE SHUTTER FS00.01 REMOVED 27.03.17 HR TS Z
A S -B
U IL T