Pavement PreservationPavement Preservationat PennDOTat PennDOT
NEPPP NEPPP –– December 12, 2007December 12, 2007
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
TOPICS:TOPICS:
PennDOT Highway SystemPennDOT Highway System
Pavement ManagementPavement Management
Pavement PreservationPavement Preservation
Condition AssessmentCondition Assessment
Performance MeasurementPerformance Measurement
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
21,43921,43921,40321,403NonNon--NHS ADT < 2000NHS ADT < 2000
43,73743,73739,76739,767TotalTotal
13,48313,483
3,5963,596
1,2851,285
TotalTotalLinearLinearMilesMiles
14,38214,382NonNon--NHS ADT NHS ADT ≥≥ 20002000
5,3465,346Other NHSOther NHS
2,5702,570InterstateInterstate
Total Segment Total Segment MilesMilesNetworkNetwork
Segment Mile = Linear Miles for Undivided Routes, Directional Miles for Divided Routes
State Owned Highway System:State Owned Highway System:
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Roadway NetworksRoadway NetworksInterstate & NHSInterstate & NHS
Interstate Other NHS
State Owned Roadways
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Interstate Other NHS Non-NHS (ADT > 2k)
State Owned Roadways
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Roadway NetworksRoadway NetworksInterstate, NHS, and NonInterstate, NHS, and Non--NHSNHS
Interstate Other NHS Non-NHS (ADT > 2k) Non-NHS (ADT < 2k)
State Owned Roadways
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Pavement Management:Pavement Management:
Best treatment to apply to a selected pavement sectionBest treatment to apply to a selected pavement section
Maintenance and rehabilitation strategies at the right timeMaintenance and rehabilitation strategies at the right time
Quantify needs over any projected timeQuantify needs over any projected time
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Pavement Management:Pavement Management:
Focus on higher level roadways firstFocus on higher level roadways first
Do not neglect lower facilitiesDo not neglect lower facilities
Balance rehabilitation and preservation Balance rehabilitation and preservation
Improve some roadways, preserve othersImprove some roadways, preserve others
Not a Not a ““worst firstworst first”” approachapproach
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Pavement Treatment Types:Pavement Treatment Types:
Preservation Preservation –– cost effective treatments to retard future cost effective treatments to retard future deterioration, and maintain or improve functional conditiondeterioration, and maintain or improve functional condition
•• bituminous resurfacing with leveling and/or millingbituminous resurfacing with leveling and/or milling
•• microsurfacingmicrosurfacing
•• seal coatseal coat
•• diamond grindingdiamond grinding
•• base repair / concrete patchingbase repair / concrete patching
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Pavement Preservation:Pavement Preservation:
Plan and strategy defined through the Maintenance Plan and strategy defined through the Maintenance Efficiency and Cost Effectiveness (MECE) initiativeEfficiency and Cost Effectiveness (MECE) initiative
Pavement cycle charts to be the basis for selecting Pavement cycle charts to be the basis for selecting appropriate treatments appropriate treatments
Defined cycles for HighDefined cycles for High--level Bituminous, Lowlevel Bituminous, Low--level level Bituminous, Concrete, and Unpaved roadwaysBituminous, Concrete, and Unpaved roadways
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Pavement Preservation:Pavement Preservation:
HighHigh--level Bituminous Roadways (Resurfacing Network)level Bituminous Roadways (Resurfacing Network)•• Interstates, NHS routes, high to medium serviceInterstates, NHS routes, high to medium service•• Maintained by routine resurfacingsMaintained by routine resurfacings
LowLow--level Bituminous Roadways (Seal Coat Network):level Bituminous Roadways (Seal Coat Network):•• Maintained by routine seal coatsMaintained by routine seal coats
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
HighHigh--level Bituminous Roadways (Resurfacing Network)level Bituminous Roadways (Resurfacing Network)ActivityActivity FrequencyFrequencyCrack sealingCrack sealing 3 to 5 years3 to 5 yearsMicroMicro--surfacing (optional)surfacing (optional) 5 to 10 years5 to 10 yearsResurfacingResurfacing 8 to 12 years (with no interim surface seal)8 to 12 years (with no interim surface seal)
13 to 17 years (with an interim surface seal)13 to 17 years (with an interim surface seal)Seal coat paved shoulders (optional)Seal coat paved shoulders (optional) 5 to 7 years5 to 7 years
LowLow--level Bituminous Roadways (Seal Coat Network)level Bituminous Roadways (Seal Coat Network)ActivityActivity FrequencyFrequencyCrack sealingCrack sealing 3 to 5 years3 to 5 yearsSeal coat (rural) or MacroSeal coat (rural) or Macro--surfacesurface 4 to 7 years4 to 7 yearsMicroMicro--surface or level (urban)surface or level (urban) 5 to 6 years5 to 6 yearsResurface or levelResurface or level 15 to 20 years15 to 20 years
Concrete PavementsConcrete PavementsActivityActivity FrequencyFrequencyJoint sealingJoint sealing 5 years5 yearsConcrete patchingConcrete patching Years 15, 20 and 25Years 15, 20 and 25Diamond GrindingDiamond Grinding 15 to 20 years15 to 20 yearsOverlayOverlay 20 to 30 years20 to 30 yearsSeal coat shoulders (if bituminous)Seal coat shoulders (if bituminous) 5 to 7 years5 to 7 years
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Functional Pavement Life:Functional Pavement Life:
Full Depth Bituminous Pavements (HighFull Depth Bituminous Pavements (High--level) level) -- 40 years40 years
Concrete Pavements Concrete Pavements -- 35 years35 years
Composite Pavements Composite Pavements -- 60 years60 years
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Effect of Pavement PreservationEffect of Pavement Preservation
YEAR
PAVE
MEN
T C
ON
DIT
ION
No Preservation
Preservation
Failed
Fair
Poor
Excellent
Good
Very PoorPAVE
MEN
T C
ON
DIT
ION
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Condition Assessment:Condition Assessment:
Skid frictionSkid friction
Structural functionalityStructural functionality
VideologgingVideologging
RoughnessRoughness
•• High SpeedHigh Speed
•• Light WeightLight Weight
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Videologging:Videologging:
Replaced manual surveysReplaced manual surveys
RoughnessRoughness
Panoramic roadway imagesPanoramic roadway images
Feature types and locationsFeature types and locations27,000 miles per year27,000 miles per year•• Entire NHS annuallyEntire NHS annually•• NonNon--NHS bienniallyNHS biennially
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
http://www.dot7.state.pa.us/ividlog/video_locate.asphttp://www.dot7.state.pa.us/ividlog/video_locate.asp
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Use of DataUse of Data
Uniform statewide condition evaluationUniform statewide condition evaluation
Allocation of county maintenance fundsAllocation of county maintenance funds
Monitor condition and assess future needsMonitor condition and assess future needs
Monitor performance of pavement designs, materials, Monitor performance of pavement designs, materials, and maintenance techniquesand maintenance techniques
Identify candidate projects Identify candidate projects
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Deterioration of Bituminous PavementDeterioration of Bituminous Pavement
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
Deterioration of Concrete PavementDeterioration of Concrete Pavement
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
% of Annual Surface Improvement% of Annual Surface Improvement
% Non% Non--NHS Routes with Inadequate Pavement WidthNHS Routes with Inadequate Pavement Width
% Non% Non--NHS w/ NHS w/ >> 2000 ADT with Poor IRI2000 ADT with Poor IRI
% Non% Non--NHS w/ ADT NHS w/ ADT >> 2000 with Excellent & Good IRI2000 with Excellent & Good IRI
% Other NHS with Poor IRI% Other NHS with Poor IRI
% Other NHS with Excellent & Good IRI% Other NHS with Excellent & Good IRI
% Interstate with Poor IRI% Interstate with Poor IRI
% Interstate with Excellent & Good IRI% Interstate with Excellent & Good IRI
MeasureMeasure
System Performance MeasuresSystem Performance Measures
Each year, the rideability of each roadway network is measured and compared to target values.
Also measured is the reduction of pavement with inadequate width.
Finally, the amount of annual surface improvement is tracked.
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
___High-level bituminous with surface age > 17 years___Low-level bituminous with resurfacing layer > 20 years
___Low-level bituminous with surface age > 7 years
___Concrete with surface age > 30 years
Pavement Cycle Assessment
Bureau of Maintenance and OperationsBureau of Maintenance and Operations
Pavement ManagementPavement Management
TOPICSTOPICS
PennDOT Highway SystemPennDOT Highway System
Pavement ManagementPavement Management
Pavement PreservationPavement Preservation
Condition AssessmentCondition Assessment
Performance MeasurementPerformance Measurement