Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: [email protected] 02/05/16 This is a synopsis of the safety documentation applicable to the deployment of conveyors to be used with parcel sortation. Due to the size of this file I have only placed the main documents in this synopsis. It is a requirement of the SAC1 and Risk Assessment that site assessments must be completed prior to any new equipment being deployed, supported by local risk assessments and consultation with local CWU representatives.

Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: [email protected]

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Parcels Sortation with Conveyors

Safety compliance and supporting documentation

Ken House Tel: 07713653072 – email: [email protected]

02/05/16

This is a synopsis of the safety documentation applicable to the deployment of conveyors to be used with parcel sortation. Due to the size of this file I have only placed the main documents in this synopsis. It is a requirement of the SAC1 and Risk Assessment that site assessments must be completed prior to any new equipment being deployed, supported by local risk assessments and consultation with local CWU representatives.

Page 2: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

The documents within this pack are electronic copies, all master documents with signatures are held by the originators on site. Should you need to review these please contact Edinburgh MC – [email protected] Continuous Improvement Lead.

Mail preperation frame safety documentation within this document.

Work Equipment Change Safety Assessment (WECSA) ……………….…………1 Safety Assessment SAC1………………………………………………………………………………….2 Safe Systems of Work………………………………………………………………………………………3 Ergonomic Screening ……………………………………………………………………………………… 4 Ergonomics Review (Edinburgh) ……………………………………………………………………..5 Ergonomics Review (Manchester) ……………………………………………………………………6 Operating Manual ……………..……………………………………………………………………………..7 Technical Drawings…………………………………………………………………………………………..8 Layout……………………………………………………………………………………………………………….9 Job Element Sheets …………………………………………………………………………………….10

ANNEX: 1…………………………………………………………………………………………………………………………….

Additional supporting document (not included in this report)

Terms of reference (TOR)……………………………………………………………………………………..11 Joint working review……………………………………………………………………………………………..12 Industrial engineering report………………………………………………………………………………..13

Page 3: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

1

Work Equipment Change Safety Assessment Template Owner: S. White Version: 4.0 Date: Nov 2012

WORK EQUIPMENT CHANGE SAFETY ASSESSMENT

Section 1 CHANGE SAFETY ASSESSMENT Work Equipment Title CONVEYORS BY Beumer Work Equipment Photograph Work Equipment Group RM 5M CONVEYOR SYSTEM

Work Equipment Intended Use To convey mail items for sortation into Alps and Hoods

Explanation of change To alleviate the manual handling experience whilst doing the sortation operation

Deployment Date Trial Begins July 2014 Project Manager (contact details)

Martyn Dundas

NATIONAL GEOGRAPHY (name)

UNIT (name)

Work equipment area of use NORTH Edinburgh MC

Section 2 PROHIBITED CHANGE ACTIVITY Will the change impact on any of the following: Yes/No (Yes) (No) Work Equipment Guarding (Primarily machinery guarding) NO If ‘Yes’ STOP do not

progress. Only complete the modification with the

authorisation of the Subject Matter Expert

(SME) Advice on identifying SME’s is

available in the guidance document to this process

If ‘No’ Progress to

Step 3

Computers or VDU’s, including all software & hardware NO Electrical Systems and any power supplies NO Machinery Controls NO Address Interpretation Systems NO Safety Systems such as interlocks, emergency stops, signs NO Machines under warranty NO Introducing substances to machinery hazardous to health NO Lifts and lifting equipment inc mechanical handling equipment NO Road vehicles NO

Section 3 CHANGE - JUSTIFICATION Description of change activity and improvement opportunity

To enable operators to comfortably sort flats and letters into different perstop trays. This will remove the likelihood of any manual handling injury whilst performing this process.

Monitoring Period used to justify the need for Change? From: To: Yes/No Target Benefit? Achieved Y/N? Benefits from the Work Equipment Change Activity

Safety? YES Nil injuries from manual handling Legal? YES SSOW in conjunction with HASAW

1974

Financial? YES Efficiency improvement Quality? YES Sortation process won’t have as many

errors

Performance? YES Modern approach to performing the task to a high standard

Equipment Availability? NO Other? (Describe) NO

During a trial the benefits of any change must be monitored for 90 days. This will prove the effectiveness of the change so it can be horizontally expanded outside the initiating unit or show if the change needs to be reversed. Is the change reversible? (It must be possible to return the work equipment to its original state)

YES Explain: The conveyors can be removed from the unit

Section 4 CHANGE - ACTIVITY What change activity is involved? Yes/No (Yes) (No) New Work Equipment, whether purchased, hired, or leased, even on a temporary basis

YES

Page 4: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

2

Work Equipment Change Safety Assessment Template Owner: S. White Version: 4.0 Date: Nov 2012

Modification to Work Equipment even on a temporary basis (As defined in the guidance document)

NO If any option is

‘Yes’ progress with the Work

Equipment Change Safety Assessment

If all options are ‘No’ there is no need to progress with the Work Equipment Change Safety Assessment

Replacement of a component where the replacement isn’t like-for-like

NO

Change of use for the Work Equipment

NO

Significant change of workplace layout due to relocation of fixed Work Equipment or mechanised equipment

NO

Change of environmental in which the equipment is designed to operate

NO

Section 5 CHANGE - SIGNIFICANCE Indicate all that apply and complete all relevant assessments Yes? If Yes

Powered Work Equipment

Which is new or the change impacts on the safety systems, controls, powered elements or it’s sufficiently close to the powered elements/moving parts to constitute a significant risk.

YES Step 6 (1) Applies

Which is not new and the change does not impact on the safety systems, controls, powered elements or it isn’t sufficiently close to the powered elements/moving parts to constitute a significant risk.

NO Step 6 (3) Applies

Non-Powered Work Equipment with moving parts Exclusion, (see Note**)

Which is new or the change impacts on the safety systems, controls, moving parts or it’s sufficiently close to the moving parts to constitute a significant risk.

NO Step 6 (2) Applies

Which is not new and the change does not impact on the safety systems, controls, moving parts or it isn’t sufficiently close to the moving parts to constitute a significant risk.

NO Step 6 (4) Applies

Non-Powered Work Equipment with no moving parts Inclusion (see Note**) NO Step 6 (5) Applies Lifts & Lifting Work Equipment (LOLER assessments are likely for some of the above) Prohibited Changed contact SME

NO Step 6 (6) Applies

Ergonomic Task Activities (Ergonomic task activities are likely to apply in most cases) YES Step 6 (7) Applies Note** Work equipment, where the only moving parts are wheels used to move that work equipment from one static location to another and where those wheels are then locked in place.

Section 6 CHANGE – ASSESSMENT TYPE Change Significance Assessment

Required By Whom Complete

Appendix 1 Powered Work Equipment which is new or

the change impacts on the safety systems, controls, powered elements/moving parts or it’s sufficiently close to the powered elements to constitute a significant risk.

PUWER Assessment.

(Nationally) Head of Engineering Safety (Geographical/Functional/Local) Geographical/Functional Director Safety Appoints an assessor

2

2 Non-Powered Work Equipment with moving parts which is new or the change impacts on the safety systems, controls, moving parts or it’s sufficiently close to the moving parts to constitute a significant risk. Exclusion, see Note**

(Nationally) Head of Logistics & Facilities Management Safety (Geographical/Functional/Local) Geographical/Functional Director Safety Appoints an assessor

NOTE: PUWER Assessment: Before making this modification is the machine/work equipment of standard configuration &/or up to current specification

Yes / No If ‘No’ STOP until such time as the machine or work

equipment has been brought up to current specification

If ‘Yes’ Progress YES

3 Powered Work Equipment which is not new and the change does not impact on the safety systems, controls, powered elements/moving parts or it isn’t sufficiently close to the powered elements to constitute a significant risk.

Screening Assessment

To determine if a

PUWER

Project Manager or Operational Line Manager

1

4 Non-Powered Work Equipment with moving parts which is not new and the change does

Page 5: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

3

Work Equipment Change Safety Assessment Template Owner: S. White Version: 4.0 Date: Nov 2012

not impact on the safety systems, controls, moving parts or it isn’t sufficiently close to the moving parts to constitute a significant risk. Exclusion, see Note **

assessment and/or Ergonomic

assessment is required

If in doubt how to proceed seek advice from the local

Safety Team

5 Non-Powered Work Equipment with no moving parts (New or existing) Inclusion, see Note **

Section 6 cont. CHANGE – ASSESSMENT TYPE 6 Lifts and Lifting Work Equipment

Lift Operations & Lifting Equipment

Assessment

Head of Logistics & Facilities Management Safety appoints a Technical Assessor or Safety

Advisor

3

7 Work Equipment used to manually lift, carry, transport or hold loads or that needs to be manually handle

Ergonomic Screening

Assessment

Project Manager, Operational Line Manager or Technical Assessor or Safety Advisor

4

Section 7 CHANGE – IMPACT The intention is that each item of work equipment will have a Work Equipment Change Safety Assessment to assess if it is intrinsically safe to use within Operations & Modernisation and a SAC1 (or equivalent) to determine the level of risk that exists from hazards encountered while using the work equipment in task activities in operations. What impact does the change have on the SAC1? Yes/No (Yes) (No) Is the Work Equipment new and will operator task activities be affected by the introduction of the work equipment?

YES Produce a SAC1 to assess task activities

There is no need to produce a SAC1

If the Change is to existing Work Equipment is there the potential for the Change to impact on any task activities associated with the use of the work equipment?

NO Amend the existing SAC1 or create one

if none exists

There is no need to review the

SAC1 List the SAC1 impacted on by the change: 1) SAC1 covering operational use of Work Equipment (where equipment is introduced as a stand alone item) 2) Project SAC1 (when work equipment is introduced as part of a wider project related to a new procedure)

We have 6 separate conveyors, all made to the same specification, that will be used to help with the

smooth sortation of flats and letters and parcels into the correct containers.

Section 8 STAKEHOLDERS LIST ANY INPUT RECEIVED AND FROM WHO Names and contact details

(Where applicable) Date input received

Unit Manager (Unit Level Work Equipment Change) Paul Laidler Safety Lead Kenny Mckean Geographical Director Safety (GDS) Steve Greaves Head of Logistics & Facilities Management Safety National Asset Team (introduction of or change to assets) Head of Engineering Safety Del Roffey Subject Matter Expert (SME) PUWER Assessor Scott Sutherland 03/07/14 LOLER Assessor NOT NEEDED Ergonomic Assessor Corinne Parsons Other (specify) Other (specify) LIST STAKEHOLDERS SUPPLYING INPUT &/or BEING CONSULTED (For National, Geographical & Unit Level Work Equipment Change)

Names and contact details (Where applicable)

Date consulted &/or input received

UNITE (National) UNITE (Local or Geographical) Alex Sayers 03/07/14

Page 6: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

4

Work Equipment Change Safety Assessment Template Owner: S. White Version: 4.0 Date: Nov 2012

CWU (National) CWU (Local of Geographical) (Ops &/or Engineering) Mark Hugall / Ian Robson Other (specify)

Section 9 WORK EQUIPMENT CHANGE SAFETY ASSESSMENT I can confirm that I have the appropriate level of competency, in terms of knowledge and experience of completing other assessments, to allow me to sign off this Work Equipment Change Safety Assessment. I can confirm that on completion of the assessment and associated specialist assessments that provided all outstanding actions are completed and no significant risks are identified and still outstanding that this work equipment is fit for purpose and the intended use to which it will be put within the Business, and that the user of the work equipment or persons who may be affected by its use have been safeguarded from any risks Name Date Signature Project Manager or Operational Line Manager (Not valid unless signed)

Martyn Dundas 03/07/14

Project Managers should: • Sign the Work Equipment Change Safety Assessment in all case and retain a copy of it and all appendices • Forward copies as appropriate:

Local Projects - The Unit Manager Geographical Projects - The Geographical Director Safety National Projects - Head of Logistics & Facilities Management Safety (Non-Powered Equipment) - Head of Engineering Safety (Powered Equipment) - SME (For change specific to areas of Prohibited Change)

PROCESS CONCURRENCE NATIONAL DEPLOYMENTS & CHANGE involving PUWER & LOLER

Name Date Signature Head of Logistics & FM Safety

(Non-Powered)

OR Name Date Signature Head of Engineering Safety

(Powered)

GEOGRAPHICAL or FUNCTIONAL or UNIT DEPLOYMENTS & CHANGE involving PUWER & LOLER (Powered & Non Powered) Name Date Signature

Geographical Director Safety PROHIBITED CHANGE ACTIVITY or SME DEPLOYMENTS & CHANGE involving PUWER & LOLER

& / OR Name Date Signature Subject Matter Expert (SME)

POWERED WORK EQUIPMENT & LIFT WORK EQUIPMENT DEPLOYMENTS & CHANGE Name Date Signature Assets Supply Chain Manager

(Where it is applicable the Process Concurrence is not valid unless signed by at least one of the above)

WORK EQUIPMENT CHANGE SAFETY ASSESSMENT APPENDICIES 1. Work Equipment

Screening Assessment Work Equipment

Screening Assessmen

2. PUWER Assessment (Powered

Equipment)

For Powered Equipment Technical Assessors should

use the PUWER Assessment Tool provided by Engineering

2. PUWER Assessment (Non-

Powered Equipment)

For Non Powered Equipment Technical Assessors or Safety

Advisor should use this PUWER

3. LOLER Assessment

LOLER Assessment v1.2

Page 7: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

5

Work Equipment Change Safety Assessment Template Owner: S. White Version: 4.0 Date: Nov 2012

Assessment

PUWER Assessment v1.6

4. Ergonomic Screening

Assessment Ergonomic Screening Assessment v1.2

(All assessments must be signed and attached where they are required )

Page 8: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC1 Template: Template Owner: S. White Version: 4.3 Date: July 2013

SAFETY ASSESSMENT & CONCURRENCE (SAC1)

Project/Programme/Product Title

Cut and Tip Conveyors Task or Work Equipment Photograph

Project/Programme/Product Description

Installation and use of Incline and/or Horizontal Conveyors

Deliver, install, use and maintain c100 conveyor systems into 22 mail centres. To provide further systems on an on-going case by case basis

Proposed Schedule, Timescales

Deployment Start: 22 April 2015 Deployment Finish: 26 June 2015 (est) Additional timescales on a case by case basis

Project Lead (Contact Details)

Murray Cook (Business Case Owner) 07702 678200

NATIONAL (SMS 8.1) REGIONAL (SMS 8.2) UNIT (SMS 8.3)

SAC1 Level X

LIST SAFETY INPUT(s) REQUIRED (indicate if applies)

Y/N CATEGORY NAME & CONTACT DETAILS

GROUP SAFETY RISK IMPROVEMENT MANAGER Y 8.1 Joanna Hosking NATIONALLY APPOINTED SAFETY LEAD N 8.1 PROGRAMMES DIRECTOR/MANAGER (as applicable) Y 8.1 Warren Cabot SENIOR SAFETY PROFESIONNAL N 8.1, 8.2 or 8.3 PROJECT SAFETY LEAD N 8.2 or 8.3 PROGRAMMES MANAGER N 8.2 SAFETY ADVISOR N 8.3 PROJECT MANAGER (If different from Project Lead) Y 8.1 & 8.2 & 8.3 Ray Pipe 07703 404378 SUBJECT MATTER EXPERT - Conveyors Y 8.1 Craig Dowe 07587 657236 PROPERTY & FACILITIES (SAFETY TEAM) N As appropriate ENGINEERING (SAFETY TEAM) Y As appropriate Del Roffey/Pete McGowan LOGISTICS (SAFETY TEAM) – (VEHICLES) N As appropriate ASSETS (SAFETY TEAM) N As appropriate ERGONOMIST As appropriate NOTE: This equipment has

been ergonomically assessed prior to national deployment

STAKEHOLDER CONSULTATION Y/N STAGE NAME & CONTACT DETAILS Is consultation necessary with the CWU

Y 8.1 Consultation conducted and agreed with Terry Pullinger through National Steering

Group. Via Francis

Terry Pullinger

Page 9: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC1 Template: Template Owner: S. White Version: 4.2 Date: July 2013

Williams/Murray Cook

Is consultation necessary with Unite CMA

Y Martyn Bunn [email protected]

Is consultation necessary with any other stakeholder?

N

LIST ADVICE OBTAINED Y/N STAGE NAME & CONTACT DETAILS HEALTH & SAFETY EXECUTIVE N As appropriate ENVIRONMENTAL HEALTH OFFICER N As appropriate FIRE AUTHORITY N As appropriate OTHER? N As appropriate OTHER? N As appropriate

CONSTRUCTION, DESIGN & MANAGEMENT YES / NO

Does CDM apply to the project? No If ‘Yes’ is the project notifiable to the HSE? No LIST REQUIRED SAFETY INPUT Y/N STAGE NAME & CONTACT DETAILS Strategic CDM Co-ordinator As appropriate N/A Local CDM Co-ordinator As appropriate N/A

Page 10: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

STEP

1

INIT

IAL

RISK

ASS

ESSM

ENT

List

bel

ow ta

sks

or w

ork

equi

pmen

t inv

olve

d &

the

haza

rds

asso

ciate

d w

ith th

em &

thos

e pe

ople

affe

cted

, list

all

exis

ting

cont

rols

& r

ate

the

leve

l of r

isk.

Use

sep

arat

e as

sess

men

t se

ctio

ns fo

r ea

ch ta

sk o

r w

ork

equi

pmen

t & a

dd m

ore

asse

ssm

ent s

ectio

ns a

nd e

xpan

ding

as

need

ed. I

f any

risk

s ar

e to

lera

ble

or a

bove

, mov

e to

Ste

p 2

Risk

Con

trol

.

Task

or

Wor

k Eq

uipm

ent

Iden

tifie

d H

azar

ds

Asso

ciate

d Ri

sk

Peop

le

Affe

cted

Ex

istin

g Co

ntro

l(s)

Risk

Ass

essm

ent

Out

com

e Se

e M

atrix

Li

kelih

ood

Seve

rity

Tota

l Co

nvey

or

enab

ling

wor

ks

and

inst

alla

tion.

Build

ing

& El

ectr

ical

Wor

ks.

Wor

king

with

tool

s,

Wor

king

at h

eigh

t In

corr

ect u

se o

f too

ls

Poor

man

ual h

andl

ing

Vario

us in

jurie

s as

a

resu

lt of

the

task

s be

ing

unde

rtak

en fo

r th

e pr

ojec

t.

Cont

ract

ors

RoM

EC –

Pro

vide

d W

ELLs

do

cum

ent d

efin

ing

gene

ric

proc

edur

e of

und

erta

king

wor

ks.

Site

sur

vey

visi

ts u

nder

take

n pr

ior

to c

omm

encin

g an

y w

orks

to

asc

erta

in lo

cal s

pecif

ic

cons

ider

atio

ns,

Conv

eyor

inst

alle

r (B

eum

er) –

Ri

sk A

sses

smen

t and

Met

hod

Stat

emen

ts (R

AMS)

pro

vide

d an

d is

sued

to n

omin

ated

per

son

at

each

site

.

1 4

4 To

lera

ble

Conv

eyor

M

ovem

ent

Mov

es v

ia F

LT &

Pal

let

Truc

k Ve

hicl

e &

pede

stria

n co

llisi

ons

Cont

ract

ors,

em

ploy

ees,

vi

sito

rs a

nd

cust

omer

s

Only

Beu

mer

per

mitt

ed to

re

mov

e co

nvey

ors

from

del

iver

y ve

hicl

es a

nd m

ove

into

fina

l po

sitio

n w

ithin

eac

h m

ail c

entr

e.

RAM

S do

cum

ents

pro

vide

d by

Be

umer

. Pro

ject

team

hav

e co

pies

of p

erso

ns tr

aine

d to

use

FL

Ts. A

ll co

nvey

ors

have

whe

els

to a

void

use

of l

iftin

g eq

uipm

ent

and

man

ual h

andl

ing

task

s w

hen

mov

ing

conv

eyor

s w

ithin

Mai

l Ce

ntre

and

into

fina

l pos

ition

. W

heel

s w

ill b

e re

mov

ed p

rior

to

fixin

g co

nvey

ors

to fl

oor

1 3

3 Ad

equa

tely

co

ntro

lled

Oper

atin

g th

e Po

or m

anua

l han

dlin

g M

uscu

losk

elet

al in

jurie

s U

nit s

taff

/ Cu

rren

t man

ual h

andl

ing

2 4

8 M

oder

ate

Page 11: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

conv

eyor

– to

pr

oces

s bu

ndle

s of

lette

rs a

nd

parc

els.

Cont

ract

ors/

Ro

MEC

Au

tom

atio

n

trai

ning

but

doe

s no

t inc

lude

this

co

nvey

or.

Man

ual H

andl

ing

SSOW

Op

erat

ing

the

conv

eyor

D

efec

tive

Mac

hine

, m

ovin

g pa

rts,

sha

rp

edge

s or

jagg

ed m

etal

ed

ges

Mus

culo

skel

etal

, str

ikin

g,

draw

n in

and

cut

s in

jurie

s

Empl

oyee

s an

d m

anag

ers

All c

onve

yors

hav

e au

dite

d pr

e-de

liver

y ch

ecks

at f

acto

ry. A

ll co

nvey

ors

have

com

mis

sion

ing

chec

ks a

nd fu

rthe

r ch

ecks

mad

e as

par

t of f

orm

al h

ando

ver.

All

conv

eyor

s el

ectr

ically

test

ed

prio

r to

firs

t use

, nip

gua

rd g

aps

chec

ked,

all

guar

ds a

re c

heck

ed

for

secu

rity,

saf

ety

and

mon

itorin

g de

vice

s ar

e ch

ecke

d (E

/Sto

ps).

SME

has

unde

rtak

en

Mac

hine

ry D

irect

ive

com

plia

nce

chec

ks a

s pa

rt o

f Reg

ulat

ion

10

and

11 o

f PU

WER

98. O

pera

ting

inst

ruct

ions

hav

e be

en p

rovi

ded

and

oper

ator

trai

ning

ses

sion(

s)

will

be

prov

ided

at e

ach

inst

alla

tion

site

. Nam

ed a

nd

trai

ned

deta

ils w

ill b

e pr

ovid

ed.

Loca

l PU

WER

ass

esso

r to

un

dert

ake

and

com

plet

e PU

WER

as

sess

men

t at e

ach

inst

alla

tion.

Gu

idan

ce w

ill b

e av

aila

ble

from

th

e SM

E

2 4

8 M

oder

ate

(d

ue to

fin

al

PUW

ER

asse

ssm

ent a

ctiv

ity)

Mai

ntai

ning

the

conv

eyor

M

aint

enan

ce

proc

edur

es

Mus

culo

skel

etal

, str

ikin

g,

draw

n in

and

cut

s in

jurie

s

Mai

nten

ance

En

gine

ers

Mai

nten

ance

pro

cedu

res

have

be

en p

rovi

ded

and

cont

aine

d w

ithin

the

Mai

nten

ance

Man

ual.

A te

chni

cal t

rain

ing

cour

se w

ill

be p

rovi

ded

at e

ach

site

1 4

4 To

lera

ble

Mai

ntai

ning

the

Def

ectiv

e M

achi

ne,

Mus

culo

skel

etal

, str

ikin

g,

Mai

nten

ance

Al

l con

veyo

rs h

ave

audi

ted

pre-

2 4

8 M

oder

ate

Page 12: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

conv

eyor

m

ovin

g pa

rts,

sha

rp

edge

s or

jagg

ed m

etal

ed

ges

draw

n in

and

cut

s in

jurie

s En

gine

ers

deliv

ery

chec

ks a

t fac

tory

. All

conv

eyor

s ha

ve c

omm

issi

onin

g ch

ecks

and

furt

her

chec

ks m

ade

as p

art o

f for

mal

han

dove

r. Al

l co

nvey

ors

elec

trica

lly te

sted

pr

ior

to fi

rst u

se, n

ip g

uard

gap

s ch

ecke

d, a

ll gu

ards

are

che

cked

fo

r se

curit

y, s

afet

y an

d m

onito

ring

devi

ces

are

chec

ked

(E/S

tops

). SM

E ha

s un

dert

aken

M

achi

nery

Dire

ctiv

e co

mpl

ianc

e ch

ecks

as

part

of R

egul

atio

n 10

an

d 11

of P

UW

ER98

. Ope

ratin

g in

stru

ctio

ns h

ave

been

pro

vide

d an

d op

erat

or tr

aini

ng s

essio

n(s)

w

ill b

e pr

ovid

ed a

t eac

h in

stal

latio

n si

te. N

amed

and

tr

aine

d de

tails

will

be

prov

ided

. Lo

cal P

UW

ER a

sses

sor

to

unde

rtak

e an

d co

mpl

ete

PUW

ER

asse

ssm

ent a

t eac

h in

stal

latio

n.

Guid

ance

will

be

avai

labl

e fr

om

the

SME

(due

to

final

PU

WER

as

sess

men

t act

ivity

)

Yard

Saf

ety

Mov

emen

t of o

ur

vehi

cles

in th

e ya

rd

whe

re th

e co

ntra

ctor

s ar

e w

orki

ng to

unl

oad

the

conv

eyor

s

Vehi

cle

colli

sion

s w

ith

peop

le M

E lif

ting

equi

pmen

t

Cont

ract

ors

Risk

Ass

essm

ent a

nd M

etho

d St

atem

ents

will

be

prov

ided

by

the

cont

ract

or p

rior

to e

ach

deliv

ery.

Enq

uirie

s w

ill b

e m

ade

for

any

spec

ial r

equi

rem

ents

1 4

4 To

lera

ble

Wor

kpla

ce

Safe

ty

Mov

emen

t of m

achi

nes

thro

ugh

the

wor

kpla

ce

from

the

plat

form

Crus

hing

and

str

ikin

g ag

ains

t inj

urie

s Co

ntra

ctor

s,

empl

oyee

s,

visi

tors

and

cu

stom

ers

Conv

eyor

s ar

e m

oved

on

cast

ers

with

in e

ach

site

to e

limin

ate

use

of m

anua

l han

dlin

g eq

uipm

ent.

Wor

kpla

ce R

isk

Asse

ssm

ent –

W

TLL

to m

ake

staf

f aw

are

of th

e in

stal

latio

n.

3 4

12

Mod

erat

e

Page 13: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

Cont

ract

or

cont

rol

Cont

ract

ors

who

are

un

fam

iliar

with

RM

G in

divi

dual

site

saf

ety

polic

y

Step

ping

, str

ikin

g, s

lip,

trip

s, fa

lls o

r m

uscu

losk

elet

al in

jurie

s

Cont

ract

ors

Site

indu

ctio

n in

to th

e w

ork

area

an

d re

mov

al fr

om s

ite if

st

anda

rds

are

brea

ched

1 4

4 To

lera

ble

Fire

Saf

ety

Erec

tion

of te

mpo

rary

fe

ncin

g in

the

area

w

here

the

conv

eyor

s w

ill b

e in

stal

led

Rest

ricte

d ac

cess

, egr

ess

entr

ance

and

rou

tes

or

wal

kway

s to

fire

exi

ts

Cont

ract

ors,

em

ploy

ees,

vi

sito

rs a

nd

cust

omer

s

Fire

Ris

k As

sess

men

t. Pr

emis

es F

ire E

vacu

atio

n Pl

ans

(PFE

P)

Pers

onal

Em

erge

ncy

Evac

uatio

n Pl

ans

(PEE

P)

3 4

12

Mod

erat

e

Noi

se

Incr

ease

d le

vels

of

nois

e in

the

wor

k ar

ea

Shor

t or

long

term

he

arin

g de

fect

s du

e to

th

e ex

posu

re to

the

nois

e le

vels

Empl

oyee

s an

d m

anag

ers

From

the

man

ufac

ture

rs d

etai

ls

the

nois

e m

easu

red

at th

e op

erat

or p

ositi

ons

on th

e in

clin

e an

d ho

rizon

tal c

onve

yors

is

44dB

whe

n in

nor

mal

run

ning

, D

urin

g th

e st

art s

ound

er a

nd

whe

n an

em

erge

ncy

stop

is

depr

esse

d th

e no

ise

mea

sure

men

t at o

pera

tor

posi

tions

has

bee

n m

easu

red

at

76dB

. Alth

ough

by

desi

gn th

e co

nvey

ors

are

rela

tivel

y qu

iete

it

is u

nkno

wn

if th

is w

ill h

ave

a cu

mul

ativ

e ef

fect

in it

’s fin

al

inst

alle

d lo

catio

n

3 3

9 M

oder

ate

Wor

k Eq

uipm

ent

New

mac

hine

s no

t ad

ded

to th

e cu

rren

t W

ork

Equi

pmen

t Ris

k As

sess

men

t

Inju

ries

as a

res

ult o

f the

us

e of

the

mac

hine

Em

ploy

ees

and

man

ager

s

Wor

k Eq

uipm

ent R

isk

Asse

ssm

ent

3 3

9 M

oder

ate

ST

EP 2

RI

SK C

ON

TRO

L Li

st a

ll ta

sks

or w

ork

equi

pmen

t rat

ed in

Ste

p 1

as to

lera

ble

or a

bove

. Ide

ntify

& r

ecor

d th

e ad

ditio

nal c

ontr

ol m

easu

res

nece

ssar

y to

ens

ure

risks

are

rem

oved

or

redu

ced

to a

n ac

cept

able

leve

l. On

the

assu

mpt

ion

thes

e ris

k co

ntro

ls w

ill b

e in

trod

uced

com

plet

e th

e ris

k as

sess

men

t ass

essin

g th

eir

impa

ct o

n th

e ris

k ra

ting.

Whe

re a

ny a

dditi

onal

con

trol

s ar

e pr

opos

ed b

ut c

anno

t be

imm

edia

tely

impl

emen

ted

add

them

at S

tep

5. W

here

nec

essa

ry o

btai

n ad

vice

from

the

Safe

ty L

ead

to th

e pr

ojec

t. Us

e se

para

te a

sses

smen

t sec

tions

for

Page 14: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

each

task

or

wor

k eq

uipm

ent &

add

mor

e as

sess

men

t sec

tions

and

exp

and

as n

eces

sary

.

Task

or

Wor

k Eq

uipm

ent

Out

com

e Se

e St

ep1

Addi

tiona

l Con

trol

Mea

sure

s Co

mpl

etio

n D

ate

By W

hom

Co

mpl

eted

Ye

s?

Risk

Ass

essm

ent

Out

com

e Se

e M

atrix

Li

kelih

ood

Seve

rity

Tota

l 1.

Ope

ratin

g th

e Co

nvey

or

Mod

erat

e In

itial

trai

ning

will

be

prov

ided

by

the

cont

ract

or p

rior

to fi

rst u

se u

sing

oper

atio

nal

and

tech

nica

l man

uals

. For

on-

goin

g tr

aini

ng

crea

te a

trai

ning

pac

kage

to e

nsur

e al

l em

ploy

ees

and

man

ager

s ar

e co

mpe

tent

to

use

the

conv

eyor

. Exi

stin

g do

cum

enta

tion

coul

d be

use

d fo

r th

is if

requ

ired.

Er

gom

ic as

sess

men

t of c

onve

yors

with

reg

ard

to c

uttin

g &

tippi

ng, h

andl

ing

and

sort

atio

n of

pa

rcel

s an

d m

ail i

tem

s in

to c

onta

iner

s su

ch a

s Yo

rks

& M

ini-

York

s.

SSOW

for

oper

atio

n of

con

veyo

r in

corp

orat

ing

the

reco

mm

neda

tions

in th

e Er

gono

mic

Asse

ssm

ent.

At d

ate

of fi

rst

use

and

will

be

ong

oing

m

ovin

g fo

rwar

d 19

/02/

2015

27

/11/

2015

Firs

t use

-

Cont

ract

or

(Beu

mer

) On

goin

g –W

PC

Corin

ne

Pars

ons

Ken

Hou

se

Each

site

to

conf

irm.

Yes

1 4

4 To

lera

ble

Mod

erat

e PU

WER

ass

essm

ent t

o be

con

duct

ed o

n th

e m

achi

ne to

ens

ure

it m

eets

the

requ

irem

ents

of

the

Mac

hine

Dire

ctiv

e an

d as

socia

ted

stan

dard

s

Each

site

to

advi

se d

ate

whe

n co

mpl

eted

Loca

l PU

WER

as

sess

or w

ith

guid

ance

from

SM

E Cr

aig

Dow

e if

req’

d

Each

site

to

conf

irm

whe

n co

mpl

eted

1 4

4 To

lera

ble

2. M

aint

aini

ng

the

conv

eyor

M

oder

ate

Initi

al tr

aini

ng w

ill b

e pr

ovid

ed b

y th

e co

ntra

ctor

prio

r to

firs

t use

. For

on-

goin

g tr

aini

ng c

reat

e a

trai

ning

pac

kage

to e

nsur

e al

l m

aint

aine

rs a

re c

ompe

tent

to m

aint

ain

and

use

the

conv

eyor

. Pro

vide

, us

ing

oper

atio

nal

and

tech

nica

l tra

inin

g m

anua

ls.

Each

site

to

advi

se d

ate

whe

n co

mpl

eted

Firs

t use

Cont

ract

or

(Beu

mer

) On

goin

g -

ETC

Each

site

to

conf

irm

whe

n co

mpl

eted

1 3

3 Ad

equa

tely

Co

ntro

lled

Page 15: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

3. Y

ard

Safe

ty

Mod

erat

e

Unlo

adin

g of

the

conv

eyor

s to

be

in a

n ar

ea

whe

re th

ere

are

eith

er n

o or

res

trict

ed v

ehicl

e m

ovem

ents

and

pre

fera

bly

durin

g th

e qu

iete

st

time

of th

e op

erat

ion.

Re

view

the

Yard

Risk

Ass

essm

ent

Each

site

to

advi

se d

ate

whe

n co

mpl

eted

Betw

een,

pr

ojec

t m

anag

er,

nom

inat

ed s

ite

cont

act a

nd

Cont

ract

or

(Beu

mer

)

Each

site

to

conf

irm

whe

n co

mpl

eted

1 4

4 To

lera

ble

4.

Wor

kpla

ce

Safe

ty

Mod

erat

e Re

view

the

Wor

kpla

ce R

isk A

sses

smen

t to

ensu

re th

e lo

catio

n of

the

mac

hine

s ar

e co

nsid

ered

Each

site

to

advi

se w

hen

com

plet

ed

Site

pro

ject

le

ad,

Regi

onal

SH

E ad

vise

r

(CW

U Sa

fety

Re

p)

(saf

ety

rep)

Each

site

to

conf

irm

whe

n co

mpl

eted

1 4

4 To

lera

ble

6. F

ire S

afet

y M

oder

ate

Revi

ew th

e fu

ll fir

e ris

k as

sess

men

t to

capt

ure

the

new

ly in

stal

led

mac

hine

s an

d th

e as

socia

ted

fire

emer

genc

y te

sts

and

evac

uatio

ns.

Each

site

to

advi

se d

ate

whe

n co

mpl

eted

Site

pro

ject

le

ad,

Regi

onal

SH

E ad

vise

r

(CW

U Sa

fety

Re

p)

(saf

ety

rep)

Rep)

(s

afet

y re

p)

Each

site

to

conf

irm

whe

n do

ne

1 4

4 To

lera

ble

7. N

oise

M

oder

ate

Prev

ious

site

spe

cific

nois

e ris

k as

sess

men

ts

shou

ld b

e re

view

ed to

asc

erta

in if

follo

win

g th

e in

trod

uctio

n of

the

conv

eyor

s m

ay ti

p th

e ba

lanc

e of

exc

eedi

ng a

ny n

oise

thre

shol

ds fo

r th

at a

rea

SHE

to a

dvise

da

te w

hen

com

plet

ed

Regi

onal

SH

E ad

vise

r

(CW

U) S

afet

y Re

p)

SHE

to

advi

se w

hen

done

1 3

Ad

equa

tely

Co

ntro

lled

8. W

ork

Equi

pmen

t M

oder

ate

Add

the

new

equ

ipm

ent t

o th

e w

ork

equi

pmen

t list

and

ass

ess.

Pas

s as

set d

etai

ls

on to

AD

ST

PEM

to a

dd

date

whe

n co

mpl

eted

(PEM

) SM

E Cr

aig

Dow

e

PEM

to

advi

se w

hen

done

1 3

3 Ad

equa

tely

Co

ntro

lled

Page 16: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

U

se th

e Ri

sk M

atrix

in S

MS

2.1

Risk

Man

agem

ent S

tand

ard

to a

sses

s th

e ta

sk o

r w

ork

equi

pmen

t in

all s

ectio

ns a

bove

.

Over

all A

sses

smen

t W

hen

the

addi

tiona

l con

trol

mea

sure

s ar

e id

entif

ied

prog

ress

with

the

risk

asse

ssm

ent b

ased

on

the

new

info

rmat

ion.

Al

l tho

se a

sses

sed

as A

dequ

atel

y Co

ntro

lled

or T

oler

able

Go

to S

tep

5 An

y th

at a

re a

sses

sed

as M

oder

ate

or a

bove

Go

to S

tep

3

STEP

3

DET

AILE

D R

ISK

ASSE

SSM

ENT

List

all

task

s or

wor

k eq

uipm

ent r

ated

as

mod

erat

e or

abo

ve in

Ste

p 2

in th

e D

etai

led

Asse

ssm

ent s

ectio

n be

low

, whe

re th

e ad

ditio

nal c

ontr

ols

intr

oduc

ed o

r in

tend

ed fo

r in

trod

uctio

n in

Ste

p 2

cann

ot c

ontr

ol th

e ris

ks to

at l

east

an

adeq

uate

leve

l. It

is e

ssen

tial a

t thi

s po

int t

hat t

he S

afet

y Le

ad fo

r th

e pr

ojec

t is

cons

ulte

d. W

ith th

eir

assi

stan

ce id

entif

y w

hich

of t

he a

dditi

onal

det

aile

d ris

k as

sess

men

ts a

re r

equi

red.

The

se a

sses

smen

ts s

houl

d be

use

d to

iden

tify

and

reco

rd a

ny s

pecif

ic co

ntro

l mea

sure

s th

e te

chni

cal s

afet

y sp

ecia

list

com

plet

ing

the

asse

ssm

ent f

eels

are

nec

essa

ry to

ens

ure

risks

are

rem

oved

or

redu

ced

to a

n ac

cept

able

leve

l. W

here

pos

sibl

e ad

ditio

nal c

ontr

ols

shou

ld b

e im

plem

ente

d st

raig

ht

away

. Whe

re a

dditi

onal

con

trol

s ar

e pr

opos

ed b

ut n

ot y

et im

plem

ente

d ad

d th

em a

t Ste

p 5.

Add

mor

e as

sess

men

t sec

tions

and

exp

and

as n

eces

sary

to r

ecor

d yo

ur fi

ndin

gs.

POSS

IBLE

DET

AILE

D R

ISK

ASSE

SSM

ENTS

1

Wor

k Eq

uipm

ent C

hang

e Sa

fety

Ass

essm

ent (

Man

dato

ry fo

r al

l cha

nge

to w

ork

equi

pmen

t) 7

Det

aile

d Re

desi

gn A

sses

smen

t (Fu

ndam

enta

l cha

nge

to th

e pr

ojec

t/pro

cess

) 2

Ergo

nom

ic As

sess

men

t 8

Haz

ard

& Op

erab

ility

Ass

essm

ent/S

tudy

(HAZ

OP)

3 CD

M A

sses

smen

t 9

Epid

emio

logi

cal A

sses

smen

t 4

Prop

erty

& F

acili

ties

Stru

ctur

al A

sses

smen

t (Fu

ndam

enta

l cha

nge

in b

uild

ing

stru

ctur

e)

10

Hea

lth e

ffect

s As

sess

men

t/Stu

dy/S

urve

illan

ce

5 Ya

rd r

isk A

sses

smen

t 11

N

oise

Ass

essm

ents

6

Fire

Sur

vey

and/

or F

ire r

isk A

sses

smen

t 12

Ot

her

Asse

ssm

ent -

spe

cify

Ta

sk o

r W

ork

Equi

pmen

t O

utco

me

See

Step

2

Det

aile

d Ri

sk A

sses

smen

ts

Com

plet

ion

Dat

e By

Who

m

Com

plet

ed

Yes?

Ri

sk A

sses

smen

t O

utco

me

See

Mat

rix

Like

lihoo

d Se

verit

y To

tal

Ta

sk o

r W

ork

Equi

pmen

t O

utco

me

See

Step

2

Det

aile

d Ri

sk A

sses

smen

ts

Com

plet

ion

Dat

e By

Who

m

Com

plet

ed

Yes?

Ri

sk A

sses

smen

t O

utco

me

See

Mat

rix

Like

lihoo

d Se

verit

y To

tal

Use

the

Risk

Mat

rix in

SM

S 2.

1 Ri

sk M

anag

emen

t Sta

ndar

d to

ass

ess

the

task

or

wor

k eq

uipm

ent.

Page 17: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

STEP

4

RESI

DU

AL R

ISKS

If

ther

e ar

e an

y re

sidu

al r

isks

mod

erat

e or

abo

ve a

fter

step

3, t

ake

the

follo

win

g ac

tion:

RESI

DU

AL R

ISK

ACTI

ON

S FO

R RI

SKS

ABO

VE M

OD

ERAT

E YE

S N

O

1. S

afet

y Le

ad to

esc

alat

e al

l risk

s m

oder

ate

or a

bove

for

advi

ce o

n a

way

forw

ard

to th

e Gr

oup

Safe

ty R

isk Im

prov

emen

t Man

ager

(8.1

) or

the

mos

t Sen

ior

Safe

ty

Prof

essi

onal

in th

e Bu

sine

ss U

nit (

ex. O

pera

tions

& M

oder

nisa

tion)

, Reg

ion,

Log

istic

s or

Sup

port

Fun

ctio

n (8

.2/3

)

2. S

afet

y Le

ad ta

kes

appr

opria

te c

ours

e of

act

ion

havi

ng e

scal

ated

the

issue

s:

a) A

bort

the

Proj

ect -

Do

not p

rogr

ess

b) A

bort

the

Proj

ect -

See

king

an

alte

rnat

ive

prod

uct/s

ervi

ce s

olut

ion,

then

sta

rt th

e Sa

fety

Ass

essm

ent &

Con

curr

ence

pro

cess

aga

in

c) R

evie

w s

teps

1 to

3. I

nclu

de a

dditi

onal

pro

posa

ls s

ugge

sted

by

the

Grou

p Sa

fety

Risk

Impr

ovem

ent M

anag

er (8

.1) o

r th

e Se

nior

Saf

ety

Prof

essi

onal

im

plem

entin

g th

e ad

ditio

nal c

ontr

ols

iden

tifie

d du

ring

the

revi

ew o

f the

pro

cess

. Whe

re c

ontr

ols

cann

ot b

e im

plem

ente

d im

med

iate

ly –

go

to S

tep

5 an

d ad

d to

the

conc

urre

nce

actio

ns.

ST

EP 5

CO

NCU

RREN

CE A

CTIO

N P

LAN

Re

cord

from

Ste

p 2

‘Ris

k Co

ntro

ls’ a

ny o

utst

andi

ng a

ctio

ns th

at s

till n

eed

to b

e im

plem

ente

d an

d an

y ad

ditio

nal r

isk c

ontr

ols

from

Ste

p 3

‘Det

aile

d Ri

sk A

sses

smen

t’ or

Ste

p 4

‘Res

idua

l Risk

s’ th

at a

re o

utst

andi

ng. R

espo

nsib

ility

and

tim

esca

les

for

com

plet

ion

shou

ld a

lso

be d

eter

min

ed. T

hese

are

par

t of t

he c

ondi

tions

of c

oncu

rren

ce. I

t is

impo

rtan

t to

reco

rd a

ny a

ctio

ns in

this

sect

ion

that

are

ess

entia

l to

the

proj

ect b

ut w

hich

can

not b

e de

ploy

ed b

efor

e sig

n of

f of t

his

proc

ess,

as

such

they

will

bec

ome

conc

urre

nt a

ctio

ns.

CON

CURR

ENCE

ACT

ION

Co

mpl

etio

n D

ate

By W

hom

Co

mpl

eted

? Y/

N

PUW

ER a

sses

smen

t to

be c

ondu

cted

on

the

mac

hine

to e

nsur

e it

mee

ts th

e re

quire

men

ts o

f the

Mac

hine

Dire

ctiv

e an

d as

socia

ted

stan

dard

s As

and

whe

n fo

r ea

ch

inst

alla

tion

Loca

l PU

WER

as

sess

or w

ith

guid

ance

from

Cr

aig

Dow

e if

reqd

Revi

ew th

e W

orkp

lace

Risk

Ass

essm

ent t

o en

sure

the

loca

tion

of th

e m

achi

nes

are

cons

ider

ed.

As a

nd w

hen

for

each

in

stal

latio

n

Site

lead

, re

gion

al S

HE

advi

sor,

loca

l sa

fety

rep

Revi

ew th

e fu

ll fir

e ris

k as

sess

men

t to

capt

ure

the

new

ly in

stal

led

mac

hine

s an

d th

e as

socia

ted

fire

emer

genc

y te

sts

and

evac

uatio

ns.

As a

nd w

hen

for

each

in

stal

latio

n

Site

lead

, re

gion

al S

HE

advi

sor,

loca

l sa

fety

rep

Page 18: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

Unde

rtak

e a

Noi

se te

st o

f the

are

a w

here

the

mac

hine

s ar

e lo

cate

d.

Revi

ew th

e N

oise

ris

k as

sess

men

t to

incl

ude

the

new

mac

hine

s If

requ

ired

at

each

site

Si

te le

ad,

regi

onal

SH

E ad

viso

r, lo

cal

safe

ty r

ep

Supp

ortin

g D

ocum

ents

Ass

ocia

ted

with

this

SAC

1

1)

RoM

EC W

ELL

docu

men

t for

ele

ctric

al p

ower

inst

alla

tion

2)

Co

ntra

ctor

Ris

k As

sess

men

t and

Met

hod

Stat

emen

t exa

mpl

e do

cum

enta

tion

for

conv

eyor

del

iver

ies

and

inst

alla

tion

3)

Man

ufac

ture

rs d

esig

n re

sidu

al r

isk a

sses

smen

t

4)

Oper

ator

man

ual

5)

M

aint

enan

ce m

anua

l

6)

Dra

ft SS

oW a

wai

ting

appr

oval

7)

Site

loca

tions

, spe

cifica

tion

and

num

ber

of c

onve

yors

at e

ach

type

(as

of 0

1/M

ay/2

015)

8)

Stan

dard

use

doc

umen

ts (K

en H

ouse

to p

rovi

de)

STEP

6

SAFE

TY R

ECOM

MEN

DAT

ION

By

sig

ning

bel

ow y

ou a

gree

that

one

of t

he b

elow

sta

tem

ents

app

lies

to y

ou, t

here

fore

del

ete

the

stat

emen

ts th

at d

o no

t app

ly

I am

sat

isfie

d in

rel

atio

n to

the

Prog

ram

me,

Pro

ject

or

Prod

uct d

eplo

ymen

t, in

clud

ing

in r

elat

ion

to h

azar

ds d

urin

g th

e op

erat

iona

l use

of w

ork

equi

pmen

t whe

re a

pplic

able

that

1.

Th

ere

are

no s

afet

y ris

ks fo

r m

y ar

ea o

f res

pons

ibili

ty. I

am

abl

e to

rec

omm

end

it fo

r fin

al s

afet

y co

ncur

renc

e.

2.

The

safe

ty r

isks

for

my

area

of r

espo

nsib

ility

are

ade

quat

ely

cont

rolle

d or

hav

e be

en r

educ

ed to

a to

lera

ble

risk.

I am

abl

e to

rec

omm

end

it fo

r fin

al s

afet

y co

ncur

renc

e.

3.

The

safe

ty r

isks

for

my

area

of r

espo

nsib

ility

hav

e be

en id

entif

ied

and

whi

le th

e co

ncur

renc

e ac

tions

hav

e no

t yet

bee

n de

ploy

ed, t

hey

have

bee

n re

cord

ed fo

r im

plem

enta

tion

via

the

Safe

ty M

anag

emen

t Pla

n or

the

Safe

ty A

sses

smen

t Con

curr

ence

Que

stio

ns &

Act

ions

doc

umen

t. I a

m a

ble

to r

ecom

men

d it

for

final

con

curr

ence

on

the

unde

rsta

ndin

g th

ese

actio

ns a

re c

ompl

eted

bef

ore

the

proj

ect i

s de

ploy

ed a

nd th

e ha

ndov

er c

ompl

eted

at U

nit l

evel

. CA

TEGO

RY (8

.1),

CATE

GORY

(8.2

) & C

ATEG

ORY

(8.3

) W

hich

App

ly**

N

AME

SIGN

ATU

RE

DAT

E N

ATIO

NAL

LY A

PPOI

NTE

D S

AFET

Y LE

AD

SEN

IOR

SAFE

TY P

ROFE

SIO

NN

AL (W

here

not

fina

l sig

nato

ry)

PROJ

ECT

SAFE

TY L

EAD

SA

FETY

AD

VISO

R (W

here

not

fina

l sig

nato

ry

PROJ

ECT

MAN

AGER

(If d

iffer

ent f

rom

Pro

ject

Lea

d)

3 Ra

y Pi

pe

Ray

Pipe

01

/05/

2015

SU

BJEC

T M

ATTE

R EX

PERT

– C

onve

yors

3

Crai

g D

owe

Crai

g Do

we

12/0

5/20

15

PROP

ERTY

& F

ACIL

ITIE

S (S

AFET

Y TE

AM)

N/A

CDM

CO-

ORD

INAT

OR

N/A

Page 19: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

ENGI

NEE

RIN

G (S

AFET

Y TE

AM)

3 D

el R

offe

y

M

AIN

TEN

ANCE

N

/A

LO

GIST

ICS

(SAF

ETY

TEAM

) – (V

EHIC

LES)

N

/A

AS

SETS

(SAF

ETY

TEAM

) N

/A

ER

GON

OMIS

T N

/A

STEP

7

FIN

AL S

AFET

Y CO

NCU

RREN

CE

By s

igni

ng b

elow

you

agr

ee th

at y

ou a

re s

atisf

ied

the

prog

ram

me/

proj

ect/p

rodu

ct h

as r

ecei

ved

adeq

uate

saf

ety

cons

ider

atio

ns a

nd th

at y

ou a

re p

repa

red

to g

ive

final

saf

ety

conc

urre

nce

on th

e un

ders

tand

ing

that

any

act

ions

in th

is do

cum

ent o

r th

e Sa

fety

Man

agem

ent P

lan

or th

e Sa

fety

Con

curr

ence

Gat

eway

Que

stio

ns &

Act

ions

doc

umen

t are

co

mpl

eted

bef

ore

final

dep

loym

ent o

f and

the

mov

emen

t of t

he p

rogr

amm

e/pr

ojec

t/pro

duct

s an

d an

y as

socia

ted

wor

k eq

uipm

ent t

o bu

sine

ss a

s us

ual t

he.

CATE

GORY

1 S

AFET

Y CO

NCU

RREN

CE (8

.1 o

nly)

N

AME

SIGN

ATU

RE

DAT

E GR

OUP

SAFE

TY R

ISK

IMPR

OVEM

ENT

MAN

AGER

Jo

anna

Hos

king

JH

oskin

g 18

/05/

2015

An

d as

Re

view

ed o

n 19

/11/

2015

. PR

OGRA

MM

ES D

IREC

TOR

/ MAN

AGER

(as

appl

icabl

e)

War

ren

Cabo

t

CA

TEGO

RY 2

SAF

ETY

CON

CURR

ENCE

(8.2

onl

y)

NAM

E SI

GNAT

URE

D

ATE

SEN

IOR

SAFE

TY P

ROFE

SIO

NN

AL

PR

OGRA

MM

ES M

ANAG

ER

CA

TEGO

RY 3

SAF

ETY

CON

CURR

ENCE

(8.3

onl

y)

NAM

E SI

GNAT

URE

D

ATE

SAFE

TY A

DVI

SOR

N

OTE

: For

fina

l sig

n of

f on

Uni

t Lev

el (8

.3) p

roje

cts

refe

r to

the

Safe

ty H

ando

ver

Com

plia

nce

Cert

ifica

te

RISK

MAT

RIX

Page 20: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

SAC

1 T

empl

ate:

T

empl

ate

Ow

ner:

S. W

hite

V

ersi

on: 4

.2

Dat

e: Ju

ly 2

013

Page 21: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

ROYAL MAIL GROUP RISK MANAGEMENT

SAFE SYSTEM OF WORK (Appendix 2)

This SSOW provides sufficient INFORMATION and INSTRUCTION to allow managers to control safety risks identified during risk assessments. It is used by work area managers to inform and instruct operators, at induction and refresher training events, how a task they are involved in or work equipment they are using can be completed / used safely. A record should be retained to show that this information and instruction has been shared with those employees affected.

Task / Work Equipment Description

Generic Task / Work Equipment (SSOW Title) Cut & Tip Powered Conveyor

Associated Risk Assessment SAC1 National Cut & Tip Conveyor SSOW Version No V1.3

WHAT RISKS ARE CONTROLLED BY THIS SAFE SYSTEM OF WORK

(As identified in the task risk assessment or SAC1 process, show the risks identified and the controls that have been introduced. For example, pedestrian/vehicle collisions controlled by the provision of a designated & protected walkway. Identified Risk Risk Rating (ref. SMS2.1 Risk Matrix) Control

Operating the conveyor

Tolerable Following initial installation and equipment deployment: National project lead to ensure training is provided on site and delivered to the workplace coaches. On-going training to be delivered by a competent Workplace Coach using safe systems detailed in this document.

INSTRUCTIONS

(How to carry out the task &/or use the work equipment safely - including the Don’t and Do written instructions)

Page 22: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

Cut and Tip Conveyors This safe system of work must be followed at all times and consolidates advice given in operator training and operations manuals. Any problems should be reported to your line manager immediately. It is the legal responsibility of every employee at work: • to take reasonable care for the health and safety of themselves and others who may be affected by

their acts or omissions

• To report defective or faulty equipment immediately.

Before use Check workstation for defects and report defects to your line manager. The work area around any machine must be kept tidy. Check that there are no trailing cables All covers and/or guards must be in place and undamaged. You must be familiar with the location and operation of all machine controls.

General DO inform your manager of any medical condition which may affect your ability to perform your work, or if you are pregnant. DO follow operating instructions. DO keep hands clear of any moving parts.

DO be aware of hypodermic needles, sharp objects and leaking or suspicious packages. DO make sure your path is clear before you lift, carry or push a load.

Manual Handling:

pping Bags

WARNING: Only authorised personnel are allowed to open and access the control panel, power point trip switch panel and disconnect the power lead from the power point. DO NOT attempt to open the control panel cover. DO NOT attempt to access the power point trip switch. DO NOT attempt to disconnect the power lead from the power point. DO NOT plug personal electrical equipment into the blue or red power socket

x

To avoid repetitive actions when tipping mail bags, operators must be rotated at regular intervals.

x

Page 23: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

Assess the weight of the bag. Inform your manager if bag is overweight. (If considered overweight, cut seal and break down contents without lifting bag.) Use the proper equipment to cut the bag tie (e.g. official scissors). Dispose of the string, label ties and seals in a bin. Use correct lifting and handling methods to lift the bag. Lift bag onto work surface in one movement. When the bag is on the surface, feed mail out of the bag by hand before lifting to fully empty. Lifting should be no higher than shoulder height. Check bag is empty and place in appropriate empty bag storage container. Discard any damaged bags. Avoid lifting and tipping bags in one movement.

DO lift full trays from the rear of the workstation using established manual handling techniques. DO fill Yorks using the “Slide and Stack” technique. DO manually lift empty grey Totes. DO NOT over stretch or overstrain arm muscles while tipping a bag. DO NOT leave bags loose on the floor.

Incline Conveyor DO operate an emergency stop button in case of emergency DO operate an emergency stop button when attempting to retrieve jammed mail, even if the machine has already stopped. DO secure, completely cover or remove all loose jewellery and loose clothing, and tie back long hair before operating any machine.

DO NOT use this equipment unless you have been fully trained. DO NOT attempt to start or interfere in any way with any machine which is under maintenance control or displaying a “machine under maintenance” sign. DO NOT tamper with electrical or mechanical equipment/remove safety covers/guards. DO NOT attempt to insert, extract, touch any component, or attempt to remove any jammed item of mail from a moving part of a machine. DO NOT start the machine until you are sure no one is working on it. DO NOT reset an emergency stop until the fault has been cleared. DO NOT use personal stereos when operating this machine. DO NOT lean, touch, stand, walk, or lie on any conveyor belt. DO NOT make unauthorised or unsafe repairs to the conveyor DO NOT overload conveyor belt or load above side height of conveyor. DO NOT throw strings, label ties, or seals on the floor.

Flat Bed Conveyor

DO operate an emergency stop button in case of emergency DO operate an emergency stop button when attempting to retrieve jammed mail, even if the machine has already stopped. DO secure, completely cover or remove all loose jewellery and loose clothing, and tie back long hair before operating any machine.

DO NOT use this equipment unless you have been fully trained. DO NOT attempt to start or interfere in any way with any machine which is under maintenance control or displaying a “machine under maintenance” sign. DO NOT tamper with electrical or mechanical equipment/remove safety covers/guards. DO NOT attempt to insert, extract, touch any component, or attempt to remove any jammed item of mail from a moving part of a machine.

Page 24: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

DO NOT start the machine until you are sure no one is working on it. DO NOT reset an emergency stop until the fault has been cleared. DO NOT use personal stereos when operating this machine. DO NOT lean, touch, stand, walk, or lie on any conveyor belt. DO NOT make unauthorised or unsafe repairs to the conveyor DO NOT overload conveyor belt or load above side height of conveyor. DO NOT throw strings, label ties, or seals on the floor.

Conveyor Safety Phrase Label DO make sure you are aware of the Safety Phrase label which is has been affixed to the side of the incline conveyor above the main control panel

Before use:

Mandatory Pre-use Checks

Page 25: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

P1. Before Use: P1.1 Carry out a visual check of the conveyors general condition. Are there any protruding,

sharp, jagged edges? Has the conveyor received

any impact damage i.e. are the covers damaged?

Is the belt free from damaged and visible wear?

Is there visible damage to the emergency stop buttons?

P2. (Machine not running) Emergency Stop button check: P2.1 There are up to eight emergency stop buttons located on the conveyor

P2.2 Engage the emergency stops by depressing the buttons. P2.3 Release the emergency stop by turning the button anti-clockwise.

Machine Operation: P3. Machine Start-up procedure:

P3.1 (On the control panel) Turn the control power switch clockwise into the vertical position.

P1.1

The equipment must not be used if faults or damage are identified. Report all defects to your line

manager immediately.

P2.1

P2.2 P2.3

Head Strike hazard Be aware of the protruding

emergency stop buttons when accessing the control panel or

picking up mail items from the floor.

P3.1 Control Panel

Check to ensure the people are clear of the conveyor prior and during the completion of the machine start-up procedure.

Page 26: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

P4. Machine Start-up procedure: P4.1 With the red light now illuminated: P4.2 Press the reset button and hold for 5 seconds. P4.3 Amber light now illuminates. P4.4 Press the start button. P4.5 The first Warning sounds with a single beep and Amber light illuminates. P4.6 Continuing to keep start button pressed, second warning alarm sounds, the green light illuminates and the conveyor belt starts.

Emergency stop & start-up procedure:

P5. Emergency Stop: P5.1 Immediately press the nearest emergency stop button. The conveyor will now stop.

P6. Emergency stop restart procedure:

P6.1 Release the emergency stop button. Continual alarm sounds. P6.2 Press the reset button and hold for 5 seconds P6.3 Amber light now illuminates P6.4 Press the start button, alarm sounds once. Keeping the start button pressed the alarm sounds twice. P6.5 The green light now illuminates and the conveyor belt starts.

Bag tipping to the conveyor:

P4.1 P4.2 P4.3

P4.4 P4.5 P4.6

P5.1

Before starting this process ensure the reason for the emergency stop

has been safely resolved and if needed checked by an engineer or

other competent person.

P6.1 P6.2 P6.3

P6.4 P6.5

Page 27: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

P7. Loading the Hopper: P7.1 Use correct lifting and handling methods to remove the bag from the York container. Rest the bag on the front of the Hopper When the bag is on the surface, empty or feed mail out of the bag by hand before lifting to fully empty. Lifting should be no higher than shoulder height. Store the empty bag in a suitable receptacle.

Flat Bed Conveyor P8. Working with the Conveyor: Position 2. P8.1. Extract the appropriate mail items as they pass on the conveyor and sort to the associated container.

P7.1

DO NOT overload the conveyor belt

Bag tipping must only be carried out at the front of the

incline conveyor. DO NOT tip bags over the sides

of the conveyor

Warning! Watch out for sharps!

Warning! watch out for sharps

P8.1

Page 28: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

P9. Conveyor Sensor: P9.1. Sensors are located at the end of the conveyor to prevent mail items falling form the belt. As mail items pass the sensors, the belt will automatically stop. The belt will again re-start once the mail item blocking the sensor is removed.

P9.2. Through local management procedures the sensor can be disabled on the control panel by use of a key switch

P9.3. Where the end of the conveyor has a no “Bump Bar” under no circumstances must a container be placed at the end of the conveyor and the sensor “MUST “be enabled and the key switched to the “ON” position.

P9.4. Where the end of the conveyor has a “Bump Bar” the sensor can be enabled or disabled through the local management procedure.

GENERAL INFORMATION

(Anything specific to the task &/or work equipment) All operators must have received suitable and sufficient manual handling lifting and handling training. Link to 2:15 Manual Handling:

P9.1

Warning! If sensor is disabled items

will travel off the end of the belt. Ensure a suitable mini sleeved York container is in

place.

P9.2

NO container allowed at end of conveyor!

Container allowed at end of conveyor!

Page 29: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

https://portal.royalmailgroup.com/sites/A402/Risk/Forms/Manual.aspx

COMPETENCY (Beyond the training received from this SSOW list any other training that is required)

Training Format (Course/Certificated/Qualification) Following initial installation and equipment deployment: National project lead to ensure training is provided on site and delivered to the workplace coaches. Manual Handling training

Theory and practical with the equipment. WTLL based with practical demonstration.

PERSONAL PROTECTIVE EQUIPMENT

(This PPE is to be provided & used, as specified, by people undertaking this task &/or using this work equipment) Item Ordering details Comments

N/A

SAFETY SIGNAGE

(The below Safety Signage is to be displayed, as specified, in the workplace where this SSOW applies) Item Ordering details Comments N/A

All of the above controls will, if implemented effectively, reduce the safety risks associated with this task &/or work equipment to an ACCEPTABLE level and as such will be ‘Adequately Controlled’.

SSOW AUTHORISATION

Name Signed Date Author Ray Pipe

07/09/2015

Safety Support (where applicable)

I have authorised this SSOW for deployment Safety Authorisation: (As defined in Levels of Authority Appendix 4)

Peter McGowan

11/09/2015

On deployment in the Work Area a copy of the SSOW should be retained for reference

SSOW LOCAL ARRANGEMENTS

SSOW Title

Region

Unit (Where applicable to individual Unit)

Page 30: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safe System of Work Template: Template Owner: S. White Version: 1.3 Date: Feb 2013

(For use where a Unit Manager wants to add local arrangements to a Group or Business Unit SSOW)

While the SSOW provides sufficient INFORMATION and INSTRUCTION to allow managers to control safety risks for a specific task &/or item of work equipment it is possible that local circumstances within a Unit could introduce additional risks. Where local risk assessment indicates this to be the case LOCAL ARRANGEMENTS could be prepared help to remove or reduce the additional risks to an acceptable level. This additional INFORMATION and INSTRUCTION must be used within the Unit(s) affected to inform and instruct those employees affected. It should also be used at induction and refresher training events to inform employees how a task they are involved in can be completed safely &/or how work equipment they are using can be used safely. Any training or briefing using the SSOW should be recorded to show where the additional information and instruction has been given.

NOTE: Local amendments to a SSOW cannot be less stringent than the national version.

LOCALISATION

Locally Identified Risk

Risk Rating (ref. SMS2.1 Risk Matrix)

Control

LOCAL SIGN OFF

Signature

Date

Local Author

Safety Authorisation: (As defined in Levels of Authority set out in

the Standard) Peter McGowan

11/09/2015

Page 31: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

1

Ergonomic Assessment Template Owner: S. White Version: 2.0 Date: May 2013

Ergonomic Screening Assessment (Appendix 4) Work Equipment Title Incline conveyors Work equipment photograph Serial Number/identification mark

Work Equipment Group Conveyors Work Equipment Details

Project Manager (contact details)

Martyn Dundas

NOTE: This is a preliminary assessment which may lead to a more detailed ergonomic assessment depending upon the answers to the following questions. If any of the answers to the questions below are No remedial action or a more detailed assessment will be required. Contact Jane Dillon or Corinne Parsons if you need help to complete the assessment. Reference should be made to the illustrations Fig 1, Fig 2, Fig 3 when answering these questions

1 For this equipment ……. Yes No N/A If No state what remedial action

required Detailed assessment

required Y/N 1.1 Is the equipment less than 16kg

total weight? If yes go to Question 1.2, if no go to Question 1.3

No

1.2 Will suitable handles be provided for lifting and carrying the equipment?

1.3 If the equipment exceeds 16kg total weight will alternative means of transporting be provided? (wheels for example)

N/A

1.4 Are all visual aids/instructions that form part of the equipment clear and easy to understand?

Yes

1.5 Is the working space where this equipment is likely to be used adequate i.e. unlikely to be congested or cramped?

Yes

2 For this equipments intended use (so

far as can be ascertained) ……. Yes No N/A If No state what remedial action

required Detailed assessment

required Y/N 2.1 Will all the lifting tasks be within the

HSE guideline figures, (see Fig 1)? Yes

2.2 Will all the lifting tasks be repeated 7 times/min or less frequently?

No No remedial required as it is parcels being lifted (not large parcels)

2.3 Will all the forces required to keep a load in motion require little effort (e.g. be less than 7kg)?

Yes

2.4 Will all the forces required to initiate movement easy to exert (e.g less than 15kg)?

Yes

2.5 Will all the pushing forces required be exerted with hands between knuckle and shoulder height?

Yes

2.6 Will all forces or items lifted whilst seated be less than 5kg?

N/A

Page 32: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

2

Ergonomic Assessment Template Owner: S. White Version: 2.0 Date: May 2013

2.7 Will any items to be carried in the hands weigh less than 10kg and need carrying for less than 1 minute at time?

Yes

2.8 Can all lifting and handling tasks be carried out without twisting or bending?

Yes

2.9 Are all tasks completed within the Golden Zone, (AA or A on Fig 3)?

No There are two low volume selections which are situated beside and slightly behind the operators. There is no remedy required

N

2.10 Will shorter or taller people find reaching or seeing to complete task elements involving this equipment easy?

Yes

2.11 Are work surface heights appropriate? (e.g. around 700mm for seated work, 950 – 1000mm for standing work; reduced to accommodate items placed on work surface or use of tools. Bag tipping heights below 500 mm)

Yes

2.12 Are all movements likely as part of using this equipment Low or Medium risk 2 on the Muri chart, (see Fig 2, ignore walking)

Yes

2.13 Are all postures on the Muri chart scoring Medium or High held for less than 1 minute at a time or repeated less than 7 times/min, (see Fig 2, Ignore walking)?

Yes

2.14 Can suitable time be allowed in any task using this equipment for rest and recovery?

Yes

2.15 Can suitable seats be provided for all tasks that can be done seated?

N/A

2.16 Where this equipment is used for tasks lasting longer than one hour and cannot be done seated will provision been made to allow sitting down during breaks?

Yes

ERGONOMIC ASSESSMENT

I can confirm that I have the appropriate level of competency, in terms of knowledge and experience of completing other assessments, to allow me to sign off this preliminary Ergonomic assessment. I can confirm that on completion of the assessment and any remedial actions that are identified as necessary and no significant risks are identified and still outstanding then this work equipment is fit for purpose and the intended use to which it will be put within the Business as far as its ergonomic impact is concerned, and that the user of the work equipment or persons who may be affected by its use have been safeguarded from any risks. NOTE: If remedial actions highlighted in the remedial action column indicate that a more detailed Ergonomic assessment report is required then the ergonomists Jane Dillon or Corinne Parsons should be contacted for advice. Work Equipment Title (as per page one)

Incline Conveyors Assessment date:

10/11/2015

Assessor name (Not valid unless signed)

Martyn Dundas Assessor signature (not valid unless signed)

Martyn Dundas

The assessors must retain a copy of this Ergonomic assessment and forward a copy to the Project Manager if the assessor and the project manager aren’t one and the same person.

Page 33: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

3

Ergonomic Assessment Template Owner: S. White Version: 2.0 Date: May 2013

End of ERGONOMIC Assessment

Fig 1: HSE Lifting and Handling Guideline Figures

Fig 2: Muri Chart

Page 34: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

4

Ergonomic Assessment Template Owner: S. White Version: 2.0 Date: May 2013

Page 35: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

5

Ergonomic Assessment Template Owner: S. White Version: 2.0 Date: May 2013

Fig 3: Golden Zone

900

1150

1400

1700 C

Page 36: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14

Royal Mail is a trading name of Royal Mail Group Ltd. Registered number 4138203. Registered in England and Wales. Registered office: 100 Victoria Embankment, London, EC4Y 0HQ

WCM Parcel conveyors ergonomics assessment

19th February 2015

Corinne Parsons

Lead Ergonomist

SHE Technical Support, Ergonomics

[email protected]

07738 311368

Page 37: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 2 of 9

Contents

1.0 Introduction .......................................................................................................................................... 3

Assessment .................................................................................................................................................. 4

Home Counties North .......................................................................................................................... 4

Edinburgh ................................................................................................................................................ 5

Assessment of Repetative Work ......................................................................................................... 7

Conclusions .................................................................................................................................................. 8

Page 38: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 3 of 9

1.0 Introduction An ergonomics assessment of the parcel conveyors in use at Home Counties North (HCN) and Edinburgh was carried out at the request of Ken House, National Workplace Organisation Deployment Lead, as part of the evaluation of the national WCM parcel conveyor trial.

This assessment should be read in conjunction with the Ergonomics Screening assessment which was carried out at the start of the conveyor project.

WCM conveyor Ergo Screening Assessmen

Three points on the screening assessment were identified as requiring a more detailed ergonomics assessment during the trials:-

2 For this equipments intended use (so far as can be ascertained) …….

Yes No N/A If No state what remedial action required

Detailed assessment required Y/N

2.2 Will all the lifting tasks be repeated 7 times/min or less frequently?

N Parcel sorting activities for small parcels. Manual handling risk will be low provided throwing distances are minimised and provision is made to walk round with any heavy or difficult parcels

Assessment during trial

2.9 Are all tasks completed within the Golden Zone, (AA or A on Fig 3)?

N Parcels will be thrown into mini-yorks, layouts may vary at different centres but should not exceed 1 deep if across a conveyor or 2 deep elsewhere. Space should be allowed to walk round to place any items that are too flimsy, heavy or awkward to throw easily.

Review during trial

2.13 Are all postures on the Muri chart scoring Medium or High held for less than 1 minute at a time or repeated less than 7 times/min, (see Fig 2, Ignore walking)?

N Depends on sorting layout. Parcel sorting frequency will be greater than 7times/min, parcels thrown over a distance or difficult parcels to throw will result in arm posture at or above shoulder height

Review during trial

A visit was made to Edinburgh and HCN Mail Centres to observe the operation during the trials and to discuss the working methods with the operators.

Page 39: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 4 of 9

Assessment The conveyors in use at the two mail centres are similar. Both have the benefit of a low level tipping hopper, rising conveyor and working belt at a good working height for standing work. The belts differ in that the one at HCN is 60cm wide and the one at Edinburgh is 50cm wide.

The layouts of containers and working methods differ at the two mail centres. Both have one person tipping into the hopper and two people sorting from the conveyor into mini-yorks or full sized Yorks with ALP sleeves. At HCN the staff work on both sides of the conveyor and at Edinburgh the staff work on one side and the containers are positioned on the other.

Home Counties North The conveyors are used for all primary parcel traffic except for the large parcels which are sorted in a separate bullring. Both parcel bags and parcels in ALP sleeves are tipped into the hopper.

Home Counties North set up

There are 8 selections around the end of the conveyor in mini-Yorks which are shared between the two staff working on the belt. In addition there are 3 full sizes Yorks for foreign, second class and a local selection. There is an additional mini-York on each side for mis-sorts

Three of the selections on each side and the mis-sorts are within easy reach of the individual on that side. The majority of selections are well outside the golden zone and it is necessary to throw the parcels. For the furthest containers the throwing distance is in

Page 40: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 5 of 9

excess of 2m causing the arms to be raised above the shoulder height to throw at times. This arrangement exceeds the recommendation in the ergonomics screening assessment for mini-yorks to be only one deep if on the opposite side of the conveyor or two deep if on the same side. As there are two people, one on each side of the conveyor, anything that would be difficult to throw, or for the furthest selections could be sorted by the person on the same side of the conveyor. All selections can readily be walked to with items that are particularly difficult to handle. During the observations occasional parcels missed and landed on the floor.

Sorting to closer selections

Sorting to more distant selections

Edinburgh The conveyor at Edinburgh was 500mm wide and the containers were arranged on the far side of the conveyor. The conveyor was used for Horizon and PPI parcels. Collection parcels were processed separately due to the need to cancel the stamps. There were 11 containers altogether including 5 roads, local selections, Glasgow and foreign selections. For First Class parcels mini-Yorks were used for the roads and the local parcels and full sized Yorks were used for the other selections. For Second Class parcels full sized Yorks were used for all selections.

Page 41: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 6 of 9

First class set up Second class set up

The conveyor was easy to sort across due to being relatively narrow. Although the reach is slightly outside the golden zone it was a comfortable distance to sort parcels without the need to throw them. The working method was for two people to work on the belt and for parcels for the selections at the far end of the belt to be left on the conveyor for the second person to sort.

It was easy to sort parcels into the full sized sleeves with the front open but it was harder to sort over the top of the closed sleeves as this requires sorting items above shoulder height, increasing the strain on the shoulders and arms. It was easy to reach across the conveyor to sequentially close the containers. This should be the normal practice rather than unnecessarily sorting all parcels over the top of the sleeve as was observed during the visit.

The operators using the conveyor at the time of the visit preferred this to their previous method of working. The low level tipping hopper was seen as a particular benefit. The main concern raised was the tendency for parcels to fall off the side, particularly if there was a big batch of slippery poly-wrapped items coming up the conveyor together. The main point at which the parcels fell off was the interface between the rising conveyor and the flat sorting conveyor. A slightly higher side rail at this point may help but should not extend onto the working area as this will get in the way of elbows when sorting. In addition it may be necessary for the individual working at the first position to move parcels that may fall first. Using a wider conveyor may reduce the number of parcels which fall off but this would have the disadvantage of increasing the risk of sorting across the conveyor by placing all selections further outside the golden zone and so is not recommended.

Page 42: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 7 of 9

Parcels surge Parcels fallen off conveyor

Several concerns were raised about the conveyor itself:-

• Temperamental to start • Tearing of the uplift conveyor belt which was not considered strong enough material • Vulnerability of the sensor to damage from parcels and it was suggested that this

should have a cage to protect it from damage.

Sensor

Assessment of Repetative Work The actions carried out for both the HCN and Edinburgh layout were analysed and an assessment of the risk from repetative work was carried out using the Health & Safety Excecutive ART tool. The tool takes into consideration the postures of the hands, wrists, arms, trunk and neck; the repetativeness, task duration and forces. The results are given in the table below for the two layouts.

HSE ART tool .pdf

Page 43: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 8 of 9

Risk factor HCN Edinburgh

Score Score A1 Arm movements 3 3 A2 Repetition 3 3 B Force 1 0 C1 Head/Neck posture 2 1 C2 Back posture 0 0 C3 Arm posture 2 1 C4 Wrist posture 1 0 C5 Hand/finger grip 1 1 D1 Breaks (between 1 and 2 hours between breaks)

2 2

D2 Work pace 0 0 D3 Other factors 0 0 Task score 15 11 D4 Duration multiplier 1 (all shift)

0.75 (up to 4 hours) 1 (all shift)

0.75 (up to 4 hours) Exposure score full shift 15 11 Exposure score full shift 11.25 8.25 Psychosocial and other risk indicators

Not identified, site dependant

Not identified, site dependant

The results show that the risk from repetitive work is higher for the HCN layout than for the Edinburgh layout for First Class mail. If carried out for a whole shift the HCN layout would pose a medium risk of injury for repetitive work, Edinburgh would pose a low risk. For the Second Class layout at Edinburgh, with full sized York sleeves, the risk would increase to medium if the sleeves were closed during the whole sorting process.

Conclusions • The introduction of a parcel conveyor with a low level tipping hopper, rising conveyor

and good working height sorting belt reduces the risk from manual handling compared to tipping parcel bags into a mini-York/ALT or onto a table.

• The Edinburgh layout has shorter sorting distances and so poses a lower risk of injury from repetitive work than the HCN layout.

Page 44: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Motorola Finger Scanner Initial Ergonomics Assessment – Version Creation Date: 19/06/14 – Page 9 of 9

• Both layouts are designed for two sorters to work together and so risks can be minimised by the individual closest to the selection sorting the parcels rather than throwing them over long distances.

• Where full sized Yorks are used the sleeves should be closed as the container fills rather than closing them at the start of the sorting process. This prevents unnecessarily sorting above shoulder height and which increases the risk of injury.

Page 45: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

1

Tipping from York Sleeve to Parcel Conveyor Ergonomics Assessment

17th April 2016

David Annett

Chartered Ergonomist

Ergotherapy

[email protected]

www.ergotherapy.co.uk

07957 542341

Page 46: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

2

Introduction

An ergonomic review of tipping parcels from York Sleeves into an ascending conveyor was requested by Ken House, National Workplace Organisation Deployment Lead. The operation was observed on the early shift at Manchester Mail Centre and took place on 5th April 2016. Operators and managers were interviewed and video was taken for postural analysis. Mark Connolly (Shift Manager) and Mathew Bullen (WCM Champion) were present during the visit.

Loading the belt with Parcels from the York Sleeve

Background

Manual parcel processing is now a large part of the Royal Mail Operation. Many parcels are sorted from York Sleeves into other York Sleeves in a Bullring. The hopper and ascending belt were originally designed for bag tipping, but has been used with York Sleeves for the last 6 months at Manchester. This provides sorters with a continuous stream of parcels presented at a good working height. This work area was assessed by Dr Corinne Parsons in February 2015 at Edinburgh and Home Counties North (HCN) but focussed on the sorting operation, with alternative layouts of containers. In these offices one person was tipping and two people were sorting from the belt.

Page 47: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

3

Assessment

The operation observed in Manchester was different from the offices in the previous report; as there were four operators sorting from the belt rather than two. This appeared to put more pressure on the person tipping the parcels onto the belt, as they were expected by the managers to get through 15 Yorks an hour in order to cost-in the manpower of the operation. Some of the operators felt they were being put under pressure to work faster than their natural pace in order to meet these goals. The CWU representative Graham Booth felt that staff were being put under undue pressure to achieve these goals.

Several operators were observed loading the belts and they were generally able to keep a good posture, minimising bending and twisting. The York Sleeve self-levelling system generally works well to minimise bending, but there will always be times when a heavier item is in the bottom so the base does not raise sufficiently. Operators were generally good at positioning the York close to the hopper and angled such to minimise twisting.

The type/size of parcel made a significant difference to the speed of the operation – larger parcels tended to be lifted with 2 hands and can be sorted quite quickly, so it was harder to keep up. With small items, many could be grabbed at a time and they took longer to sort, so it was easier to keep up. A new working method introduced by the WCM champion is to have a second York available with small items, so that they can alternate with a few handfuls of these to slow down the sorters so it is easier to keep up. This appeared to work well with the limited amount of time it was observed.

The tipper role was rotated every hour with other tasks in the work area, although some staff liked the task and were not always rotated. Taking the empty York away and fetching a full York gives the tipper a break from the repetitive work, but if they are away from the belt for too long the belt empties and the sorters may be standing waiting for work which can put more stress on the tipper and manager. This can vary depending on the quality of portering.

Risks were increased when:

• Operators did not apply the brake of the York so it moved away from them if they leant into the York.

• Items were thrown longer distances to fill in gaps higher up the belt. (Some operators walked down the side of the belt to do this, but this took up time).

• The York was not placed close to the belt which could introduce more twisting when loading.

• Pressure on manager/tipper if the belt was seen to be empty or the closest sorters were standing waiting for work.

• Staff are not rotated to another task after an hour.

Page 48: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

4

Assessment of Repetitive work The actions carried out were analysed and an assessment of the risk from repetative work was carried out using the Health & Safety Excecutive ART tool. The tool takes into consideration the postures of the hands, wrists, arms, trunk and neck; the repetativeness, task duration and forces. The results are given in the table below for Manchester where there are four people sorting. An estimate has also been given for the risk when only 2 people are sorting assuming they will not be required to load the belt as quickly. Hence lower figures for the frequency of arm movements, repetitions and work pace.

Risk factor 4 people sorting Estimate for 2 people sorting

Score Score A1 Arm movements 5 3 A2 Repetition 6 3 B Force 1 1 C1 Head/Neck posture 1 1 C2 Back posture 1 1 C3 Arm posture 2 2 C4 Wrist posture 1 1 C5 Hand/finger grip 1 1 D1 Breaks (between 1 and 2 hours between breaks)

2 2

D2 Work pace 1 0 D3 Other factors 0 0 Task score 21 15 D4 Duration multiplier 1 (all shift)

0.75 (up to 4 hours) 1 (all shift)

0.75 (up to 4 hours) Exposure score full shift 21 15 Exposure score half shift 15.75 11.25 Psychosocial and other risk indicators

Under pressure, but site dependant

Less time pressure?

Risk Levels

Exposure score

Proposed exposure level Action

0–11 Low Consider individual circumstances

12–21 Medium Further investigation required

22 or more High Further investigation required urgently

Page 49: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

5

Conclusion

If the task of loading the belt from a York Sleeve is undertaken at a steady rate (less than 20 lifts per minute) then it is considered a low risk if undertaken for half shift or (low)medium risk if undertaken for a full shift. This assumes that the York is placed close to the belt to minimise twisting and the York brake is applied.

If the task is undertaken at a faster pace – over 20 lifts per minute then it is rated as a medium risk for a half shift and full shift, although the full shift is very close to the high risk category. Psychosocial indicators at Manchester suggested there was pressure on managers and operators to maintain a high work rate to achieve emptying 15 Yorks per hour.

Handling rates at Manchester varied between 16-30 lifts per minute, so further investigation is recommended. This could include the following:

i. Review other offices using this system to check perceived pressure and handling rates.

ii. Consider using fewer sorters to reduce the pressure on the tipper (2 or 3). iii. Review in more detail if having a second York with smaller items, to top up the belt,

reduces the handling rates.

Page 50: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

6

Pictures

Increased risk when throwing items to empty gaps higher up the belt (left). Walking along the belt to drop them higher up takes more time (right).

Placing the York too far from the Belt can lead to more twisting of the torso.

The conveyor sides are relatively low, so if sometimes items may fall over the side they have to be picked off the floor.

Layout for when two Yorks are used, so the operator can alternate between left and right handed.

This operator preferred to work from one side.

Page 51: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Operating Instructions

Incline Conveyor and 4m Horizontal Conveyor for

Operator Instructions

for Cut and Tip conveyors

TITLE:

DO NOT SCALE DRAWIN

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

DRAWN

1

Design
Text Box
Design
Image
Design
Image
Design
Image
Design
Text Box
Page 52: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Table of contents About this document Information about this document 3 Warning signs in this document 4

Safety Basic safety instructions 5 Intended use 5 Incorrect use 5 Specialists 5 Dangers 6 Malfunctioning during operation 6 Interfaces to other devices 6 Operating modes 7 Position of Key Components 8

Start up and operation Initial start-up 9 Operation 9 Procedure for accidents or malfunctioning 9 Operational Procedures 10 Troubleshooting 12 Daily Checks 14

Risk assessment 15 Certificate of Conformity 16 APPENDIX A – Print out procedures 17

2

Design
Image
Page 53: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Information about the operating instructions Contents - These operating instructions contain important details and information about the

various operating phases of the conveyor: • Transport, assembly and start-up • Safe operation, required maintenance, remedy of possible faults • Spare parts, supplementary accessories

Product affiliation - The operating instructions describe the finished conveyor at the time of initial delivery.

Supplementary to these operating instructions, special contractual agreements and technical documents apply for special conveyor versions and additional appliances.

- These operating instructions are an integral part of the conveyor - To ensure trouble-free and safe operation as well as the settlement of any warranty claims,

always read these operating instructions first and observe all the information contained herein. - Keep these operating instructions close to the conveyor. - Always give the operating instructions to each subsequent owner or user.

Beumer Group UK shall not accept liability for any damages or malfunctioning caused by non-adherence to these operating instructions.

- Please contact Beumer Group UK if you have any further questions after reading these operating instruc-tions.

BEUMER House, 9 Cartwright Court, Cartwright Way, Bardon HillLE67 1UE LeicestershireUnited Kingdom

Phone: 01530 4412 97Fax: 01530 8157 17E-Mail: [email protected]

RM Office:

System:

Belt width Horiz. Length

Serial no Inc

Serial no Horiz

Date of Install: Engineer:

RHSLHS

Electrical Pass: Y/N

CONVEYOR IDENTIFICATION

3

Design
Text Box
Page 54: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Warning signs in this document

The warning signs in this document provide information about dangers which may arise during conveyor operation. The relevant warning signs are displayed in the "safety" section.

There are three types of warning signs:

• DANGER • WARNING • CAUTION

Signal word Meaning Consequences of non-adherence

DANGER warns of an imminent death or serious injuries. danger WARNING warns of a possible death or serious injuries are danger possible. CAUTION warns of a possibly

dangerous situation slight injuries are possible.

4

Page 55: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safety

Basic safety instructions

The conveyor was state of the art and generally safe to operate at the time of delivery; however dangers may still arise during utilization: • Danger of death or personal injury to operators and others • Adverse effects on the conveyor and other areas

Non-adherence to the information in these operating instructions can result in life

threatening injuries! - Read these operating instructions carefully and adhere to the information contained herein to ensure safe conveyor operation.

Intended use

The conveyor is intended for use in mail sort environments and should only be applied to transport goods, such as, parcels or letters.

The conveyor is intended for certain application areas only and its defined capacity limits must not be exceeded during operation. Maximum loading is 50kg/m, over loading may cause product to fall off the conveyors

Any other use without prior consultation with Beumer Group UK is not recom-mended. Operating conditions which deviate from those specified require Beumer Group UK to agree that the changes are safe.

Users should not carry out alterations or modifications without agreeing such changes with Beumer Group UK.

Incorrect use

The conveyor is not intended for transporting people. Beumer Group UK or Conveyortek take no responsibility if the conveyor is not used as originally intended.

Specialists

Specialists are personnel who have the knowledge to read and understand the operating instructions and the ability to carry out work professionally while observingnational regulations.

5

Page 56: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safety

Dangers This section provides information about various dangers and damages which may occur when operating the conveyor. - Do not climb on the conveyor during operation. - Only carry out maintenance and repair work once the machine has been de-energized and measures have been taken to ensure that it cannot be started accidentally.

- Organise additional safety measures for passageways and to stop people reaching into the moving conveyor.

- Protective covers and housings should only be removed by a competent person carry out maintenance work. All covers and housing must be refitted before the system can be handed back for operational use. - Regularly inspect safety equipment. - No unauthorised access into electrical enclosures or guarding. - Loose clothing could get caught in the conveyor. - Jewelry, such as necklaces or bracelets may get caught in the conveyor. - Long hair could also get caught in the conveyor.. - Always remove materials and objects which are not required from the work environment area to avoid trip hazards.

Malfunctioning during operation

- Regularly inspect the conveyor for visible damage. - Stop the device immediately and ensure that it cannot be started accidentally

in the event of: Smoke, unusual noises, trapped or broken goods, defective support stands, side guides or accessory appliances.

- A specialist must locate the source and remedy the fault before the conveyor can be used again.

Interfaces to other devices

Danger zones can arise when integrating the conveyor into a system. These zones will not be described in these operating instructions and must be analyzed during installation and initial start-up of the respective system. After connecting the conveyor to other conveyors or machines, always check

for new danger zones prior to initial start-up. Especially at the drive roller where cuts, nips and crushing can occur.

6

Design
Text Box
Design
Text Box
Page 57: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Safety

Operating modes

Normal mode. Operation when installed at the end customer's site as an individualconveyor or as a conveyor in a system.

Special mode. All operating modes which are required to guarantee and maintain safe and normal operation and listed below.

Special operating mode Explanation Comment

Transport/Storage Loading and unloading, transport and correct storage

Assembly/Initial start-up Installation at the end customer's and execution of a test run

Cleaning Cleaning the outside without removing When de-energized safety equipment

Maintenance/Repairs Maintenance and inspection tasks When de-energized Troubleshooting Trouble shooting during normal operation Fault elimination Eliminating the fault When de-energized Shut-down Removal from the system When de-energized Disposal Removal from the system and disassembly When de-energiz

The conveyors are fitted with Emergency Stop devices which are monitored to ensure the system

comes to a safe stop when activated or if the safety circuit has a fault

7

Design
Text Box
Design
Text Box
Design
Text Box
Design
Text Box
Design
Snapshot
Page 58: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

8

Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Arrow
Design
Text Box
NON OPERATOR SIDE
Design
Text Box
OPERATOR SIDE
Design
Text Box
POSITION OF KEY COMPONENTS
Design
Text Box
CONVEYOR SHOWN IS LEFT HAND SIDE OPERATOR WORKING CONTROL CABINET AND BEACON ARE NORMALLY LOCATED ON OPERATOR SIDE
Design
Text Box
EMERGENCY STOPS
Design
Text Box
EMERGENCY STOPS
Design
Text Box
EMERGENCY STOP
Design
Text Box
BEACON
Design
Text Box
SENSOR
Design
Text Box
SENSOR
Design
Text Box
CONTROL CABINET
Design
Arrow
Design
Text Box
INCLINE MOTORISED DRUM
Design
Text Box
HORIZONTAL BELT DRIVE MOTOR
Design
Snapshot
Page 59: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Start-up and operation Initial start-up

The conveyor has been factory tested. The belt adjustment or the belt tension is factory set and does not usually have to be altered.

Wear correct PPE

- If goods become trapped isolate the conveyor and only if easy and safe to do so remove the itemIf not easy to do so then call Engineering

Procedure for accidents or malfunctioning

- Stop the conveyor system and ensure that the isolator is switched off. - In case of an accident: Use the site accident procedure. - Inform your supervisor.

- Only restart the conveyor after it has been deemed safe and released by your supervisor

9

Design
Text Box
Page 60: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

NORMAL OPERATIONAL PROCEEDURE

CONTROL CABINET

Normal Working

a) Ensure the main isolator is switched on on the control cabinet. b) If red lamp with buzzer sounds continuously an emergency stop is depressed c) Check that the sensor is clear d) On the control panel press the blue reset button for 5 seconds until a constant amber light shows on

the beacon e) Press and hold the start button for 3 seconds, this will show a flashing amber light on the beacon and

sound an intermittent buzzer for 3 f) During the sounding of the buzzer and flashing beacon the operator should check that colleagues are

clear of the conveyor. Releasing the button will prevent the conveyor from starting g) When the signal ends the conveyor will start automatically and is ready for operational us h) The conveyors will continue to run with a constant green light until the sensor beam is broken, upon

which an intermittent amber light will be displayed i) To stop the conveyor press the stop button, the green light will flash to indicate

"operator stop". To start again press start button and the conveyor will start again without warning

RESETBUTTON

STARTBUTTON

POWER ONINDICATOR

STOPBUTTON

SENSORON/OFF

RED

AMBER

GREEN

MAIN ISOLATOR

10

Design
Text Box
Design
Text Box
LIGHT BEACON
Design
Snapshot
Page 61: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

The system will fall into sleep mode if:-

a) On a green flashing light it is left idle for more than 5 mins and require starting again b) On an amber flashing light or constant green light with no activity for more than 2 hours and will

require starting again

EMERGENCY STOP In the case of an emergency one of the 4 E stop buttons on the four corners of the incline conveyor or 2 on the horizontal conveyor operator side must be pressed. Doing this will initiate a continuous buzzer as well as a constant red light on the beacon. To re-start use the following procedure:- a) Reset the E stop b) On the control panel press the blue reset button until amber light shows c) Press and hold the start button for 3 seconds, this will sound an intermittent buzzer and flashing amber light on the beacon for 3 seconds d) During the sounding of the buzzer and flashing beacon the operator should check that colleagues are clear of the conveyor. Releasing the button will prevent the conveyor from starting e) When the signal ends the conveyor will start automatically and is ready for operational use f) The conveyors will continue to run with a constant green light until the sensor beam is broken, upon which an intermittent amber light will be displayed g) To stop the conveyor press the stop button, the green light will flash to indicate "operator stop". To start again press start button and the conveyor will start again without warning

This conveyor should only be used by trained operatives

CONVEYORS SHOULD NOT BE OVER LOADED

MAXIMUM LOAD 50Kg/M

11

Page 62: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Troubleshooting

In case of malfunctioning

Operators are only allowed to eliminate faults which are clearly related to an operator error! The danger zones at the conveyor are covered by guards and protective equipment. - Stop the device immediately and ensure that it cannot be started

accidentally. - Remove the conveyed material. - Always make sure that nobody can be injured before restarting the conveyor. - Dispose of any leaked gear oil correctly. If necessary, a specialist must replace the geared motor.

12

Page 63: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

DAILY CHECKS

Part Entire conveyor

Interval

Weekly Monthly

Task/ Inspection General visual inspection Check screwed connections

Required work Report if necessary Report if necessary

Rollers Monthly Listen for noise development

Report if necessary

Belts Daily Check the straight running Check for damage

Report if necessary Report if necessary

Visible cables E Stops Trapped items

Daily Daily Daily

Check for damage General Visual Inspection Check for damage Check that they work Remove if safe to do so

Report if necessary

Report if necessary Report if necessary

Report if necessary Report if necessary

LIGHT STATUS SOUNDER

CONSTANT YES

CONSTANT YES

CONSTANT NO

FLASHING YES

FLASHING NO

FLASHING NO

3 PULSES AFTER PULSES

8 PULSES AFTER PULSES MOTOR OVERHEAT CALL AN ENGINEER

BEACON LIGHT

TROUBLESHOOTING WARNINGS

CAUSE ACTION

STOP BUTTON PRESSED

INTERNAL OR SUPPLY FAILURE

RESET ESTOP AND FOLLOW START

PROCEEDURE

PRESS AND HOLD START BUTTON

NONE REQUIRED

CALL AN ENGINEER

REMOVE ITEM BLOCKING SENSOR,

CONVEYOR WILL START

PRESS START BUTTON

CALL AN ENGINEER

ESTOP DEPRESSED

SYSTEM HAS BEEN RESET

SYSTEM IS RUNNING

FAILURE IN SAFETY SYSTEM

SENSOR HAS BEEN COVERED

13

Page 64: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

troubleshooting table

DAILY CHECKS

Part Entire conveyor

Interval

Weekly Monthly

Task/ Inspection General visual inspection Check screwed connections

Required work Report if necessary Report if necessary

Rollers Monthly Listen for noise development

Report if necessary

Belts Daily Check the straight running Check for damage

Report if necessary Report if necessary

Visible cables E Stops Trapped items

Daily Daily Daily

Check for damage General Visual Inspection Check for damage Check that they work Remove if safe to do so

Report if necessary

Report if necessary Report if necessary

Report if necessary Report if necessary

14

Page 65: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

OP

ERA

TOR

HEA

D D

RU

M IN

RU

NN

ING

NIP

PO

INT

32

6H

EAD

DR

UM

IS C

OM

PLE

TELY

EN

CLO

SED

BEL

T C

OM

PLE

TELY

CO

VER

S TH

E H

EAD

DR

UM

WIT

H

FIN

GER

GU

AR

DS

AT

EAC

H S

IDE

HEA

D D

RU

M IS

CO

MP

LETE

LY E

NC

LOSE

D W

ITH

INTE

RN

AL

MO

TOR

AN

D

BEA

RIN

GS

WH

EN R

UN

NIN

G O

R R

EAD

Y TO

RU

N T

HE

GR

EEN

LIG

HT

IS L

IT O

N T

HE

LIG

HTI

NG

STA

CK

32

6P

USH

BU

TTO

N V

ERSI

ON

- O

NC

E ST

AR

TED

CO

NV

EYO

R R

UN

S

CO

NTI

NU

OU

SLY

IF L

EFT

RU

NN

ING

TH

E P

LC W

ILL

SWIT

CH

TH

E C

ON

VEY

OR

OFF

AFT

ER A

SET

TIM

E

PV

C B

ELT

IS A

NTI

STA

TIC

FA

BR

IC B

AC

KED

GR

IP F

AC

E B

ELT

GEN

ERA

L R

UN

NIN

GO

PER

ATO

RA

CC

IDEN

TAL

STA

RT

UP

32

6FO

OT

PED

AL

VER

SIO

N -

OP

ERA

TOR

CO

NTR

OLS

STA

RT

UP

IF L

EFT

IDLE

FO

R G

REA

TER

TH

AN

5 M

INS

THE

CO

NV

EYO

R

NEE

DS

TO B

E R

ESET

AN

D R

ESTA

RTE

D

CO

NTR

OL

CA

BIN

ET C

AN

NO

T B

E O

PEN

ED U

NLE

SS IS

OLA

TED

FIR

ST. S

HO

ULD

ON

LY B

E O

PEN

ED B

Y TR

AIN

ED E

NG

INEE

RS

GEN

ERA

L R

UN

NIN

GO

PER

ATO

RST

ATI

C S

HO

CK

32

6

ALL

EX

TRA

NEO

US

CO

ND

UC

TIV

E P

AR

TS A

RE

ELEC

TRIC

ALL

Y

BO

ND

ED B

Y N

ATU

RE

OF

THE

BU

ILD

TO

EN

SUR

E TH

ERE

IS N

O

PO

TEN

TIA

L D

IFFE

REN

CE

BET

WEE

N P

AR

TS

INC

LIN

E C

ON

VEY

OR

IS F

ULL

Y EA

RTH

ED

MO

TOR

RA

TED

TO

DO

MO

RE

BU

T H

AV

E B

UIL

T IN

A S

AFE

TY F

AC

TOR

GEN

ERA

L R

UN

NIN

GO

PER

ATO

REL

ECTR

IC S

HO

CK

42

8IN

CLI

NE

CO

NV

EYO

R IS

FU

LLY

EAR

THED

ON

LY E

XTE

RN

AL

CA

BLE

S A

RE

TO F

OO

T P

EDA

L (I

F FI

TTED

)

AN

D M

AIN

S FE

ED

EXIS

TIN

G P

RO

CES

S W

ITH

IN R

OYA

L M

AIL

IS O

F A

SIM

ILA

R N

ATU

RE

VIE

WED

AN

D R

EPLI

CA

TED

TIP

PIN

G M

AIL

BA

GS

OP

ERA

TOR

MO

TOR

OV

ERH

EATI

NG

21

2P

LC IS

PR

OG

RA

MM

ED T

O C

UT

PO

WER

AN

D S

END

WA

RN

ING

MES

SAG

ES I

F M

OTO

R O

VER

LOA

DED

CO

NV

EYO

R L

OA

DED

AN

D R

AN

WIT

H 1

50

KG

S LO

AD

BEF

OR

E D

ISP

ATC

H

THE

TAIL

DR

UM

SIT

S IN

SID

E C

ON

VEY

OR

STR

UC

TUR

E C

OM

PLE

TE W

ITH

INTE

RN

AL

BEA

RIN

GS

TIP

PIN

G M

AIL

BA

GS

OP

ERA

TOR

MA

NU

AL

HA

ND

LIN

G IN

JUR

IES

32

6C

ON

VEY

OR

IS F

ITTE

D W

ITH

TW

O L

EVEL

S FO

R E

MP

TYIN

G M

AIL

BA

GS

WH

EN T

OP

SH

ELF

IS R

EMO

VED

IT R

EVEA

LS A

LO

WER

SHEL

F TH

AT

STIL

L C

OV

ERS

THE

TAIL

DR

UM

BEL

T IS

SET

AT

BO

TTO

M O

F 1

50

MM

WEL

L A

ND

OU

T O

F G

ENER

AL

AC

CES

S FO

R

THE

MO

ST P

AR

T. T

HER

E IS

A V

ISU

AL

AN

D A

CO

UST

IC W

AR

NIN

G O

N S

TAR

T U

P

CO

MP

LETE

WIT

H 1

0 S

EC D

ELA

Y

TIP

PIN

G M

AIL

BA

GS

OP

ERA

TOR

TAIL

DR

UM

INR

UN

NIN

G N

IP P

OIN

T3

26

TAIL

DR

UM

IS C

OM

PLE

TELY

EN

CLO

SED

BEL

T C

OM

PLE

TELY

CO

VER

S TH

E TA

IL D

RU

M W

HIC

H IS

LOC

ATE

D B

EHIN

D T

WO

CO

VER

S

BEF

OR

E M

OV

ING

FR

OM

SIT

E TO

SIT

E A

GEN

ERA

L C

HEC

K O

F A

LL B

OLT

S

SHO

ULD

BE

CA

RR

IED

OU

T

OP

ERA

TIO

NC

LEA

RIN

G M

AIL

OP

ERA

TOR

CA

UG

HT

IN B

ELT

42

8A

LL IN

RU

NN

ING

NIP

S A

RE

BU

ILT

TO E

N6

19

BEL

T IS

CO

MP

LETE

LY C

OV

ERED

IN A

PA

RT

FRO

M P

HYS

ICA

L

WO

RK

ING

AR

EA

CO

NV

EYO

R C

AN

BE

MO

VED

AR

OU

ND

BY

MEA

NS

OF

PA

LLET

PLA

CED

UN

DER

HO

RIZ

ON

TAL

FRA

MEW

OR

K

TRA

NSP

OR

TATI

ON

PA

RTS

LO

OSE

NIN

G3

26

ALL

BO

LTS

& F

IXIN

GS

FAC

TOR

YCH

ECK

ED B

EFO

RE

DIS

PA

TCH

A

LL B

OLT

S U

SED

WIT

H S

PR

ING

WA

SHER

S TO

PR

EVEN

T

LOO

SEN

ING

GEN

ERA

L C

OM

MEN

TS

GEN

ERA

LTR

AN

SPO

RTA

TIO

NTI

PP

ING

OV

ER4

28

SUP

PLI

ED S

TRA

PP

ED O

N P

UR

PO

SE B

UIL

T P

ALL

ETS

CA

N B

E M

OV

ED B

Y FO

RK

TR

UC

K O

R P

ALL

ET T

RU

CK

AR

OU

ND

SIT

E

RIS

K A

SSES

MEN

T

AR

EAP

RO

CES

S P

ERSO

N A

T R

ISK

HA

ZAR

D

SEV

P

RO

BR

ISK

CO

NTR

OL

MEA

SUR

ESA

DD

ITIO

NA

L C

ON

TRO

L M

EASU

RES

RIS

K A

NA

LYSI

S

SEV

ERIT

Y 1.

NO

RIS

K

2. L

OW

RIS

K 3

. MED

IUM

RIS

K

4. M

AJO

R IN

JU

RY

5. H

IGH

RIS

K

PR

OB

AB

ILIT

Y 1.

IMP

RO

BA

BA

LE

2. R

EMO

TE R

ISK

3

. PO

SSIB

LE

4. P

RO

BA

BLE

5.

LIK

ELY

RIS

K =

SEV

ERIT

Y X

PR

OB

AB

ILIT

Y: R

ISK

RA

TIN

G L

OW

1-1

0 M

EDIU

M 1

1-1

5 H

IGH

15

-25

GEN

ERA

L

ENG

INEE

R

CA

UG

HT

IN B

ELT

4

1

4

DIR

T C

OV

ERS

CA

N B

E R

EMO

VED

FR

OM

UN

DER

SID

E

WIT

HO

UT

REV

EALL

ING

AN

Y H

AZA

RD

S

CO

VER

S M

AD

E O

F C

LEA

R P

OLY

CA

RB

ON

ATE

TO

ALL

OW

A V

ISU

AL

INSP

ECTI

ON

BEF

OR

E R

EMO

VIN

G

ISO

LATE

PO

WER

AN

D L

OC

K O

UT

WIT

H P

ERSO

NA

L LO

CK

BEF

OR

E ST

AR

Ple

ase n

ote

this

is a

desig

n R

isk A

ssessm

ent

and s

hould

be u

sed in c

onju

nction w

ith a

site

specific

ris

k a

ssessm

ent

SEVERITY

1. MINOR INJURY

2. LOST TIME INCIDENT

3. +3 DAYS OFF

4. MAJOR INJURY

FATALITY

PROBABILITY

1. IMPROBABLE

2.REMOTE RISK

3. POSSIBLE

4. PROBABLE

5. LIKELY

RISK = SEVERITY X PROBABILITY RISK RATING: LOW: 1 -10 MEDIUM: 11-15 HIGH:15-25

RISK ANALYSIS

15

Page 66: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

CERT. of CONFORMITY

16

Page 67: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

START UP PROCEEDURE

ONLY NAMED AND TRAINED OPERATORS SHOULD USE THESE CONVEYORS

OPERATORS SHOULD FAMILIARISE THEMSELVES WITH THE RM HEALTH AND SAFETY LABEL

BEFORE USING

1) TURN ON MAIN ISOLATOR

2) THERE WILL BE AN INITIAL START UP SOUND AND THE POWER INDICATOR LIGHT

WILL LIGHT UP

3) ENSURE THAT ALL OPERATORS ARE CLEAR OF MOVING PARTS

4) PRESS AND HOLD THE BLUE RESET BUTTON FOR 5 SECONDS UNTIL THE AMBER LIGHT STAYS

ON

5) PRESS AND HOLD THE START BUTTON FOR 3 SECONDS – THE AMBER LIGHT WILL FLASH AND

THE SIREN WILL SOUND

6) T HE CONVEYORS WILL START TO MOVE

7) SENSOR –

A. IF THE PEC IS SWITCHED OFF THE CONVEYORS WILL RUN CONTINUOUSLY

B. IF THE PEC IS SWITCHED ON THE CONVEYORS WILL RUN UNTIL THE SENSOR BEAM IS

BLOCKED

LIGHT BEACON

CONTROL CABINET

17

Design
Image
Design
Text Box
Page 68: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

CONVEYOR START UP TROUBLE SHOOTING

1) Power indicator not lit

- Check isolator on panel is on

- Check that the main supply isolator is on

- If both on and no power indicator light call an engineer

2) Red light stays lit and steady audible warning

- An Estop is depressed

- Reset Estop and start again

3) Amber light continues to flash and audible warning

- Sensor at end of horizontal is covered

- Unblock sensor and start again

REFER TO MANUAL FOR ADDITIONAL DETAILS

LIGHT STATUS SOUNDER

CONSTANT YES

CONSTANT YES

CONSTANT NO

FLASHING YES

FLASHING NO

FLASHING NO

3 PULSES AFTER PULSES

8 PULSES AFTER PULSES MOTOR OVERHEAT CALL AN ENGINEER

BEACON LIGHT

TROUBLESHOOTING WARNINGS

CAUSE ACTION

STOP BUTTON PRESSED

INTERNAL OR SUPPLY FAILURE

RESET ESTOP AND FOLLOW START

PROCEEDURE

PRESS AND HOLD START BUTTON

NONE REQUIRED

CALL AN ENGINEER

REMOVE ITEM BLOCKING SENSOR,

CONVEYOR WILL START

PRESS START BUTTON

CALL AN ENGINEER

ESTOP DEPRESSED

SYSTEM HAS BEEN RESET

SYSTEM IS RUNNING

FAILURE IN SAFETY SYSTEM

SENSOR HAS BEEN COVERED

18

Page 69: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

861

9

900 759

861

9

600x

600

0 ho

rizW

EIG

HT:

A3

SHEE

T 1 O

F 1

SCA

LE:1

:25

DW

G N

O.

TITLE

:

REVI

SIO

ND

O N

OT

SCA

LE D

RAW

ING

MA

TERI

AL:

DA

TESI

GN

ATU

REN

AM

E

DEB

UR A

ND

BR

EAK

SHA

RP

EDG

ES

FINIS

H:UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D:

DIM

ENSI

ON

S A

RE IN

MILL

IMET

ERS

SURF

AC

E FI

NIS

H:TO

LERA

NC

ES:

LIN

EAR:

A

NG

ULA

R:

Q.A

MFG

APP

V'D

CHK

'D

DRA

WN

Design
Image
Page 70: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

1C P

arce

ls L

ayou

t with

use

of C

onve

yor 5

Met

er B

elt (

Bag

Tip)

Issu

ed b

y: K

en H

ouse

D

ate:

10/

11/2

015

Issu

es N

o: 3

Sh

eet 1

of 1

: Not

to s

cale

Belt

leng

th: 5

Met

ers

M

axim

um N

o of

ope

rato

rs: 4

M

inim

um N

o of

ope

rato

rs: 2

M

axim

um N

o of

sel

ectio

ns: 1

3

5m

2.6m

Op 1

Op

2

Tip

Open

/ asid

e

15.5

5m

6.52m

Def

ects

/ In

corr

ect S

trea

m

Dupl

icat

e

Ensu

re th

at m

otor

are

not

cov

ered

by

sleev

es

Oper

ator

1 z

one

to s

ort.

Item

s no

t to

be s

orte

d to

Op

2 zo

ne.

Page 71: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Issu

ed b

y: K

en H

ouse

D

ate:

10/

11/2

015

Issu

es N

o: 3

Sh

eet 1

of 1

: Not

to s

cale

Belt

leng

th: 5

Met

ers

M

axim

um N

o of

ope

rato

rs: 4

M

inim

um N

o of

ope

rato

rs: 2

M

axim

um N

o of

sel

ectio

ns: 1

3

5m

2.6m

Sort

So

rt

Tip

Open

/ asid

e

15.5

5m

6.52m

Def

ects

/ In

corr

ect S

trea

m

2C P

arce

ls L

ayou

t with

use

of C

onve

yor 5

Met

er B

elt (

Bag

Tip)

Dupl

icat

e

Ensu

re th

at m

otor

are

not

cov

ered

by

sleev

es

Oper

ator

1 z

one

to s

ort.

Item

s no

t to

be s

orte

d to

Op

2 zo

ne.

Page 72: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Issu

ed b

y: K

en H

ouse

D

ate:

25/

04/2

016

Issu

es N

o: 1

Sh

eet 1

of 1

: Not

to s

cale

Belt

leng

th: 5

Met

ers

M

axim

um N

o of

ope

rato

rs: 3

M

inim

um N

o of

ope

rato

rs: 2

M

axim

um N

o of

sel

ectio

ns: 1

3

5m

2.6m

Sort

So

rt

Tip

15.5

5m

6.52m

Def

ects

/ In

corr

ect S

trea

m

Prim

ary

Parc

els

Layo

ut w

ith u

se o

f Con

veyo

r 5 M

eter

Bel

t (fr

om fu

ll Sl

eeve

s)

= Du

plic

ate

Ensu

re th

at m

otor

are

not

cov

ered

by

sleev

es

Oper

ator

1 z

one

to s

ort.

Item

s no

t to

be s

orte

d to

Op

2 zo

ne.

If w

ork

is m

ovin

g di

rect

ly to

sec

onda

ry ro

ads

whe

n so

rted

, So

rtat

ion

shou

ld b

e in

to m

ini s

leev

es.

If st

orin

g to

wor

k pl

an s

orta

tion

is in

to fu

ll sl

eeve

s.

Page 73: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Test weight by moving the bag.

Be aware of overweight bags.

Max bag weight 11 kg. Report over

weight bags to your line manager.

Lift the bag onto the hopper ledge.

Remember to use both hands and bend your knees, not your

back.

Check the label to ensure you have

the correct stream.

Re distribute missorted bags.

Cut the tie.Place discarded tie and label in

correct bin.

Tip the bag contents into the

hopper.

Do not bend down to retrieve

debris from hopper.

Check bag is empty of all mail.

Fold and place bag onto the correct york.

Issued by: Verified by: JES Ref:Ken House

Maximum Minimum1 1

Manning Levels Version 1:0 Date 21/04/2105

JOB ELEMENT SHEET

INCLINE CONVEYOR CUT AND TIP

Process Step Key Point

Compliance… Incline Cut and Tip

= CRITICAL STEP SAFETY WARNING =

Page 74: Parcels Sortation with Conveyors - CWU: Home · Parcels Sortation with Conveyors Safety compliance and supporting documentation Ken House Tel: 07713653072 – email: kenneth.house@royalmail.com

Pick up one parcel from the belt. If the item has a bar code

scan the item.

Ensure that the scanner has registered

the item.

If the parcels has

stamps on them check that they are canceled.

Cancel all stamps before sorting to

selection.

Now look for the

onward post code.If no post code place to one side, so post code can be found. DO not

guess destination.

Sort the item to the correct selection. Mini sleeve or full sleeve

only.

If the selection is not on your side of the

belt, pass to the operator next to you. DO NOT throw across

each other

If the red sleeves needs to be fastened this can be done if the belt if it

is 500mm wide.

If the belt is over 500mm wide, then the

Logistics operator should fasten the

sleeve.

Allow logistics team to move all full containers.

Logistics team will then replace with an empty

container

Issued by: Verified by: JES Ref:Ken House

Maximum Minimum2 1

Manning Levels Version 1:0 Date 18/01/2106

JOB ELEMENT SHEET

CONVEYOR - PARCEL SORTING

Process Step Key Point

Compliance… Conveyor Sorting

= CRITICAL STEP SAFETY WARNING =