architectscox graae + spackPalisades Recreation Center CoverApril 4th 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
Palisades Recreation Center
Palisades Citizens Association Meeting
April 4th, 2017
5200 Sherier Place NWWashington, DC 20016
April 4th 2017
April 4th 2017
April 4th 2017
architectscox graae + spackPalisades Recreation Center Proposed First Floor PlanMarch 6th, 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
30 8' 16' 32'
UP
UP
UP
UP UP
UP
UP
UP
DN
DN
Court Size48'x40'
Spaces
Office/ControlOffice StorageStaff Restroom
Subtotal
Public Entr. Lobby and ReceptionMulti-Purpose RoomMulti-Purpose Room StorageClassroomSenior LoungeFamily Restroom
Subtotal
GynmasuimGymnasium StorageFitness RoomFitness Room Storage
Subtotal
Men's RestroomWomens RestroomWarming/Demonstration KitchenOutdoor StorageKitchen Storage
Following Areas Located at Lower Level or Elsewhere on SiteGeneral Build. Equip. and Stor.Janitor's Closets/Mop SinkTrash /RecyclingServer/MDF RoomMechanical / Electrical Rooms
Subtotal
Total
Area
200incl. abv.
175
4201,670
130
incl. abv.
1,030
2500
6050
8,580
4,350
150170
100
120
3,200220930
incl. abv.
31037055
2,825
incl. abv.
375
1/16" = 1'
34
65
1211
98
1
7
10
1314
15 Overlook/Terrace
1
34
5
6
7
8
9
10
1112
13
14
15
Classroom
Lounge2
2
12
April 4th 2017
April 4th 2017
architectscox graae + spackPalisades Recreation Center Building ElevationsMarch 6th, 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
50 8' 16' 24'
1st Floor±0' 0"
2nd Floor+10' 8"
New Roof+22' 6"
Existing Ridge+27' 6"
1st Floor±0' 0"
2nd Floor+10' 8"
New Roof+22' 6"
Existing Ridge+27' 6"
East Elevation
North Elevation
3/32" = 1'
Notes (Proposed)
1. Repair paint, wood structure2. Repair, paint wood dormer3. Repair metal roofing4. New wood shutter to match
original, typ.5. Repl. windows to closely match
original. Repair, paint wood trim6. Wood trim repair, repaint7. Repair gutters and downspouts8. New entry doors9. New Stair10. Clean, repair, repaint brick11. Not Used12. Not Used
Notes (Existing)
1. Not Used2. Brick3. Rusticated brick4. Slat mechanical equip. screen5. Metal coping color matched to
slate wall6. Slate wall cladding7. Horiz. Aluminum louvers color
matched to storefront8. Aluminum storefront9. Concrete wall10. Not Used11. New ramp12. Metal awning over entry doors13. Pre-finished metal wall panel
3 4 65
2
98
1
7
10
11
1 6
2
8
82 35 6
9
13
8 7
April 4th 2017
architectscox graae + spackPalisades Recreation Center Building ElevationsMarch 6th, 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
6
1st Floor±0' 0"
1st Floor±0' 0"
2nd Floor+10' 8"
New Roof+22' 6"
0 8' 16' 24'
Existing Ridge+27' 6"
2nd Floor+10' 8"
New Roof+22' 6"
Existing Ridge+27' 6"
South Elevation
West Elevation
3/32" = 1'
Notes (Proposed)
1. Repair paint, wood structure2. Repair, paint wood dormer3. Repair metal roofing4. New wood shutter to match
original, typ.5. Repl. windows to closely match
original. Repair, paint wood trim6. Wood trim repair, repaint7. Repair gutters and downspouts8. New entry doors9. New Stair10. Clean, repair, repaint brick11. Not Used12. Not Used13. New ramp
Notes (Existing)
1. Scupper and Downspout2. Brick3. Rusticated brick4. Slat mechanical equip. screen5. Metal coping color matched to
slate wall6. Slate wall cladding7. Horiz. Aluminum louvers color
matched to storefront8. Aluminum storefront9. Concrete wall10. Not Used11. New Ramp12. Metal awning over entry doors13. Pre-finished metal wall panel
9
8
12 16
7
2 34 5 612 12
13
13 13
8 23 56
9
88
84 1
1111
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017architectscox graae + spackPalisades Recreation Center Title BlockJanuary 5th, 2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
E X I S T ING PHOTOS
April 4th 2017architectscox graae + spackPalisades Recreation Center Title BlockJanuary 5th, 2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
E X I S T ING PHOTOS
April 4th 2017architectscox graae + spackPalisades Recreation Center Title BlockJanuary 5th, 2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
E X I S T ING PHOTOS
April 4th 2017architectscox graae + spackPalisades Recreation Center Title BlockJanuary 5th, 2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
P ROPOS ED S I T E P LAN
N
TERRACE
BIKE RACKS/ TRASH RECEPTACLE
CONCRETE WALL WITH WOOD SEATING
FLAG POLE
ENTRANCE PLAZAEXISTING PATH
BIORETENTION PLANTING
BIORETENTION PLANTING
BENCH
RAINWATER STORAGE
RIVER ROCK STRIP AT BUILDING EDGE
EX. BASKETBALL COURT
EXISTING PLAYGROUND AND SPLASHPAD
RAMP
SEAT WALLSLOT DRAIN
ACCENT PLANTING
PORCH
COMMUNITY
GARDENS
EXISTING LARGE CANOPY TREE
EXISTING FLOWERING TREES
COMM
UNITY
GARDENS
1 " = 2 0 ' ‐ 0 "
April 4th 2017
April 4th 2017architectscox graae + spackPalisades Recreation Center Title BlockJanuary 5th, 2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
P LANT MATER I A L S
River Birch Flowering Dogwood Yoshino Cherry Crabapple
Bioretent ion plant ing Bioretent ion plant ing Accent plant ing
April 4th 2017
architectscox graae + spackPalisades Recreation Center TRAFFIC CONDITIONSMarch 6th, 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
N 0 20' 40'10'
1"=20'
SHERIER PL NW
STOP
12
2
2
2
3 34
5
6
7
77
109
EXISTING PARK ENTRANCE
5432 EXISTING SIDEWALK
EXISTING ADA PEDESTRIAN RAMP
EXISTING CROSSWALK
EXISTING LAWN
PROPOSED TRAFFIC HUMPPER DDOT STANDARD 605.15
6 EXISTING BRICK PATH
7 EXISTING PARKING LANE
PROPOSED RAISED PEDESTRIANCROSSWALK PER DDOT STANDARD 605.169
1KEY NOTES
10
EXISTING ON-SITE PARKING LOT8
April 4th 2017
architectscox graae + spackPalisades Recreation Center TRAFFIC CONDITIONSMarch 6th, 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
N/A
April 4th 2017
Next Steps
Pre Construction / Site Investigations April 2017 to June 2017
Interior Demolition / Abatement May 2017 to June 2017
Site Construction / Expansion July 2017 to March 2018
Department of General Services (DGS)
Jackie Stanley, Community Outreach [email protected]
Department of Parks & Recreation (DPR)
Brent Sisco, Landscape [email protected]
Contact Information