5
P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

  • Upload
    lekhanh

  • View
    228

  • Download
    3

Embed Size (px)

Citation preview

Page 1: P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

Page 2: P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

Page 3: P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

Page 4: P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

L O T # 1 & 2 C o m b i n e d

P R E -A D D I T I O N (E X I S T I N G ) S I T E

C O N D I T I O N S

P O S T -A D D I T I O N (N E W ) S I T E

C O N D I T I O N SA D D I T I O N A L

A C R E A G E 1 . 3 0 7 1 . 3 0 7 0 . 0 0 0

I M P E R V I O U S 0 . 2 1 4 0 . 5 3 7 0 . 3 2 3

M A N A G E D O P E N S P A C E

1 . 0 9 3 0 . 7 7 0 -0 . 3 2 3

U N D I S T U R B E D O P E N A R E A

0 . 0 0 0 0 . 0 0 0 0 . 0 0 0

A N L = 7 .4 0 3

G O F F R E N T A L S

A P P O R T IO N E D N IT R O G E N L O A D IN G PREDEVELOPED POST DEVELOPEDRETURN EVENT PEAK RUN-OFF PEAK RUN-OFF REDUCTION

(YEARS) (CFS) (CFS) (%)1 1.22 1.15 5.7%10 4.60 3.04 33.9%25 6.71 5.83 13.1%

PRELIMINARY PEAK FLOW REDUCTION

Lot # Acreage Act.

Imperv.

Area (%)

Act.

Imperv.

Area (ac)

NO3

Loading

(lbs)(21.2)

Actual

Undisturbed

Open Space

AREA (%)

Undisturbed

Open Space

(ac)

NO3

Loading

(lbs)(0.6)

Actual

Managed

Open Space

AREA (%)

Managed

Open Space

(ac)

NO3

Loading

(lbs)(1.2)

TOTAL NO3

Loading w /o

BMP's (lbs)

Actual

BMP'S

NO3

Reduction

Factor

TOTAL NO3

Loading

w ith BMP's

TOTAL

NO3

lbs/ac/yr

Excess

NO3

lbs/ac/yr

Excess

NO3 lbs

DISTRIBUTED

NO3 IN LBS.1 &2 1.307 N/A N/A N/A N/A N/A N/A N/A N/A N/A 7.403 N/A 1.000 7.403 5.664 2.064 2.698 2.064

Totals 1.31 N/A N/A N/A N/A N/A N/A N/A 7.403 5.664 2.064 2.698 2.064

1.307 (ac) 0.000

BMP TYPE NOTES: Nitrogen loading computed based upon apportionment methond for Lot # 1 & 2 combined . A 25%B 40%C 35%D 35%E 20%F

20%G

30%H 10%

TN REMOVAL RATEWET DENTENTION PONDSTORMWATER WETLANDS

VEGETATED FILTER STRIP W/

NO3 Reduction from BMP's (lbs)Total Development Acreage

SAND FILTERBIORETENTIONGRASS SWALE

50' RESTORED REPARIANW/LEVEL SPREADERDRY DETENTION

Prepared by RON SUTTON

NEUSE RIVER BASIN SCHEDULEGOFF RENTALS

Herring-Sutton & Associates, P.A.

August 2, 2016

LEVEL SPREADER

P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

Page 5: P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg

P:\16PROJ\6158\6158-CCS\_Drawings\6158A-SITE PLAN.dwg