Orginal BP Tra

Embed Size (px)

Citation preview

  • 8/18/2019 Orginal BP Tra

    1/32

     HAZARDOUS CONSTRUCTION ACTIVITIES 

    Sr. # ACTIVITIES  

    1 Loading / Un-loading.

    2 Bush cutting / Tree cutting. Bush transportation.

    3 Erection of parda wall.

    4 Erection of fence.

    5 Water Bowzer.

    6 Traffic control.

    7 Road works. Heating of itu!en.

    8 Electrical works "Lighting# outside.

    9 $caffolding.

    10 Erection of !asonr% wall.

    11 $teel works "Rears#

    12 &anual lifting "'e!ent( locks( ags ) pu!ps#.

    13 $huttering.

    14 'ul*erts ) ridges.

    15 +aint.

    16 ,ewatering.

    17 'ellar pipe.

    18 Water proofing.

    19 'oncrete pouring.

    20 $and lasting.

  • 8/18/2019 Orginal BP Tra

    2/32

     HAZARDOUS CONSTRUCTION ACTIVITIES 

    Sr. # ACTIVITIES  

    21 &o*e!ent through populated area.

    22 +arking.

    23 ,ri*ing and working in rain / fog condition. "Bed weather#

    24 ight working.

    25 Underground utilities identification "n and outside#.

    26 H%drotesting.

    27 as c%linder handling / storage / transportation "+ropane#

    28 0arication.

    29 1ack ha!!ering.

    30 ,is!antling of e2uip!ent / !anual or !echanical.

    31 &aterial storage on site.

    32 &echanical E3ca*ation.

    33 +ipeline acti*ities.

    34 Thrust oring.

    35 $ur*e%.

    36 Te!porar% ladder / handrail.

    37 1o related to working at height.

    38 Energ% isolation "outside fence#

    39 dentification of un-recognized confined space.

    40 +igging of pipelines.

  • 8/18/2019 Orginal BP Tra

    3/32

     HAZARDOUS CONSTRUCTION ACTIVITIES 

    Sr. # ACTIVITIES  

    41 $horing of deep trench.

    42 ,rilling / grinding / cutting on site.

    43 Worko*er 4os.

    44 +ulling of stuck e2uip!ent.

    45 &oilization / de!oilization.

    46 Working in e3tre!e weather.

    47 'ontrol of working hours.

    48 'ontractor5s li*ing conditions in ca!ps / on site.

    49 Route ) risk identification with 4ourne% !anage!ent.

  • 8/18/2019 Orginal BP Tra

    4/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

    67 M M 8 M L 4

    7a H M 12 M L 4

     Ha(ard Effect

    "Refer to E*aluation0or!#

    Loading and Off-loading of material

    . !proper handling of!aterial.

    . !proper use of LiftingE2uip!ents. 8*er loading

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . $ecure theload.. +rohiited.. +rocedure.. '&s

    . +roper tightening with chain or elts after loading.

    . E2uip!ent 'heck List "9erified#.

    . :rea cordon off.

    . +roper indication !arked on the e3trude portionefore the !o*e!ent.. Load the !aterial as per the designed loadingcapacit% of the *ehicle.. Loading !aterial will not protrude !ore than ; feetfro! the transporting *ehicle.. Loading capacit% indication on the *ehicle.. Weight of load clearl% !arked /

  • 8/18/2019 Orginal BP Tra

    5/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    6; M M 8 M L 4

    6= L H 7 L L 2

    6> re!tion of "en!e# L H 7 L L 2

    $rop% &'s( and Trees!'tting and t(anTransportation

    . !proper use of tools

    . $nake Bite / +oisonous

    insects.. 'li!ing on the trees.. !proper stacking ofcut trees ) ushes.. Blind turning.. 'rowded places.. arrow path.. 8*er loading.. round 'ondition. 'ondition of Trees

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&s

    . ER+

    . +rocedure.

    . +rohiited.

    . E2uip!ent 'heck List

    . Trained persons

    . Ensure no person stand under the tree to e cut.

    . 9isit of the working area with local co!!unit% persons forawareness of hazard "like presence of snakes( ponds andtransportation of *egetation waste#. +roper awareness aout the nature / size of trees andushes. Before cutting of trees area to e arricade.. Tri! / 'ut to size for ade2uate handling. :de2uate e2uip!ent for tri!!ing.. $tand% 9ehicle

    . $nake Bite

  • 8/18/2019 Orginal BP Tra

    6/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    6@ M M 8 M L 4

    6? Traffi! $ontrol M M 8 M L 4

    Aa M M 8 L L 2

    *ater &o+ser for,prinling .Transportation atdesignated pla!e

    . 0ast !o*e!ent

    . 'hanging Route

    . 8*er turning

    . Blind Turnings

    . +oor *ision

    . 'rowded places

    . Re!ote areas

    . :ccess/ crossing.

    . +edestrians/ani!als.. 'hange in condition.. E3cessi*e $prinkling

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&s

    . +rocedure.

    . Bowser 'hecklist.

    . 'onduct Route anal%sis efore transportation.

    . ,esignate lookouts in all critical places like lind

    turnings( near *illages roads.. 'ontrol the $peed li!it of transporting *ehicle asper Bp5s dri*ing polic%.. 'onduct the '& with near% co!!unit% people.. $pecial care will e taken near $ugarcane Loaded*ehicles( ani!al dri*en carts and *illages.. +eriodic inspection of Bowser.. +h%sical condition of dri*er.

    . ,ri*e right.

    . $eat Belts.

    . Look outs

    . 'o!petent dri*er.

    . +edestrians.

    . :ni!al 'arts.

    . arrow path.

    . Blind turning.

    . 8*er speeding.

    . E2uip!ent failure.

    . Road condition.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&.

    . +rocedure.

    . Route awareness.. 'o!petenc% of dri*er.

    . 0ollowed speed li!it.

    . E2uip!ent check list.

    . o !o*e!ent in ad weather/high wind/ fog/ nightcondition.. nstalled traffic sign oard.. Refresher course should e done ti!e to ti!e.. 'onduct road safet% awareness progra! with localco!!unit%.. ,ri*er5s e%e sight / *ision test.. ,eputed skilled lookout near % populated area/*illage/narrow path/ lind turning.

    . Lookout.

    . ,ri*e right.

    . 'ertified ,ri*ers.

    /oad +ors#&it'menHeating

    . :d*erse wheathercondition.. Te!porar% heatingplace near straw( ushesetc.. !proper handling ofitu!en dru!.. 0ire / ignition source.

    . +eople.

    . E2uip!ent.

    . En*iron!ent.

    . '&.

    . ER+

    . +rocedure.

    . +rohiited.

    . 'ordon off heating place.

    . :ppropriate ++E

    . 'heck wind direction.

    . Use of ther!o!eter / apparatus for carefull% watchingte!perature of itu!en.. :*oid to o*er filling itu!en in ,ope kettle.. Use of proper fuel.. Heating place !ust not e3ist on shoulder.. +resence of sand to a*oid spreading of fire fro! theheating place.. E2uip!ent for proper !elting " ,ope kettle#

    . 0ire watch !an.

    . 0ire e3tinguisher.

    . ,ope kettle.

    . ++E.

  • 8/18/2019 Orginal BP Tra

    7/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s  Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    A M M 8 L L 2

    A' M M 8 L L 2

    /oad *ors#,praing of Hotit'men

    . spill of itu!en fro!dope kettle.. $afe distance /w workplace and heating place.. 'utting of itu!endru!.

    . +eople.

    . E2uip!ent.

    . En*iron!ent.

    . +rohiited.

    . +rocedure.

    . E!ergenc%responseplan.. '& withWorkers /localco!!unit%.

    . Leather lo*es for the person for handling hot itu!en.

    . Heating place will e at safe place.

    . $ufficient distance /w heating and work place.

    . Use of additional safet% co*er area o*er all.

    . ,ispla% of sign oard.

    . +roper storage of !aterial.

    .Traffic control.

    . 0ire watch !an.

    . 0ire e3tinguisher.

    . ,ope kettle.

    . ++E.

    /oad *ors#$ompa!tion of ro!+it( road roller#

    . 0ailure of e2uip!ent.

    . 8ther *ehiclular!o*e!ent.. personal in4ur%.. propert% da!age.. arrow road.. Laor working on thatsection.. 'rowded place.

    . +eople.

    . E2uip!ent.

    . En*iron!ent .

    . +rohiited.

    . +rocedure.

    . E!ergenc%responseplan.. '& withWorkers /localco!!unit%.. ,ri*ingpolic%.

    . E2uip!ent check list

    . $afet% Talk

    . safe distance /w two tractor.

    . keep sufficient distance /w roller and laor.

    . 9alid license.

    . 'o!petenc% of operator.

    . $afet% awareness !eeting with local co!!unit%.

    . ,ri*ing polic%.

    . &edic. $tand % *ehicle.. $afet% watch!an.. 0irst aid o3.. 0ire watch!an.. 0ire e3tinguisher.

    . Look out.

  • 8/18/2019 Orginal BP Tra

    8/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    Ad H M 12 M L 4

    Ae M M 8 M L 4

    /oad *ors irtfilling trolle-inmaterial#

    . arrow roads.

    . loading of !aterial atorrow site.. crop ad4acent to dirtroad/track. populated areas.. stucking of e2uip!ent.. sugar cane trolle%s.. o*er loading of trolle%s.

    . $i!ops of e2uip!ent.

    . $nake ite

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +rohiited.

    . +rocedure.

    . E!ergenc%responseplan.. '& withWorkers /localco!!unit%.

    . ,ri*ingpolic%.

    . o person tra*eling with tractor trolle%.

    . E2uip!ent check list.

    . ,uring the loading of !aterial( tractor dri*er to keep awa%fro! the e2uip!ent.. o !o*e!ent in ad weather condition.. 9alid HT9 license holder in case of filling to e done %du!per.. +referal% use of ,u!per where possile.. onl% h%draulic trolle%s where du!per !o*e!ent is notpossile.. o !o*e!ent of h%draulic trolle%s on dirt track ha*ingwidth less then 7;5. ,esignate look out in all critical points e.g sharp turning(

    near oths and under construction work.. 'o!!unit% awareness !eetings.. Route !ap fro! orrow area to site.. Tr% to $elect orrow area nearest to rig road.. :*oid e3cessi*e use of +ressure horn.. 0ollow *ehicle polic%.

    . Look out.

    . $nake ite kit.

    . $afet% watch!an.

    . &edic !an.

    . 0.:.B.

    . 'ertified !edic!an.. $tand % *ehicle.. ,ust !ask.

    /oad *orsMoiliation.emoiliation

    . +edestrians.

    . :ni!al 'arts.

    . +oor 9ision.

    . $lipper% road.

    . arrow path.

    . Blind turning.

    . 8*er speeding.

    . E2uip!ent failure.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&s

    . ,ri*ingpolic%.

    . Route :wareness.

    . o !o*e!ent in ad weather/high wind/ fog/ nightcondition.. 0ollowed speed li!it.. E2uip!ent check list.. nstalled traffic sign oard.. 'onduct road safet% awareness progra! with localco!!unit%.. o passenger is allowed to sit n 'argo 'ain ) it !uste strictl% +rohiited.. +h%sical fitness of dri*er.. ,eputed skilled lookout near % populated area/*illage/narrow path/ lind turning.

    . Lookout.

    . 0ire e3tinguisher.

    . 'o!petent dri*er.

  • 8/18/2019 Orginal BP Tra

    9/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    Af  L M 6 L L 2

    Ag M M 8 M L 4

    /oad *or s&'s(and tree !'tting

    . !proper use of tools

    . $nake Bite / +oisonousinsects. $nake Bite / +oisonousinsects. 'li!ing on the trees. !proper stacking ofcut trees ) ushes. Blind turning.. 'rowded places.

    . arrow path.

    . 8*er loading.

    . round 'ondition

    . 'ondition of Trees

    . +eople.

    . E2uip!ent.

    . En*iron!ent .

    . +rohiited.

    . +rocedure.

    . E!ergenc%responseplan.. '& withWorkers /localco!!unit%.

    . E2uip!ent 'heck List

    . Ensure no person stand under the tree to e cut.

    . 9isit of the working area with local co!!unit% persons forawareness of hazard "like presence of snakes( ponds andtransportation of *egetation waste#. +roper awareness aout the nature / size of trees andushes. Before cutting of trees area to e arricade.. Tri! / 'ut to size for the ease of handling.. :ppropiate e2uip!ent for tri!!ing.

    . Trained persons.

    . $nake Bite

  • 8/18/2019 Orginal BP Tra

    10/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    Ah M M 8 M L 4

    Ai L L 2 L L 2

    /oad *or )'s(ing Tra!tor )lo'g(ing% Leelingand rading Tra!tor &lade#

    . $i!ops of tractor.

    . 0ailure of tractor.

    . Re*ersing !aneu*er.

    . $nake ite.

    . Li*e e2uip!ent.

    . +eople.

    . E2uip!ent.

    . En*iron!ent .

    . +rohiited.

    . +rocedure.

    . E!ergenc%responseplan.. '&.

    . E2uip!ent check list

    . +TW.

    . $afet% Talk

    .

  • 8/18/2019 Orginal BP Tra

    11/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORM

    TASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    6 M M 8 M L 4

    6C ,!affolding M H 9 M L 4

    76 M M 8 L L 2

    77 ,teel +ors /ear . +eople. L M 6 L L 2

    le!tri!al *orsLig(ting o'tsideD+ower arrange!ent "en

    set ( +ower outlet #&aterial arrange!ent for nstallation of lighta andTer!ination of e lectriccale

    . $hock(

    . Burn(

    . 0ire(. E3plosion(

    . n4ur%(

    . Use of i!proper tools.

    . +eople.

    . E2uip!ent.. 0acilit%.

    . En*iron!ent .

    . +rohiited.

    . +rocedure.

    . E!ergenc%responseplan.. '&.

    . enerator5s checklist(

    . solated ,istriution Bo3 with EL'B(

    . 'lassified E2uip!ents for specified area(

    . Use of E3plosion proof light ) proper handling of lights(

    . +roper 'onnection(

    . +roper instru!ents and tools.

    . o work on li*e lines.

    . 'ertifiedElectrician(. $pecific lo*es.

    . ++E.

    . TestingE2uip!ents.. ,istriution o3.

    F Trip and fall. +oor ground condition.F 0all of o4ect fro!heightF Unalance structureF Loose !e!ers andplanks.F Hea*% windF nade2uate design.. Working at height.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +rocedure.

    . +TW.

    . '&.

    .$egregation /Barricade.. ER+.

    . Ele*ated ground condition.

    . +roper anchoring. "preferal% o*er head#.

    F $caffolding !aterial !ust e used as per procedure.F Una*ailailit% of co!petent person for design erectionand inspect as well.F Tag s%ste!.F Use of prefaricated ladder.

    F ++E "0ull od%harness with shockasorer.#F E!ergenc% stand% *ehicle.. 0:B.. 'ertified safet%super*isor.. $caffolding checklist.F 'ertified$caffolders.

    re!tion of masonar+all#

    . Hit.

    . 0all.. En*iron!ental.

    . Working at height.

    . 'e!ent / 'he!ical.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +rocedure.

    . +TW.

    . '&..$egregation /Barricade.. ER+.

    . Use of proper tools.

    . +roper plate for!.

    . 'ordon off.

    . +roper &aterial storage place.

    . +roper house keeping.

    . E!pt% ce!ent ags to e proper disposed off.

    . 'onduct '& related to the En*iron!ent hazard.

    . :*ailailit% of &$,$.

    . $afet% watch.

    . 0irst :id Bo3.

    . $killed &ason.

    . Ruer glo*esand dust !ask.. $tand % *ehicle.

    . !proper use of tools.

    . Working at height.

    . +rocedure.

    . +TW.

    . '&.

    . Barricade.

    . ER+.

    . '&s.

    . :rea to e arricade.

    . $killed +erson.

    . ,ispla% of sign oard.

    . &aterial to e properl% stacked at 4o site on woodenplanks and also to e co*ered % pol%thene sheet..

    . &edic !an.

    . $afet% Watch.

    . &echanical rearcutter.

  • 8/18/2019 Orginal BP Tra

    12/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard

     Effect"Refer to E*aluation

    0or!#

     

    7; L M 6 L L 2

    7= ,('ttering M M 8 L L 2

    7>a M M 8 L L 2

    Man'al Lifting$ement% &lo!s%ags p'mps et!#

    . !proper handling of!aterial.. 0all.. Hit.. $lip.. Lifting of e3cess load.. $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +rocedure.

    . +TW.

    . '&.

    . ER+.

    . :ppropriate $uper*ision.

    . :ccess fro! the storage to the Loading site !ust eclear.. $killed !anpower to shift the load.. +roper procedure to e adopted during !anual lifting.. $ufficient reak to rest.. &aterial !ust e stacked in proper storage place.

    . 0irst aid o3.

    . $nake ite kit.

    . &edic !an.

    . $afet%Watch!an.. $afet%Watch!an.. $tand % *ehicle.

    . !proper use of tools

    . E3posed nails of wood

    . nsufficient support

    . Gualit% of shuttering.

    . +rotrude portion ofracing/ horizontalsupport.. Working at height.. Hit / 0all / $lip / 'ut.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +rocedure.

    . +TW.

    . '&.

    . ER+.

    . :rea to e arricade

    . Re!o*ing of nails fro! work site.

    . ,ispla% of $ign oard.

    . House 5 depth as per soil condition.

    . 0ire watch !an.

    . $afet% watch!an.

    . &edic !an with0.:.Bo3.. 0ire e3tinguisher.

  • 8/18/2019 Orginal BP Tra

    13/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORM

    TASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    7> M M 8 L L 2

    7>c M M 8 L L 2

    7>d M M 8 L L 2

    7>e M M 8 L L 2

    $'lert ridges#,('ttering

    . !proper use of tools

    . E3posed nails of wood

    . nsufficient support

    . Gualit% of shuttering.. +rotrude portion ofracing/ horizontalsupport.. Working at height.. Hit / 0all / $lip / 'ut.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +rocedure.. +TW.

    . '&.

    . ER+.

    . $killed persons.

    . :rea to e arricade.

    . Re!o*ing of nails fro! work site.

    . ,ispla% of $ign oard.

    . House

  • 8/18/2019 Orginal BP Tra

    14/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard

     Effect"Refer to E*aluation

    0or!#

     

    7>f  M M 8 L L 2

    7@ )ainting L H 7 L L 2

    7? e+atering# M M 8 M L 4

    $'lert ridges#)la!ement of irder."ari!ation .*elding

    . Lifting 8peration.

    . Welding.

    . nade2uate crane ase.

    . Working at height.

    . !proper $ignals

    . 0ailure of lifting gears.

    . &is4udg!ent of load.

    . 0ire gnition $ource.

    . !proper use of tools.

    . nade2uate workingarea for the welder.. nsufficient workingspace /w crane andtrailer.. High flow of drain

    canal.. round 'ondition.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +rocedure.

    . +TW.

    . '&.

    . ER+.

    . E2uip!ent 'heck List

    . :rea cordon off.

    . 'ertified 8perators( Riggers and E2uip!ents.

    . o unauthorized / unconcerned persons allowed to enterin the lifting operation area.. +roper working platfor! pro*ided for the welders andhelpers.. 'onduct !eeting with near % *illagers efore critical andti!e taken lifting operations.. n case of single access pro*ision of %-pass will e!ade for local *illagers.. +h%sical condition of the crane operators.. nstallation of warning sign oard.

    . $afet% watch!an.

    . 0ire Watch!an.

    . 0ire e3tinguisher.

    . &edic !an

    . 0irst aid o3.

    . Lookouts.

    F To3ic fu!es.F En*iron!ent hazard.F $kin swollen.F E3pired paint.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&.

    . +TW.

    . ER+.

    . &anpower co!petenc%.

    . +roper disposal of e!pt% cans / cotton rags / glo*es /roller etc.. $killed painting super*isor.. :*oid keeping unused paint cans in open at!osphere.. +aint should not e !i3ed on ground with out arranging

    wooden pl% or tarpaulin.. Ensure a*ailailit% of &$,$.

    . Leather glo*es.

    . $plash glasses.

    . ++E.

    . 0ace!ask.

    . 0irst aid o3.

    . &edic.

    . Use of !achiner%

    . &is handling

    . nade2uate groundcondition. Trip and 0all. !proper hoseconnections. ois% area

    . $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . 9alid e2uip!ent check list

    . $killed +ersonal

    . House keeping

    . +roper arricade

    . Warning sign oard

    . +roper hose connection "1uilee cla!ps not per!issile#

    . :ppro*ed dewatering procedure

    . :*ailailit% of 2uick set fitting and well points s%ste!.

    . $nake ite kit.

    . ++E

    . 0irst aid o3

    . E!ergenc% stand% *ehicle. Water owser.. 'ertified $afet%

    watch

  • 8/18/2019 Orginal BP Tra

    15/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    7A M M 8 M L 4

    7 *ater )roofing L M 6 L L 2

    7C $on!rete )o'ring# M M 8 M L 4

    :nstallation of $ellarand $ond'!tor )ipe

    . $lipping of Tripod Legs.

    . &achiner% !a% fall andcan hit so!e one.. $ling can e roken.. $liding of e2uip!entduring unloading withchain lock.. round condition.. $liding of e2uip!entduring unloading withchain lock.. 0ailure of e2uip!ent.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . 'ertified lifting gears.

    . Trained ) e3perienced person.

    . Tripod legs stands on hard ground.

    . :rea cordon off.

    . E2uip!ent check list.

    . House keeping.

    . 'oordination with associated work force working atsa!e location.

    . $afet% watch!an.

    . &edic !an.

    . 0.:.B.

    . 'ertified operator.

    . 'ertified rigger.

    . $tand % *ehicle.

    . !proper !aterialHandling. 'utting Tool. Working at height. Handling of hot itu!enunto roof.. En*iro!ental

    . +eople.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . Leather glo*es for the persons for handling hot itu!en.

    . +roper scaffolding .

    . $hifting of itu!en through rope and ucket safel%.

    . o one should stand during the pulling of ucket.

    . :rea should e arricade.

    . 'heck Wind direction.

    . House

  • 8/18/2019 Orginal BP Tra

    16/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ;6 M M 8 L L 2

    ;7 M H 9 M L 4

    ,and lasting ,; 2<)iping ,tr'!t're

    . High +ressure

    . Rupture

    . 0ire

    . En*iro!ental ,a!age

    . !proper 'onnection

    . nhaling

    . :rasi*e

    . $uffocation .

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . E2uip!ent $hould e with 9alid 'heck List

    . :ll 'onnection $hould Be with 'hicago 'oupling ) WithGuick 8pen ) Lock. :ll +$9$ . $hould 'alirated With Traceilit% 'ertificate.. 8perator ) $and Blaster Both $hould $ee to Each 8therEasil%. ,ead !an $witch e 8perational.. Use ,ust &ask.. Use Breathing :pparatus With Regulator.. :rea $hould 'ordoned 8ff . ,epute $afet% ) fire Watch !an.. Use :ppro*ed Gualit% $ilica $and. $eparate air Breathing 'onnection :ir 0ilter.. +rocedure for disposal of rit / $ilica.. +ressure rating on hoses should e !arked.

    . ++E

    . ,ust &ask.

    . 0:B.

    . 'o!pressor andsand latingaccessories.

    Moement t(ro'g(pop'lated area

    . +edestrians.

    . +oor 9ision.

    . $lipper% road.

    . arrow path.

    . Blind turning.

    . 8*er speeding.

    . E2uip!ent failure.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . ,ri*ingpolic%.. '&.

    . 0ollow speed li!it.

    . E2uip!ent check list.

    . o !o*e!ent in ad weather/high wind/ fog/ nightcondition.. Route awareness.. nstalled traffic sign oard.

    . 'onduct road safet% awareness progra! with localco!!unit%.. Refresher course should e done ti!e to ti!e.. +h%sical fitness of dri*er.. ,eputed skilled lookout near % populated area/*illage/narrow path/ lind turning.. :rrange se!inars to learn traffic rules.. ,,T for contractors.

    . ,ri*e right.

    . +ortale firee3tinguishers.. Lookout.. 'o!petent dri*er.

  • 8/18/2019 Orginal BP Tra

    17/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ;; )aring# L M 6 . +arking Triangle. L L 2

    ;= M H 9 M L 4

    ;> =ig(t *oring M H 9 . Lights. M L 4

    ;@ M M 8 M L 4

    . Road condition.

    . arrow path.

    . :ni!al sit eneath the*ehicle to rest.. Blind turning.. 8*er speeding.. E2uip!ent failure.. +edestrians.. :ni!al carts.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . ,ri*ingpolic%.. '&.

    . Use of designated parking at location and all otherworking places.. 'o!petenc% of dri*er.. Use of triangles

    . f parked at populated area it depends on dri*erco!petenc% to 4udge the hazard.. +ark awa% fro! passing % 9ehicle( ani!al carts etc.. nspection round the *ehicle i!!ediatel% efore startingand !aneu*ering has een declared a !ust.. 9ehicle !ust e parked in re*erse direction.

    riing in /ain or"og *eat(er$ondition

    . +oor 9ision.

    . $lipper% road.. arrow path.

    . Blind turning.

    . 8*er speeding.

    . E2uip!ent failure.

    . &o*e!ent oninspection path.. 0low of electric current.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . ,ri*ingpolic%.. '&.

    . $top *ehicle at safe place.

    . 'o!petent dri*er.

    . n fogg% weather if *ision is slightl% clear then reduce the

    speed li!it to half of design speed.. !!ediatel% report to Radio roo!.. Use > 3 > *ehicle.. Use of head light in fogg% / rain% condition.. Hea*% *ehicle is not allowed to !o*e during rain andfogg% weather.. 9ehicle check list. Wait till the weather gets nor!al and a*oid to rush.. +rofessional dri*er should e used.. :*oid un-necessar% !o*e!ent.

    . Low *isiilit%(

    . $nake ite(

    . Blind $pots.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . Lightning arrange!ent

    . +er!ission 'TL.

    . +roper illu!ination.

    >nder gro'nd'tilities identifi!ation:nside O'tside t(e"a!ilit

    . under ground utilit%lines can get struck whileperfor!ing e3ca*ationeither % !anual/&echanical.. Electric shock.

    . 0ire ignition.. En*iron!ental.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . Bell holes are !ade prior to e3ca*ation and reliance onproduction / !aintenance for infor!ation.. :rea cordon off.. 0ollow Route !arker.. 'ale detector used inside facilit%.. 0ire ,rill.

    . Ensured appropriate/ right kind of tools and e2uip!entare used for e3ca*ation.

    . $tand % 9ehicle.

    . $afet% Watch.

    . 0irst aid o3.

    . 0ire watch!an.

    . &edic !an.

    . 0ire e3tinguisher.

  • 8/18/2019 Orginal BP Tra

    18/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ;? Hdro Testing M M 8 M L 4

    ;A M M 8 L L 2

    . !proper :nchoring

    . High +ressure

    . Rupture

    . En*iron!ental,a!age.. Use of &achiner%.. $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . ER+

    . +rocedure.

    . +rohiited.

    . :rea 'ordoned 8ff.

    . +roper :nchoring.

    . Use appropriate rating asse!l% for H%dro-Testing .

    . :ppro*ed H%dro Testing +rocedure.

    . o Entr% for Unauthorized +ersons.

    . &ake sure proper tightening.

    . Testing +ressure :s per 'ode ) +iping $pecificat ion.

    . 9alid E2uip!ent 'heck List.

    . :ppro*ed h%dro test package.

    . :ll nline 9al*e should e in open position.

    . High 9ent +oint :ir Re!o*al.

    . :ppro*ed Water.

    . 1oint $hould e E3posed for inspection.

    . Testing Recorder $hould e 'alirated.

    . :ir Blowing Before ) :fter H%dro Testing.

    . &ake $ure 0illing +oint $hould Low Ele*ated.

    . Use of rupture disc during :ir lowing.

    . +rocedure i!ple!entation

    . ++E.

    . 'alirated +$9 )+.. $afet% Watch.. 0:B.. $nake ite kit.. Warning $ign.. $tand % 9ehicle.. $killed !anpower.

    . &edic.

    as $linderHandling Transportation

    . High +ressure

    . rupture

    . !proper $torage

    . 0ire

    . En*iro!ental ,a!age

    . Unranded c%linders.

    . Leakage.

    . &is-Handling

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    .

  • 8/18/2019 Orginal BP Tra

    19/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ; "ari!ation M M 8 L L 2

    ;C M M 8 M L 4

    =6 M M 8 L L 2

    . $parks

    . 'hipping

    . Un trained persons

    . n4uries.

    . High te!perature.

    . 'urrent.

    . $hock.

    . :rasi*e wheel.

    . E2uip!ent da!age

    . +eople.

    . E2uip!ent.. 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&. +rocedure.

    . +rohiited.

    . 'ertified and appro*ed persons

    . E2uip!ent checklist

    F as testF $creening.

    . ++EF $creen.

    F 0ire e3tinguisher F $tand % *ehicleF 0irst aid o3

    ?a! Hammering#:nside or o'tside t(efa!ilit

    . Under ground utilit%lines can get struck whileperfor!ing the floorde!olishing 4o insidethe facilit%.

    . Use of !achiner%.

    . $plash of concrete.

    . Hit.

    . $park.

    . Electric shock.

    . !proper use ofe2uip!ent.. 'hisel reakage.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.. '&

    . +rocedure.

    . +rohiited.

    . 0ollow the route !arkers.

    . :rea cordon off.

    . 0ire ,rill.

    . :wareness of !uster point

    . E2uip!ent check list.. +roper as uilt of all under ground utilit% lines.

    . Re2uired proper 'heck List for!at of 4ack ha!!er.

    . Use of detector should e introduced.

    . Ensure the Route !arker a*ailailit% out side the facilit%.

    . Use of 0ire +roof Tarpaulin $heet / 0ire Retarder "nsidethe facilit%#. +h%sical fitness of e2uip!ent operator.

    . $afet% Watch.

    . $tand % 9ehicle.

    . 0ire watch!an.

    . &edic !an ) 0irstaid o3.. 0ire e3tinguisher.

    ismantling Of@'ipment.Man'al.Me!(

    . 0alling of load(

    . ,a!age to ad4acente2uip!ent(. $parks(. 0ire E3plosion(. &ishandling(. Breaking(. 0ailure of Lifting earsor e2uip!ent. &iscalculation of weightor underesti!ation.. +ressure.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . Energ%solation.

    . :rea cordon off.

    . E2uip!ent check list.

    . 'ertified $lings(

    . 'ertified 'rane(

    . Brass Ha!!ers(

    . +roper Rigging +lan.

    . Third +art% certified persons(

    . $tand%- 9ehicle.

    . 0:B.

    . &edic.

    . $lings.

    . 'rane.

  • 8/18/2019 Orginal BP Tra

    20/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    =7 L M 6 L L 2

    =; H M 12 M L 4

    Material storage atsite

    . !proper place!ent.

    . 0all

    . 8pen ends

    . !proper stacking

    . Unco*ered congestion

    . !proper lifting gear 

    . &$,$

    . 8*er stacking

    . ,ust .

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . 'ertified !anpower.

    . :ll pipes and fitting should e with stopper.

    . :rea should e cordoned off 

    . Hazards &aterial should e !arked :nd solated

    . &aterial should e co*ered fro! rain ) dust

    . Eas% access of !o*e!ent for loading off loading

    . &aterial should e ele*ated fro! ground le*el.

    . 0i3 end caps where its re2uired

    . 0itting (9al*es ) instru!ents should e placed in sidethe container or storeroo!. 0la!!ale !aterial( 'he!ical ) high +ressure &aterialshould e placed at safe ) specified area. $ensiti*e ite!s( pol%ken tape (heat shrink slee*e( epo3%

    coating ( paint ) electronic e2uip!ent should e placed incold storeroo!. :*ailailit% of &$,$.

    . Racks.

    . $helfs.

    . Tarpaulins.

    !aationMan'all.Me!(ani!al

    . under ground Utilitieslines can get struck whileperfor!ing thee3ca*ation inside facilit%.. 0ire. Electric shock.. High Water Tale.. 'ollapse. Under ground Utilities.. ,eep e3ca*ation. 83%gen deficienc%.condition.. Working in depth.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . 0ollow the route !arker.

    . :rea cordon off.

    . Use of cale detector.

    . E2uip!ent 'heck List.

    . Re!o*e soil/ stock pile !aterial !a3i!u! awa% fro!edge.. $teps ( $lop ( $horing after >5 depth as per soil condition.. Bell holes.

    . $afet% watch!an.

    . 'ale detector.

    . &edic.

    . Bell holes.

    . 0.:.Bo3.

    . 0ire e3tinguisher.

    . 0ire watch !an.

  • 8/18/2019 Orginal BP Tra

    21/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ==a M M 8 M L 4

    == M M 8 M L 4

    ==c M M 8 M L 4

    ):) L:=AMoiliation

    F Transportation of

    personels.. Transportation ofe2uip!ent.. Haulage of line pipes.F Loading / off loadingF Hit and fallF Use of !achiner%F 8*er speeding. 8*er load / insecure!aterial

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    F Route sur*e%. 'ondition of road / R8W.F 9erified e2uip!ent check list.F 'ertified e2uip!ents( lifting gears and !anpower . $peed li!its.. +roper securing of load.. 'ertified e2pt.lifting gears and all &/+.

    F ++E.. ,ri*e right.F $afet% super*isor F 0irst aid o3.F Look out.F E!ergenc% stand% *ehicle.

    ):) L:=A)reparation of /O*#

    . E2uip!ent stucking.

    . Handling of cul*ertpipe.. Roll o*er due to une*enground.. Use of !achiner%.F En*iron!ental hazard.F Roll o*er due to une*en ground. $nake and otherreptiles.. Use of !achine.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    F &ini!u! re!o*al of treesF 9erified e2uip!ent check listF 'ertified &/+. :rea arricade.. $peed li!it.

    . ++EF $nake ite kitF 0irst aid o3.F Look out. $afet% super*isor.F E!ergenc% stand% *ehicle.

    ):) L:=A,tringing

    . 0all of pipe.

    . Roll o*er.

    . Hit.

    . Lifting operation.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    F 'ertified e2pt.lifting gears and all &/+F Use of tag line.F +roper rigging procedureF 9erified check list.

    F ++E. Look 8ut.. 0:B.. $afet% super*isor.

  • 8/18/2019 Orginal BP Tra

    22/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORM

    TASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ==d ):) L:=A *elding M H 9 M L 4

    F Use of !achine.F Welding light.F $park.

    F Burn.F To3ic gases.F Roll o*er welded.seg!ents.. Hit / strike.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&. +rocedure.

    . +rohiited.

    . ER+.

    . 9alid check list.F +roper welder5s kit.F +roper support to hold the welded seg!ents.

    F $kill and certified !anpower.. as test in facilit%.. :*oid e3cessi*e e3posure at high te!perature.. +roper house keeping to e ensure after co!pletion of

     4o.

    F E!ergenc% stand% *ehicle.. 0irst aid o3.

    F ++E. 0iree3tinguishers.. 0ire watch.. as detector.

  • 8/18/2019 Orginal BP Tra

    23/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ==e M M 8 M L 4):) L:=A/adiograp(

    . Radiation e3posure

    . 8*er dose

    . +ropert% loss

    . onizing radiation

    . 9o!iting

    . ausea

    . +aleness

    . Loss of hairs

    . Loss of appetite

    . ,a!age ofgeneses

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . $ource under lock and ke%.

    . +ersonal &onitoring.

    . :rea !onitoring / 'ordon 8ff.

    . 'a!era in lead o3 and lead o3 in the trunk of *ehicle.

    . 9ehicle *alid check list.

    . &aintain dail% and !onthl% dose record through fil!

    adge.. +ersonal !onitoring through dosi !eter.. 'ordoned off radiation zone through radiation warningsign.. 'ontinuous radiation !onitoring with the help of sur*e%!eter.. Reduce radiation e3posure.. Retract source ack to container.. $pare container.. ,,T 2ualified dri*er . Handling and transportation to e perfor!ed as per B++standing instructions.

    . Radiation dose records keeping.

    . ++E

    . 'ertified +ersonel"le*el :$T#. ,osi !eter.. $ur*e% !eter.

  • 8/18/2019 Orginal BP Tra

    24/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ==f  M H 9 M L 4

    ==g H M 12 M L 4

    ==h M M 8 M L 4

    ):) L:=A:nstallation of Heats(rin sleee

    . 0ire due to !ishandling of !ethane gastorch.. E3plosion due to !isshandling of !ethane gasc%linder/ torch.. High te!perature.. Bod% urning due tocontact to hot surface.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    .$egregation.

    . ++E "as per re2uire!ent#

    . 9alid check list

    . $creening

    . nstallation +rocedure.

    . +ropane gas for re2uired te!perature.

    . 0ire e3tinguisher 

    . 'ertified $lee*e!an. certified fire watch!an. 0irst aid o3. E!ergenc% stand% *ehicle.. +%ro-!eter.

    ):) L:=A!aation of linepipe tren!(

    . E3ca*ation !ore than

    >5 deep. Use of !achine.. $lip. 'ritical soil condition. Hand tools. 'ollapse. 'a*e in. $and oiling. High water tale.. $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . $killed and co!petent persons

    . E2uip!ent *alid check list

    . Benching / $lopping / $horing

    . Ele*ated ground condition

    . ,ewatering.

    . E3ca*ated soil should e placed at least ;5 awa% fro!edge of the trench.

    . Look out withwhistle.. 0irst aid o3.. E!ergenc% stand% *ehicle. $nake ite kit.. ++E.

    ):) L:=A Holidadete!tor test

    . Electric shock

    . $park

    . 0ire

    . &ishandling

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . $egregation

    . ++E "as per re2uire!ent#.

    . E3perienced and co!petent e2uip!ent operator.

    . E2uip!ent caliration.

    . +roper grounding as per procedure.

    . 'lose !onitoring of the seg!ents.

    . Ensure electrical insulation.

    . E2uip!ent check list.

    . 0ire e3tinguisher

    . 'ertified firewatch !an. 0irst aid o3. E!ergenc% stand% *ehicle. 'ertified safet%watch!an

  • 8/18/2019 Orginal BP Tra

    25/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ==i M M 8 M L 4

    ==4 ):) L:=A Tie-:n H M 12 M L 4

    ==k M M 8 M L 4

    ):) L:=A Lo+eringof )ipe linesegments

    . Use of !achiner%

    . 0all( hit and roll "pipeseg!ents#. Hea*% wind. n*isiilit%. nade2uate groundcondition.. Lifting operation.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . $egregation

    . E2uip!ent certified docu!ents.

    . 'ertified lif ting gears and !anpower.

    . E2uip!ent *alid check list..

    . !ple!entation of lowering procedure.

    . Look out

    . 0irst aid o3

    . E!ergenc% stand% *ehicle. certified safet%watch!an.. ++E. $killed andcertified personals

    . Use of !achine

    . $park

    . !proper trench

    . Hea*% wind

    . n*isiilit%

    . ,eficienc% of o3%gen

    . 'ollapsing of side walls

    . 'a*e in.

    . Lifting operation.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . +TW.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . $egregation

    . as test

    . 9alid e2uip!ent check list

    . 'ertified e2uip!ent and lifting gears

    . $killed and certified personals

    . $horing /stepping/slopping

    . Tie in +rocedure

    . E!ergenc% stand

    % *ehicle. 0irst aid o3. 'ertified &edic. ++E. as tester.. 'ertified firewatch!an. 'ertified safet%watch. Look out. $horing plates.

    ):) L:=A &a!"illing

    . Use of !achine

    . $lip

    . 'ritical soil condition.

    . $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . 9alid e2uip!ent check list

    . 'ertified and co!petent persons.

    . Ele*ated R8W condition.

    . Back filling procedure.

    . E!plo%!ent of proper e2uip!ent.

    . Look out.

    . $nake ite ket.

  • 8/18/2019 Orginal BP Tra

    26/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard

     Effect

    "Refer to E*aluation0or!#

     

    ==l ):) L:=A )igging M M 8 M L 4

    . High +ressure

    . Rupture / 0ire

    . En*iro!ental ,a!age. !proper 'onnection.

    . $tuck

    . !proper anchoring

    . &ishandling ofTe!porar% +ig recei*erand Launcher.. $hort olting.. Use of !achine.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . :de2uate piping class ) fittings.

    . +roper tightening ) ade2uate gaskets.

    . :de2uate $tud olt sizes.

    . E2uip!ent $hould e with 9alid 'heck List

    . +roper 'onnections.

    . ,uring pigging co!!unication source should e at othend.

    . nstall certified pig recei*er and launcher at oth ends.

    . Line should e properl% anchored

    . RT ) +T should e clear efore pigging

    . :rea should e cordoned off.

    . ,epute $afet% ) fire Watch !an

    . Un authorize personnel are not allowed in working area

    . Recei*ing end *ent *al*e should e in open position

    . Warning sign oard should e installed at oth ends atappropriate locations.. +ig indicator should e !ounted at +ig recei*er )launcher.. Before pigging water filling as re2uired.. Water disposal arrange!ent.

    . E!ergenc%9ehicle

    . Warning signoard.. $tand % *ehicleat oth end.. ++E.. &edic with firstaid kit at othends.

  • 8/18/2019 Orginal BP Tra

    27/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    ==! M M 8 M L 4

    => T(r'st &ore# H M 12 M L 4

    ):) L:=A Hdrostati! testing

    . !proper :nchoring

    . High +ressure

    . Rupture

    . En*iron!ental,a!age.. Use of &achiner%.. $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . :rea 'ordoned 8ff.

    . +roper :nchoring.

    . +roper Rating H%dro Testing :sse!l%.

    . :ppro*ed H%dro Testing +rocedure.

    . ,epute $afet% Watch.

    . o Entr% for Unauthorized +ersons.

    . &ake sure proper tightening of all the olt.

    . $killed !anpower.

    . Testing +ressure :s per 'ode ) +iping $pecification.

    . 9alid E2uip!ent 'heck List.

    . :ppro*ed h%dro test package.

    . :ll nline 9al*e should e in open position.

    . High 9ent +oint :ir Re!o*al.

    . :ppro*ed Water.

    . Testing Recorder $hould e 'alirated.

    . Ensure i!ple!entation of procedure.

    . :ir Blowing Before ) :fter H%dro Testing.

    . ++E.

    . 'alirated +$9 )+.. $tand % 9ehicle.. 0:B.. $nake ite kit.. &edic.. Warning $ignoards.

    . ,eep e3ca*ation ofthrust oring pits. 83%gen defecienc%.. 'ollapse. 'a*e in. +lace!ent of oring

    !achine( track( shoringplate and pipes. Use of !achiner%.. $nake ite.. Hit and 0all.. 8pen ditch.. nade2uate align!entor le*eling.. High water tale.. Lifting operation.. 'ritical soil condition.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . :ppro*ed profile of pit

    . $lopping( enching and shoring

    . 9alid e2uip!ent check list

    . 'ertified lifting e2uip!ent and lifting gears

    . 'ertified +ersonals

    . ,ewatering

    . House keeping

    . +roper arricade

    . Tag line to a*oid swing

    . 'ertified $afet% watch

    . E3perienced and co!petent Thrust ore super*isor andworkforce. :ppro*ed rigging plan.. :ppro*ed Thrust ore procedure.. as / o3%gen test.

    . $ur*e%or.

    . Le*eling !achine.

    . Look out.. Warning signoard.. $nake ite kit.. 0irst aid o3.. ight watch!an.. ++E.

  • 8/18/2019 Orginal BP Tra

    28/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORM

    TASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    =@ ,'re *or M L 4 L L 2

    =? M M 8 L L 2

    =A *oring at Heig(t# M M 8 L L 2

    . !proper handling /place!ent of instru!ent.. 'arelessness aout

    *ehicular traffic.. $lip fro! slopes.. $tuck in soft soil.. Harsh weather " hot(sunshine#. &arsh%/ wet area.. Thick ushes.. $nake/ poisonousinsect ite.. Local culturalsensiti*ities.. etting stranded.. $nake ite.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . 'heck ground condition.

    . +roper place!ent of instru!ent.

    . $ignal !an guiding traffic.

    . Tr% to !ini!ize e3posure.

    . 'o!!unication.

    . +roper rest to a*oid deh%dration.

    . U!rella for sur*e%or if sur*e% to e done % e2uip!ent.

    . :wareness of local cultural sensiti*ities.

    . 0.:.Bo3.

    . $nake ite kit.

    . &edic &an.

    Temporar ladder .Hand rail#

    . !proper andinade2uate groundcondition.. $lip and fall. 0ailure of structure.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . +lace ladder at proper ground

    . Ladder should e place at approprite angle to a*oid slip.

    . uard rail " f re2uired#.

    . +roper arricade

    . House keeping.

    . nspection of $tructure.

    . ++E

    . 'ertified $afet%watch. 0irst aid o3. E!ergenc% stand% *ehicle

    F Trip and fallF 0all of o4ect fro!heightF Unalanced structureF Loose !e!ers andplanks.F Hea*% wind.. 8*er load on scaffold.F nade2uate design ofscaffold.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    .$egregation

    . Barricade the area..

    . :nchoring point preferal% at top " 0or saafet% harness#.

    . $caffolding check list ) tagging.

    . Ensure i!ple!entation of procedure.

    . 'o!petent person to certif% scaffolding.F 0ull od% harness with shock asorer.F +roper anchoring.F Tool kit elt.

    F ++E "full od%harness#F E!ergenc% stand% *ehicle.. 0:B.. 'ertified safet%super*isor.

  • 8/18/2019 Orginal BP Tra

    29/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    =a M M 8 M L 4

    = M M 8 M L 4

    =C M H 9 M L 4

    energ isolationo'tside fen!eB/epair of )ipe lineleaage C

    . ,a!age of propert%

    . n4ur%

    . 0ire

    . En*iron!ent

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . ,oule lock ) leed s%ste!(. 9al*es closed locked ) tagged % authorized person.

    . as test efore starting of 4o.

    . :rea cordoned off.

    . $tored energ% released(

    . Re!o*al and disposal of conta!inated soil.

    . Ensure awareness for procedure i!ple!entation.

    . :rrange doule lock and leed s%ste! where nota*ailale.. Ensure application of en*iron!ental protection protocols.

    F ++E.F E!ergenc% stand% *ehicle.. 0:B.. 'ertified safet%super*isor.

    energ isolationo'tside fen!eBle!tri!al +or C

    . $hock

    . Burn

    . 0ire

    . E3plosion

    . +ropert% loss.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . $pecified circuit reakers should e off.

    . Tagged and locked % authorized person.

    . 'ertified electrician.

    . $pecific glo*es.

    . 'o!!unication.

    F ++E.. 'ertifed!anpower.F E!ergenc% stand% *ehicle.. 0:B.. $afet% super*isor.

    :dentifi!ation of 'n-re!ognied !onfined

    spa!e $(imne%!ellar pipe% ,ta! % )it% &asement % >n-entilated room %!aation moret(an 4 feet +(ereOgen !ontents lesst(an 21D

    . E3plosion

    . $uffocation.

    . E3cess te!perature.

    . $lip.

    . +oor 9ision.

    . To3ic ases.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . 83%gen test

    . +TW issuance % authorized person

    . :de2uate lighting.

    . 'o!!itted co!!unication.

    . as test.

    . Use of gu! oots "in case of sludge inside *essel#.

    . &aintaining of log ook.

    . 'onfined spaceattendant

    . $elf reathingapparatus

    . Blower / E3haustfan. Life line. ++E. $tand % *ehicle.

  • 8/18/2019 Orginal BP Tra

    30/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    >6 )igging of pipe lines M H 9 M L 4

    >7 M H 9 M L 4

    . High +ressure

    . Rupture / 0ire

    . En*iro!ental ,a!age

    . !proper 'onnection.

    . $tuck

    . !proper anchoring

    . &ishandling ofTe!porar% +ig recei*er

    and Launcher. $hort olting. Use of !achine

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . :de2uate piping class ) fittings.

    . +roper tightening ) ade2uate gaskets.

    . :de2uate $tud olt size.

    . E2uip!ent $hould e with 9alid 'heck List.

    . +roper 'onnection.

    . ,uring pigging 'o!!unication $hould e :t oth end.

    . $tand % *ehicle at oth end.

    . nstall certified pig recei*er and launcher at oth ends.

    . Line should e properl% anchored.

    . RT ) +T should e clear efore pigging.

    . :rea $hould 'ordoned 8ff.

    . ,epute $afet% ) fire Watch !an.

    . Un authorize personnel are not allowed in working area.

    . Recei*ing end *ent *al*e should e in open position.

    . Warning sign oard should e installed at oth onappropriate locations.. +ig recei*er ) launcher should e pig indicator !ounted.. Before pigging water filling as re2uired.. Water disposal arrange!ent.

    . Warning signoard.. ++E. &edic with firstaid kit at oth end.

    . $tand % *ehicle.

    ,(oring of eepTren!(es

    . E3istence of Underground utilit% lines.. !proper use ofe2uip!ent/ tool.. $oil collapsing.. High water tale.. nade2uate support.. Working at depth.. 'onfined space.. Use of !achiner%.. Hit / 0all / $lip.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&

    . +rocedure.

    . +rohiited.

    . ER+.

    . 0ollow the route !arkers.

    . :rea cordon off.

    . E2uip!ent checklist

    . 'ale/ pipe detector used inside facilit%.

    . 0ollow confined space entr% procedure.

    . 'o!petent operator.

    . Use of gas detector.

    . $afet% Watch.

    . $tand % 9ehicle.

    . 0ire watch!an.

    . &edic !an ) 0irstaid o3.. 0ire e3tinguisher.

  • 8/18/2019 Orginal BP Tra

    31/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    >; M M 8 M L 4

    >> M L 4 L L 2

    >@ H M 12 M L 4

    rilling .rinding and!'tting at site

    . $parks

    . 'hipping

    . Un trained persons

    . n4uries.

    . High te!perature.

    . 'urrent.

    . $hock.

    . :rasi*e wheel.

    . E2uip!ent da!age

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent .

    . '&.

    . +TW.

    . +rocedure.

    . +rohiited.

    . ER+.

    . 'ertified and appro*ed persons

    . E2uip!ent checklistF as testF $creening

    F as detector.F $creen.

    F 0ire e3tinguisher.F E!ergenc% stand% *ehicle.F 0irst aid o3.. ++E.

    )'lling of ,t'!@'ipment#

    . !proper signals duringoperation..Breaking 8r ,a!aging) shackle and tow hook.. Hit.. En*iron!entalHazards.. 0ire ignition.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . 'ertified $ling ) shackles.

    . 9alid 'heck list.

    . $low operation during pulling.

    . +roper handling of sling.

    . Traffic control during operation.

    . o person could stand near e2uip!ent during pulling.

    . Routine checking of $ling and shackle efore use.

    . 'o-ordinate B/W dri*ers efore pulling of stuck owser/e2uip!ent.. +roper signals during operation.. +roper lock pin for tie up.. $tand % *ehicle in case of e!ergenc%.. E*aluation of pulling capacit% of e2uip!ent.

    . $killed 8perator.

    . $tand % *ehicle.

    . $ignal !an.

    . $killed +erson.

    Moiliationdemoiliation#

    . +edestrians.

    . :ni!al 'arts.

    . +oor 9ision.

    . $lipper% road.

    . arrow path.

    . Blind turning.

    . 8*er speeding.

    . E2uip!ent failure.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . +rohiited.

    . Route :wareness.

    . o !o*e!ent in ad weather/high wind/ fog/ nightcondition.. 0ollowed speed li!it.. E2uip!ent check list.. nstalled traffic sign oard.. 'onduct road safet% awareness progra! with localco!!unit%.. o passenger is allowed to sit n 'argo 'ain ) it !uste strictl% +rohiited.. +h%sical fitness of dri*er.

    . 'o!petent dri*er.

    . 0ire e3tinguisher.

    . Lookout.

    RISK ASSESSMENT

  • 8/18/2019 Orginal BP Tra

    32/32

     RISK ASSESSMENT

    TASK RISK ASSESSMENT FORMTASK TITLE: TRA for Defined activities Location : !!!!!!!!! Date: "#$Mar$"##%

     Sr& Distinct Activit' Ha(ard 

     Ris) Eva*+ation

    Contro*s Action to ,e ta)en  Resid+a* Ris)

     HE - R  Descri,e Action Reso+rces  HE - R

     Ha(ard Effect

    "Refer to E*aluation0or!#

     

    >? H H 13 M M 8

    >A L M 6 . +roper super*ision L L 2

    > . +eople. L H 7 . '$&$ audit L L 2

    >C M M 8 M L 4

    HE= Hazard Effect P = Probability R = Risk  

     NAME OF TEAM LEADER:___________________________  P#______   NAME OF TEAM MEMER!: _________________________  P#______ 

     !"#NAT$RE:___________________________ !"#NAT$RE:__________________________  

    *oring in etreme*eat(er 

    . n*isiilit%

    . ,a!age

    . 0ire

    . E3plosion

    . High Te!perature.

    . Wind.

    . '%clone.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +rocedure.

    . Un necessar% Work should e a*oided

    . &edical tips co!!unication.

    . o work in e3tre!e weather condition.

    . +rotocol to e de*eloped and i!ple!ented.

    $ontrol of +oring(o'rs#

    . Ti!e lose.

    . E3posure.

    . 8*er work.

    . Health.

    . 0atigue.

    . 0ire fighting.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&

    . +lanning.

    . ,efinition of roles and responsiilities.

    . 1udicial assign!ent.

    . 'o!petenc%.

    . Resourceful and self rel%ing contractors.

    $ontra!tor liing$onditions

    . Unh%gienic condition.

    . Un co!fortaleacco!!odations.. un h%gienic foods /

    Water.

    . 'ontractor &anage!ent should e forced to pro*ideh%gienic condition and food

    /o'te and /is:dentifi!ation *it(?o'rne Management

    . $lipper% roads.

    . arrow path.

    . 'rossing.

    . Blind turning.

    . 8*er speeding.

    . E2uip!ent failure.

    . 8*er loaded truck andtrolle%s.. +edestrians.. :ni!al carts.

    . 'rowded places.

    . +eople.

    . E2uip!ent.

    . 0acilit%.

    . En*iron!ent.

    . '&.

    . ER+.

    . 'o!petent dri*er.

    . 0ollow B+5s $afe dri*ing policies.

    . +ark the *ehicle at designated parking area.

    . f an% hazard is oser*ed i!!ediatel% report to RadioRoo!.. 'o!!unication on radio sets.. +arking !ust e done in sa!e direction.. nstalled traffic sign oard.. 'onduct road safet% awareness progra! with localco!!unit%.

    . +h%sical condition of dri*er.

    . Gualified dri*er.

    . Look out(

    . ,i*e right unit(

    . 0irst aid o3.