OptiRamp Rational SCADA Ramp Rate 2700 2800 3000 3000 Actual Acceleration 2 RPM RPM RPM RPM/min RPM/min

  • View
    219

  • Download
    4

Embed Size (px)

Text of OptiRamp Rational SCADA Ramp Rate 2700 2800 3000 3000 Actual Acceleration 2 RPM RPM RPM RPM/min...

  • OptiRamp Rational SCADA

  • OptiRamp on the Edge

    The OptiRamp Rational SCADA solution brings data on the edge into OptiRamp to fully light up your total value stream and improve model accuracy, simulation, optimization, and predictive analytics. Examples of where Rational SCADA may be used include

    Virtual Well Test/Gas Lift Optimization Pipeline Pressure Management Pump Stations, Compressor Stations Chemical Injection Tank Level Monitoring

    Benefits

    Rapidly deploy field instrumentation to strategic locations where data are lacking

    Cost-effective wireless solution that does not require a significant investment of capital, resources, or programming

    Start using data almost immediately with the OptiRamp Virtual Tag Server (VTS)

  • The OptiRamp Rational SCADA solution is highly flexible for any situation and has the following components: 1) instrumentation, 2) communication, and 3) data collection, management, and transformation.

    How Rational SCADA Works

    Rational SCADA Panel

    Cell Tower

    RemoteLocation

    Internet

    Virtual TagServer

    Instrumentation

  • OptiRamp Rational SCADA uses mesh networking to communicate information from the field back the OptiRamp VTS. With a mesh network, wireless devices (nodes) self-configure into a web-like structure to cooperate with each other and efficiently relay data to a central location.

    Mesh Network Benefits

    Less power required to transmit data Increase coverage over a larger area Reduce installation problems because the

    nodes self-configure Solve challenges in outdoor environments

    where hills or buildings may block radio signals Improve data reliability and availability, even

    if a node fails, with the ability to take alternate path to the ultimate destination

    Reduce costs and maintenance needs

    Mesh Network

  • Mesh Network

    Field 1

    Field 2

    Field 3

    Plant 2

    Main Office

    Office 1

    Plant 1

    2.27 Km

    2.01 Km

    1.92 Km

    0.5 Km

    1.86 Km

    1.53 Km

    1.37 Km

    1.74 Km

    0.5 Km

    0.68 Km

    OptiRamp Rational SCADA is flexible to help you receive and leverage data into operational intelligence across your total value stream.

  • OptiRamp VTS is a time-series database that collects, stores, and manages Rational SCADA data from the field and other asset data source via the OptiRamp OPC and ODBC drivers. The OptiRamp VTS is designed to handle the large quantities of data todays processes generate.

    OptiRamp VTS

    Virtual TagServer

    Aspen HYSYSOPC ODBC

    ...and otherdata sources

    RationalSCADA

  • 01011100101010010111010 1 001

    1101

    00101

    101011101001

    010111001010100101 1 101

    01

    0011101001011010111

    010111 0 01010100101110101001110100101101011101000

    01011100101010010 1 110

    1010011101001011010

    010111001010100101110101001110 1 0 010110101110100010101

    0101

    1100

    1010

    1001

    0111

    0101

    0011

    1010

    0101

    1010

    1110

    1000

    1010

    1010

    1001

    1010

    01010

    101

    01011100101010010111010100111010 0 101

    1010

    11

    1010001010101010011011011

    01011100101010010111010 10011101001011010111

    01011100101010010111010100 1 1 101001011010

    0101

    1100101 0

    1001

    0111

    0101

    010111001010100101110101

    0 011101001011010111010001010101010011

    01011100 1 0101001011101010011101001011

    010111001010 1 00101110101001110100101101011101000101010101001100101101011

    0 1 0 1110010101001011101010011101001011010111010001010101010011010010110

    01011100101010010111010100111010010110101110100010101010100110101101010010101101010010100100101110111 010101010100010101110101010101010

    Once data are available in the OptiRamp VTS, the possibilities are endless. Data may be transformed into dynamic, advanced key performance indicators with OptiRamp Tag Advanced Functions; used in the OptiRamp Runtime Applications to improve model accuracy, simulation, and optimization; and visualized across your company with the OptiRamp Web Applications.

    Data Transformation

    Virtual TagServer

    Gross

    MW510

    Aux

    Gen 1

    LL

    UL

    Main Steam

    Press

    PSIG210

    Temp

    C43

    Steam Turbine Overview

    Turbine Trip Status

    OKRPM

    Speed

    3000Power Train Clutch

    OKVibration

    OK

    Hot RH

    Press

    PSIG210

    Temp

    C43

    LP Steam

    Press

    PSIG210

    Temp

    C43

    LP Exhaust

    Press

    in HgA0.5

    Lube Oil

    Press

    PSIG210

    Temp

    C43

    Active1 10

    2

    3

    10

    10

    Total Plant

    GT HRSG ST GEN BOP Electric Tasks

    + Auxiliaries

    + Monitoring

    + Tests & Maintenance

    Master Control

    Master Reset

    Diagnostic Reset

    Alarm Viewer

    Turbine Control StatusHigh Speed Not PermittedTurbine Trip Start Permissive

    Flex Hot Start Status Flex Hot Start Permissive

    Power Train Clutch Hold Status

    Flow Mode Operator Hold

    Limiters

    Select Master Control Mode

    Min Load Permissive

    Load Cmd Permissive

    IPC Permissive

    OK

    Not Active

    Disengaged

    Forward

    Not OK

    Not OK

    On Operator Hold

    ON OFF

    Select

    Shut Down

    Close Valves

    Accelerating

    Min Load

    Load Cmd

    Load to IPC

    OK

    OK

    OK

    Speed Control

    SpeedCurrentReferenceTarget

    Ref Ramp Rate

    270028003000

    3000Actual Acceleration2

    RPMRPMRPM

    RPM/min

    RPM/min

    Load Control

    LoadCurrentTarget

    59.589.2

    %%

    Ramp RateCurrentOperator Rate

    2.515

    %/min%/min

    Ramp Rate StatusSpeed/Load/Temp Hold

    Inlet Press Control

    IN OUT

    IP Ref2700 psiIP Ref

    720.0 psi +

    Control Ref128.0 %Setpoint Tracking

    ON OFF

    LP Admission Press ControlStart PermissiveNot OKAP Ref74.8 psiAP Setpoint

    74.8 psi +

    Flow Limit Ref-10.0 %Flow Limit Setpoint

    74.8 psi +

    VibrationH

    HP

    H

    L

    IP LP Aux SystemMain Steam

    H

    L

    H

    L

    164C

    164C

    210PSIG

    5 6 7 8 9

    5

    6

    7

    8

    9

    XY

    0.80.8

    XY

    3.33.3

    XY

    1.01.1

    XY

    5.86.1

    XY

    4.54.5

    CV 1 MSV 1

    A A100% 100%

    IV 1 RSV 1

    A A100% 30%

    IV 2 RSV 2

    A A100% 30%

    ACV ASV

    A A30% 30%

    Water Spray Valve

    A30%

    HP Exhaust

    H

    L

    Cold RH

    H

    L

    164C

    210PSIG

    H

    L

    Hot RH

    H

    L

    164C

    210PSIG

    H

    L

    LP Steam

    H

    L

    164

    C

    210PSIG

    H

    L

    LP Exhaust

    H

    L

    164C

    210PSIG

    H

    L

    Lube Oil

    H

    L

    H

    L

    164C

    210PSIG

    210PSIG

    Lift Oil

    H

    L

    210PSIG

    Hyd Oil

    H

    L

    Steam Seal

    H

    L

    164C

    210PSIG

    Power Plant Generation

    ActualMaximum

    52.855.0

    MWMW

    Unit 1

    ActualMaximum

    94.395.0

    MWMW

    Unit 2

    ActualMaximum

    119.8121.0

    MWMW

    Unit 3

    Total Daily Generation

    Total Net Generation

    Total CER

    271 MW1,270 MW

    87 Ton

    Today Change-0.5+15+1

    MW

    MW

    Ton

    Unit PerformanceUnit 1

    Unit 2 Unit 3

    Reliability

    99.0 % 99.0 % 98.9 %

    Availability

    99.0 % 99.0 % 98.9 %

    Efficiency

    99.0 % 99.0 % 98.9 %

    ForecastGross Generation PM

    YTD Gross Generation

    YE Gross Generation

    Variance

    Projected Date Target Reached

    Remaining Days to Target

    2,184 GWh1,148 GWh2,263 GWh85.52 GWh27 Dec 2017

    120 Days

    Exception Report

    Production Variance Above 10%

    Field Steam Generation

    Common Unit

    Unit 1 Power Plant

    Unit 2 Power Plant

    Unit 3 Power Plant

    WHP Under Separator Press.

    Unit 1 Back Pressure

    Unit 2 Back Pressure

    Unit 3 Back Pressure

    Grid Voltage

    Today Yesterday2 Wells 3 Wells

    Field Common Unit 1 Unit 2 Unit 3

    Field Performance OverviewSteam ProducedTotal Capacity

    271 MW 630,000 Glbs.

    Demand (Forecast)

    271 MW

    Condensate Injected

    45,000 BBLS

    Efficiency

    76.5 %

    Total CER

    87 Tons

    Last 90 Days

    Current

    Electricity Generated

    271 MW

    LegendProduction Well

    Injection Well

    Observation Well

    Plugged & Abandoned Well

    Unit II, III

    Unit I

    Compressor

    LL

    HH

    Inlet Exhaust CDPTemp Press Temp Press Press

    LL

    HH

    LL

    HH

    LL

    HH

    LL

    HH

    230 C 230 C25PSIG 25PSIG 25PSIG

  • 4401 Westown Parkway, Suite 124West Des Moines, IA 50266 USATelephone: 1.515.267.8700www.optiramp.com

    OptiRamp and the S&C logo are registered trademarks of Statistics & Control, Inc.Copyright 2018 Statistics & Control, Inc. All rights reserved. Rev. 1 01/18

    USA

    Argentina

    Angola

    Bulgaria

    Russia

    Indonesia

    Ukraine

    Turkmenistan

    Barbados

    China

    For more information about the OptiRamp Solutions, contact one of our representatives. For a complete listing of our worldwide locations, visit our website at www.optiramp.com.