eWFM/ Empower

• Provide real time information on what an agent is currently doing and comparing it to what they are to be scheduled to be doing.

• Allow agents to request time off and receive automatic approvals.

• Allow the team managers to preplan off phone activity by scheduling time into an agents schedule.

• Allow the agents the ability to sign up for extra hours or voluntary down time.

• Allow Operations access to view IDP that is updated real time throughout the day.

Page 3: Operations and Team Leader Empower Training v1128

3

How does eWFM Impact Me?

• Automate many existing Transcom processes and reduces the need for certain Tandims,

• Allow agent flexibility with shift trades, vacation with automated approvals and reduce wait times.

• Improved response time when requesting coaching, meeting etc…

• Allow for greater visibility of agents activities vs. scheduled to improve performance.

Page 4: Operations and Team Leader Empower Training v1128

4

Process OverviewProcess Methodology

Calling Sick line Select Option 2 in IVR for eWFM

Checking Breaks and Lunches Empower > Schedule Viewer

Extra Hours Empower > Schedule Editor

Go Home Early Empower > Schedule Editor

Holiday Lieu Options No Change at this time

Payroll No Change at this time

Permanent Shift Trade Submit Schedule Investigation Tandim

Preplanned OPE: Coaching Team Meeting and Training BST to Schedule

Real Time OPE Empower > Urgent Issues call RTR for Approval

Schedule Requests Submit Schedule Investigation Tandim

Shift Bid TBD

Shift Giveaway Submit Schedule Investigation Tandim

Shift Swap putting someone in OT Submit Schedule Investigation Tandim

Shift Trades Empower > Schedule Editor

Unpaid Time Off Empower > Schedule Editor

Paid Time Off TBD

Vacation Accrual TBD

Page 5: Operations and Team Leader Empower Training v1128

5

Logging In

In order to begin you need to log in.

Once you are given your login go to the login page.

This can be accessed through Favorites>eWFM>Empowerlink

Type in your login information and click the OK button.

You will then be logged in!

Page 6: Operations and Team Leader Empower Training v1128

6

Introduction

The web client user interface is divided into two panes:

1. a navigation pane on the left2. an application workspace on the right.

Most of the links in the navigation tree are options for selecting applications.

This image shows what you see when you first log in.

Page 7: Operations and Team Leader Empower Training v1128

7

Views

When you click a link in the navigation tree, the page, or view, for thatapplication appears in the pane on the right.

Each application’s view includes a toolbar at the top that contains drop-down menus, toolbar buttons, and descriptive information, as shown below.

Page 8: Operations and Team Leader Empower Training v1128

8

Common Menu and Toolbar Items

Page 9: Operations and Team Leader Empower Training v1128

9

Common Menu and Toolbar ItemsCommon Menu and Toolbar Items

Page 10: Operations and Team Leader Empower Training v1128

10

Introduction

The modules within this course will take you through each of the tools you will soon be using.

Page 11: Operations and Team Leader Empower Training v1128

11

Logging Out

Click the Logout link to log out.

You will then be logged out!

Page 12: Operations and Team Leader Empower Training v1128

12

Agent Check-In

Page 13: Operations and Team Leader Empower Training v1128

13

Agent Check-in

The Agent Check In view displays a summary of schedule information for a specific date.

At a minimum, each row of this report shows:

• The employee name • The code of the work segment associated with this date • The time at which the earliest segment for this date starts • The time at which the latest segment for this date stops

What does this mean to a Team Leader?• Previews team schedule, inclusive of planned OPE, breaks and

lunches• Provides visibility into the team and what is expected for the day• Identify and discrepancies and adjust accordingly

Page 14: Operations and Team Leader Empower Training v1128

14

Agent Check-in

As an agent, your own schedule is automatically selected. As a supervisor you must select the employees. You can customize the

report to show additional segment details.

Modify button

Click the modify button if you want to change the fields you are viewing.

Page 15: Operations and Team Leader Empower Training v1128

15

Agent Check-in

Once you click the modify button you are able to check or uncheck fields that you will see.

As you can see, the breaks have been removed from view.

Page 16: Operations and Team Leader Empower Training v1128

16

Week at a Glance

Page 17: Operations and Team Leader Empower Training v1128

17

Week at a glance

The Week at a Glance view shows daily schedule information for a selected week. As an agent your own schedule is automatically selected; if you are a supervisor, you must select the employees.

Each row of this report shows the employee name and, for each day of the week:

• The code of the work segment associated with this date • The time at which the earliest segment for this date starts • The time at which the latest segment for this date stops • The general segment, if any, associated with this date

Page 18: Operations and Team Leader Empower Training v1128

18

Account Balances

Personal Account BalancesGroup Allowance BalancesIntra-Day Staffing Balances

Page 19: Operations and Team Leader Empower Training v1128

19

Balances

Typically there are limits on how much time off or extra time can be granted on a given day for the staff as a whole, or for particular groups or categories of agents. Additionally, some requests (such as vacation) might require that sufficient time is available the personal account.

Personal Account Balances:• View the amount of vacation and lieu time accrual in a personal

account

Group Allowance Balances:• View the amount of time available to your group on each date

including GHE, BTO, extra hours, off phone allowance, etc…

Intra-Day Staffing Balances:• View how many agents can be added or subtracted from the

scheduled staff throughout a particular day

Page 20: Operations and Team Leader Empower Training v1128

20

Personal Account Balances

To begin click the link for Personal Account Balances.

Using the Personal Account Balances view, you can find out how much time is available in each personal account for a selected employee as of today's date or a selected date. If you are an agent , your own personal account balances are automatically displayed.

Page 21: Operations and Team Leader Empower Training v1128

21

Personal Account Balances

The table shows each personal account's code, description, and balance: that is, the amount of time currently available, in hours and minutes (for example, 120:00).

To display balances for a different date, click the Select Date toolbar button or click the Previous Day or Next Day button on either side of it.

Previous Day Next Day

Select Date

Page 22: Operations and Team Leader Empower Training v1128

22

Personal Account Balances

To see a history of the transactions in a particular account, click that account's (in the last column) to display the Personal Account Details view.

To go back to the previous screen click the Back button.

Page 23: Operations and Team Leader Empower Training v1128

23

Group Allowance Balances

To begin click the link for Group Allowance Balances.

The Group Allowance Balances view shows the group allowance balances for the selected account and month, in hours and minutes. Use these balances to judge whether or not a schedule change request that will use up some of the available time is likely to be approved.

A balance of zero or less means that no more time is available for that date. Keep in mind that this view provides an earlier snapshot of the balances; if you enter a schedule change request, the balances may be different when it is evaluated.

Page 24: Operations and Team Leader Empower Training v1128

24

Group Allowance Balances

Once you click the link a pop up will open. You will need to select the campaign as well as the month/year. Click OK when you have done that.

Page 25: Operations and Team Leader Empower Training v1128

25

Group Allowance Balances

There are 2 views that you can choose from for this page.

You can change the view from the drop down menu. Calendar View

Details View

Page 26: Operations and Team Leader Empower Training v1128

26

This view provides additional information, in tabular form, about each group allowance balance in the selected month. The same toolbar buttons are available as in the Calendar view. The table also shows the following information for each date:

Allowance: The original amount of time allotted. Official Transactions: The amount of time already taken by approved requests (Hours), as well as the number of requests involved (Count). Open Transactions: The amount of time already taken by requests still waiting for approval (Hours), as well as the number of requests involved (Count). Time Since Last Update: How long ago the balance for that date last updated, in days (d) hours (h) and minutes (m).

Group Allowance Balances - Calendar View

Page 27: Operations and Team Leader Empower Training v1128

27

To update the balance for a particular date, click the corresponding Update Balance button in the Options column.

Options Button

Once you click it the allowance time will update.

To return to the Calendar view, click the drop-down list on the toolbar and select Calendar View.

Group Allowance Balances - Calendar View

Page 28: Operations and Team Leader Empower Training v1128

28

Intra-Day Staffing Balances

To begin click the link for Intra-day Staffing Balances.

Once you click the link a pop up will open. You will need to select the campaign as well as the

date. Click OK when you have done that.

Page 29: Operations and Team Leader Empower Training v1128

29

Intra-Day Staffing Balances

This view shows the intra-day staffing balances for the selected staff group and date, as of the last time the balances were updated.

Use the displayed balances to judge whether or not a schedule change request of less than a full day can be approved. For example, suppose you want to request a few hours of overtime or time off, change your shift to a later time, or do a different type of work during the last part of your shift.

Page 30: Operations and Team Leader Empower Training v1128

30

Intra-Day Staffing Balances

Before entering your request, view the following balances for the intra-day periods that will be affected by it:

Allowable Increase in Staff Allowable Decrease in Staff

The number of additional agents that can be scheduled to work in this period. A value of 2.00, for example, means that no more than two agents can be approved for extra work time.A zero or a negative number usually means that a request for work during that period will not be approved.

The number of scheduled agents that can be allowed to leave or do something else during this period. A zero or a negative number usually means that a request for time off (for some other type of work) during that period will not be approved.

Page 31: Operations and Team Leader Empower Training v1128

31

Intra-Day Staffing Balances

The Time Since Last Update column shows how long ago the balances for that period were last updated, in days (d) hours (h) and minutes (m).

Page 32: Operations and Team Leader Empower Training v1128

32

Request Viewer

Page 33: Operations and Team Leader Empower Training v1128

33

Request Viewer

The Request Viewer view displays current status and other information for the schedule change requests your agents have entered.

Agents can cancel a request before it has been approved, resubmit a request that was denied, and rank deferred requests that are part of a request bid.

The display shows either requests created during a specific date range or requests affecting dates within a specified range.

As a Team Lead you may be asked for reasons why a member of your teams’ request has failed. The request viewer is where you will go to research this information.

Page 34: Operations and Team Leader Empower Training v1128

34

Request Viewer

Once you have logged in click the link for Request Viewer.

Page 35: Operations and Team Leader Empower Training v1128

35

Request Viewer

Page 36: Operations and Team Leader Empower Training v1128

36

To see the reason a request has failed, simply click on the

status beside the request. It will open a

window then displaying the reason(s) the

request has failed.

Request Viewer

Page 37: Operations and Team Leader Empower Training v1128

37

Request Viewer

Page 38: Operations and Team Leader Empower Training v1128

38

Request Viewer

Page 39: Operations and Team Leader Empower Training v1128

39

Request Viewer

Page 40: Operations and Team Leader Empower Training v1128

40

Request Viewer

Page 41: Operations and Team Leader Empower Training v1128

41

Web Notifications

Page 42: Operations and Team Leader Empower Training v1128

42

Web Notifications

Use this view to read messages sent events related to your teams’ work schedule. Depending on how your system has

been configured, you might receive notifications about changes to schedules, schedule change requests submitted, and

schedule trade requests submitted by an employee.

Page 43: Operations and Team Leader Empower Training v1128

43

Web Notifications

When you exit this view, all messages that were retrieved are discarded, whether or not you have actually read them.

Page 44: Operations and Team Leader Empower Training v1128

44

Web Notifications

In the message list, new and unread notifications appear in bold text. The messages retrieved during this session are listed in the order they were sent (Timestamp column), newest to oldest. To read a message, click it in the list to display the text in the view pane at the bottom of the window. You can adjust the horizontal window divider by dragging it up or down.

All messages have been composed by an administrative user and are generated automatically from stored text and selected variables (placeholders), such as name and date.

Page 45: Operations and Team Leader Empower Training v1128

45

Web Notifications

To retrieve new messages immediately, click Check Messages button. You will see an alert if you have new messages.

To delete all messages from the current list, click Clear. Whether you use this option or not, all displayed messages are deleted when you exit Web Notifications.

Page 46: Operations and Team Leader Empower Training v1128

46

Empower E-Workforce Management

Schedule Editor & Segment Entries

Page 47: Operations and Team Leader Empower Training v1128

47

Content

Segment OverviewViewing agent segments

Adding, changing and deleting segmentsSchedule/Segment Audit Process

Page 48: Operations and Team Leader Empower Training v1128

48

Segment Overview

Page 49: Operations and Team Leader Empower Training v1128

49

Segment Definition

What is a Segment?

A segment is defined as a state that an agent is scheduled to be in during part of their scheduled shift. Segments in our existing environment are referred to as standard schedules or OPE.

eWFM Segments Include:

• GHE Segments

• Training

• Nesting

• Unable to Work

• Shift Container (Paid or Unpaid Time – An agent’s full schedule for the day)

• Back Up Role

• Break/Lunch

• Vacation

• LOA

• Absence/AWOL

• Over Time

• Meetings

• Etc.

Page 50: Operations and Team Leader Empower Training v1128

50

Team Leader Expectations

With Empower, Team Leaders will have the ability to add, change or delete agent segments -7 days to +7 days

Resource will continue to be 100% accountable for queue management and updating pre-planned segments

Audit of team to ensure accurate segment tracking

Restrictions have been applied to Team Leader segment entries:– TL’ will have the ability to add, change or delete unplanned segments

TLs will have the ability to add Coaching 1-1 and Coaching Team Meeting

TLs will have the ability to add an ABST segment on the day of.

– TLs will be restricted to add, change or delete pre-planned segments

Page 51: Operations and Team Leader Empower Training v1128

51

Segments RASIC

eWFM Segments Team Leader Resource

Absence Planned Informed Responsible

Leave Of Absence Informed Responsible

Rest Day (Manila) Informed Responsible

Split Shift Interlude Informed Responsible

Statutory Holiday Informed Responsible

Suspension Informed Responsible

Vacation (Paid or Unpaid) Informed Responsible

Absence/AWOL Unplanned Responsible Informed

Unable to Work (Tech Issues, etc) Responsible Informed

Break/Lunch Responsible Responsible

Coaching Responsible Informed

Meeting Responsible Responsible

Training Informed Responsible

Off Phone Time (Back-Up Role) Responsible Responsible

Overtime Informed Responsible

Shift/Work Segment Informed Responsible

Training Informed Responsible

Page 52: Operations and Team Leader Empower Training v1128

52

Viewing Agent Segments

Page 53: Operations and Team Leader Empower Training v1128

53

Schedule Editor

Click the link in the navigation pane for Schedule Editor. This will be the section where all segments or segment packages will be added, or modified from.

Page 54: Operations and Team Leader Empower Training v1128

54

Schedule Editor

You will see in the top right corner the View you are seeing, the selected agent’s name, the date range, and Request Mode visible on the screen. You can change the employee you see here, by clicking on the Employee Selection Icon

Page 55: Operations and Team Leader Empower Training v1128

55

Schedule Editor

Once you click the link you’ll see the page is in the default ‘Segments’ view.

Page 56: Operations and Team Leader Empower Training v1128

56

Schedule Editor

You will have the ability to change to another view – Resolutions View.

Schedule Editor

Page 57: Operations and Team Leader Empower Training v1128

57

Segment View

Let’s take a closer look at what we are looking at in Segment view.

Date

Lunch segment

Shift time(s) Campaign

Break segments

Copy Delete

Edit

As you can see by this example, the shift starts at 08:00. The first break is at 09:30 and goes until 09:45. The shift then resumes until 11:50 when lunch is scheduled. At 12:20 the agent needs to be logged back in for the next block. The last break is at 13:45. Unique to this view is the Copy/Delete/Edit buttons.

Page 58: Operations and Team Leader Empower Training v1128

58

Resolution View

Let’s take a closer look at what we are looking at in Resolution view. We are told the agents prefer the Resolution view. You decide for yourself what you prefer.

Date

Lunch

segment

Campaign

Break segments

As you can see by this example, the shift starts at 08:00. The first break is at 09:30 and goes until 09:45. The shift then resumes until 11:50 when lunch is scheduled. At 12:20 the agent needs to be logged back in for the next block. The last break is at 13:45.

Unique to this view is the times in brackets, example – (1:30) or (0:30). This shows how long the ‘segment’ is.

Page 59: Operations and Team Leader Empower Training v1128

59

Adding, Changing and Deleting Segments

Page 60: Operations and Team Leader Empower Training v1128

60

Copy/Delete/Edit

When you are in Segments View you will see 3 buttons.

Copy / Delete / Edit

Page 61: Operations and Team Leader Empower Training v1128

61

Adding Segments

Segments can be entered in one of two fashions. Either by segment package or individual segments, and can be either detailed, or general. In most cases,segments will always be entered using the detailed method.

Detailed Segments have a specific start and stop time, where as, general segments entered would apply to an entire shift.

Segment packages are groups of segments that are required to complete certain entries.

Page 62: Operations and Team Leader Empower Training v1128

62

Adding Segments

• To add a segment to an agents schedule, select the employee you wish to add the segment to, then simply click on the Add Segment icon. A dialogue box will open up.

Page 63: Operations and Team Leader Empower Training v1128

63

Adding Segments

• Select the start and stop time, then click on the Code: box, a list of segments available to you will populate.

The list is quite large, so scroll to the appropriate segment and select it. Please note that some segments are regional based and should only be used

in those regions.

Adding Segments

Page 64: Operations and Team Leader Empower Training v1128

64

Adding Segments

Next, select a Start time and End time for the segment (detailed) or place a check mark in the All Day box (general). As stated before almost all segments will be detailed segments to maintain accuracy.

Please note that some segments require a memo to be entered, so it is a good habit to just enter them in for all. Memo’s will be visible to all who can look or view the segments (including other agents) so personal information should be kept out.

Page 65: Operations and Team Leader Empower Training v1128

65

Aspect® Workforce Real Time Adherence Training

Page 66: Operations and Team Leader Empower Training v1128

66

Introduction

Perform is a combination of Real Time Adherence and Agent Productivity that gives team leaders and managers better visibility of what agents are actually doing in comparison to what they were scheduled to be doing.

RTA is a proactive tool that shows alarms after certain thresholds when agents are not doing what they were scheduled to do.

Agent Productivity is the reports that come across the following day for the previous day with compliance and signed in percentages.

These tools help Team Leaders manage their staff more effectively and be proactive to problems as opposed to reactive.

These do not replace existing policies or procedures, but rather assist the Team Leaders when it is time to engage them.

What is Perform?

Page 67: Operations and Team Leader Empower Training v1128

67

Components

Compliance reports have two measurements:

Component Description

Sign-in % What % of my scheduled time was I signed in for?

Compliance %What % of my breaks, meetings etc did I take when I was scheduled to take them?

Page 68: Operations and Team Leader Empower Training v1128

68

Importance

Why is compliance important to our customers, our people and our business?

• Are available to answer our customers when they call

• Can evenly distribute the workload across all Agents

• Optimise productivity across the business.

Page 69: Operations and Team Leader Empower Training v1128

69

Benefits of Schedule Compliance

• Leads to an increase in productivity as agents are in the right place at the right time, which improves customer service.

• Ensures equitable distribution of staffing throughout the day as agents are taking their breaks as scheduled.

• Results in an increased grade of service for customers.

Page 70: Operations and Team Leader Empower Training v1128

70

Non-compliance - Impact on Customers

Available Agents Av.Delay (ASA) Service Level (GOS) (x% in 20secs)

55 18 sec 75%

54 28 sec 66% 53 46 sec 55% 52 84 sec 40% 51 201 sec 22%

• 750 calls are received between 9 - 10am

• Each call takes 240 seconds to handle

• The goal in this example is to answer calls in under 20 seconds.

Page 71: Operations and Team Leader Empower Training v1128

71

Non-compliance - Impact on Customers

• When the scheduled number of agents are available to answer customers’ calls, meeting the ASA target of 20 seconds is easy.

• With 55 Agents available, the delay in answering the calls would be 18 seconds.

With 54 Agents available, the delay in answering the calls would be 28 seconds.

• The impact of having only 51 of the 55 scheduled Agents available is an additional 3 minutes of wait time and would be very noticeable to the caller. This also results in GOS being only 22% in 20 seconds.

• So you can see the impact of not being where you should be can have a large impact on the customer waiting time.

Page 72: Operations and Team Leader Empower Training v1128

72

Non-compliance - Impact on Agents

Available Agents Av.Delay (ASA) Occupancy Idle

55 18 sec 90% 10%

54 28 sec 92% 8%

53 46 sec 94% 6%

52 84 sec 96% 4%

51 201 sec 98% 2%

• Occupancy = workload / number of available staff

• As occupancy increases, idle time between calls decreases - The job becomes more stressful as the available Agents have to work harder.

Page 73: Operations and Team Leader Empower Training v1128

73

Non-adherence - Impact to Agents

• In the example, with 55 agents available, the occupancy rate is 90%.

• This means agents would talk to customers or complete after-call work for 90% of the hour and 10% of the time would be idle, waiting for calls to arrive -In other words they would have an extra 6 minutes of time to spread throughout the hour to ‘catch their breath’ between calls.

• In the previous example, occupancy rates rise quickly when a few agents aren’t where they are supposed to be. Every time a scheduled agent becomes unavailable, everyone else has to work a little harder. Occupancy goes up about 2% with the loss of each agent. This means the idle time between calls during the hour gets shorter and shorter. The closer the call arrivals are, with no idle time, the more stressful the job will be.

Page 74: Operations and Team Leader Empower Training v1128

74

Real Time Adherence

RTA is live (real time) reporting of:

• What an Agent is scheduled to be doing (eg. on the phones or off the phone)

• What activity they are actually doing (eg. Active, On Hold, Not Ready).

What is Real Time Adherence (RTA)?

Page 75: Operations and Team Leader Empower Training v1128

75

Example - Planned schedule including segments

8:00 10 10:15 12 12:30 3 3:15 4:30

Break Lunch Break

• Total Scheduled Time = 450 mins of Phone Time

Page 76: Operations and Team Leader Empower Training v1128

76

Example - Comparison of scheduled to actual phone time

8:00 10 10:15 12 12:30 3 3:15 4:30

8:15 10 10:30 12:15 12:45 3:30 5:00Late Late Late Late

Total Scheduled Time = 450 mins of Phone TimeActual Total Phone Time = 435 mins (97%)

Page 77: Operations and Team Leader Empower Training v1128

77

Example - Comparison of scheduled to actual phone time

8:00 10 10:15 12 12:30 3 3:15 4:30

Black = Scheduled work time

Red = Actual ‘logged in’ time

Blue = Time not compliant with the schedule

Page 78: Operations and Team Leader Empower Training v1128

78

Compliance Calculation

8:00 10 10:15 12 12:30 3 3:15 4:30

Total Scheduled Minutes = 450 mins of Phone Time

Total Sign On Minutes = 435 mins (97%)Total Compliant Minutes = 390 mins (87%)

Page 79: Operations and Team Leader Empower Training v1128

79

Schedule Compliance Benchmark

• No one expects agents to get 100% compliance. Our target is not 100% as we know people do get stuck on calls from time to time or get to work a little late

• Transcom Schedule Compliance Benchmark is set at 98%

• Compliance Target will be set by individual program.

• How Do Manage Schedule Compliance?

• Real time monitoring of agent activity compared to agent schedule

• Real time agent management to drive schedule adherence

• Real time updates to correct errors in schedules and segments

Page 80: Operations and Team Leader Empower Training v1128

80

USING RTA & AGENT PRODUCTIVITY

Systems Training

Page 81: Operations and Team Leader Empower Training v1128

81

What does RTA do?

• RTA is live (real time) reporting of:- What an Agent is scheduled to be doing (eg. on the phones or off the phone)

- What activity an Agent is actually doing (eg. Active, On Hold, Not Ready).

• Displays discrepancies immediately so Team Leaders can be proactive and address them as they happen.

Page 82: Operations and Team Leader Empower Training v1128

82

RTA – Logging on to RTA

1. Login to citrix.nucomm.net using the following

credentials:

Username: citrix username

Password: citrix password

2. Launch RTA_1 in your applications list

3. Make sure you have the options as below:

*Select STC CMS for programs other than Talktalk 4 . Please select Open New Workspace if this is the

first time you are launching RTA

Page 83: Operations and Team Leader Empower Training v1128

83

Viewing the Real-Time Adherence Interface and Workspace

Toolbar

Menu Bar

Workspace Status Bar

Page 84: Operations and Team Leader Empower Training v1128

84

RTA - Opening Activity and Schedule windows

From the Menu bar go to File - New or select the icon from

the toolbar.

Select Create New Window and select Activity.

Repeat the process selecting Schedule

Page 85: Operations and Team Leader Empower Training v1128

85

RTA - Tiling Activity and Schedule windows

Select Window – Tile Horizontally or Tile

Vertically

Page 86: Operations and Team Leader Empower Training v1128

86

RTA – Selecting a team

Select View- Employee Selection and filter your Team from the employee tree Team Current.

Page 87: Operations and Team Leader Empower Training v1128

87

RTA – Viewing real-time data (Main Display)

Page 88: Operations and Team Leader Empower Training v1128

88

Renaming the windows

88

To rename the schedule and activity windows select

from the toolbar or right click and select Properties from

the menu. In the title rename the window.

Page 89: Operations and Team Leader Empower Training v1128

89

Adding Additional Windows

89

You can add additional windows and filter them to show different teams by going to File- New or using the icon in the toolbar.

Page 90: Operations and Team Leader Empower Training v1128

90

Displaying Alarm Windows – There are different ways to view windows in RTA.

This example shows a focused Activity window

which filters certain alarms in a separate

window

Page 91: Operations and Team Leader Empower Training v1128

91

Filter Alarms or Agents within Windows

• Schedule or Activity alarm windows may be filtered to include only certain alarms or agents.

You many want to monitor a single activity of special interest like Hold or Wrap Up time

• To Filter Alarms:

Highlight the title bar of the window to filter.

Choose View - Filter Alarms or click the icon.

Use the selection interface to move desired alarms to the right (Selected) side. Alarms may be removed by moving them to the left (Available) side.

To Filter agents use choose View – Filter Employees or click the icon

Page 92: Operations and Team Leader Empower Training v1128

92

RTA - Schedule Alarms

Schedule alarms are associated with the beginning or end of an Agent's shift or segment.

Code Alarm Long Definition

BBE Begin Break Early Sign out for break early

BXE Begin Exception Early Sign out for exception early

BSE Begin Shift Early Sign in for shift early

BSL Begin Shift Early Sign in for shift late

EBL End Break Late Sign in from break late

EXL End Exception Late Sign in from exception late

ESE End Shift Early Sign out from shift early

ESL End Shift Late Sign out from shift late

NODATA Insufficient Data Insufficient data alarm

SIU Signed In Unexpectedly Unexpected sign on

SOU Signed Out Unexpectedly Unexpected sign off

WOB Working On Break Working on break

WOX Working On Exception Working on exception

Page 93: Operations and Team Leader Empower Training v1128

93

RTA Alarm Actions

CODE DEFINITION POSSIBLE SCENARIOSTEPS FOR Resolution

 

 BBE Begin Break Early

Sign Out for Break Early

Agent is not following the correct break schedule

1. Team Lead reminds the agent of his break schedule. Check empower. Follow

existing COM procedures.

BBL Begin Break Late Sign Out for Break Late

Agent is not following the correct break schedule or engaged in a

long call

1. Team Lead reminds the agent of his break schedule. Check empower. Follow

existing COM procedures

BXE Begin Exception Early

Sign Out for Exception Early

The agent went on AUX earlier than scheduled. (Example: Agent

is scheduled to be on meeting from 10:00 - 10:30 BUT agent

pressed AUX 3 at 9:30)

1. Team Lead locates agent and investigates reason for starting the

exception early.Follow existing COM procedures.

BSE Begin Shift Early Sign In for Shift Early

The agent logged in to AVAYA earlier than scheduled

1. Team Lead locates the agent. Agent should be asked to log off and log back in

as scheduled 2. For approved OT, team lead can update

the agents segment

BSL Begin Shift Late Sign In for Shift Late

Agent isn't logged in to the phone as scheduled.

1. Team Lead will inform RTR if the agent can not be located.

2. RTR/TL will assign ABST-NCNS segment.3. If the agent then appears in WOX, note the login time and code the agent as late from the start of their shift to login time.

4. All agents flagged with ABST-NCNS segment will need to be investigated, and

proper attendance segment added.

EBL End Break Late Sign In from Break Late

Agent ended her break LATE1. Agent should be asked to follow the

correct break schedules. Use existing COM procedures.

Page 94: Operations and Team Leader Empower Training v1128

94

RTA Alarm Actions

CODE DEFINITION POSSIBLE SCENARIOSTEPS FOR Resolution

 

EXLEnd Exception

LateSign In from

Exception Late

Late from pullouts such as Training / Meeting / Coaching.

Etc. Possible extended pull outs without informing OSC.

1. The Team Lead should update RTR of the end time of the pull out.

2. Team Lead should update the end time of the exceptions in Empower.

ESE End Shift EarlySign Out for Shift

EarlyLogged out of AVAYA earlier than

scheduled

1. Investigate why the agent is in ESE (check if the agent is still signed in or in

an Aux code)2. If required Team Lead to code Empower

schedule with proper attendance segment.

ESL End Shift lateSign Out for Shift

Late

Agent is still logged in to AVAYA and is still in available / on AUX

beyond the shift.

1. The agent should be logging off as it is the end of the shift.

2. In case of OT, Team Lead should inform RTR for the duration of Overtime.

3. RTR will then update eWFM with Overtime package.

SIUSign In

UnexpectedlyUnexpected Sign

On

- Agent is not scheduled to be at work for the day and is not

scheduled for OT but is logged in to AVAYA.

- Someone might be using an incorrect AVAYA login ID.

- The agent might be confused of their schedule.

- The schedule in EWFM might be incorrect.

1. Investigate if the agent is scheduled to work at the time of the alarm. If so update

RTR that agent requires a schedule and inform RTR of what that schedule should

be. 2. Send the agent home if not scheduled.

SOUSign Out

UnexpectedlyUnexpected Sign

Off

- Agent logged off from AVAYA within or at the middle part of

the shift.- Agent might have logged off due to system / AVAYA issue

 

1. Team Lead investigates the reason for the agent signing out from their

phone early.2. Team Lead can update segment to

proper Attendance segment, if RTR has already added the MIA segment.

Page 95: Operations and Team Leader Empower Training v1128

95

RTA Alarm Actions

CODE DEFINITION POSSIBLE SCENARIOSTEPS FOR RESOLUTION

 

WOB Working On Break

Working On Break

- Agent is showing in AVAIL and forgot to take his break

-Agent is using incorrect AUX -- Agent is on ACW and forgot to press the proper AUX for break

- Agent did not logout from LUNCH as scheduled

1. Ask agent to follow Break Schedule given.

2. Confirm agent is taking their break, and adjust AUX code.

WOXWorking on Exception

Working on Exception

Agent is taking in a call but is scheduled to be on Training /

Meeting / Coaching …etc.

1. Team Lead locates agent and investigates why agent is taking calls

during the exception period.2. Adjust segments as required for the

exception to reflect when agent actually started it.

Page 96: Operations and Team Leader Empower Training v1128

96

RTA Features and Benefits

Features

• Real time visibility of schedule adherence• Real time visibility of activities as they occur• Immediate alerts for Team Leader assistance.

Benefits

• Enables Team Leaders to investigate adherence issues proactively leading to:

Increased productivity

Increased efficiency

Improved customer service.

Page 97: Operations and Team Leader Empower Training v1128

97

Viewing Employee Information - Employee Detail

To get schedule details and state and alarm information for

an agent ,double click on their name or

use the icon from the toolbar.

Page 98: Operations and Team Leader Empower Training v1128

98

Viewing Employee Information - Employee Monitor

• To monitor an agent more closely select Employee Monitor. To access this use the icon from the toolbar or right click and select monitor from an agents alarm.

• The monitor displays a bell icon if the agent is on an alarm

Page 99: Operations and Team Leader Empower Training v1128

99

Alarm Summary Report

• Organizes alarm information and helps identify problem areas.

• Consolidates information from alarm windows with other employee and workspace data.

• Useful if you have been in a meeting and would like to know what has happened when you were gone.

• You must have kept your workspace open in order to run this report.

Page 100: Operations and Team Leader Empower Training v1128

100

Generating a Real-Time Adherence Report

• Select Reports > Alarm Summary Report or click the toolbar button.

• Enter the required setup information on the General, Settings, and Format tabs.

• Click OK to run the report.

• Print by choosing File > Print or clicking the toolbar button.

.

Page 101: Operations and Team Leader Empower Training v1128

101

Alarm Summary Report

Page 102: Operations and Team Leader Empower Training v1128

102

Conclusion

• RTA provides visibility of an agents current activity and what they are scheduled to be doing

• Empower will replace Quartz for all of the agents scheduling needs.