Boston 2024 plans for Olympic Aquatic Events at Magazine Beach
Citation preview
10km
S1 G1
C1
F1M1V1
A1
HARVARD
A1
76 FE A SIBIL IT Y S T U dIE S + PL A NS • NUMBER 4: SPORT S + V ENUES • 1 DECEMBER 2014
Magazine Beach Course
Aquatics Marathon Swim
Status: Temporary
Venue Location: Cambridge, MA
Venue + Support Acreage: 6.5 ac
Land Owner: Commonwealth of Massachusetts
Venue Access/Use: Preliminary venue access and use of the land has been reviewed with the City of Cambridge and the Commonwealth of Massachusetts.
Construction Timeline: March 2024 - July 2024
Anticipated Hurdles: We will pursue omnibus state legislation to coordinate permitting at the local and state levels. This legislation will carefully consider land use, zoning, transportation, historic preservation, cultural celebration, environmental protection and economic benefits to ensure the successful implementation and integration of Games infrastructure. No specific permitting hurdles are anticipated.
Test Event Construction: We anticipate construction for a test event.
Accessibility Options: Magazine Beach is a public park located in the Cambridgeport neighborhood. Situated on the Charles River, the site features a number of fields and recreation areas along a half-mile of waterfront. Olympic athletes and spectators visiting this location will be in the center of the University Cluster venues, with easy access to the Olympic events occurring on the MIT, BU and Harvard campuses. Magazine Beach is located a short walk from the Green Line and the Red Line. The venue will also be accessible via the pedestrian pathway along the Charles River and will be served by the Olympic Route Network via Massachusetts Avenue to Memorial Drive.
Planned Seating Capacity: 2,500
ATHLETES’ VILLAGE
MAGAZINE BEACH
aboveMagazine Beach Overall Plan
leftLocus Map
belowCourse Diagram
opposite pageMarathon Swim Plan
Swim 10km (7 laps)
BOSTON
CAMBRIdGEHARVARd
START/FINISH
CHARLESRIVER
SOLd
IER
S FI
ELd
RO
Ad
MEM
OR
IAL
dR
IVE
133 367 500ft0
0 75 150m
C1 FIELD OF PLAYC2 WARM-UP AREAC3 RESIDENT CENTER
A1 ATHLETE ENTRANCEA2 ATHLETE SEATINGA3 ATHLETE CHANGING ROOMSA4 SPORT EQUIPMENTA5 ATHLETE LOUNGEA6 MEDICAL/MASSAGEA7 DOPING CONTROL
V1 INTERNATIONAL FEDERATION /OFFICIAL ENTRANCE
V2 IF/OFFICIAL OFFICE/AREA
F1 OLYMPIC FAMILY / VIP ENTRANCEF2 OF/VIP SEATINGF3 OF/VIP LOUNGEF4 OF/VIP PARKING
B1 SCOREBOARD / VIDEOBOARD
R1 REMAINING OVERLAY STRUCTURES
M1 MEDIA ENTRANCEM2 MEDIA SEATINGM3 MEDIA OPERATIONM4 MIXED ZONE (INTERVIEW)
M5 BROADCAST AREA
S1 SPECTATOR ENTRANCES2 SPECTATOR SEATING
S3 SPECTATOR SERVICES
G1 STAFF/OPERATIONS ENTRANCEG2 STAFF/VOLUNTEERSG3 BACK OF HOUSE OPERATIONS
G4 CEREMONY
G5 SHARED STRUCTURES
SECURE PERIMETER/FENCE LINEATHLETE ARRIVALFOH/BOH BOUNDARYZONE SEPARATIONMBTA RAIL STATION
S1 G1
C1
A1F1M1V1
S2
A2
F2
M2 F2
F4
M5
S3
S3
V3
S3
S3
S3
M3
G3
G2
M5
M4A6 A3 A5
M2
G4
A4 A7
771 DECEMBER 2014 • NUMBER 4: SPORT S + V ENUES • FE A SIBIL IT Y S T U dIE S + PL A NS
Marathon Swim CourseGround LevelBlock Plan
MEM
OR
IAL
dR
IVE
CHARLESRIVER
50 100 150ft0
0 25 50m