2
Republic of the Philippines OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula General Santos City 2 /F Barangay Hall Building, Barangay Bula 9500 General Santos City Telephone No. (083) 301-1845 EXCERPT FROM THE MINUTES OF THE 15o. REGULAR SESSION OF THE SANGGUNIANG BARANGAY OF BARANGAY BULA, THIS CITY HELD AT THE SESSION HALL STARTING AT 9:00 O'CLOCK IN THE MORNING ON 02 AUGUST 2013. PRESENT: ABSENT: Bon. EDUARDO T. VARGAS Bon. PEDRO T. VARGAS Bon. EDISON D. TULlO Bon. ANTONIO M. TALLE Bon. MARISOL F. SALIGUMBA Bon. LADISLAO G. GAVILO, Jr. Bon. FELECIANO T. SOMOSOT, Jr. Bon. EDILBERTO R. LOPEZ, Jr. Bon. REITAH MAE D. APARIS RESOLUTION NO. 41 Series of 2013 Punong Barangay Presiding Officer Barangay Councilor -do- -do- -do- -do- -do- -do- Brgy. Councilor (SL) SK Chairperson A RESOLUTION APPROVING THE PLANS, SPECIFICATIONS, AS WELL AS THE INDIVIDUAL PROGRAM OF WORKS FOR THE PROPOSED REPAIR AND REHABILITATION OF DAY CARE CENTER AT ZONE 7 LGU-BARANGAY BULA, THIS CITY (BY ADMIN.) IN THE AMOUNT OF PHPSO,OOO.OO OF WHICH FUND SHALL BE CHARGED AGAINST THE 20% BARANGAY DEVELOPMENT (BDF) OF THIS LOCAL GOVERNMENT UNIT (LGU). Bon. Ladislao G. Gavilo, Jr. - Sponsor WHEREAS, presented for consideration before this chamber is the plans, specifications, as well as the individual program of works for the Proposed repair and rehabilitation ofDay Care Center at Zone 7 LGU-Barangay Bula, this city in the amount ofPhp50,000.00 to be implemented this Fiscal Year 2013; WHEREAS, this infrastructure project has been funded under the 200 /o Barangay Development Fund (BDF) of this LGU; WHEREAS, upon review and evaluation of the committee concern, the herein plan, specification, as well as the individual program of works conforms with the proposal by this chamber and the stakeholders of this project and do follows as to the existing government engineering standards insofar as government infrastructure project is concern; -Page 2 follows-

OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula …spgensantos.ph/wp-content/uploads/2013/08/RES412013-BULA.pdf · OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula General Santos

Embed Size (px)

Citation preview

Page 1: OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula …spgensantos.ph/wp-content/uploads/2013/08/RES412013-BULA.pdf · OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula General Santos

Republic of the Philippines OFFICE OF THE SANGGUNIANG BARANGAY

Barangay Bula General Santos City

2/F Barangay Hall Building, Barangay Bula 9500 General Santos City Telephone No. (083) 301-1845

EXCERPT FROM THE MINUTES OF THE 15o. REGULAR SESSION OF THE SANGGUNIANG BARANGAY OF BARANGAY BULA, THIS CITY HELD AT THE SESSION HALL STARTING AT 9:00 O'CLOCK IN THE MORNING ON 02 AUGUST 2013.

PRESENT:

ABSENT:

Bon. EDUARDO T. VARGAS

Bon. PEDRO T. VARGAS Bon. EDISON D. TULlO Bon. ANTONIO M. TALLE Bon. MARISOL F. SALIGUMBA Bon. LADISLAO G. GA VILO, Jr. Bon. FELECIANO T. SOMOSOT, Jr. Bon. EDILBERTO R. LOPEZ, Jr.

Bon. REITAH MAE D. APARIS

RESOLUTION NO. 41 Series of 2013

Punong Barangay Presiding Officer Barangay Councilor

-do--do--do--do--do--do-

Brgy. Councilor (SL) SK Chairperson

A RESOLUTION APPROVING THE PLANS, SPECIFICATIONS, AS WELL AS THE INDIVIDUAL PROGRAM OF WORKS FOR THE PROPOSED REPAIR AND REHABILITATION OF DAY CARE CENTER AT ZONE 7 LGU-BARANGAY BULA, THIS CITY (BY ADMIN.) IN THE AMOUNT OF PHPSO,OOO.OO OF WHICH FUND SHALL BE CHARGED AGAINST THE 20% BARANGAY DEVELOPMENT (BDF) OF THIS LOCAL GOVERNMENT UNIT (LGU).

Bon. Ladislao G. Gavilo, Jr. - Sponsor

WHEREAS, presented for consideration before this chamber is the plans, specifications, as well as the individual program of works for the Proposed repair and rehabilitation ofDay Care Center at Zone 7 LGU-Barangay Bula, this city in the amount ofPhp50,000.00 to be implemented this Fiscal Year 2013;

WHEREAS, this infrastructure project has been funded under the 200/o Barangay Development Fund (BDF) of this LGU;

WHEREAS, upon review and evaluation of the committee concern, the herein plan, specification, as well as the individual program of works conforms with the proposal by this chamber and the stakeholders of this project and do follows as to the existing government engineering standards insofar as government infrastructure project is concern;

-Page 2 follows-

Page 2: OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula …spgensantos.ph/wp-content/uploads/2013/08/RES412013-BULA.pdf · OFFICE OF THE SANGGUNIANG BARANGAY Barangay Bula General Santos

Page2.

Barangay resolution no. 41, series of2013.

WHEREAS, this chamber hereby recommend for its approval and likewise implementation of the said infrastructure project;

NOW THEREFORE, on motion of Hon. Ladislao G. Gavilo, Jr., Barangay Councilor and Chairperson, Committee on Public Works, Infrastructure and Buildings, this Barangay jointly seconded by all of the members present, be it;

RESOLVED, as it is hereby resolved "APPROVING THE PLANS, SPECIFICATIONS, AS WELL AS THE INDIVIDUAL PROGRAM OF WORKS FOR THE PROPOSED REPAIR AND REHABILITATION OF DAY CARE CENTER AT WNE 7 LGU-BARANGAY BULA, TIDS CITY <BY ADMIN.) IN THE AMOUNT OF PHP50,000.00 OF WHICH FUND SHALL BE CHARGED AGAINST THE 20% BARANGAY DEVELOPMENT (BDF) OF THIS LOCAL GOVERNMENT UNIT (LGU)."

RESOLVED FURTHER to submit copies of this resolution to the Office of the Sangguniang Panlungsod, this city and other line agencies of the government both local and national for their ready reference, perusal and documentation.

RESOLVED FINALLY that this resolution shall take effect upon its approval.

APPROVED. 02 August 2013.

I HEREBY CERTIFY to the correctness of the above quoted resolution.

AT.TESTE

GAS

e and correct:

ry) } \II\ ---­noJ·y--