5
UP UP DN DN DN FD EXISTING MAIN FLOOR ABOVE EXISTING MAIN FLOOR ABOVE EXISTINGMAINFLOORABOVE EXISTINGMAINFLOORABOVE EXISTING MAIN FLOOR ABOVE PROPERTY LINE R.O.W. SETBACK SETBACK PROPERTY LINE NEW DECK ABOVE (MAIN LEVEL) SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM DOUBLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM DOUBLE ROOM W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R W/R JANITOR CLOSET SHOWER / TUB RM RESIDENT W/R MULTI PURPOSE ROOM STORAGE STORAGE KITCHEN / SERVERY RECEIVING AREA SHARED OFFICE W/R STORAGE WEST WING EXIT RECYCLING / GARBAGE ROOM LOADING BAY CORRIDOR STORAGE EXISTING WATER ENTRY ROOM STAFF WR EXAM. ROOM RESIDENT LAUNDRY LINEN ELEVATOR EXIST. BOILER RM. LOUNGE / DINING ACTIVITY AREA QUIET ROOM EXIST. ELEV. MECH. RM. CORRIDOR VEST. EXIT EXIST. STAIR B EXIST. STORAGE MED. CUP. CHART AREA KITCHEN / SERVERY ELEC. CL. STAIR ELEVATOR LOADING DOCK ST4 - S_B ST3 - S_B STAIR BC HYDRO PMT LOUNGE LOUNGE SOILED/UTILITY RM OUTDOOR AMENITY PLANTER PLANTER LIGHT WELL ROOF DECK OUTDOOR AMENITY CLOSET BENCH PROPERTY LINE PROPERTY LINE SET BACK RIGHT OF WAY CORRIDOR HAIRDRESSING SALON THERAPY ROOM MEETING ROOM CORRIDOR STORAGE ST5 - S_B ST6 - B_M DUMBWAITER 4.0% EXIT EXIT EXIT EXIT EXIT EXISTING SIAMESE CONNECTION CLOSET EXIT LINE OF FINS ABOVE GAS METER STORAGE PLANTER PLANTER PLANTER CORRIDOR NEW WEST WING ADDITION 71'-11" EXISTING BUILDING RENOVATED 93'-11" NEW EAST WING ADDITION 71'-6" BALSAM STREET LANE GFA ADDED GFA SUBTRACTED OUTLINE OF BLDG LEGEND N is a member of the IBI Group of companies DATE: ISSUE SHEET TITLE PROJECT SCALE: CHKD' BY: DRAWN BY: PROJECT NO: SHEET NUMBER PRIME CONSULTANT SUB CONSULTANT SEAL CLIENT COPYRIGHT: ISSUES Any reproduction or distribution for any purpose other than authorized by IBI Group is forbidden. Written dimensions shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and IBI Group shall be informed of any variations from the dimensions and conditions shown on the drawing. Shop drawings shall be submitted to IBI Group for approval before proceeding with fabrication. IBI Group Architects (Canada) Inc. File Location: 1/8" = 1'-0" C:\Users\robert.huang\Documents\REVIT2016\PGPH-Central_robert.huang.rvt 6/2/20175:55:59PM BASEMENT LEVEL FLOOR PLAN 100787 RH 05/30/17 A103 POINT GREY PRIVATE HOSPITAL EXPANSION PL 2423 Cornwall Ave, Vancouver, BC Point Grey Private Hospital Ltd. Vancouver, BC,Canada tel (604)687-8797 fax (604) 683-0492 IBI GROUP Architects (Canada) Inc. NO. ISSUANCE STATUS DATE 1 2016/09/13 ISSUED FOR 30% CD 2 2016/10/07 ISSUED FOR 50% CD 3 2016/11/25 ISSUED FOR 75% CD 4 2017/01/27 ISSUED FOR REZONING 5 2017/01/27 ISSUED FOR DE 6 2017/06/05 DE REVISION SUMMARY GROSS FLOOR AREA COMPARISION GFA - 2015 DP Drawings: 11,519.10 SQ.FT.* GFA - 2017 DP Proposal: 13,903.03 SQ.FT. Total Additional GFA: 2,383.93 SQ.FT. Notes: 1. Building footprint increased to accommodate VCH Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to exterior face of building. 3. Kitchen, Laundry and mechanical/electrical services spaces relocated to New Sub- Basement Level in West Wing to allow for VCH required Multipurpose Room and other resident treatment spaces. 4. Parking area and Mechanical/Electrical Service areas excluded from GFA calculations. Parking ramp changed to one way system with addition of Parkade Traffic Signal System Additional building area below grade. Note: Outline of mechanical service spaces shown on 2015 DP drawings, which have been relocated to new Sub-Basement Level of West Wing Minor addition mostly below grade (with planted green roof) over to accommodate VCH minimum size for double room Note: Additional Area Additional area incurred from building structural shift and as required to accommodate VCH Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings. 2017-06-06 Note: Proposed building structure shifted west to preserve existing exterior wall and minimize impacts on PGPH residents during construction Note: Proposed building structure shifted east to preserve existing exterior wall and minimize impacts on PGPH residents during construction Note: New Shared Resident Facilities Added to Suit VCH Guidelines: Multipurpose Room, Therapy Room, Hair Salon, Exam Room, and Meeting Room ands stoage support spaces added. Kitchen, Laundry, Staff Room and Mechanical/ Electrical Services spaces relocated to new West Wing Sub-Basement Level below. Proposed Rezoning/Development Permit Revisions: Revised 2017 DP Proposal (2017-01-27) Compared to 2015 DP Drawings (2015-03-27) Outline of new West Wing addition as per 2015 DP drawings Outline of new East Wing addition as per 2015 DP drawings AS PER 2015 DP DRAWINGS Note: Area Reduction Proposed extension of existing stair as per 2015 DP drawings deleted

Notes: Total Additional GFA: 2,383.93 SQ.FT. GFA - …...DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Notes: Total Additional GFA: 2,383.93 SQ.FT. GFA - …...DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to

UP

UP

DNDN

DN

FD

A2.012

A2.02

A2.02

1

2

EXISTING MAIN FLOOR ABOVE EXISTING MAIN FLOOR ABOVE

EXIS

TIN

GM

AIN

FLO

OR

ABO

VE

EXIS

TIN

GM

AIN

FLO

OR

ABO

VE

EXISTING MAIN FLOOR ABOVE

PROPERTY LINE

R.O.W.

SETBACK

SETBACK

PROPERTY LINE

NEW DECK ABOVE (MAIN LEVEL)

SINGLE ROOM SINGLE ROOM

SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOM

SINGLE ROOMDOUBLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

DOUBLE ROOM

W/R

W/R

W/R W/RW/R

W/R W/R

W/R

W/R W/R W/R W/R

W/R

W/R

W/R

W/R

W/R

JANITOR

CLOSET

SHOWER / TUBRM

RESIDENT W/R

MULTI PURPOSEROOM

STO

RAG

EST

OR

AGE

KITCHEN /SERVERY

REC

EIVI

NG

AR

EA

SHARED OFFICE

W/R

STO

RAG

E

WES

T W

ING

EXI

T

RECYCLING /GARBAGE ROOM

LOADING BAY

CORRIDOR

STO

RAG

E

EXISTING WATERENTRY ROOM

STAFF WR

EXAM. ROOM

RESIDENTLAUNDRY

LINEN

ELEV

ATO

R

EXIST. BOILERRM.

LOUNGE / DININGACTIVITY AREA

QUIET ROOM

EXIST. CRAWLSPACE

EXIST. ELEV.MECH. RM.

CORRIDOR

VEST.

EXIT

EXIST. STAIR B

EXIST. STORAGE

MED. CUP.

CHART AREA

KITCHEN /SERVERY

ELEC. CL.

STAIR

ELEV

ATO

R

LOADING DOCK

ST4 - S_B

ST3 - S_B

STAIR

BC HYDRO PMT

LOUNGE

LOUNGE

SOILED/UTILITYRM

OUTDOORAMENITY

PLANTER

PLANTER

LIGHT WELL

ROOF DECKOUTDOORAMENITY

CLOSET

BENCH

PROPERTY LINE

PROPERTY LINE

SET BACK

RIGHT OF WAY

CORRIDORHAIRDRESSING

SALON

THERAPY ROOM MEETING ROOM

CORRIDOR

STORAGE

ST5 - S_B

ST

6 - B

_M

DUMBWAITER

4.0%

EXIT

EXIT

EXIT

EXIT

EXIT

EXISTING SIAMESECONNECTION

CLOSET

EXIT

LINE OFFINSABOVE

GAS METER

STORAGE

PLANTER

PLANTER

PLANTER

CORRIDOR

NEW WEST WING ADDITION71'-11"

EXISTING BUILDING RENOVATED93'-11"

NEW EAST WING ADDITION71'-6"

BALS

AM S

TREE

T

LANE

GFA ADDEDGFA SUBTRACTEDOUTLINE OF BLDGAS PER 2015 SHADP PRIOR-TO

LEGEND

N

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBIGroup is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and IBI Group shall be informed of any variations from

the dimensions and conditions shown on the drawing. Shop drawings shall besubmitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

File

Loca

tion :

1/8" = 1'-0"

C:\U

sers

\rob e

rt.hu

ang\

Doc

umen

ts\R

EVI

T201

6 \PG

PH-C

entra

l_r o

bert.

huan

g.rv

t6/

2/2 0

175:

5 5:5

9PM

BASEMENT LEVELFLOOR PLAN

100787

RH

05/30/17

A103

POINT GREY PRIVATEHOSPITAL EXPANSION

PL

2423 Cornwall Ave, Vancouver, BC

Point Grey PrivateHospital Ltd.

700 - 1285 West Pender StreetVancouver, BC,Canadatel (604)687-8797 fax (604) 683-0492

IBI GROUP Architects (Canada) Inc.

NO. ISSUANCE STATUS DATE

1 2016/09/13ISSUED FOR 30% CD2 2016/10/07ISSUED FOR 50% CD3 2016/11/25ISSUED FOR 75% CD4 2017/01/27ISSUED FOR REZONING5 2017/01/27ISSUED FOR DE6 2017/06/05DE REVISION SUMMARY

GROSS FLOOR AREA COMPARISION GFA - 2015 DP Drawings: 11,519.10 SQ.FT.* GFA - 2017 DP Proposal: 13,903.03 SQ.FT. Total Additional GFA: 2,383.93 SQ.FT. Notes: 1. Building footprint increased to accommodate VCH Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to exterior face of building. 3. Kitchen, Laundry and mechanical/electrical services spaces relocated to New Sub-Basement Level in West Wing to allow for VCH required Multipurpose Room and other resident treatment spaces. 4. Parking area and Mechanical/Electrical Service areas excluded from GFA calculations.

Parking ramp changed to one way system with addition of Parkade Traffic Signal System

Additional building area below grade.

Note: Outline of mechanical service spaces shown on 2015 DP drawings, which have been relocated to new Sub-Basement Level of West Wing

Minor addition mostly below grade (with planted green roof) over to accommodate VCH minimum size for double room

Note: Additional Area Additional area incurred from building structural shift and as required to accommodate VCH

Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings.

2017-06-06

Note: Proposed building structure shifted west to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Proposed building structure shifted east to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: New Shared Resident Facilities Added to Suit VCH Guidelines: Multipurpose Room, Therapy Room, Hair Salon, Exam Room, and Meeting Room ands stoage support spaces added. Kitchen, Laundry, Staff Room and Mechanical/Electrical Services spaces relocated to new West Wing Sub-Basement Level below.

Proposed Rezoning/Development Permit Revisions: Revised 2017 DP Proposal (2017-01-27) Compared to 2015 DP Drawings (2015-03-27)

Outline of new West Wing addition as per 2015 DP drawings

Outline of new East Wing addition as per 2015 DP drawings

AS PER 2015 DP DRAWINGS

Note: Area Reduction Proposed extension of existing stair as per 2015 DP drawings deleted

Page 2: Notes: Total Additional GFA: 2,383.93 SQ.FT. GFA - …...DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to

DN

UPUP

FD FD

FD FD

FD

FD

FD

FD

FDFD

FD

FD

FD

FDFD

FD

FD

FDFD

FD FD FD FD

FD

FD

FD

FD

FDFD

A2.012

A2.01

A2.02

A2.02

1

2

1

EXISTINGELEVATOR

EXIST. SINGLEROOM

108

EXIST.W/R

EXIST.W/R

EXISTINGMAIN ENTRY

EXIST.DOUBLEROOM

102

EXIST. SINGLEROOM

101

EXIST. DOUBLE ROOM105

EXIST. SINGLEROOM

107

EXIST.OFFICE

EXIST.NURSE

STATIONEXIST.

SHOWERROOM

EXIST.BATHING

ROOM

EXIST. DOUBLEROOM

109

EXIST. DOUBLEROOM

110

EXIST. DOUBLEROOM

111

EXIST. DOUBLEROOM

112

EXIST. DOUBLEROOM

113

EXIST. DOUBLEROOM

114

EXIST. SINGLEROOM

103

EXIST. DOUBLEROOM

104

EXIST. LOUNGE /DINING / ACTIVITY

AREA

VEST.

OPEN TOBELOW

CORNWALL AVENUE

BALS

AM S

TREE

T

EXIST.OFFICE

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

SINGLE ROOMSINGLE ROOM

DOUBLE ROOM

SINGLE ROOMSINGLE ROOMSINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOMSINGLE ROOMSINGLE ROOM

EXIST. STAIR B

LOUNGE / DININGACTIVITY AREA

CORRIDOR

RESIDENT W/R

CHART AREA

RESIDENTLAUNDRY

VEST.

ELEC. CLO.

QUIET ROOM

EXIST. STAIR A

LINEN SUPPLYCLOSET

MECH.SHAFT

SOILED/UTILITY RM

W/R

W/R

W/RW/RW/RW/RW/R

W/R

W/R

W/R

W/R

W/R W/RW/R

W/R W/R

W/R

W/R

W/R

W/R

W/RW/R

W/R

CARE EQUIP.STRG.

ELEV

ATO

R

ELEV

ATO

R

JAN.

LOUNGE / DININGACTIVITY AREA

CORRIDOR

SHOWER / TUBRM

LINEN SUPPLYCLOSET

ELEC. CL.

MED.CUPBCHART AREA

KITCHEN /SERVERY

RESIDENT W/R

RESIDENTLAUNDRY

EXIST.OFFICE

SOILED /UTILITY RM

MED.CUPB

TUCK SHOP

HANDWASH

BALCONYTERRACEOUTDOORAMENITY

BALCONY

BALC

ON

Y

OUTDOORAMENITY

OUTDOORAMENITY

LIGHT WELLBELOW

JAN.

QUIET AREA

STAFF WR

3.0m

18.5m

ARTICULATED CITY BUS2.6m x 12.0m

PASSENGERCLASS "B" LARGE 4.

0m

7.5m

DEDICATION LINE

OVERHEADDOOR

KPAO

EXIT

EXIT

EXIT

EXIT

EXIT

RIGHT OF WAY

LANE

EXISTING FIRE ALARMANNUNCIATOR PANELS

EXISTING FIREDEPARTMENTCONNECTION ATMAIN LEVEL

WATERCURTAINABOVE

WATERCURTAIN ABOVE

NEW FIRE ALARMANNUNCIATOR PANEL

NEW WEST WING ADDITION71'-10"

EXISTING BUILDING RENOVATED94'-0"

NEW EAST WING ADDITION71'-5"

GFA ADDEDGFA SUBTRACTEDOUTLINE OF BLDGAS PER 2015 SHADP PRIOR-TO

LEGEND

N

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBIGroup is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and IBI Group shall be informed of any variations from

the dimensions and conditions shown on the drawing. Shop drawings shall besubmitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

File

Loca

tion :

1/8" = 1'-0"

C:\U

sers

\rob e

rt.hu

ang\

Doc

umen

ts\R

EVI

T201

6 \PG

PH-C

entra

l_r o

bert.

huan

g.rv

t6/

2/2 0

175:

5 6:0

7PM

MAIN FLOOR LEVELFLOOR PLAN

100787

RH

05/30/17

A104

POINT GREY PRIVATEHOSPITAL EXPANSION

PL

2423 Cornwall Ave, Vancouver, BC

Point Grey PrivateHospital Ltd.

700 - 1285 West Pender StreetVancouver, BC,Canadatel (604)687-8797 fax (604) 683-0492

IBI GROUP Architects (Canada) Inc.

NO. ISSUANCE STATUS DATE

1 2016/09/13ISSUED FOR 30% CD2 2016/10/07ISSUED FOR 50% CD3 2016/11/25ISSUED FOR 75% CD4 2017/01/27ISSUED FOR REZONING5 2017/01/27ISSUED FOR DE6 2017/06/05DE REVISION SUMMARY

GROSS FLOOR AREA COMPARISION GFA - 2015 DP Drawings: 17,051.90 SQ.FT.* GFA - 2017 DP Proposal: 17,479.98 SQ.FT. Total Additional GFA: 428.08 SQ.FT. Notes: 1. Building footprint increased to accommodate VCH Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to exterior face of building.

Light wells with flat metal grille to provide natural light to the Multipurpose room at the Basement Level .

Outline of proposed addition below with green roof over Stone finish added to exposed wall in lieu of stucco

Kitchen exhaust shaft added

2017-06-06

Note: Proposed building structure shifted east to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Additional Area Additional area incurred from building structural shift and as required to accommodate VCH

Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings.

Note: Proposed building structure shifted west to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Minor addition to accommodate VCH minimum resident room sizes

Proposed Rezoning/Development Permit Revisions: Revised 2017 DP Proposal (2017-01-27) Compared to 2015 DP Drawings (2015-03-27)

Outline of new West Wing addition as per 2015 DP drawings

Outline of new East Wing addition as per 2015 DP drawings

AS PER 2015 DP DRAWINGS

Page 3: Notes: Total Additional GFA: 2,383.93 SQ.FT. GFA - …...DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to

DNDNUP

A2.012

A2.01

A2.02

A2.02

1

2

1

EXISTINGELEVATOR

EXIST.W/R

EXIST. SINGLEROOM

208

EXIST. DOUBLEROOM

202

EXIST.SINGLEROOM

201

EXIST.DOUBLEROOM

204

EXIST.SINGLEROOM

206

EXIST.SHOWER

ROOM

EXIST.TUB

ROOM

EXIST. DOUBLEROOM

209

EXIST.DOUBLE ROOM

210

EXIST.DOUBLEROOM

211

EXIST. DOUBLEROOM

212

EXIST. DOUBLEROOM

213

EXIST. DOUBLEROOM

214

EXIST.DOUBLEROOM

203

EXIST. DOUBLEROOM

205

EXIST.STAFF

W/R

EXIST.KITCH./

SERVERY

EXIST.FAMILYROOM

EXIST. LOUNGE/ DINING /

ACTIVITY AREA EXIST.NURSE

STATION

PROPERTY LINE

R.O.W.

SETBACK

SETBACK

PROPERTY LINE

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIT

EXIST. STAIR BEXIST. STAIR A

MECH.SHAFT

SINGLE ROOM

SINGLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOMSINGLE ROOMSINGLE ROOMSINGLE ROOMSINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOMSINGLE ROOMSINGLE ROOMSINGLE ROOM

LOUNGE / DININGACTIVITY AREA

MED.CUPB

SOILED /UTILITY RM.

KITCHEN /SERVERY

VEST.

ELEC. CLO.

JAN.

RESIDENT W/R

CORRIDOR

QUIET ROOM

ELEV

ATO

R

SUPPLY CLOSET

COMM / LOWVOLT.

SOILED / UTILITYRM

JAN.

CORRIDOR

LOUNGE / DININGACTIVITY AREA

SHOWER / TUBRM

ELEC. CL.

VEST.

RESIDENT W/R

RESIDENTLAUNDRYLINEN SUPPLY

CLOSET

MED.CUPBCHART AREA

KITCHEN /SERVERY

W/R W/RW/R

W/RW/RW/RW/R

W/R

W/R

W/R

W/R

W/R W/R

W/R W/R W/R

W/R

W/R

W/R

W/RW/RW/R

W/R

ELEV

ATO

R

CHART AREA

ROOF TERRACEOUTDOORAMENITY

BALCONY

BALC

ON

Y

EXIST.BALCONY

RESIDENTLAUNDRY

QUIET AREA

KP

EXIT

EXIT

EXIT

HANDWASH

NEW WEST WING ADDITION68'-5"

EXISTING BUILDING RENOVATED94'-1"

NEW EAST WING ADDITION71'-5"

GFA ADDEDGFA SUBTRACTEDOUTLINE OF BLDGAS PER 2015 SHADP PRIOR-TO

LEGEND

N

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBIGroup is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and IBI Group shall be informed of any variations from

the dimensions and conditions shown on the drawing. Shop drawings shall besubmitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

File

Loca

tion :

1/8" = 1'-0"

C:\U

sers

\rob e

rt.hu

ang\

Doc

umen

ts\R

EVI

T201

6 \PG

PH-C

entra

l_r o

bert.

huan

g.rv

t6/

2/2 0

175:

5 6:1

0PM

SECOND FLOOR LEVELFLOOR PLAN

100787

RH

05/30/17

A105

POINT GREY PRIVATEHOSPITAL EXPANSION

PL

2423 Cornwall Ave, Vancouver, BC

Point Grey PrivateHospital Ltd.

700 - 1285 West Pender StreetVancouver, BC,Canadatel (604)687-8797 fax (604) 683-0492

IBI GROUP Architects (Canada) Inc.

NO. ISSUANCE STATUS DATE

1 2016/09/13ISSUED FOR 30% CD2 2016/10/07ISSUED FOR 50% CD3 2016/11/25ISSUED FOR 75% CD4 2017/01/27ISSUED FOR REZONING5 2017/01/27ISSUED FOR DE6 2017/06/05DE REVISION SUMMARY

GROSS FLOOR AREA COMPARISION GFA - 2015 DP Drawings: 16,961.90 SQ.FT.* GFA - 2017 DP Proposal: 17,696.56 SQ.FT. Total Additional GFA: 734.66 SQ.FT. Notes: 1. Building footprint increased to accommodate VCH Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to exterior face of building.

Minor addition to accommodate VCH minimum resident room sizes

Note: Additional Area Area added to accommodate VCH minimum lounge/dining areas and other support facilities

Kitchen exhaust shaft added

2017-06-06

Note: Proposed building structure shifted west to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Proposed building structure shifted east to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Additional Area Additional area incurred from building structural shift and as required to accommodate VCH

Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings.

Proposed Rezoning/Development Permit Revisions: Revised 2017 DP Proposal (2017-01-27) Compared to 2015 DP Drawings (2015-03-27)

Outline of new West Wing addition as per 2015 DP drawings

Outline of new East Wing addition as per 2015 DP drawings

AS PER 2015 DP DRAWINGS

Page 4: Notes: Total Additional GFA: 2,383.93 SQ.FT. GFA - …...DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to

DN

A2.012

A2.01

A2.02

A2.02

1

2

1

PROPERTY LINE

R.O.W.

SETBACK

SETBACK

PROPERTY LINE

EXIST.SERVERY /KITCHEN

SINGLE ROOM

SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOMSINGLE ROOMSINGLE ROOMSINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM

SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM

SINGLE ROOM

DOUBLE ROOM

SINGLE ROOM

SINGLE ROOMSINGLE ROOMSINGLE ROOM

W/R

W/R W/R W/R

W/R

W/RW/RW/RW/R

W/R

W/R

W/R

W/R

W/RW/R

W/R W/RW/R

W/R

W/R

W/RW/R

W/R

EXIST. STAIR A

ELEV

ATO

R

ELEV

ATO

R

EXIST. STAIR BLOUNGE / DININGACTIVITY AREA

VEST.

ELEC. CL.

JAN.

RESIDENT W/R

CORRIDOR

MED.CUPB

SOILED / UTILITYRM

KITCHEN /SERVERY

CORRIDOR LOUNGE / DININGACTIVITY AREA

SHOWER / TUBRM

ELEC. CL.

VEST.

RESIDENTLAUNDRY

JAN.

RESIDENT W/R

SOILED / UTILITYRM

LINEN SUPPLYCLOSET

CHART AREA

KITCHEN /SERVERY

CHART AREA

MED.CUPB

LOUNGE

BALCONY

BALC

ON

Y

LAUNDRY

EXIST. DECK

EXITEXISTING

ELEVATOR

EXIST. DININGAREA

EXIST. DOUBLEROOM

313

EXIST. DOUBLEROOM

312

EXIST. DOUBLEROOM

311

EXIST. DOUBLEROOM

310

EXIST. DECK

EXIST.W/R

EXIST.TUB ROOM

EXIST. DOUBLEROOM

304

EXIST. DOUBLEROOM

305

EXIST. SINGLEROOM

306

EXIST. DOUBLEROOM

307

EXIST. DOUBLEROOM

302EXIST. SINGLE

ROOM303

EXIST. SINGLEROOM

301

EXIST. SINGLEROOM

308EXIST.

STAFF W/R LAUNDRY

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.W/R

EXIST.SERVERY /KITCHEN

EXIT

EXIT

EXIT

EXIT

QUIET AREA

LINEN SUPPLYCLOSET

NEW WEST WING ADDITION71'-11"

NEW WEST WING ADDITION67'-5"

EXISTING BUILDING RENOVATED93'-11"

GFA ADDEDGFA SUBTRACTEDOUTLINE OF BLDGAS PER 2015 SHADP PRIOR-TO

LEGEND

N

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBIGroup is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and IBI Group shall be informed of any variations from

the dimensions and conditions shown on the drawing. Shop drawings shall besubmitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

File

Loca

tion :

1/8" = 1'-0"

C:\U

sers

\rob e

rt.hu

ang\

Doc

umen

ts\R

EVI

T201

6 \PG

PH-C

entra

l_r o

bert.

huan

g.rv

t6/

2/2 0

175:

5 6:1

4PM

THIRD FLOOR LEVELFLOOR PLAN

100787

RH

05/30/17

A106

POINT GREY PRIVATEHOSPITAL EXPANSION

PL

2423 Cornwall Ave, Vancouver, BC

Point Grey PrivateHospital Ltd.

700 - 1285 West Pender StreetVancouver, BC,Canadatel (604)687-8797 fax (604) 683-0492

IBI GROUP Architects (Canada) Inc.

NO. ISSUANCE STATUS DATE

1 2016/09/13ISSUED FOR 30% CD2 2016/10/07ISSUED FOR 50% CD3 2016/11/25ISSUED FOR 75% CD4 2017/01/27ISSUED FOR REZONING5 2017/01/27ISSUED FOR DE6 2017/06/05DE REVISION SUMMARY

GROSS FLOOR AREA COMPARISION GFA - 2015 DP Drawings: 16,094.20 SQ.FT.* GFA - 2017 DP Proposal: 17,193.38 SQ.FT. Total Additional GFA: 1,099.18 SQ.FT. Notes: 1. Building footprint increased to accommodate VCH Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to exterior face of building.

Kitchen exhaust shaft added

Note: Area Reduction Resident Room infill at existing deck deleted

Note: Area Reduction Infill at existing deck deleted

Green Roof deleted at Level 3 step back roofs due to small size and overhangs. Decorative gravel substituted.

Minor addition to accommodate VCH minimum resident room sizes

2017-06-06

Note: Proposed building structure shifted west to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Proposed building structure shifted east to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Additional Area Additional area incurred from building structural shift and as required to accommodate VCH

Guidelines for minimum resident room areas and lounge/dining areas, door sizes and support facilities as well as structural, mechanical and electrical service requirements not contemplated in the 2015 DP drawings.

Note: Additional Area Area added to accommodate VCH minimum lounge/dining areas and other support facilities

Proposed Rezoning/Development Permit Revisions: Revised 2017 DP Proposal (2017-01-27) Compared to 2015 DP Drawings (2015-03-27)

Outline of new West Wing addition as per 2015 DP drawings

Outline of new East Wing addition as per 2015 DP drawings

AS PER 2015 DP DRAWINGS

Page 5: Notes: Total Additional GFA: 2,383.93 SQ.FT. GFA - …...DP drawings. 2. *2015 DP drawings GFA calculations taken to face of sheathing only. 2017 DP proposal calculations taken to

DN

DNDN

FD FD

FD FD

FD

FD

FD

FD

FDFD

FD

FD

FD

FDFD

FD

FD

FDFD

FD FD FD FD

FD

FD

FD

FD

FDFD

FD

FD

FD

FD

FD

GREEN ROOF

GREEN ROOF

NEW ELEVATORROOF

NEWELEVATOR

ROOF

PROPERTY LINE

R.O.W.

SETBACK

SETBACK

PROPERTY LINE

EXISTINGROOF

EXISTINGELEVATOR

ROOF

ACH-1

NEW ROOFNEW ROOF

PATIO

OUTDOOR AMENITY AREA

OUTDOOR AMENITY AREA

OUTDOOR AMENITY AREA

PARKINGEXHAUST

ROOFLADDER

ROOFLADDER

GREEN ROOF

GREEN ROOF

GREEN ROOF

GREEN ROOF

GREEN ROOFGREEN ROOF

GREEN ROOF

NEW WEST WING ADDITION72'-1"

NEW EAST WING ADDITION67'-7"

EXISTING BUILDING RENOVATED93'-10"

N

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBIGroup is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and IBI Group shall be informed of any variations from

the dimensions and conditions shown on the drawing. Shop drawings shall besubmitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

File

Loca

tion :

1/8" = 1'-0"

C:\U

sers

\rob e

rt.hu

ang\

Doc

umen

ts\R

EVI

T201

6 \PG

PH-C

entra

l_r o

bert.

huan

g.rv

t6/

2/2 0

175:

5 6:2

0PM

ROOF PLAN

100787

RH

05/30/17

A107

POINT GREY PRIVATEHOSPITAL EXPANSION

PL

2423 Cornwall Ave, Vancouver, BC

Point Grey PrivateHospital Ltd.

700 - 1285 West Pender StreetVancouver, BC,Canadatel (604)687-8797 fax (604) 683-0492

IBI GROUP Architects (Canada) Inc.

NO. ISSUANCE STATUS DATE

1 2016/09/13ISSUED FOR 30% CD2 2016/10/07ISSUED FOR 50% CD3 2016/11/25ISSUED FOR 75% CD4 2017/01/27ISSUED FOR REZONING5 2017/01/27ISSUED FOR DE6 2017/06/05DE REVISION SUMMARY

Note: Green Roof deleted from existing building due to structural capacity of existing roof structure

Rooftop mechanical units and roof screens added

Skylight Modifications Small skylights deleted. One large skylight deleted. 3 medium size pyramidal skylights substituted.

Elevator shafts increased in height by 1.5 feet to accommodate elevator overrun

Note: No increase proposed in overall building height to top of roof parapet .

2017-06-06

Note: Proposed Building structure shifted west to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Note: Proposed building structure shifted east to preserve existing exterior wall and minimize impacts on PGPH residents during construction

Skylight Modifications Small skylights deleted. One large skylight deleted. 3 medium size pyramidal skylights substituted.

Rooftop mechanical units and roof screens added

Top of Roof Parapet Elev. 77.25 ft. Typical (No change Proposed)

Top of Roof Parapet Elev. 77.25 ft. Typical (No change Proposed)

Top of Roof Parapet Elev. 77.25 ft. Typical (No change Proposed)

Top of Roof Parapet Elev. 77.25 ft. Typical (No change Proposed)

Proposed Rezoning/Development Permit Revisions: Revised 2017 DP Proposal (2017-01-27) Compared to 2015 DP Drawings (2015-03-27)

Outline of new West Wing addition as per 2015 DP drawings

Outline of new East Wing addition as per 2015 DP drawings