Upload
buikien
View
217
Download
0
Embed Size (px)
Citation preview
B
U
T
T
E
R
F
L
Y
W
A
L
K
DE
NM
AR
K H
ILL
C
A
M
B
E
R
W
E
L
L
C
H
U
R
C
H
S
T
R
E
E
T
C
A
M
B
E
R
W
E
L
L
N
E
W
R
O
A
D
G
BUS STOP
SHELTER
BUS STOP
SHELTER
G
G
G
G
B
U
S
S
T
O
P
S
H
E
L
T
E
R
TIE INTO EXISTING
ROAD MARKINGS.
0.0
4.2
11.9
4.6
7.7
14.5
17.5
26.2
33.7
3.0
3.4
2.2
3.1
3.2
3.0
5.7
3.1
3.4
3.0
3.3
2.2
3.1
3.1
3.0
3.3
1.9
3.1
3.0
2.8
3.6
3.8
USE EXISTING GULLY (SOUTH WESTERN
CORNER) TO SET OUT NEW ROAD MARKINGS
EXTENTS MEASURING ALONG THE KERBLINE.
15.0
31.2
BUS STOP Q TO BE RELOCATED
PROPOSED LENGTH: 25M
N
3.0
3.0
1
.6
5.2
PROPOSED TfL DESIGN FOR DENMARK HILL
JUNCTION WITH CAMBERWELL NEW ROAD.
5.7
LEGEND / NOTES.
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2017. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.
ISO FULL BLEED A1 841 X 594 MM
PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER
B
APRIL 2017MAY 2016
KC
ABE
HP
HP
60343287-C0294-1200-01
FOR DISCUSSION
1:200 @ A1
60343287-C0294
SERIES 1200
ROAD MARKINGS & SIGNS
SHEET 1 OF 6
CAMBERWELL TOWN CENTRE
DENMARK HILL / ORPHEUS STREET
DETAILED DESIGN
\\U
KC
RD
1F
P001\U
KC
RD
1F
P001-V
1T
I\P
RO
JE
CT
S\T
RA
FF
IC
- S
OU
TH
WA
RK
H
AP
S 201415\06. LO
T C
P
RO
FE
SS
IO
NA
L S
ER
VIC
ES
\P
RO
JE
CT
S\C
0294 D
EN
MA
RK
H
ILL JW
O
RP
HE
US
S
T\50 C
AD
\60343287-C
0294-S
1200.D
WG
LEGEND / NOTES.
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER
FILE
_N
AM
E
DRAFT
Cut Line A
Cut Line A
NOTES
1. All dimensions are in metres unless otherwise stated.
2. The information shown on this drawing is based on a topographical
survey provided by LB Southwark.
3. This drawing is to be read in conjunction with all Conway-AECOM
drawings for job ref. C0294 as listed on the scheme document issue
sheet.
4. Traffic management is to be in accordance with Chapter 8 of the Traffic
Signs Manual and Safety at Street Works and Road Works.
5. Contractor to scan for services prior to excavation and refer to utility
information.
6. Contractor to maintain access to all properties and businesses at all
times.
7. All road markings and signs are to be installed in accordance with the DfT
Traffic Signs Manual - Chapter 5: 2003.
8. All road markings and signs are to be in accordance with the Traffic Signs
Regulations & General Directions (TSRGD) 2016.
9. All proportions and forms of letters, numerals and other characters are to
be in accordance with Schedule 17 of the TSRGD 2016.
10. Single/double yellow and red lines to be offset a minimum of 250mm from
kerb edge.
11. All street furniture except lighting columns should be set a minimum of
450mm from the kerb face.
12. Refer to SSDM/TDR drawing LBS /C/030, Detail E (Sheet 3 OF 3) for
surface finishes around sign post bases.
KEY
SITE EXTENTS.
NEW KERBS.
NEW ROAD MARKINGS
ROAD MARKINGS REFERENCE. FOR DETAILS REFER TO
TABLE 1.
EXISTING UTILITY COVERS.
EXISTING GULLY.
NEW KERB INLET GULLY.
EXISTING LAMP COLUMN.
NEW CYCLE RACKS.
G
AGBJEHPREVISED ROAD MARKINGS03/04/2017A
AGBJEHP24/05/2017B
REVISED ROAD MARKINGS & ADDED SB BUS LANE.
APPENDIX E
DENMARK HILL
O
R
P
H
E
U
S
S
T
R
E
E
T
D
A
N
E
V
I
L
L
E
R
O
A
D
DE
NM
AR
K H
ILL
G
M
I
L
K
W
E
L
L
Y
A
R
D
C
O
L
D
H
A
R
B
O
U
R
L
A
N
E
G
G
G
G
G
BUS STOP
SHELTER
BUS STOP
SHELTER
G
G
G
G
G
G
G
G
G
G
G
B
2.9
0.0
31.3
3.0
6.1
3.1
2.9
2.9
3.1
3.0
3.0
3.0
3.0
1.9
0.0
7.114.8
24.1
37.0
52.6
57.6
29.0
USE EXISTING GULLY (SOUTH EASTERN
CORNER) TO SET OUT NEW ROAD MARKINGS
EXTENTS MEASURING ALONG THE KERBLINE.
5
.0
2
.7
28.2
5
.0
2
.7
37.1
41.2
54.4
57.8
2
.
0
2
.
0
USE EXISTING GULLY (SOUTH WEST
CORNER) TO SET OUT NEW ROAD
MARKINGS EXTENTS MEASURING
ALONG THE KERBLINE.
4.5
26.3
0.0
3.2
L
O
A
D
I
N
G
O
N
L
Y
25.8
3.0
D
I
S
A
B
L
E
D
34.5
44.3
2
.0
2
.0
53.1
0.0
3.0
4
.
0
3
.
0
3
.
2
3
.2
4
.
5
4
.
1
N
1
.
5
3
.
4
2.9
2.9
3.0
9.4
4.6
LEGEND / NOTES.
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2017. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.
ISO FULL BLEED A1 841 X 594 MM
PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER
B
APRIL 2017MAY 2016
KC
ABE
HP
HP
60343287-C0294-1200-02
FOR DISCUSSION
1:200 @ A1
60343287-C0294
SERIES 1200
ROAD MARKINGS & SIGNS
SHEET 2 OF 6
CAMBERWELL TOWN CENTRE
DENMARK HILL / ORPHEUS STREET
DETAILED DESIGN
\\U
KC
RD
1F
P0
01
\U
KC
RD
1F
P0
01
-V
1T
I\P
RO
JE
CT
S\T
RA
FF
IC
- S
OU
TH
WA
RK
H
AP
S 2
01
41
5\0
6. L
OT
C
P
RO
FE
SS
IO
NA
L S
ER
VIC
ES
\P
RO
JE
CT
S\C
02
94
D
EN
MA
RK
H
IL
L JW
O
RP
HE
US
S
T\5
0 C
AD
\6
03
43
28
7-C
02
94
-S
12
00
.D
WG
LEGEND / NOTES.
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER
FIL
E_
NA
ME
DRAFTCu
t L
in
e B
Cu
t L
in
e B
Cu
t L
in
e A
Cu
t L
in
e A
NOTES
KEY
1. All dimensions are in metres unless otherwise stated.
2. The information shown on this drawing is based on a topographical
survey provided by LB Southwark.
3. This drawing is to be read in conjunction with all Conway-AECOM
drawings for job ref. C0294 as listed on the scheme document issue
sheet.
4. Traffic management is to be in accordance with Chapter 8 of the Traffic
Signs Manual and Safety at Street Works and Road Works.
5. Contractor to scan for services prior to excavation and refer to utility
information.
6. Contractor to maintain access to all properties and businesses at all
times.
7. All road markings and signs are to be installed in accordance with the DfT
Traffic Signs Manual - Chapter 5: 2003.
8. All road markings and signs are to be in accordance with the Traffic Signs
Regulations & General Directions (TSRGD) 2016.
9. All proportions and forms of letters, numerals and other characters are to
be in accordance with Schedule 17 of the TSRGD 2016.
10. Single/double yellow and red lines to be offset a minimum of 250mm from
kerb edge.
11. All street furniture except lighting columns should be set a minimum of
450mm from the kerb face.
12. Refer to SSDM/TDR drawing LBS /C/030, Detail E (Sheet 3 OF 3) for
surface finishes around sign post bases.
SITE EXTENTS.
NEW KERBS.
NEW ROAD MARKINGS
ROAD MARKINGS REFERENCE. FOR DETAILS REFER TO
TABLE 1.
EXISTING UTILITY COVERS.
EXISTING GULLY.
NEW KERB INLET GULLY.
EXISTING LAMP COLUMN.
NEW CYCLE RACKS.
G
AGBJEHPREVISED ROAD MARKINGS03/04/2017A
REVISED ROAD MARKINGS & ADDED SB BUS LANE.B 24/05/2017 HP JE AGB
LO
VE
W
ALK
S
E
L
B
O
R
N
E
R
O
A
D
G
BUS STOP
SHELTER
DENMARK HILL
G
3.2
3.1
3.9
3.2
3.3
3.7
TIE INTO EXISTING
ROAD MARKINGS.
16.5
0.0
11.5
26.8
6.1
5.0
3.1
3.1
5.0
3.1
3.1
5.0
0.0
9.9
22.8
37.0
3.2
3.1
3.9
3.0
3.9
3.1
3.2
3.2
3.3
3.7
3.1
3.3
3.8
6.63.0
19.3
23.8
48.2
54.8
60.5
25.628.0
62.3
10.5
BUS STOP V
PROPOSED LENGTH: 37M
N
TO BE COORDINATED WITH WORKS
AT SELBORNE ROAD AS PART OF
CAMBERWELL POCKET PLACES.
LO
VE
W
ALK
BUS STOP
SHELTER
DE
NM
AR
K H
ILL
G
G
GG
3.2
3.3
3.7
TIE INTO EXISTING
ROAD MARKINGS.
TIE INTO EXISTING
ROAD MARKINGS.
TIE INTO EXISTING
ROAD MARKINGS.
0.0
USE EXISTING GULLY
(SOUTHERN SIDE) TO SET OUT
NEW ROAD MARKINGS EXTENTS.
3.2
3.3
3.7
3.1
3.3
3.8
6.63.0
19.3
23.8
48.2
54.8
60.5
25.628.0
62.3
10.5
3.6
3.5
3.4
N
LEGEND / NOTES.
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2017. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.
ISO FULL BLEED A1 841 X 594 MM
PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER
B
APRIL 2017MAY 2016
KC
ABE
HP
HP
60343287-C0294-1200-03
FOR DISCUSSION
1:200 @ A1
60343287-C0294
SERIES 1200
ROAD MARKINGS & SIGNS
SHEET 3 OF 6
CAMBERWELL TOWN CENTRE
DENMARK HILL / ORPHEUS STREET
DETAILED DESIGN
\\U
KC
RD
1F
P0
01
\U
KC
RD
1F
P0
01
-V
1T
I\P
RO
JE
CT
S\T
RA
FF
IC
- S
OU
TH
WA
RK
H
AP
S 2
01
41
5\0
6. L
OT
C
P
RO
FE
SS
IO
NA
L S
ER
VIC
ES
\P
RO
JE
CT
S\C
02
94
D
EN
MA
RK
H
IL
L JW
O
RP
HE
US
S
T\5
0 C
AD
\6
03
43
28
7-C
02
94
-S
12
00
.D
WG
LEGEND / NOTES.
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2016. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.
PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER
FIL
E_
NA
ME
DRAFT
NOTES
KEY
1. All dimensions are in metres unless otherwise stated.
2. The information shown on this drawing is based on a topographical
survey provided by LB Southwark.
3. This drawing is to be read in conjunction with all Conway-AECOM
drawings for job ref. C0294 as listed on the scheme document issue
sheet.
4. Traffic management is to be in accordance with Chapter 8 of the Traffic
Signs Manual and Safety at Street Works and Road Works.
5. Contractor to scan for services prior to excavation and refer to utility
information.
6. Contractor to maintain access to all properties and businesses at all
times.
7. All road markings and signs are to be installed in accordance with the DfT
Traffic Signs Manual - Chapter 5: 2003.
8. All road markings and signs are to be in accordance with the Traffic Signs
Regulations & General Directions (TSRGD) 2016.
9. All proportions and forms of letters, numerals and other characters are to
be in accordance with Schedule 17 of the TSRGD 2016.
10. Single/double yellow and red lines to be offset a minimum of 250mm from
kerb edge.
11. All street furniture except lighting columns should be set a minimum of
450mm from the kerb face.
12. Refer to SSDM/TDR drawing LBS /C/030, Detail E (Sheet 3 OF 3) for
surface finishes around sign post bases.
SITE EXTENTS.
NEW KERBS.
NEW ROAD MARKINGS
ROAD MARKINGS REFERENCE. FOR DETAILS REFER TO
TABLE 1.
EXISTING UTILITY COVERS.
EXISTING GULLY.
NEW KERB INLET GULLY.
EXISTING LAMP COLUMN.
NEW CYCLE RACKS.
G
AGBJEHPREVISED ROAD MARKINGS03/04/2017A
Cu
t L
in
e C
Cu
t L
in
e C
Cu
t L
in
e C
Cu
t L
in
e C
Cu
t L
in
e C
Cu
t L
in
e C
AGBJEHP24/05/2017
B
Cu
t L
in
e B
Cu
t L
in
e B
REVISED ROAD MARKINGS & ADDED SB BUS LANE.