Upload
norm
View
59
Download
0
Embed Size (px)
DESCRIPTION
NFV Updates. Deepanshu Gautam. MANO Descriptors. TOSCA is expected to support all!!!. NFV recommends TOSCA. ACCEPTED (Work in Progress). IMS MRF using TOSCA. ACCEPTED. IMS MRF use case. In Black: TOSCA constructs In red : mapping NFV requirements. - PowerPoint PPT Presentation
Citation preview
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
24.Oct 2013
www.huawei.com
Security Level: Alpha
NFV Updates
Deepanshu Gautam
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
MANO Descriptors
Page 2
TOSCA is expected to support all!!!
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
NFV recommends TOSCA
Page 3
ACCEPTED
(Work in Progress)
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
IMS MRF using TOSCA
Page 4
ACCEPTED
In Black: TOSCA constructsIn red: mapping NFV requirementsNote: Refer to the attached document for detailed
IMS MRF Service Template
IMS MRF use case
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
TOSCA for MANO Descriptors
Page 5
TOSCA Service Template TOSCA NodeType Note yet defined ???
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
VNF Forwarding Graph
Page 6
Virtual Link (VL)The VLD describes the basic topology of the connectivity (e.g. ELAN, ELINE, ETREE) between one or more VNFs connected to this VL, bandwidth and QoS class, IP address and VLAN allocation), and additional information (e.g. location, anti-affinity rules etc.).
Work in Progress
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
VLD
Page 7
The VLD describes the basic topology of the connectivity (e.g. ELAN, ELINE, ETREE) between one or more VNFs connected to this VL, the required parameters for each interface (e.g. bandwidth and QoS class, IP address and VLAN allocation)
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
Next meeting (13-16 May)
• Okinawa
• WG specifications will be stable after Okinawa
• WG will be approved on 18 June
• NFV Phase 1 release approval Dec 2014
• NFV Phase 2 initiation Feb 2015
• Phase 2 proposal under discussion already
Page 8
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
Conclusions
• Liaison statement from TC is received by ETSI NFV Support
• The Liaison will be discussed in Okinawa meeting
• ISG will also appoint an ISG liaison officer for OASIS
• Gap Analysis work in ETSI has deferred to post Okinawa.
• A new EG will be formed which will consolidate input from all WGs
and create a single report to be shared externally.
• TC is requested to look into NFVs requirements and see how
TOSCA can support them and how.
Page 9
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
Current MANO Architecture
Page 10
Current NFV Architecture
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
Timeline
Page 11
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
NOIP (NFV OpenSource)
Page 12
NFV Open Source project is proposed to be governed by Linux Foundation
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public
Membership
Page 13