TECHNICAL FEASIBILITY
1. Product
a. Description and specifications of the product, including weight, size, and physical
and chemical properties.
The products are custom made jewellery ranging from earrings to necklaces
and more. The jewellery is made from gold, silver, platinum and gems which
are designed by in house designers.
The jewellery thus designed varies in terms of proportions of various materials used
depending upon the specification and budget of the customers.
BIS certification to be obtained to ascertain quality to customers.
2. Manufacturing Process
a. Description of the process, flow chart, and normal duration of the process
8/9/2019 NEW Kanika Technical Feasibility
2/6
b. Proof of reliability and superiority of the processing alternative processes considered,
and factors used in determining the process to be employed.
Raw material and the finished jewellery to be tested by government approved testing
labs for certifying gold and diamond carats.
c. Processes used in existing plants and in other new projects in the US and abroad
Other method used in jewellery making.
Lost Wax Casting
Methods Of Setting Gem Stones
Finishing Procedures and Polishing
Gold and Silver Soldering
Repouss and Chasing
Patination Of Metals
Forging Basic Synclastic and Anticlasting Forming
3. Plant size and production schedule
a. Rated annual and daily plant capacity, at a given number of shifts per day and number
of operating days per year.
Number of working days in a year are 310 days and working in one shift. Time taken
to manufacture jewellery depends upon the kind of jewellery item to be produced, e.g.
a gold ring takes 3-4 days of processing while a necklace could take upto a month of
processing.
b. Expected annual production volume for the next five years
The expected annual production of some articles is as follows:
Gold rings- 1800/annum
8/9/2019 NEW Kanika Technical Feasibility
3/6
Necklaces- 50/annum
Gold Chains 2500/annum
4. Machinery (major, and auxiliary as transport, materials handling, and standby units)
a. Specifications and functions; rated capacities and balancing, engineering firm which
prepared the specifications
Induction Melter (Citizen Induction Melter)
Technical Specifications
MODEL CMI 0.5
Capacity 0.5 kg
Power Supply 230 V Single Phase
Power Consumption 2kW
Maximum Temperature 1200C
Temperature Time 10 mins.
Dimensions (inch) 20x14x15
Weight 30 Kg
Laser Welder (Citizen Laser Welder)
Technical Specifications
MODEL CLW 100J
Laser source type Nd:YAG
Max. pulse energy 0.5 - 100 Jouels
Max. peak power 5.0kW
Average pulse energy 80 W
Laser safety class (internal) 4
Wavelength 1064 nm
Pulse duration 0.5-10 ms
Pulse frequency 0.5-10 Hz
Spot diameter 0.2 2. mm
Focusing optics Stereomicroscope with antidazzle
proetection
Laser cooling system External water chillers
Power Supply 220 V / 50 Hz / single phase / 25 amps.
380V/50 Hz 3phase, 13 amps.
Dimensions (machine) 1030L x 470W x 1200 H (mm)
8/9/2019 NEW Kanika Technical Feasibility
4/6
Dimensions (chillers) 620L x 470W x 670H (mm)
Weight, nett / gross 190/230 kgs.
Cutting Machine
Metal Cutting & Engraving Machine
Size (W)390*(H)360*(D)310mm
Max. Engraving Area (W)200*(D)120mm
Tool 2.4, 3, 4, 6mm
Weight 24.6kq
Resolution XY 0.005mm, Z: 0.0015mm
RPM 23.000RPM
Power 100-240V, 50/60Hz
b. Availability of spare parts and repair services
Spares and repair services are readily provided by the original manufacturers.
c. Reliability of the suppliers and machinery guarantees
The suppliers or the manufacturers of the machines should be either ISO certified or certified
by any other institution.
d. Delivery, payments, and other arrangements with suppliers
Delivery of raw materials is done by the suppliers through vehicles accompanied by security
personnel and the delivery is made hand to hand.
5. Plant location
a. Plant location; location map
Plant to be situated in Dhanlaxmi Estate, Shahibaag.
8/9/2019 NEW Kanika Technical Feasibility
5/6
6. Structures
a. Buildings - area, specification and built-in utitilies and airconditioning facilities
Buildings
The building will be divided in to four sections Vault for storing raw materials
and finished product, manufacturing facility, design studio and general office.
The building would be spread in 2500 sq. ft of area of which 1500 sq.ft would be
utilized for manufacturing purpose, while 400 sq.ft. would be utilized for Vault
and rest 600 sq. ft. Is to be utilized for office and design studio.
The plant would have air handling units to remove metal particulates from the air
and air conditioning units to provide protection to the workers from heat
b. Other facilities
The plant would have waste disposal and effluent treatment system for water
waste generated from the manufacturing process. The metals would be
recollected from the waste using suitable technology.
7. Raw Materials
a. Specifications or description (physical and chemical)
Gold- It is available in the form of bullions in the international and national
markets. The quality of gold is measured in karats highest karats being 24. The
gold bars may range from 1gm to 1 kg. The gold bars will be purchased from
various nationalized banks which are authorized by government to sell gold bars.
Also it can be purchased from Mineral and Metals Trading Corporation (MMTC).
Silver- It is also available in the form of bullions in the international and national
markets. The quality of silver is represented in terms of percentages. Silver forms
alloy with many other metals, thus many types of silver are available such as
german silver, Mexican silver, fine silver, etc. The size of silver bars may range
from 1 ounce to 1000 ounces. Silver would be purchased from banks.
8/9/2019 NEW Kanika Technical Feasibility
6/6
Platinum- The purity of Platinum is calculated in terms of Plat (pt). The general
accepted standard for Platinum of 95% pure platinum (950 pt). The size of a
platinum bar is 10 ounces provided by Monex Precious Metals, Caifornia, USA.
b. Quatity of raw materials required per annum materials
Gold 25 kg
Silver 120 kg
Platinum 1 Kg
Diamonds 6000 pieces
c. Suppliers reliability, and arrangements as to delivery and payments
The suppliers of raw materials are to be government approved so that the
material that is purchased is completely legal and quality can be assured of.
d. Current costs of raw materials
Gold `18735/10 gm
Silver - ` 30020/ kg
Platinum - ` 25734/10 gm
8. Utilities
a. Electricity
1. Used in Machines (induction melter, laser welding,
Cutting machine, rolling machine)
2. Quantity required 5000 units/ month
3.Peak Power Load 10 KW
4. Availability 24 hr/day
5. Sources Torrent Power Ltd.
6. Reason for the choice of
source
Largest supplier of electricity in the area
7. Relaibility of the source Almost nil Downtime since last many years
8. Alternative souces
considered
Diesel Gensets
9. Cost Rs.7/ unit