11
New Community Center City of Burlingame April 20, 2020 CITY COUNCIL

New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

New

Community Center

City of Burlingame

April 20, 2020

CITY COUNCIL

Page 2: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

SITE INTEGRATION OPTIONS

AGENDA

1. Project Update

2. Fiscal Impact

3. Recommendation

Page 3: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 3

EXTERIOR RENDERING

C1 C2 C3

ENTRY FROM BURLINGAME AVE

Page 4: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 4

INTERIOR RENDERING

C1 C2 C3*Final Furniture, Fabrics and Paint colors to be selected

CREATIVE ARTS STUDIO

Page 5: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 5

INTERIOR RENDERING

C1 C2 C3*Final Furniture, Fabrics and Paint colors to be selected

ACTIVE LOUNGE

Page 6: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 6

INTERIOR RENDERING

C1 C2 C3*Final Furniture, Fabrics and Paint colors to be selected

FINE ART

Page 7: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 7

FISCAL IMPACT

C1 C2 C3

Construction Contract $39,967,000

Furniture, Fixtures, & Equipment $559,057

Architectural Team $3,610,202

Photovoltaic Panels $1,129,156

Construction Manager $917,950

Utility and Connection Fees $92,500

Legal Ads $6,864

Temporary Facilities $430,108

Special Inspection & Testing $327,250

Environmental Fees $38,766

Planning & Building Fees $53,799

Construction Contingency $5,000,000

Architectural Contingency $125,951

Total $52,258,603

The following are the estimated total project

expenditures without the add-alternates:

Remaining estimated cost to

complete the project:

$49,571,800Including the photovoltaic panels

Page 8: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 8

RECOMMENDATIONS

C1 C2 C3

Company Name Base BidAdd. Alt. 1

EXT. TOEKICK

LIGHTING

Add. Alt. 2

KIDS TOWN

GREEN ROOF

Add. Alt 3

INT. LINEAR

METAL CEILINGS

Add. Alt 4

ENRICHMENT

CLASSROOM

PARTITION

1. BHM Construction, Inc $39,967,000 $19,000 $112,000 0 $40,000

2. Alten Construction $41,586,000 $45,000 $122,000 -$91,000 $15,000

3. Amoroso Construction $42,777,000 $30,000 $160,000 -$50,000 $40,000

Engineer’s estimate of $41,030,829.

BHM Construction= lowest responsible bidder= 2.5% below Engineer’s estimate.

Staff recommends that the City Council adopt the resolution authorizing the

City Manager to execute an Agreement with BHM Construction, Inc. for the

construction of the new Community Center, City Project #83240, at a cost of

$39,967,000.

Page 9: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 9

• Pavilion Terraces:

• CCT = 3000K

• Toe-kick lighting at seatwalls (recessed in channel)

ADD. ALTERNATE 1

EXTERIOR SEATWALL TOE KICK LIGHTING

Page 10: New Community Center - Burlingame, California€¦ · 04.20.2020 8 BURLINGAME COMMUNITY CENTER RECOMMENDATIONS C1 C2 C3 Company Name Base Bid Add. Alt. 1 EXT. TOEKICK LIGHTING Add

B U R L I N G A M E C O M M U N I T Y C E N T E R0 4 . 2 0 . 2 0 2 0 1 0

BASE BID

WOOD-LOOK METAL GRILLE

WITH ACOUSTIC BACKING*

ADD ALT.

WOOD GRILLE WITH

ACOUSTIC BACKING*

* IMAGE FOR REFERENCE; FINISH TO MATCH ARCH. SAMPLE

ADD. ALTERNATE 3

INTERIOR LINEAR METAL CEILINGS